Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gebr Grohmann KG
Original Assignee
Gebr Grohmann KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gebr Grohmann KGfiledCriticalGebr Grohmann KG
Priority to DE1951G0003428priorityCriticalpatent/DE1631098U/en
Publication of DE1631098UpublicationCriticalpatent/DE1631098U/en
Vorder. 4L*Uhrung fUr Robelbanks.Die lieuerung betrifft die VorderfUhrung fUr lIobelbãnke.Bei der bisher bekannten DreiecksfUhrnse besteht der Uebelstand,dasß die Zange nicht parallel arbeiten kann und eckt, wenn
dieWerkstneke einseitig eingem*nut sindkBieserebelstand wird durc& die Neuerang beseitigt ;sie besteht darin, dass das ßleitstek der Xangs adt seinen
Breit-seiten zwischen zwei fest gelagerten langen Stangen geführt
ist.Dabei kann der vorstehend geschilderte Uebelstsnd nicht mehr
auf-treten, denn selbst bei einseitigem Einspannen des Werkstücks
kanninfolge derlangenundsicheren Fhrung des GleistackeseinSekender Zange nicht mehr auftreten...In der Zeichnung ist ein Ausführusgsbeispiel der Neue-rangAargestellt.Sszeijgeni eine. j) rautsioü-t auf äie-forderturmg,Fig. feines Sehnig nach A-B der heFig.-3 einen 5e t n D der Fig. tuNach der Neuerung ; ist d§s ßleitsek a der Zange Ritseiner langen Breitseite b zwischen den beiden langen rungs-und alei tsta. 1lgell c gef11hrt. Das GleitstUck'a ist in bekannterWeise-mittels der Spindel d verschiebbar gelagert, wobei dieBreitseiten mit einer geeigneten Fanrung et Stangen e eut-langgleiten. Die Gleitstangen c haben eine feste und sichereLagerung in den beiden Verbindungsstücken f und g und dem M-flansch d.Die Gleitflächen i des Gleitstuckes sind neuerungsgemassals Winkelf Ehrung ausgebildet (Fig. 2 und 3),was den Vorteilhat, dass die Gleitstücke sich immer wieder selbsttätig auf
dieGleitwinkel einstellen. Before the. 4L * Clock for Robelbanks. The delivery concerns the front display for praise banks. With the previously known triangular guide, there is the disadvantage that the pliers cannot work in parallel and corners when the Workstones with a * groove on one side Bieserbelstand is eliminated by the new rank; it consists in the fact that the ßleitstek of the Xangs adt its broad sides is guided between two fixed long rods. The above-described situation can no longer exist. step, because even with one-sided clamping of the workpiece due to the long and safe guidance of the Gleistackeseken the pliers no longer occur ... The drawing shows an example of the new ranked.Sszeijgen i a. j) rautsioü-t auf äie-fordurmg, Fig. Fine sinews to AB der he Fig. 3 shows a 5e tn D of Fig. Tu After the innovation; is d§s ßleitsek a of the forceps Rit its long broad side b between the two long and alei tsta. 1lgell c guided. The GleitstUck'a is known in Way-mounted displaceably by means of the spindle d, the Wide sides with a suitable fan ring and rods slide along. The slide bars c have a firm and safe Storage in the two connecting pieces f and g and the M- flange d. The sliding surfaces i of the sliding piece are according to the innovation designed as an eleven honor (Fig. 2 and 3), which has the advantage has that the sliding pieces are always automatically on the Adjust the glide angle.
Claims (1)
S ff p r a c h e *Sohuizansprl1ohe.
1.) Vorderfuhrung für Sobelbank, dadurch gekennzeichnet, dassdas Gleitstück(a)derZaDgmitseinenBreitseiten (b) zwischenzwei fest gelagerten Stangen (e) geführt ist.2.) Vorrichtung nach Anspruch l, dadurch gekennzeichnet, dass
diebeiden Gleitflächen (i) des Sleitst&ckes (a) als WinkelfOhrnngausgebildet sind.3.) Torrichtung nach Anspruch l, dadurch gekennzeichnet, dass
diGleit'-und FuhrungsBtangen (e) in den beiden Verbindungsstücken(f, g) und dem Sndflansch (h) gelagert sind.
S ff language * Sohuizan demands.
1.) Front guide for Sobel bench, characterized in that the sliding piece (a) of the ZaDg with its broad sides (b) between two fixed rods (e) is guided. 2.) Device according to claim l, characterized in that the both sliding surfaces (i) of the sliding piece (a) as angled bore are trained. 3.) gate direction according to claim l, characterized in that di Slide and guide rods in the two connecting pieces (f, g) and the flange (h) are supported.
DE1951G00034281951-08-141951-08-14
FRONT GUIDE FOR PLANING JOINT.
ExpiredDE1631098U
(en)