DE60328854D1 - Method for compacting a subsoil - Google Patents
Method for compacting a subsoilInfo
- Publication number
- DE60328854D1 DE60328854D1 DE60328854T DE60328854T DE60328854D1 DE 60328854 D1 DE60328854 D1 DE 60328854D1 DE 60328854 T DE60328854 T DE 60328854T DE 60328854 T DE60328854 T DE 60328854T DE 60328854 D1 DE60328854 D1 DE 60328854D1
- Authority
- DE
- Germany
- Prior art keywords
- ground
- cavity
- additional material
- subsoil
- compacting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 abstract 4
- 239000011230 binding agent Substances 0.000 abstract 1
- 239000002689 soil Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/36—Coherent pavings made in situ by subjecting soil to stabilisation
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
- E02D3/054—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Agronomy & Crop Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Superconductors And Manufacturing Methods Therefor (AREA)
- Soil Working Implements (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Road Repair (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Road Paving Structures (AREA)
Abstract
A cavity 16 is formed by repeatedly vibrating an elongate lance member into the ground, withdrawing it, and introducing additional material into the cavity prior to the process being repeated. The additional material is formed by mixing soil and ground amelioration material, particularly a cementitious binder. The cavity 16 will burst outwardly, such as at 38, as additional material is introduced and compacted. The process is repeated until heave 39 is detected in the ground, around the position being treated. <IMAGE>
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0216701A GB0216701D0 (en) | 2002-07-18 | 2002-07-18 | Preparation of ground prior to building |
| GB0225943A GB0225943D0 (en) | 2002-07-18 | 2002-11-07 | Preparation of ground prior to building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE60328854D1 true DE60328854D1 (en) | 2009-10-01 |
Family
ID=27767110
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE60328853T Expired - Fee Related DE60328853D1 (en) | 2002-07-18 | 2003-07-18 | Method for improving a subsoil |
| DE60328854T Expired - Fee Related DE60328854D1 (en) | 2002-07-18 | 2003-07-18 | Method for compacting a subsoil |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE60328853T Expired - Fee Related DE60328853D1 (en) | 2002-07-18 | 2003-07-18 | Method for improving a subsoil |
Country Status (5)
| Country | Link |
|---|---|
| EP (2) | EP1382751B1 (en) |
| AT (2) | ATE440182T1 (en) |
| DE (2) | DE60328853D1 (en) |
| ES (2) | ES2331238T3 (en) |
| GB (2) | GB2391035B (en) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2403964B (en) * | 2003-07-18 | 2006-09-27 | Roxbury Ltd | Ground improvement |
| WO2010080941A2 (en) * | 2009-01-09 | 2010-07-15 | Geopier Foundation Company, Inc. | Construction modulus testing apparatus and method |
| WO2011001297A1 (en) * | 2009-06-30 | 2011-01-06 | Russet Trading & Investment 24 (Pty) Ltd | A method for constructing a column |
| DE102010022661A1 (en) * | 2010-06-04 | 2011-12-08 | vgs Ingenieure Dr. Köhler & Kirschstein GmbH | Methods for soil compaction of sands and gravels, involves generating vertical vibration movements of compression tool by vibration device which is fitted on upper end of compression tool |
| CN102409588B (en) * | 2011-11-25 | 2013-06-12 | 中铁十二局集团第三工程有限公司 | Movable grouting workshop |
| CN102535291A (en) * | 2012-02-02 | 2012-07-04 | 石家庄铁道大学 | Soft-soil foundation treatment method for expressway engineering |
| CA3011557C (en) | 2016-02-24 | 2021-01-12 | Ingios Geotechnics, Inc. | Systems and methods to provide pressed and aggregate filled concavities for improving ground stiffness and uniformity |
| CN105970995A (en) * | 2016-05-25 | 2016-09-28 | 宁波市建设集团股份有限公司 | Bearing platform mold |
| CN109183542A (en) * | 2018-07-26 | 2019-01-11 | 武汉大学 | Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method |
| CN109355990B (en) * | 2018-11-29 | 2023-09-19 | 中国电建集团成都勘测设计研究院有限公司 | Ultra-fine sand roadbed structure for hydraulic filling in low-lying marsh areas |
| GB2595274B (en) * | 2020-05-20 | 2023-07-05 | Subsea 7 Norway As | Modifying seabed contours |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5249892A (en) * | 1991-03-20 | 1993-10-05 | Fox Nathaniel S | Short aggregate piers and method and apparatus for producing same |
| GB2286613B (en) * | 1994-02-18 | 1998-05-13 | Roxbury Ltd | Improvements in or relating to methods and apparatus for improving the condition of ground |
| ATE272149T1 (en) * | 1997-08-20 | 2004-08-15 | Roxbury Ltd | SUBSTANCE TREATMENT |
| GB2366819B (en) * | 1997-08-20 | 2002-06-05 | Roxbury Ltd | Monitoring the degree of compaction achieved during ground treatment |
| NL1007690C2 (en) * | 1997-12-04 | 1999-06-09 | Ballast Nedam Funderingstechni | Method and device for installing a pile in a substrate. |
| GB2365891B (en) * | 2000-07-07 | 2004-05-26 | Roxbury Ltd | Ground preparation |
-
2003
- 2003-07-18 GB GB0316860A patent/GB2391035B/en not_active Expired - Fee Related
- 2003-07-18 ES ES03254512T patent/ES2331238T3/en not_active Expired - Lifetime
- 2003-07-18 DE DE60328853T patent/DE60328853D1/en not_active Expired - Fee Related
- 2003-07-18 DE DE60328854T patent/DE60328854D1/en not_active Expired - Fee Related
- 2003-07-18 EP EP03254513A patent/EP1382751B1/en not_active Expired - Lifetime
- 2003-07-18 EP EP03254512A patent/EP1382750B1/en not_active Expired - Lifetime
- 2003-07-18 AT AT03254512T patent/ATE440182T1/en not_active IP Right Cessation
- 2003-07-18 AT AT03254513T patent/ATE440183T1/en not_active IP Right Cessation
- 2003-07-18 ES ES03254513T patent/ES2331239T3/en not_active Expired - Lifetime
- 2003-07-18 GB GB0316861A patent/GB2391036B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| ATE440183T1 (en) | 2009-09-15 |
| EP1382751B1 (en) | 2009-08-19 |
| ES2331238T3 (en) | 2009-12-28 |
| ATE440182T1 (en) | 2009-09-15 |
| EP1382750B1 (en) | 2009-08-19 |
| GB2391036A (en) | 2004-01-28 |
| GB2391035B (en) | 2005-05-04 |
| EP1382751A1 (en) | 2004-01-21 |
| ES2331239T3 (en) | 2009-12-28 |
| EP1382750A1 (en) | 2004-01-21 |
| GB2391036B (en) | 2005-05-04 |
| DE60328853D1 (en) | 2009-10-01 |
| GB0316861D0 (en) | 2003-08-20 |
| GB2391035A (en) | 2004-01-28 |
| GB0316860D0 (en) | 2003-08-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE60328854D1 (en) | Method for compacting a subsoil | |
| DE60217633D1 (en) | Method and device for controlling a tractor in combination with a soil cultivator | |
| ATE531855T1 (en) | METHOD AND DEVICE FOR SOIL REINFORCEMENT | |
| ATE278069T1 (en) | DEVICE FOR INTRODUCING A FOREIGN SUBSTANCE INTO SOILS AND/OR FOR COMPACTING THE SOIL AND METHOD FOR PRODUCING A COLUMN OF MATERIAL IN THE SOIL | |
| AU2002241828A1 (en) | Subsurface soil injection apparatus and method | |
| SE8205390D0 (en) | METHOD AND APPARATUS OF FORMING SAND PILES FOR IMPROVING A SOFT GROUND | |
| ATE225322T1 (en) | METHOD FOR CONSOLIDATING SOILS | |
| DE50106844D1 (en) | Method and device for producing an in-situ concrete pile | |
| DE502004003865D1 (en) | Drilling apparatus and method for introducing a drilling element into the ground | |
| DE60235600D1 (en) | Process for the production of self-compacting filler material | |
| ATE211609T1 (en) | APPARATUS AND METHOD FOR LOOSENING A BLOCK OF COMPRESSED LOOSE MATERIAL, IN PARTICULAR POTTING SOIL | |
| DE60223878D1 (en) | Machine for producing a concrete path, and device for introducing dowels therefor | |
| DE59004296D1 (en) | Method and device for introducing oxygen into a soil. | |
| GB0304092D0 (en) | Soil working method and apparatus | |
| DE50114843D1 (en) | Apparatus and method for producing columns of material in the soil of bodies of water | |
| GR3032414T3 (en) | Method for stabilising slopes | |
| JPS56142935A (en) | Stabilized piling method for earth slope | |
| DE59304585D1 (en) | Deep shaking with the addition of liquid nitrogen | |
| DE10314368A1 (en) | Manufacture of compaction columns for ground improvement, by connecting ram to depth vibrator and integrating into depth vibrating process | |
| SU1694774A1 (en) | Method for forming hole for subsoil irrigation | |
| DE69828604D1 (en) | Method for producing a cast-in-place pile in the ground | |
| DE20023685U8 (en) | Air injection well: apparatus for remediation of the saturated soil zone | |
| DE69913593D1 (en) | Process for the creation of a foundation pile in the underground | |
| GB0121938D0 (en) | Pile driving apparatus and method | |
| AT3598U3 (en) | PIPE UMBRELLA AND METHOD AND DEVICE FOR PRODUCING A PIPE UMBRELLA WHEN DRIVING A TUNNEL |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 8364 | No opposition during term of opposition | ||
| 8339 | Ceased/non-payment of the annual fee |