- DE20106308U1 DE20106308U1 DE20106308U DE20106308U DE20106308U1 DE 20106308 U1 DE20106308 U1 DE 20106308U1 DE 20106308 U DE20106308 U DE 20106308U DE 20106308 U DE20106308 U DE 20106308U DE 20106308 U1 DE20106308 U1 DE 20106308U1
- Authority
- DE
- Germany
- Prior art keywords
- cabin
- modular
- technical
- side walls
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 claims description 8
- 238000005192 partition Methods 0.000 claims description 3
- 239000006260 foam Substances 0.000 claims description 2
- 239000002184 metal Substances 0.000 claims 1
- 108010066057 cabin-1 Proteins 0.000 description 8
- 238000004378 air conditioning Methods 0.000 description 6
- 244000309464 bull Species 0.000 description 3
- 238000009423 ventilation Methods 0.000 description 3
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 108010066114 cabin-2 Proteins 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 238000010616 electrical installation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011253 protective coating Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Description
14901.9-D1928-54 06.04.200114901.9-D1928-54 06.04.2001
Anmelder: DeTeMobil Deutsche Telekom MobilNet GmbHApplicant: DeTeMobil Deutsche Telekom MobilNet GmbH
■&pgr; 'S■&pgr; 'S
Die Erfindung betrifft eine integrierte Modulkabine, insbesondere eine Technikkabine zur Beherbergung von technischen Anlagen, wie z.B. Mobilfunkanlagen, nach dem Oberbegriff der unabhängigen Schutzansprüche.The invention relates to an integrated modular cabin, in particular a technical cabin for accommodating technical systems, such as mobile radio systems, according to the generic term of the independent claims.
Derartige Container oder Kabinen sind bekannt, jedoch handelt es sich dabei um Standardcontainer, die nicht auf die Bedürfnisse zur Installation von technischen Anlagen zugeschnitten sind.Such containers or cabins are known, but they are standard containers that are not tailored to the needs of installing technical systems.
Die Aufgabe der Erfindung ist es, eine integrierte Modulkabine zu schaffen, die hinsichtlich Flexibilität und Sicherheit auf die Bedürfnisse zur Installation von technischen Anlagen zugeschnitten ist.The object of the invention is to create an integrated modular cabin which is tailored to the needs of installing technical systems in terms of flexibility and safety.
Diese Aufgabe wird durch die in den unabhängigen Schutzansprüche angegebenen Merkmale gelöst.This problem is solved by the features specified in the independent claims.
Hausanschrift: I I fggkkonten: tit*! Ci!.. ··.·Street address: II fggk accounts: tit*! Ci!.. ··.·
Rennerle 10 '. '. flypo-VereiriisBanJ Linjiau (f) Nr.J25;iJ0 (EJLZ §00&phgr;&xgr;90); ;Rennerle 10 '. '. flypo-VereiriisBanJ Linjiau (f) No.J25;iJ0 (EJLZ §00φ&xgr;90);;
D-88131 Lindau ··· Velksbankt_tntteu (Wf Nr. *1«2e200e<BLZ«S09201"0) ·· ·D-88131 Lindau ··· Velksbankt_tntteu (Wf No. *1«2e200e<BLZ«S09201"0) ·· ·
VAT-NR: DE 129020439
Riebling - \\R2\voll\Akten\D1928\D1928 original.doc - 06.04.01 VAT number: DE 129020439
Riebling - \\R2\full\files\D1928\D1928 original.doc - 06.04.01
J l*(Jstscheckkonto J MünchenJ l*(Jstscheckkonto J Munich
• ·«**« ff• ·«**« ff
T01014DE 2T01014EN 2
Erfindungsgemäß ist die Kabine in einen Betriebsraum zur Unterbringung der technischen Anlagen und einen Stromversorgungsraum unterteilt. Dadurch ist die Zugangssicherheit für die eingebauten, oft einen erheblichen Wert darstellenden, technischen Anlagen gewährleistet. Das heißt bei Arbeiten an den Stromversorgungsanlagen, die oft von betriebsfremden Personal durchgeführt werden, muss der eigentliche Betriebsraum nicht betreten werden.According to the invention, the cabin is divided into an operating room for accommodating the technical systems and a power supply room. This ensures safe access to the installed technical systems, which often represent considerable value. This means that when working on the power supply systems, which is often carried out by external personnel, the actual operating room does not have to be entered.
Ferner sind die Seitenwände derart ausgebildet, dass sie jederzeit, auch während des Betriebes der technischen Anlagen, an- und abbaubar sind. Dadurch sind Umbauten oder Erweiterungen an der Technikkabine ohne Betriebsunterbrechung der technischen Anlagen möglich. Dies ist z.B. für Netzbetreiber eines Telekommunikationsnetzes ein wichtiges Kriterium, da Verfügbarkeitswerte bei Telefonanlagen besser als 99% anzustreben sind.Furthermore, the side walls are designed in such a way that they can be attached and removed at any time, even while the technical systems are in operation. This means that modifications or extensions to the technical cabin are possible without interrupting the operation of the technical systems. This is an important criterion for network operators of a telecommunications network, for example, since availability values of better than 99% are desirable for telephone systems.
Vorteilhafte Ausgestaltungen und Weiterbildungen der Erfindung sind Gegenstand der abhängigen Schutzansprüche.Advantageous embodiments and further developments of the invention are the subject of the dependent claims.
Die Erfindung wird anhand eines Ausführungsbeispiels unter Bezugnahem auf die Zeichnungsfiguren näher beschrieben. Hierbei ergeben sich weitere Merkmale, Vorteile und Anwendungsmöglichkeiten der Erfindung. Es zeigt:The invention is described in more detail using an embodiment with reference to the drawing figures. This reveals further features, advantages and possible applications of the invention. It shows:
Figur 1: einen Grundriss der Modulkabine;Figure 1: a floor plan of the modular cabin;
Figur 2: eine Ansicht in Pfeilrichtung A gemäß Figur 1;Figure 2: a view in the direction of arrow A according to Figure 1;
Figur 3: eine Ansicht in Pfeilrichtung B gemäß Figur 1;Figure 3: a view in the direction of arrow B according to Figure 1;
Figur 4: eine Ansicht in Pfeilrichtung C gemäß Figur 1.Figure 4: a view in the direction of arrow C according to Figure 1.
Die Technikkabine 1 hat vorzugsweise die Außenabmessungen 2,435 m &khgr; 2,435 m und 2,89 m Höhe. Die Innenabmessungen betragen 2,29m &khgr; 2,29m und 2,50 m lichte Höhe.The technical cabin 1 preferably has the external dimensions 2.435 m x 2.435 m and 2.89 m height. The internal dimensions are 2.29 m x 2.29 m and 2.50 m clear height.
Die Kabine 1 besteht aus einer feuerverzinkten Rahmenkonstruktion 14. Die Se/tenwände 2 der Kabine 1 sind in Schichtbauweise (Sandwichbauweise)The cabin 1 consists of a hot-dip galvanized frame construction 14. The side walls 2 of the cabin 1 are constructed in a layered construction (sandwich construction)
T01014DE 3T01014EN 3
ausgeführt, was eine hohe Stabilität der Konstruktion sicherstellt. Die Außenwände der Seitenwände 2 bestehen aus feuerverzinkten Stahlblechen, die innen vorzugsweise eine Schutzlackierung aufweisen und deren Außenseite mit einer Schicht aus Piatalkunststoff beschichtet ist. Die beugt einer Korrosion und Rostbildung vor.which ensures a high level of stability of the construction. The outer walls of the side walls 2 are made of hot-dip galvanized steel sheets, which preferably have a protective coating on the inside and whose outside is coated with a layer of Piatal plastic. This prevents corrosion and rust formation.
Die Innenwände der Seitenwände 2 bestehen aus beschichteten Platalblechen. Der Zwischenraum zwischen Außen- und Innenwänden ist mit PUR-Hartschaum unter hohem Druck ausgeschäumt, welches vorzugsweise einer Baustoffklasse von B2 entspricht. Dieses gewährt einen Feuerwiderstand von F30.The inner walls of the side walls 2 are made of coated platal sheets. The space between the outer and inner walls is filled with PUR rigid foam under high pressure, which preferably corresponds to a building material class of B2. This ensures a fire resistance of F30.
Der Fußboden 4 besteht aus wasserfesten OSB-Mehrschichtplatten, darauf ein oberflächenversiegelter, verklebter und verschweißter PVC-Belag mit Sockelleisten.Floor 4 consists of waterproof OSB multi-layer boards, on top of which is a surface-sealed, glued and welded PVC covering with skirting boards.
Die Wärmeisolationswerte betragen: Dach: 0,29 W / m2 KThe thermal insulation values are: Roof: 0.29 W / m 2 K
Wände 0,45 W / m2 K Fußboden 0,44 W / m2 KWalls 0.45 W / m 2 K Floor 0.44 W / m 2 K
Die Belastbarkeit des Bodens beträgt 350 kg je m2 und kann bis auf 950 kg / m2 erhöht werden.The load capacity of the floor is 350 kg per m 2 and can be increased to 950 kg / m 2 .
Die Kabineneingangstür 8 zum Betriebsraum 5 ist vorzugsweise eine Sicherheitstür, SI-5A nach DIN 18103, Sicherheitsklasse 3 einschließlich Spezialeckzargen und einer LM-Drückergarnitur.The cabin entrance door 8 to the operating room 5 is preferably a security door, SI-5A according to DIN 18103, security class 3 including special corner frames and an LM handle set.
Der Zugang zum Stromversorgungsraum 6, der gegenüber dem Betriebsraum 5 durch eine wärmeisolierte, doppelwandige Trennwand 7 abgeteilt ist, erfolgt durch eine Stahltür 9, oder eine Sicherheitstür mit einem Feuerwiderstand von F30.Access to the power supply room 6, which is separated from the operating room 5 by a thermally insulated, double-walled partition 7, is via a steel door 9 or a security door with a fire resistance of F30.
• · «·&iacgr;· «ff·• · «·&iacgr;· «ff·
♦ ·«♦ ·«
T01014DE 4T01014EN 4
Die Stromzuführungskabel werden durch eine Bodenöffnung, die bereits im Boden des Stromsversorgungsraums 6 eingelassen ist, hereingeführt.The power supply cables are led in through a floor opening which is already recessed in the floor of the power supply room 6.
Es ist eine Klimaanlage 10 vorgesehen, für die eine Öffnung in der vorderen, eingangsseitigen Seitenwand 2 erstellt wird. Diese Öffnung kann bei einer späteren Vergrößerung der Klimaanlage 10 auf der Baustelle problemlos vergrößert werden, so dass eine größere Klimaanlage installiert werden kann. Bei noch größeren Anlagen kann das Klimaaußengerät auf dem Dach 3 der Kabine 1 befestigt werden.An air conditioning system 10 is provided, for which an opening is created in the front, entrance-side side wall 2. This opening can easily be enlarged if the air conditioning system 10 is later enlarged on site, so that a larger air conditioning system can be installed. For even larger systems, the external air conditioning unit can be attached to the roof 3 of the cabin 1.
Vor Ort ist es möglich, durch einfache Hilfsmittel Öffnungen beliebiger Größe nachträglich in die Seitenwände 2 einzubauen. Dadurch können später Be- und Entlüftungen, auch elektronisch gesteuerte Lüftungen jeder Art und Bauweise als Ventilator installiert werden.On site, it is possible to subsequently install openings of any size in the side walls 2 using simple tools. This means that ventilation and exhaust ventilation systems, including electronically controlled ventilation systems of any type and design, can be installed later as a fan.
Der Stromversorgungsraum 6 ist so groß, dass ohne Schwierigkeiten eine mehr-reihige Unterverteilung mit einem geprüften Elektronmodul installiert werden kann. Des weiteren ist ausreichend Platz für eine ausklappbare NT-Anbindung 300/300, die in voller Größe und Breite installiert werden kann.The power supply compartment 6 is large enough to easily accommodate a multi-row sub-distribution board with a tested electronic module. There is also enough space for a fold-out NT connection 300/300, which can be installed in full size and width.
Die innere Stellfläche der Hauptkabine (Betriebsraum 5) ist so ausgelegt, dass größere technische Anlagen 12, z.B. eine weitere Stromversorgungsanlage und vier Mobilfunk-Basisstationsmodule aufgestellt werden können.The interior space of the main cabin (operating room 5) is designed to accommodate larger technical systems 12, e.g. an additional power supply system and four mobile radio base station modules.
Die Kabine 1 hat an allen Ecken Bohrungen für die Erdungsanschlüsse und Gewindebohrungen für den Potentialausgleich. An jeder beliebigen Stelle der Außenwände 2 kann eine Öffnung für die Kabeldurchführung angebracht werden. Die Größe und Lage ist nahezu beliebig. Ferner können in geringem Abstand von der Decke Kabelbrücken 11 vorgesehen sein.The cabin 1 has holes for the earthing connections and threaded holes for potential equalization at all corners. An opening for the cable feedthrough can be made at any point on the external walls 2. The size and position is almost unlimited. Cable bridges 11 can also be provided at a short distance from the ceiling.
An allen vier Seiten können ferner begehbare Laufbühnen 13 angehängt werden. Auf diesen ist eine Montage von Antennenkabel zu einemWalkable platforms 13 can also be attached to all four sides. On these, antenna cables can be mounted to a
• t · ·• t · ·
T01014DE 5T01014EN 5
Antennenmast möglich, ohne dass dies, einen Einfluss auf die Statik des Mastes hat.Antenna mast possible without this having an influence on the statics of the mast.
Die Kabine 1 wird vor Ort auf eine ebene, frostfrei gegründete Schotterebene aufgestellt. Sie wird fertig montiert einschließlich der Elektroinstallation und der Klimaanlage 10 geliefert und vor Ort als eine Einheit aufgestellt. Es ist auch möglich, die Kabine 1 auf eine frostfrei gegründete Asphalt- oder Betonfläche aufzustellen oder auf ein über das Erdreich herausragendes Fertigfundament aufzustellen. Bei Höhenunterschieden kann dann eine verzinkte, dreistufige Gitterrosttreppe durch Schraubverbindung vor der Ausgangstür 8 angebracht werden.The cabin 1 is set up on site on a level, frost-free gravel surface. It is delivered fully assembled including the electrical installation and the air conditioning system 10 and set up on site as a single unit. It is also possible to set up the cabin 1 on a frost-free asphalt or concrete surface or on a prefabricated foundation that protrudes above the ground. If there are differences in height, a galvanized, three-step grating staircase can be attached by screwing in front of the exit door 8.
Bei geringen Platzverhältnissen ist es möglich, die Kabinen 1 zu stapeln, d.h. es können zwei gleichartige Kabinen 1 übereinander gestellt werden, wobei die Obere durch eine Gitterrosttreppe zugänglich gemacht werden kann.If space is limited, it is possible to stack the cabins 1, i.e. two identical cabins 1 can be placed on top of each other, whereby the upper one can be made accessible via a grating staircase.
Bei bestehenden Anlagen ist es mit nur geringem Aufwand möglich, in kürzester Zeit jede der vier Seitenwände 2 auszubauen und durch eine andere zu ersetzen bzw. andere Kabinen anzubauen. So ist es auch möglich, ganze Vorderseiten mit Eingangstür 8, Tür 9 und der Öffnung für die Klimaanlage 10 neu einzubauen. Durch diese Kombinationsmöglichkeiten lassen sich beliebig lange Technikräume erstellen, welche mit beliebig vielen Türen versehen und durch variable Gitterwände in einzelne Räume aufgeteilt werden können. Selbst bei voll mit Technikmodulen bestückten, in Betrieb befindlichen Anlagen können alle Wände 2 ohne Abschaltung der Anlagen abgebaut und andere Kabinen angebaut werden. Die neu angebauten Kabinen werden mit der vorhandenen Kabine 1 fest verschraubt und die Fugen durch Dichtelemente abgedichtet, welche durch aufgeklemmte Schutzbleche geschützt werden. So ist es bei dieser Systemtechnik auch sehr schnell möglich, bestehende Kabinen 1 abzubauen und an anderer Stelle wieder neu aufzubauen.In existing systems, it is possible to remove each of the four side walls 2 in a very short time and replace them with another one or to add other cabins with very little effort. It is also possible to install entire front sides with entrance door 8, door 9 and the opening for the air conditioning system 10. These combination options make it possible to create technical rooms of any length, which can be equipped with any number of doors and divided into individual rooms using variable grid walls. Even in systems that are fully equipped with technical modules and are in operation, all walls 2 can be dismantled and other cabins added without switching off the systems. The newly added cabins are firmly screwed to the existing cabin 1 and the joints are sealed with sealing elements that are protected by clamped-on protective plates. This system technology also makes it possible to dismantle existing cabins 1 very quickly and rebuild them elsewhere.
T01014DE 6T01014EN 6
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE20106308U DE20106308U1 (en) | 2001-04-10 | 2001-04-10 | Integrated module cabin |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE20106308U DE20106308U1 (en) | 2001-04-10 | 2001-04-10 | Integrated module cabin |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE20106308U1 true DE20106308U1 (en) | 2002-08-22 |
Family
ID=7955611
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE20106308U Expired - Lifetime DE20106308U1 (en) | 2001-04-10 | 2001-04-10 | Integrated module cabin |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE20106308U1 (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2130978A1 (en) * | 1971-06-22 | 1973-01-11 | Siemens Ag | TELEPHONE HOUSE |
| DE8626362U1 (en) * | 1986-10-02 | 1986-11-13 | Meurer, Udo, 7530 Pforzheim | Portable cell with a lounge for people |
| DE4020960A1 (en) * | 1990-06-30 | 1992-01-09 | Jodag Mobilsysteme Gmbh | ROOM CELL |
| DE9318352U1 (en) * | 1993-12-01 | 1994-06-09 | Schall Kg M | Housing with wall connections |
| DE4341511A1 (en) * | 1992-12-21 | 1994-06-23 | Siemens Ag | Container arrangement e.g. for high voltage equipment |
| DE4138241C2 (en) * | 1991-11-21 | 1995-04-27 | Hans Victor Schoenfeld | Detachable hall, especially for telephone stations |
| DE19741119A1 (en) * | 1997-09-12 | 1999-04-01 | Deutsche Telekom Ag | Public telephone booth |
| DE29820511U1 (en) * | 1998-11-17 | 1999-04-22 | Otto Lampertz GmbH & Co. KG, 57584 Wallmenroth | Security room for information technology facilities |
| DE20013446U1 (en) * | 2000-08-02 | 2000-11-30 | SIG Schürmann Ing.-Gesellschaft mbH, 44135 Dortmund | Cabin with at least three side walls and a roof |
| US6205716B1 (en) * | 1995-12-04 | 2001-03-27 | Diane P. Peltz | Modular video conference enclosure |
-
2001
- 2001-04-10 DE DE20106308U patent/DE20106308U1/en not_active Expired - Lifetime
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE2130978A1 (en) * | 1971-06-22 | 1973-01-11 | Siemens Ag | TELEPHONE HOUSE |
| DE8626362U1 (en) * | 1986-10-02 | 1986-11-13 | Meurer, Udo, 7530 Pforzheim | Portable cell with a lounge for people |
| DE4020960A1 (en) * | 1990-06-30 | 1992-01-09 | Jodag Mobilsysteme Gmbh | ROOM CELL |
| DE4138241C2 (en) * | 1991-11-21 | 1995-04-27 | Hans Victor Schoenfeld | Detachable hall, especially for telephone stations |
| DE4341511A1 (en) * | 1992-12-21 | 1994-06-23 | Siemens Ag | Container arrangement e.g. for high voltage equipment |
| DE9318352U1 (en) * | 1993-12-01 | 1994-06-09 | Schall Kg M | Housing with wall connections |
| US6205716B1 (en) * | 1995-12-04 | 2001-03-27 | Diane P. Peltz | Modular video conference enclosure |
| DE19741119A1 (en) * | 1997-09-12 | 1999-04-01 | Deutsche Telekom Ag | Public telephone booth |
| DE29820511U1 (en) * | 1998-11-17 | 1999-04-22 | Otto Lampertz GmbH & Co. KG, 57584 Wallmenroth | Security room for information technology facilities |
| DE20013446U1 (en) * | 2000-08-02 | 2000-11-30 | SIG Schürmann Ing.-Gesellschaft mbH, 44135 Dortmund | Cabin with at least three side walls and a roof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0878808B1 (en) | Electric transformer station | |
| EP1131503B1 (en) | Security room for information technology facilities | |
| EP0209027B1 (en) | Transportable transformer station | |
| DE20106308U1 (en) | Integrated module cabin | |
| DE102018102089A1 (en) | Room module for a building, building with the room module and method for producing a room module and for integrating the room module in a building | |
| DE3611539C2 (en) | ||
| DE2726303A1 (en) | Modular prefabricated building elements - comprise column ends connectable to unitary size base and roof elements | |
| DE202024101327U1 (en) | Distribution and/or substation | |
| EP0175958B1 (en) | Box, in particular an overpressurised box for the protection by ventilation of electrical installations in mines | |
| DE102019121346A1 (en) | Ceiling module for setting up a clean room | |
| CH708841A2 (en) | An apparatus for producing openings in concrete elements. | |
| DE19717655A1 (en) | Services module for buildings | |
| AT513265B1 (en) | Multifunctional façade module system | |
| EP0189126A2 (en) | Container dwelling system | |
| DE8509797U1 (en) | Small station | |
| EP0196624A2 (en) | Small station | |
| DE20215395U1 (en) | Transportable room cell to protect a transmitter system or other electronic devices | |
| EP4411090A1 (en) | Container for electronic modules of a regenerative energy source and facility comprising the container | |
| EP0034705A2 (en) | Fire barrier device for a wall opening, especially for buildings with space-dividing wall elements | |
| EP0075090A1 (en) | System for the supply and evacuation of drinking and waste water, especially for partition walls of an exhibition booth | |
| DE202023104930U1 (en) | Modular house and wet room for modular house | |
| DE102024118463A1 (en) | Functional building for electrical switchgear | |
| DE202015106821U1 (en) | Personennotunterkunft | |
| DE9319483U1 (en) | Device for ventilation and / or air conditioning of heat-emitting devices | |
| DE9115235U1 (en) | Device for protecting buildings against the ingress of dangerous gases, especially radon, from the subsoil |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R163 | Identified publications notified | ||
| R207 | Utility model specification |
Effective date: 20020926 |
|
| R156 | Lapse of ip right after 3 years |
Effective date: 20041103 |