Kim et al., 2001 - Google Patents
A dispatching algorithm for multiple-load AGVs using a fuzzy decision-making method in a job shop environmentKim et al., 2001
- Document ID
- 16399400964246547191
- Author
- Kim D
- Hwang H
- Publication year
- Publication venue
- Engineering Optimization
External Links
Snippet
This paper proposes a dispatching algorithm for automated guided vehicles (AGV) with multiple-load capacity operating in a job shop environment. At each dispatching point, the algorithm prioritizes all move requests based on the fuzzy urgency which is determined by …
- 101700050571 SUOX 0 title abstract description 16
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/04—Inference methods or devices
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06N—COMPUTER SYSTEMS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N5/00—Computer systems utilising knowledge based models
- G06N5/02—Knowledge representation
- G06N5/022—Knowledge engineering, knowledge acquisition
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100689125B1 (en) | Method and system for dispatching semiconductor lots to manufacturing equipment for manufacturing | |
Sabuncuoglu et al. | Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion | |
Chien et al. | A novel route selection and resource allocation approach to improve the efficiency of manual material handling system in 200-mm wafer fabs for industry 3.5 | |
Lu et al. | Dynamic dispatching for a flexible manufacturing system based on fuzzy logic | |
Chan et al. | Real time fuzzy scheduling rules in FMS | |
Wu et al. | An adaptive multi-parameter based dispatching strategy for single-loop interbay material handling systems | |
Bilge et al. | Multi-attribute responsive dispatching strategies for automated guided vehicles | |
Kim et al. | A dispatching algorithm for multiple-load AGVs using a fuzzy decision-making method in a job shop environment | |
Castillo et al. | Unit load and material-handling considerations in facility layout design | |
Chan et al. | Analysis of dynamic control strategies of an FMS under different scenarios | |
Shih et al. | Fuzzy inference-based multiple criteria FMS scheduling | |
Guan et al. | Deadlock-free multi-attribute dispatching method for AGV systems | |
Naso et al. | A fuzzy multi-criteria algorithm for dynamic routing in FMS | |
Tanchoco et al. | Real-time control strategies for multiple-load AGVs | |
Nadoli et al. | Simulation in automated material handling systems design for semiconductor manufacturing | |
Taghaboni-Dutta | A value-added approach for automated guided vehicle task assignment | |
Kim et al. | Storage prioritization by redistributing wafer lot transfers to enhance real-world fab throughput | |
Chiba et al. | Integrated design with classification of transporter routing for AGV systems | |
Varadarajan et al. | A survey of dispatching rules for operational control in wafer fabrication | |
Joe et al. | Multi-commodity flow dynamic resource assignment and matrix-based job dispatching for multi-relay transfer in complex material handling systems (MHS) | |
Lingayat et al. | Order release in automated manufacturing systems | |
Seidel et al. | An agent-based approach to self-organized production | |
Chan et al. | An intelligent fuzzy decision system for a flexible manufacturing system with multidecision points | |
Ho et al. | A study on the lot production management in a thin-film-transistor liquid-crystal display fab | |
Tuncel | A heuristic rule-based approach for dynamic scheduling of flexible manufacturing systems |