[go: up one dir, main page]

Bilge et al., 2006 - Google Patents

Multi-attribute responsive dispatching strategies for automated guided vehicles

Bilge et al., 2006

View PDF
Document ID
8245226711084917735
Author
Bilge Ã
Esenduran G
Varol N
Öztürk Z
Aydın B
Alp A
Publication year
Publication venue
International Journal of Production Economics

External Links

Snippet

This paper discusses responsiveness in automated guided vehicle dispatching. The additive multi-attribute dispatching rule employs two attributes, output buffer length and travel time to pick-up, to prioritize the tasks based on the current system status, while the weights convey …
Continue reading at www.academia.edu (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for programme control, e.g. control unit
    • G06F9/06Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
    • G06F9/46Multiprogramming arrangements
    • G06F9/48Programme initiating; Programme switching, e.g. by interrupt
    • G06F9/4806Task transfer initiation or dispatching
    • G06F9/4843Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
    • G06F9/4881Scheduling strategies for dispatcher, e.g. round robin, multi-level priority queues
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for programme control, e.g. control unit
    • G06F9/06Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • G06F9/505Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals considering the load
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for programme control, e.g. control unit
    • G06F9/06Arrangements for programme control, e.g. control unit using stored programme, i.e. using internal store of processing equipment to receive and retain programme
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5083Techniques for rebalancing the load in a distributed system
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0631Resource planning, allocation or scheduling for a business operation
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"

Similar Documents

Publication Publication Date Title
Klei et al. AGV dispatching
Henn Algorithms for on-line order batching in an order picking warehouse
Bilge et al. Multi-attribute responsive dispatching strategies for automated guided vehicles
Jeong et al. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules
Chandra et al. Intelligent dispatching for flexible manufacturing
Chien et al. A novel route selection and resource allocation approach to improve the efficiency of manual material handling system in 200-mm wafer fabs for industry 3.5
US8214521B2 (en) Systems and methods for changing computational tasks on computation nodes to minimize processing time variation
Rubrico et al. Online rescheduling of multiple picking agents for warehouse management
Tung et al. Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems
Chiang et al. Rule-based scheduling in wafer fabrication with due date-based objectives
Portioli-Staudacher et al. The use of labour flexibility for output control in workload controlled flow shops: A simulation analysis
Kim et al. An adaptive dispatching algorithm for automated guided vehicles based on an evolutionary process
CN117610899B (en) Multi-robot task allocation method based on priority
Chan et al. Analysis of dynamic control strategies of an FMS under different scenarios
Joseph et al. Analysis of dynamic due-date assignment models in a flexible manufacturing system
Guan et al. Deadlock-free multi-attribute dispatching method for AGV systems
Srinoi et al. A fuzzy logic modelling of dynamic scheduling in FMS
Glassey et al. The use of bottleneck starvation avoidance with queue predictions in shop floor control
Huang Optimization of job shop scheduling with material handling by automated guided vehicle
Belmamoune et al. Solving a job shop scheduling problem using Q-learning algorithm
Lu et al. Dynamic dispatching for a flexible manufacturing system based on fuzzy logic
Taghaboni-Dutta A value-added approach for automated guided vehicle task assignment
Chen et al. Adaptive scheduling and tool flow control in flexible job shops
Kim et al. A dispatching algorithm for multiple-load AGVs using a fuzzy decision-making method in a job shop environment
Olteanu et al. A genetic algorithm for solving the quay crane scheduling and allocation problem