[go: up one dir, main page]

GB2391035A - Formation of a foundation by compaction - Google Patents

Formation of a foundation by compaction Download PDF

Info

Publication number
GB2391035A
GB2391035A GB0316860A GB0316860A GB2391035A GB 2391035 A GB2391035 A GB 2391035A GB 0316860 A GB0316860 A GB 0316860A GB 0316860 A GB0316860 A GB 0316860A GB 2391035 A GB2391035 A GB 2391035A
Authority
GB
United Kingdom
Prior art keywords
ground
lance
depression
additional material
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB0316860A
Other versions
GB0316860D0 (en
GB2391035B (en
Inventor
Roger Alfred Bullivant
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Roxbury Ltd
Original Assignee
Roxbury Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from GB0216701A external-priority patent/GB0216701D0/en
Application filed by Roxbury Ltd filed Critical Roxbury Ltd
Publication of GB0316860D0 publication Critical patent/GB0316860D0/en
Publication of GB2391035A publication Critical patent/GB2391035A/en
Application granted granted Critical
Publication of GB2391035B publication Critical patent/GB2391035B/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/36Coherent pavings made in situ by subjecting soil to stabilisation
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • E02D3/054Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Superconductors And Manufacturing Methods Therefor (AREA)
  • Soil Working Implements (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Road Repair (AREA)
  • Road Paving Structures (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

A method of forming a foundation involves driving by vibration a lance (fig 1) into the ground to form an elongate cavity (16) which is filled with material (19) such as soil and quick lime. The material (19) is compacted using the lance (fig 1) which can result in bulging (38) of the cavity (16). The process is repeated until heave (39) is detected in the ground around the position being treated.

Description

239 1 035
I Ground Improvement I The present invention relates to ground improvement, particularly, but not exclusively, prior to building.
The present invention provides a method of ground improvement, in which a lance member is repeatedly vibrated into the ground at substantially the same position, to leave on each occasion an elongate cavity as the lance member is removed, and in which additional material is introduced into the cavities so formed, the additional material being formed by mixing at least soil and a ground amelioration material, and in which the process is repeated until heave is detected in the ground around the said position.
In this specification, the temm Ground amelioration materials refers to a
material which consists of, or includes, a binder capable of increasing cohesion in material such as soil. The binder may be a gettable material such as a cementitious material. Preferably, the binder is cement. Altematively, bitumen may be used as a binder. Ground amelioration material may also incorporate additional granular material such as pulverised fuel ash, and hydrophilic material such as quick lime, to assist in controlling pore pressure of the material and of the surrounding ground. The term "ameliorated soil" is used to refer to soil, preferably derived locally, into which ground amelioration material has been mixed. The ground amelioration material may include a cementitious binder such as cement. The additional material may further include quick lime.
Preferably, after the repeating process is finished, a depression is formed in the ground, at the said position, the depression being filled with concrete to form a structural member supported by the improved ground. The depression may be formed by vibrating a tapered member into the; improved ground.
Preferably the response of the ground during the fomation of the depression is
measured to determine the load bearing capacity of the improved ground.
The lance member preferably enters the ground substantially vertically.
Preferably the lance member is at least 2m long, preferably am long. The lance may taper at an angle of between 2 and 5 .
Examples of the present invention will now be described in more detail, by way of example only, and with reference to the accompanying drawings, in which: Fig. 1 is a lance used in the ground improvement method of the invention; Figs. 2 and 3 are intermediate and final stages in the method; Fig. 4 illustrates a testing technique used in conjunction with the method; and Fig. 5 is a partial view of a cap supported by ground improved by the method. The drawings illustrate ground being prepared in accordance with the method of the present invention. The method is primarily intended for bad ground which has low natural load bearing capacity. Bad ground may, for example, include peat. It will be understood by the skilled reader that in many practical situations, no clear delineation can be made between good ground and bad ground, there being a continuous spectrum of ground quality. Indeed, the term Marginal ground" is sometimes used to refer to ground which is between good and bad ground. Consequently, the choice of technique to be used will be made in accordance with the quality of the ground in its natural state, the nature of the load imposed by the building to be constructed and other factors.
Fig. 1 shows a lance member 14, for use in the method of the invention.
The lance 14 is driven into the ground by vibration, to form an elongate cavity 16 (Fig. 3) in the ground 17. The lance 14 is then withdrawn and the cavity 16 is filled with additional material which includes soil mixed with ground amelioration material. This may include a cementitious binder matenal, such as cement and may also include a hydrophilic material, such as quick lime.
The lance 14 has an inverted frustoonical shape. In one example, the lance 14 may have a diameter of about 300mm at its upper end and about 150mm at its lower end 14A, with a length of approximately am. The lance 14 is attached to extend down, substantially vertically, from a vibrator arrangement 18 which applies vertical oscillation to the lance 14 during use. For example, the vertical oscillation may have an amplitude of about 25mm and a frequency of 1500 cycles per minute, with a rated impact per blow in excess of 40 tonnes.
The cone angle of the lance 14 may be low, such as between 2 and 5 .
In consequence of the shape of the lance 14 and the use of vertical vibration, the lance 14 will be driven into the ground substantially without impact in a horizontal direction between the surface of the lance 14 and the sides of the cavity 16. That is, the main impact with the ground will be at the bottom of the cavity 16 as the lance 14 forces itself deeper into the ground.
Contact with the sides of the cavity 16 will consist primarily of a pressing action, causing ground material to be pressed gently sideways to form the cavity 16, without harsh impacts. Avoiding impacts in this manner results in the technique minimising shocks which can result in increased pore pressure in water-laden ground and, in extreme cases, can cause liquefaction of ground. If impacts are used to form depressions, they may cause significant and sudden increases in pore pressure, with consequential disturbance to the ground at some considerable distance from the point of working.
Furthermore, the lance 14 can be driven, by vibration, to any chosen depth without causing pore pressure problems.
Once the cavity 16 has been formed, the lance 14 is withdrawn.
I Additional material 19 is then introduced into the cavity. As has been described, the additional material includes a ground amelioration material, preferably cementitious material such as cement, mixed with soil. The soil is preferably derived locally. The additional material may also include a hydrophilic material, such as quick lime. Stone or other aggregate may also be included. This injection of additional material results in the intermediate situation illustrated in Fig. 2.
The presence of quick lime, which is highly hydrophilic, causes ground water to be drawn strongly from the surrounding ground 12, causing a significant reduction in local pore pressure. Consequently, the addition of quick lime is particularly preferred in locations at which excessive pore pressure is expected to be a problem. The reduction in pore pressure helps overcome any tendency of fine-grained soils to liquefy during the procedure.
The lance 14 is then reintroduced into the ground, at the same position, and vibrated down to cause compaction of the additional material, and possible bulging of the cavity 16, as shown at 38 (Fig. 3). The degree of bulging which occurs will depend on the size of downward compacting forces created by the vibration of the lance 14, and the natural capacity of the surrounding ground 34 to provide lateral containment of the additional material. The lance 14 is repeatedly vibrated in, removed and reintroduced after additional material has been introduced, until the cavity 16 is full of material which has been adequately compacted, with resultant bulging of the cavity.
Compaction of the additional material in the cavity 16 is continued until the ground 17 is seen to heave upwardly (indicated at 39) around the position of the cavity 16. This heave indicates that no further additional material can be accommodated in the ground, and no further compaction is possible.
It is then preferred to test the condition of the ground, which will have
improved by virtue of the additional material and the compaction. This is achieved, as illustrated in Fig. 4, by driving a test member 20 down onto the top of the additional material 19. The test member 20 is an inverted frusto-conical former, having a minimum diameter approximately the same as the diameter of the cavity 16, and flaring upwardly to a wider diameter at Ks upper surface. The test member 20 is driven downwardly, as indicated by the arrow 22, by vibration, causing compaction of the additional material, until the member 20 is fully embedded to the position indicated by broken lines 24. The test member 20 is then removed, leaving a cavity which is preferably filled with concrete, or other gettable material to form a cap 25 as illustrated in Fig. 5. The concrete cap 25 forms a structural member to which downward force can be transmitted from a structure, such as a building, to be formed at the surface. The cap 25 is, in tum, supported by the improved ground which has been produced by the repeated use of the lance 14.
The use of the test member 20 provides a form of dynamic test of the ground at the position of the cavity 16. If the vibration frequency and rated impact per blow applied to the test member 20 are both known, then the time taken for the test member 20 to become embedded to a particular depth is indicative of the load bearing capacity of the ground at that position. Naturally, the final load bearing property of the ground will be greater than the capacity tested in this way, because it will increase as the cementitious material sets, but it is envisaged that with appropriate safety factors included in calculations, the final capacity can be predicted from the measurements made in this way.
In the example described above, it can be seen that the use of vertical vibration to form the cavity, results in the pore pressure being controlled in the ground, and in particular, prevents sudden pore pressure increases which can arise from the impacts or from the use of horizontally vibrating hole fonning mechanisms. The depth to which the ground can be improved is virtually unlimited, with the advantages relating to pore pressure being retained.
Many variations and modifications can be made to the arrangements described above. In particular, the dimensions and relative dimensions and choice of materials can be widely varied according to the particular condition of the ground being treated and the load to be borne by the arrangements formed.
Whilst endeavouring in the foregoing specification to draw attention to
those features of the invention believed to be of particular importance it should be understood that the Applicant claims protection in respect of any patentable feature or combination of features hereinbefore referred to and/or shown in the drawings whether or not particular emphasis has been placed thereon.

Claims (12)

1. A method of ground improvement, in which a lance member is repeatedly vibrated into the ground at substantially the same position, to leave on each occasion an elongate cavity as the lance member is removed, and in which additional material is introduced into the cavities so formed, the additional material being formed by mixing at least soil and a ground amelioration material, and in which the process is repeated until heave is detected in the ground around the said position.
2. A method according to claim 1, wherein the ground amelioration material includes a cementitious binder such as cement.
3. A method according to claim 1 or 2, wherein the additional material further includes quick lime.
4. A method according to any preceding claim, wherein after the repeating process is finished, a depression is formed in the ground, at the said position, the depression being filled with concrete to form a structural member supported by the improved ground.
5. A method according to claim 4, wherein the depression is fommed by vibrating a tapered member into the improved ground.
6. A method according to claim 4 or 5, wherein the response of the ground during the fommation of the depression is measured to determine the load bearing capacity of the improved ground.
7. A method according to any preceding claim, wherein the lance member enters the ground substantially vertically.
8. A method according to any preceding claim, wherein the lance member is
at least 2m long.
9. A method according to claim 8, wherein the lance is at least am long
10. A method according to any preceding claim, wherein the lance tapers at an angle of between 2 and 5 .
11. A method substantially as described above, with reference to the accompanying drawings.
12. Any novel subject matter or combination including novel subject matter disclosed herein, whether or not within the scope of or relating to the same invention as any of the preceding claims.
GB0316860A 2002-07-18 2003-07-18 Ground improvement Expired - Fee Related GB2391035B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB0216701A GB0216701D0 (en) 2002-07-18 2002-07-18 Preparation of ground prior to building
GB0225943A GB0225943D0 (en) 2002-07-18 2002-11-07 Preparation of ground prior to building

Publications (3)

Publication Number Publication Date
GB0316860D0 GB0316860D0 (en) 2003-08-20
GB2391035A true GB2391035A (en) 2004-01-28
GB2391035B GB2391035B (en) 2005-05-04

Family

ID=27767110

Family Applications (2)

Application Number Title Priority Date Filing Date
GB0316861A Expired - Fee Related GB2391036B (en) 2002-07-18 2003-07-18 Ground improvement
GB0316860A Expired - Fee Related GB2391035B (en) 2002-07-18 2003-07-18 Ground improvement

Family Applications Before (1)

Application Number Title Priority Date Filing Date
GB0316861A Expired - Fee Related GB2391036B (en) 2002-07-18 2003-07-18 Ground improvement

Country Status (5)

Country Link
EP (2) EP1382750B1 (en)
AT (2) ATE440183T1 (en)
DE (2) DE60328853D1 (en)
ES (2) ES2331238T3 (en)
GB (2) GB2391036B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970995A (en) * 2016-05-25 2016-09-28 宁波市建设集团股份有限公司 Bearing platform mold

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2403964B (en) * 2003-07-18 2006-09-27 Roxbury Ltd Ground improvement
WO2010080941A2 (en) * 2009-01-09 2010-07-15 Geopier Foundation Company, Inc. Construction modulus testing apparatus and method
WO2011001297A1 (en) * 2009-06-30 2011-01-06 Russet Trading & Investment 24 (Pty) Ltd A method for constructing a column
DE102010022661A1 (en) * 2010-06-04 2011-12-08 vgs Ingenieure Dr. Köhler & Kirschstein GmbH Methods for soil compaction of sands and gravels, involves generating vertical vibration movements of compression tool by vibration device which is fitted on upper end of compression tool
CN102409588B (en) * 2011-11-25 2013-06-12 中铁十二局集团第三工程有限公司 Movable grouting workshop
CN102535291A (en) * 2012-02-02 2012-07-04 石家庄铁道大学 Soft-soil foundation treatment method for expressway engineering
US10196793B2 (en) 2016-02-24 2019-02-05 Ingios Geotechnics, Inc. Systems and methods to provide pressed and aggregate filled concavities for improving ground stiffness and uniformity
CN109183542A (en) * 2018-07-26 2019-01-11 武汉大学 Run highway soft soil roadbed bumping at bridge-head lower clapboard processing method
CN109355990B (en) * 2018-11-29 2023-09-19 中国电建集团成都勘测设计研究院有限公司 Ultra-fine sand roadbed structure for hydraulic filling in low-lying marsh areas
GB2595274B (en) * 2020-05-20 2023-07-05 Subsea 7 Norway As Modifying seabed contours

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2286613A (en) * 1994-02-18 1995-08-23 Roxbury Ltd Ground improvement
GB2345509A (en) * 1997-08-20 2000-07-12 Roxbury Ltd Ground treatment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5249892A (en) * 1991-03-20 1993-10-05 Fox Nathaniel S Short aggregate piers and method and apparatus for producing same
GB2366819B (en) * 1997-08-20 2002-06-05 Roxbury Ltd Monitoring the degree of compaction achieved during ground treatment
NL1007690C2 (en) * 1997-12-04 1999-06-09 Ballast Nedam Funderingstechni Method and device for installing a pile in a substrate.
GB2365891B (en) * 2000-07-07 2004-05-26 Roxbury Ltd Ground preparation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2286613A (en) * 1994-02-18 1995-08-23 Roxbury Ltd Ground improvement
GB2345509A (en) * 1997-08-20 2000-07-12 Roxbury Ltd Ground treatment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970995A (en) * 2016-05-25 2016-09-28 宁波市建设集团股份有限公司 Bearing platform mold

Also Published As

Publication number Publication date
EP1382750A1 (en) 2004-01-21
EP1382750B1 (en) 2009-08-19
GB2391036A (en) 2004-01-28
DE60328854D1 (en) 2009-10-01
GB2391036B (en) 2005-05-04
GB0316860D0 (en) 2003-08-20
GB0316861D0 (en) 2003-08-20
EP1382751B1 (en) 2009-08-19
GB2391035B (en) 2005-05-04
ES2331238T3 (en) 2009-12-28
ES2331239T3 (en) 2009-12-28
ATE440183T1 (en) 2009-09-15
EP1382751A1 (en) 2004-01-21
ATE440182T1 (en) 2009-09-15
DE60328853D1 (en) 2009-10-01

Similar Documents

Publication Publication Date Title
EP1431463B1 (en) Ground treatment
US5249892A (en) Short aggregate piers and method and apparatus for producing same
AU2006297200B2 (en) Pyramidal or conical shaped tamper heads and method of use for making rammed aggregate piers
GB2391035A (en) Formation of a foundation by compaction
KR20180084101A (en) Stable foundation ground formation method
CN108930224A (en) Punching stick method bent cap supports regulating system construction method
CN103711114A (en) Foundation treatment method
GB2286613A (en) Ground improvement
CN111663561B (en) Construction method of industrial building damping foundation
CA2922374C (en) Apparatuses for constructing displacement aggregate piers
HU225407B1 (en) Procedure for augmentation physical parameters and bearing capacity of ground and for diminution time of consolidation and expected consolidation settlement of thereof
CN207047828U (en) Vibrating and impacting construction of ballast pile unit with bottom discharge
CN211227880U (en) Expansive soil limited deformation anti-upwarp foundation structure
CN102619218B (en) Rear slotting reinforcing cage CFG and piling method thereof
JP5156900B2 (en) Foundation of structure made of single-grain aggregate and construction method
CN1100182C (en) Construction method of vibration punching slurry-bitstone pile and apparatus used thereof
CN1621623A (en) Construction method of composite ground foundation
JPH0765315B2 (en) Embankment structure
CN220768012U (en) Water-gas co-injection vibroflotation pile machine equipment
CN110241830A (en) Backfilling device and backfilling method
JPH0814101B2 (en) Liquefaction control method for sandy ground
JP2010209605A (en) Piled-raft foundation
Fortunato et al. Soil-binder columns for the rehabilitation of railway track platforms
KR20250093031A (en) Compaction-Pile Composition for Preventing Ground Liquefaction and Sand Compaction Pile Method using Thereof
SU1680876A1 (en) Foundation for building on swelling ground

Legal Events

Date Code Title Description
732E Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977)
732E Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977)

Free format text: REGISTERED BETWEEN 20091008 AND 20091014

732E Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977)

Free format text: REGISTERED BETWEEN 20120412 AND 20120418

PCNP Patent ceased through non-payment of renewal fee

Effective date: 20160718