SU34582A1 - Tool for checking railroad track curves - Google Patents
Tool for checking railroad track curvesInfo
- Publication number
- SU34582A1 SU34582A1 SU111534A SU111534A SU34582A1 SU 34582 A1 SU34582 A1 SU 34582A1 SU 111534 A SU111534 A SU 111534A SU 111534 A SU111534 A SU 111534A SU 34582 A1 SU34582 A1 SU 34582A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- mirrors
- rail
- curve
- checking
- measured
- Prior art date
Links
- 229910052739 hydrogen Inorganic materials 0.000 claims description 10
- 229910052799 carbon Inorganic materials 0.000 claims description 5
- 229910052740 iodine Inorganic materials 0.000 claims description 5
- 210000001503 joint Anatomy 0.000 description 12
- 238000012360 testing method Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 229910052757 nitrogen Inorganic materials 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 244000145845 chattering Species 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000004992 fission Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 229910052698 phosphorus Inorganic materials 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 210000000538 tail Anatomy 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
- Length Measuring Devices With Unspecified Measuring Means (AREA)
Description
Предлагаемое приспособление имеет назначение рационализировать одну из работ по ремонту пути железных дорог и содержанию его в исправности, а именно проверку и рехтовку пути в кривых .The proposed device has the purpose to rationalize one of the works on repairing the railway track and keeping it in good condition, namely, checking and rehiring the track in curves.
Бесспорно, что правильна крива имеет то же, если не большее, значение, что и пр мой путь дл безопасности движени , дл сохранени подвижного состава и просто дл спокойной езДы. Если броски подвижного состава на неотрехтованном пр мом пути способствуют разбалтыванию ходовых частей, то на неотрехтованной с достаточной точностью кривой эти вредные вли ни усугубл ютс , соедин сь с усиленным износом колесных бандажей от болтани колес с наружной нитки кривой на внутреннюю и обратно.It is indisputable that the correct curve has the same, if not greater, significance as the direct path for driving safety, for keeping rolling stock and simply for quiet driving. If the rolling stock rolls on an unrepresented straight way contribute to the chattering of the running gears, then on the unpresented curve with sufficient accuracy, these adverse effects are aggravated, coupled with increased wear of the wheel tires from the wheel bolt from the outer thread of the curve to the inner and back.
Между тем обычный способ проверки кривых и их рехтовки на железных до-, рогах имеет примитивный характер. Проверка кривых производитс по стрелам отрезков на прот жении двух рельсовых звеньев путем нат гивани тонкой проволоки между крайними стыками и измерением стрелы у среднего стыка карманным метром.Meanwhile, the usual way of checking curves and re-fitting them on iron horns is of a primitive nature. Curves are checked along the length of the booms for two rail links by pulling a thin wire between the extreme joints and measuring the boom at the middle joint with a pocket meter.
Такой способ проверки кривых ведет к следующим потер м: 1) дл проверки требуетс два человека по концам шнура (1ли проволоки) и один ответственныйThis method of checking the curves leads to the following losses: 1) two people are required for checking at the ends of the cord (1 or wire) and one person responsible
,(368), (368)
агент у среднего стыка, 2) при рехтовке работа ведетс с перерывами, так как после передвижки рехтуемого стыка следует проверка шнуром, затем нова подача и оп ть проверка, и т. д. Эту работу можно ускорить только выделением двух человек специально на шнур, что, конечно, дает ускорение работы, но удорожает ее производство, 3) кроме этого, не подлежит сомнению, что проверка на шнур не может дать достаточной точности, 4) в виду усложненности производства проверки кривых при суш ,ествуюш,их услови х, периодическа проверка их зачастую сводитс к поверке уширени пути и возвышени наружного рельса, геометрическа же точность кривой прикладываетс на глазок. Предлагаемое приспособление исключает указанные недостатки, а именно:the agent at the middle joint, 2) when rehtovka work is intermittently, because after shifting rehtuyomogo joint should be checked with a cord, then a new supply and again check, and so on. This work can be accelerated only by allocating two people specifically to the cord that , of course, it accelerates the work, but it increases the cost of its production, 3) besides, there is no doubt that the test for the cord cannot provide sufficient accuracy, 4) due to the complexity of the production of checking the curves for sushi, test, conditions, periodic check they are often reduced to Overko broadening is the path and the elevation of the outer rail, the geometrical accuracy of the curve is applied to the eye. The proposed device eliminates these disadvantages, namely:
1)по своей конструкции при проверке требует участи только одного человека,1) by its design, when checking, it requires the participation of only one person,
2)при рехтовке наблюдение за передвигаемым стыком идет беспрерывно, следовательно получаетс экономи вех времени, 3) способ провешивани концевых стыков дает наибольшую точность, 4) не требу добавочно двух человек, облада незначительным весом, приспособление дает возможносгь агенту, наблюдающему за состо нием пути (дорожному мастеру), производить проверку кривых чаще и точнее, 5) с добавлением2) during the rechtovka observation of the moving joint goes continuously, therefore saving time is obtained, 3) the method of fixing the end joints gives the greatest accuracy, 4) does not require an additional two people, has little weight, the device allows the agent watching the condition of the path ( road master), to check the curves more often and more precisely, 5) with the addition of
иезначитальных деталей приспособление может быть пригодным и дл других проверочных работ как на кривых (возвышение наружного рельса и уширение), так и на пр мых участках, т. е. быть универсальным проверочным путевым прибором.Of minor details, the fixture may be suitable for other verification work on curves (elevation of the outer rail and broadening) as well as on straight sections, i.e., to be a universal testing instrument.
На схематическом чертеже фиг. 1 изображает вид приспособлени сбоку; чфиг. 2-разрез по линии аб на фиг. 1; фиг. 3-вид . приспособлени сверху; фиг. 4-щиток; фиг. 5-схему установки прибора; фиг, б-деталь приспособлени ; фиг. 7-схему работы с приспособле .нием.In the schematic drawing of FIG. 1 is a side elevational view; hfig 2 is a section along the line ab in FIG. one; FIG. 3 view. adaptations from above; FIG. 4-shield; FIG. 5-scheme of installation of the device; fig, b-part fixture; FIG. 7-scheme of work with devices.
Устройство и действие прибора основано на способе проверки кривой по стрелам отрезков этой кривой прот жением в два рельсовых звена пути. Измерение стрел кривых осуществл етс провешиванием концевых стыков отрезка кривой по изображени м в зеркалах прибора, устанавливаемого на среднем .рельсовом стыке.The device and operation of the device is based on the method of checking the curve along the arrows of the segments of this curve over two rail links. The measurement of the arrows of the curves is carried out by fixing the end joints of the segment of the curve along the images in the mirrors of the device installed at the middle rail joint.
Прибор состоит из рейки А (фиг. 1), с прикрепленными по концам ее планками В и Г, поддерживающими прибор (при укладке его на рельсы пути. Длина рейки А равна нормальной.ширине железнодорожной колеи. По верху рейки, вдоль нее, укладываетс металлический винт Д, имеющий на одном конце ленточную нарезку, примерно, в 1,5 нитки «а 1 см длины и могущий вращатьс в подшипниках Ж,Ж..-Ж посредством руко тки Р. The device consists of the rail A (Fig. 1), with the strips C and D attached at its ends, supporting the device (when it is placed on the rails of the track. The rail length A is equal to the normal rail track width. Metal is laid along the top of the rail screw D, having tape cutting at one end approximately 1.5 strings a and 1 cm long and capable of being rotated in bearings Ж, Ж ..- Ж by means of handle P.
У одного из концов рейки А помещаетс каретка 3, перемещающа с вдоль рейки Л посредством гайки и навинтованного конца ходового винта Д. Правильное и плавное передвижение «аретки достигаетс посредством имею4ЦИХСЯ на ней особых выступов, скольз щих в пазах М. На каретке 3 укреплены два зеркала //, Н под углом 45° к продольной оси рейки А и лицом Ik концу Б рейки. На зеркалах нанесены по одной вертикальной риске на одинаковых рассто ни х от линии пересечени плоскостей двух зеркал.A carriage 3 is placed at one of the ends of the rail A, moving along the rail L by means of a nut and a screwed end of the lead screw D. The correct and smooth movement of the rail is achieved by having special protrusions sliding on the grooves M. On the carriage 3 two mirrors are fixed //, H at an angle of 45 ° to the longitudinal axis of the rail A and the face Ik of the end B of the rail. The mirrors have one vertical risk at equal distances from the line of intersection of the planes of the two mirrors.
На конце Б рейки А, под углом к ней 45°, укрепл етс визирное зеркало О, на котором нанесены две вертикальных риски на рассто ни х от середины его, равных проекционным рассто ни м такихAt the end B of the slat A, at an angle of 45 ° thereto, the sighting mirror O is reinforced, on which two vertical risks are placed at distances from the middle of it, equal to the projection distances of such
рисок от линии пересечени плоскостей зеркал Н, Н.,risk from the line of intersection of the planes of the mirrors H, N.,
На верхней планке рейки А у конца с кареткой нанос тс делени , по которым берутс отсчеты длин стрел кривых при их проверке. Дл более мелких отсчетов в дол х делений у каретки 3 на на конце винта Д у руко тки укрепл етс диск С, с нанесенными на нем по окружности дес тью делени ми. Поворот диска винтом Д на окружности соответствует передвижению каретки 3On the upper rail of the rail A at the end of the carriage, divisions are made, according to which the readings of the arrow lengths of the curves are taken when checking them. For smaller counts in the fission segments at the carriage 3 on the end of the screw D at the handle, the disk C is fixed, with ten divisions on it around the circumference. Turning the disk with a screw D on a circle corresponds to the movement of the carriage 3
1„„п1 „„ p
на -TQ- линейной меры. Деление на диске С отсчитываетс против горизонтальной полки пластинки.on -TQ-linear measure. The division on the disk C is counted against the horizontal shelf of the plate.
Дл достижени четких изображений концевых рельсовых стыков при работе с прибором на них устанавливаютс особые щитки, окрашенные в два цвета. Устройство их сно из фиг. 4.To achieve clear images of the end rail joints, when working with the device, special shields painted in two colors are installed on them. Their arrangement is clear from FIG. four.
Приспособление укладывают поперек пути на рельсы Над первым стыком от начала провер емой кривой так, чтобы конец рейки с зеркалами Н, Н находилс у наружного рельса кривой. На стыках рельсов , ограничивающих концы части кривой прот жением в два рельсовых звена, устанавливаютс вспомогательные щитки (фиг. 4 и 7). Затем, наблюда в зеркало О, вращением руко тки Р передвигают зеркало Н, Н на каретке 3 до тех пор пока изображени вертикальных осей, установленных на концевых стыках щитков , не станут в створе вертикальных рисок зеркал Н, Н ц О. По мере передвижени зеркал П, Н, конец Б рейки А слегка передвигают влево или вправо дл быстрейшего достижени нужного положени ; этом наблюдают за тем, чтобы конец рейки А не отходил от со-, прикосновени с рельсом. Это достигаетс легким нажатием от себ рейки при манипулировании . После достижени нужного положени на рейке и на диске С производ т получившийс отсчет который записывают. Затем прибор перенос т на следующий рельсовый стык, переставл ют соответственно стыковые щитки и производ т туже манипул цию и т. д. После прохождени всей провер емой, кривой сравнением записанных отсчетов определ ют деформацию криво,й.The fixture is laid across the path on the rails Above the first joint from the beginning of the test curve so that the end of the rail with mirrors H, H is located at the outer rail of the curve. At the joints of the rails, limiting the ends of the part of the curve over two rail links, auxiliary plates are installed (Fig. 4 and 7). Then, watching in mirror O, rotating the handle P moves the mirror H, H on the carriage 3 until the images of the vertical axes installed on the end joints of the panels become in the vertical scrutiny of the mirrors H, N and O. As the mirrors move P, H, end B of the lath A is slightly moved to the left or right in order to reach the desired position as soon as possible; This is to ensure that the end of the rail A does not depart from the co-contact with the rail. This is achieved by lightly pressing the reiki during manipulation. After reaching the desired position on the rail and on disk C, the resulting reading is performed and recorded. Then the device is transferred to the next rail joint, rearranged the butt plates, respectively, and performed tighter manipulation, etc. After passing through the entire checked, curve, the deformation of the crooked curve is determined by comparing the recorded readings.
Схематический вид одной половины зеркала О при провешивании стыков показан на фиг. б, где а, б, в, г-поло- вина зеркала О; д, е, ж, з,-изображение зеркала Я, Я; и, к, А -вторичное изображение стыкового щитка; On визирна ось зеркала О.A schematic view of one half of the mirror O when fitting the joints is shown in FIG. b, where a, b, c, d-half mirror O; d, e, f, s, image of the mirror I, I; and, k, A is the secondary image of the butt shield; On the sighting axis of the mirror O.
Работа прибором схематически показана на фиг. 5, где зеркала обозначены буквами Л, Я и О, и С, С-крайние стыки кривой с установленнымиThe operation of the device is shown schematically in FIG. 5, where the mirrors are denoted by the letters L, I and O, and C, C-extreme joints of the curve with the established
щитками.shields.
При пользовании приспособлением дл путевой рехтовки в кривых могут быть .два случа : 1) рехтовка кривой известного радиуса, 2) рехтовка кривой, радиус которой неизвестен.When using a device for traveling rehtovki in curves can be. Two cases: 1) rehtovka curve of a known radius, 2) rehtovka curve, the radius of which is unknown.
В первом случае поступают так: по специальной таблице, против радиуса данной кривой и длины кривой, равной двум рельсовым звень м, берут длину стрелы и откладывают на рейке приспособлени , передвига соответственно каретку 3. Затем укладывают приспо собление на первом от начала кривой рельсовом стыке, а на смежных стыках визирные щитки. По изображени м в зеркалах Я и О и по вертикальным рискам на зеркалах провешивают стык О, что достигаетс постепенным передвижением конца Б приспособлени вправо или влево. Установив таким образом приспособление, гл д в правую часть зеркала О, по рискам на нем и на правом зеркале S провешивают правильное положение стыка в. В случае его несовпадени с плоскостью провешивани , подаетс команда рабочим, сто щим у стыка в о передвижке этого стыка в ту или другую сторону до полного приведени в правильное положение. Привед этот стык в нормальное положение, перенос т на него приспособление и соответственно на другие стыки щитки б и в, после чего производ т работу тем же пор дком.In the first case, the following is done: according to a special table, against the radius of a given curve and the length of a curve equal to two rail links m, take the length of the boom and lay on the staff rail, move the carriage 3, respectively. Then put the fixture on the rail junction first from the beginning, and at the adjacent joints are scutes. According to the images in the mirrors I and O and on the vertical risks on the mirrors, the joint O is fixed, which is achieved by gradually moving the end B of the device to the right or left. Having thus established the device, ch d in the right side of the mirror O, according to the risks on it and on the right mirror S, fix the correct position of the junction in. In case of its inconsistency with the hanging plane, a command is given to the worker standing at the junction in advancing this junction in one direction or the other until it is fully set in the correct position. When this joint is brought to its normal position, the device b and c are transferred to it and, correspondingly, to the other joints, plates b and c, after which the work is done in the same order.
Во втором случае работу производ т в следующей последовательности. Первоначально измер ют стрелы отрезков кривой у каждого стыка способом, описанным вьшде. По записанным отсчетам наход т среднюю длину стрелы дл отрезка кривой прот жением в два рельсовых звена, которую и откладывают на рейке прибора кареткой 3.In the second case, the work is performed in the following sequence. Initially, the arrows of the curve segments at each joint are measured in the manner described above. According to the recorded readings, the average length of the boom is found for a segment of a curve over two rail links, which is laid on the instrument rail by the carriage 3.
В дальнейщем работа производитс как и в первом случае.Further work is done as in the first case.
Предмет изобретени .The subject matter of the invention.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU111534A SU34582A1 (en) | 1932-06-24 | 1932-06-24 | Tool for checking railroad track curves |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU111534A SU34582A1 (en) | 1932-06-24 | 1932-06-24 | Tool for checking railroad track curves |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU34582A1 true SU34582A1 (en) | 1934-02-28 |
Family
ID=48351446
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU111534A SU34582A1 (en) | 1932-06-24 | 1932-06-24 | Tool for checking railroad track curves |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU34582A1 (en) |
-
1932
- 1932-06-24 SU SU111534A patent/SU34582A1/en active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB1492628A (en) | Apparatus for surveying railway track | |
| CN204309801U (en) | For detecting the detecting device of rail smooth degree | |
| SU34582A1 (en) | Tool for checking railroad track curves | |
| US5848476A (en) | Manual clamping device for measuring railway track alignment and profile | |
| CN204461395U (en) | A kind of overhead contact built-in conduit gap measuring device | |
| US2531461A (en) | Means for lining railroad curves | |
| CN204325832U (en) | For detecting the railcar of rail smooth degree | |
| US3165073A (en) | Method of lining curved track | |
| JP3966335B2 (en) | Trajectory inspection method and trajectory inspection kit | |
| US4575945A (en) | Measuring arrangement, and a method, for measuring the gap formed between a first and a second roll or roller | |
| US3344530A (en) | Measuring equipment for the geometrical control and/or the truing of railway tracks | |
| CN215727919U (en) | A portable rail flaw detection equipment that can be automatically centered | |
| GB1244994A (en) | Improvements in or relating to mobile apparatus for correcting railway tracks, in particular for effecting continuous, progressive aligning operations | |
| CN204184374U (en) | A kind of portable rail head abrasion measuring instrument | |
| CN105728475A (en) | Method for measuring rolling center line of seamless steel tube continuous rolling mill | |
| AT102786B (en) | Measuring stand for determining all main dimensions of wheelsets for railway vehicles. | |
| CN208350031U (en) | A kind of high-speed train body side wall type face automatic detection device | |
| CN205140009U (en) | Quick high accuracy calibration device of linear array camera | |
| US1751393A (en) | Combined track level and gauge | |
| US2803063A (en) | Apparatus for detecting and measuring clearance on railway equipment, ladings and the like | |
| CN211171459U (en) | An intelligent track gauge inspection and analysis system | |
| CN215447816U (en) | Chassis adjusting and repairing detection device | |
| RU199569U1 (en) | DEVICE FOR CHECKING THE DEPTH OF DEFECTS ON THE WHEEL ROLLING SURFACE | |
| KR102687642B1 (en) | Measurement device for railway ballast | |
| CN121452946A (en) | I-steel failure detection device of single-girder hoisting machinery |