DE212016000208U1 - Maritime green settlement system and its modular design - Google Patents
Maritime green settlement system and its modular design Download PDFInfo
- Publication number
- DE212016000208U1 DE212016000208U1 DE212016000208.2U DE212016000208U DE212016000208U1 DE 212016000208 U1 DE212016000208 U1 DE 212016000208U1 DE 212016000208 U DE212016000208 U DE 212016000208U DE 212016000208 U1 DE212016000208 U1 DE 212016000208U1
- Authority
- DE
- Germany
- Prior art keywords
- floor unit
- settlement system
- maritime
- green
- modules
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000002093 peripheral effect Effects 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 38
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 7
- 238000003860 storage Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 4
- 238000004659 sterilization and disinfection Methods 0.000 claims description 4
- 229910001209 Low-carbon steel Inorganic materials 0.000 claims description 3
- 229910052602 gypsum Inorganic materials 0.000 claims description 3
- 239000010440 gypsum Substances 0.000 claims description 3
- 238000009417 prefabrication Methods 0.000 claims description 3
- 238000011084 recovery Methods 0.000 claims description 3
- 239000002351 wastewater Substances 0.000 claims description 3
- 238000004140 cleaning Methods 0.000 claims description 2
- 238000007789 sealing Methods 0.000 claims 1
- 238000005192 partition Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 241000282346 Meles meles Species 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 239000000565 sealant Substances 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 240000003517 Elaeocarpus dentatus Species 0.000 description 1
- 241000196324 Embryophyta Species 0.000 description 1
- 239000011230 binding agent Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000010612 desalination reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/02—Dwelling houses; Buildings for temporary habitation, e.g. summer houses
- E04H1/04—Apartment houses arranged in two or more levels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/005—Modulation co-ordination
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/10—Photovoltaic [PV]
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Residential Or Office Buildings (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
- Sewage (AREA)
Abstract
Maritimes grünes Siedlungssystem, dadurch gekennzeichnet, dass es mindestens eine Stockwerkeinheit umfasst, wobei jede Stockwerkeinheit mindestens ein Zimmer, Innenmöbel, ein Deck und einen photovoltaischen Solarkollektor umfasst, und wobei das Zimmer und die Innenmöbel durch eine ausgerichtete Verbindung von mindestens zwei Modulen ausgebildet sind, und wobei die Module standardisierte Abmessungen haben; und wobei das Deck nach außen hinausragend an dem Umfangsrand der Unterseite und der Oberseite jeder Stockwerkeinheit installiert ist; und wobei der photovoltaische Solarkollektor einen photovoltaischen Solarkollektor des Dachs und einen photovoltaischen Solarkollektor der Seitenfläche umfasst, und wobei der photovoltaische Solarkollektor des Dachs an der Oberseite der höchsten Stockwerkeinheit installiert ist, und wobei der photovoltaische Solarkollektor der Seitenfläche sich auf beiden Seiten jeder Stockwerkeinheit befindet und zwischen der Oberseite jeder Stockwerkeinheit und dem Deck an der Unterseite sandwichartig angeordnet ist.A maritime green settlement system, characterized in that it comprises at least one floor unit, each floor unit comprising at least one room, interior furniture, a deck and a photovoltaic solar collector, and wherein the room and the interior furniture are formed by an aligned connection of at least two modules, and the modules have standardized dimensions; and wherein the deck is installed outwardly projecting at the peripheral edge of the bottom and the top of each floor unit; and wherein the photovoltaic solar collector comprises a solar photovoltaic collector of the roof and a photovoltaic solar collector of the lateral surface, and wherein the photovoltaic solar collector of the roof is installed at the top of the highest floor unit, and wherein the photovoltaic solar collector of the lateral surface is located on both sides of each floor unit the top of each floor unit and the deck is sandwiched at the bottom.
Description
TECHNISCHES GEBIETTECHNICAL AREA
Die vorliegende Erfindung betrifft das technische Gebiet des Baus, insbesondere ein maritimes grünes Siedlungssystem und seine modulare Bauweise.The present invention relates to the technical field of construction, in particular a maritime green settlement system and its modular design.
STAND DER TECHNIKSTATE OF THE ART
Mit dem Fortschritt von Wissenschaft und Technologie werden immer mehr Meeresressourcen genutzt, das Konzept der menschlichen Siedlungen auf dem Meer wird auch allmählich bei den Menschen beliebt. Bezüglich der rauen variablen Meeresumwelt sollen bei dem Bau der Wohngebäude auf Meer häufig die Sicherheit, der Komfort und der maximale Einsatz von Ressourcen vollständig berücksichtigt werden, deshalb hat das Wohngebäude mehr Bauteile, im Vergleich zum Wohngebäude auf der Landfläche sind die elektromechanischen Systeme und photovoltaischen Systeme auch relativ kompliziert, was dazu führt, dass beim Bau des Gebäudes eine große Menge an Fertigungen der Bauteile an der Baustelle, Verarbeitungen und Zusammenbau besteht, dadurch wird die Bauzeit der Gebäude extrem verbraucht, dabei bestehen eine lange Bauzeit und hohe Baukosten.With the advancement of science and technology, more and more marine resources are being used, and the concept of human settlements at sea is also becoming popular with humans. With regard to the harsh variable marine environment, the construction of residential buildings at sea often takes full account of the safety, comfort and maximum use of resources, so the residential building has more components compared to residential land-based buildings are the electromechanical systems and photovoltaic systems also relatively complicated, which results in the construction of the building, a large amount of manufacturing of components on the site, processing and assembly, thereby the construction time of the building is extremely consumed, there is a long construction time and high construction costs.
INHALT DER VORLIEGENDEN ERFINDUNGCONTENTS OF THE PRESENT INVENTION
Hinsichtlich der oben geschilderten technischen Probleme stellt die vorliegende Erfindung ein maritimes grünes Siedlungssystem und seine modulare Bauweise zur Verfügung, mit der der Bau eines maritimen Siedlungssystems in relativ kurzer Zeit abgeschlossen werden kann, um die Bauzeit extrem zu verkürzen und die Baukosten zu reduzieren.In view of the above-described technical problems, the present invention provides a marine green settlement system and its modular construction that can complete the construction of a maritime settlement system in a relatively short time to extremely shorten the construction time and reduce the construction cost.
Die vorliegende Erfindung wird dadurch realisiert: ein maritimes grünes Siedlungssystem, umfassend mindestens eine Stockwerkeinheit, wobei jede Stockwerkeinheit mindestens ein Zimmer, Innenmöbel, ein Deck und einen photovoltaischen Solarkollektor umfasst, und wobei das Zimmer und die Innenmöbel durch eine ausgerichtete Verbindung von mindestens zwei Modulen ausgebildet sind, und wobei die Module standardisierte Abmessungen haben; und wobei das Deck nach außen hinausragend an dem Umfangsrand der Unterseite und der Oberseite jeder Stockwerkeinheit installiert ist; und wobei der photovoltaische Solarkollektor einen photovoltaischen Solarkollektor des Dachs und einen photovoltaischen Solarkollektor der Seitenfläche umfasst, und wobei der photovoltaische Solarkollektor des Dachs an der Oberseite der höchsten Stockwerkeinheit installiert ist, und wobei der photovoltaische Solarkollektor der Seitenfläche sich auf beiden Seiten jeder Stockwerkeinheit befindet und zwischen der Oberseite jeder Stockwerkeinheit und dem Deck an der Unterseite sandwichartig angeordnet ist.The present invention is realized by: a maritime green settlement system comprising at least one floor unit, each floor unit comprising at least one room, interior furniture, a deck and a photovoltaic solar collector, and wherein the room and the interior furniture are formed by an aligned connection of at least two modules are, and wherein the modules have standardized dimensions; and wherein the deck is installed outwardly projecting at the peripheral edge of the bottom and the top of each floor unit; and wherein the photovoltaic solar collector comprises a solar photovoltaic collector of the roof and a photovoltaic solar collector of the lateral surface, and wherein the photovoltaic solar collector of the roof is installed at the top of the highest floor unit, and wherein the photovoltaic solar collector of the lateral surface is located on both sides of each floor unit the top of each floor unit and the deck is sandwiched at the bottom.
Bevorzugt sind die Zimmer in einer Anzahl von mindestens 3 bereitgestellt, wobei sie einen Geräteraum, eine Küche und ein Badezimmer umfassen.Preferably, the rooms are provided in a number of at least 3, comprising a equipment room, a kitchen, and a bathroom.
Bevorzugt ist das Badezimmer eng benachbart zu dem Geräteraum angeordnet.Preferably, the bathroom is located closely adjacent to the equipment room.
Bevorzugt sind an jeder Stockwerkeinheit eine Aussichtsfläche zum Betrachten der Meersicht und eine Nichtaussichtsfläche angeordnet, wobei das Badezimmer und der Geräteraum sich an der Nichtaussichtsfläche der Stockwerkeinheit befinden.Preferably, a viewing area for viewing the sea view and a non-viewing area are arranged on each floor unit, wherein the bathroom and the equipment room are located on the non-viewing area of the floor unit.
Bevorzugt umfasst das Modul einen Rahmen, einen Außenwandkörper, eine Innentrennwand, eine Hängedecke und einen Boden, wobei der Außenwandkörper mit einer wärmedämmenden Technik hergestellt ist, und wobei die Innentrennwand und die Hängedecke jeweils aus einem Leichtstahlkielsystem hergestellt sind.Preferably, the module comprises a frame, an outer wall body, an inner partition wall, a suspended ceiling, and a floor, wherein the outer wall body is made with a thermally insulating technique, and wherein the inner partition wall and the suspended ceiling are each made of a mild steel keel system.
Bevorzugt umfasst das maritime grüne Siedlungssystem weiterhin ein Regenwassersammelsystem zur Rückgewinnung des Regenwassers, wobei das Regenwassersammelsystem eine Regenwasserfiltereinrichtung, eine Wasserspeichervorrichtung und eine Reinigungsvorrichtung umfasst.Preferably, the maritime green settlement system further comprises a rainwater collection system for recovering the rainwater, the rainwater collection system comprising a rainwater filter device, a water storage device, and a purifier.
Bevorzugt umfasst das maritime grüne Siedlungssystem weiterhin ein Recyclingwasseraufbereitungssystem zur Rückgewinnung des Lebensabwassers, wobei das Recyclingwasseraufbereitungssystem ein Gitter, ein Einstellbecken, eine Hebepumpe, einen Haarfilter und eine Desinfektionsanlage umfasst.Preferably, the maritime green settlement system further comprises a recycled water treatment system for recovering the life waste water, the recycling water treatment system comprising a grid, an adjustment basin, a lift pump, a hair filter and a disinfection facility.
Bevorzugt umfasst das maritime grüne Siedlungssystem mehrere Stockwerkeinheiten und Treppen, wobei die Treppen zwischen zwei benachbarten Stockwerkeinheiten installiert sind und sich auf dem Deck außerhalb des Geräteraums und des Badezimmers befinden.Preferably, the maritime green settlement system comprises several storey units and stairs, the stairs being installed between two adjacent storey units and located on the deck outside the equipment room and the bathroom.
Die vorliegende Erfindung stellt weiterhin eine modulare Bauweise zum Bauen des maritimen grünen Siedlungssystems zur Verfügung, umfassend folgende Schritte:
- A. Vorfertigungsstufe in der Fabrik, Feststellen der Anzahl der Stockwerke, der Anzahl der Module in jeder Stockwerkeinheit und der optimalen Kombinationsmethode nach den Bedürfnissen des Kunden, separates Vervollständigen der Herstellung, der Vormontage und der Innenausstattung der jeweiligen Komponenten in jedem Modul;
- B. Fördern der jeweiligen Module zur Baustelle, Heben der jeweiligen Module der ersten Stockwerkeinheit zur vorgegebenen Position;
- C. Zusammenbau der jeweiligen Module der ersten Stockwerkeinheit nach bündigem Ausrichten, um eine regelmäßige Gesamtstruktur, Installieren des Decks am Umfang der Oberseite und Unterseite der Stockwerkeinheit, anschließendes Installieren des photovoltaischen Solarkollektors der Seitenfläche;
- D. Installieren des photovoltaischen Solarkollektors des Dachs an der Oberseite der höchsten Stockwerkeinheit.
- A. Prefabrication stage in the factory, determining the number of floors, the number of modules in each floor unit and the optimal combination method according to the needs of the customer, separately completing the manufacture, pre-assembly and interior fittings of the respective components in each module;
- B. conveying the respective modules to the construction site, lifting the respective modules of the first floor unit to the predetermined position;
- C. assembling the respective modules of the first floor unit after flush alignment to maintain a regular overall structure, installing the deck at the periphery of the top and bottom of the floor unit, then installing the photovoltaic solar panel of the side surface;
- D. Install the photovoltaic solar collector of the roof at the top of the highest floor unit.
Bevorzugt sind im Schritt C die Module durch eine Schraube miteinander verbunden, wobei nach fertiger Verbindung der Module ein Stöpseln mittels einer Gipsplatte und eines Dichtungsmittels an dem Verbindungsspalt durchgeführt wird.Preferably, in step C, the modules are connected to each other by a screw, wherein after finished connection of the modules, a plugging is performed by means of a gypsum board and a sealant at the connecting gap.
Bevorzugt bestehen noch folgende Schritte zwischen dem Schritt C und D:Preferably, the following steps still exist between step C and D:
Installieren der zweiten Stockwerkeinheit an der Oberseite der ersten Stockwerkeinheit mit dem Verfahren des Schritt C, Wiederholen, bis die Installation der restlichen Stockwerkeinheiten abgeschlossen wird, und Installieren der Treppen zwischen zwei benachbarten Stockwerkeinheiten.Installing the second floor unit at the top of the first floor unit by the method of step C, repeating until the installation of the remaining floor units is completed, and installing the stairs between two adjacent floor units.
Bevorzugt umfasst die modulare Bauweise weiterhin Schritt E:Preferably, the modular construction further comprises step E:
Durchführen einer von der Entfeuchtungsbehandlung befreiten Betätigung für das maritime grüne Siedlungssystem.Performing a de-humidifying treatment for the maritime green settlement system.
Im Vergleich zum Stand der Technik hat die vorliegende Erfindung folgende Vorteile: die vorliegende Erfindung stellt ein maritimes grünes Siedlungssystem und seine modulare Bauweise zur Verfügung, bei dem maritimen grünen Siedlungssystem werden mindestens zwei Module an der Baustelle nach bündigem Ausrichten zusammengebaut, um die Zimmer und Innenmöbel jeder Stockwerkeinheit auszubilden, und das Deck und der photovoltaische Solarkollektor werden installiert, dadurch kann der Bau des maritimen Siedlungssystems in relativ kurzer Zeit vervollständigt werden, dadurch wird die Bauzeit extrem verkürzt, um die Baukosten zu reduzieren.Compared with the prior art, the present invention has the following advantages: the present invention provides a maritime green settlement system and its modular construction, in which maritime green settlement system are assembled at least two modules at the construction site after flush alignment to the rooms and interior furniture to construct each floor unit, and the deck and the photovoltaic solar collector are installed, thereby completing the construction of the maritime settlement system in a relatively short time, thereby extremely shortening the construction time to reduce the construction cost.
Figurenlistelist of figures
-
1 zeigt eine schematische Darstellung der Teilungsrichtung der jeweiligen Module in der Stockwerkeinheit in einer Ausführungsform der vorliegenden Erfindung.1 shows a schematic representation of the division direction of the respective modules in the floor unit in an embodiment of the present invention. -
2 zeigt eine schematische Montageansicht des Zusammenbaus der jeweiligen Module in der Stockwerkeinheit in einer Ausführungsform der vorliegenden Erfindung.2 shows a schematic assembly view of the assembly of the respective modules in the floor unit in an embodiment of the present invention. -
3 zeigt ein Effektsdiagramm nach dem Zusammenbau der jeweiligen Module in der Stockwerkeinheit in einer Ausführungsform der vorliegenden Erfindung.3 shows an effect diagram after assembly of the respective modules in the floor unit in an embodiment of the present invention. -
4 zeigt eine schematische Montageansicht eines Paars der Oberseitendecke in der Stockwerkeinheit in einer Ausführungsform der vorliegenden Erfindung.4 Fig. 12 is a schematic mounting view of a pair of the top cover in the floor unit in an embodiment of the present invention. -
5 zeigt eine schematische Montageansicht eines anderen Paars der Oberseitendecke in der Stockwerkeinheit in einer Ausführungsform der vorliegenden Erfindung.5 shows a schematic assembly view of another pair of the top cover in the floor unit in an embodiment of the present invention. -
6 zeigt eine schematische Montageansicht des photovoltaischen Solarkollektors (photovoltaischer Solarkollektor des Dachs nicht beinhaltet) in der Stockwerkeinheit in einer Ausführungsform der vorliegenden Erfindung.6 FIG. 12 shows a schematic mounting view of the solar photovoltaic panel (solar roof photovoltaic solar collector not included) in the floor unit in an embodiment of the present invention. FIG. -
7 zeigt eine schematische Montageansicht des Zusammenbaus der Module der zweiten Stockwerkeinheit in dem maritimen grünen Siedlungssystems in einer Ausführungsform der vorliegenden Erfindung.7 shows a schematic assembly view of the assembly of the modules of the second floor unit in the maritime green settlement system in an embodiment of the present invention. -
8 zeigt eine schematische Montageansicht des Decks der zweiten Stockwerkeinheit in dem maritimen grünen Siedlungssystems in einer Ausführungsform der vorliegenden Erfindung.8th shows a schematic assembly view of the deck of the second floor unit in the maritime green settlement system in an embodiment of the present invention. -
9 zeigt eine schematische Strukturansicht des maritimen grünen Siedlungssystems mit drei Stockwerkeinheiten in einer Ausführungsform der vorliegenden Erfindung.9 shows a schematic structural view of the maritime green settlement system with three storey units in an embodiment of the present invention.
AUSFÜHRLICHE BESCHREIBUNGDETAILED DESCRIPTION
Im Zusammenhang mit Figuren und Ausführungsformen wird die vorliegende Erfindung im Folgenden näher erläutert, damit das Ziel, die technischen Lösungen und die Vorteile der vorliegenden Erfindung klarer werden. Es versteht sich, dass die hier geschilderten ausführlichen Ausführungsformen nur zur Erläuterung der vorliegenden Erfindung dient, statt die vorliegende Erfindung zu beschränken.In the context of figures and embodiments, the present invention will be explained in more detail below, so that the object, the technical solutions and the advantages of the present invention become clearer. It should be understood that the detailed embodiments described herein are for the purpose of illustrating the present invention, rather than limiting the present invention.
Insbesondere sind die Zimmer
Bevorzugt hat das Badezimmer
Wenn der Baumodul als Basismodul verwendet wird, beträgt die Einheitsgröße der Möbel 300, 600, 900, 1200 und 1500mm. Die Gesamtbreitengröße der abtrennenden Möbel beträgt 2700, 3000 und 3300mm usw. Wenn der Tiefenmodul der abtrennenden Möbel als 50mm festgestellt und als Basismodul verwendet wird, wird der Vergrößerungsmodul durch 300, 350, 400, 500 und 600mm usw. ausgebildet.If the building module is used as the base module, the unit size of the furniture is 300, 600, 900, 1200 and 1500mm. The total width size of the severing furniture is 2700, 3000 and 3300mm etc. If the depth modulus of the severing furniture is determined as 50mm and used as a base module, the magnification module is formed by 300, 350, 400, 500 and 600mm and so on.
Für den vollen Nutzen von Ressourcen, die Energieeinsparung und den Umweltschutz umfasst das maritime grüne Siedlungssystem weiterhin ein Meerwasserentsalzungssystem (nicht dargestellt), ein Regenwassersammelsystem zur Rückgewinnung des Regenwassers (nicht dargestellt) und ein Recyclingwasseraufbereitungssystem zur Rückgewinnung des Lebensabwassers (nicht dargestellt), wobei das Regenwassersammelsystem eine Regenwasserfiltereinrichtung, eine Wasserspeichervorrichtung und eine Reinigungsvorrichtung umfasst, und bei der Wasserspeichervorrichtung handelt es um ein unterirdisch eingebettetes Wasserspeichermodul oder einen Wasserspeicherbehälter. Das Recyclingwasseraufbereitungssystem wird mit einem künstlichen Feuchtgebiet kombiniert und umfasst ein Gitter, ein Einstellbecken, ein Absetzbecken, ein Filtrierbecken und eine Desinfektionsanlage, der Arbeitsablauf ist wie folgt: Rohwasser - Einstellen durch das Gitter - zweistufige biologische Behandlung (nämlich künstliches Feuchtgebiet) - Absetzbecken - Filtrierbecken - Desinfektion - Recyclingwasser, das aufbereitete Recyclingwasser kann zum Spülen der Toiletten und Bewässern der Grünflächen verwendet werden.For the full benefit of resources, energy conservation and environmental protection, the marine green settlement system further includes a seawater desalination system (not shown), a rainwater collection system for rainwater recovery (not shown), and a recycled water treatment system for recovery of life wastewater (not shown) using the rainwater collection system a rainwater filter device, a water storage device and a cleaning device, and the water storage device is an underground embedded water storage module or a water storage tank. The recycling water treatment system is combined with an artificial wetland and includes a grid, a settling basin, a sedimentation tank, a filtration pond and a disinfection plant, the operation is as follows: raw water - setting by the grid - two-stage biological treatment (namely artificial wetland) - settling tank - filtration pool - Disinfection - recycled water, recycled recycled water can be used to flush toilets and irrigate green areas.
Eine modulare Bauweise zum Bauen des maritimen grünen Siedlungssystems in einer bevorzugten Ausführungsform der vorliegenden Erfindung umfasst folgende Schritte:
- A. Vorfertigungsstufe in der Fabrik, Feststellen der Anzahl der Stockwerke, der Anzahl der Module B in jeder Stockwerkeinheit und der optimalen Kombinationsmethode nach den Bedürfnissen des Kunden, separates Vervollständigen der Herstellung, der Vormontage und der Innenausstattung der jeweiligen Komponenten in jedem Modul B;In der vorliegenden Ausführungsform wird die Länge jeder Stockwerkeinheit als 12 m und die Breite als 7,5 m festgestellt. Wenn das Modul B in der Funktionsrichtung in drei offene Funktionsräume - Speiseraum und Küche, Wohnzimmer, Schlafzimmer und Arbeitszimmer - unterteilt wird (wie 1A in
1 dargestellt), ist die Abmessung der offenen Funktionsräume unter der Berücksichtigung, dass die Fahrzeugbreite auf 2,5 m beschränkt wird, nicht auf die Abmessung der Beschränkung der Fahrzeugbreite abgestimmt, deshalb wird die Teilungsrichtung um 90° verdreht (wie 1B in1 dargestellt), nämlich wird die Stockwerkeinheit anhand der Struktur in drei Module B unterteilt, und jedes Modul B hat eine Abmessung von 12m×2,5m. Darüber hinaus wird das maritime grüne Siedlungssystem in Form der vorgefertigten Module verkauft, der Kunde kann vor dem Bestellen bei dem Verkäufer anfragen und ein einzigartiges Gebäude-Programm feststellen. Unter möglichst festen Umständen werden Möglichkeiten der notwendigen Optionen bereitgestellt, so dass der Kunde einfach und effektiv an dem Gebäude-Programm teilnehmen und am Ende in einem befriedigenden Haus wohnen kann. Wenn z.B. die Größe und das Gesamtlayout des Hauses fest sind, kann der Kunde nach den Vorlieben die Größe, die Form und die Farbe usw. eines Teils der Innenmöbel frei auswählen und eine angemessene Innenausstattungslösung feststellen. - B. Vor dem Bau werden die Module B zur Baustelle gefördert und an einer vorgegebenen Position hängend installiert. In der vorliegenden Ausführungsform werden die Module mit großen Lastwagen von dem Land transportiert.
- C. Bei dem Bau werden zuerst die jeweiligen Module B der ersten Stockwerkeinheit nach bündigem Ausrichten zusammengebaut, um eine regelmäßige Gesamtstruktur, und am Umfang der Oberseite und Unterseite der Stockwerkeinheit wird
das Deck 2 installiert. In der vorliegenden Ausführungsform sind die Module B durch eine Schraube (nicht dargestellt) miteinander verbunden, wobei nach fertiger Verbindung der Module B ein Stöpseln mittels einer Gipsplatte und eines Dichtungsmittels (nicht dargestellt) an dem Verbindungsspalt durchgeführt wird. Anschließend wird der photovoltaische Solarkollektor der Seitenfläche32 installiert, wie in2 bis6 dargestellt. Bevorzugt handelt es sich bei der Installation desDecks 2 um eine symmetrische Installation. Zwischen dem Schritt C und D bestehen noch folgende Schritte: Installieren der zweiten Stockwerkeinheit an der Oberseite der ersten Stockwerkeinheit mit dem Verfahren des Schritt C, Wiederholen, bis die Installation der restlichen Stockwerkeinheiten abgeschlossen wird, und Installieren der Treppen (nicht dargestellt) zwischen zwei benachbarten Stockwerkeinheiten, wie in7 bis9 dargestellt. - D. Installieren des photovoltaischen Solarkollektors des
Dachs 31 an der Oberseite der höchsten Stockwerkeinheit, um die Solarressourcen auf dem Meer völlig zu benutzen. - E. Durchführen einer von der Entfeuchtungsbehandlung befreiten Betätigung für das E maritime grüne Siedlungssystem.
- A. Prefabrication stage in the factory, determining the number of floors, the number of modules B in each floor unit and the optimal combination method according to the customer's needs, separately completing the manufacture, pre-assembly and interior fitting of the respective components in each module B; In the present embodiment, the length of each floor unit is determined to be 12 m and the width 7.5 m. If the module B is subdivided in the functional direction into three open function rooms - dining room and kitchen, living room, bedroom and study - (like 1A in
1 1), taking into consideration that the vehicle width is limited to 2.5 m, the dimension of the open function spaces is not adjusted to the dimension of the restriction of the vehicle width, therefore, the pitch direction is rotated by 90 ° (as shown in FIG1 That is, the floor unit is divided into three modules B based on the structure, and each module B has a dimension of 12 m × 2.5 m. In addition, the maritime green settlement system is sold in the form of prefabricated modules, the customer can ask before ordering with the seller and determine a unique building program. Under the strongest possible circumstances, options are provided for the necessary options so that the customer can easily and effectively participate in the building program and ultimately live in a satisfying house. For example, if the size and the overall layout of the house are fixed, the customer can freely choose the size, shape and color, etc. of a part of the interior furniture according to the preferences and find an appropriate interior decoration solution. - B. Prior to construction, the modules B are conveyed to the construction site and installed hanging at a predetermined position. In the present embodiment, the modules are transported by large trucks from the land.
- C. In construction, first, the respective modules B of the first floor unit are assembled after flush alignment to form a regular forest, and at the periphery of the top and bottom of the floor unit becomes the
deck 2 Installed. In the present embodiment, the modules B are connected to each other by a screw (not shown), and after completion of connection of the modules B, plugging is performed by means of a gypsum board and a sealant (not shown) at the connecting nip. Subsequently, the photovoltaic solar collector of theside surface 32 installed as in2 to6 shown. It is preferable to install the deck2 a symmetrical installation. Between steps C and D, there are still the following steps: installing the second floor unit at the top of the first floor unit by the method of step C, repeating until the installation of the remaining floor units is completed, and installing the stairs (not shown) between two adjacent ones Floors, as in7 to9 shown. - D. Install the photovoltaic solar collector of the
roof 31 at the top of the highest floor unit, to fully utilize the solar resources at sea. - E. Performing a de-humidification-free operation for the maritime green settlement system.
Die vorliegende Erfindung stellt ein maritimes grünes Siedlungssystem und seine modulare Bauweise zur Verfügung, bei dem maritimen grünen Siedlungssystem werden mindestens zwei Module B an der Baustelle nach bündigem Ausrichten zusammengebaut, um die Zimmer
Der vorstehende Inhalt ist eine detaillierte Erläuterung der vorliegenden Erfindung im Zusammenhang mit bevorzugten Ausführungsformen. Jedoch ist die Erfindung nicht auf die beschriebenen Ausführungsformen beschränkt. Alle unter Gedanken und Grundsätzen der vorliegenden Erfindung ausgeführten Änderungen, äquivalenten Ersatze und Verbesserungen sollen als vom Schutzumfang der vorliegenden Erfindung gedeckt angesehen werden.The above content is a detailed explanation of the present invention in the context of preferred embodiments. However, the invention is not limited to the described embodiments. All changes, equivalent substitutions and improvements made in accordance with the principles and principles of the present invention should be considered to be within the scope of the present invention.
Claims (12)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510662813.1 | 2015-10-14 | ||
| CN201510662813.1A CN105298157A (en) | 2015-10-14 | 2015-10-14 | Ocean green human settlements system and modular construction method thereof |
| PCT/CN2016/090209 WO2017063414A1 (en) | 2015-10-14 | 2016-07-15 | Maritime green human settlement system and modularized construction method therefor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE212016000208U1 true DE212016000208U1 (en) | 2018-05-16 |
Family
ID=55195906
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE212016000208.2U Expired - Lifetime DE212016000208U1 (en) | 2015-10-14 | 2016-07-15 | Maritime green settlement system and its modular design |
Country Status (4)
| Country | Link |
|---|---|
| JP (1) | JP3218434U (en) |
| CN (1) | CN105298157A (en) |
| DE (1) | DE212016000208U1 (en) |
| WO (1) | WO2017063414A1 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106245779A (en) * | 2016-07-05 | 2016-12-21 | 上海建工二建集团有限公司 | Integral prefabricated modular architectural construction technology based on UHPC material and system |
| CN106223665A (en) * | 2016-07-29 | 2016-12-14 | 中国冶集团有限公司 | A kind of combination type workplace carrying photovoltaic system |
| CN107724709A (en) * | 2017-10-26 | 2018-02-23 | 天津大学 | A kind of hexagon assembled arthitecutral structure |
| CN110080564A (en) * | 2019-04-25 | 2019-08-02 | 中国电建集团江西省电力设计院有限公司 | A kind of main body module and preparation method thereof of transforming plant assembly type guardroom |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101046126A (en) * | 2006-03-30 | 2007-10-03 | 张宗明 | Lane type apartment building |
| CN101086186A (en) * | 2007-07-31 | 2007-12-12 | 任丙辉 | Modular dwelling design and manufacture and fabrication method |
| CN201474092U (en) * | 2009-07-16 | 2010-05-19 | 招商局重工(深圳)有限公司 | Combined living space module for offshore platform |
| CN201665915U (en) * | 2009-11-25 | 2010-12-08 | 北京诚栋房屋制造有限公司 | Movable house with detachable single-layer lightweight steel structure |
| CN101864804A (en) * | 2010-06-10 | 2010-10-20 | 朱培世 | Composite type low-carbon square warehouse building |
| CN201794160U (en) * | 2010-06-10 | 2011-04-13 | 朱培世 | Low-carbon combined square chamber type building |
| JP2012087466A (en) * | 2010-10-15 | 2012-05-10 | Takenaka Komuten Co Ltd | Solar cell power generating system for group of apartment houses |
| CN102561723B (en) * | 2011-12-14 | 2014-02-12 | 深圳市新天光电科技有限公司 | Modular photovoltaic power generation building |
| CN103835446B (en) * | 2012-11-26 | 2016-04-20 | 中国建筑第七工程局有限公司 | Thin film solar photovoltaic panel construction method |
| CN202990455U (en) * | 2012-12-28 | 2013-06-12 | 牟敦箫 | Container intelligent camping apartment |
| CN203361343U (en) * | 2013-05-03 | 2013-12-25 | 张弘 | Building based on integrated modules |
| CN104131711B (en) * | 2013-05-03 | 2016-12-28 | 张弘 | Building based on integration module |
| CN103982038B (en) * | 2014-04-03 | 2016-03-23 | 中建四局第六建筑工程有限公司 | A kind of for solar energy separate house modularization rapid-assembling construction method |
| CN203795890U (en) * | 2014-04-15 | 2014-08-27 | 苏州大学 | Integrated container residence |
| CN205444981U (en) * | 2015-10-14 | 2016-08-10 | 中建钢构有限公司 | A Marine Green Habitat System |
-
2015
- 2015-10-14 CN CN201510662813.1A patent/CN105298157A/en active Pending
-
2016
- 2016-07-15 DE DE212016000208.2U patent/DE212016000208U1/en not_active Expired - Lifetime
- 2016-07-15 JP JP2018600082U patent/JP3218434U/en active Active
- 2016-07-15 WO PCT/CN2016/090209 patent/WO2017063414A1/en not_active Ceased
Also Published As
| Publication number | Publication date |
|---|---|
| JP3218434U (en) | 2018-10-18 |
| WO2017063414A1 (en) | 2017-04-20 |
| CN105298157A (en) | 2016-02-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE212016000209U1 (en) | Maritime green settlement system and its modular design | |
| DE212016000202U1 (en) | Integrated composite building with steel structure | |
| DE2137375A1 (en) | Modular structure | |
| DE2361164A1 (en) | METHOD AND DEVICE FOR CREATING BUILDINGS | |
| DE212016000208U1 (en) | Maritime green settlement system and its modular design | |
| DE102011119697A1 (en) | Method for producing shower system installed in home, involves arranging shower plate around partially enclosing channel which is provided with recess for flow, and forming groove in one piece | |
| DE102014103852A1 (en) | Multi-storey residential building | |
| DE212016000207U1 (en) | Maritime settlement system and its construction | |
| DE19631647C2 (en) | Transportable, foldable and combinable large components for mobile housing prefabricated houses | |
| DE2856851B1 (en) | Wall element for installation walls | |
| EP0467191A1 (en) | Building with at least four flats and elements for its construction | |
| DE102010044036B4 (en) | Building, which is arranged above a correspondingly shaped bottom recess and lowered into this bottom recess | |
| WO2014187838A1 (en) | Building having a stationary building part and a transportable building unit | |
| DE202014002800U1 (en) | Building construction with adjustable or removable partitions | |
| DE102004020023B4 (en) | Wooden building and method for its assembly | |
| DE202020005081U1 (en) | Module house system house kit | |
| DE2636196A1 (en) | PREFABRICATED COMPONENT THAT HAS EQUIPMENT FOR RECEPTION AND / OR RADIATION OF THERMAL ENERGY ON ITS OPPOSITE SURFACES | |
| DE102015009835A1 (en) | Earthquake safe building | |
| CN205444981U (en) | A Marine Green Habitat System | |
| DE102013003785A1 (en) | Multifunctional construction module system (abbreviated MFBMS) | |
| CN205153587U (en) | A Marine Green Habitat System | |
| DE202004005432U1 (en) | Solar structure has roof surface in single alignment and provided with photovoltaic modules adjoining one another in rainproof arrangement | |
| DE2318121A1 (en) | APARTMENT CONSTRUCTED FROM PREFABRICATED ELEMENTS OR THE LIKE | |
| DE835650C (en) | Process for the production of structures of all kinds | |
| CH431912A (en) | Process for the manufacture of buildings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R207 | Utility model specification | ||
| R150 | Utility model maintained after payment of first maintenance fee after three years | ||
| R151 | Utility model maintained after payment of second maintenance fee after six years | ||
| R158 | Lapse of ip right after 8 years |