WO2019181092A1 - 負荷推定装置および可搬型の電力供給装置 - Google Patents
負荷推定装置および可搬型の電力供給装置 Download PDFInfo
- Publication number
- WO2019181092A1 WO2019181092A1 PCT/JP2018/044963 JP2018044963W WO2019181092A1 WO 2019181092 A1 WO2019181092 A1 WO 2019181092A1 JP 2018044963 W JP2018044963 W JP 2018044963W WO 2019181092 A1 WO2019181092 A1 WO 2019181092A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- load
- power
- power supply
- supply device
- generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/382—Arrangements for monitoring battery or accumulator variables, e.g. SoC
- G01R31/3842—Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
- G01R21/133—Arrangements for measuring electric power or power factor by using digital technique
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02B—INTERNAL-COMBUSTION PISTON ENGINES; COMBUSTION ENGINES IN GENERAL
- F02B63/00—Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices
- F02B63/04—Adaptations of engines for driving pumps, hand-held tools or electric generators; Portable combinations of engines with engine-driven devices for electric generators
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/385—Arrangements for measuring battery or accumulator variables
- G01R31/387—Determining ampere-hour charge capacity or SoC
- G01R31/388—Determining ampere-hour charge capacity or SoC involving voltage measurements
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
-
- H02J7/82—
-
- H02J7/855—
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47J—KITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
- A47J27/00—Cooking-vessels
- A47J27/004—Cooking-vessels with integral electrical heating means
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R21/00—Arrangements for measuring electric power or power factor
- G01R21/06—Arrangements for measuring electric power or power factor by measuring current and voltage
-
- H02J2105/61—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J7/00—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
- H02J7/14—Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
- H02J7/1469—Regulation of the charging current or voltage otherwise than by variation of field
- H02J7/1492—Regulation of the charging current or voltage otherwise than by variation of field by means of controlling devices between the generator output and the battery
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Definitions
- the present invention relates to a load estimation device for estimating a load connected to a portable power supply device such as a generator or a storage battery.
- Patent Document 1 it is described that the operation state of an electric device is determined by causing a neural network to learn the fundamental wave and harmonics of the current and the operation state of the electric device.
- Patent Document 2 it is described that it is determined whether or not the load is in an operating state by performing frequency analysis of a fundamental wave and a harmonic of a current.
- Patent Document 1 an enormous amount of teacher data is required for the neural network to learn.
- Patent Document 1 does not specify the type of load.
- Patent Document 2 requires frequency analysis, the amount of computation is enormous.
- Patent Document 2 does not specify the type of load.
- the present invention estimates the type of load from the feature amount of the load connected to the portable power supply device.
- an object of the present invention is to predict a load that may be connected to a portable power supply apparatus from an estimated load that is already connected to the power supply apparatus.
- the present invention is, for example, Measuring means for measuring voltage and current supplied to a load connected to a portable power supply device; A computing means for computing a characteristic value of the load from a measured value of voltage and a measured value of current measured by the measuring means; Storage means for storing in advance a feature amount for each load and related load information indicating a plurality of loads used in association with each other; Load estimation means for estimating a load connected to the power supply device based on the feature quantity calculated by the calculation means and the feature quantity stored in the storage means; A load prediction unit that predicts a load that is not connected to the power supply device and is related to the load estimated by the load estimation unit based on the related load information; There is provided a load estimation device characterized by comprising:
- the present invention it is possible to predict a load that may be connected to a portable power supply apparatus from an estimated load that is already connected to the power supply apparatus.
- the figure explaining the structural example of an electric power supply apparatus The figure explaining the structural example of an electric power supply apparatus
- the figure explaining the structural example of an electric power supply apparatus Block diagram illustrating a control circuit of a power supply device
- Block diagram illustrating a control circuit of a power supply device Flow chart showing load prediction method Flow chart showing load prediction method Flow chart showing load prediction method Flow chart showing load prediction method Flow chart showing load prediction method Flow chart showing load prediction method
- the power supply device is a device that can supply power to one or more loads (electrical devices).
- the power supply device is, for example, an engine-driven generator, a storage battery, or an engine-driven generator with a storage battery.
- the power supply device may be a portable power supply device.
- the power supply device may be usable outdoors such as a campsite.
- Such a power supply device is not supplied with power from a commercial AC power supply and is independent of the commercial AC power supply.
- the engine-driven generator can supply power to the load only while fuel remains. If it is a storage battery, electric power can be supplied to the load only while the charge amount remains.
- the rice cooker consumes much power during the rice cooking start period and consumes less power during the steaming period.
- the typical electric energy required until a rice cooker starts rice cooking and is completed is known.
- the amount of power required to boil a specified amount of water is also known for an electric kettle (highly dependent boiling points may be further considered). Therefore, if the load can be estimated, it is possible to determine whether or not the electric device can achieve the main purpose (eg, typical work such as rice cooking and boiling) based on the remaining amount of fuel.
- FIG. 1 is a block diagram showing the power supply device 1.
- the engine generator 2 is a generator that generates electricity by driving the generator with an engine that operates according to the fuel supplied from the fuel tank 15.
- the fuel is, for example, gasoline, liquefied petroleum gas, hydrogen or the like.
- the power supply circuit 3 is a circuit that converts the voltage generated by the engine generator 2 into predetermined alternating current or direct current.
- the AC / DC circuit 4 includes a rectifying / smoothing circuit that rectifies and smoothes the alternating current generated by the engine generator 2.
- the inverter circuit 5 is a circuit that converts direct current output from the AC / DC circuit 4 into stable alternating current having a predetermined frequency.
- the measurement circuit 6 measures the alternating voltage and alternating current supplied to the load 17 connected to the AC outlet 7 and outputs the measurement result to the control circuit 11.
- the AC outlet 7 may have a plurality of receptacles so that a plurality of loads 17 can be connected. Further, a power strip may be connected to the AC outlet 7, and a plurality of loads 17 may be connected to the power strip.
- the DC / DC circuit 9 converts the level of the DC voltage output from the AC / DC circuit 4 and supplies an operating voltage to the control circuit 11 or the like, or outputs it from the DC outlet 10.
- the control circuit 11 is a circuit that controls the power supply circuit 3, the communication circuit 12, the display device 13, and the like.
- the communication circuit 12 is a circuit that communicates with a smartphone 18 and a PC (personal computer) 19 via a wired or wireless connection.
- the PC 19 may be a server device connected to the Internet.
- the display device 13 outputs information indicating the type of load, a continuous operation possible time, and the like to the user.
- the display device 13 may have a touch panel type input device.
- the remaining amount sensor 16 measures the remaining amount of fuel stored in the fuel tank 15 and outputs the measurement result to the control circuit 11.
- the control circuit 11 calculates feature amounts of a plurality of loads based on the measurement results of the measurement circuit 6, and estimates a plurality of loads (types, names, etc.) based on the feature amounts.
- the control circuit 11 determines the continuous operation possible time of the load based on the remaining amount of fuel and the power consumption of the load.
- FIG. 2 shows a power supply device 1 that employs a storage battery 14 instead of the engine generator 2.
- the storage battery 14 outputs a DC voltage such as 48 V to the inverter circuit 5 and the DC / DC circuit 9, for example.
- the remaining amount sensor 16 measures the charge amount (Ah) of the storage battery 14 by monitoring the voltage [V] of the storage battery 14. In general, the amount of charge of the storage battery 14 and the voltage are correlated. The remaining amount sensor 16 converts the voltage of the storage battery 14 into a charge amount according to this correlation.
- the control circuit 11 determines a time during which the load can be continuously operated (hereinafter, continuous operation time) based on the remaining amount of the storage battery and the power consumption of the load.
- FIG. 3 shows the power supply device 1 having the engine generator 2 and the storage battery 14.
- the remaining amount sensor 16 measures the remaining amount of fuel held in the fuel tank 15 and measures the charge amount of the storage battery 14.
- the inverter circuit 5 converts the direct current generated by the AC / DC circuit 4 or the direct current supplied from the storage battery 14 into alternating current.
- the charging circuit 8 charges the storage battery 14 based on the electric power generated by the engine generator 2.
- the power supply device 1 shown in FIG. 3 can supply the power stored in the storage battery 14 to the load 17 even after the fuel runs out.
- the control circuit 11 determines the continuous operation time of the load based on the remaining amount of fuel, the amount of charge, and the power consumption of the load.
- the power supply circuit 3 the control circuit 11, the remaining amount sensor 16, the communication circuit 12, and the display device 13 form a load estimation device 100.
- FIG. 4 shows the control circuit 11. The portion indicated by the broken line in FIG. 4 is optional.
- the CPU 21 is a processor circuit (central processing unit) that controls the power supply device 1 according to a control program stored in the storage device 22.
- the storage device 22 is a storage circuit having a nonvolatile memory (ROM: read-only memory), a volatile memory (RAM: random access memory), and the like.
- the CPU 21 has a plurality of functions realized by executing a control program. Some or all of these functions may be realized by a hardware circuit such as a DSP (digital signal processor) or FPGA (field programmable gate array).
- the feature amount calculation unit 23 calculates feature amounts of a plurality of loads from the measured voltage value and the measured current value measured by the measurement circuit 6.
- the feature amount is, for example, apparent power and power factor.
- the power factor can be obtained by dividing the active power by the apparent power or can be obtained as the cosine (cos ⁇ ) of the phase difference between the voltage and the current. In the latter case, the measurement circuit 6 measures the phase difference ⁇ .
- the feature amount may include a stabilization time that is a time required until a stable operation is performed after the load is activated, and a peak value of an activation current that flows through the load when the load is activated.
- the storage device 22 stores feature amount data 26 and power data 27.
- the feature amount data 26 is data that holds the type or name of the load and the feature amount of the load in association with each other.
- the feature value data 26 has a feature value for each combination of two or more loads.
- the load estimation unit 24 estimates a plurality of loads connected to the power supply device 1 based on the feature amount calculated by the feature amount calculation unit 23 and the known feature amount stored in the storage device 22. .
- the operation time calculation unit 25 determines the time during which the plurality of loads can be continuously operated (continuous operation time) based on the power consumption of the plurality of loads estimated by the load estimation unit 24 and the remaining amount of fuel and the amount of charge. .
- the CPU 21 may display the continuous operation time on the display device 13, or may transmit the continuous operation time to an external information processing device (communication terminal) through the communication circuit 12 to be displayed on the display of the external information processing device.
- the power data 27 may include the rated power consumption for each load and the amount of power required to achieve the main purpose for each load.
- the load number acquisition unit 28 acquires the number of loads connected to the AC outlet 7. The number of loads may be input by the user through the information processing apparatus, or the number of loads may be specified in accordance with the time change of the current output from the AC outlet 7.
- FIG. 5 shows a feature amount map constituting a part of the feature amount data 26.
- the apparent power and the power factor are exemplified as the feature amount.
- the coordinates of the feature amount of a single load and the coordinates of the feature amount corresponding to a combination of two or more loads are shown by dots.
- the feature coordinate dots corresponding to combinations of three or more loads are omitted because the feature map becomes complicated to illustrate.
- the feature amount C1 indicates the feature amount of only the lighting fixture.
- the feature amount C2 indicates the feature amount of only the rice cooker.
- a feature amount C4 indicates a feature amount of only the compressor.
- a feature amount C5 indicates a feature amount of only the electric kettle.
- a feature amount C6 indicates a feature amount of only the heater.
- a feature value C7 indicates a feature value of only the dryer.
- a feature amount C12 indicates a feature amount for a combination of a lighting fixture and a rice cooker.
- a feature amount C14 indicates a feature amount for a combination of a lighting fixture and a compressor.
- a feature amount C15 indicates a feature amount for a combination of a lighting fixture and an electric kettle.
- a feature amount C16 indicates a feature amount for a combination of a lighting fixture and a heater.
- a feature amount C17 indicates a feature amount for a combination of a lighting fixture and a dryer.
- a feature amount C24 indicates a feature amount for a combination of a rice cooker and a compressor.
- a feature amount C25 indicates a feature amount of a combination of a rice cooker and an electric kettle.
- a feature amount C26 indicates a feature amount of a combination of a rice cooker and a heater.
- a feature amount C27 indicates a feature amount for a combination of a rice cooker and a dryer.
- a feature amount C45 indicates a feature amount for a combination of a compressor and an electric kettle.
- a feature amount C46 indicates a feature amount for a combination of a compressor and a heater.
- a feature amount C47 indicates a feature amount for a combination of a compressor and a dryer.
- a feature amount C56 indicates a feature amount of a combination of an electric kettle and a heater.
- a feature amount C57 indicates a feature amount for a combination of an electric kettle and a dryer.
- a feature amount C67 indicates a feature amount for a combination of a heater and a dryer.
- the load estimation unit 24 calculates the distance between the feature amount coordinate calculated by the feature amount calculation unit 23 and the feature amount coordinate stored in the storage device 22, and stores the distance in the storage device 22 that provides the minimum distance. Specify the coordinates of the feature amount. Furthermore, the load estimation unit 24 specifies the type and name (identification information) of the load associated with the specified feature amount. For example, when the feature amount that provides the minimum distance is identified as C56, the load estimation unit 24 extracts an electric kettle and a heater from the feature amount data 26 as load identification information corresponding to C56. Ci or Cij is used as a symbol for identifying the feature quantity, but Ci is used to identify a single load, and Cij is used to identify a combination of two loads. ing.
- the symbol used to identify the combination of three loads is denoted as Cijk.
- the symbol used to identify the combination of four loads is denoted as Cijkl. Similar naming conventions may be adopted for combinations of five or more loads.
- the feature amount Cij is a vector composition of the feature amount Ci and the feature amount Cj.
- the load estimation unit 24 may narrow down only the combination feature amounts according to the number of loads as a comparison target. If the number of loads is 2, Cij is a comparison target. If the number of loads is 4, Cijkl is a comparison target.
- the operation time calculation unit 25 basically calculates the remaining operation time from the instantaneous value [W] of the current power consumption of the entire load and the suppliable power amount [Wh] obtained from the remaining fuel amount and the charge amount. [H] is calculated and output to the display device 13 or the communication circuit 12 every moment. However, the operation time calculation unit 25 may obtain the continuous operation time using the following method.
- FIG. 6 shows an example of the power data 27.
- the power data 27 holds the rated power consumption and typical power amount for each load.
- the typical electric energy is the minimum electric energy required to achieve the main purpose (typical work) of the electrical equipment.
- the typical electric energy of a rice cooker is the electric energy required from the start to the end of rice cooking.
- the operation time calculation unit 25 refers to the power data 27 and determines the rating of the electric kettle. Obtain and add the power consumption and the rated power consumption of the rice cooker.
- the operation time calculation unit 25 calculates the amount of power that can be supplied from the remaining amount of fuel and the amount of charge.
- the operation time calculation unit 25 calculates the continuous operation time by dividing the amount of power that can be supplied by the sum of the rated power consumption of the electric kettle and the rated power consumption of the rice cooker, and displays the display device 13 or the communication circuit. 12 is output.
- the operation time calculation unit 25 calculates the amount of power that can be supplied from the remaining amount of fuel and the amount of charge, and the sum of the typical power amount of the electric kettle and the typical power amount of the rice cooker is greater than the power amount that can be supplied. If it is smaller, information indicating that the electric kettle and the rice cooker can each achieve the main purpose is output to the display device 13 or the communication circuit 12.
- the operation time calculation unit 25 cannot achieve the main purpose of the electric kettle and the rice cooker, respectively. Is output to the display device 13 or the communication circuit 12.
- the warning message may be output from a speaker or a buzzer as a voice message or a warning sound.
- FIG. 7 shows a load estimation method executed by the CPU 21 according to the control program.
- the CPU 21 uses the measurement circuit 6 to acquire a measurement value of voltage and a measurement value of current supplied to the load 17.
- the CPU 21 acquires the feature amount (eg, power factor and apparent power) of the load 17 using the measured values of voltage and current.
- the CPU 21 (load estimation unit 24) estimates the load 17 by searching for a known feature amount close to the feature amount of the load 17.
- the storage device 22 stores the feature amount data 26 having a known feature amount. Therefore, the load estimation unit 24 identifies a known feature amount close to the feature amount of the load 17 from the feature amount data 26, and acquires load identification information associated with the identified known feature amount.
- the load identification information may be, for example, the name and type of the load, Ci, and Cij.
- the CPU 21 acquires the estimated power consumption of the load from the power data 27.
- the power data 27 holds the rated power consumption corresponding to the load identification information. Therefore, the operation time calculation unit 25 acquires the rated power consumption corresponding to the load identification information from the power data 27.
- the load estimation unit 24 estimates a combination of a plurality of loads (for example, when Cij or Cijk is estimated)
- the operation time calculation unit 25 acquires the rated power consumption of each of the plurality of loads from the power data 27.
- the CPU 21 obtains the amount of power that can be supplied from the power supply device 1.
- the operation time calculation unit 25 calculates the amount of power that can be supplied from the power supply device 1 based on the remaining amount of fuel detected by the remaining amount sensor 16.
- the operation time calculation unit 25 calculates the amount of power that can be supplied from the power supply device 1 based on the charge amount of the storage battery 14 detected by the remaining amount sensor 16.
- the operation time calculation unit 25 is based on the remaining amount of fuel detected by the remaining amount sensor 16 and the charge amount of the storage battery 14 detected by the remaining amount sensor 16. The amount of power that can be supplied from 1 is calculated. Note that a mathematical expression or a function for converting the measurement result of the remaining amount sensor 16 into the electric energy may be stored in the storage device 22.
- the CPU 21 calculates the continuous operation time for the estimated load by dividing the amount of power that can be supplied by the rated power consumption of the load. Instead of the rated power consumption of the load, an instantaneous value of the power consumption of the entire load may be used.
- the continuous operation time is a time during which the estimated load can be operated continuously (continuously).
- the CPU 21 outputs the continuous operation time to the display device 13 and the communication circuit 12.
- the operation time calculation unit 25 may output the continuous operation time together with the load identification information.
- the operation time calculation unit 25 determines whether the amount of power that can be supplied is equal to or greater than the typical power amount of the estimated load, so that the estimated load is the main purpose (typical operation of the load). It may be determined whether or not can be completed. If the amount of power that can be supplied is less than the typical power amount of the estimated load, the operation time calculation unit 25 indicates that the estimated load cannot complete the main purpose (typical operation of the load). A warning may be output. For example, a warning indicating that the rice cooker cannot complete cooking may be output.
- the load connected to the power supply device 1 can be estimated by the load estimation method described above.
- the load estimation method estimates the load from the feature amount of the load connected to the power supply device 1, the load that is not connected to the power supply device 1 cannot be estimated. This is because there is no means for acquiring the feature amount of the load that is not connected to the power supply device 1. That is, the load estimation method cannot estimate a load that may be connected to the power supply device 1.
- the load connected to the power supply device 1 can be predicted in the near future (after several minutes to several tens of minutes).
- a cooking utensil eg, a hot plate
- an electric pot may be connected to the power supply apparatus 1 to make a beverage after meal (eg, coffee, tea, green tea).
- a beverage after meal eg, coffee, tea, green tea
- the power supply device 1 may include a generator and a storage battery. Although such a power supply device 1 can supply power to the rice cooker with only the generator, it may not be possible to supply sufficient power to both the rice cooker and the cooking utensil with only the generator. Therefore, the power supply device 1 may supply sufficient power to these loads using both the generator and the storage battery. However, if the amount of electricity stored in the storage battery is insufficient with respect to the amount of power required for the cooking utensil, the user cannot complete cooking. In this case, the power supply device 1 precharges the storage battery with a generator. This will allow the user to complete cooking. Thus, it is advantageous to predict an unconnected load with respect to the power supply device 1.
- FIG. 8 shows a control circuit 11 having a load prediction function.
- the CPU 21 functions as the load prediction unit 29 and the power supply control unit 31 by executing the control program stored in the storage device 22.
- the load prediction unit 29 and the power supply control unit 31 may also be realized by a hardware circuit such as an FPGA.
- the storage device 22 stores related load data 30.
- the load predicting unit 29 predicts an unconnected load used in association with the load estimated by the load estimating unit 24 based on the related load data 30.
- the related load data 30 stores identification information of a plurality of loads used in association with each other.
- the storage device 22 stores the rice cooker identification information and the hot plate identification information in association with each other.
- the power supply control unit 31 determines whether or not the power supply apparatus 1 can sufficiently supply power to the estimated load and the predicted load. In addition, the power supply control unit 31 controls the power supply circuit 3 to supply power to the load 17 from one of the engine generator 2 and the storage battery 14 or from both of the engine generator 2 and the storage battery 14. 17 to supply power.
- the power supply control unit 31 may supply the alternating current supplied from the other power supply device 1 to the load 17 via the AC / DC circuit 4 or the inverter circuit 5.
- FIG. 9 is a flowchart showing the load prediction method. Here, it is assumed that S1 to S3 have already been executed. The feature of this load prediction method is that charging of the storage battery 14 is started before the predicted load is actually connected when power cannot be supplied to the predicted load by only the generator.
- the CPU 21 (load prediction unit 29) predicts an unconnected load used in association with the load estimated by the load estimation unit 24 based on the related load data 30.
- the load predicting unit 29 acquires, from the related load data 30, other load identification information stored in association with the estimated load identification information.
- the CPU 21 (power supply control unit 31) acquires the estimated power consumption of the load and the predicted power consumption of the load from the power data 27. As shown in FIG. 6, the power data 27 holds the rated power consumption corresponding to the load identification information. Therefore, the power supply control unit 31 acquires the rated power consumption corresponding to the load identification information from the power data 27.
- the CPU 21 determines whether or not the engine generator 2 can sufficiently supply power to the estimated load and the predicted load. For example, the power supply control unit 31 supplies power to the load if the sum of the estimated load power consumption and the predicted load power consumption is equal to or less than the power generation capacity (rated output power) of the engine generator 2. Judge that it is possible. The power supply control unit 31 cannot supply power to the load if the sum of the estimated load power consumption and the predicted load power consumption exceeds the power generation capacity (rated output power) of the engine generator 2. Is determined. If power can be supplied to the load, the CPU 21 skips S14 and ends the load prediction method. If power cannot be supplied to the load, the CPU 21 proceeds to S14.
- the CPU 21 controls the charging circuit 8 to start charging the storage battery 14 using a part of the power generated by the engine generator 2.
- the power supply control unit 31 recognizes that the predicted load is actually connected based on the estimation result of the load estimation unit 24, the power supply control unit 31 supplies power from both the engine generator 2 and the storage battery 14 to the load.
- the power supply circuit 3 is controlled.
- FIG. 10 is a flowchart showing another load prediction method.
- the feature of this load prediction method is that a warning message is output when power cannot be supplied to the predicted load by only the generator.
- S14 in FIG. 9 is replaced with S22. If the engine generator 2 alone cannot supply enough power to the estimated load and the predicted load, the CPU 21 proceeds to S22.
- the CPU 21 power supply control unit 31
- the CPU 21 outputs a warning message to the display device 13 or the communication circuit 12.
- the message output from the communication circuit 12 is displayed on the display device of the smartphone 18 or the PC 19.
- the warning message is a message indicating that the power supply device 1 falls short of power when the predicted load is connected to the power supply device 1.
- the user may devise not to connect a plurality of loads to the power supply device 1 at the same time.
- the user may connect the second load (eg, hot plate) to the power supply device 1 after removing the first load (eg, rice cooker) from the power supply device 1 according to the message.
- FIG. 11 is a flowchart showing another load prediction method.
- the CPU 21 proceeds to S31 after S12.
- S31 to S33 are similar to S5 to S7 shown in FIG.
- the feature of this load prediction method is to provide the user with the continuous operation time when the estimated load and the predicted load are connected to the power supply apparatus 1.
- the CPU 21 obtains the amount of power that can be supplied from the power supply device 1.
- the operation time calculation unit 25 calculates the amount of power that can be supplied from the power supply device 1 based on the remaining amount of fuel detected by the remaining amount sensor 16.
- the operation time calculation unit 25 calculates the amount of power that can be supplied from the power supply device 1 based on the charge amount of the storage battery 14 detected by the remaining amount sensor 16.
- the operation time calculation unit 25 is based on the remaining amount of fuel detected by the remaining amount sensor 16 and the charge amount of the storage battery 14 detected by the remaining amount sensor 16. The amount of power that can be supplied from 1 is calculated. Note that a mathematical expression or a function for converting the measurement result of the remaining amount sensor 16 into the electric energy may be stored in the storage device 22.
- the CPU 21 obtains the continuous operation time for the load by dividing the amount of power that can be supplied by the rated power consumption of the load.
- the load is both an estimated load and a predicted load.
- the operation time calculation unit 25 obtains the estimated rated power consumption of the load and the predicted rated power consumption of the load from the power data 27 and obtains the sum of these. Furthermore, the operation time calculation unit 25 calculates the continuous operation time by dividing the amount of power that can be supplied as a sum.
- the CPU 21 (operation time calculation unit 25) outputs the continuous operation time to the display device 13 and the communication circuit 12.
- the message output from the communication circuit 12 is displayed on the display device of the smartphone 18 or the PC 19.
- the operation time calculation unit 25 may output the continuous operation time together with the load identification information.
- the operation time calculator 25 outputs both the continuous operation time when only the estimated load is used and the continuous operation time when both the estimated load and the predicted load are used. Also good.
- the operation time calculation unit 25 may determine whether or not the amount of power that can be supplied is equal to or greater than the sum of the estimated typical power amount of the load and the predicted typical power amount of the load. As a result, the operation time calculation unit 25 may determine whether the estimated load and the predicted load can complete their main purposes (typical operation of the load).
- the operation time calculation unit 25 may output a warning indicating that the load cannot complete the main purpose (typical operation of the load). For example, a warning indicating that the rice cooker cannot complete cooking or that the hot plate cannot complete cooking may be output.
- FIG. 12 is a flowchart showing another load prediction method.
- This load prediction method can be executed by the power supply device 1 equipped with the engine generator 2. After executing S11, the CPU 21 proceeds to S41.
- the feature of this load prediction method is to warn the user that fuel shortage may occur when the estimated load and the predicted load are connected to the power supply device 1. That is, it is possible to prompt the user to refuel.
- the CPU 21 (power supply control unit 31) acquires the estimated typical power amount of the load and the predicted typical power amount of the load from the power data 27.
- the CPU 21 calculates the amount of power that can be supplied from the power supply device 1 based on the remaining amount of fuel detected by the remaining amount sensor 16.
- the CPU 21 (power supply control unit 31) runs out of fuel based on whether or not the sum of the estimated typical power amount of the load and the predicted typical power amount of the load is less than or equal to the suppliable power amount. Determine whether or not. If the fuel is not insufficient, the CPU 21 skips S44 and ends the load prediction method. On the other hand, if the fuel is insufficient, the CPU 21 proceeds to S44.
- the CPU 21 power supply control unit 31
- the CPU 21 outputs a refueling message to the display device 13 and the communication circuit 12.
- the message output from the communication circuit 12 is displayed on the display device of the smartphone 18 or the PC 19.
- the fuel supply message is a message that prompts the user to supply fuel to the fuel tank 15.
- the user when the message of S22 or S44 is output, the user may be supplied with surplus power from the power supply device 1 of another user. As shown in FIG. 13, many users have the power supply device 1 in the campsite. Therefore, the user “a” having insufficient power may be supplied with surplus power from the other user “b”.
- a plurality of power supply apparatuses 1 a and 1 b may be connected via a power line 34, and the plurality of power supply apparatuses 1 a and 1 b may supply / receive surplus power to each other. For example, the power supply capacity of the power supply device 1a is small, and the power generation capacity of the power supply device 1b is large.
- the electric power supply apparatus 1a can supply sufficient electric power to the load 17a (example: rice cooker), if the predicted load 17a '(hot plate) is connected, it will fall into electric power shortage.
- the power supply device 1b supplies power only to the load 17b (eg, electric kettle) and has surplus power. In this case, the power supply device 1a may receive surplus power from the power supply device 1b and supply power to the loads 17a and 17a '.
- a load estimation device 100 is provided.
- the measurement circuit 6 is an example of a measurement unit that measures a voltage and a current supplied to one or a plurality of loads connected to the power supply device 1.
- the feature amount calculation unit 23 is an example of a calculation unit that calculates one or a plurality of load feature amounts from the voltage measurement value and current measurement value measured by the measurement unit.
- the storage device 22 is an example of a storage unit that stores in advance a feature value for each combination of one or more loads.
- the storage device 22 is an example of a storage unit that stores in advance related load information indicating a plurality of loads used in association with each other.
- the load estimation unit 24 is a load estimation unit that estimates one or more loads connected to the power supply device 1 based on the feature amount calculated by the calculation unit and the feature amount stored in the storage unit. It is an example.
- the load prediction unit 29 is a load that is not connected to the power supply apparatus 1 and is an example of a load prediction unit that predicts a load related to the load estimated by the load estimation unit based on related load information.
- the related load data 30 is an example of related load information. According to the first aspect, it is possible to accurately estimate one or a plurality of loads by a simple method, and it is possible to predict a load that is not connected to the power supply device 1 from the estimated load. .
- the load estimation device 100 includes a generator (e.g., engine generator 2) provided in the power supply device 1, and a storage battery 14 provided in the power supply device and charged by the generator. And the load estimated by the load estimating means based on the load power estimated by the load estimating means, the power consumption of the load predicted by the load predicting means, and the power generation capacity of the generator. Determination means (eg, operating time calculation unit 25, power supply control unit 31, etc.) for determining whether the generator can supply sufficient power to the predicted load, and the generator and storage battery to the load You may further have a control means (example: power supply control part 31) which controls the electric power supplied.
- a control means example: power supply control part 31 which controls the electric power supplied.
- the power supply control unit 31 determines that the generator cannot supply sufficient power to the load estimated by the load estimation unit and the load predicted by the load prediction unit, the power supply control unit 31 charges the storage battery by the generator. Start. Thereby, when the predicted load is actually connected to the power supply device 1, the predicted load is supplied with power from both the generator and the storage battery.
- the remaining amount sensor 16 is an example of a measuring unit that measures the remaining amount of fuel stored in the fuel tank 15 of the generator.
- the operation time calculation unit 25 calculates the estimated load and the predicted load based on the power consumption of the load estimated by the load estimation unit, the power consumption of the load predicted by the load prediction unit, and the remaining amount of fuel. It is an example of the determination means which determines the time which can be continuously operated.
- the communication circuit 12 and the display device 13 are an example of an output unit that outputs a time during which the estimated load and the predicted load can be continuously operated. As a result, the user can grasp the time during which the estimated load and the predicted load can be continuously operated.
- the power supply device 1 may further include the storage battery 14 that is charged by the generator.
- the operation time calculation unit 25 uses the load estimation unit based on the load power consumption estimated by the load estimation unit, the load power consumption predicted by the load prediction unit, the remaining amount of fuel, and the charge amount of the storage battery. You may determine the time which can continue the estimated load and the load estimated by the load prediction means. Thus, the amount of charge of the storage battery 14 may be taken into consideration for the time during which the continuous operation can be performed.
- the load estimation device 100 measures the remaining amount of fuel stored in the generator (eg, engine generator 2) provided in the power supply device 1 and the fuel tank 15 of the generator.
- the fuel tank 15 based on the power consumption of the load estimated by the measurement means (eg, the remaining amount sensor 16), the load estimation means, the power consumption of the load predicted by the load prediction means, and the remaining amount of fuel.
- the determination means e.g., power supply control unit 31
- the fuel tank should be replenished with fuel.
- the estimated load and the predicted load are connected to the power supply device 1, it becomes difficult for the fuel to run out.
- a power supply apparatus 1 including the load estimation device according to any one of the first to fifth aspects.
- the load estimation device may be provided by being incorporated in the power supply device 1.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Manufacturing & Machinery (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
負荷推定装置は、可搬型の電力供給装置に接続された負荷に供給される電圧と電流を計測し、前記計測された電圧の計測値と電流の計測値から前記負荷の特徴量を演算し、前記演算された特徴量と、記憶手段に記憶されている負荷ごとの特徴量とに基づき、前記電力供給装置に接続されている複数の負荷を推定する。さらに、負荷推定装置は、電力供給装置に接続されていない負荷であって、前記負荷推定手段により推定された負荷と関連した負荷を記憶手段に記憶されている関連負荷情報に基づき予測する。
Description
本発明は発電機や蓄電池などの可搬型の電力供給装置に接続される負荷を推定する負荷推定装置に関する。
発電機には様々な負荷(電気機器)が接続される。エンジン駆動式の発電機では燃料がなくなれば、発電することができない。たとえば、炊飯器が炊飯を完了する前に燃料切れになると、ご飯ができないばかりか、お米が無駄になってしまう。そのため、発電機に接続された負荷の種類や名称が推定できれば、負荷に十分に電力を供給できるほど燃料が残っているかどうかも判定可能となろう。
特許文献1によれば電流の基本波や高調波と電気機器の動作状態とをニューラルネットワークに学習させることで電気機器の動作状態を判別することが記載されている。特許文献2によれば電流の基本波や高調波を周波数解析することで負荷が稼働状態かどうかを判定することが記載されている。
特許文献1によればニューラルネットワークに学習させるために膨大な数の教師データが必要となってしまう。そもそも、特許文献1は負荷の種類を特定するものではない。特許文献2では周波数解析が必要となるため、演算量が膨大となる。また、特許文献2も負荷の種類を特定するものではない。本発明は、可搬型の電力供給装置に接続された負荷の特徴量から負荷の種類を推定する。さらに、本発明は、可搬型の電力供給装置に接続される可能性のある負荷を、電力供給装置にすでに接続され、かつ、推定された負荷から予測することを目的とする。
本発明は、たとえば、
可搬型の電力供給装置に接続された負荷に供給される電圧と電流とを計測する計測手段と、
前記計測手段により計測された電圧の計測値と電流の計測値から前記負荷の特徴量を演算する演算手段と、
負荷ごとの特徴量と、それぞれ関連して使用される複数の負荷を示す関連負荷情報とを予め記憶した記憶手段と、
前記演算手段により演算された特徴量と、前記記憶手段に記憶されている特徴量とに基づき、前記電力供給装置に接続されている負荷を推定する負荷推定手段と、
前記電力供給装置に接続されていない負荷であって、前記負荷推定手段により推定された負荷と関連した負荷を前記関連負荷情報に基づき予測する負荷予測手段と、
を有することを特徴とする負荷推定装置を提供する。
可搬型の電力供給装置に接続された負荷に供給される電圧と電流とを計測する計測手段と、
前記計測手段により計測された電圧の計測値と電流の計測値から前記負荷の特徴量を演算する演算手段と、
負荷ごとの特徴量と、それぞれ関連して使用される複数の負荷を示す関連負荷情報とを予め記憶した記憶手段と、
前記演算手段により演算された特徴量と、前記記憶手段に記憶されている特徴量とに基づき、前記電力供給装置に接続されている負荷を推定する負荷推定手段と、
前記電力供給装置に接続されていない負荷であって、前記負荷推定手段により推定された負荷と関連した負荷を前記関連負荷情報に基づき予測する負荷予測手段と、
を有することを特徴とする負荷推定装置を提供する。
本発明によれば、可搬型の電力供給装置に接続される可能性のある負荷を、電力供給装置にすでに接続され、かつ、推定された負荷から予測することが可能となる。
[電力供給装置]
電力供給装置は一つ以上の負荷(電気機器)に対して電力を供給可能な装置である。電力供給装置は、たとえば、エンジン駆動発電機、蓄電池、または、蓄電池付のエンジン駆動発電機などである。このように、電力供給装置は、可搬型の電力供給装置であってもよい。たとえば、電力供給装置は、キャンプ場などの野外で使用可能であってもよい。このような電力供給装置は、商用の交流電源から電力の供給を受けておらず、商用の交流電源から独立している。たとえば、エンジン駆動発電機は、燃料が残っている間に限り、負荷に電力を供給できる。蓄電池であれば、充電量が残っている間に限り、負荷に電力を供給できる。また、蓄電池付のエンジン駆動発電機であれば、燃料および充電量が残っている間に限り、負荷に電力を供給できる。なお、負荷の種類に応じて定格消費電力や消費電力量は異なる。たとえば、炊飯器は炊飯開始期間において多くの電力を消費し、蒸らし期間においてはより少ない電力を消費する。なお、炊飯器が炊飯を開始してから完了するまでに必要とする典型的な電力量は既知である。電気ケトルについても規定量の水を沸騰させるまでに必要とする電力量は既知である(高度に依存した沸点がさらに考慮されてもよい)。したがって、負荷を推定することができれば、燃料の残量などに基づき、電気機器が主要目的(例:炊飯、湯沸しなどの典型的な作業)を達成できるかどうかが判定可能となる。なお、照明やヒータ、エアコンプレッサーなど使用時間がユーザによって大きく異なる製品もある。このような場合には、電気機器の定格消費電力と燃料の残量などに基づき、電気機器を連続運転可能な時間が演算可能である。ユーザはこの連続運転時間を参考にして、いずれかの負荷を停止させることで、特定の負荷を優先的に稼働させてもよい。
電力供給装置は一つ以上の負荷(電気機器)に対して電力を供給可能な装置である。電力供給装置は、たとえば、エンジン駆動発電機、蓄電池、または、蓄電池付のエンジン駆動発電機などである。このように、電力供給装置は、可搬型の電力供給装置であってもよい。たとえば、電力供給装置は、キャンプ場などの野外で使用可能であってもよい。このような電力供給装置は、商用の交流電源から電力の供給を受けておらず、商用の交流電源から独立している。たとえば、エンジン駆動発電機は、燃料が残っている間に限り、負荷に電力を供給できる。蓄電池であれば、充電量が残っている間に限り、負荷に電力を供給できる。また、蓄電池付のエンジン駆動発電機であれば、燃料および充電量が残っている間に限り、負荷に電力を供給できる。なお、負荷の種類に応じて定格消費電力や消費電力量は異なる。たとえば、炊飯器は炊飯開始期間において多くの電力を消費し、蒸らし期間においてはより少ない電力を消費する。なお、炊飯器が炊飯を開始してから完了するまでに必要とする典型的な電力量は既知である。電気ケトルについても規定量の水を沸騰させるまでに必要とする電力量は既知である(高度に依存した沸点がさらに考慮されてもよい)。したがって、負荷を推定することができれば、燃料の残量などに基づき、電気機器が主要目的(例:炊飯、湯沸しなどの典型的な作業)を達成できるかどうかが判定可能となる。なお、照明やヒータ、エアコンプレッサーなど使用時間がユーザによって大きく異なる製品もある。このような場合には、電気機器の定格消費電力と燃料の残量などに基づき、電気機器を連続運転可能な時間が演算可能である。ユーザはこの連続運転時間を参考にして、いずれかの負荷を停止させることで、特定の負荷を優先的に稼働させてもよい。
図1は電力供給装置1を示すブロック図である。エンジン発電機2は燃料タンク15から供給される燃料にしたがって動作するエンジンにより発電機を駆動して発電する発電機である。燃料は、たとえば、ガソリン、液化石油ガス、水素などである。電源回路3は、エンジン発電機2により発電された電圧を所定の交流や直流に変換する回路である。AC/DC回路4は、エンジン発電機2により発電された交流を整流および平滑する整流平滑回路などを有している。インバータ回路5は、AC/DC回路4から出力される直流を所定周波数の安定した交流に変換する回路である。計測回路6は、ACアウトレット7に接続された負荷17に供給される交流電圧と交流電流とを計測し、計測結果を制御回路11に出力する。ACアウトレット7は、複数の負荷17を接続可能とするために複数のレセプタクルを有していてもよい。また、ACアウトレット7に電源タップが接続され、電源タップに複数の負荷17が接続されてもよい。DC/DC回路9は、AC/DC回路4から出力される直流電圧のレベルを変換して、制御回路11などに動作電圧を供給したり、DCアウトレット10から出力したりする。制御回路11は、電源回路3、通信回路12および表示装置13などを制御する回路である。通信回路12は、有線または無線を介してスマートフォン18やPC(パーソナルコンピュータ)19と通信する回路である。PC19はインターネットに接続されたサーバ装置であってもよい。表示装置13はユーザに対して負荷の種類を示す情報や連続運転可能時間などを出力する。表示装置13はタッチパネル型の入力装置を有していてもよい。残量センサ16は燃料タンク15に収容されている燃料の残量を測定し、測定結果を制御回路11に出力する。制御回路11は、計測回路6の計測結果に基づき複数の負荷の特徴量を演算し、この特徴量に基づき複数の負荷(種類や名称など)を推定する。制御回路11は、燃料の残量や負荷の消費電力に基づき、負荷の連続運転可能時間を決定する。
図2はエンジン発電機2の代わりに蓄電池14を採用した電力供給装置1を示している。図2において図1と共通する部分の説明は省略される。蓄電池14は、たとえば、48Vなどの直流電圧をインバータ回路5やDC/DC回路9に出力する。残量センサ16は、蓄電池14の電圧[V]を監視することで、蓄電池14の充電量(Ah)を測定する。一般に蓄電池14の充電量と電圧とは相関関係にある。残量センサ16はこの相関関係にしたがって蓄電池14の電圧を充電量に変換する。制御回路11は、蓄電池の残量や負荷の消費電力に基づき、負荷を連続的に運転できる時間(以下、連続運転時間)を決定する。
図3はエンジン発電機2および蓄電池14を有した電力供給装置1を示している。図3において図1や図2と共通する部分の説明は省略される。残量センサ16は燃料タンク15に保持されている燃料の残量を計測するとともに、蓄電池14の充電量を計測する。インバータ回路5はAC/DC回路4により生成された直流または蓄電池14から供給された直流を交流に変換する。充電回路8はエンジン発電機2により発電された電力に基づき蓄電池14を充電する。図3に示された電力供給装置1は、燃料が無くなった後も、蓄電池14に蓄えられている電力を負荷17に供給可能となる。制御回路11は、燃料の残量、充電量および負荷の消費電力に基づき、負荷の連続運転時間を決定する。
図1、図2および図3によれば、電源回路3、制御回路11、残量センサ16、通信回路12および表示装置13は負荷推定装置100を形成している。
[制御回路]
図4は制御回路11を示している。図4において破線により示された部分はオプションである。CPU21は、記憶装置22に記憶されている制御プログラムにしたがって電力供給装置1を制御するプロセッサ回路(中央演算処理装置)である。記憶装置22は、不揮発性メモリ(ROM:リードオンリーメモリ)や揮発性メモリ(RAM:ランダムアクセスメモリ)などを有する記憶回路である。
図4は制御回路11を示している。図4において破線により示された部分はオプションである。CPU21は、記憶装置22に記憶されている制御プログラムにしたがって電力供給装置1を制御するプロセッサ回路(中央演算処理装置)である。記憶装置22は、不揮発性メモリ(ROM:リードオンリーメモリ)や揮発性メモリ(RAM:ランダムアクセスメモリ)などを有する記憶回路である。
CPU21は、制御プログラムを実行することで実現される複数の機能を有している。なお、これらの機能の一部またはすべてはDSP(デジタルシグナルプロセッサ)やFPGA(フィールドプログラマブルゲートアレイ)などのハードウエア回路により実現されてもよい。特徴量演算部23は計測回路6により計測された電圧の計測値と電流の計測値から複数の負荷の特徴量を演算する。特徴量は、たとえば、皮相電力および力率である。力率は有効電力を皮相電力で除算することで得られるか、電圧と電流との位相差の余弦(cosθ)として求められる。後者の場合、計測回路6は位相差θを計測する。さらに、特徴量は、負荷が起動してから安定して動作するまでに必要となる時間である安定時間や、負荷が起動するときに負荷に流れる起動電流のピーク値を含んでもよい。記憶装置22は特徴量データ26と電力データ27とを記憶している。特徴量データ26は、負荷の種類または名称と、負荷の特徴量とを関連付けて保持するデータである。とりわけ、本発明では、特徴量データ26は、二以上の負荷の組み合わせごとの特徴量を有している。負荷推定部24は、特徴量演算部23により演算された特徴量と、記憶装置22に記憶されている既知の特徴量とに基づき、電力供給装置1に接続されている複数の負荷を推定する。運転時間計算部25は、負荷推定部24により推定された複数の負荷の消費電力と、燃料の残量や充電量とに基づき、複数の負荷を継続運転できる時間(連続運転時間)を決定する。CPU21は連続運転時間を表示装置13に表示させたり、通信回路12を通じて外部の情報処理装置(通信端末)に送信し、外部の情報処理装置のディスプレイに表示させたりしてもよい。電力データ27は、負荷ごとの定格消費電力や、負荷ごとに主要目的を達成するために必要となる電力量を含んでいてもよい。負荷数取得部28は、ACアウトレット7に接続されている負荷の個数を取得する。負荷の個数はユーザにより情報処理装置を通じて入力されてもよいし、ACアウトレット7から出力される電流の時間変化に応じて負荷の個数が特定されてもよい。
[特徴量マップ]
図5は特徴量データ26の一部を構成する特徴量マップを示している。ここでは、特徴量として皮相電力と力率が例示されている。図5には、単一の負荷の特徴量の座標と、二以上の負荷の組み合わせに対応する特徴量の座標とがドットにより示されている。もちろん、三以上の負荷の組み合わせに対応する特徴量の座標のドットは、特徴量マップの図示が煩雑になるため、省略されている。
特徴量C1は照明器具のみの特徴量を示している。
特徴量C2は炊飯器のみの特徴量を示している。
特徴量C4はコンプレッサーのみの特徴量を示している。
特徴量C5は電気ケトルのみの特徴量を示している。
特徴量C6はヒータのみの特徴量を示している。
特徴量C7はドライヤーのみの特徴量を示している。
特徴量C12は照明器具と炊飯器との組み合わせについての特徴量を示している。
特徴量C14は照明器具とコンプレッサーとの組み合わせについての特徴量を示している。
特徴量C15は照明器具と電気ケトルとの組み合わせについての特徴量を示している。
特徴量C16は照明器具とヒータとの組み合わせについての特徴量を示している。
特徴量C17は照明器具とドライヤーとの組み合わせについての特徴量を示している。
特徴量C24は炊飯器とコンプレッサーとの組み合わせについての特徴量を示している。
特徴量C25は炊飯器と電気ケトルとの組み合わせの特徴量を示している。
特徴量C26は炊飯器とヒータとの組み合わせの特徴量を示している。
特徴量C27は炊飯器とドライヤーとの組み合わせについての特徴量を示している。
特徴量C45はコンプレッサーと電気ケトルとの組み合わせについての特徴量を示している。
特徴量C46はコンプレッサーとヒータとの組み合わせについての特徴量を示している。
特徴量C47はコンプレッサーとドライヤーとの組み合わせについての特徴量を示している。
特徴量C56は電気ケトルとヒータとの組み合わせの特徴量を示している。
特徴量C57は電気ケトルとドライヤーとの組み合わせについての特徴量を示している。
特徴量C67はヒータとドライヤーとの組み合わせについての特徴量を示している。
図5は特徴量データ26の一部を構成する特徴量マップを示している。ここでは、特徴量として皮相電力と力率が例示されている。図5には、単一の負荷の特徴量の座標と、二以上の負荷の組み合わせに対応する特徴量の座標とがドットにより示されている。もちろん、三以上の負荷の組み合わせに対応する特徴量の座標のドットは、特徴量マップの図示が煩雑になるため、省略されている。
特徴量C1は照明器具のみの特徴量を示している。
特徴量C2は炊飯器のみの特徴量を示している。
特徴量C4はコンプレッサーのみの特徴量を示している。
特徴量C5は電気ケトルのみの特徴量を示している。
特徴量C6はヒータのみの特徴量を示している。
特徴量C7はドライヤーのみの特徴量を示している。
特徴量C12は照明器具と炊飯器との組み合わせについての特徴量を示している。
特徴量C14は照明器具とコンプレッサーとの組み合わせについての特徴量を示している。
特徴量C15は照明器具と電気ケトルとの組み合わせについての特徴量を示している。
特徴量C16は照明器具とヒータとの組み合わせについての特徴量を示している。
特徴量C17は照明器具とドライヤーとの組み合わせについての特徴量を示している。
特徴量C24は炊飯器とコンプレッサーとの組み合わせについての特徴量を示している。
特徴量C25は炊飯器と電気ケトルとの組み合わせの特徴量を示している。
特徴量C26は炊飯器とヒータとの組み合わせの特徴量を示している。
特徴量C27は炊飯器とドライヤーとの組み合わせについての特徴量を示している。
特徴量C45はコンプレッサーと電気ケトルとの組み合わせについての特徴量を示している。
特徴量C46はコンプレッサーとヒータとの組み合わせについての特徴量を示している。
特徴量C47はコンプレッサーとドライヤーとの組み合わせについての特徴量を示している。
特徴量C56は電気ケトルとヒータとの組み合わせの特徴量を示している。
特徴量C57は電気ケトルとドライヤーとの組み合わせについての特徴量を示している。
特徴量C67はヒータとドライヤーとの組み合わせについての特徴量を示している。
負荷推定部24は、特徴量演算部23により演算された特徴量の座標と、記憶装置22に記憶されている特徴量の座標との距離を計算し、最小の距離をもたらす記憶装置22に記憶されている特徴量の座標を特定する。さらに、負荷推定部24は、特定された特徴量に関連付けられている負荷の種類や名称(識別情報)を特定する。たとえば、負荷推定部24は、最小の距離をもたらす特徴量をC56であると特定すると、C56に対応する負荷の識別情報として電気ケトルとヒータとを特徴量データ26から抽出する。なお、特徴量を識別するための記号としてCiまたはCijが使用されているが、Ciは、単一の負荷を識別するために使用され、Cijは二つの負荷の組み合わせを識別するために使用されている。この命名規則にしたがえば、三つの負荷の組み合わせを識別するために使用される記号はCijkと表記される。また、四つの負荷の組み合わせを識別するために使用される記号はCijklと表記される。5つ以上の負荷の組み合わせについても同様の命名規則が採用されてもよい。なお、特徴量Cijは特徴量Ciと特徴量Cjとをベクトル合成したものである。負荷数取得部28が負荷の個数を取得している場合、負荷推定部24は負荷の個数に応じた組み合わせの特徴量だけを比較対象として絞り込んでもよい。負荷の個数が2であれば、Cijが比較対象とされる。負荷の個数が4であれば、Cijklが比較対象とされる。
[電力データ]
運転時間計算部25は、基本的に、現在の負荷全体の消費電力の瞬時値[W]と、燃料の残量や充電量から求められた供給可能な電力量[Wh]とから残運転時間[h]を計算し、時々刻々と表示装置13または通信回路12に出力する。しかし、次のような手法を用いて運転時間計算部25は、連続運転時間を求めてもよい。
運転時間計算部25は、基本的に、現在の負荷全体の消費電力の瞬時値[W]と、燃料の残量や充電量から求められた供給可能な電力量[Wh]とから残運転時間[h]を計算し、時々刻々と表示装置13または通信回路12に出力する。しかし、次のような手法を用いて運転時間計算部25は、連続運転時間を求めてもよい。
図6は電力データ27の一例を示している。電力データ27は、負荷ごとの定格消費電力と典型電力量とを保持している。典型電力量とは、電気機器の主要目的(典型作業)を達成するために必要となる最小限の電力量である。たとえば、炊飯器の典型電力量は、炊飯の開始から終了までに必要となる電力量である。たとえば、負荷推定部24が、電力供給装置1に接続されている複数の負荷を電気ケトルと炊飯器であると推定すると、運転時間計算部25は、電力データ27を参照し、電気ケトルの定格消費電力と炊飯器の定格消費電力とを取得して、加算する。運転時間計算部25は、燃料の残量や充電量から供給可能な電力量を算出する。さらに、運転時間計算部25は、電気ケトルの定格消費電力と炊飯器の定格消費電力との和で供給可能な電力量を除算することで、連続運転時間を計算し、表示装置13または通信回路12に出力する。あるいは、運転時間計算部25は、燃料の残量や充電量から供給可能な電力量を算出し、電気ケトルの典型電力量と炊飯器の典型電力量との和が供給可能な電力量よりも小さければ、電気ケトルと炊飯器とがそれぞれ主要目的を達成できることを示す情報を表示装置13または通信回路12に出力する。もし、電気ケトルの典型電力量と炊飯器の典型電力量との和が供給可能な電力量よりも小さければ、運転時間計算部25は、電気ケトルと炊飯器とがそれぞれ主要目的を達成できないこことを示す情報(警告メッセージなど)を表示装置13または通信回路12に出力する。警告メッセージは音声メッセージや警告音として、スピーカやブザーから出力されてもよい。
[負荷推定方法のフローチャート]
図7はCPU21が制御プログラムにしたがって実行する負荷推定方法を示している。
図7はCPU21が制御プログラムにしたがって実行する負荷推定方法を示している。
S1でCPU21(特徴量演算部23)は計測回路6を用いて負荷17に供給される電圧の計測値と電流の計測値とを取得する。
S2でCPU21(特徴量演算部23)は電圧と電流の計測値を用いて負荷17の特徴量(例:力率や皮相電力)を取得する。
S3でCPU21(負荷推定部24)は、負荷17の特徴量に近い既知の特徴量を探索することで、負荷17を推定する。上述したように、記憶装置22は、既知の特徴量を有する特徴量データ26を記憶している。したがって、負荷推定部24は負荷17の特徴量に近い既知の特徴量を特徴量データ26から特定し、特定した既知の特徴量に関連付けられている負荷の識別情報を取得する。負荷の識別情報は、たとえば、負荷の名称や種類、Ci,Cijなどであってもよい。
S4でCPU21(負荷推定部24または運転時間計算部25)は、推定された負荷の消費電力を電力データ27から取得する。図6が示すように、電力データ27は負荷の識別情報に対応した定格消費電力を保持している。よって、運転時間計算部25は負荷の識別情報に対応した定格消費電力を電力データ27から取得する。負荷推定部24が複数の負荷の組み合わせを推定した場合(例:CijやCijkが推定された場合)、運転時間計算部25は複数の負荷のそれぞれの定格消費電力を電力データ27から取得する。
S5でCPU21(運転時間計算部25)は、電力供給装置1から供給可能な電力量を求める。図1の電力供給装置1であれば、運転時間計算部25は残量センサ16により検知された燃料の残量に基づき電力供給装置1から供給可能な電力量を演算する。図2の電力供給装置1であれば、運転時間計算部25は残量センサ16により検知された蓄電池14の充電量に基づき電力供給装置1から供給可能な電力量を演算する。図3の電力供給装置1であれば、運転時間計算部25は、残量センサ16により検知された燃料の残量と残量センサ16により検知された蓄電池14の充電量とに基づき電力供給装置1から供給可能な電力量を演算する。なお、残量センサ16の測定結果を電力量に変換する数式または関数は、記憶装置22に記憶されていてもよい。
S6でCPU21(運転時間計算部25)は、供給可能な電力量を負荷の定格消費電力で除算することで、推定された負荷についての連続運転時間を求める。なお、負荷の定格消費電力に代えて、負荷全体の消費電力の瞬時値が使用されてもよい。連続運転時間とは、推定された負荷が連続して(継続的に)稼働可能な時間である。
S7でCPU21(運転時間計算部25)は、連続運転時間を表示装置13や通信回路12に出力する。運転時間計算部25は負荷の識別情報とともに連続運転時間を出力してもよい。また、運転時間計算部25は、供給可能な電力量が、推定された負荷の典型電力量以上であるかどうかを判定することで、推定された負荷が主要目的(負荷の典型的な動作)を完了できるかを判定してもよい。仮に、供給可能な電力量が、推定された負荷の典型電力量未満であれば、運転時間計算部25は、推定された負荷が主要目的(負荷の典型的な動作)を完了できないことを示す警告を出力してもよい。たとえば、炊飯器が炊飯を完了できないことを示す警告が出力されてもよい。
[負荷予測方法]
上述した負荷推定方法により電力供給装置1に接続されている負荷を推定することが可能となる。ところで、負荷推定方法は電力供給装置1に接続されている負荷の特徴量から当該負荷を推定するため、電力供給装置1に接続されていない負荷を推定できない。これは、電力供給装置1に接続されていない負荷の特徴量を取得する手段が存在しないことに起因する。つまり、負荷推定方法は、電力供給装置1に接続される可能性のある負荷を推定することができない。
上述した負荷推定方法により電力供給装置1に接続されている負荷を推定することが可能となる。ところで、負荷推定方法は電力供給装置1に接続されている負荷の特徴量から当該負荷を推定するため、電力供給装置1に接続されていない負荷を推定できない。これは、電力供給装置1に接続されていない負荷の特徴量を取得する手段が存在しないことに起因する。つまり、負荷推定方法は、電力供給装置1に接続される可能性のある負荷を推定することができない。
電力供給装置1に近い将来(数分~数十分後)において接続される負荷を予測できれば便利なことがある。たとえば、キャンプ場において電力供給装置1が炊飯器に接続されている場合、次はおかずなどを調理するための調理器具(例:ホットプレートなど)が電力供給装置1に接続される可能性がある。キャンプ場において電力供給装置1に調理器具が接続された場合に、食後の飲料(例:コーヒーや紅茶、緑茶)を作るために電気ポットが電力供給装置1に接続される可能性がある。このように時間の経過とともに電力供給装置1に接続される負荷は変更されたり、増加したりする。
図3が示すように、電力供給装置1は、発電機と蓄電池とを有してもよい。このような電力供給装置1は発電機のみで炊飯器に電力を供給できるが、発電機のみでは炊飯器と調理器具との両方に十分な電力を供給できないかもしれない。そこで、電力供給装置1は発電機と蓄電池との両方を使用してこれらの負荷に十分な電力を供給してもよい。しかし、調理器具が必要とする電力量に対して蓄電池の蓄電量が不十分であると、ユーザは調理を完了することができなくなってしまう。この場合、電力供給装置1は発電機により蓄電池に予め充電しておく。これにより、ユーザは調理を完了することができるだろう。このように電力供給装置1に対して未接続の負荷を予測することはメリットがある。
図8は負荷予測機能を有した制御回路11を示している。CPU21は記憶装置22に記憶された制御プログラムを実行することで負荷予測部29や電力供給制御部31として機能する。上述したように負荷予測部29や電力供給制御部31もFPGAなどのハードウエア回路により実現されてもよい。記憶装置22は関連負荷データ30を記憶している。負荷予測部29は、負荷推定部24により推定された負荷と関連して使用される未接続の負荷を関連負荷データ30に基づき予測する。関連負荷データ30は、関連して使用される複数の負荷の識別情報を関連付けて記憶する。たとえば、記憶装置22は、炊飯器の識別情報とホットプレートの識別情報とを関連付けて記憶している。電力供給制御部31は、たとえば、推定された負荷と予測された負荷とに対して電力供給装置1が十分に電力を供給できるかどうかを判定する。また、電力供給制御部31は、電源回路3を制御し、エンジン発電機2と蓄電池14とのうち一方から負荷17に電力を供給させたり、エンジン発電機2と蓄電池14とのうち両方から負荷17に電力を供給させたりする。電力供給制御部31は、他の電力供給装置1から供給された交流をAC/DC回路4やインバータ回路5を経由して負荷17に電力を供給してもよい。
図9は負荷予測方法を示すフローチャートである。ここでは、すでにS1ないしS3が実行されていることが仮定されている。この負荷予測方法の特徴は、予測された負荷に発電機のみで電力を供給できないときに、予測された負荷が実際に接続される前に、蓄電池14の充電を開始することにある。
S11でCPU21(負荷予測部29)は、負荷推定部24により推定された負荷と関連して使用される未接続の負荷を関連負荷データ30に基づき予測する。たとえば、負荷予測部29は、推定された負荷の識別情報と関連付けて記憶されている他の負荷の識別情報を関連負荷データ30から取得する。
S12でCPU21(電力供給制御部31)は、推定された負荷の消費電力と予測された負荷の消費電力を電力データ27から取得する。図6が示すように、電力データ27は負荷の識別情報に対応した定格消費電力を保持している。よって、電力供給制御部31は負荷の識別情報に対応した定格消費電力を電力データ27から取得する。
S13でCPU21(電力供給制御部31)は、推定された負荷と予測された負荷とに対してエンジン発電機2のみで十分に電力を供給できるかどうかを判定する。たとえば、電力供給制御部31は、推定された負荷の消費電力と予測された負荷の消費電力との和がエンジン発電機2の発電能力(定格出力電力)以下であれば、負荷に電力を供給できると判定する。電力供給制御部31は、推定された負荷の消費電力と予測された負荷の消費電力との和がエンジン発電機2の発電能力(定格出力電力)を超えていれば、負荷に電力を供給できないと判定する。負荷に電力を供給できれば、CPU21はS14をスキップして負荷予測方法を終了する。負荷に電力を供給できなければ、CPU21はS14に進む。
S14でCPU21(電力供給制御部31)は、充電回路8を制御してエンジン発電機2により発電された電力の一部を用いて蓄電池14への充電を開始する。なお、電力供給制御部31は、予測された負荷が実際に接続されたことを負荷推定部24の推定結果に基づき認識すると、エンジン発電機2と蓄電池14との双方から電力を負荷に供給するよう電源回路3を制御する。このように事前に蓄電池14を充電しておくことで、予測された負荷への電力の供給を準備することが可能となる。その結果、実際に予測された負荷が電力供給装置1に接続されたときに、電力供給装置1が電力不足に陥りにくくなろう。
図10は他の負荷予測方法を示すフローチャートである。この負荷予測方法の特徴は、予測された負荷に発電機のみで電力を供給できないときに、警告メッセージを出力することにある。図10では図9におけるS14がS22に置換されている。推定された負荷と予測された負荷とに対してエンジン発電機2のみで十分に電力を供給できない場合、CPU21はS22に進む。
S22でCPU21(電力供給制御部31)は、表示装置13または通信回路12に警告メッセージを出力する。通信回路12出力されたメッセージはスマートフォン18やPC19のディスプレイ装置に表示される。警告メッセージは、予測された負荷を電力供給装置1に接続した場合に電力供給装置1が電力不足に陥ることを示すメッセージである。これによりユーザは、複数の負荷を同時に電力供給装置1に接続しないように工夫してもよい。たとえば、ユーザはメッセージにしたがって、第一負荷(例:炊飯器)を電力供給装置1から外した後で、第二負荷(例:ホットプレート)を電力供給装置1に接続してもよい。
図11は他の負荷予測方法を示すフローチャートである。CPU21はS12の次にS31に進む。S31~S33は図7に示されたS5~S7と類似している。この負荷予測方法の特徴は、推定された負荷と予測された負荷とが電力供給装置1に接続されたときの連続運転時間をユーザに提供することにある。
S31でCPU21(運転時間計算部25)は、電力供給装置1から供給可能な電力量を求める。図1の電力供給装置1であれば、運転時間計算部25は残量センサ16により検知された燃料の残量に基づき電力供給装置1から供給可能な電力量を演算する。図2の電力供給装置1であれば、運転時間計算部25は残量センサ16により検知された蓄電池14の充電量に基づき電力供給装置1から供給可能な電力量を演算する。図3の電力供給装置1であれば、運転時間計算部25は、残量センサ16により検知された燃料の残量と残量センサ16により検知された蓄電池14の充電量とに基づき電力供給装置1から供給可能な電力量を演算する。なお、残量センサ16の測定結果を電力量に変換する数式または関数は、記憶装置22に記憶されていてもよい。
S32でCPU21(運転時間計算部25)は、供給可能な電力量を負荷の定格消費電力で除算することで、負荷についての連続運転時間を求める。ここで、負荷とは、推定された負荷と予測された負荷との両方である。運転時間計算部25は推定された負荷の定格消費電力と予測された負荷の定格消費電力を電力データ27から取得して、これらの和を求める。さらに、運転時間計算部25は和で供給可能な電力量を除算することで連続運転時間を求める。
S33でCPU21(運転時間計算部25)は、連続運転時間を表示装置13や通信回路12に出力する。通信回路12出力されたメッセージはスマートフォン18やPC19のディスプレイ装置に表示される。運転時間計算部25は負荷の識別情報とともに連続運転時間を出力してもよい。運転時間計算部25は推定された負荷のみが使用されたときの連続運転時間と、推定された負荷と予測された負荷との両方が使用されたときの連続運転時間との両方を出力してもよい。また、運転時間計算部25は、供給可能な電力量が、推定された負荷の典型電力量と予測された負荷の典型電力量との和以上であるかどうかを判定してもよい。その結果、運転時間計算部25は、推定された負荷と予測された負荷とがそれぞれの主要目的(負荷の典型的な動作)を完了できるかを判定してもよい。仮に、供給可能な電力量が、和未満であれば、運転時間計算部25は負荷が主要目的(負荷の典型的な動作)を完了できないことを示す警告を出力してもよい。たとえば、炊飯器が炊飯を完了できないか、または、ホットプレートが調理を完了できないことを示す警告が出力されてもよい。
図12は他の負荷予測方法を示すフローチャートである。この負荷予測方法はエンジン発電機2を搭載した電力供給装置1で実行されうる。CPU21はS11を実行した後でS41に進む。この負荷予測方法の特徴は、推定された負荷と予測された負荷とが電力供給装置1に接続されたときに燃料不足が発生しうることをユーザに警告することにある。つまり、ユーザに対して燃料の補給を促すことが可能となる。
S41でCPU21(電力供給制御部31)は、推定された負荷の典型電力量と予測された負荷の典型電力量を電力データ27から取得する。
S42でCPU21(電力供給制御部31)は、残量センサ16により検知された燃料の残量に基づき電力供給装置1から供給可能な電力量を演算する。
S43でCPU21(電力供給制御部31)は、推定された負荷の典型電力量と予測された負荷の典型電力量との和が供給可能な電力量以下であるかどうかに基づいて燃料が不足しているかどうかを判定する。燃料が不足していなければ、CPU21はS44をスキップして負荷予測方法を終了する。一方、燃料が不足していれば、CPU21はS44に進む。
S44でCPU21(電力供給制御部31)は、燃料補給メッセージを表示装置13や通信回路12に出力する。通信回路12出力されたメッセージはスマートフォン18やPC19のディスプレイ装置に表示される。燃料補給メッセージは、ユーザに燃料タンク15への燃料の補給を促すメッセージである。
なお、S22やS44のメッセージが出力された場合に、ユーザは、他のユーザの電力供給装置1から余剰電力の供給を受けてもよい。図13が示すように、キャンプ場では多数のユーザが電力供給装置1を有している。そのため、電力不足のユーザaは、他のユーザbから余剰電力の供給を受けてもよい。図13において、複数の電力供給装置1a、1bが電力線34を介して接続されており、複数の電力供給装置1a、1bが相互に余剰電力を供給/受給してもよい。たとえば、電力供給装置1aの発電能力が小さく、電力供給装置1bの発電能力は大きい。あるいは、電力供給装置1aは負荷17a(例:炊飯器)には十分な電力を供給できるが、予測された負荷17a’(ホットプレート)が接続されると、電力不足に陥る。一方で、電力供給装置1bは、負荷17b(例:電気ケトル)にのみ電力を供給しており、余剰電力を有している。この場合、電力供給装置1aは電力供給装置1bから余剰電力を受給して、負荷17a、17a’に電力を供給してもよい。
[まとめ]
第1態様によれば、負荷推定装置100が提供される。計測回路6は電力供給装置1に接続された一つまたは複数の負荷に供給される電圧と電流とを計測する計測手段の一例である。特徴量演算部23は計測手段により計測された電圧の計測値と電流の計測値から一つまたは複数の負荷の特徴量を演算する演算手段の一例である。記憶装置22は一つまたは二以上の負荷の組み合わせごとの特徴量を予め記憶した記憶手段の一例である。記憶装置22はそれぞれ関連して使用される複数の負荷を示す関連負荷情報を予め記憶した記憶手段の一例である。負荷推定部24は演算手段により演算された特徴量と、記憶手段に記憶されている特徴量とに基づき、電力供給装置1に接続されている一つまたは複数の負荷を推定する負荷推定手段の一例である。負荷予測部29は電力供給装置1に接続されていない負荷であって、負荷推定手段により推定された負荷と関連した負荷を関連負荷情報に基づき予測する負荷予測手段の一例である。関連負荷データ30は関連負荷情報の一例である。第一態様によれば、簡易な方法で一つまたは複数の負荷を精度良く推定可能となり、かつ、電力供給装置1に接続されていない負荷を、推定された負荷から予測することが可能となる。
第1態様によれば、負荷推定装置100が提供される。計測回路6は電力供給装置1に接続された一つまたは複数の負荷に供給される電圧と電流とを計測する計測手段の一例である。特徴量演算部23は計測手段により計測された電圧の計測値と電流の計測値から一つまたは複数の負荷の特徴量を演算する演算手段の一例である。記憶装置22は一つまたは二以上の負荷の組み合わせごとの特徴量を予め記憶した記憶手段の一例である。記憶装置22はそれぞれ関連して使用される複数の負荷を示す関連負荷情報を予め記憶した記憶手段の一例である。負荷推定部24は演算手段により演算された特徴量と、記憶手段に記憶されている特徴量とに基づき、電力供給装置1に接続されている一つまたは複数の負荷を推定する負荷推定手段の一例である。負荷予測部29は電力供給装置1に接続されていない負荷であって、負荷推定手段により推定された負荷と関連した負荷を関連負荷情報に基づき予測する負荷予測手段の一例である。関連負荷データ30は関連負荷情報の一例である。第一態様によれば、簡易な方法で一つまたは複数の負荷を精度良く推定可能となり、かつ、電力供給装置1に接続されていない負荷を、推定された負荷から予測することが可能となる。
第2態様によれば、負荷推定装置100は、電力供給装置1に設けられた発電機(例:エンジン発電機2)と、電力供給装置に設けられて、前記発電機により充電される蓄電池14と、負荷推定手段により推定された負荷の消費電力と、負荷予測手段により予測された負荷の消費電力と、発電機の発電能力とに基づき、負荷推定手段により推定された負荷と負荷予測手段により予測された負荷とに発電機が十分な電力を供給できるかどうかを判定する判定手段(例:運転時間計算部25や電力供給制御部31など)と、発電機と蓄電池とから負荷に対して供給される電力を制御する制御手段(例:電力供給制御部31)をさらに有してもよい。電力供給制御部31は、判定手段が負荷推定手段により推定された負荷と負荷予測手段により予測された負荷とに発電機が十分な電力を供給できないと判定すると、発電機による蓄電池への充電を開始する。これにより、予測された負荷が実際に電力供給装置1に接続されたときには、予測された負荷は発電機と蓄電池との両方から電力を供給される。
第3態様によれば、残量センサ16は、発電機の燃料タンク15に収容されている燃料の残量を測定する測定手段の一例である。運転時間計算部25は負荷推定手段により推定された負荷の消費電力と、負荷予測手段により予測された負荷の消費電力と、燃料の残量とに基づき、推定された負荷および予測された負荷を継続運転できる時間を決定する決定手段の一例である。通信回路12や表示装置13は推定された負荷と予測された負荷とを継続運転できる時間を出力する出力手段の一例である。これによりユーザは推定された負荷と予測された負荷とを継続運転できる時間を把握できるようになる。
第4態様によれば、電力供給装置1は、発電機により充電される蓄電池14をさらに有していてもよい。運転時間計算部25は負荷推定手段により推定された負荷の消費電力と、負荷予測手段により予測された負荷の消費電力と、燃料の残量と、蓄電池の充電量とに基づき、負荷推定手段により推定された負荷と負荷予測手段により予測された負荷とを継続運転できる時間を決定してもよい。このように継続運転できる時間には蓄電池14の充電量が考慮されてもよい。
第5態様によれば、負荷推定装置100は、電力供給装置1に設けられた発電機(例:エンジン発電機2)と、発電機の燃料タンク15に収容されている燃料の残量を測定する測定手段(例:残量センサ16)と、負荷推定手段により推定された負荷の消費電力と、負荷予測手段により予測された負荷の消費電力と、燃料の残量とに基づき、燃料タンク15に燃料を補充すべきかどうかを判定する判定手段(例:電力供給制御部31)と、燃料タンク15に燃料を補充すべきと判定手段が判定すると、燃料タンクに燃料を補充すべきことを示すメッセージを出力する出力手段(例:表示装置13)を有してもよい。これにより、ユーザは、燃料を補充すべきことを容易に知ることができる。また、推定された負荷と予測された負荷とが電力供給装置1に接続された場合に、燃料切れが発生しにくくなる。
第6態様によれば、第1の態様から第5の態様までのいずれか一つの態様に記載の負荷推定装置を有することを特徴とする電力供給装置1が提供される。このように負荷推定装置は電力供給装置1に組み込まれて提供されてもよい。
Claims (6)
- 可搬型の電力供給装置に接続された負荷に供給される電圧と電流とを計測する計測手段と、
前記計測手段により計測された電圧の計測値と電流の計測値から前記負荷の特徴量を演算する演算手段と、
負荷ごとの特徴量と、それぞれ関連して使用される複数の負荷を示す関連負荷情報とを予め記憶した記憶手段と、
前記演算手段により演算された特徴量と、前記記憶手段に記憶されている特徴量とに基づき、前記電力供給装置に接続されている負荷を推定する負荷推定手段と、
前記電力供給装置に接続されていない負荷であって、前記負荷推定手段により推定された負荷と関連した負荷を前記関連負荷情報に基づき予測する負荷予測手段と、
を有することを特徴とする負荷推定装置。 - 前記電力供給装置に設けられた発電機と、
前記電力供給装置に設けられて、前記発電機により充電される蓄電池と、
前記負荷推定手段により推定された負荷の消費電力と、前記負荷予測手段により予測された負荷の消費電力と、前記発電機の発電能力とに基づき、前記負荷推定手段により推定された負荷と前記負荷予測手段により予測された負荷とに前記発電機が十分な電力を供給できるかどうかを判定する判定手段と、
前記発電機と前記蓄電池とから前記負荷に対して供給される電力を制御する制御手段と
をさらに有し、
前記制御手段は、前記判定手段が前記負荷推定手段により推定された負荷と前記負荷予測手段により予測された負荷とに前記発電機が十分な電力を供給できないと判定すると、前記発電機による前記蓄電池への充電を開始することを特徴とする請求項1に記載の負荷推定装置。 - 前記電力供給装置に設けられた発電機と、
前記発電機の燃料タンクに収容されている燃料の残量を測定する測定手段と、
前記負荷推定手段により推定された負荷の消費電力と、前記負荷予測手段により予測された負荷の消費電力と、前記燃料の残量とに基づき、前記負荷推定手段により推定された負荷と前記負荷予測手段により予測された負荷とを継続運転できる時間を決定する決定手段と、
前記時間を出力する出力手段と
を有することを特徴とする請求項1に記載の負荷推定装置。 - 前記電力供給装置は、前記発電機により充電される蓄電池をさらに有し、
前記決定手段は、前記負荷推定手段により推定された負荷の消費電力と、前記負荷予測手段により予測された負荷の消費電力と、前記燃料の残量と、前記蓄電池の充電量とに基づき、前記負荷推定手段により推定された負荷と前記負荷予測手段により予測された負荷とを継続運転できる時間を決定するように構成されていることを特徴とする請求項3に記載の負荷推定装置。 - 前記電力供給装置に設けられた発電機と、
前記発電機の燃料タンクに収容されている燃料の残量を測定する測定手段と、
前記負荷推定手段により推定された負荷の消費電力と、前記負荷予測手段により予測された負荷の消費電力と、前記燃料の残量とに基づき、前記燃料タンクに燃料を補充すべきかどうかを判定する判定手段と、
前記燃料タンクに燃料を補充すべきと前記判定手段が判定すると、前記燃料タンクに燃料を補充すべきことを示すメッセージを出力する出力手段と
を有することを特徴とする請求項1に記載の負荷推定装置。 - 請求項1ないし5のいずれか一項に記載の負荷推定装置を有することを特徴とする可搬型の電力供給装置。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US17/016,536 US11821955B2 (en) | 2018-03-20 | 2020-09-10 | Load estimation device and portable power-supplying device |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018-052595 | 2018-03-20 | ||
| JP2018052595A JP2019164057A (ja) | 2018-03-20 | 2018-03-20 | 負荷推定装置および可搬型の電力供給装置 |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US17/016,536 Continuation US11821955B2 (en) | 2018-03-20 | 2020-09-10 | Load estimation device and portable power-supplying device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2019181092A1 true WO2019181092A1 (ja) | 2019-09-26 |
Family
ID=67987071
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2018/044963 Ceased WO2019181092A1 (ja) | 2018-03-20 | 2018-12-06 | 負荷推定装置および可搬型の電力供給装置 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US11821955B2 (ja) |
| JP (1) | JP2019164057A (ja) |
| WO (1) | WO2019181092A1 (ja) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2022059103A1 (ja) | 2020-09-16 | 2022-03-24 | 本田技研工業株式会社 | 電力供給装置 |
| US12326707B2 (en) * | 2022-05-16 | 2025-06-10 | Galvion Ltd. | Method and system of providing a uniform messaging platform in a heterogeneous environment |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2011142330A1 (ja) * | 2010-05-11 | 2011-11-17 | 三洋電機株式会社 | 電力供給システム |
| WO2012020756A1 (ja) * | 2010-08-09 | 2012-02-16 | 三洋電機株式会社 | 電力制御装置 |
| JP2012189526A (ja) * | 2011-03-14 | 2012-10-04 | Mitsubishi Electric Corp | 機器状態検出装置及び機器状態検出システム |
| WO2013157294A1 (ja) * | 2012-04-18 | 2013-10-24 | ソニー株式会社 | 電気機器の動作状態推定装置、電気機器の動作状態推定方法、プログラム、電気機器の特徴ベクトル登録装置、電気機器の特徴ベクトル登録方法、サーバ装置および電気機器の動作状態推定システム |
| JP2013251102A (ja) * | 2012-05-31 | 2013-12-12 | Nissan Motor Co Ltd | バッテリ制御装置 |
| JP2015512077A (ja) * | 2012-01-26 | 2015-04-23 | クアルコム,インコーポレイテッド | ポータブルコンピューティングデバイスにおけるバッテリ負荷管理のためのシステムおよび方法 |
| US20150134279A1 (en) * | 2013-11-13 | 2015-05-14 | Kt Corporation | Estimating operation state of individual load |
| US20150241487A1 (en) * | 2014-02-26 | 2015-08-27 | Electricite De France | Estimation of electric energy consumption of a given device among a set of electrical devices |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3403368B2 (ja) | 1999-02-01 | 2003-05-06 | 財団法人電力中央研究所 | 電気機器モニタリングシステム及び動作異常警報システム |
| JP2007003296A (ja) | 2005-06-22 | 2007-01-11 | Toenec Corp | 電気機器モニタリングシステム |
| JP4808036B2 (ja) * | 2006-02-15 | 2011-11-02 | 富士通株式会社 | 電子機器 |
| JP2009042183A (ja) * | 2007-08-10 | 2009-02-26 | Canon Inc | 電子機器及びバッテリチェック方法 |
| JP5641584B2 (ja) * | 2012-06-15 | 2014-12-17 | Necソリューションイノベータ株式会社 | 電気機器判別装置、電気機器判別システム、電気機器判別方法、及びプログラム |
| US9568901B2 (en) * | 2012-08-27 | 2017-02-14 | Nec Corporation | Multi-objective energy management methods for micro-grids |
| US9250669B2 (en) * | 2012-09-14 | 2016-02-02 | Lutron Electronics Co., Inc. | Power measurement in a two-wire load control device |
| JP2018084986A (ja) * | 2016-11-24 | 2018-05-31 | 株式会社東芝 | サーバ装置、プログラム、および、通信システム |
| JP6443577B2 (ja) * | 2017-06-02 | 2018-12-26 | 株式会社Gsユアサ | 管理装置、蓄電モジュール、管理方法、及びコンピュータプログラム |
-
2018
- 2018-03-20 JP JP2018052595A patent/JP2019164057A/ja active Pending
- 2018-12-06 WO PCT/JP2018/044963 patent/WO2019181092A1/ja not_active Ceased
-
2020
- 2020-09-10 US US17/016,536 patent/US11821955B2/en active Active
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2011142330A1 (ja) * | 2010-05-11 | 2011-11-17 | 三洋電機株式会社 | 電力供給システム |
| WO2012020756A1 (ja) * | 2010-08-09 | 2012-02-16 | 三洋電機株式会社 | 電力制御装置 |
| JP2012189526A (ja) * | 2011-03-14 | 2012-10-04 | Mitsubishi Electric Corp | 機器状態検出装置及び機器状態検出システム |
| JP2015512077A (ja) * | 2012-01-26 | 2015-04-23 | クアルコム,インコーポレイテッド | ポータブルコンピューティングデバイスにおけるバッテリ負荷管理のためのシステムおよび方法 |
| WO2013157294A1 (ja) * | 2012-04-18 | 2013-10-24 | ソニー株式会社 | 電気機器の動作状態推定装置、電気機器の動作状態推定方法、プログラム、電気機器の特徴ベクトル登録装置、電気機器の特徴ベクトル登録方法、サーバ装置および電気機器の動作状態推定システム |
| JP2013251102A (ja) * | 2012-05-31 | 2013-12-12 | Nissan Motor Co Ltd | バッテリ制御装置 |
| US20150134279A1 (en) * | 2013-11-13 | 2015-05-14 | Kt Corporation | Estimating operation state of individual load |
| US20150241487A1 (en) * | 2014-02-26 | 2015-08-27 | Electricite De France | Estimation of electric energy consumption of a given device among a set of electrical devices |
Also Published As
| Publication number | Publication date |
|---|---|
| US11821955B2 (en) | 2023-11-21 |
| JP2019164057A (ja) | 2019-09-26 |
| US20200408847A1 (en) | 2020-12-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Ghosh et al. | Artificial bee colony optimization based non-intrusive appliances load monitoring technique in a smart home | |
| JP5617578B2 (ja) | 配電システム及び配電方法 | |
| US20200339004A1 (en) | Power reception/billing between multiple portable power supply devices | |
| KR101611301B1 (ko) | 스마트 서버 및 스마트 디바이스 | |
| JP2011163858A (ja) | エネルギー表示システム | |
| JP2013245839A (ja) | 電気給湯装置 | |
| WO2015118845A1 (ja) | コージェネレーション装置の制御装置、およびコージェネレーション装置の制御方法 | |
| US11821955B2 (en) | Load estimation device and portable power-supplying device | |
| US20210218042A1 (en) | Power supply system, server, and power generation facility | |
| JP5508141B2 (ja) | エネルギー消費量表示システム | |
| US11841382B2 (en) | Information providing apparatus, information providing method, and system | |
| US11255888B2 (en) | Load estimating device and power supply device | |
| US11568332B2 (en) | Information providing device, information providing method, and transportable power supply device | |
| JP2016082771A (ja) | エネルギー制御システム | |
| WO2019181093A1 (ja) | 負荷推定装置および発電機 | |
| JP2016025830A (ja) | 電力供給システム | |
| JP4925631B2 (ja) | 系統連係システムおよび自己消費電力量データ用統括サーバ | |
| WO2019181089A1 (ja) | 可搬型の電力供給装置 | |
| JP2018029447A (ja) | 電力管理装置および電力管理プログラム | |
| JP2019165574A (ja) | 情報処理装置、情報処理方法及び情報処理システム | |
| WO2019181084A1 (ja) | 情報提供装置、情報提供方法及びシステム | |
| US20110258063A1 (en) | Power generation leveling system and power generation leveling method | |
| WO2019159416A1 (ja) | 電力供給システムおよび電力供給装置 | |
| JP2010213468A (ja) | 電力制御システム | |
| CN113841314A (zh) | 储存电力来源管理装置、方法及程序 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 18910373 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 18910373 Country of ref document: EP Kind code of ref document: A1 |