DE60328854D1 - Verfahren zur Verdichtung eines Baugrundes - Google Patents
Verfahren zur Verdichtung eines BaugrundesInfo
- Publication number
- DE60328854D1 DE60328854D1 DE60328854T DE60328854T DE60328854D1 DE 60328854 D1 DE60328854 D1 DE 60328854D1 DE 60328854 T DE60328854 T DE 60328854T DE 60328854 T DE60328854 T DE 60328854T DE 60328854 D1 DE60328854 D1 DE 60328854D1
- Authority
- DE
- Germany
- Prior art keywords
- ground
- cavity
- additional material
- subsoil
- compacting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 abstract 4
- 239000011230 binding agent Substances 0.000 abstract 1
- 239000002689 soil Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/36—Coherent pavings made in situ by subjecting soil to stabilisation
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/04—Foundations produced by soil stabilisation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
- E02D3/054—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Agronomy & Crop Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Superconductors And Manufacturing Methods Therefor (AREA)
- Soil Working Implements (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Road Repair (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Road Paving Structures (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB0216701A GB0216701D0 (en) | 2002-07-18 | 2002-07-18 | Preparation of ground prior to building |
| GB0225943A GB0225943D0 (en) | 2002-07-18 | 2002-11-07 | Preparation of ground prior to building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE60328854D1 true DE60328854D1 (de) | 2009-10-01 |
Family
ID=27767110
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE60328853T Expired - Fee Related DE60328853D1 (de) | 2002-07-18 | 2003-07-18 | Verfahren zur Verbesserung eines Baugrundes |
| DE60328854T Expired - Fee Related DE60328854D1 (de) | 2002-07-18 | 2003-07-18 | Verfahren zur Verdichtung eines Baugrundes |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE60328853T Expired - Fee Related DE60328853D1 (de) | 2002-07-18 | 2003-07-18 | Verfahren zur Verbesserung eines Baugrundes |
Country Status (5)
| Country | Link |
|---|---|
| EP (2) | EP1382751B1 (de) |
| AT (2) | ATE440182T1 (de) |
| DE (2) | DE60328853D1 (de) |
| ES (2) | ES2331238T3 (de) |
| GB (2) | GB2391035B (de) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2403964B (en) * | 2003-07-18 | 2006-09-27 | Roxbury Ltd | Ground improvement |
| WO2010080941A2 (en) * | 2009-01-09 | 2010-07-15 | Geopier Foundation Company, Inc. | Construction modulus testing apparatus and method |
| WO2011001297A1 (en) * | 2009-06-30 | 2011-01-06 | Russet Trading & Investment 24 (Pty) Ltd | A method for constructing a column |
| DE102010022661A1 (de) * | 2010-06-04 | 2011-12-08 | vgs Ingenieure Dr. Köhler & Kirschstein GmbH | Verfahren und Vorrichtung zur Bodenverdichtung |
| CN102409588B (zh) * | 2011-11-25 | 2013-06-12 | 中铁十二局集团第三工程有限公司 | 移动式注浆车间 |
| CN102535291A (zh) * | 2012-02-02 | 2012-07-04 | 石家庄铁道大学 | 一种高速公路工程软弱土地基处理方法 |
| CA3011557C (en) | 2016-02-24 | 2021-01-12 | Ingios Geotechnics, Inc. | Systems and methods to provide pressed and aggregate filled concavities for improving ground stiffness and uniformity |
| CN105970995A (zh) * | 2016-05-25 | 2016-09-28 | 宁波市建设集团股份有限公司 | 承台胎模 |
| CN109183542A (zh) * | 2018-07-26 | 2019-01-11 | 武汉大学 | 运营公路软土路基桥头跳车下隔板处理方法 |
| CN109355990B (zh) * | 2018-11-29 | 2023-09-19 | 中国电建集团成都勘测设计研究院有限公司 | 低洼沼泽地区吹填特细砂路基结构 |
| GB2595274B (en) * | 2020-05-20 | 2023-07-05 | Subsea 7 Norway As | Modifying seabed contours |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5249892A (en) * | 1991-03-20 | 1993-10-05 | Fox Nathaniel S | Short aggregate piers and method and apparatus for producing same |
| GB2286613B (en) * | 1994-02-18 | 1998-05-13 | Roxbury Ltd | Improvements in or relating to methods and apparatus for improving the condition of ground |
| ATE272149T1 (de) * | 1997-08-20 | 2004-08-15 | Roxbury Ltd | Baugrundbehandlung |
| GB2366819B (en) * | 1997-08-20 | 2002-06-05 | Roxbury Ltd | Monitoring the degree of compaction achieved during ground treatment |
| NL1007690C2 (nl) * | 1997-12-04 | 1999-06-09 | Ballast Nedam Funderingstechni | Werkwijze en inrichting voor het in een ondergrond aanbrengen van een paal. |
| GB2365891B (en) * | 2000-07-07 | 2004-05-26 | Roxbury Ltd | Ground preparation |
-
2003
- 2003-07-18 GB GB0316860A patent/GB2391035B/en not_active Expired - Fee Related
- 2003-07-18 ES ES03254512T patent/ES2331238T3/es not_active Expired - Lifetime
- 2003-07-18 DE DE60328853T patent/DE60328853D1/de not_active Expired - Fee Related
- 2003-07-18 DE DE60328854T patent/DE60328854D1/de not_active Expired - Fee Related
- 2003-07-18 EP EP03254513A patent/EP1382751B1/de not_active Expired - Lifetime
- 2003-07-18 EP EP03254512A patent/EP1382750B1/de not_active Expired - Lifetime
- 2003-07-18 AT AT03254512T patent/ATE440182T1/de not_active IP Right Cessation
- 2003-07-18 AT AT03254513T patent/ATE440183T1/de not_active IP Right Cessation
- 2003-07-18 ES ES03254513T patent/ES2331239T3/es not_active Expired - Lifetime
- 2003-07-18 GB GB0316861A patent/GB2391036B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| ATE440183T1 (de) | 2009-09-15 |
| EP1382751B1 (de) | 2009-08-19 |
| ES2331238T3 (es) | 2009-12-28 |
| ATE440182T1 (de) | 2009-09-15 |
| EP1382750B1 (de) | 2009-08-19 |
| GB2391036A (en) | 2004-01-28 |
| GB2391035B (en) | 2005-05-04 |
| EP1382751A1 (de) | 2004-01-21 |
| ES2331239T3 (es) | 2009-12-28 |
| EP1382750A1 (de) | 2004-01-21 |
| GB2391036B (en) | 2005-05-04 |
| DE60328853D1 (de) | 2009-10-01 |
| GB0316861D0 (en) | 2003-08-20 |
| GB2391035A (en) | 2004-01-28 |
| GB0316860D0 (en) | 2003-08-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE60328854D1 (de) | Verfahren zur Verdichtung eines Baugrundes | |
| DE60217633D1 (de) | Verfahren und Vorrichtung zur Regelung eines Traktors in Kombination mit einem Bodenbearbeitungsgerät | |
| ATE531855T1 (de) | Verfahren und vorrichtung zur bodenverstärkung | |
| ATE278069T1 (de) | Gerät zum einbringen eines fremdstoffes in böden und/oder zur verdichtung des bodens und verfahren zur herstellung einer materialsäule im boden | |
| AU2002241828A1 (en) | Subsurface soil injection apparatus and method | |
| SE8205390D0 (sv) | Method and apparatus of forming sand piles for improving a soft groud | |
| ATE225322T1 (de) | Verfahren zum verfestigen von böden | |
| DE50106844D1 (de) | Verfahren und Vorrichtung zur Herstellung eines Ortbetonpfahls | |
| DE502004003865D1 (de) | Bohrgerät und Verfahren zum Einbringen eines Bohrelementes in den Boden | |
| DE60235600D1 (de) | Verfahren zur Herstellung von selbstverdichtendem Füllmaterial | |
| ATE211609T1 (de) | Vorrichtung und verfahren zum auflockern eines blocks komprimierten losen materials, insbesondere blumenerde | |
| DE60223878D1 (de) | Maschine zur Herstellung eines Betonweges, sowie Vorrichtung zum Einbringen von Dübeln dafür | |
| DE59004296D1 (de) | Verfahren und Vorrichtung zum Eintrag von Sauerstoff in einen Boden. | |
| GB0304092D0 (en) | Soil working method and apparatus | |
| DE50114843D1 (de) | Vorrichtung und Verfahren zur Erzeugung von Materialsäulen im Boden von Gewässern | |
| GR3032414T3 (en) | Method for stabilising slopes | |
| JPS56142935A (en) | Stabilized piling method for earth slope | |
| DE59304585D1 (de) | Tiefenrütteln unter Zugabe von Flüssigstickstoff | |
| DE10314368A1 (de) | Verfahren und Einrichtung zur Herstellung von Rüttelsäulen, insbesondere von Rütteldruck-, Rüttelstopf- oder Fertigmörtel Rüttelstopfsäulen | |
| SU1694774A1 (ru) | Способ выполнени скважины дл подпочвенного орошени | |
| DE69828604D1 (de) | Verfahren zum Herstellen eines Ortbetonpfahles im Boden | |
| DE20023685U8 (de) | Luftinjektionsbrunnen: Vorrichtung zur Sanierung der gesättigten Bodenzone | |
| DE69913593D1 (de) | Verfahren zur Erzeugung eines Gründungspfahls in den Untergrund | |
| GB0121938D0 (en) | Pile driving apparatus and method | |
| AT3598U3 (de) | Rohrschirm und verfahren sowie vorrichtung zur herstellung eines rohrschirms beim vortrieb eines tunnels |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 8364 | No opposition during term of opposition | ||
| 8339 | Ceased/non-payment of the annual fee |