WO2012120755A1 - 分析装置 - Google Patents
分析装置 Download PDFInfo
- Publication number
- WO2012120755A1 WO2012120755A1 PCT/JP2012/000068 JP2012000068W WO2012120755A1 WO 2012120755 A1 WO2012120755 A1 WO 2012120755A1 JP 2012000068 W JP2012000068 W JP 2012000068W WO 2012120755 A1 WO2012120755 A1 WO 2012120755A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- maintenance
- analyzer
- items
- item
- procedure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N35/00—Automatic analysis not limited to methods or materials provided for in any single one of groups G01N1/00 - G01N33/00; Handling materials therefor
- G01N35/00584—Control arrangements for automatic analysers
- G01N35/00594—Quality control, including calibration or testing of components of the analyser
- G01N35/00613—Quality control
- G01N35/00623—Quality control of instruments
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N35/00—Automatic analysis not limited to methods or materials provided for in any single one of groups G01N1/00 - G01N33/00; Handling materials therefor
- G01N35/00584—Control arrangements for automatic analysers
- G01N35/0092—Scheduling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
Definitions
- the present invention relates to an analysis apparatus that requires a plurality of maintenance operations with different execution frequencies, and more particularly to an analysis apparatus having a function for recommending an optimum maintenance according to the maintenance operation.
- Periodic maintenance of the equipment is necessary work to maintain the performance of the equipment.
- Facilities that have introduced analyzers that analyze solids, liquids, gases, etc. maintain maintenance at the intervals recommended by the equipment manufacturer, and maintain the analytical performance of the equipment and preventive maintenance.
- the present invention can be applied to various analyzers, but the following description will be made with an analyzer for clinical testing as an example.
- Devices that are medical devices that are designated as specific maintenance management devices must be maintained and recorded at intervals recommended by the device manufacturer.
- the maintenance procedure is described in a paper manual or help built into the operation section of the device.
- the operator performs maintenance according to the procedure for each item according to the procedure written in the manual.
- Maintenance types are mainly divided into cleaning and parts replacement.
- the history of items to be automatically executed can be stored in the storage unit of the apparatus, and the time limit can be managed.
- some maintenance items that are manually performed create a maintenance management table and leave a history. In such a case, it is necessary to perform maintenance so as not to affect the sample measurement in light of the measurement status of the apparatus.
- the mechanism of the apparatus becomes complicated, the number of maintenance items to be performed increases, and it becomes difficult for an operator who is not familiar with the apparatus to respond accurately.
- Patent Document 1 the history of operation of the medical device and the abnormality information regarding the abnormality that has occurred so far are held and managed, and the elapsed time and abnormality occurrence state of the operation of the medical device are managed. It has been proposed to display the operating state of a medical device according to the condition. According to this technique, the short-term or long-term operation status can be displayed. The more complicated the device, the more difficult it is to grasp the operating status at the level of the person in charge. However, the efficiency of individual procedures is not considered.
- the frequency of maintenance is different, such as once a week, once a month, because the operating time interval, deterioration of parts to be replaced, wear conditions, and the degree of contamination attached to parts due to differences in sample and reagent properties are different. Yes.
- the deadline recommended by the manufacturer is based on the standard time (5 hours of operation, 8 hours of energization, etc.), so it is necessary to change the maintenance plan according to the operation of each facility. Some procedures for performing maintenance may limit the state of the apparatus.
- the order in which the maintenance items are executed is not always the same as the combination of the selected items, so each time the maintenance items are considered, an efficient procedure is considered. If the experience increases, it can be carried out in an efficient procedure. However, if an inexperienced operator carries out one item at a time according to the manual, the same procedure may occur several times and may be troublesome twice.
- the maintenance procedure is written in the manual. Since the manual does not assume that a plurality of maintenance items are performed at a time, the procedure is described for each maintenance item. However, if it is assumed that a plurality of maintenance items are performed at once, various combinations can be considered, so the number of manuals increases and it becomes difficult to read.
- the procedure that the operator wants to know is a procedure for efficiently performing a plurality of actually selected maintenance items, but it is not possible when the selected maintenance item changes every time.
- the maintenance and management of the equipment is performed by the operator and administrator using the management table. Since there is a record of the maintenance performed by the device, it can be posted even after the implementation. Maintenance performed manually is performed only in the maintenance management table. The operator who performed it may forget. Although manual maintenance is required, manual maintenance items that do not leave an implementation record account for 50 to 70% of the total, and the management method is cumbersome and burdensome to the operator.
- An object of the present invention is to provide an analyzer that can perform maintenance efficiently and without waste in an analyzer having a plurality of maintenance items.
- the configuration of the present invention for achieving the above object is as follows.
- Storage means for storing a plurality of maintenance items and the maintenance execution interval for each maintenance item, maintenance execution instruction means for instructing execution of maintenance, and the maintenance execution instruction means instructing execution of maintenance
- an extraction means for extracting a maintenance item to be performed at the time when an instruction is issued in light of the maintenance execution interval stored in the storage means, and a maintenance item extracted by the extraction means in advance
- An analyzer comprising: a rearranging unit that rearranges in the order in which maintenance is performed based on a predetermined rule; and a display unit that displays maintenance items in the order rearranged by the rearranging unit.
- a plurality of procedure elements are stored for each maintenance item of the analyzer, and a rule for rearranging the procedure elements is stored, and maintenance items are stored in units of the maintenance items.
- An analyzing apparatus comprising: selecting means for selecting; and a control section for displaying the procedural elements of the maintenance items selected by the selecting means in accordance with the rules and displaying them on the display means.
- Maintenance items are operations / operations necessary for the analyzer to operate normally.
- the operator performs operations such as cleaning the dispensing nozzle for dispensing a predetermined amount of sample and reagent, washing the reaction container, Some of them are automatically performed by the machine, such as a purge operation for removing bubbles.
- the present invention displays the maintenance items to be performed in the order of execution, but this is not limited to what the operator performs, for example, when maintenance items performed by the operator and maintenance items performed by the machine are mixed,
- An analyzer comprising means for displaying both in order of implementation.
- the present invention when performing maintenance, it is not necessary to confirm the procedure manually in advance and consider an efficient maintenance procedure. That is, the labor and time required for the maintenance work itself can be reduced, and can be utilized for the main work of the analysis operation.
- FIG. Procedure integration flow Example of maintenance item selection screen.
- Example of maintenance item selection screen Maintenance item procedure element information.
- Maintenance item procedure element information Maintenance item procedure element information.
- Sort rule list Specific example of maintenance item selection.
- Specific example of maintenance item selection An example after rearranging the element procedures.
- Maintenance execution flow Example on a mobile terminal.
- FIG. 1 shows the appearance of the analyzer.
- the analyzer shown in FIG. 1 mainly includes a sample disk 1, a reagent disk 2, a reaction disk 3, a reaction tank 4, a sampling mechanism 5, a reagent pipetting mechanism 6, a stirring mechanism 7, and a photometric mechanism 8.
- a plurality of sample containers 16 in which collected samples are placed are fixed on the circumference of a circular disk 17 in the sample disk 1.
- the circular disk 17 can be rotated in the circumferential direction and stopped at a predetermined position by a drive mechanism including a motor, a rotating shaft, and the like (not shown).
- a plurality of reagent bottles 18 containing reagents for mixing and reacting with a sample are fixed on the circumference of a circular disk 19 in the reagent disk 2.
- the periphery of the reagent bottle 18 is a temperature-controlled cool box 20.
- the circular disk 19 is rotated in the circumferential direction so as to be positioned by a drive mechanism including a motor, a rotating shaft and the like (not shown).
- reaction vessel holders 22 holding reaction vessels 21 for containing samples and reagents are attached to the reaction disk 3, and circumferential rotation and stop are performed by a drive mechanism 23 at a constant cycle. And the reaction vessel 21 is intermittently transferred.
- the reaction tank 4 is installed along the movement locus
- This is a thermostatic bath that controls the reaction solution at a constant temperature.
- the reaction vessel 21 moves in the reaction vessel 4.
- the sampling mechanism 5 includes a probe 24, an arm 26 attached to the support shaft 25, and a drive mechanism that enables reciprocation between the sample disk 1 and the reaction disk 3 about the support shaft 25. And.
- the sampling mechanism 5 supplies the sample in the sample container 16 transferred to the fixed position along with the rotation of the sample disk 1 to the reaction container 21 in accordance with a predetermined sequence.
- the reagent pipetting mechanism 6 reciprocates between the probe disk 27, the arm 29 attached to the support shaft 28, and the reagent disk 2 and the reaction disk 3 about the support shaft 28. And a drive mechanism that enables it.
- the reagent pipetting mechanism 6 supplies the reagent in the reagent bottle 18 that is transferred to a fixed position with the rotation of the reagent disk 2 into the reaction container 21 according to a predetermined sequence.
- reaction container 21 different types of samples and reagents are placed in each of the sample container 16 and the reagent bottle 18, and a necessary amount is supplied to the reaction container 21.
- the reaction solution in the reaction vessel 21 is agitated by sound waves emitted from the piezoelectric element 31 of the agitation mechanism 7 every time the reagent enters.
- the drawing shows an agitation mechanism using ultrasonic waves, an agitation mechanism using an agitation rod is also possible.
- reaction vessel 21 After the reaction vessel 21 is measured with the photometer 8, it is washed with the washing nozzle 33 of the washing mechanism 9 and used in the next measurement.
- the display unit 10 displays various screens such as analysis items, analysis results, and maintenance execution statuses.
- the display unit 10 is also a display unit that is a mobile terminal display unit 35 that can communicate wirelessly with a monitor connected to a personal computer.
- the mobile terminal display unit 35 has not only a role of the display unit but also a function that can exchange information with the storage unit in the apparatus and can give an operation instruction to the control unit via the control unit. It is also possible to store information in the storage unit of the mobile terminal.
- the input unit 11 inputs various information such as analysis items and reagents.
- the storage unit 12 stores various information such as a predetermined sequence (program) and analysis items for controlling each mechanism.
- a syringe, a pump, and the like are included as components, and all of them including the syringe are controlled by the control unit 13 according to a sequence stored in the storage unit 12.
- storage unit 12 There may be two types of storage unit 12: a storage device inside the device and a storage device in a personal computer that is an operation unit. In that case, the storage unit 12 in the analyzer is always connected to the storage unit 12 of the operation unit via a communication cable or wirelessly to exchange information.
- This embodiment is an example in which a storage device of a personal computer in the operation unit is used as the storage unit 12.
- the display unit 10 in FIG. 1 can be connected to a CRT display or a liquid crystal monitor.
- the storage unit 12 stores maintenance item procedure element information 40 to be executed by the apparatus and a rearrangement rule list 41 which is a determination logic for conversion into a series of maintenance procedures.
- the storage unit 12, the logic determination unit, and the maintenance execution instruction unit may be arranged in the analysis device together or separately, or may be different from the analysis device connected to the analysis device by wire or wirelessly. You may arrange
- the maintenance item procedure element information 40 stored in the storage unit will be described with reference to FIG.
- the apparatus requires regular maintenance to maintain performance.
- the maintenance deadline is set, managed and implemented with reference to the deadline specified by the manufacturer.
- the maintenance execution date can be confirmed on the display unit 10 or the mobile terminal display unit 35, and the maintenance execution date corresponding to each maintenance item is stored in the storage unit 12.
- a maintenance execution record 42 to which alarm occurrence information is added is stored.
- the deadline for executing the warning level and the warning level is set from the input unit 11, and the settings are stored in the storage unit 12 as the deadline management information 43. I have to.
- the maintenance items are selected from the input unit 11 or the mobile terminal display unit 35 (Step 1).
- the procedure shifts to procedure display (Step 8).
- the selected maintenance item is divided into procedure elements (Step 3).
- the procedure elements divided in advance are stored in the storage unit 12 of the apparatus or the mobile terminal display unit 35.
- Step 4 the rearrangement rule list 41 is compared with whether there is an item with a different maintenance state, whether there is a procedure that overlaps the divided procedure elements, or whether there is a priority order. Based on the result, the procedural elements are rearranged (Step 6). The time required for the rearranged procedural elements is integrated (Step 7). Finally, a series of procedure elements calculated in Step 6 and the estimated required time are displayed (Step 8).
- FIGS. 3a and 3b Maintenance item selection in Step 1 will be described with reference to FIGS. 3a and 3b.
- a list of periodic maintenance items is displayed by frequency, and maintenance items are displayed for each frequency.
- the frequency can be changed with an arrow key or the like.
- FIG. 3a the colorimetric analysis unit is mainly shown
- FIG. 3b is an example of maintenance items mainly in the electrolyte analysis (ISE) unit. The following description is based on the case where the items shown in FIGS. 3a and 3b are selected.
- ISE electrolyte analysis
- a list is stored in advance and stored in the storage unit 12.
- the list of maintenance item information will be described with reference to FIGS. 4A, 4B, and 4C.
- 4a and 4b show procedure element information of the maintenance item selected in FIG. 3a
- FIG. 4c shows procedure element information of the maintenance item selected in FIG. 3b.
- Maintenance item procedure element information 40 is stored in the storage unit 12 in the order of execution for the maintenance items and the procedure elements divided for performing the maintenance. It includes whether or not to perform, required time, and device status. In addition, such information is held in association with the maintenance execution record 42 such as the execution date (previous success date), the deadline management information 43 that sets the set execution interval, and the display can be changed according to the level of the execution deadline, At the time of implementation, the implementation date is updated (Step 107 in FIG. 8).
- the rearrangement in Step 4 and Step 5 is stored as the rearrangement rule list 41 in the storage unit 12 in advance.
- the rearrangement rule list 41 will be described with reference to the example of FIG.
- the order of procedures is determined. Basically, the order of element procedures is not changed, and procedure elements that do not overlap are not deleted (rule (1)).
- the procedure element to be executed in the power-off state is first (rule (2)). Thereafter, when there is maintenance to be performed in the standby state, a procedure for turning on the power is entered (rule (3)).
- rule (4) Group together with the same parts and units (Rule (5)).
- rules (2) to (5) have the same conditions, priority is given to items with a short maintenance interval (rule (6)). If you are still unable to narrow down, set rules such as following the list order. Furthermore, if there is a restriction in the order of execution between individual maintenance items, it is also ruled out (rule (7)). For example, if cell blank measurement and cell replacement are selected, the cell blank measurement is performed later. The reason why the above rule is necessary will be described in detail in the maintenance integration from FIG. 6a to FIG. 7a and the maintenance integration from FIG. 6b to FIG. 7b.
- FIG. 6a is an example of selection from the maintenance items of FIGS. 3a, 4a, and 4b.
- Reaction system cleaning, cell cover cleaning, cleaning tank cleaning, and water supply tank cleaning were selected from the list once a week. From the list once a month, we chose to replace the reaction cell, clean the reaction tank, and clean the branch pipe filter. Symbols (A5 to A15, A18, C1, C3 to C5, C8, C10, and C11) are assigned to the element procedures of each item.
- FIG. 6b is an example of selection from the maintenance items of FIGS. 3b and 4c. Cleaning bath cleaning was selected from the list once a week. From the list once a month, ISE reagent channel cleaning, reagent suction filter cleaning, and electrode replacement and electrode tube replacement were selected from the list once every two months. Symbols (A8, D1 to D15) are assigned to the element procedures of each item.
- the rule (5) in which the same parts and units are collectively collected has an advantage that less movement of the worker's place is required. The reason why the maintenance interval is short is that it is highly necessary to always observe the maintenance interval.
- cell blank measurement is necessary as a final confirmation work. Cleaning and replacement operations are performed together, and finally cell blank measurement for confirmation is performed (A6) (rearrangement according to rule (7)). If it is meaningful in the order of execution, such as after the confirmation work as described above, it is not necessary to make a mistake in the order by rearranging according to rule (7).
- the maintenance since the last confirmation work cannot be imagined from the maintenance item name, the maintenance may be interrupted and redone. However, if we noticed after the routine test began, not only will time be lost, but the test report to the patient will be delayed. This is a serious problem. In order not to neglect the confirmation, it is necessary for the inspection engineer to look at the instruction manual so that it does not leak, and this is a dilemma that cannot be solved. However, this complexity can be eliminated by efficiently rearranging the procedure elements in this way.
- Step elements are rearranged in Step 6 of FIG. 6 and displayed on the display unit 10.
- the procedural elements after performing the rearrangement according to the rearrangement rule list shown in FIG. 5 will be described with reference to FIG.
- the procedure element (C3) “turns off the power supply of the apparatus” to the procedure element (A6) “execute maintenance of“ cell blank measurement ”” is displayed on the screen.
- a progress chart and estimated time are displayed. The procedural elements are no longer overlapped, and the power is turned on / off only once.
- Step 101 the procedure element shown in FIG. 7, an indicator for understanding the progress and the estimated required time are displayed (Step 101). If there are many procedural elements, there is no need to display a list.
- Step 102 Maintenance items are executed in the order in which they are displayed, and execution completion is declared for the executed procedure elements (Step 102, Step 103).
- the indicator indicating the progress status is updated in the end declaration (Step 104), and the next procedure element is displayed (Step 105).
- Step 102 to Step 105 are repeated until the procedure element is completed.
- the maintenance execution record 42 in the storage unit 12 is updated (Step 107). If necessary, a record of the performed maintenance is printed (Step 108), and the maintenance is completed.
- Touching “Start” maintenance starts a series of integrated maintenance procedures (FIG. 9A).
- an indicator indicating the estimated required time and progress is displayed (FIG. 9B).
- Touching the procedure display button displays the maintenance procedure element to be executed next (FIG. 9C). If you want to see the manual, press the manual reference button. When finished, touch ⁇ to declare maintenance complete.
- the automatic maintenance item of the apparatus shown in FIG. 6 displays the next procedural element when it ends normally.
- Maintenance item procedure element information 40 and a rearrangement rule list 41 are stored in the storage unit 12 of the apparatus, the procedure is rearranged, and not only a means for displaying on the mobile terminal display unit 35 but also maintenance in the mobile terminal.
- the item procedure element information 40, the rearrangement rule list 41, the maintenance execution record 42, and the time limit management information 43 are retained, and a series of integrated maintenance procedures can be displayed and managed.
- the procedure elements of the selected maintenance item are rearranged so that the same common procedure element becomes one. For this reason, it is not necessary to carry out procedural elements redundantly, and maintenance efficiency can be improved.
- the control unit displays the procedural elements A, B, D, and C in the order of A, D, B, and C, and displays them on the display unit.
- the order of B and D can be determined by the maintenance interval of rule (6) or a predetermined rule.
- A, B, C, and D are (A7), (A8), (A9), and (A11), respectively.
- the maintenance item with a short maintenance interval is preferentially rearranged first.
- the maintenance intervals can be maintained. Can do.
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Quality & Reliability (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Theoretical Computer Science (AREA)
- Analytical Chemistry (AREA)
- Pathology (AREA)
- Immunology (AREA)
- General Health & Medical Sciences (AREA)
- Biochemistry (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Automatic Analysis And Handling Materials Therefor (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
2 試薬ディスク
3 反応ディスク
4 反応槽
5 サンプリング機構
6 試薬ピペッティング機構
7 攪拌機構
8 測光機構
9 洗浄機構
10 表示部
11 入力部
12 記憶部
13 制御部
16 試料容器
17、19 円形ディスク
18 試薬ボトル
20 保冷庫
21 反応容器
22 反応容器ホールダ
23 駆動機構
24、27 プローブ
25、28 支承軸
26、29 アーム
31 圧電素子
33 洗浄ノズル
35 モバイル端末表示部または、メンテナンス実行の指示装置(モバイルとは限らない)
40 メンテナンス項目手順要素情報
41 並び替えルールリスト
42 メンテナンス実施記録
43 期限管理情報
Claims (17)
- 複数のメンテナンス項目を有する分析装置において、
前記メンテナンス項目毎に、該メンテナンスの実施を推奨する間隔、を記憶する記憶手段と、
メンテナンスの実施指示を受けて、該指示が出された時点で前記記憶手段に記憶されたメンテナンスの実施間隔に基づいて実施すべきメンテナンス項目を抽出する抽出手段と、
該抽出手段で抽出されたメンテナンス項目を、予め定められたルールに基づき、メンテナンスを実施する順序に並べ替える並べ替え手段と、
該並べ替え手段で並べ替えられた順序にメンテナンス項目を表示する表示手段と、
を備えたことを特徴とする分析装置。 - 請求項1記載の分析装置において、
前記予め定められたルールは、装置の電源オフの状態で実施するメンテナンス項目と、装置の電源オンの状態で実施するメンテナンス項目がそれぞれ連続して実施されるように並べ替えることを含むことを特徴とする分析装置。 - 請求項1記載の分析装置において、
前記予め定められたルールは、前記抽出手段で抽出されたメンテナンス項目に、同じ部位についての複数のメンテナンス項目があった場合は、それらが連続して実施されるように並べ替えることを含むことを特徴とする分析装置。 - 請求項1記載の分析装置において、
前記予め定められたルールは、前記抽出手段で抽出されたメンテナンス項目に、同じ手順要素がある場合はそれらを一つにするように並べ替えることを含むことを特徴とする分析装置。 - 請求項1記載の分析装置において、
前記予め定められたルールは、前記抽出手段で抽出されたメンテナンス項目に、同一のレベルのものがあった場合は、メンテナンス間隔が短い項目を優先するように並べ替えることを含むことを特徴とする分析装置。 - 請求項1記載の分析装置において、
前記記憶手段に記憶されたメンテナンス項目は、メンテナンス実施時の所要時間の情報も含み、
実施するメンテナンスが終了するまでに要する時間を算出する算出手段を備え、
該算出手段が算出した時間を前記表示手段に表示することを特徴とする分析装置。 - 請求項1~6のいずれかに記載の分析装置において、
現在実施中のメンテナンスを識別表示することを特徴とする分析装置。 - 請求項1~6のいずれかに記載の分析装置において、
実施したメンテナンス項目の実施日時、実施時のアラームの有無の少なくともいずれかを記憶する記憶手段を備えたことを特徴とする分析装置。 - 請求項1~6のいずれかに記載の分析装置において、
実施するメンテナンス項目の説明を表示する機能を備えたことを特徴とする分析装置。 - 複数のメンテナンス項目を有する分析装置と、
前記メンテナンス項目毎に、該メンテナンスの実施を推奨する間隔、を記憶する記憶手段と、
メンテナンスの実施指示を受けて、該指示が出された時点で前記記憶手段に記憶されたメンテナンスの実施間隔に基づいて実施すべきメンテナンス項目を抽出する抽出手段と、
該抽出手段で抽出されたメンテナンス項目を、予め定められたルールに基づき、メンテナンスを実施する順序に並べ替える並べ替え手段と、
該並べ替え手段で並べ替えられた順序にメンテナンス項目を表示する表示手段と、
を備えたことを特徴とする分析装置の管理システム。 - 請求項10記載の分析装置の管理システムにおいて、
前記予め定められたルールは、装置の電源オフの状態で実施するメンテナンス項目と、装置の電源オンの状態で実施するメンテナンス項目がそれぞれ連続して実施されるように並べ替えることを含むことを特徴とする分析装置の管理システム。 - 請求項10記載の分析装置の管理システムにおいて、
前記予め定められたルールは、前記抽出手段で抽出されたメンテナンス項目に、同じ部位についての複数のメンテナンス項目があった場合は、それらが連続して実施されるように並べ替えることを含むことを特徴とする分析装置の管理システム。 - 複数のメンテナンス項目を有する分析装置の前記メンテナンス項目毎に、該メンテナンスの実施を推奨する間隔、を記憶する記憶ステップと、
メンテナンスの実施指示を受けて、該指示が出された時点で前記記憶ステップで記憶されたメンテナンスの実施間隔に基づいて実施すべきメンテナンス項目を抽出する抽出ステップと、
該抽出ステップで抽出されたメンテナンス項目を、予め定められたルールに基づき、メンテナンスを実施する順序に並べ替える並べ替えステップと、
該並べ替えステップで並べ替えられた順序にメンテナンス項目を表示する表示ステップと、
を備えたことを特徴とする分析装置の管理方法。 - 請求項13記載の分析装置の管理方法において、
前記予め定められたルールは、装置の電源オフの状態で実施するメンテナンス項目と、装置の電源オンの状態で実施するメンテナンス項目がそれぞれ連続して実施されるように並べ替えることを含むことを特徴とする分析装置の管理方法。 - 請求項13記載の分析装置の管理方法において、
前記予め定められたルールは、前記抽出手段で抽出されたメンテナンス項目に、同じ部位についての複数のメンテナンス項目があった場合は、それらが連続して実施されるように並べ替えることを含むことを特徴とする分析装置の管理方法。 - 分析装置のメンテナンスの項目毎に複数の手順要素を記憶し、かつ、前記手順要素を並び替えるルールを記憶する手段と、
前記メンテナンスの項目単位でメンテナンス項目を選択する選択手段と、
前記選択手段により選択されたメンテナンス項目の手順要素を、前記ルールに従って並べて表示手段に表示させる制御部と、
を備えたことを特徴とする分析装置。 - 請求項16記載の分析装置において、
前記選択手段によって、手順要素A、B、Cで並べられた手順要素を含む第一メンテナンス項目と、手順要素A、D、Cで並べられた手順要素を含む第二メンテナンス項目が選択された場合に、前記制御部は、手順要素A、B、D、Cの順、若しくはA、D、B、Cの順に並べて前記表示手段に表示されることを特徴とする分析装置。
Priority Applications (4)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2013503339A JPWO2012120755A1 (ja) | 2011-03-04 | 2012-01-10 | 分析装置 |
| EP12754369.2A EP2682755B1 (en) | 2011-03-04 | 2012-01-10 | Analysis device |
| US13/980,909 US9978044B2 (en) | 2011-03-04 | 2012-01-10 | Analyzing device |
| CN201280008501.3A CN103348249B (zh) | 2011-03-04 | 2012-01-10 | 分析装置 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011047076 | 2011-03-04 | ||
| JP2011-047076 | 2011-03-04 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2012120755A1 true WO2012120755A1 (ja) | 2012-09-13 |
Family
ID=46797736
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2012/000068 Ceased WO2012120755A1 (ja) | 2011-03-04 | 2012-01-10 | 分析装置 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US9978044B2 (ja) |
| EP (1) | EP2682755B1 (ja) |
| JP (2) | JPWO2012120755A1 (ja) |
| CN (1) | CN103348249B (ja) |
| WO (1) | WO2012120755A1 (ja) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140119994A1 (en) * | 2012-10-30 | 2014-05-01 | Sysmex Corporation | Sample analyzer |
| WO2014073684A1 (ja) * | 2012-11-12 | 2014-05-15 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| JP2017146264A (ja) * | 2016-02-19 | 2017-08-24 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| JP2018040621A (ja) * | 2016-09-06 | 2018-03-15 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| WO2020137216A1 (ja) * | 2018-12-25 | 2020-07-02 | 株式会社日立ハイテク | 自動分析装置及び保守支援方法 |
| JP2021105619A (ja) * | 2017-03-07 | 2021-07-26 | 株式会社日立ハイテク | 自動分析装置 |
| JPWO2023037426A1 (ja) * | 2021-09-08 | 2023-03-16 |
Families Citing this family (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3321690B1 (en) * | 2015-08-26 | 2021-03-03 | Hitachi High-Tech Corporation | Automatic analysis device |
| JP6432551B2 (ja) * | 2016-03-09 | 2018-12-05 | 横河電機株式会社 | 機器保全装置、機器保全システム、機器保全方法、機器保全プログラム及び記録媒体 |
| JP6991147B2 (ja) * | 2016-09-21 | 2022-01-14 | 株式会社日立ハイテク | 自動分析装置 |
| JP6732667B2 (ja) * | 2017-01-18 | 2020-07-29 | 横河電機株式会社 | 保全作業支援装置、保全作業支援方法、保全作業支援プログラム及び記録媒体 |
| JP6866249B2 (ja) * | 2017-07-14 | 2021-04-28 | 株式会社堀場製作所 | 分析装置 |
| CN112219121B (zh) * | 2017-12-05 | 2024-08-23 | 株式会社日立高新技术 | 自动分析装置 |
| JP6913232B2 (ja) | 2018-03-29 | 2021-08-04 | 株式会社日立ハイテク | 自動分析システム |
| CN111399914A (zh) * | 2018-12-27 | 2020-07-10 | 深圳迈瑞生物医疗电子股份有限公司 | 一种样本分析装置及其维护方法 |
| JP7210309B2 (ja) * | 2019-02-07 | 2023-01-23 | 株式会社日立ハイテク | 自動分析装置、及び分析方法 |
| EP3961221B1 (en) * | 2019-04-24 | 2025-05-28 | Hitachi High-Tech Corporation | Automatic analysis device and maintenance guide method in automatic analysis device |
| JP6795080B2 (ja) * | 2019-12-06 | 2020-12-02 | 横河電機株式会社 | 保全作業支援装置、保全作業支援方法、保全作業支援プログラム及び記録媒体 |
| EP4092420A4 (en) * | 2020-01-14 | 2024-02-28 | Hitachi High-Tech Corporation | AUTOMATIC ANALYZER |
| CN115053138B (zh) * | 2020-03-05 | 2025-12-23 | 株式会社日立高新技术 | 自动分析装置 |
| JP7745093B2 (ja) * | 2022-04-18 | 2025-09-26 | 株式会社日立ハイテク | 容器保管装置及び自動分析システム |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01305337A (ja) * | 1988-06-03 | 1989-12-08 | Hitachi Ltd | サンプリング運転支援装置 |
| JPH03148068A (ja) * | 1989-11-06 | 1991-06-24 | Hitachi Ltd | 生化学自動分析装置用機器メンテナンス表示装置 |
| JPH08304581A (ja) * | 1995-04-28 | 1996-11-22 | Toshiba Corp | プラント点検支援装置および方法 |
| JP2002162400A (ja) * | 2000-11-22 | 2002-06-07 | Hitachi Ltd | 自動分析装置 |
| JP2007068721A (ja) | 2005-09-06 | 2007-03-22 | Toshiba Corp | 医用機器の稼動状態表示装置 |
| JP2007323643A (ja) * | 2006-06-01 | 2007-12-13 | Xerox Corp | 現在の機械の状態を用いるカスタマイズされた保守マニュアルの作成及び印刷 |
| JP2008051532A (ja) * | 2006-08-22 | 2008-03-06 | Hitachi High-Technologies Corp | 自動分析装置 |
| JP2008051542A (ja) * | 2006-08-22 | 2008-03-06 | Sysmex Corp | 分析装置 |
| JP2010249757A (ja) * | 2009-04-20 | 2010-11-04 | Hitachi High-Technologies Corp | 自動分析装置 |
Family Cites Families (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4512442A (en) * | 1984-03-30 | 1985-04-23 | Westinghouse Electric Corp. | Method and apparatus for improving the servicing of an elevator system |
| JP2595063B2 (ja) * | 1988-09-16 | 1997-03-26 | 株式会社日立製作所 | 自動分析装置 |
| JP2649409B2 (ja) * | 1989-03-14 | 1997-09-03 | 株式会社日立製作所 | 臨床検査用の自動分析方法 |
| JP3142377B2 (ja) * | 1992-07-06 | 2001-03-07 | 日立造船株式会社 | ダムゲートの水密ゴム圧着装置 |
| JP2996860B2 (ja) * | 1994-03-18 | 2000-01-11 | 株式会社日立製作所 | 自動分析装置 |
| JP3063564B2 (ja) * | 1995-03-17 | 2000-07-12 | 株式会社日立製作所 | 自動分析装置 |
| US5705977A (en) * | 1995-07-20 | 1998-01-06 | Jones; James L. | Maintenance reminder |
| EP0871034B1 (en) * | 1997-04-10 | 2007-03-07 | Hitachi, Ltd. | Automatic analyzer and support system therefor |
| JP3598019B2 (ja) * | 1999-06-16 | 2004-12-08 | 株式会社日立製作所 | 自動分析装置 |
| JP2002048802A (ja) * | 2000-08-07 | 2002-02-15 | Hitachi Ltd | 自動分析システム |
| JP3823162B2 (ja) * | 2001-07-31 | 2006-09-20 | 株式会社エイアンドティー | 臨床検査分析装置、臨床検査分析方法および臨床検査分析プログラム |
| JP3990944B2 (ja) * | 2002-06-28 | 2007-10-17 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| EP1422650A3 (en) * | 2002-11-21 | 2007-06-06 | Hitachi High-Technologies Corporation | A cross-contamination prevention system and automatic analyzer |
| US8676510B2 (en) * | 2003-07-18 | 2014-03-18 | A&T Corporation | Clinical-result confirming device, clinical-result confirming method, and computer program therefor |
| JP4550675B2 (ja) * | 2005-06-30 | 2010-09-22 | 日立アプライアンス株式会社 | 空気清浄機 |
| EP1892531B1 (en) * | 2006-08-22 | 2017-04-05 | Sysmex Corporation | Sample analyzer |
| JP4979307B2 (ja) * | 2006-08-25 | 2012-07-18 | シスメックス株式会社 | 血液試料測定装置 |
| JP2008070321A (ja) * | 2006-09-15 | 2008-03-27 | Hitachi High-Technologies Corp | 自動分析システム |
| EP1986013A3 (en) * | 2007-04-27 | 2013-04-03 | Sysmex Corporation | Sample analyzing apparatus |
| WO2009031455A1 (ja) * | 2007-09-03 | 2009-03-12 | Olympus Corporation | 自動分析装置 |
| CN101743477B (zh) * | 2007-09-03 | 2014-06-18 | 希森美康株式会社 | 检体分析系统 |
| JP5479672B2 (ja) * | 2007-09-27 | 2014-04-23 | シスメックス株式会社 | 血液または尿の分析装置およびデータ処理装置 |
| JP5171368B2 (ja) * | 2008-04-17 | 2013-03-27 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| JP5380123B2 (ja) * | 2009-03-25 | 2014-01-08 | 株式会社日立ハイテクノロジーズ | サンプル分析装置 |
| JP5864847B2 (ja) * | 2010-10-28 | 2016-02-17 | 株式会社日立製作所 | 保守管理システム、及び保守管理方法 |
| EP2919015B1 (en) * | 2012-11-12 | 2021-03-31 | Hitachi High-Tech Corporation | Automatic analyzer device |
| WO2015179300A1 (en) * | 2014-05-18 | 2015-11-26 | Awair, Inc. | Device to reduce discomfort in the upper airway |
-
2012
- 2012-01-10 WO PCT/JP2012/000068 patent/WO2012120755A1/ja not_active Ceased
- 2012-01-10 US US13/980,909 patent/US9978044B2/en active Active
- 2012-01-10 CN CN201280008501.3A patent/CN103348249B/zh active Active
- 2012-01-10 JP JP2013503339A patent/JPWO2012120755A1/ja active Pending
- 2012-01-10 EP EP12754369.2A patent/EP2682755B1/en active Active
-
2015
- 2015-03-10 JP JP2015046615A patent/JP5891322B2/ja active Active
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01305337A (ja) * | 1988-06-03 | 1989-12-08 | Hitachi Ltd | サンプリング運転支援装置 |
| JPH03148068A (ja) * | 1989-11-06 | 1991-06-24 | Hitachi Ltd | 生化学自動分析装置用機器メンテナンス表示装置 |
| JPH08304581A (ja) * | 1995-04-28 | 1996-11-22 | Toshiba Corp | プラント点検支援装置および方法 |
| JP2002162400A (ja) * | 2000-11-22 | 2002-06-07 | Hitachi Ltd | 自動分析装置 |
| JP2007068721A (ja) | 2005-09-06 | 2007-03-22 | Toshiba Corp | 医用機器の稼動状態表示装置 |
| JP2007323643A (ja) * | 2006-06-01 | 2007-12-13 | Xerox Corp | 現在の機械の状態を用いるカスタマイズされた保守マニュアルの作成及び印刷 |
| JP2008051532A (ja) * | 2006-08-22 | 2008-03-06 | Hitachi High-Technologies Corp | 自動分析装置 |
| JP2008051542A (ja) * | 2006-08-22 | 2008-03-06 | Sysmex Corp | 分析装置 |
| JP2010249757A (ja) * | 2009-04-20 | 2010-11-04 | Hitachi High-Technologies Corp | 自動分析装置 |
Cited By (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140119994A1 (en) * | 2012-10-30 | 2014-05-01 | Sysmex Corporation | Sample analyzer |
| WO2014073684A1 (ja) * | 2012-11-12 | 2014-05-15 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| CN104769438A (zh) * | 2012-11-12 | 2015-07-08 | 株式会社日立高新技术 | 自动分析装置 |
| EP2919015A4 (en) * | 2012-11-12 | 2016-07-13 | Hitachi High Tech Corp | AUTOMATIC ANALYZER |
| JPWO2014073684A1 (ja) * | 2012-11-12 | 2016-09-08 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| US9784754B2 (en) | 2012-11-12 | 2017-10-10 | Hitachi High-Technologies Corporation | Automatic analyzer |
| JP2018010016A (ja) * | 2012-11-12 | 2018-01-18 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| JP2017146264A (ja) * | 2016-02-19 | 2017-08-24 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| JP2018040621A (ja) * | 2016-09-06 | 2018-03-15 | 株式会社日立ハイテクノロジーズ | 自動分析装置 |
| JP2021105619A (ja) * | 2017-03-07 | 2021-07-26 | 株式会社日立ハイテク | 自動分析装置 |
| JP7068527B2 (ja) | 2017-03-07 | 2022-05-16 | 株式会社日立ハイテク | 自動分析装置 |
| WO2020137216A1 (ja) * | 2018-12-25 | 2020-07-02 | 株式会社日立ハイテク | 自動分析装置及び保守支援方法 |
| JPWO2020137216A1 (ja) * | 2018-12-25 | 2021-10-14 | 株式会社日立ハイテク | 自動分析装置及び保守支援方法 |
| JP7135115B2 (ja) | 2018-12-25 | 2022-09-12 | 株式会社日立ハイテク | 自動分析装置及び保守支援方法 |
| US12038449B2 (en) | 2018-12-25 | 2024-07-16 | Hitachi High-Tech Corporation | Automatic analyzer and maintenance support method |
| JPWO2023037426A1 (ja) * | 2021-09-08 | 2023-03-16 | ||
| WO2023037426A1 (ja) * | 2021-09-08 | 2023-03-16 | 三菱電機株式会社 | 受配電設備管理装置、受配電設備管理方法及びプログラム |
| JP7409565B2 (ja) | 2021-09-08 | 2024-01-09 | 三菱電機株式会社 | 受配電設備管理装置、受配電設備管理方法及びプログラム |
| DE112021007836B4 (de) * | 2021-09-08 | 2025-04-10 | Mitsubishi Electric Corporation | Verwaltung von leistungsaufnahme- und -verteilungsanlagen |
Also Published As
| Publication number | Publication date |
|---|---|
| US9978044B2 (en) | 2018-05-22 |
| CN103348249A (zh) | 2013-10-09 |
| JP2015108641A (ja) | 2015-06-11 |
| JPWO2012120755A1 (ja) | 2014-07-07 |
| EP2682755A4 (en) | 2014-08-27 |
| US20130311243A1 (en) | 2013-11-21 |
| EP2682755A1 (en) | 2014-01-08 |
| CN103348249B (zh) | 2016-02-17 |
| EP2682755B1 (en) | 2019-02-27 |
| JP5891322B2 (ja) | 2016-03-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5891322B2 (ja) | 臨床検査用分析装置 | |
| CN102483423B (zh) | 自动分析装置、其信息显示方法以及信息显示系统 | |
| US8758684B2 (en) | Automatic analyzer | |
| JP4866808B2 (ja) | 自動分析装置 | |
| CN104737186B (zh) | 自动分析装置 | |
| EP2717058B1 (en) | Autoanalyzer | |
| JP6879871B2 (ja) | 自動分析装置 | |
| JP2007524083A (ja) | 自動臨床アナライザの機能毎に区分化されたオペレータ・インタフェース・モジュール | |
| JP4979305B2 (ja) | 分析装置 | |
| JP7105530B2 (ja) | 自動分析装置および自動分析装置におけるメンテナンスガイド方法 | |
| US11537968B2 (en) | Predictive inventory control including scheduling and performing bio-fluid tests out of order based on reagent inventory expiration | |
| CN114174836A (zh) | 自动分析系统以及警报处置方法 | |
| JP5923396B2 (ja) | 自動分析装置 | |
| CN112219121A (zh) | 自动分析装置 | |
| CN106483309B (zh) | 自动分析装置 | |
| JP2011149905A (ja) | 自動分析装置 | |
| RU2757204C1 (ru) | Устройство для автоматического анализа | |
| JP4925768B2 (ja) | 検体分析装置 | |
| CN113039438B (zh) | 自动分析装置 | |
| JP2011226868A (ja) | 検体分析装置及び分析制御プログラム | |
| JP6994586B2 (ja) | 自動分析装置 | |
| CN112567249A (zh) | 自动分析装置及其方法 | |
| WO2025238680A1 (ja) | 検査装置及び検査方法 | |
| JP2025102165A (ja) | 管理装置、管理方法、およびプログラム | |
| Elena et al. | Improving the efficiency of a clinical laboratory: A mathematical approach |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| WWE | Wipo information: entry into national phase |
Ref document number: 201280008501.3 Country of ref document: CN |
|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 12754369 Country of ref document: EP Kind code of ref document: A1 |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2013503339 Country of ref document: JP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 2012754369 Country of ref document: EP |
|
| WWE | Wipo information: entry into national phase |
Ref document number: 13980909 Country of ref document: US |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |