CH278032A - Automatic measuring device on preload hardness testing machines. - Google Patents

Automatic measuring device on preload hardness testing machines.

Info

Publication number
CH278032A
CH278032A CH278032DA CH278032A CH 278032 A CH278032 A CH 278032A CH 278032D A CH278032D A CH 278032DA CH 278032 A CH278032 A CH 278032A
Authority
CH
Switzerland
Prior art keywords
test
preload
lever
dial indicator
measuring sleeve
Prior art date
Application number
Other languages
German (de)
Inventor
Reicherter Georg
Original Assignee
Reicherter Georg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Reicherter Georg filed Critical Reicherter Georg
Publication of CH278032A publication Critical patent/CH278032A/en

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/40Investigating hardness or rebound hardness
    • G01N3/42Investigating hardness or rebound hardness by performing impressions under a steady load by indentors, e.g. sphere, pyramid
    • G01N3/44Investigating hardness or rebound hardness by performing impressions under a steady load by indentors, e.g. sphere, pyramid the indentors being put under a minor load and a subsequent major load, i.e. Rockwell system

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Description

  

  



  Automatische Me¯einrichtung an Vorlastharteprufmaschinen.



   Die VorlasthÏrtepr fung, bei der die bei Steigerung des Prüfdruckes von Vorlast auf    Gesamtlast und ansehliessender Wiederent-      lastung auf Vorlast    erzielte Vergrösserung der Eindringtiefe des   Eindringkörpers    mit einer Messuhr gemessen und an dieser als   Härtewert    abgelesen wird, wird vorzugsweise und in grösstem Umfange dann angewendet, wenn gehärtete   oder vergütete Stücke zu prüfen    sind.

   In der    Mengenfertigung sollte diese Prüfung aus      Gründen    der Wirtschaftlichkeit in Automaten durchgeführt werden, was auch mit   Rüek-    sieht auf Schonung des Pr fenden, Ausschaltung seiner körperlichen und geistigen Ermüdbarkeit und damit verbundene Erhöhung der Sicherheit der Prüfung dringend geboten ist. Es hat deshalb an Ansätzen und Vorsehlägen zur Automatisierung der Vorlasthärteprüfung schon bisher nicht gefehlt.



   Die meisten der   bisher hekanntgewor-    denen Vorsehläge sind dadurch gekennzeichnet, da¯ die Prüfspindel während der Pr fung stillsteht oder doeh nur bis zur Erreichung der Vorlast naeh oben geht, während die Hauptlast unter Vermittlung von Hebeln von oben auf den   Prüfstempel    abgesetzt wird.



  Es wurde aber auch schon eine   machine    be  schrieben,    bei der laut Beschreibung alle zur Prüfung erforderliehen Bewegungsvorgänge mit Ausnahme des Festhaltens des   Messuhr-    zeigers in der Nullstellung von der Auf-und AbwÏrtsbewegung der Spindel abgeleitet werden. Es ist   bei dieser Maschine aber nicht    gelungen, den   Härtewert    an der Messuhr bis zur nächsten Prüfung festzuhalten. Darin liegt eine   Unvollkommenheit,    die die hier besehriebene Messeinrichtung nieht aufweist, da bei ihr der Härtewert bis zur   nächsten Prü-      fung    festgehalten wird, so dass genügend Zeit zur Verfügung steht, ihn bequem und sicher abzulesen.



   In den Abbildungen 1 bis 6 ist die den Gegenstand der vorliegenden Erfindung bildende   Messeinrichtung in verschiedenen    Ar  beitsstellungen    beispielsweise und schematisch dargestellt. In diesen Abbildungen bedeutet   1.    das Gehäuse der   Vorlasthärteprüfmaschine,    welches nach einer Längsmittelebene geteilt und in das die Messeinrichtung eingebaut ist.



  In diesem Gehäuse ist gleitend geführt eine   Messbüchse    2, in der der   Prüfstempel    3 und ein Sehieber 4 gleitend geführt sind. An letzterem ist mittels eines Zapfens 30 oder sonst in   geeigneter Weise der Messuhrhebel    5 angelenkt, der mit einer im   Prüfstempel    befestigten Schneide 6, oder unter Umständen einer Spitze, dauernd in. Berührung ist. Es ist mit dem   Prüfstempel    ein Messuhrhalter 7 fest verbunden, in dem die Messuhr 8 be  festigt    ist. An dem   Messuhrhalter 7 ist    ein Winkelhebel 9 drehbar gelagert, der mit seinem einen Arm mit einem im Maschinengehäuse angebrachten Anschlag 10 zeitweilig zur Berührung kommt.

   Mit seinem andern Arm steht der Winkelhebel 9 dauernd in Berührung mit einem Keil   11,    der auf   dem Mess-      uhrhebel    5 hin und her schiebbar angeordnet ist und unter der Wirkung einer Zugfeder 12 steht, die zwischen ihm und dem Messuhrhebel eingeschaltet ist.



   Die Wand der Messbüchse 2 weist ausser dem Durchbruch f r den   Messuhrhalter    und den Messuhrhebel einen weiteren Durchbruch für ein Druckglied 13 auf, das die Aufgabe hat, den Schieber 4 der Klemmvorrichtung unmittelbar vor dem Aufbringen der Hauptlast mit der Messbüchse 2   durch Reibungs-    sehluss zu verbinden. Solange diese Verbindung besteht und solange der Keil 11 ausgefahren ist,  bertrÏgt der um den Zapfen 30 drehbare Messuhrhebel die   Eindringung    des am   Prüfstempel      befestigten Eindringkssrpers    21 in entsprechender Vergrösserung auf die Messuhr. Gelöst wird diese Verbindung erst dann, wenn nach   der Wiederentlastung    auf Vorlast der Keil 11 zwischen Messuhrschalter und Messuhrhebel   eingesehoben    ist.

   Nach dem   Loden    dieser Verbindung kann die dadurch frei gewordene Feder   14    über den Schieber 4 wieder auf den Messuhrhebel drücken und den Härtewert auch dann noeh festhalten, wenn der   Prüfstempel    mit seinem Band 15 wieder im   Masehinengehäuse    aufsitzt. Der Härtewert bleibt also bis zur nächsten Prüfung stehen.



  Das automatische Herstellen und L¯sen der    Verbindung zwischen Me¯b chse @ und Schie-    ber 4 wird mittels einer einschichtigen Blattfeder 16 bewirkt, die mit ihrem einen Ende an der Messbüehse eingespannt ist und deren freies Ende je nach der augenblicklichen Stellung der Me¯b chse im Maschinengehäuse entweder auf Druckglied 13 dr ckt oder auf einen keilförmig gestalteten Klotz 17, der bei der Bewegung der Messbüehse an dieser mittels eines am Maschinengehäuse angebrachten   Anschlages 22 2 verschoben wird.   



   Das Zusammenwirken der aufgeführten Teile, sowie der Vorlastfeder 19 und der Hauptlastfeder 20 beim Messvorgang ist aus den Abbildungen 1 bis 6, die die Me¯einrich  tung    in den aufeinanderfolgenden Stellungen eines Arbeitsspiels zeigen,   Zll    ersehen.



   Abbildung   1    zeigt die Messeinrichtung in der Ausgangsstellung. Die Me¯b chse 2 wird durch die Feder 23 auf ihren Ruhesitz im Maschinengehäuse   1      gedrüekt.    Der Prüfstempel 3 wird   dureh    die Vorlastfeder 1 auf seinen Ruhesitz im   Masehinengehäuse      1    ge  drüekt.    Das von der Kraft der Blattfeder 16   entlastete Druekglied    13 kann auf den Schieber 4 noch nicht driieken, so dass dieser infolge der Kraft der Feder   14 den Messuhr-    hebel 5  ber den Keil 11 gegen   den Messuhr-    halter 7   drüekt.    Die Messuhr zeigt noch den Wert der vorhergehenden Prüfung an.



   In Abb. 2 hat die Pr fspindel 24 mit dem darauf ruhenden   Prüfling    25 die Me¯b chse @   und den Prüfstempel    3 angehoben. Die von der Vorlastfeder 19 herrührende Vorlast ist auf den Prüfstempel aufgebracht. Der eine Arm des Winkelhebels 9 ist mit dem Anschlag 10 bei der Bewegung des Stempels zur Berührung gekommen und gedreht worden.



  Infolgedessen wurde der Keil 11 ausgefahren.



  Infolgedessen konnte der noch nicht festge  klemmte    Schieber 4 den   Messuhrhebel    5 bis zur unmittelbaren Berührung gegen den Messuhrhalter   7    dr cken und damit die Messuhr auf Null stellen. Damit dies   geschehen    kann, ist die Kraft der Feder 1. 4 so bemessen, da¯ sie am   Messuhrhebel    5 in bezug auf die Scheide 6 ein grösseres Drehmoment ergibt   als der Messdruck der Messuhr.    Der Ansehlag   22    hat angefangen, den Klotz 17 unter der Blattfeder 16 herauszuziehen.



   Abb. 3 zeigt   die Messeinrichtung unmittel-    bar vor dem Aufbringen der Hauptlast. Der Anschlag 22 hat den Klotz 17 unter der Blattfeder 16 hervorgezogen, so dass letztere das Druekglied 13 gegen den Sehieber 4 drüeken und damit dessen reibungssehlüssige Verbin  dung    mit   der Zlessbüehse    2   herstell. en    kann.



  Der   Messuhrzeiger    steht noch auf Null.



   In Abb.   4    ist die von der   Hauptlastfeder      20    herr hrende Hauptlast auf den Pr fstempel 3 anfgebracht. Infolgedessen ist der am   Prüfstempel    3 befestigte   Eindringkorper    21 in den   Prüfling    25 erheblich mehr   eingedrun-    gen, als dies unter   der AVirkung der    Vorlast sehon der Fal war. Die daraus sich ergebende Relativbewegung zwischen Pr fstempel und   Messbüchse vergrössert um den    Be trag   geringfügigster im Prüfstempel    auftretender elastischer Formänderungen hat sich iiber den Me¯uhrhebel 5 in entsprechender   Vergrösserung anf    den Messuhrzeiger übertragen.

   Letzterer steht jetzt infolge der vorerwähnten im   Prüfstempel    auftretenden elastischen Formänderungen, wie auch infolge der am   Prüfeindruck    auftretenden elastischen Formänderungen ein wenig  ber dem HÏrtewert, der demnäehst angezeigt werden wird.



   In Abb. 5 ist die   Prüfspindel    24 mit dem Prüfling 25 wieder etwas nach unten gegangen. Die Kraft der Hauptlastfeder 20 ist wieder im   Masehinengehäuse      1    rückgeschlossen, so dass auf den   Prüfstempel    3 nur noch die Vorlast wirkt. Die am   Prüfstempel und    am Prüfeindruek auftretenden, dem Unterschied zwischen Gesamtlast und Vorlast   entsprechen-    den elastischen Formänderungen haben sich infolge des Wegnehmens der Hauptlast zurüekgebildet, so dass der   Messuhrzeiger    jetzt auf den   Härtewert    weist.



   In Abb. 6 ist die   Prüfspindel    mit dem   Prüfling weiter nach unten gegangen.    Infolge dieser Bewegung, der der   Prüfstempel    3 und die   Messbüehse    2 folgen mussten, hat sich der im Messuhrhebel 7 drehbar gelagerte Winkelhebel 9 vom Ansehlag 10 wieder wegbewegt, so dass der   Keil 11 von    der Feder 12 zwisehen   Messuhrhalter 7 und Messuhrhebel    5 geschoben und damit der Härtewert fixiert wurde, indem der Schieber 4 den   Messuhr-    hebel 5 über den Keil 11 gegen den Mess  uhrhalter    7 dr ckt.

   Der Schieber 4 ist mit der   Alessbüehse      2    immer   noeh gekuppelt.    Der   Prüfstem. pel und die Messbüchse    sind in ihrer Ausgansstellung, in der sie im   Masphinen-       geliäuse aufsitzen, noch nicht ganz angekom-      men.    Ehe sie dort ankommen, wird der Klotz z   17 unter die    Feder 16   gesehoben    und damit das Druckglied 13 vom Druck der Blattfeder 16 entlastet und der Schieber 4 also wieder   freigelassen. Naehdem    auf diese Weise die   reibungssehlüssige    Verbindung zwischen Messbüchse 2 und Schieber 4 gelöst wurde, setzt sich der   Prüfstempel    3 im Masehinengehäuse 1 wieder ab.

   Darnach setzt sich auch die Me¯  büehse    2 im Maschinengehäuse 1 wieder ab, wobei sieh letztere schützend vor den Ein  dringkorper    schiebt.



   Der im Vorhergehenden beschriebene Pr fvorgang würde sich in genau derselben Weise abspielen in einer Vorlasthärteprüfmaschine, bei der zur Ausführung einer Prüfung das Gehäuse 1 am Masehinenständer auf und ab bewegt w rde, die   Prüfspindel    mit dem auf ihr ruhenden   Prüfling    aber während des Prüfvorganges stillstehen würde. Mit einer solchen Bauart lässt sieh die Prüfung grosser und sperriger Werkstücke, die zur   Durchfüh-    rung einer Härteprüfung nicht gehoben und gesenkt werden können, sehr leicht bewerkstelligen, worin ein weiterer Vorteil der hier beschriebenen   Einrichtung zu erblicken    ist.



  



  Automatic metering device on preload hard test machines.



   The preload hardness test, in which the increase in the penetration depth of the penetration body achieved when the test pressure is increased from preload to total load and then relieved to preload is measured with a dial gauge and read as the hardness value from this, is preferably and to the greatest extent used if hardened or tempered pieces are to be tested.

   In volume production, this test should be carried out in machines for reasons of economy, which is also imperative with regard to the protection of the test person, elimination of his physical and mental fatigue and the associated increase in the security of the test. There has therefore been no lack of approaches and suggestions for automating the preload hardness test.



   Most of the previously unknown recommendations are characterized by the fact that the test spindle stands still during the test or only goes up to the preload, while the main load is placed on the test stamp from above by means of levers.



  However, a machine has already been described in which, according to the description, all movement processes required for testing, with the exception of holding the dial indicator pointer in the zero position, are derived from the up and down movement of the spindle. On this machine, however, it was not possible to record the hardness value on the dial indicator until the next test. This is an imperfection that the measuring device described here does not have, since it records the hardness value until the next test so that there is enough time to read it comfortably and reliably.



   In FIGS. 1 to 6, the measuring device forming the subject of the present invention is shown in various working positions, for example and schematically. In these figures, 1. means the housing of the preload hardness testing machine, which is divided according to a longitudinal center plane and in which the measuring device is installed.



  A measuring sleeve 2, in which the test stamp 3 and a slide valve 4 are slidably guided, is slidably guided in this housing. The dial indicator lever 5 is articulated to the latter by means of a pin 30 or in some other suitable manner and is in constant contact with a cutting edge 6 fastened in the test stamp or, under certain circumstances, a point. It is firmly connected to the test stamp, a dial indicator holder 7, in which the dial indicator 8 is be fastened. On the dial gauge holder 7, an angle lever 9 is rotatably mounted, one arm of which comes temporarily into contact with a stop 10 mounted in the machine housing.

   With its other arm, the angle lever 9 is constantly in contact with a wedge 11, which is arranged on the dial indicator lever 5 so that it can be pushed back and forth and is under the action of a tension spring 12 which is connected between it and the dial indicator lever.



   In addition to the opening for the dial gauge holder and the dial gauge lever, the wall of the measuring sleeve 2 has a further opening for a pressure member 13, which has the task of connecting the slide 4 of the clamping device to the measuring sleeve 2 by a frictional connection immediately before the main load is applied . As long as this connection exists and as long as the wedge 11 is extended, the dial indicator lever rotatable about the pin 30 transmits the penetration of the penetration body 21 attached to the test stamp to the dial indicator in a corresponding magnification. This connection is only released when the wedge 11 is lifted between the dial indicator switch and the dial indicator lever after relieving the load.

   After lodening this connection, the spring 14 that has become free can press the dial indicator lever again via the slide 4 and hold the hardness value even when the test stamp with its band 15 is back in the machine housing. The hardness value remains there until the next test.



  The automatic production and release of the connection between Mēb chse @ and slide 4 is effected by means of a single-layer leaf spring 16, one end of which is clamped to the measuring sleeve and the free end of which depends on the current position of the Mē The bushing in the machine housing either presses on the pressure member 13 or on a wedge-shaped block 17, which is displaced when the measuring sleeve is moved by means of a stop 22 2 attached to the machine housing.



   The interaction of the listed parts, as well as the preload spring 19 and the main load spring 20 during the measuring process can be seen from Figures 1 to 6, which show the measuring device in the successive positions of a work cycle.



   Figure 1 shows the measuring device in the starting position. The box 2 is pressed by the spring 23 onto its resting place in the machine housing 1. The test stamp 3 is dureh the preload spring 1 on its resting seat in the machine housing 1 ge pressed. The pressure member 13 relieved of the force of the leaf spring 16 cannot yet press on the slide 4, so that the latter presses the dial indicator lever 5 via the wedge 11 against the dial indicator holder 7 as a result of the force of the spring 14. The dial gauge still shows the value of the previous test.



   In Fig. 2 the test spindle 24 with the test piece 25 resting on it has lifted the box @ and the test stamp 3. The preload originating from the preload spring 19 is applied to the test stamp. One arm of the angle lever 9 has come into contact with the stop 10 during the movement of the punch and has been rotated.



  As a result, the wedge 11 was extended.



  As a result, the not yet Festge clamped slide 4 could press the dial indicator lever 5 until it touched the dial indicator holder 7 and thus set the dial indicator to zero. So that this can happen, the force of the spring 1. 4 is so dimensioned that it results in a greater torque on the dial gauge lever 5 in relation to the sheath 6 than the measuring pressure of the dial gauge. The Ansehlag 22 has started to pull the block 17 out from under the leaf spring 16.



   Fig. 3 shows the measuring device immediately before the main load is applied. The stop 22 has pulled the block 17 out from under the leaf spring 16 so that the latter press the pressure member 13 against the slide valve 4 and thus its frictional connection with the cylinder sleeve 2. en can.



  The dial indicator pointer is still at zero.



   In Fig. 4, the main load originating from the main load spring 20 is applied to the test stamp 3. As a result, the penetrating body 21 attached to the test stamp 3 has penetrated the test specimen 25 considerably more than was the case under the action of the preload. The resulting relative movement between the test stamp and the measuring sleeve, enlarged by the amount of the slightest elastic shape changes occurring in the test stamp, was transferred to the dial indicator pointer via the clock lever 5 in a corresponding increase.

   The latter is now a little above the hardness value that will soon be displayed as a result of the elastic changes in shape that have occurred in the test stamp, as well as the elastic changes in shape that occur on the test indentation.



   In Fig. 5 the test spindle 24 with the test object 25 has gone down a little. The force of the main load spring 20 is inferred again in the machine housing 1, so that only the preload acts on the test stamp 3. The elastic changes in shape that occur on the test stamp and the test indentation and correspond to the difference between total load and preload have receded as a result of the removal of the main load, so that the dial indicator pointer now points to the hardness value.



   In Fig. 6 the test spindle with the test item has gone further down. As a result of this movement, which the test stamp 3 and the measuring sleeve 2 had to follow, the angle lever 9 rotatably mounted in the dial indicator lever 7 has moved away from the stop 10 again, so that the wedge 11 is pushed by the spring 12 between the dial indicator holder 7 and the dial indicator lever 5 and thus the The hardness value was fixed by the slide 4 pressing the dial gauge lever 5 against the dial gauge holder 7 via the wedge 11.

   The slide 4 is always coupled to the Alessbüehse 2. The test stem. Pel and the measuring sleeve have not yet fully arrived in their starting position in which they sit in the Masphine gelium. Before they arrive there, the block z 17 is lifted under the spring 16 and thus the pressure member 13 is relieved of the pressure of the leaf spring 16 and the slide 4 is thus released again. After the frictional connection between the measuring sleeve 2 and the slide 4 has been released in this way, the test stamp 3 settles in the machine housing 1 again.

   The mē büehse 2 then also settles down again in the machine housing 1, with the latter sliding in front of the penetration body to protect it.



   The test process described above would take place in exactly the same way in a preload hardness testing machine, in which the housing 1 on the machine stand would be moved up and down to carry out a test, but the test spindle with the test piece resting on it would stand still during the test process. With such a design, the testing of large and bulky workpieces that cannot be raised and lowered to carry out a hardness test can be carried out very easily, which is another advantage of the device described here.

 

Claims (1)

PATENTANSPRUCH : Automatische Me¯einrichtung an Vorlast härteprüfmaschinen, bei denen die Prüfung infolge einer Relativbewegung zwischen Pr fling und MaschinengehÏuse zustande kommt, gekennzeichnet durch eine im Maschinengehäuse geführte, unter Federdruck auf den Prüfling aufsetzbare Messbüchse, in der ausser dem einen Messuhrhalter samt Messuhr tra genden Prüfstempel ein mit einem Messuhrhebel gelenkig verbundener Sehieber geführt ist, und ferner gekennzeichnet durch eine an der Messbüchse angebrachte und durch deren Bewegung steuerbare Klemmvorrichtung, die den mit dem Messuhrhebel gelenkig verbundenen Schieber naeh dem Aufbringen der Vorlast und vor dem Aufbringen der Hauptlast mit der Messbüehse kuppelt, nach der Wiederentlastung auf Vorlast aber freigibt, PATENT CLAIM: Automatic measuring device on preload hardness testing machines, in which the test takes place as a result of a relative movement between the test specimen and the machine housing, characterized by a measuring sleeve guided in the machine housing that can be placed on the test specimen under spring pressure, in which, in addition to the dial gauge holder and dial gauge, the test stamp is inserted with a dial indicator lever articulated, and further characterized by a clamping device attached to the measuring sleeve and controllable by its movement, which couples the slide, which is articulated to the dial indicator lever, after the application of the preload and before the application of the main load to the measuring sleeve the relieving to the preload but releases, so dass er beim Aufbringen der Vorlast den Messuhr- hebel, der mit einer am Prüfstempel befestigten Schneide dauernd in Beriihrmg ist, gegen den Messuhrhalter drüekt und so die Messuhr auf Null stellt, während des Wirkens der Ge- samtlast als Drehstelle f r den Messuhrhebel dient und nach Wegnehmen der Hauptlast den Messuhrhebel, auf dem ein dureh die Be wegungen des Prüfstempels steuerbarer Keil hin und her sehiebbar angeordnet ist, über diesen Keil gegen den Me¯uhrhalter dr ckt und so den Härtewert bis zur nächsten Pr fung festhält. so that when the preload is applied, it presses the dial indicator lever, which is permanently in contact with a cutting edge attached to the test stamp, against the dial indicator holder and thus sets the dial indicator to zero, while the total load acts as a turning point for the dial indicator lever and After the main load has been removed, the dial gauge lever, on which a wedge that can be controlled by the movements of the test stamp, is arranged so that it can be pushed back and forth, presses this wedge against the clock holder and thus holds the hardness value until the next test. UNTERANSPR¯CHE : 1. Me¯einrichtung nach Patentanspruch, dadurch gekennzeichnet, dass die hin und her gehende Bewegung des Keils (11) erreicht wird mittels einer zwisehen ihm und dem Me¯uhrhebel (5) eingeschalteten Zugfeder (12) und mittels eines Winkelhebels (9), der an dem mit dem Prüfstempel (3) fest verbun- denen Messuhrhalter (7) drehbar gelagert ist und bei den Bewegungen des Prüfstem- pels zeitweise mit einem im Maschinengehäuse (l) befestigten Anschlag (10) in Berührung tritt und gedreht wird. SUBClaims: 1. Mē device according to claim, characterized in that the reciprocating movement of the wedge (11) is achieved by means of a tension spring (12) switched on between it and the Mēuhr lever (5) and by means of an angle lever (9), which is rotatably mounted on the dial gauge holder (7) firmly connected to the test stamp (3) and when the test stamp is moved it comes into contact with a stop (10) fixed in the machine housing (1) and is rotated. 2. Messeinrichtung nach Patentanspruch, dadurch gekennzeichnet, da¯ die an der Messbüchse angebrachte Klemmvorrichtung zum Festklemmen des Sehiebers (4) in der Mess- b chse (2) eine an letzterer befestigte Blattfeder (16) und einen keilförmigen Klotz (17) aufweist, der bei der Bewegung der Messbüehse von einem im Maschinengehause (1) befestigten Ansehlag (22) an der Messbüchse derart verschoben wird, da¯ er naeh dem Aufbringen der Vorlast und vor dem Aufbringen der Hauptlast die Blattfeder (16) frei gibt und auf ein Druckglied (13) und damit auf den Schieber (4) drücken lässt, un- mittelbar vor Beendigung des Arbeitsspiels aber die Blattfeder (16) 2. Measuring device according to claim, characterized in that the clamping device attached to the measuring sleeve for clamping the sight glass (4) in the measuring sleeve (2) has a leaf spring (16) fastened to the latter and a wedge-shaped block (17), which during the movement of the measuring sleeve is displaced by a stop (22) attached to the measuring sleeve in the machine housing (1) in such a way that it releases the leaf spring (16) after the application of the preload and before the application of the main load and on a pressure member (13) and thus on the slide (4), but immediately before the end of the work cycle, the leaf spring (16) wieder unterfasst und damit das Druckglied (13) von seinem Druek entlastet. gripped under again and thus relieved the pressure member (13) from its pressure.
CH278032D 1949-05-30 1949-08-06 Automatic measuring device on preload hardness testing machines. CH278032A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE278032X 1949-05-30

Publications (1)

Publication Number Publication Date
CH278032A true CH278032A (en) 1951-09-30

Family

ID=6028455

Family Applications (1)

Application Number Title Priority Date Filing Date
CH278032D CH278032A (en) 1949-05-30 1949-08-06 Automatic measuring device on preload hardness testing machines.

Country Status (1)

Country Link
CH (1) CH278032A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117949330A (en) * 2024-03-26 2024-04-30 深圳市典誉精密模具有限公司 Injection mold thimble intensity detection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117949330A (en) * 2024-03-26 2024-04-30 深圳市典誉精密模具有限公司 Injection mold thimble intensity detection device
CN117949330B (en) * 2024-03-26 2024-05-31 深圳市典誉精密模具有限公司 Injection mold thimble intensity detection device

Similar Documents

Publication Publication Date Title
DE3128537C2 (en)
CH278032A (en) Automatic measuring device on preload hardness testing machines.
DE920993C (en) Automatic measuring device for Vorlasthaerteprüefer
EP0334161A2 (en) Method and device for backlash adjustment in a differential with conical gears
DE568911C (en) Hardness testing machine like the Rockwell hardness testing machine
DE571886C (en) Hardness checker
DE802103C (en) Device for testing nozzles, connecting pieces, etc. like. with inner cone
DE762033C (en) Preload tester with an indicator for the penetration depth of the test tip
DE705268C (en) Hardness testing machine with loading lever and microscope arranged on this
DE910229C (en) Inside measuring device
DE879022C (en) Pressure gauges, in particular tire pressure gauges
DE571924C (en) Device for determining the cutting force of tools
DE956174C (en) Device for automatic dial gauge zero setting for pre-load pressure testers
DE722064C (en) A hardness tester working according to the preload method with a mechanically operating device for automatic zero setting of the dial gauge
DE2061459A1 (en) Harteprufer, especially micro harteprufer
DE507111C (en) Device for locking the card cylinder on dobby machines
DE884937C (en) High pressure drawing process and equipment
DE1111424B (en) Device for testing the bursting strength of paper, cardboard, fabrics, etc. like
DE375013C (en) Strength testing machine
DE760772C (en) Hydraulic hardness testing machine
DE936359C (en) Rack arrangement for scales, especially bathroom scales
AT214309B (en) Chuck for ring-shaped or cylindrical workpieces, especially on internal grinding machines
DE2645871A1 (en) DEVICE FOR FASTENING A CUTTING INSERT
DE866397C (en) Measuring device
DE581377C (en) Clamping device for the sound pen, especially on electric pickups