[go: up one dir, main page]

WO2017056842A1 - ヒートパイプ、放熱部品、ヒートパイプの製造方法 - Google Patents

ヒートパイプ、放熱部品、ヒートパイプの製造方法 Download PDF

Info

Publication number
WO2017056842A1
WO2017056842A1 PCT/JP2016/075615 JP2016075615W WO2017056842A1 WO 2017056842 A1 WO2017056842 A1 WO 2017056842A1 JP 2016075615 W JP2016075615 W JP 2016075615W WO 2017056842 A1 WO2017056842 A1 WO 2017056842A1
Authority
WO
WIPO (PCT)
Prior art keywords
metal
heat pipe
pipe
intermetallic compound
porous wick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2016/075615
Other languages
English (en)
French (fr)
Inventor
鷲塚清多郎
川口義博
北村隆司
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Manufacturing Co Ltd
Original Assignee
Murata Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Manufacturing Co Ltd filed Critical Murata Manufacturing Co Ltd
Priority to CN201680040550.3A priority Critical patent/CN107850400B/zh
Priority to JP2017543047A priority patent/JP6528852B2/ja
Publication of WO2017056842A1 publication Critical patent/WO2017056842A1/ja
Priority to US15/864,369 priority patent/US10591223B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D15/00Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies
    • F28D15/02Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes
    • F28D15/04Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes with tubes having a capillary structure
    • F28D15/046Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes with tubes having a capillary structure characterised by the material or the construction of the capillary structure
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C24/00Coating starting from inorganic powder
    • C23C24/08Coating starting from inorganic powder by application of heat or pressure and heat
    • C23C24/10Coating starting from inorganic powder by application of heat or pressure and heat with intermediate formation of a liquid phase in the layer
    • C23C24/103Coating with metallic material, i.e. metals or metal alloys, optionally comprising hard particles, e.g. oxides, carbides or nitrides
    • C23C24/106Coating with metal alloys or metal elements only
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D15/00Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies
    • F28D15/02Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes
    • F28D15/0283Means for filling or sealing heat pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F19/00Preventing the formation of deposits or corrosion, e.g. by using filters or scrapers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F21/00Constructions of heat-exchange apparatus characterised by the selection of particular materials
    • F28F21/08Constructions of heat-exchange apparatus characterised by the selection of particular materials of metal
    • F28F21/081Heat exchange elements made from metals or metal alloys
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F21/00Constructions of heat-exchange apparatus characterised by the selection of particular materials
    • F28F21/08Constructions of heat-exchange apparatus characterised by the selection of particular materials of metal
    • F28F21/081Heat exchange elements made from metals or metal alloys
    • F28F21/085Heat exchange elements made from metals or metal alloys from copper or copper alloys
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D21/00Heat-exchange apparatus not covered by any of the groups F28D1/00 - F28D20/00
    • F28D2021/0019Other heat exchangers for particular applications; Heat exchange systems not otherwise provided for
    • F28D2021/0028Other heat exchangers for particular applications; Heat exchange systems not otherwise provided for for cooling heat generating elements, e.g. for cooling electronic components or electric devices

Definitions

  • the present invention relates to a heat pipe, a heat dissipating part including the heat pipe, and a method for manufacturing the heat pipe.
  • Patent Document 1 discloses a heat pipe including a pipe housing and a porous wick. Both ends in the longitudinal direction of the pipe housing constitute a heating part that is heated by contacting the heating element and a cooling part that is naturally cooled, for example.
  • the pipe housing encloses the hydraulic fluid.
  • the hydraulic fluid is composed of a substance that undergoes phase transformation at a predetermined temperature.
  • the hydraulic fluid is, for example, water, alcohols, ammonia water, or the like.
  • the porous wick has a plurality of holes and generates a capillary force against the working fluid.
  • the porous wick is provided inside the pipe casing. Thereby, the pipe housing and the porous wick form a cavity extending in the longitudinal direction of the pipe housing. The cavity communicates with the plurality of holes.
  • the porous wick connects the heating unit and the cooling unit in the pipe casing.
  • the porous wick is composed of a sintered body in which copper particles are sintered inside a pipe housing.
  • the working fluid is evaporated by the heat of the heating element in the heating unit to become a gas.
  • the gas passes through the cavity and moves to the cooling unit, and is radiated and liquefied by the cooling unit.
  • the liquefied hydraulic fluid penetrates into the porous wick.
  • the hydraulic fluid is refluxed from the cooling unit to the heating unit by the capillary force generated by the porous wick.
  • the heat pipe of patent document 1 cools a heat generating body.
  • the porous wick is configured by sintering copper particles inside the pipe housing. Therefore, the pipe housing needs to be heated to a temperature slightly lower than the melting point (1084 ° C.) of the copper particles.
  • the pipe housing is generally sealed by welding or brazing. Therefore, the pipe housing needs to be heated to a high temperature (for example, 450 ° C. in the case of brazing).
  • An object of the present invention is to provide a heat pipe, a heat radiating component, and a method of manufacturing a heat pipe that can greatly suppress deterioration of a pipe housing.
  • the heat pipe of the present invention includes a pipe casing and a porous wick.
  • a hydraulic fluid is enclosed in the pipe casing.
  • the porous wick is provided inside the pipe casing.
  • the porous wick includes an intermetallic compound containing at least a first metal and a second metal having a melting point higher than that of the first metal.
  • the porous wick may be made of a material containing a first metal, a second metal, and an intermetallic compound.
  • the second metal is, for example, at least one alloy selected from the group consisting of a CuNi alloy, a CuMn alloy, a CuAl alloy, and a CuCr alloy.
  • the first metal is, for example, at least one metal selected from the group consisting of Sn or Sn-based alloys.
  • the melting point of Sn is 231.9 ° C.
  • the heat pipe having this configuration can obtain the porous wick inside the pipe housing at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe having this configuration can suppress deterioration of the pipe housing.
  • the heat pipe of the present invention includes a pipe housing, a wick, and a sealing member.
  • a hydraulic fluid is enclosed in the pipe casing.
  • the wick is provided inside the pipe casing.
  • the sealing member seals the pipe housing.
  • the sealing member seals the end of the pipe housing.
  • the sealing member includes an intermetallic compound containing at least a first metal and a second metal having a melting point higher than that of the first metal.
  • the sealing member may be comprised with the material containing a 1st metal and an intermetallic compound.
  • the second metal is, for example, at least one alloy selected from the group consisting of a CuNi alloy, a CuMn alloy, a CuAl alloy, and a CuCr alloy.
  • the first metal is, for example, at least one metal selected from the group consisting of Sn or Sn-based alloys.
  • the melting point of Sn is 231.9 ° C.
  • the heat pipe having this configuration can obtain the sealing member at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe having this configuration can suppress deterioration of the pipe housing.
  • the heat dissipating component of the present invention includes the heat pipe of the present invention. Therefore, the heat dissipation component of the present invention has the same effect as the heat pipe of the present invention.
  • the heat pipe manufacturing method of the present invention includes an installation step and a heating step.
  • the metal composition is provided inside the pipe casing.
  • the metal composition includes a first metal and a second metal having a melting point higher than that of the first metal.
  • the metal composition preferably contains a flux.
  • the heating step for example, the metal composition is heated to a temperature within the range of the melting point of the first metal to the melting point of the second metal to form a porous wick inside the pipe casing.
  • the porous wick is made of a material containing an intermetallic compound generated by a reaction between the first metal and the second metal.
  • the metal composition is in a paste form, and the installation step may be a step of applying the metal composition to the inside of the pipe casing.
  • This heat pipe manufacturing method is a method for manufacturing the heat pipe of the present invention including the porous wick described above. Therefore, the manufacturing method of the heat pipe of this invention has the same effect as the heat pipe of this invention provided with the above-mentioned porous wick.
  • the heat pipe manufacturing method of the present invention includes an installation step and a heating step.
  • the metal composition is provided at the end of the pipe housing.
  • the metal composition includes a first metal and a second metal having a melting point higher than that of the first metal.
  • the metal composition preferably contains a flux.
  • the heating step for example, the metal composition is heated to a temperature within the range of the melting point of the first metal to the melting point of the second metal, and the sealing member is formed at the end of the pipe casing.
  • the sealing member is made of a material containing an intermetallic compound generated by a reaction between the first metal and the second metal.
  • This heat pipe manufacturing method is a method for manufacturing the heat pipe of the present invention including the above-described sealing member. Therefore, the manufacturing method of the heat pipe of this invention has the same effect as the heat pipe of this invention provided with the above-mentioned sealing member.
  • the present invention can suppress deterioration of the pipe casing.
  • FIG. 6A is a cross-sectional view of the metal paste 105 prepared by the method for manufacturing the heat pipe 100 shown in FIG.
  • FIG. 6B is a cross-sectional view of the metal sheet 155 prepared by the method for manufacturing the heat pipe 100 shown in FIG.
  • FIG. 5 is an enlarged cross-sectional view showing a state of an intermetallic compound phase 109 generated from the metal paste 105 by the heating step shown in FIG. 4. It is an expanded sectional view which shows the mode of the intermetallic compound phase 119 produced
  • FIG. 1 is a perspective view showing an appearance of a heat pipe 100 according to the first embodiment of the present invention.
  • FIG. 2 is a cross-sectional view showing the first end 91 of the heat pipe 100 shown in FIG. 3 is a cross-sectional view showing a central portion 93 of the heat pipe 100 shown in FIG. 3 is a cross-sectional view taken along line SS shown in FIG.
  • the heat pipe 100 includes a pipe casing 90, a porous wick 30, and sealing members 191 and 192.
  • the heat pipe 100 is provided in a heat dissipation component and cools a heating element such as an electronic component.
  • the heat dissipating component is, for example, a heat sink or a heat spreader.
  • the pipe housing 90 has a cylindrical shape.
  • the pipe housing 90 has both end portions 91 and 92 in the longitudinal direction of the pipe housing 90 and a center portion 93 located between the both end portions 91 and 92.
  • the first end portion 91 of the pipe housing 90 constitutes a heating portion 91 that is heated by being in contact with the heating element, and the second end portion 92 constitutes a cooling portion 92 that is naturally cooled, for example.
  • the material of the pipe housing 90 is, for example, Cu.
  • Both end portions 91 and 92 of the pipe housing 90 are sealed with sealing members 191 and 192.
  • the sealing member 191 is configured by the first metal foil 116 and the intermetallic compound phase 119.
  • the sealing member 192 is also constituted by the first metal foil 116 and the intermetallic compound phase 119.
  • the configuration of the second end 92 is the same as the configuration of the first end 91, and the configuration of the sealing member 192 is the same as the configuration of the sealing member 191. Therefore, the description of the second end 92 and the sealing member 192 of the pipe housing 90 is omitted.
  • the pipe casing 90 encloses hydraulic fluid inside.
  • the hydraulic fluid is composed of a substance that undergoes phase transformation at a predetermined temperature.
  • the hydraulic fluid is, for example, water, alcohols, ammonia water, or the like.
  • the porous wick 30 has a plurality of holes 80 as shown in FIGS.
  • the plurality of holes 80 are basically open pores communicating with the outside of the porous wick 30.
  • the porosity of the porous wick 30 is, for example, 20 to 70%.
  • the porous wick 30 generates a capillary force with respect to the hydraulic fluid by the plurality of holes 80.
  • the porous wick 30 has a cylindrical shape.
  • the porous wick 30 is provided inside the pipe housing 90.
  • the porous wick 30 extends in the longitudinal direction of the pipe housing 90 and connects between the heating unit 91 and the cooling unit 92 in the pipe housing 90.
  • the pipe housing 90 and the porous wick 30 form a cavity 95 extending in the longitudinal direction of the pipe housing 90.
  • the cavity 95 communicates with the plurality of holes 80.
  • the porous wick 30 includes first metal particles 106, second metal particles 107, and an intermetallic compound phase 109.
  • the working fluid is evaporated by the heat of the heating element in the heating unit 91 to become a gas.
  • the gas passes through the cavity 95 and moves to the cooling unit 92 where it is radiated and liquefied by the cooling unit 92.
  • the liquefied hydraulic fluid penetrates into the plurality of holes 80 of the porous wick 30.
  • the hydraulic fluid is refluxed from the cooling unit 92 toward the heating unit 91 by the capillary force of the porous wick 30.
  • the heat pipe 100 cools the heating element.
  • FIGS. 2 and 3 the hole 80 in FIGS. 2 and 3 is schematically shown.
  • the porous wick 30 also has minute holes 80 that do not appear in FIGS. 2 and 3 and holes 80 at the particle interface level. Therefore, the hydraulic fluid can move in the longitudinal direction of the pipe housing 90 through the holes 80 in the porous wick 30.
  • the intermetallic compound phase 109 and the intermetallic compound phase 119 are phases composed of intermetallic compounds. Differences between the intermetallic compound phase 109 and the intermetallic compound phase 119 will be described later.
  • the intermetallic compound is composed of a first metal and a second metal.
  • the material of the first metal is Sn or an Sn-based alloy. Examples of the Sn-based alloy include a SnAgCu alloy, a SnAg alloy, a SnCu alloy, a SnBi alloy, a SnSb alloy, a SnAu alloy, a SnPb alloy, and a SnZn alloy.
  • the second metal is a metal that reacts with the molten first metal to generate an intermetallic compound.
  • the material of the second metal is at least one selected from the group consisting of a CuNi alloy, a CuMn alloy, a CuAl alloy, and a CuCr alloy.
  • the material of the intermetallic compound is, for example, (Cu, Ni) 6 Sn 5 , Cu 4 Ni 2 Sn 5 , Cu 5 NiSn 5 , (Cu, Ni) 3 Sn, CuNi 2 Sn, Cu 2 NiSn, or the like.
  • the melting point of the second metal is higher than that of the first metal.
  • the melting point of the intermetallic compound is higher than the melting point of the first metal.
  • the melting point of the intermetallic compound is, for example, 400 ° C. or higher.
  • the melting point of the first metal particles 106 is 231.9 ° C.
  • the 1st metal particle 106 and the 2nd metal particle 107 which are shown in FIG. 3 remain
  • the heat pipe 100 by heating at a temperature equal to or higher than the melting point of the first metal, the molten first metal and the second metal react, and an intermetallic compound composed of the first metal and the second metal becomes. Generated.
  • the intermetallic compound phase 109 produced by this reaction constitutes the porous wick 30.
  • the intermetallic compound phase 119 generated by this reaction constitutes the sealing members 191 and 192.
  • the heat pipe 100 can obtain the porous wick 30 inside the pipe housing 90 at a temperature extremely lower than the above-described sintering temperature. Similarly, the heat pipe 100 can obtain the sealing members 191 and 192 at both ends 91 and 92 of the pipe housing 90 at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe 100 and the heat dissipating component including the heat pipe 100 can suppress the deterioration of the pipe housing 90.
  • the intermetallic compound phase 109 has a high melting point (for example, 400 ° C. or higher). Therefore, the porous wick 30 composed of the intermetallic compound phase 109 has high heat resistance.
  • the intermetallic compound phase 119 also has a high melting point (for example, 400 ° C. or higher). Therefore, the sealing members 191 and 192 configured with the intermetallic compound phase 119 have high heat resistance.
  • the intermetallic compound has a melting point higher than that of the first metal, the porous wick 30 and the seal are sealed even when the heat pipe 100 is further mounted on another device, component, board, etc. by heating such as reflow.
  • the structure of the stop members 191 and 192 is not impaired, and the function of the heat pipe 100 can be maintained.
  • the heat pipe 100 shown above can be manufactured by the following manufacturing method, for example.
  • FIG. 4 is a flowchart showing a method for manufacturing the heat pipe 100 shown in FIG.
  • FIG. 5 is a perspective view showing the appearance of a pipe housing 90 prepared by the method for manufacturing the heat pipe 100 shown in FIG.
  • FIG. 6A is a cross-sectional view of the metal paste 105 prepared by the method for manufacturing the heat pipe 100 shown in FIG.
  • FIG. 6B is a cross-sectional view of the metal sheet 155 prepared by the method for manufacturing the heat pipe 100 shown in FIG.
  • FIG. 7 is a cross-sectional view showing the coating process shown in FIG.
  • FIG. 8 is a cross-sectional view showing the state of the attaching step shown in FIG. FIG.
  • FIG. 9 is an enlarged cross-sectional view showing a state of the intermetallic compound phase 109 generated from the metal paste 105 by the heating step shown in FIG.
  • FIG. 10 is an enlarged cross-sectional view showing a state of the intermetallic compound phase 119 generated from the metal sheet 155 by the heating step shown in FIG.
  • a pipe housing 90, a metal paste 105, and a metal sheet 155 are prepared.
  • Each of the metal paste 105 and the metal sheet 155 corresponds to an example of the metal composition of the present invention.
  • the metal paste 105 includes a metal component 110 and an organic component 108 as shown in FIG.
  • the metal component 110 includes first metal particles 106 and second metal particles 107.
  • the first metal particles 106 and the second metal particles 107 are uniformly dispersed in the organic component 108.
  • the metal sheet 155 is a sheet having a coating film 115 and a first metal foil 116 as shown in FIG.
  • the coating film 115 is a film in which the second metal particles 107 that are metal components are uniformly dispersed in the organic component 118.
  • the manufacturing method of the heat pipe 100 uses Sn for the material of the first metal particles 106 and uses a CuNi alloy for the material of the second metal particles 107.
  • a CuNi alloy is a material that reacts with molten Sn to produce a CuNiSn alloy that is an intermetallic compound.
  • the average particle diameter (D50) of the first metal particles 106 is preferably in the range of 1 to 100 ⁇ m.
  • the average particle diameter (D50) of the second metal particles 107 is preferably in the range of 0.1 to 30 ⁇ m.
  • the average particle size of the second metal particles 107 greatly affects the amount of intermetallic compound produced.
  • the average particle size (D50) means, for example, the particle size at an integrated value of 50% in the particle size distribution obtained by the laser diffraction / scattering method.
  • the average particle diameter of the first metal particles 106 is smaller than 1 ⁇ m, the surface area of the Sn particles increases. Therefore, more oxide is formed on the surface of the Sn particles, the wettability of the Sn particles with respect to the second metal particles 107 is lowered, and the generation reaction tends to be suppressed.
  • the average particle diameter of the first metal particles 106 is larger than 100 ⁇ m, the amount of Sn becomes excessive, and the porosity of the porous wick 30 may be remarkably lowered.
  • the average particle size of the second metal particles 107 is smaller than 0.1 ⁇ m, the surface area of the CuNi alloy particles increases. Therefore, more oxides are formed on the surface of the CuNi alloy particles, the wettability of the CuNi alloy particles with respect to molten Sn tends to be reduced, and the production reaction tends to be inhibited.
  • the average particle diameter of the second metal particles 107 is larger than 30 ⁇ m, the size of the gap between the CuNi alloy particles increases. Thereby, it cannot utilize for the production
  • the organic component 108 includes a flux, a solvent, a thixotropic agent, and the like.
  • the viscosity of the organic component 108 is lower than the viscosity of the organic component 118. Since the other configuration is the same as that of the organic component 108, the description of the organic component 118 is omitted.
  • Flux contains rosin and activator.
  • the flux fulfills a reducing function of removing oxide films on the surfaces of the pipe housing 90, the first metal particles 106, and the second metal particles 107.
  • the rosin is, for example, natural rosin, hydrogenated rosin, disproportionated rosin, polymerized rosin, rosin derivatives such as unsaturated dibasic acid-modified rosin, acrylic acid-modified rosin, or a mixture thereof.
  • rosin for example, polymerized rosin R-95 is used.
  • Activators also promote the flux reduction reaction.
  • Activators include, for example, monocarboxylic acids (eg, formic acid, acetic acid, lauric acid, palmitic acid, stearic acid, benzoic acid), dicarboxylic acids (eg, oxalic acid, malonic acid, succinic acid, glutaric acid, adipic acid, suberin) Acid, azelaic acid, sebacic acid, phthalic acid, etc.), bromoalcohols (eg, 1-bromo-2-butanol, etc.), organic amine hydrohalides, bromoalkanes, bromoalkenes, benzylbromides, polyamines And chlorinated activators.
  • adipic acid is used as the activator.
  • Solvent adjusts the viscosity of the metal paste 105. Similarly, the solvent adjusts the viscosity of the coating film 115 of the metal sheet 155.
  • the solvent include alcohols, ketones, esters, ethers, aromatics, and hydrocarbons.
  • HeDG hexyl diglycol
  • the thixotropic agent is maintained so that the metal component and the organic component are not separated after the metal component and the organic component are uniformly mixed.
  • thixotropic agents include hydrogenated castor oil, carnauba wax, amides, hydroxy fatty acids, dibenzylidene sorbitol, bis (p-methylbenzylidene) sorbitol, beeswax, stearamide, hydroxystearic acid ethylene bisamide, and the like.
  • the metal paste 105 and the metal sheet 155 include, as additives, Ag, Au, Al, Bi, C, Co, Cu, Fe, Ga, Ge, In, Mn, Mo, Ni, P, Pb, Pd, Pt, Si, Sb, Zn, or the like may be included. Further, the metal paste 105 and the metal sheet 155 may contain not only these additives but also metal complexes, metal compounds, and the like as additives.
  • the metal paste 105 is applied to the inner surface of the pipe housing 90 so as to have a uniform thickness (S1: application step). That is, in this coating process, the metal paste 105 is provided on the inner surface of the pipe housing 90 so as to have a uniform thickness.
  • the metal paste 105 can be applied to the inner surface of the pipe 90 by pumping the metal paste 105 to the pipe housing 90 with compressed air.
  • the metal sheet 155 is attached to the first end 91 of the pipe housing 90 as shown in FIG. 8. It sticks to the 1 end part 91 (S2: sticking process). That is, in this attaching step, the metal sheet 155 is provided on the first end 91 of the pipe housing 90.
  • the pipe housing 90 is heated using, for example, a reflow device (S3: heating step).
  • the heating step the metal paste 105 and the metal sheet 155 are heated to a temperature in the range from the melting point of Sn to the melting point of the CuNi alloy.
  • the melting point of Sn is 231.9 ° C.
  • the melting point of the CuNi alloy varies depending on the Ni content and is, for example, 1220 ° C. to 1300 ° C.
  • heating after preheating at 150 ° C. to 230 ° C., heating is performed at a heating temperature of 250 ° C. to 400 ° C. for 2 minutes to 10 minutes. The peak temperature is allowed to reach 400 ° C.
  • TLP bonding Transient LiquidLiPhase Diffusion Bonding
  • the metal sheet 155 reaches the melting point of Sn or higher by heating, the first metal foil 116 is melted.
  • an intermetallic compound phase 119 as shown in FIG. 10 is generated by the reaction between the molten Sn and the second metal particles 107.
  • This reaction is, for example, a reaction accompanying liquid phase diffusion bonding (“TLP bonding: Transient LiquidLiPhase Diffusion Bonding”).
  • the solvent contained in the organic components 108 and 118 volatilizes or evaporates between the start of heating in the heating step and the end of preheating.
  • the porous wick 30 is composed of the first metal particles 106, the second metal particles 107, and the intermetallic compound phase 109.
  • excess Sn flows to the outer periphery of the intermetallic compound phase 119 and covers the intermetallic compound phase 119 as shown in FIG. That is, excess Sn seals the pipe housing 90 more reliably.
  • the metal sheet 155 is affixed to the second end 92 of the pipe housing 90 in the same manner as the affixing process of S2 shown in FIG. 8 (S5: affixing process). That is, in this attaching step, the metal sheet 155 is provided on the second end portion 92 of the pipe housing 90.
  • the second end portion 92 of the pipe housing 90 is heated using, for example, a reflow device (S6: heating step).
  • a reflow device S6: heating step.
  • the metal sheet 155 attached to the second end 92 of the pipe housing 90 is heated to a temperature within the range of the melting point of Sn to the melting point of the CuNi alloy.
  • the melting point of Sn is 231.9 ° C.
  • the melting point of the CuNi alloy varies depending on the Ni content, and is, for example, 1220 ° C. to 1300 ° C. Therefore, in the heating step, for example, after preheating is performed at 150 ° C. to 230 ° C., heating is performed at a heating temperature of 250 ° C. to 400 ° C. for 2 minutes to 5 minutes. The peak temperature is allowed to reach 400 ° C.
  • the metal sheet 155 When the metal sheet 155 reaches or exceeds the melting point of Sn by heating, the first metal foil 116 is melted.
  • an intermetallic compound phase 119 as shown in FIG. 10 is generated by the reaction between the molten Sn and the second metal particles 107.
  • This reaction is, for example, a reaction accompanying liquid phase diffusion bonding (“TLP bonding: Transient LiquidLiPhase Diffusion Bonding”).
  • the solvent contained in the organic component 118 volatilizes or evaporates between the start of heating in the heating step and the end of preheating.
  • the sealing member 192 is obtained similarly to the sealing member 191 shown in FIG. After the reflow device stops heating, the sealing member 192 naturally cools to room temperature.
  • the heat pipe 100 is obtained by the above manufacturing method.
  • the porosity of the porous wick 30 is 60% (see FIG. 9).
  • the pore diameter of the porous wick 30 is not less than 1 ⁇ m and not more than 60 ⁇ m.
  • the thermal conductivity of the porous wick 30 is, for example, 21 to 23 (W / m ⁇ K).
  • the porosity of the sealing members 191 and 192 is 2% or less (see FIG. 10). In the present embodiment, the porosity is expressed as the volume of pores per unit volume (cm 3 ).
  • the second metal is a material that reacts with the first metal to generate an intermetallic compound.
  • the second metal is a CuNi alloy.
  • the first metal is Sn.
  • the melting point of Sn is 231.9 ° C.
  • the first metal melted by heating at a temperature equal to or higher than the melting point of the first metal reacts with the second metal to produce an intermetallic compound composed of the first metal and the second metal.
  • the intermetallic compound phase 109 produced by this reaction constitutes the porous wick 30.
  • the intermetallic compound phase 119 generated by this reaction constitutes the sealing members 191 and 192.
  • the manufacturing method of the heat pipe 100 can form the porous wick 30 in the pipe housing 90 at a temperature extremely lower than the above-described sintering temperature.
  • the sealing members 191 and 192 can be formed on both end portions 91 and 92 of the pipe housing 90 at a temperature extremely lower than the above-described sintering temperature.
  • the manufacturing method of the heat pipe 100 can suppress the deterioration of the pipe housing 90.
  • the intermetallic compound phase 109 has a high melting point (for example, 400 ° C. or higher). Therefore, the porous wick 30 created by the above manufacturing method has high heat resistance.
  • the intermetallic compound phase 119 has a high melting point (for example, 400 ° C. or higher). Therefore, the sealing members 191 and 192 created by the above manufacturing method have high heat resistance.
  • the intermetallic compound has a melting point higher than that of the first metal, the porous wick 30 and the seal are sealed even when the heat pipe 100 is further mounted on another device, component, board, etc. by heating such as reflow.
  • the structure of the stop members 191 and 192 is not impaired, and the function of the heat pipe 100 can be maintained.
  • the intermetallic compound phase 119 of the sealing members 191 and 192 has a dense structure with extremely low porosity (see FIG. 10). Therefore, the heat pipe 100 can reliably prevent the leakage of the working fluid enclosed in the pipe housing 90. Further, the sealing members 191 and 192 are excellent in impact resistance.
  • the manufacturing method of the heat pipe 100 is a porous material having a uniform thickness by simply applying the metal paste 105 to the inner surface of the pipe housing 90 to a uniform thickness even if the inner surface of the pipe housing 90 is curved.
  • the wick 30 can be obtained on the inner surface of the pipe housing 90.
  • the manufacturing method of the heat pipe 100 can form the porous wick 30 having a high porosity inside the pipe casing 90 (see FIG. 9). Therefore, the heat pipe 100 can have high liquid permeability and high capillary force. That is, the heat pipe 100 can have high thermal conductivity.
  • the manufacturing method of the heat pipe 100 adjusts the material used for the metal paste 105 or the metal sheet 155, the content of each material, the heating temperature, or the like, so that the pores of the porous wick 30 and the sealing members 191 and 192 are adjusted.
  • the rate can be set in the range of 1% to 80%.
  • the manufacturing method of the heat pipe 100 can improve the heat dissipation characteristics of the heat pipe 100 when the porosity of the porous wick 30 is set to 20% or more.
  • the manufacturing method of the heat pipe 100 can set the porosity of the porous wick 30 to 45% or more, and can realize a porosity that cannot be realized with a sintered body.
  • the manufacturing method of the heat pipe 100 sets the pore diameter of the porous wick 30 in the range of 1 ⁇ m or more and 100 ⁇ m or less by adjusting the material used for the metal paste 105 or the metal sheet 155, the content or the heating temperature. can do.
  • the pore diameter of the porous wick 30 is preferably smaller from the viewpoint of transportability by capillary action.
  • the pore diameter of the porous wick 30 is in the range of 5 ⁇ m to 40 ⁇ m, or 10 ⁇ m or more, depending on conditions such as the length, inclination, or specific gravity of the hydraulic fluid of the pipe housing 90. It can be set within a range of 30 ⁇ m or less.
  • FIG. 11 is a cross-sectional view showing a central portion of the heat pipe 200 according to the second embodiment of the present invention.
  • the difference between the heat pipe 200 and the heat pipe 100 is the shape of the pipe housing 290 and the porous wick 230.
  • the pipe housing 90 has a cylindrical shape, whereas the pipe housing 290 has a rectangular tube shape.
  • the porous wick 30 has a cylindrical shape, whereas the porous wick 230 has a rectangular parallelepiped shape.
  • the porous wick 230 extends in the longitudinal direction of the pipe housing 290 and connects the heating unit 91 and the cooling unit 92 in the pipe housing 290 in the same manner as the porous wick 30 shown in FIGS.
  • the pipe housing 290 and the porous wick 230 form a cavity 295 extending in the longitudinal direction of the pipe housing 290. Since other configurations are the same, description thereof is omitted.
  • FIG. 12 is a cross-sectional view showing a coating process performed by the method of manufacturing the heat pipe 200 shown in FIG.
  • the difference between the manufacturing method of the heat pipe 200 and the manufacturing method of the heat pipe 100 is the step S1 shown in FIG. Since other steps are the same, the description thereof is omitted.
  • the compact 205 is used instead of the metal paste 105.
  • the compact 205 includes first metal particles 106, second metal particles 107, and an organic component 218.
  • the viscosity of the organic component 218 is higher than the viscosity of the organic component 108. Since the other configuration is the same as that of the organic component 108, the description of the organic component 218 is omitted.
  • the compact body 205 is provided in the center part of the transversal direction of the pipe housing
  • the heat pipe 200 having the porous wick 230 at the center in the short direction of the pipe housing 290 is obtained.
  • the heat pipe 200 similarly to the heat pipe 100, by heating at a temperature equal to or higher than the melting point of the first metal, the molten first metal and the second metal react to form a metal composed of the first metal and the second metal. An intermetallic compound is produced.
  • the intermetallic compound phase 109 generated by this reaction constitutes the porous wick 230.
  • the heat pipe 200 can obtain the porous wick 230 in the pipe casing 290 at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe 200 and the heat dissipating component including the heat pipe 200 have the same effects as the heat pipe 100.
  • the manufacturing method of the heat pipe 200 has the same effect as the manufacturing method of the heat pipe 100.
  • FIG. 13 is a perspective view showing an appearance of a heat pipe 300 according to the third embodiment of the present invention.
  • the sealing members 191 and 192 are not shown for the sake of simplicity.
  • the difference between the heat pipe 300 and the heat pipe 100 is the shape of the pipe housing 390 and the porous wick 330.
  • the cross sections of the pipe housing 390 and the porous wick 330 are spiral.
  • Each of the pipe housing 390 and the porous wick 330 extends in the longitudinal direction of the pipe housing 390 with substantially the same cross-sectional shape.
  • the porous wick 330 connects the heating unit 391 and the cooling unit 392 in the pipe housing 390 in the same manner as the porous wick 30 illustrated in FIGS. 1 and 2.
  • the pipe housing 390 and the porous wick 330 form a cavity 395 extending in the longitudinal direction of the pipe housing 390. Since other configurations are the same as those of the heat pipe 100, description thereof is omitted.
  • FIG. 14 is a flowchart showing a method for manufacturing the heat pipe 300 shown in FIG.
  • FIG. 15 is a cross-sectional view showing the coating process shown in FIG.
  • FIG. 16 is a cross-sectional view showing the winding process shown in FIG.
  • the difference between the manufacturing method of the heat pipe 300 and the manufacturing method of the heat pipe 100 is that S1 shown in FIG. 4 is replaced with S31 to S33. Since other steps are the same, the description thereof is omitted.
  • a core material 396 and a foil 380 are prepared.
  • the material of the foil 380 is, for example, copper.
  • the metal paste 105 is apply
  • the foil 380 is wound around the core material 396 so that the surface of the foil 380 on which the metal paste 105 is provided is inside (FIG. 14: S32). Thereby, the metal paste 105 and the pipe housing 390 having a spiral cross section are obtained.
  • the metal sheet 155 is affixed to the first end 391 of the pipe housing 390 (S2: affixing step).
  • the pipe casing 390 is heated using, for example, a reflow apparatus (S3: heating step).
  • S3 heating step
  • the intermetallic compound phase 109 is generated by the reaction between the molten Sn and the second metal particles 107, and the porous wick 330 having a spiral cross section is obtained.
  • the core material 396 is removed from the porous wick 330 and the pipe housing 390 (FIG. 14: S33). As a result, the region where the core material 396 was present becomes the cavity 395.
  • the heat pipe 300 is obtained.
  • the heat pipe 300 similarly to the heat pipe 100, by heating at a temperature equal to or higher than the melting point of the first metal, the molten first metal and the second metal react to form a metal composed of the first metal and the second metal.
  • An intermetallic compound is produced.
  • the intermetallic compound phase 109 generated by this reaction constitutes the porous wick 330.
  • the heat pipe 300 can obtain the porous wick 330 inside the pipe housing 390 at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe 300 and the heat dissipating component including the heat pipe 300 have the same effects as the heat pipe 100.
  • the manufacturing method of the heat pipe 300 has the same effect as the manufacturing method of the heat pipe 100.
  • FIG. 17 is a cross-sectional view showing a central portion of a heat pipe 400 according to the fourth embodiment of the present invention.
  • the heat pipe 400 is obtained by replacing the porous wick 230 of the heat pipe 200 shown in FIG.
  • the stacked body 430 is obtained by stacking a foil 491, a porous wick 431, a foil 492, a porous wick 432, and a foil 493.
  • the pipe housing 290 and the laminate 430 form a cavity 495 extending in the longitudinal direction of the pipe housing 290. Since other configurations are the same, description thereof is omitted.
  • FIG. 18 is a flowchart showing a method for manufacturing the heat pipe 400 shown in FIG.
  • FIG. 19 is a perspective view showing the appearance of the plurality of foils 491, 492, and 493 prepared by the method for manufacturing the heat pipe 400 shown in FIG. 20 is a cross-sectional view showing the state of the stacking step shown in FIG.
  • FIG. 21 is a cross-sectional view showing the state of the insertion step shown in FIG.
  • the manufacturing method of the heat pipe 400 is obtained by replacing S1 shown in FIG. 4 with S41 to S43. Since other steps are the same, the description thereof is omitted.
  • a foil 491, a foil 492, and a foil 493 are prepared.
  • the foil 491 has a plurality of openings 440.
  • the foil 493 has a plurality of openings 440.
  • the material of the foil 491, the foil 492, and the foil 493 is, for example, copper.
  • the metal paste 105 is apply
  • a foil 491, a foil 492, and a foil 493 are stacked (FIG. 18: S42).
  • the laminated body of the foil 491, the foil 492, and the foil 493 is inserted into the pipe housing 290 (FIG. 18: S43).
  • the pipe casing 290 is heated using, for example, a reflow device (S3: heating step).
  • S3 heating step
  • the intermetallic compound phase 109 is generated by the reaction between the molten Sn and the second metal particles 107, and the porous wick 431 and the porous wick 432 are obtained.
  • the heat pipe 400 is obtained.
  • the heat pipe 400 similarly to the heat pipe 100, by heating at a temperature equal to or higher than the melting point of the first metal, the molten first metal reacts with the second metal, and the metal composed of the first metal and the second metal. An intermetallic compound is produced.
  • the intermetallic compound phase 109 generated by this reaction constitutes the porous wicks 431 and 432.
  • the heat pipe 400 can obtain the porous wicks 431 and 432 in the pipe housing 290 at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe 400 and the heat dissipating component including the heat pipe 400 have the same effects as the heat pipe 100.
  • the manufacturing method of the heat pipe 400 has the same effect as the manufacturing method of the heat pipe 100.
  • the manufacturing method of the heat pipe 400 uses three foils 491 to 493, but is not limited to this. In implementation, for example, three metal plates may be used. Further, the number of foils and metal plates to be laminated is not limited to three, and may be two or more.
  • FIG. 22 is a cross-sectional view showing a central portion of a heat pipe 500 according to the fifth embodiment of the present invention.
  • the heat pipe 500 is obtained by replacing the porous wick 230 of the heat pipe 200 shown in FIG. 11 with porous wicks 531 and 532.
  • the pipe housing 290 and the porous wicks 531 and 532 form a cavity 595 extending in the longitudinal direction of the pipe housing 290. Since other configurations are the same, description thereof is omitted.
  • FIG. 23 is a flowchart showing a method for manufacturing the heat pipe 500 shown in FIG.
  • FIG. 24 is a perspective view showing the appearance of the plurality of foils 591, 592, 593 and 594 prepared by the method for manufacturing the heat pipe 500 shown in FIG. 25 is a cross-sectional view showing the state of the stacking step shown in FIG.
  • a foil 591, a foil 592, a foil 593, and a foil 594 are prepared as shown in FIG.
  • the foil 592 has an opening 540.
  • the foil 593 has an opening 540.
  • the material of the foil 591, the foil 592, the foil 593, and the foil 594 is, for example, copper.
  • the metal paste 105 is applied to the surface of the foil 591 facing the foil 594 and the surface of the foil 594 facing the foil 591 (FIG. 23: S51).
  • the foil 591, the foil 592, the foil 593, and the foil 594 are stacked (FIG. 23: S52).
  • the laminate of the foil 591, the foil 592, the foil 593, and the foil 594 is heated using, for example, a reflow apparatus (FIG. 23: S53).
  • a reflow apparatus FIG. 23: S53
  • the intermetallic compound phase 109 is generated by the reaction between the molten Sn and the second metal particles 107, and the porous wicks 531 and 532 and the pipe housing 290 as shown in FIG. 22 are obtained.
  • the porous wicks 531 and 532 and the pipe housing 290 are naturally cooled to room temperature.
  • the laminated body 590 is a laminated body in which four foils are laminated. This joining is performed by, for example, heating after activating the joining surface of the second end 292 of the pipe housing 290 and the joining surface of the laminate 590.
  • the heat pipe 500 is obtained by the above manufacturing method.
  • the heat pipe 500 similarly to the heat pipe 100, by heating at a temperature equal to or higher than the melting point of the first metal, the molten first metal and the second metal react to form a metal composed of the first metal and the second metal.
  • An intermetallic compound is produced.
  • the intermetallic compound phase 109 generated by this reaction constitutes porous wicks 531 and 532.
  • the heat pipe 500 can obtain the porous wicks 531 and 532 inside the pipe casing 290 at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe 500 and the heat dissipating component including the heat pipe 500 have the same effects as the heat pipe 100.
  • the manufacturing method of the heat pipe 500 has the same effect as the manufacturing method of the heat pipe 100.
  • the manufacturing method of the heat pipe 500 uses four foils 591 to 594, but is not limited to this.
  • four metal plates may be used.
  • the number of foils and metal plates to be laminated is not limited to four, and may be two or more.
  • FIG. 26 is a perspective view showing an appearance of a heat pipe 600 according to the sixth embodiment of the present invention.
  • 27 is a cross-sectional view showing the first end 91 of the heat pipe 600 shown in FIG.
  • the heat pipe 600 is different from the heat pipe 100 in sealing members 691 and 692. Since other configurations are the same, description thereof is omitted.
  • Both end portions 91 and 92 of the pipe casing 90 are sealed with sealing members 691 and 692.
  • the sealing member 691 is constituted by the second metal foil 616, the first metal foil 116, and the intermetallic compound phase 119.
  • the configuration of the second end 92 is the same as the configuration of the first end 91, and the configuration of the sealing member 692 is the same as the configuration of the sealing member 691. Therefore, description of the second end 92 and the sealing member 692 of the pipe housing 90 is omitted.
  • FIG. 28 is a cross-sectional view showing the state of the attaching step in the method for manufacturing the heat pipe 600 shown in FIG.
  • the manufacturing method of the heat pipe 600 is different from the manufacturing method of the heat pipe 100 in that a metal sheet 655 and a coating film are used instead of the metal sheet 155 shown in FIG. 6B in the attaching process of S2 and S5 shown in FIG. 115 is used.
  • the metal sheet 655 is a sheet having a second metal foil 616 and a first metal foil 116 as shown in FIG. Since the other points are the same, the description is omitted.
  • the coating film 115 is applied to the first end 91 of the pipe casing 90, and then the metal sheet 655 is pasted to the first end 91 of the pipe casing 90. (FIG. 4: S2).
  • the coating film 115 is a film in which the second metal particles 107 are uniformly dispersed in the organic component 118.
  • the first end 91 of the pipe housing 90 is heated using, for example, a reflow device (FIG. 4: S3). Thereby, an intermetallic compound phase 119 is generated by the reaction between the molten Sn and the second metal particles 107, and a sealing member 691 as shown in FIGS. 26 and 27 is obtained at the first end portion 91.
  • a reflow device FIG. 4: S3
  • a metal sheet 655 is applied to the second end 92 of the pipe casing 90 (FIG. 4: S5).
  • the second end 92 of the pipe housing 90 is heated using, for example, a reflow device (FIG. 4: S3). Accordingly, an intermetallic compound phase 119 is generated by the reaction between the molten Sn and the second metal particles 107, and a sealing member 692 as shown in FIG. 26 is obtained at the second end portion 92.
  • a reflow device FIG. 4: S3
  • the heat pipe 600 is obtained by the above manufacturing method. Similarly to the heat pipe 100, the heat pipe 600 is heated at a temperature equal to or higher than the melting point of the first metal, so that the molten first metal and the second metal react with each other, and the metal composed of the first metal and the second metal. An intermetallic compound is produced.
  • the intermetallic compound phase 119 generated by this reaction constitutes the sealing members 691 and 692.
  • the heat pipe 600 can obtain the sealing members 691 and 692 at both ends 91 and 92 of the pipe housing 90 at a temperature extremely lower than the above-described sintering temperature. Further, the intermetallic compound phase 119 of the sealing members 691 and 692 has a dense structure with extremely low porosity (see FIG. 10). Therefore, the heat pipe 600 can reliably prevent the leakage of the working fluid enclosed in the pipe housing 90. Further, the sealing members 691 and 692 are also excellent in impact resistance.
  • the heat pipe 600 and the heat dissipating component including the heat pipe 600 have the same effect as the heat pipe 100.
  • the method for manufacturing the heat pipe 600 has the same effect as the method for manufacturing the heat pipe 100.
  • FIG. 29 is a cross-sectional view showing a central portion of a heat pipe 700 according to the seventh embodiment of the present invention.
  • the difference between the heat pipe 700 and the heat pipe 100 is that the porosity of the porous wick 730 is higher than the porosity of the porous wick 30.
  • the porous wick 730 has a hole 780.
  • the porous wick 730 includes the first metal particles 106 made of the first metal, the second metal particles 107 made of the second metal, and the third metal particles 727 made of the third metal.
  • intermetallic compound particles 709 made of an intermetallic compound. In the porous wick 730, a plurality of intermetallic compound particles 709 join the third metal particles 727.
  • the porous wick 730 extends in the longitudinal direction of the pipe housing 90 in the same manner as the porous wick 30 shown in FIGS. 1 and 2, and connects the heating unit 91 and the cooling unit 92 in the pipe housing 90.
  • the pipe housing 90 and the porous wick 730 form a cavity 95 extending in the longitudinal direction of the pipe housing 90. Since other configurations are the same, description thereof is omitted.
  • FIG. 30 is a cross-sectional view showing a coating process performed by the method of manufacturing the heat pipe 700 shown in FIG.
  • the method of manufacturing the heat pipe 700 is different from the method of manufacturing the heat pipe 100 in the step S1 shown in FIG. Since other steps are the same, the description thereof is omitted.
  • the metal paste 705 is used instead of the metal paste 105. And as shown in FIG. 30, the metal paste 705 is provided in the center part of the transversal direction of the pipe housing
  • the metal paste 705 includes third metal particles 727 in addition to the first metal particles 106, the second metal particles 107, and the organic component 108.
  • the third metal is, for example, Cu.
  • the third metal particles 727 satisfy the following conditions.
  • the melting point of the third metal is higher than the melting point of the first metal.
  • the diameter of the third metal particle 727 is larger than the diameter of the second metal particle 107.
  • the third metal chemically reacts with the first metal.
  • An intermetallic compound is generated on the surface of the third metal particle 727.
  • the reaction rate when the third metal particle 727 and the first metal particle 106 react to generate an intermetallic compound is the same as that of the second metal particle 107 and the first metal particle 106 to generate an intermetallic compound. Slower than the reaction rate.
  • the third metal particles 727 are insoluble in hydraulic fluid such as water.
  • the specific surface area of the second metal particle 107 is larger than that of the third metal particle 727 by making the diameter of the third metal particle 727 larger than the diameter of the second metal particle 107. Then, the first metal particles 106 preferentially react with the second metal particles 107 having a large specific surface area, and an intermetallic compound composed of the second metal particles 107 and the first metal particles 106 is easily generated.
  • the third metal particles 727 can be bound to each other through the compound. Moreover, since the clearance gap between particle
  • the heat pipe 700 provided with the porous wick 730 at the center in the short direction of the pipe housing 90 is obtained through the steps S2 to S6.
  • the heat pipe 700 similarly to the heat pipe 100, by heating at a temperature equal to or higher than the melting point of the first metal, the molten first metal and the second metal react to form a metal composed of the first metal and the second metal. An intermetallic compound is produced. Intermetallic compound particles 709 generated by this reaction constitute porous wick 730.
  • the heat pipe 700 can obtain the porous wick 730 inside the pipe housing 90 at a temperature extremely lower than the above-described sintering temperature.
  • the heat pipe 700 and the heat dissipating component including the heat pipe 700 have the same effects as the heat pipe 100.
  • the manufacturing method of the heat pipe 700 has the same effect as the manufacturing method of the heat pipe 100.
  • the third metal particle 727 is made of Cu, but is not limited thereto.
  • the third metal may be a metal other than Cu.
  • the third metal may be Ni.
  • the second metal may be CuNiCo and the third metal may be CuNi.
  • all the third metal particles 727 are drawn in a spherical shape, but may be indefinite.
  • the pipe housing may have a cylindrical shape with a polygonal or elliptical cross section, a tapered cylindrical shape with a conical outer shape, and the area of the opening and the area of the side wall.
  • the same cylindrical shape may be used.
  • the metal paste 105 is in the form of a paste, but is not limited thereto.
  • the metal composition may be in the form of a putty, for example.
  • the material of the first metal particles 106 is Sn alone, but is not limited thereto.
  • the material of the first metal particles 106 may be a Sn-based alloy.
  • the Sn-based alloy include a SnAgCu alloy, a SnAg alloy, a SnCu alloy, a SnBi alloy, a SnSb alloy, a SnAu alloy, a SnPb alloy, and a SnZn alloy.
  • the material of the second metal particles 107 is a CuNi alloy, but is not limited thereto.
  • the material of the second metal particles 107 may be at least one alloy selected from the group consisting of CuMn alloy particles, CuAl alloy particles, and CuCr alloy particles, for example.
  • the ratio of Ni, Mn, Al and Cr is preferably 5 to 20% by weight of Cu alloy particles.
  • an intermetallic compound containing at least two selected from the group consisting of Cu, Mn, and Sn is generated by a reaction between molten Sn and CuMn alloy particles.
  • This intermetallic compound is, for example, (Cu, Mn) 6 Sn 5 , Cu 4 Mn 2 Sn 5 , Cu 5 MnSn 5 , (Cu, Mn) 3 Sn, Cu 2 MnSn, or CuMn 2 Sn.
  • hot air is heated, but the present invention is not limited to this.
  • far infrared heating, high frequency induction heating, a hot plate, or the like may be used.
  • hot air is heated in air
  • hot air may be heated in N 2 , H 2 , formic acid, or vacuum, for example.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Sustainable Development (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Cooling Or The Like Of Electrical Apparatus (AREA)
  • Cooling Or The Like Of Semiconductors Or Solid State Devices (AREA)

Abstract

ヒートパイプ(100)は、パイプ筐体(90)と多孔質ウィック(30)と封止部材(191、192)とを備える。パイプ筐体(90)の両端部(91、92)は、封止部材(191、192)によって封止されている。封止部材(191、192)は、第1金属箔(116)と金属間化合物相(119)とによって構成されている。パイプ筐体(90)は内部に作動液を封入する。多孔質ウィック(30)は複数の孔(80)によって、作動液に対して毛細管力を生じる。多孔質ウィック(30)は、パイプ筐体(90)の内部に設けられている。これにより、パイプ筐体(90)及び多孔質ウィック(30)は、パイプ筐体(90)の長手方向へ伸びる空洞(95)を形成する。多孔質ウィック(30)は、第1金属粒子(106)と第2金属粒子(107)と金属間化合物相(109)とによって構成されている。

Description

ヒートパイプ、放熱部品、ヒートパイプの製造方法
 本発明は、ヒートパイプ、このヒートパイプを備える放熱部品、及びこのヒートパイプの製造方法に関するものである。
 従来、電子部品などの発熱体を冷却するヒートパイプが知られている。例えば特許文献1は、パイプ筐体と多孔質ウィックとを備えるヒートパイプを開示している。パイプ筐体の長手方向の両端部は、発熱体と接触することによって加熱される加熱部と、例えば自然冷却される冷却部とを構成する。パイプ筐体は、作動液を封入する。作動液は、所定の温度で相変態する物質により構成される。作動液は例えば、水やアルコール類やアンモニア水等である。
 多孔質ウィックは、複数の孔を有し、作動液に対して毛細管力を生じる。多孔質ウィックは、パイプ筐体の内部に設けられている。これにより、パイプ筐体及び多孔質ウィックは、パイプ筐体の長手方向へ伸びる空洞を形成する。空洞は、複数の孔に連通する。多孔質ウィックは、パイプ筐体における加熱部と冷却部との間を繋ぐ。一般に、多孔質ウィックは、銅粒子がパイプ筐体の内部で焼結された焼結体で構成されている。
 以上より特許文献1のヒートパイプでは、作動液が加熱部で発熱体の熱によって蒸発して気体となる。その気体は、空洞を通過して冷却部へ移動し、冷却部で放熱されて液化する。液化した作動液は多孔質ウィックに浸透する。そして、多孔質ウィックによる毛細管力によって作動液が冷却部から加熱部へ向けて還流する。これにより、特許文献1のヒートパイプは、発熱体を冷却する。
特許第5685656号公報
 しかしながら、特許文献1のヒートパイプにおいて多孔質ウィックは、銅粒子がパイプ筐体の内部で焼結されることによって構成されている。そのため、パイプ筐体が銅粒子の融点(1084℃)より少し低い温度まで加熱される必要がある。
 また、パイプ筐体は一般的に溶接やロウ付けによって封止される。そのため、パイプ筐体が高い温度(例えばロウ付けの場合450℃)まで加熱される必要がある。
 したがって、特許文献1のヒートパイプでは、パイプ筐体が高い温度によって劣化(酸化など)してしまうという問題がある。
 本発明の目的は、パイプ筐体が劣化することを大幅に抑えることができるヒートパイプ、放熱部品、及びヒートパイプの製造方法を提供することにある。
 本発明のヒートパイプは、パイプ筐体と多孔質ウィックとを備える。パイプ筐体には、作動液が封入される。多孔質ウィックは、パイプ筐体の内部に設けられている。多孔質ウィックは、少なくとも第1金属と第1金属より融点の高い第2金属とを含有する金属間化合物を含む。ここで、多孔質ウィックは、第1金属、第2金属、及び金属間化合物を含む材料で構成されていてもよい。
 この構成において第2金属は例えば、CuNi合金、CuMn合金、CuAl合金およびCuCr合金からなる群より選ばれる少なくとも1種の合金である。第1金属は例えば、SnまたはSn系合金からなる群より選ばれる少なくとも1種の金属である。Snの融点は、231.9℃である。
 この構成では、第1金属の融点以上の温度で加熱することによって少なくとも第1金属と第2金属とが反応し、少なくとも第1金属と第2金属とを含有する金属間化合物が生成される。この反応で生成された金属間化合物が多孔質ウィックを構成する。そのため、この構成のヒートパイプは、前述の焼結温度より極めて低い温度で、多孔質ウィックをパイプ筐体の内部に得ることができる。
 従って、この構成のヒートパイプは、パイプ筐体が劣化することを抑制できる。
 また、本発明のヒートパイプは、パイプ筐体とウィックと封止部材とを備える。パイプ筐体には、作動液が封入される。ウィックは、パイプ筐体の内部に設けられている。封止部材は、パイプ筐体を封止する。封止部材は例えば、パイプ筐体の端部を封止する。封止部材は、少なくとも第1金属と第1金属より融点の高い第2金属とを含有する金属間化合物を含む。ここで、封止部材は、第1金属及び金属間化合物を含む材料で構成されていてもよい。
 この構成において第2金属は例えば、CuNi合金、CuMn合金、CuAl合金およびCuCr合金からなる群より選ばれる少なくとも1種の合金である。第1金属は例えば、SnまたはSn系合金からなる群より選ばれる少なくとも1種の金属である。Snの融点は、231.9℃である。
 この構成では、第1金属の融点以上の温度で加熱することによって少なくとも第1金属と第2金属とが反応し、少なくとも第1金属と第2金属とを含有する金属間化合物が生成される。この反応で生成された金属間化合物が封止部材を構成する。そのため、この構成のヒートパイプは、前述の焼結温度より極めて低い温度で、封止部材を得ることができる。
 従って、この構成のヒートパイプは、パイプ筐体が劣化することを抑制できる。
 また、本発明の放熱部品は、本発明のヒートパイプを備える。そのため、本発明の放熱部品は、本発明のヒートパイプと同様の効果を奏する。
 また、本発明のヒートパイプの製造方法は、設置工程と加熱工程とを含む。設置工程は、金属組成物をパイプ筐体の内部に設ける。金属組成物は、第1金属と第1金属より融点の高い第2金属とを含む。金属組成物はフラックスを含んでいることが好ましい。加熱工程は、例えば第1金属の融点以上第2金属の融点以下の範囲内の温度まで金属組成物を加熱し、多孔質ウィックをパイプ筐体の内部に形成する。多孔質ウィックは、第1金属と第2金属とが反応することによって生成された金属間化合物を含む材料で構成される。ここで、金属組成物は、ペースト状であり、設置工程は、金属組成物をパイプ筐体の内部に塗布する工程でもよい。
 このヒートパイプの製造方法は、前述の多孔質ウィックを備える本発明のヒートパイプを製造する方法である。そのため、本発明のヒートパイプの製造方法は、前述の多孔質ウィックを備える本発明のヒートパイプと同様の効果を奏する。
 また、本発明のヒートパイプの製造方法は、設置工程と加熱工程とを含む。設置工程は、金属組成物をパイプ筐体の端部に設ける。金属組成物は、第1金属と第1金属より融点の高い第2金属とを含む。金属組成物はフラックスを含んでいることが好ましい。加熱工程は、例えば第1金属の融点以上第2金属の融点以下の範囲内の温度まで金属組成物を加熱し、封止部材をパイプ筐体の端部に形成する。封止部材は、第1金属と第2金属とが反応することによって生成された金属間化合物を含む材料で構成される。
 このヒートパイプの製造方法は、前述の封止部材を備える本発明のヒートパイプを製造する方法である。そのため、本発明のヒートパイプの製造方法は、前述の封止部材を備える本発明のヒートパイプと同様の効果を奏する。
 本発明は、パイプ筐体が劣化することを抑制できる。
本発明の第1実施形態に係るヒートパイプ100の外観を示す斜視図である。 図1に示すヒートパイプ100の第1端部91を示す断面図である。 図1に示すヒートパイプ100の中央部93を示す断面図である。 図1に示すヒートパイプ100の製造方法を示すフローチャートである。 図4に示すヒートパイプ100の製造方法で用意されるパイプ筐体90の外観を示す斜視図である。 図6(A)は、図4に示すヒートパイプ100の製造方法で用意される金属ペースト105の断面図である。図6(B)は、図4に示すヒートパイプ100の製造方法で用意される金属シート155の断面図である。 図4に示す塗布工程の様子を示す断面図である。 図4に示す貼付工程の様子を示す断面図である。 図4に示す加熱工程によって金属ペースト105から生成される金属間化合物相109の様子を示す拡大断面図である。 図4に示す加熱工程によって金属シート155から生成される金属間化合物相119の様子を示す拡大断面図である。 本発明の第2実施形態に係るヒートパイプ200の中央部を示す断面図である。 図11に示すヒートパイプ200の製造方法で行われる塗布工程の様子を示す断面図である。 本発明の第3実施形態に係るヒートパイプ300の外観を示す斜視図である。 図13に示すヒートパイプ300の製造方法を示すフローチャートである。 図14に示す塗布工程の様子を示す断面図である。 図14に示す巻き工程の様子を示す断面図である。 本発明の第4実施形態に係るヒートパイプ400の中央部を示す断面図である。 図17に示すヒートパイプ400の製造方法を示すフローチャートである。 図18に示すヒートパイプ400の製造方法で用意される複数の箔491、492、493の外観および塗布工程の様子を示す斜視図である。 図18に示す積層工程の様子を示す断面図である。 図18に示す挿入工程の様子を示す断面図である。 本発明の第5実施形態に係るヒートパイプ500の中央部を示す断面図である。 図22に示すヒートパイプ500の製造方法を示すフローチャートである。 図23に示すヒートパイプ500の製造方法で用意される複数の箔591、592、593、594の外観および塗布工程の様子を示す斜視図である。 図23に示す積層工程の様子を示す断面図である。 本発明の第6実施形態に係るヒートパイプ600の外観を示す斜視図である。 図26に示すヒートパイプ600の第1端部91を示す断面図である。 図26に示すヒートパイプ600の製造方法における貼付工程の様子を示す断面図である。 本発明の第7実施形態に係るヒートパイプ700の中央部を示す断面図である。 図29に示すヒートパイプ700の製造方法で行われる塗布工程の様子を示す断面図である。
 以下、本発明の第1実施形態に係るヒートパイプ100について説明する。
 図1は、本発明の第1実施形態に係るヒートパイプ100の外観を示す斜視図である。図2は、図1に示すヒートパイプ100の第1端部91を示す断面図である。図3は、図1に示すヒートパイプ100の中央部93を示す断面図である。図3は、図1に示すS-S線の断面図である。
 ヒートパイプ100は、パイプ筐体90と多孔質ウィック30と封止部材191、192とを備える。ヒートパイプ100は、放熱部品に備えられ、電子部品などの発熱体を冷却する。放熱部品は例えば、ヒートシンクやヒートスプレッダなどである。
 パイプ筐体90は、円筒形状である。パイプ筐体90は、パイプ筐体90の長手方向の両端部91、92と、両端部91、92の間に位置する中央部93と、を有する。パイプ筐体90の第1端部91は、発熱体と接触することによって加熱される加熱部91を構成し、第2端部92は、例えば自然冷却される冷却部92を構成する。パイプ筐体90の材料は例えばCuである。
 パイプ筐体90の両端部91、92は、封止部材191、192によって封止されている。封止部材191は、第1金属箔116と金属間化合物相119とによって構成されている。封止部材192も、第1金属箔116と金属間化合物相119とによって構成されている。
 なお、ヒートパイプ100に関して、第2端部92の構成は第1端部91の構成と同じであり、封止部材192の構成は封止部材191の構成と同じである。そのため、パイプ筐体90の第2端部92及び封止部材192の説明を省略する。
 パイプ筐体90は内部に作動液を封入する。作動液は、所定の温度で相変態する物質により構成される。作動液は例えば、水やアルコール類やアンモニア水等である。
 多孔質ウィック30は、図2、図3に示すように複数の孔80を有する。複数の孔80は、基本的には多孔質ウィック30の外部に連通したオープンポアである。多孔質ウィック30の気孔率は例えば20~70%である。多孔質ウィック30は複数の孔80によって、作動液に対して毛細管力を生じる。
 多孔質ウィック30は、円筒形状である。多孔質ウィック30は、パイプ筐体90の内部に設けられている。多孔質ウィック30は、パイプ筐体90の長手方向へ伸び、パイプ筐体90における加熱部91と冷却部92との間を繋ぐ。
 これにより、パイプ筐体90及び多孔質ウィック30は、パイプ筐体90の長手方向へ伸びる空洞95を形成する。空洞95は、複数の孔80に連通する。多孔質ウィック30は、第1金属粒子106と第2金属粒子107と金属間化合物相109とによって構成されている。
 以上よりヒートパイプ100では、作動液が加熱部91で発熱体の熱によって蒸発して気体となる。その気体は、空洞95を通過して冷却部92へ移動し、冷却部92で放熱されて液化する。液化した作動液は多孔質ウィック30の複数の孔80に浸透する。そして、多孔質ウィック30による毛細管力によって作動液が冷却部92から加熱部91へ向けて還流する。これにより、ヒートパイプ100は、発熱体を冷却する。
 なお、図2及び図3の孔80は模式的に現されたものである。多孔質ウィック30には、図2及び図3に現れない微小な孔80や粒子界面レベルの孔80も存在している。そのため、作動液は、多孔質ウィック30中をこれらの孔80を伝って、パイプ筐体90の長手方向へ移動することができる。
 ここで、金属間化合物相109及び金属間化合物相119は、金属間化合物から成る相である。金属間化合物相109及び金属間化合物相119の相違点については後述する。金属間化合物は、第1金属と第2金属とから成る。第1金属の材料は、SnまたはSn系合金である。Sn系合金は例えば、SnAgCu合金、SnAg合金、SnCu合金、SnBi合金、SnSb合金、SnAu合金、SnPb合金、SnZn合金などである。第2金属は、溶融する第1金属と反応し、金属間化合物を生成する金属である。第2金属の材料は、CuNi合金、CuMn合金、CuAl合金およびCuCr合金からなる群より選ばれる少なくとも1種である。金属間化合物の材料は、例えば(Cu,Ni)Sn、CuNiSn、CuNiSn、(Cu,Ni)Sn、CuNiSn、CuNiSn等である。
 第2金属の融点は、第1金属の融点より高い。金属間化合物の融点は、第1金属の融点より高い。金属間化合物の融点は、例えば400℃以上である。第1金属粒子106の材料がSnである場合、第1金属粒子106の融点は、231.9℃である。なお、図3に示す第1金属粒子106と第2金属粒子107とは、後述の加熱工程において反応せずに残留したものである。
 ここで、ヒートパイプ100では、第1金属の融点以上の温度で加熱することによって、溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物相109が多孔質ウィック30を構成する。また、この反応で生成された金属間化合物相119が封止部材191、192を構成する。
 そのため、ヒートパイプ100は、前述の焼結温度より極めて低い温度で、多孔質ウィック30をパイプ筐体90の内部に得ることができる。同様に、ヒートパイプ100は、前述の焼結温度より極めて低い温度で、封止部材191、192をパイプ筐体90の両端部91、92に得ることができる。
 従って、ヒートパイプ100とヒートパイプ100を備える放熱部品とは、パイプ筐体90が劣化することを抑制できる。
 また、金属間化合物相109は、高い融点(例えば400℃以上)を有する。そのため、金属間化合物相109で構成される多孔質ウィック30は、高い耐熱性を有する。また、金属間化合物相119も、高い融点(例えば400℃以上)を有する。そのため、金属間化合物相119で構成される封止部材191、192は、高い耐熱性を有する。
 特に、金属間化合物が、第1金属よりも高い融点を有することで、ヒートパイプ100をさらにリフローなどの加熱により他の装置、部品、基板などに実装する際にも、多孔質ウィック30及び封止部材191、192の構造は損なわれず、ヒートパイプ100の機能を維持できる。
 以上に示したヒートパイプ100は例えば、以下の製造方法で製造することができる。
 図4は、図1に示すヒートパイプ100の製造方法を示すフローチャートである。図5は、図4に示すヒートパイプ100の製造方法で用意されるパイプ筐体90の外観を示す斜視図である。図6(A)は、図4に示すヒートパイプ100の製造方法で用意される金属ペースト105の断面図である。図6(B)は、図4に示すヒートパイプ100の製造方法で用意される金属シート155の断面図である。図7は、図4に示す塗布工程の様子を示す断面図である。図8は、図4に示す貼付工程の様子を示す断面図である。図9は、図4に示す加熱工程によって金属ペースト105から生成される金属間化合物相109の様子を示す拡大断面図である。図10は、図4に示す加熱工程によって金属シート155から生成される金属間化合物相119の様子を示す拡大断面図である。
 まず、図5、図6(A)(B)に示すように、パイプ筐体90と金属ペースト105と金属シート155とを用意する。なお、金属ペースト105及び金属シート155のそれぞれが、本発明の金属組成物の一例に相当する。
 金属ペースト105は、図6(A)に示すように、金属成分110と有機成分108とを含む。金属成分110は、第1金属粒子106と、第2金属粒子107と、からなる。第1金属粒子106と第2金属粒子107とは、有機成分108中に均一に分散している。
 金属シート155は、図6(B)に示すように、塗膜115と第1金属箔116とを有するシートである。塗膜115は、金属成分である第2金属粒子107が有機成分118中に均一に分散した膜である。
 なお、ヒートパイプ100の製造方法は、第1金属粒子106の材料にSnを使用し、第2金属粒子107の材料にCuNi合金を使用している。CuNi合金は、溶融するSnと反応し、金属間化合物であるCuNiSn合金を生成する材料である。
 第1金属粒子106の平均粒径(D50)は、1~100μmの範囲内であることが好ましい。さらに、第2金属粒子107の平均粒径(D50)は、0.1~30μmの範囲内であることが好ましい。特に第2金属粒子107の平均粒径は、金属間化合物の生成量に大きく影響する。ここで、平均粒径(D50)は例えば、レーザ回折・散乱法によって求めた粒度分布における積算値50%での粒径を意味する。
 第1金属粒子106の平均粒径が1μmよりも小さい場合、Sn粒子の表面積が増加する。そのため、より多くの酸化物がSn粒子の表面に形成し、第2金属粒子107に対するSn粒子の濡れ性が低下し、生成反応が抑制されてしまう傾向がある。一方、第1金属粒子106の平均粒径が100μmよりも大きい場合、Snの量が過剰になり、多孔質ウィック30の気孔率が著しく低下してしまうおそれがある。
 また、第2金属粒子107の平均粒径が0.1μmよりも小さい場合、CuNi合金粒子の表面積が増加する。そのため、より多くの酸化物がCuNi合金粒子の表面に形成し、溶融したSnに対するCuNi合金粒子の濡れ性が低下し、生成反応が阻害されてしまう傾向がある。
 一方、第2金属粒子107の平均粒径が30μmよりも大きい場合、CuNi合金粒子間の隙間のサイズが増大する。これにより、CuNi合金粒子の中心部分まで金属間化合物の生成反応に利用することができず、生成反応に利用されるCuNi合金が不足する。そのため、金属間化合物の生成量が低減してしまう。
 また、金属ペースト105において、第1金属粒子106と第2金属粒子107との配合比は、重量比で、第2金属粒子107:第1金属粒子106=50:50~20:80の範囲内であることが好ましい。
 また、金属ペースト105と金属シート155の塗膜115とにおいて、金属成分と有機成分との配合比は、重量比で、金属成分:有機成分=75:25~99.5:0.5の範囲内であることが好ましい。金属成分の配合量が上記よりも多いと、十分な粘性を得ることができず、有機成分から金属成分が剥落するおそれがある。一方、金属成分の配合量が上記よりも少ないと、第1金属を十分に反応させることができず、金属間化合物相109又は金属間化合物相119中に未反応の第1金属粒子106が多量に残存するおそれがある。
 次に、有機成分108は、フラックス、溶剤、チキソ剤などを含む。有機成分108の粘性は、有機成分118の粘性より低い。なお、その他の構成は有機成分108と同じであるため、有機成分118の説明は省略する。
 フラックスは、ロジンと活性剤を含む。フラックスは、パイプ筐体90、第1金属粒子106、及び第2金属粒子107のそれぞれの表面の酸化被膜を除去する還元機能を果たす。
 ロジンは例えば、天然ロジン、水素化ロジン、不均化ロジン、重合ロジン、不飽和二塩基酸変性ロジン、アクリル酸変性ロジンなどのロジン誘導体等、またはこれらの混合材などである。ロジンは例えば、重合ロジンR-95を用いる。
 また、活性剤はフラックスの還元反応を促進する。活性剤は例えば、モノカルボン酸(例えば、ギ酸、酢酸、ラウリン酸、パルミチン酸、ステアリン酸、安息香酸など)、ジカルボン酸(例えば、シュウ酸、マロン酸、コハク酸、グルタル酸、アジピン酸、スベリン酸、アゼライン酸、セバシン酸、フタル酸など)、ブロモアルコール類(例えば、1-ブロモー2-ブタノールなど)、有機アミンのハロゲン化水素酸塩類、ブロモアルカン類、ブロモアルケン類、ベンジルブロマイド類、ポリアミン類、塩素系活性剤などである。活性剤は例えば、アジピン酸を用いる。
 溶剤は、金属ペースト105の粘度を調整する。同様に溶剤は、金属シート155の塗膜115の粘度を調整する。溶剤は例えば、アルコール、ケトン、エステル、エーテル、芳香族系、炭化水素類などである。溶剤は例えば、ヘキシルジグリコール(HeDG)を用いる。
 チキソ剤は、金属成分と有機成分を均一に混和させた後、金属成分と有機成分が分離しないように維持する。チキソ剤は例えば、硬化ヒマシ油、カルナバワックス、アミド類、ヒドロキシ脂肪酸類、ジベンジリデンソルビトール、ビス(p-メチルベンジリデン)ソルビトール類、蜜蝋、ステアリン酸アミド、ヒドロキシステアリン酸エチレンビスアミドなどである。
 なお、金属ペースト105及び金属シート155には、添加物として、Ag、Au、Al、Bi、C、Co、Cu、Fe、Ga、Ge、In、Mn、Mo、Ni、P、Pb、Pd、Pt、Si、Sb、Zn等が含まれていても良い。また、金属ペースト105及び金属シート155には、これらの添加物だけでなく、添加剤として金属錯体、金属化合物等が含まれていても良い。
 次に、図7に示すように、均一の厚みとなるよう金属ペースト105をパイプ筐体90の内面に塗布する(S1:塗布工程)。すなわち、この塗布工程は、均一の厚みとなるよう金属ペースト105をパイプ筐体90の内面に設ける。具体的な塗布方法としては、例えば、金属ペースト105をパイプ筐体90に圧縮空気で圧送することにより、パイプ90の内面に塗布することができる。
 次に、図1、図2に示すようにパイプ筐体90の第1端部91を封止部材191によって封止するため、図8に示すように、金属シート155をパイプ筐体90の第1端部91に貼付する(S2:貼付工程)。すなわち、この貼付工程は、金属シート155をパイプ筐体90の第1端部91に設ける。
 次に、パイプ筐体90を、例えばリフロー装置を用いて加熱する(S3:加熱工程)。加熱工程は、Snの融点以上CuNi合金の融点以下の範囲内の温度まで、金属ペースト105及び金属シート155を加熱する。Snの融点は、231.9℃である。CuNi合金の融点は、Niの含有量によって変化し、例えば1220℃から1300℃である。例えば、加熱工程は、150℃~230℃でプレヒートを行った後、加熱温度250℃~400℃で2分~10分の間、加熱する。ピーク温度は400℃に到達させる。
 加熱により金属ペースト105がSnの融点以上に達すると、第1金属粒子106が溶融する。溶融したSnと第2金属粒子107との反応によって、例えば図9に示すような金属間化合物相109が生成される。この反応は、例えば、液相拡散接合(「TLP接合:TransientLiquid Phase DiffusionBonding」)に伴う反応である。
 同様に、加熱により金属シート155がSnの融点以上に達すると、第1金属箔116が溶融する。溶融したSnと第2金属粒子107との反応によって、例えば図10に示すような金属間化合物相119が生成される。この反応は、例えば、液相拡散接合(「TLP接合:TransientLiquid Phase DiffusionBonding」)に伴う反応である。
 なお、有機成分108、118に含まれる溶剤は、加熱工程が加熱を開始してから、プレヒートを終了するまでの間に、揮発または蒸発する。
 リフロー装置が加熱を停止した後、溶融したSnと第2金属粒子107との反応が終了する。これにより、図2、図3、図9、図10に示すような多孔質ウィック30及び封止部材191が得られる。リフロー装置が加熱を停止した後、多孔質ウィック30及び封止部材191は常温まで自然冷却していく。
 なお、第1金属粒子106の一部と第2金属粒子107の一部とは、図3に示すように、反応せずに多孔質ウィック30中に残留する。そのため、多孔質ウィック30は、第1金属粒子106と第2金属粒子107と金属間化合物相109とによって構成されている。
 また、第1金属箔116の一部も、図2に示すように、反応せずに残留する。ここで、過剰なSnは、図2に示すように、金属間化合物相119の外周に流動し、金属間化合物相119を覆う。即ち、過剰なSnは、パイプ筐体90をより確実に封止する。
 次に、作動液をパイプ筐体90の内部に充填する(S4:充填工程)。
 次に、図8に示すS2の貼付工程と同様に、金属シート155をパイプ筐体90の第2端部92に貼付する(S5:貼付工程)。すなわち、この貼付工程は、金属シート155をパイプ筐体90の第2端部92に設ける。
 次に、S3の加熱工程と同様に、パイプ筐体90の第2端部92を、例えばリフロー装置を用いて加熱する(S6:加熱工程)。加熱工程は、Snの融点以上CuNi合金の融点以下の範囲内の温度まで、パイプ筐体90の第2端部92に貼付した金属シート155を加熱する。
 ここで、Snの融点は、231.9℃である。CuNi合金の融点は、Niの含有量によって変化し、例えば1220℃から1300℃である。そのため、加熱工程は例えば、150℃~230℃でプレヒートを行った後、加熱温度250℃~400℃で2分~5分の間、加熱する。ピーク温度は400℃に到達させる。
 加熱により金属シート155がSnの融点以上に達すると、第1金属箔116が溶融する。溶融したSnと第2金属粒子107との反応によって、例えば図10に示すような金属間化合物相119が生成される。この反応は、例えば、液相拡散接合(「TLP接合:TransientLiquid Phase DiffusionBonding」)に伴う反応である。
 なお、有機成分118に含まれる溶剤は、加熱工程が加熱を開始してから、プレヒートを終了するまでの間に、揮発または蒸発する。
 リフロー装置が加熱を停止した後、溶融したSnと第2金属粒子107との反応は終了する。これにより、図2に示す封止部材191と同様に、封止部材192が得られる。リフロー装置が加熱を停止した後、封止部材192は常温まで自然冷却していく。
 なお、封止部材192における第1金属箔116の一部は、図2に示す封止部材191と同様に、反応せずに残留する。過剰なSnは、図2に示す封止部材191と同様に、金属間化合物相119の外周に流動し、金属間化合物相119を覆う。即ち、過剰なSnは、パイプ筐体90をより確実に封止する。
 以上の製造方法によって、ヒートパイプ100が得られる。以上の製造方法で実際にヒートパイプ100を製造した結果、次のような多孔質ウィック30及び封止部材191、192が得られた。多孔質ウィック30の気孔率は60%である(図9参照)。多孔質ウィック30の気孔径は1μm以上60μm以下である。多孔質ウィック30の熱伝導率は例えば、21~23(W/m・K)である。一方、封止部材191、192の気孔率は2%以下である(図10参照)。なお、本実施形態において気孔率は、単位体積(cm)当たりに占める気孔の体積で表している。
 以上の製造方法において、第2金属は、第1金属と反応して金属間化合物を生成する材料である。第2金属は、CuNi合金である。第1金属は、Snである。Snの融点は、231.9℃である。
 以上の製造方法では、第1金属の融点以上の温度で加熱することによって溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物相109が多孔質ウィック30を構成する。同様に、この反応で生成された金属間化合物相119が封止部材191、192を構成する。
 そのため、ヒートパイプ100の製造方法は、前述の焼結温度より極めて低い温度で、多孔質ウィック30をパイプ筐体90の内部に形成することができる。同様に、ヒートパイプ100の製造方法は、前述の焼結温度より極めて低い温度で、封止部材191、192をパイプ筐体90の両端部91、92に形成することができる。
 従って、ヒートパイプ100の製造方法は、パイプ筐体90が劣化することを抑制できる。
 また、金属間化合物相109は、高い融点(例えば400℃以上)を有する。そのため、以上の製造方法で作成された多孔質ウィック30は、高い耐熱性を有する。また、金属間化合物相119は、高い融点(例えば400℃以上)を有する。そのため、以上の製造方法で作成された封止部材191、192は、高い耐熱性を有する。
 特に、金属間化合物が、第1金属よりも高い融点を有することで、ヒートパイプ100をさらにリフローなどの加熱により他の装置、部品、基板などに実装する際にも、多孔質ウィック30及び封止部材191、192の構造は損なわれず、ヒートパイプ100の機能を維持できる。
 また、封止部材191、192の金属間化合物相119は前述したように、気孔率が極めて小さい緻密な構造を有する(図10参照)。よって、ヒートパイプ100は、パイプ筐体90の内部に封入した作動液の漏洩を確実に防ぐことができる。また、封止部材191、192は、耐衝撃性にも優れる。
 また、ヒートパイプ100の製造方法は、パイプ筐体90の内面が湾曲していても、金属ペースト105を均一の厚みにパイプ筐体90の内面に塗布するだけで、均一の厚みを持つ多孔質ウィック30をパイプ筐体90の内面に得ることができる。
 また、ヒートパイプ100の製造方法は、前述したように気孔率の高い多孔質ウィック30をパイプ筐体90の内部に形成することができる(図9参照)。そのため、ヒートパイプ100は、高い液浸透性および高い毛細管力を有することができる。即ちヒートパイプ100は、高い熱伝導度を有することができる。
 なお、ヒートパイプ100の製造方法は、金属ペースト105や金属シート155に使用する材料、各材料の含有量または加熱温度等を調整することで、多孔質ウィック30や封止部材191、192の気孔率を1%以上80%以下の範囲で設定することができる。
 ここで、ヒートパイプ100の製造方法は、多孔質ウィック30の気孔率を20%以上に設定した場合、ヒートパイプ100の放熱特性を向上させることができる。特に、ヒートパイプ100の製造方法は、多孔質ウィック30の気孔率を45%以上に設定することができ、焼結体で実現できない気孔率を実現できる。
 また、ヒートパイプ100の製造方法は、金属ペースト105や金属シート155に使用する材料、含有量または加熱温度等を調整することで、多孔質ウィック30の気孔径を1μm以上100μm以下の範囲で設定することができる。ここで、多孔質ウィック30の気孔径は、毛細管現象による輸送性の観点から小さい方が好ましい。例えば、ヒートパイプ100の製造方法は、パイプ筐体90の長さ、傾き又は作動液の比重などの条件に応じて、多孔質ウィック30の気孔径を、5μm以上40μm以下の範囲や、10μm以上30μm以下の範囲で設定することができる。
 以下、本発明の第2実施形態に係るヒートパイプ200について説明する。
 図11は、本発明の第2実施形態に係るヒートパイプ200の中央部を示す断面図である。ヒートパイプ200がヒートパイプ100と相違する点は、パイプ筐体290及び多孔質ウィック230の形状である。パイプ筐体90は円筒形状であるのに対してパイプ筐体290は角筒形状である。多孔質ウィック30は円筒形状であるのに対して多孔質ウィック230は直方体形状である。
 多孔質ウィック230は図1、図2に示す多孔質ウィック30と同様に、パイプ筐体290の長手方向へ伸び、パイプ筐体290における加熱部91と冷却部92との間を繋ぐ。そして、パイプ筐体290及び多孔質ウィック230は、パイプ筐体290の長手方向へ伸びる空洞295を形成する。その他の構成については同じであるため説明を省略する。
 次に、ヒートパイプ200の製造方法について説明する。
 図12は、図11に示すヒートパイプ200の製造方法で行われる塗布工程の様子を示す断面図である。ヒートパイプ200の製造方法がヒートパイプ100の製造方法と相違する点は、図4に示すS1の工程である。その他の工程については同じであるため説明を省略する。
 ヒートパイプ200の製造方法では、金属ペースト105の代わりに圧紛体205を使用する。圧紛体205は、第1金属粒子106と第2金属粒子107と有機成分218とを含む。有機成分218の粘性は、有機成分108の粘性より高い。なお、その他の構成は有機成分108と同じであるため、有機成分218の説明は省略する。
 そして、図12に示すように、圧紛体205をパイプ筐体290の短手方向の中央部に設ける。
 その後、S2~S6の工程を経ると、多孔質ウィック230をパイプ筐体290の短手方向の中央部に備えるヒートパイプ200が得られる。ヒートパイプ200ではヒートパイプ100と同様に、第1金属の融点以上の温度で加熱することによって、溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物相109が多孔質ウィック230を構成する。
 そのため、ヒートパイプ200は、前述の焼結温度より極めて低い温度で、多孔質ウィック230をパイプ筐体290の内部に得ることができる。
 従って、ヒートパイプ200とヒートパイプ200を備える放熱部品とは、ヒートパイプ100と同様の効果を奏する。同様に、ヒートパイプ200の製造方法は、ヒートパイプ100の製造方法と同様の効果を奏する。
 以下、本発明の第3実施形態に係るヒートパイプ300について説明する。
 図13は、本発明の第3実施形態に係るヒートパイプ300の外観を示す斜視図である。なお、図13は、説明簡略化のため、封止部材191、192の図示を省略している。
 ヒートパイプ300がヒートパイプ100と相違する点は、パイプ筐体390及び多孔質ウィック330の形状である。パイプ筐体390及び多孔質ウィック330のそれぞれの断面は、螺旋状である。そして、パイプ筐体390及び多孔質ウィック330のそれぞれは、パイプ筐体390の長手方向に、略同じ断面形状のまま伸びている。
 多孔質ウィック330は図1、図2に示す多孔質ウィック30と同様に、パイプ筐体390における加熱部391と冷却部392との間を繋ぐ。そして、パイプ筐体390及び多孔質ウィック330は、パイプ筐体390の長手方向へ伸びる空洞395を形成する。その他の構成についてはヒートパイプ100と同じであるため説明を省略する。
 次に、ヒートパイプ300の製造方法について説明する。
 図14は、図13に示すヒートパイプ300の製造方法を示すフローチャートである。図15は、図14に示す塗布工程の様子を示す断面図である。図16は、図14に示す巻き工程の様子を示す断面図である。
 ヒートパイプ300の製造方法がヒートパイプ100の製造方法と相違する点は、図4に示すS1をS31~S33に置き替えた点である。その他の工程については同じであるため説明を省略する。
 ヒートパイプ300の製造方法では、芯材396及び箔380を用意する。箔380の材料は例えば銅である。
 そして、図15に示すように、金属ペースト105を、箔380の表面に塗布する(図14:S31)。
 次に、図16に示すように、箔380の金属ペースト105が設けられた側の面が内側になるように、芯材396を軸にして箔380を巻く(図14:S32)。これにより、螺旋状の断面を有する金属ペースト105及びパイプ筐体390が得られる。
 次に、金属シート155をパイプ筐体390の第1端部391に貼付する(S2:貼付工程)。
 次に、パイプ筐体390を、例えばリフロー装置を用いて加熱する(S3:加熱工程)。これにより、溶融したSnと第2金属粒子107との反応によって金属間化合物相109が生成され、螺旋状の断面を有する多孔質ウィック330が得られる。
 次に、S2、S3の工程を経た後、芯材396を多孔質ウィック330及びパイプ筐体390から抜く(図14:S33)。これにより、芯材396が存在していた領域が空洞395になる。
 その後、S4~S6の工程を経ると、ヒートパイプ300が得られる。ヒートパイプ300ではヒートパイプ100と同様に、第1金属の融点以上の温度で加熱することによって、溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物相109が多孔質ウィック330を構成する。
 そのため、ヒートパイプ300は、前述の焼結温度より極めて低い温度で、多孔質ウィック330をパイプ筐体390の内部に得ることができる。
 従って、ヒートパイプ300とヒートパイプ300を備える放熱部品とは、ヒートパイプ100と同様の効果を奏する。同様に、ヒートパイプ300の製造方法は、ヒートパイプ100の製造方法と同様の効果を奏する。
 以下、本発明の第4実施形態に係るヒートパイプ400について説明する。
 図17は、本発明の第4実施形態に係るヒートパイプ400の中央部を示す断面図である。ヒートパイプ400は、図11に示すヒートパイプ200の多孔質ウィック230を積層体430に置き替えたものである。積層体430は、箔491、多孔質ウィック431、箔492、多孔質ウィック432、及び箔493が積層されたものである。パイプ筐体290及び積層体430は、パイプ筐体290の長手方向へ伸びる空洞495を形成する。その他の構成については同じであるため説明を省略する。
 次に、ヒートパイプ400の製造方法について説明する。
 図18は、図17に示すヒートパイプ400の製造方法を示すフローチャートである。図19は、図18に示すヒートパイプ400の製造方法で用意される複数の箔491、492、493の外観および塗布工程の様子を示す斜視図である。図20は、図18に示す積層工程の様子を示す断面図である。図21は、図18に示す挿入工程の様子を示す断面図である。
 ヒートパイプ400の製造方法は図18に示すように、図4に示すS1を、S41~S43に置き替えたものである。その他の工程については同じであるため説明を省略する。
 ヒートパイプ400の製造方法では、図19に示すように、箔491、箔492、及び箔493を用意する。箔491は複数の開口部440を有する。箔493は複数の開口部440を有する。箔491、箔492、及び箔493の材料は例えば銅である。
 そして、図19に示すように、金属ペースト105を、箔491の複数の開口部440と箔492の両面と箔493の複数の開口部440とに塗布する(図18:S41)。
 次に、図20に示すように、箔491、箔492、及び箔493を積層する(図18:S42)。
 次に、図21に示すように、箔491、箔492、及び箔493の積層体をパイプ筐体290の内部に挿入する(図18:S43)。
 次に、金属シート155をパイプ筐体290の端部に貼付する(S2:貼付工程)。
 次に、パイプ筐体290を、例えばリフロー装置を用いて加熱する(S3:加熱工程)。これにより、溶融したSnと第2金属粒子107との反応によって金属間化合物相109が生成され、多孔質ウィック431及び多孔質ウィック432が得られる。
 その後、S4~S6の工程を経ると、ヒートパイプ400が得られる。ヒートパイプ400ではヒートパイプ100と同様に、第1金属の融点以上の温度で加熱することによって、溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物相109が多孔質ウィック431、432を構成する。
 そのため、ヒートパイプ400は、前述の焼結温度より極めて低い温度で、多孔質ウィック431、432をパイプ筐体290の内部に得ることができる。
 従って、ヒートパイプ400とヒートパイプ400を備える放熱部品とは、ヒートパイプ100と同様の効果を奏する。同様に、ヒートパイプ400の製造方法は、ヒートパイプ100の製造方法と同様の効果を奏する。
 なお、ヒートパイプ400の製造方法は、3枚の箔491~493を使用しているが、これに限るものではない。実施の際、例えば3枚の金属板を使用してもよい。また、積層する箔や金属板などの枚数は3枚に限られず、2枚以上の複数であればよい。
 以下、本発明の第5実施形態に係るヒートパイプ500について説明する。
 図22は、本発明の第5実施形態に係るヒートパイプ500の中央部を示す断面図である。ヒートパイプ500は、図11に示すヒートパイプ200の多孔質ウィック230を多孔質ウィック531、532に置き替えたものである。パイプ筐体290及び多孔質ウィック531、532は、パイプ筐体290の長手方向へ伸びる空洞595を形成する。その他の構成については同じであるため説明を省略する。
 次に、ヒートパイプ500の製造方法について説明する。
 図23は、図22に示すヒートパイプ500の製造方法を示すフローチャートである。図24は、図23に示すヒートパイプ500の製造方法で用意される複数の箔591、592、593、594の外観および塗布工程の様子を示す斜視図である。図25は、図23に示す積層工程の様子を示す断面図である。
 ヒートパイプ500の製造方法では、図22に示す構造を得るため、図24に示すように、箔591、箔592、箔593、及び箔594を用意する。箔592は開口部540を有する。箔593は開口部540を有する。箔591、箔592、箔593、及び箔594の材料は例えば銅である。
 そして、図24に示すように、金属ペースト105を、箔594に対向する箔591の面と箔591に対向する箔594の面とに塗布する(図23:S51)。
 次に、図25に示すように、箔591、箔592、箔593、及び箔594を積層する(図23:S52)。
 次に、箔591、箔592、箔593、及び箔594の積層体を、例えばリフロー装置を用いて加熱する(図23:S53)。これにより、溶融したSnと第2金属粒子107との反応によって金属間化合物相109が生成され、図22に示すような多孔質ウィック531、532及びパイプ筐体290が得られる。リフロー装置が加熱を停止した後、多孔質ウィック531、532及びパイプ筐体290は常温まで自然冷却していく。
 次に、作動液をパイプ筐体290の内部に充填する(S4:充填工程)。
 次に、パイプ筐体290の第2端部292を封止するため、図25に示す積層体590をパイプ筐体290の第2端部292に接合する(S54:接合工程)。積層体590は、4枚の箔が積層した積層体である。この接合は例えば、パイプ筐体290の第2端部292の接合面と積層体590の接合面とを活性化した後に加熱することによって、実施される。
 以上の製造方法によってヒートパイプ500が得られる。ヒートパイプ500ではヒートパイプ100と同様に、第1金属の融点以上の温度で加熱することによって、溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物相109が多孔質ウィック531、532を構成する。
 そのため、ヒートパイプ500は、前述の焼結温度より極めて低い温度で、多孔質ウィック531、532をパイプ筐体290の内部に得ることができる。
 従って、ヒートパイプ500とヒートパイプ500を備える放熱部品とは、ヒートパイプ100と同様の効果を奏する。同様に、ヒートパイプ500の製造方法は、ヒートパイプ100の製造方法と同様の効果を奏する。
 なお、ヒートパイプ500の製造方法は、4枚の箔591~594を使用しているが、これに限るものではない。実施の際、例えば4枚の金属板を使用してもよい。また、積層する箔や金属板などの枚数は4枚に限られず、2枚以上の複数であればよい。
 以下、本発明の第6実施形態に係るヒートパイプ600について説明する。
 図26は、本発明の第6実施形態に係るヒートパイプ600の外観を示す斜視図である。図27は、図26に示すヒートパイプ600の第1端部91を示す断面図である。ヒートパイプ600がヒートパイプ100と異なる点は、封止部材691、692である。その他の構成については同じであるため、説明を省略する。
 パイプ筐体90の両端部91、92は、封止部材691、692によって封止されている。封止部材691は、第2金属箔616と第1金属箔116と金属間化合物相119とによって構成されている。
 なお、ヒートパイプ600に関して、第2端部92の構成は第1端部91の構成と同じであり、封止部材692の構成は封止部材691の構成と同じである。そのため、パイプ筐体90の第2端部92及び封止部材692の説明を省略する。
 次に、ヒートパイプ600の製造方法について説明する。
 図28は、図26に示すヒートパイプ600の製造方法における貼付工程の様子を示す断面図である。ヒートパイプ600の製造方法がヒートパイプ100の製造方法と相違する点は、図4に示すS2、S5の貼付工程において図6(B)に示す金属シート155の代わりに、金属シート655及び塗膜115を用いる点である。金属シート655は、図28に示すように、第2金属箔616と第1金属箔116とを有するシートである。その他の点については同じであるため説明を省略する。
 ヒートパイプ600の製造方法では、図28に示すように塗膜115をパイプ筐体90の第1端部91に塗布した後、金属シート655をパイプ筐体90の第1端部91に貼付する(図4:S2)。塗膜115は前述したように、第2金属粒子107が有機成分118中に均一に分散した膜である。
 次に、パイプ筐体90の第1端部91を、例えばリフロー装置を用いて加熱する(図4:S3)。これにより、溶融したSnと第2金属粒子107との反応によって金属間化合物相119が生成され、図26、図27に示すような封止部材691が第1端部91に得られる。
 同様に、塗膜115をパイプ筐体90の第2端部92に塗布した後、金属シート655をパイプ筐体90の第2端部92に貼付する(図4:S5)。
 次に、パイプ筐体90の第2端部92を、例えばリフロー装置を用いて加熱する(図4:S3)。これにより、溶融したSnと第2金属粒子107との反応によって金属間化合物相119が生成され、図26に示すような封止部材692が第2端部92に得られる。
 以上の製造方法によってヒートパイプ600が得られる。ヒートパイプ600ではヒートパイプ100と同様に、第1金属の融点以上の温度で加熱することによって、溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物相119が封止部材691、692を構成する。
 そのため、ヒートパイプ600は、前述の焼結温度より極めて低い温度で、封止部材691、692をパイプ筐体90の両端部91、92に得ることができる。また、封止部材691、692の金属間化合物相119は、気孔率が極めて小さい緻密な構造を有する(図10参照)。よって、ヒートパイプ600は、パイプ筐体90の内部に封入した作動液の漏洩を確実に防ぐことができる。また、封止部材691、692は、耐衝撃性にも優れる。
 従って、ヒートパイプ600とヒートパイプ600を備える放熱部品とは、ヒートパイプ100と同様の効果を奏する。同様に、ヒートパイプ600の製造方法は、ヒートパイプ100の製造方法と同様の効果を奏する。
 以下、本発明の第7実施形態に係るヒートパイプ700について説明する。
 図29は、本発明の第7実施形態に係るヒートパイプ700の中央部を示す断面図である。ヒートパイプ700がヒートパイプ100と相違する点は、多孔質ウィック730の気孔率が多孔質ウィック30の気孔率より高い点である。多孔質ウィック730は、孔780を有する。多孔質ウィック730は、第1金属で構成される第1金属粒子106と、上述してきた第2金属で構成される第2金属粒子107と、第3金属で構成される第3金属粒子727と、金属間化合物で構成される金属間化合物粒子709とによって構成されている。多孔質ウィック730では、複数の金属間化合物粒子709が各第3金属粒子727を接合している。
 多孔質ウィック730は図1、図2に示す多孔質ウィック30と同様に、パイプ筐体90の長手方向へ伸び、パイプ筐体90における加熱部91と冷却部92との間を繋ぐ。そして、パイプ筐体90及び多孔質ウィック730は、パイプ筐体90の長手方向へ伸びる空洞95を形成する。その他の構成については同じであるため説明を省略する。
 次に、ヒートパイプ700の製造方法について説明する。
 図30は、図29に示すヒートパイプ700の製造方法で行われる塗布工程の様子を示す断面図である。ヒートパイプ700の製造方法がヒートパイプ100の製造方法と相違する点は、図4に示すS1の工程である。その他の工程については同じであるため説明を省略する。
 ヒートパイプ700の製造方法では、金属ペースト105の代わりに金属ペースト705を使用する。そして、図30に示すように、金属ペースト705をパイプ筐体90の短手方向の中央部に設ける。
 金属ペースト705は、第1金属粒子106と、第2金属粒子107と、有機成分108と、に加え、第3金属粒子727を含んでいる。第3金属は、例えばCuである。
 ここで、第3金属粒子727は、以下の条件を満たすものである。
 ・第3金属の融点が第1金属の融点より高い。
 ・第3金属粒子727の径の大きさが第2金属粒子107の径の大きさより大きい。
 ・第3金属は、第1金属と化学反応する。
 ・第3金属粒子727の表面に金属間化合物が生成される。
 ・第3金属粒子727と第1金属粒子106とが反応して金属間化合物を生成する際の反応速度は、第2金属粒子107と第1金属粒子106とが反応して金属間化合物を生成する際の反応速度より遅い。
 ・第3金属粒子727は、水などの作動液に不溶である。
 なお、第3金属粒子727の径の大きさを第2金属粒子107の径の大きさより大きくすることで、第2金属粒子107の比表面積が、第3金属粒子727より大きくなる。そして、第1金属粒子106が比表面積の大きな第2金属粒子107と優先的に反応して第2金属粒子107と第1金属粒子106とからなる金属間化合物が生成しやすくなり、該金属間化合物を介して第3金属粒子727同士を結着することが可能になる。また、第3金属粒子727を大きくすることで、粒子間の隙間が大きくなるため、加熱後の孔780を大きくすることができる。
 塗布工程が終わった後、S2~S6の工程を経ると、多孔質ウィック730をパイプ筐体90の短手方向の中央部に備えるヒートパイプ700が得られる。ヒートパイプ700ではヒートパイプ100と同様に、第1金属の融点以上の温度で加熱することによって、溶融した第1金属と第2金属とが反応し、第1金属と第2金属とからなる金属間化合物が生成される。この反応で生成された金属間化合物粒子709が多孔質ウィック730を構成する。
 そのため、ヒートパイプ700は、前述の焼結温度より極めて低い温度で、多孔質ウィック730をパイプ筐体90の内部に得ることができる。
 従って、ヒートパイプ700とヒートパイプ700を備える放熱部品とは、ヒートパイプ100と同様の効果を奏する。同様に、ヒートパイプ700の製造方法は、ヒートパイプ100の製造方法と同様の効果を奏する。
 なお、本実施形態では、第3金属粒子727がCuで構成されているが、これに限るものではない。実施の際、第3金属はCu以外の金属でも良い。例えば、第3金属がNiでも良い。また第2金属がCuNiCoで第3金属がCuNiでも良い。また、図29及び図30では全ての第3金属粒子727が球形で描かれているが、不定形でも良い。
《他の実施形態》
 なお、上述の実施形態では、パイプ筐体が、円筒形状、角筒形状などである例を示したが、これに限るものではない。パイプ筐体は、断面が多角形状、楕円形状などである筒形状でもよいし、外観形状が円錐形状であるような先細りする筒形状でもよいし、また、開口部の面積と側壁の面積とが同程度である筒形状でもよい。
 また、本実施形態の製造方法において金属ペースト105は、ペーストの形態であるが、これに限るものではない。実施の際、金属組成物は、たとえばパテ状の形態であってもよい。
 また、本実施形態の製造方法において第1金属粒子106の材料は、Sn単体であるが、これに限るものではない。実施の際は、第1金属粒子106の材料は、Sn系合金であってもよい。Sn系合金は例えば、SnAgCu合金、SnAg合金、SnCu合金、SnBi合金、SnSb合金、SnAu合金、SnPb合金、SnZn合金などである。
 また、本実施形態の製造方法において第2金属粒子107の材料は、CuNi合金であるが、これに限るものではない。実施の際は、第2金属粒子107の材料は、例えばCuMn合金粒子、CuAl合金粒子およびCuCr合金粒子からなる群より選ばれる少なくとも1種の合金であってもよい。Ni、Mn、Al、Crの割合は5~20重量%のCu合金粒子が好ましい。
 CuMn合金粒子を用いる場合、溶融したSnとCuMn合金粒子との反応により、Cu、MnおよびSnからなる群より選ばれる少なくとも2種を含んだ金属間化合物が生成される。この金属間化合物は例えば、(Cu,Mn)Sn、CuMnSn、CuMnSn、(Cu,Mn)Sn、CuMnSn、CuMnSnである。
 また、本実施形態の加熱工程において、熱風加熱しているが、これに限るものではない。実施の際は、例えば遠赤外線加熱や高周波誘導加熱、ホットプレート等を用いてもよい。
 また、本実施形態の加熱工程において、大気中で熱風加熱しているが、これに限るものではない。実施の際は、例えばN、H、ギ酸、又は真空中で熱風加熱しても良い。
 また、本実施形態の加熱工程において、加熱中は加圧していないが、これに限るものではない。実施の際は、例えば加熱中、数MPa程度の加圧を行ってもよい。この場合、緻密な金属間化合物が得られ、接合強度が増大する。
 最後に、前記実施形態の説明は、すべての点で例示であって、制限的なものではないと考えられるべきである。本発明の範囲は、上述の実施形態ではなく、特許請求の範囲によって示される。さらに、本発明の範囲は、特許請求の範囲と均等の範囲とを含む。
30、730…多孔質ウィック
80、780…孔
90…パイプ筐体
91…第1端部(加熱部)
92…第2端部(冷却部)
93…中央部
95…空洞
100、200、300、400、500、600、700…ヒートパイプ
105、705…金属ペースト
106…第1金属粒子
107…第2金属粒子
108…有機成分
109…金属間化合物相
110…金属成分
115…塗膜
116…第1金属箔
118…有機成分
119…金属間化合物相
155…金属シート
191、192…封止部材
205…圧紛体
218…有機成分
230…多孔質ウィック
250…加熱温度
290…パイプ筐体
291…第1端部(加熱部)
292…第2端部(冷却部)
295…空洞
330…多孔質ウィック
380…箔
390…パイプ筐体
391…第1端部(加熱部)
392…第2端部(冷却部)
395…空洞
396…芯材
430…積層体
431、432…多孔質ウィック
440…開口部
491、492、493…箔
495…空洞
531…多孔質ウィック
540…開口部
590…積層体
591、592、593、594…箔
595…空洞
616…第2金属箔
655…金属シート
691、692…封止部材
709…金属間化合物粒子
727…第3金属粒子

Claims (13)

  1.  作動液が封入されたパイプ筐体と、
     前記パイプ筐体の内部に設けられた多孔質ウィックと、を備え、
     前記多孔質ウィックは、少なくとも第1金属と前記第1金属より融点が高い第2金属とを含有する金属間化合物を含む、
    ヒートパイプ。
  2.  前記多孔質ウィックは、前記第1金属、前記第2金属、及び前記金属間化合物を含む材料で構成されている、請求項1に記載のヒートパイプ。
  3.  前記多孔質ウィックの気孔率は、20%以上である、請求項1又は請求項2に記載のヒートパイプ。
  4.  作動液が封入されたパイプ筐体と、
     前記パイプ筐体の内部に設けられたウィックと、
     前記パイプ筐体を封止する封止部材と、を備え、
     前記封止部材は、少なくとも第1金属と前記第1金属より融点の高い第2金属とを含有する金属間化合物を含む、
    ヒートパイプ。
  5.  前記封止部材は、前記パイプ筐体の端部を封止する、請求項4に記載のヒートパイプ。
  6.  前記封止部材は、前記第1金属及び前記金属間化合物を含む材料で構成されている、請求項4又は請求項5に記載のヒートパイプ。
  7.  前記第1金属は、SnまたはSn系合金からなる群より選ばれる少なくとも1種の金属であり、
     前記第2金属は、CuNi合金、CuMn合金、CuAl合金およびCuCr合金からなる群より選ばれる少なくとも1種の合金である、請求項1乃至請求項6のいずれか1項に記載のヒートパイプ。
  8.  請求項1乃至請求項7のいずれか1項に記載のヒートパイプを備える放熱部品。
  9.  第1金属と前記第1金属より融点の高い第2金属とを含む金属組成物を、パイプ筐体の内部に設ける設置工程と、
     前記金属組成物を加熱し、前記第1金属と前記第2金属とが反応することによって生成された金属間化合物を含む材料で構成される多孔質ウィックを、前記パイプ筐体の前記内部に形成する加熱工程と、を含む、ヒートパイプの製造方法。
  10.  第1金属と前記第1金属より融点の高い第2金属とを含む金属組成物を、パイプ筐体の端部に設ける設置工程と、
     前記金属組成物を加熱し、前記第1金属と前記第2金属とが反応することによって生成された金属間化合物を含む材料で構成される封止部材を、前記パイプ筐体の前記端部に形成する加熱工程と、を含む、ヒートパイプの製造方法。
  11.  前記金属組成物は、ペースト状であり、
     前記設置工程は、前記金属組成物を前記パイプ筐体の前記内部に塗布する工程である、請求項9に記載のヒートパイプの製造方法。
  12.  前記金属組成物はフラックスを含む、請求項9乃至請求項11のいずれか1項に記載のヒートパイプの製造方法。
  13.  前記加熱工程は、前記第1金属の融点以上前記第2金属の融点以下の範囲内の温度まで前記金属組成物を加熱する、請求項10乃至請求項12のいずれか1項に記載のヒートパイプの製造方法。
PCT/JP2016/075615 2015-09-28 2016-09-01 ヒートパイプ、放熱部品、ヒートパイプの製造方法 Ceased WO2017056842A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201680040550.3A CN107850400B (zh) 2015-09-28 2016-09-01 热导管、散热元件、热导管的制造方法
JP2017543047A JP6528852B2 (ja) 2015-09-28 2016-09-01 ヒートパイプ、放熱部品、ヒートパイプの製造方法
US15/864,369 US10591223B2 (en) 2015-09-28 2018-01-08 Heat pipe, heat dissipating component, and method for manufacturing heat pipe

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2015189647 2015-09-28
JP2015-189647 2015-09-28
JP2016064747 2016-03-28
JP2016-064747 2016-03-28

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US15/864,369 Continuation US10591223B2 (en) 2015-09-28 2018-01-08 Heat pipe, heat dissipating component, and method for manufacturing heat pipe

Publications (1)

Publication Number Publication Date
WO2017056842A1 true WO2017056842A1 (ja) 2017-04-06

Family

ID=58423323

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/075615 Ceased WO2017056842A1 (ja) 2015-09-28 2016-09-01 ヒートパイプ、放熱部品、ヒートパイプの製造方法

Country Status (4)

Country Link
US (1) US10591223B2 (ja)
JP (1) JP6528852B2 (ja)
CN (1) CN107850400B (ja)
WO (1) WO2017056842A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190078847A1 (en) * 2017-09-11 2019-03-14 Toyota Motor Engineering & Manufacturing North America, Inc. Low temperature sintering porous metal foam layers for enhanced cooling and processes for forming thereof
KR20200028843A (ko) * 2018-09-07 2020-03-17 도요타지도샤가부시키가이샤 증발기 및 그 제조 방법, 그리고 증발기를 갖는 루프형 히트 파이프
JP2020519837A (ja) * 2017-05-16 2020-07-02 エルジー・ケム・リミテッド ヒートパイプの製造方法
WO2021029204A1 (ja) * 2019-08-09 2021-02-18 矢崎エナジーシステム株式会社 構造体及びその製造方法
WO2024014429A1 (ja) * 2022-07-11 2024-01-18 古河電気工業株式会社 放熱部品用銅合金材および放熱部品

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111238276B (zh) * 2018-11-28 2021-04-16 南京舒宜汇科学仪器有限公司 加压烧结法制备吸液芯的方法
CN113140830B (zh) * 2020-01-20 2023-01-10 广州力及热管理科技有限公司 具有加热功能的均温板元件及应用其的动力电池模组

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5229656U (ja) * 1975-07-31 1977-03-02
JPH03110392A (ja) * 1989-09-22 1991-05-10 Teijin Seiki Co Ltd ヒートパイプ
JPH0647579A (ja) * 1992-04-13 1994-02-22 Mitsubishi Materials Corp 活性Agろう材
JPH09119789A (ja) * 1995-10-24 1997-05-06 Mitsubishi Materials Corp ヒートパイプの製造方法
JP2001205476A (ja) * 2000-01-27 2001-07-31 Sumitomo Metal Mining Co Ltd 合金ろう材
US20050022975A1 (en) * 2003-06-26 2005-02-03 Rosenfeld John H. Brazed wick for a heat transfer device and method of making same
JP3110111U (ja) * 2005-01-31 2005-06-16 ▲玉▼成化工有限公司 熱導管
JP2015135211A (ja) * 2014-01-17 2015-07-27 株式会社フジクラ ヒートパイプ
JP2015147989A (ja) * 2014-02-07 2015-08-20 株式会社村田製作所 多孔質金属体およびその製造方法

Family Cites Families (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3426420A (en) 1966-04-08 1969-02-11 Nat Res Corp Method of making brazed composite tubing for heat exchangers used in corrosive fluids
US3479731A (en) 1967-06-13 1969-11-25 Gen Motors Corp Brazing method
JPS57107501A (en) 1980-12-25 1982-07-05 Sony Corp Conduction material
JPS58100992A (ja) 1981-12-10 1983-06-15 Tokuriki Honten Co Ltd 金一錫複合ろう材とその製造方法
JPH084925B2 (ja) 1987-01-23 1996-01-24 日東電工株式会社 金属部材の接合方法
US5597656A (en) 1993-04-05 1997-01-28 The Louis Berkman Company Coated metal strip
US6861159B2 (en) 1992-03-27 2005-03-01 The Louis Berkman Company Corrosion-resistant coated copper and method for making the same
JPH07299591A (ja) 1994-05-10 1995-11-14 Tanaka Denshi Kogyo Kk 複合半田材料の製造方法
DE69701277T2 (de) 1996-12-03 2000-08-31 Lucent Technologies Inc., Murray Hill Gegenstand mit dispergierten Teilchen enthaltendes feinkörniges Weichlot
US6085965A (en) 1997-02-04 2000-07-11 Mcdonnel & Douglas Corporation Pressure bonding and densification process for manufacturing low density core metal parts
JP3335896B2 (ja) 1997-12-26 2002-10-21 株式会社東芝 ハンダ材及びハンダ材の製造方法
JP3736452B2 (ja) 2000-12-21 2006-01-18 株式会社日立製作所 はんだ箔
TW592871B (en) 2000-12-21 2004-06-21 Hitachi Ltd Solder foil and semiconductor device and electronic device
WO2002062519A1 (en) 2001-02-05 2002-08-15 Rutgers, The State University Transient eutectic phase process for ceramic-metal bonding, metallilzation, and compositing
US20040211291A1 (en) 2001-03-28 2004-10-28 Tamura Kaken Corporation Method of manufacturing fine metal particles, substance containing fine metal particles, and paste solder composition
US7776454B2 (en) 2001-12-14 2010-08-17 EMS Solutions, Inc. Ti brazing strips or foils
JP2004174522A (ja) 2002-11-25 2004-06-24 Hitachi Ltd 複合はんだ、その製造方法および電子機器
TW553371U (en) * 2002-12-02 2003-09-11 Tai Sol Electronics Co Ltd Liquid/vapor phase heat dissipation apparatus
JP3990330B2 (ja) 2003-08-01 2007-10-10 ヒューマンユニテック株式会社 線状無鉛ハンダ、その製造方法及びハンダ接合方法。
GB0327002D0 (en) 2003-11-20 2003-12-24 Rolls Royce Plc A method of manufacturing a fibre reinforced metal matrix composite article
US20060180296A1 (en) * 2005-02-17 2006-08-17 Yuh-Cheng Chemical Ltd. Heat pipe
US10081852B2 (en) 2005-09-15 2018-09-25 Senju Metal Industry Co., Ltd. Solder preform and a process for its manufacture
DE102005045492A1 (de) 2005-09-23 2007-03-29 Emitec Gesellschaft Für Emissionstechnologie Mbh Wabenkörper mit stirnseitiger Hartlot-Zone
JP2007287712A (ja) 2006-04-12 2007-11-01 Oki Electric Ind Co Ltd 半導体装置、半導体装置の実装構造、及びそれらの製造方法
CN100582638C (zh) * 2006-04-14 2010-01-20 富准精密工业(深圳)有限公司 热管
TWI296039B (en) * 2006-06-02 2008-04-21 Delta Electronics Inc Heat dissipation module and heat column thereof
JP5266682B2 (ja) 2007-07-31 2013-08-21 キャタピラージャパン株式会社 複層焼結摺動部材
JP5207707B2 (ja) 2007-10-31 2013-06-12 ニホンハンダ株式会社 金属線入り成形はんだ、およびその製造方法
JP5217640B2 (ja) 2008-05-30 2013-06-19 富士通株式会社 プリント配線板の製造方法およびプリント基板ユニットの製造方法
KR101276147B1 (ko) 2009-09-03 2013-06-18 가부시키가이샤 무라타 세이사쿠쇼 솔더 페이스트, 그것을 사용한 접합 방법, 및 접합 구조
JP4616927B1 (ja) 2010-02-25 2011-01-19 パナソニック株式会社 配線基板、配線基板の製造方法、及びビアペースト
WO2012066795A1 (ja) 2010-11-19 2012-05-24 株式会社村田製作所 導電性材料、それを用いた接続方法、および接続構造
TWI461252B (zh) 2010-12-24 2014-11-21 村田製作所股份有限公司 A bonding method, a bonding structure, an electronic device, an electronic device manufacturing method, and an electronic component
TWI436710B (zh) 2011-02-09 2014-05-01 村田製作所股份有限公司 Connection structure
CN103619529B (zh) 2011-09-02 2015-05-06 三菱综合材料株式会社 焊料粉末以及使用该粉末的焊料用浆料
EP2753804A4 (en) 2011-09-05 2015-08-26 Basf Corp METHOD FOR APPLYING BRASURE TO A HONEYCOMB METAL MATRIX, HONEYCOMB METAL MATRIX, AND MANUFACTURING METHOD THEREOF
JPWO2013038817A1 (ja) * 2011-09-16 2015-03-26 株式会社村田製作所 導電性材料、それを用いた接続方法、および接続構造
CN103797139A (zh) * 2011-09-16 2014-05-14 株式会社村田制作所 导电性材料、使用该导电性材料的连接方法和连接结构物
KR20140110926A (ko) * 2012-03-05 2014-09-17 가부시키가이샤 무라타 세이사쿠쇼 접합 방법, 접합 구조체 및 그 제조 방법
CN104245203B (zh) * 2012-03-05 2016-10-12 株式会社村田制作所 接合方法、电子装置的制造方法和电子部件
EP2824681B1 (en) 2012-03-05 2019-04-10 Murata Manufacturing Co., Ltd. Electronic component and a junction structure between electronic component and object to be joined
KR20140098815A (ko) 2012-03-05 2014-08-08 가부시키가이샤 무라타 세이사쿠쇼 접합 방법, 접합 구조체 및 그 제조 방법
JP5990758B2 (ja) 2012-04-02 2016-09-14 株式会社弘輝 はんだ材及びその製造方法
WO2013191022A1 (ja) 2012-06-19 2013-12-27 株式会社村田製作所 接合用部材
JP6064886B2 (ja) 2012-12-26 2017-01-25 株式会社豊田中央研究所 熱伝導性応力緩和構造体
JP2014180690A (ja) 2013-03-19 2014-09-29 Nippon Steel Sumikin Materials Co Ltd シート状高温はんだ接合材およびこれを用いたダイボンディング方法
JP6384894B2 (ja) 2013-11-11 2018-09-05 新日鐵住金株式会社 金属ナノ粒子を用いた金属接合構造及び金属接合方法並びに金属接合材料
TWI624356B (zh) 2013-11-11 2018-05-21 新日鐵住金股份有限公司 Metal joint structure using metal nanoparticle, metal joint method, and metal joint material
WO2015105088A1 (ja) 2014-01-07 2015-07-16 株式会社村田製作所 構造材接合方法、接合用シートおよび接合構造
JP6075465B2 (ja) 2014-01-07 2017-02-08 株式会社村田製作所 補修方法および補修材
WO2015118982A1 (ja) 2014-02-04 2015-08-13 株式会社村田製作所 電子部品モジュール、および電子部品モジュールの製造方法
JP2015166101A (ja) 2014-03-03 2015-09-24 株式会社Uacj アルミニウム材の接合方法及びアルミニウム材の接合体
DE102014112831B4 (de) 2014-09-05 2016-03-31 Vacuumschmelze Gmbh & Co. Kg Verfahren zum Hartlöten und Verwendung einer Hartlotfolie zum Induktionslöten
US10485149B2 (en) 2016-09-23 2019-11-19 Te Connectivity Corporation Composite formulation and composite article

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5229656U (ja) * 1975-07-31 1977-03-02
JPH03110392A (ja) * 1989-09-22 1991-05-10 Teijin Seiki Co Ltd ヒートパイプ
JPH0647579A (ja) * 1992-04-13 1994-02-22 Mitsubishi Materials Corp 活性Agろう材
JPH09119789A (ja) * 1995-10-24 1997-05-06 Mitsubishi Materials Corp ヒートパイプの製造方法
JP2001205476A (ja) * 2000-01-27 2001-07-31 Sumitomo Metal Mining Co Ltd 合金ろう材
US20050022975A1 (en) * 2003-06-26 2005-02-03 Rosenfeld John H. Brazed wick for a heat transfer device and method of making same
JP3110111U (ja) * 2005-01-31 2005-06-16 ▲玉▼成化工有限公司 熱導管
JP2015135211A (ja) * 2014-01-17 2015-07-27 株式会社フジクラ ヒートパイプ
JP2015147989A (ja) * 2014-02-07 2015-08-20 株式会社村田製作所 多孔質金属体およびその製造方法

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11118844B2 (en) 2017-05-16 2021-09-14 Lg Chem, Ltd. Preparation method for heat pipe
JP7025088B2 (ja) 2017-05-16 2022-02-24 エルジー・ケム・リミテッド ヒートパイプの製造方法
JP2020519837A (ja) * 2017-05-16 2020-07-02 エルジー・ケム・リミテッド ヒートパイプの製造方法
US10794642B2 (en) * 2017-09-11 2020-10-06 Toyota Motor Engineering & Manufacturing North America, Inc. Low temperature sintering porous metal foam layers for enhanced cooling and processes for forming thereof
US20190078847A1 (en) * 2017-09-11 2019-03-14 Toyota Motor Engineering & Manufacturing North America, Inc. Low temperature sintering porous metal foam layers for enhanced cooling and processes for forming thereof
KR102351282B1 (ko) * 2018-09-07 2022-01-14 도요타지도샤가부시키가이샤 증발기 및 그 제조 방법, 그리고 증발기를 갖는 루프형 히트 파이프
KR20200028843A (ko) * 2018-09-07 2020-03-17 도요타지도샤가부시키가이샤 증발기 및 그 제조 방법, 그리고 증발기를 갖는 루프형 히트 파이프
WO2021029204A1 (ja) * 2019-08-09 2021-02-18 矢崎エナジーシステム株式会社 構造体及びその製造方法
JP2021028555A (ja) * 2019-08-09 2021-02-25 矢崎エナジーシステム株式会社 構造体及びその製造方法
CN114096794A (zh) * 2019-08-09 2022-02-25 矢崎能源系统公司 结构体以及结构体的制造方法
GB2600039A (en) * 2019-08-09 2022-04-20 Yazaki Energy System Corp Structure, and method for manufacturing same
GB2600039B (en) * 2019-08-09 2023-06-07 Yazaki Energy System Corp Structure, and method for manufacturing same
JP7350434B2 (ja) 2019-08-09 2023-09-26 矢崎エナジーシステム株式会社 構造体及びその製造方法
AU2020328306B2 (en) * 2019-08-09 2023-10-19 Yazaki Energy System Corporation Structure, and method for manufacturing same
WO2024014429A1 (ja) * 2022-07-11 2024-01-18 古河電気工業株式会社 放熱部品用銅合金材および放熱部品

Also Published As

Publication number Publication date
JP6528852B2 (ja) 2019-06-12
CN107850400B (zh) 2019-10-25
CN107850400A (zh) 2018-03-27
US10591223B2 (en) 2020-03-17
US20180128554A1 (en) 2018-05-10
JPWO2017056842A1 (ja) 2018-04-05

Similar Documents

Publication Publication Date Title
JP6528852B2 (ja) ヒートパイプ、放熱部品、ヒートパイプの製造方法
US6997371B2 (en) Thermal spray application of brazing material for manufacture of heat transfer devices
JP4459270B2 (ja) フラックスが含まれた低温接合用ブレージング材
CN111836695A (zh) 助焊剂、焊膏、焊接制程、焊接制品的制造方法、bga封装件的制造方法
US10625377B2 (en) Bonding member and method for manufacturing bonding member
JP2009058167A (ja) 耐食性に優れたチューブを用いたアルミニウム熱交換器および耐食性に優れたアルミニウム製熱交換器の製造方法
WO2013132953A1 (ja) 接合方法、電子装置の製造方法、および電子部品
TW201313376A (zh) 無鉛焊料組合物
CN106102967A (zh) 多孔铝复合体及多孔铝复合体的制造方法
TW202112482A (zh) 銲錫-金屬網複合材及其製造方法
CN106573343B (zh) 金属间化合物的生成方法
JP6311844B2 (ja) 接合方法
CN107848075B (zh) 接合用构件、接合用构件的制造方法和接合方法
JP5490603B2 (ja) アルミニウム部材のろう付方法
JP2006307292A (ja) ろう付性に優れたラジエータチューブ用アルミニウム合金板材、及びそれを備えたラジエータチューブと熱交換器
JP6231800B2 (ja) 微細通路を備えた熱交換器用Al部材及びその製造方法
CN109312990B (zh) 热管的制造方法和热管
WO2016194435A1 (ja) 放熱部材の接合方法、放熱部材付き発熱素子
JP2019090065A (ja) アルミニウム系多孔質部材及びその製造方法
EP2067565B1 (en) Composition of brazing flux and method for manufacturing heat exchanger tubes using said composition
WO2017073313A1 (ja) 接合部材、および、接合部材の接合方法
JP2019090064A (ja) アルミニウム系多孔質部材及びその製造方法
JP2013111596A (ja) 構造体の製造方法
WO2019035162A1 (ja) アルミニウム系多孔質部材及びその製造方法
JP2019065322A (ja) アルミニウム系多孔質部材及びその製造方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16851018

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017543047

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 16851018

Country of ref document: EP

Kind code of ref document: A1