Varadarajan et al., 2006 - Google Patents
A survey of dispatching rules for operational control in wafer fabricationVaradarajan et al., 2006
View PDF- Document ID
- 4054269165430605419
- Author
- Varadarajan A
- Sarin S
- Publication year
- Publication venue
- IFAC Proceedings Volumes
External Links
Snippet
Production scheduling in semiconductor wafer fabs is a nontrivial task owing to the complexity of wafer fabrication. Dispatching rules are the most commonly used tools for shop floor control in this industry. Over the years, advanced dispatching rules capable of …
- 238000004519 manufacturing process 0 title abstract description 50
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/45—Nc applications
- G05B2219/45031—Manufacturing semiconductor wafers
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32234—Maintenance planning
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- H—ELECTRICITY
- H01—BASIC ELECTRIC ELEMENTS
- H01L—SEMICONDUCTOR DEVICES; ELECTRIC SOLID STATE DEVICES NOT OTHERWISE PROVIDED FOR
- H01L21/00—Processes or apparatus adapted for the manufacture or treatment of semiconductor or solid state devices or of parts thereof
- H01L21/67—Apparatus specially adapted for handling semiconductor or electric solid state devices during manufacture or treatment thereof; Apparatus specially adapted for handling wafers during manufacture or treatment of semiconductor or electric solid state devices or components; Apparatus not specifically provided for elsewhere
- H01L21/67005—Apparatus not specifically provided for elsewhere
- H01L21/67242—Apparatus for monitoring, sorting or marking
- H01L21/67276—Production flow monitoring, e.g. for increasing throughput
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sarin et al. | A survey of dispatching rules for operational control in wafer fabrication | |
US7349751B2 (en) | Method for autonomic control of a manufacturing system | |
Johri | Practical issues in scheduling and dispatching in semiconductor wafer fabrication | |
Mönch et al. | Production planning and control for semiconductor wafer fabrication facilities: modeling, analysis, and systems | |
US7953507B2 (en) | Method and system for intelligent automated reticle managment | |
Fowler et al. | Control of multiproduct bulk server diffusion/oxidation processes. Part 2: multiple servers | |
CN102253662A (en) | Scheduling method for semiconductor production line based on multi-ant-colony optimization | |
US8055533B2 (en) | Method and apparatus for assigning material transport vehicle idle locations | |
Arima et al. | Optimization of re-entrant hybrid flows with multiple queue time constraints in batch processes of semiconductor manufacturing | |
Qin et al. | Dynamic dispatching for interbay material handling by using modified Hungarian algorithm and fuzzy-logic-based control | |
Singh et al. | Experimental investigation for performance assessment of scheduling policies in semiconductor wafer fabrication—a simulation approach | |
Cigolini et al. | A new dynamic look‐ahead scheduling procedure for batching machines | |
US7257502B1 (en) | Determining metrology sampling decisions based on fabrication simulation | |
Varadarajan et al. | A survey of dispatching rules for operational control in wafer fabrication | |
Kuo et al. | Dispatching of overhead hoist vehicles in a fab intrabay using a multimission-oriented controller | |
JP4262482B2 (en) | Integrated scheduler and material control system | |
Glassey et al. | The use of bottleneck starvation avoidance with queue predictions in shop floor control | |
Neale et al. | Control of manufacturing networks which contain a batch processing machine | |
Chan et al. | Dynamic scheduling for a flexible manufacturing system-the pre-emptive approach | |
Nadoli et al. | Simulation in automated material handling systems design for semiconductor manufacturing | |
Huang et al. | A pre-dispatching vehicle method for a diffusion area in a 300 mm wafer fab | |
Kao et al. | Near optimal furnace tool allocation with batching and waiting time constraints | |
Mönch et al. | Semiconductor manufacturing process description | |
Zhang et al. | Time bound control in a stochastic dynamic wafer fab | |
US20080201003A1 (en) | Method and system for reticle scheduling |