WO2020261610A1 - 摩擦攪拌接合方法 - Google Patents
摩擦攪拌接合方法 Download PDFInfo
- Publication number
- WO2020261610A1 WO2020261610A1 PCT/JP2019/050044 JP2019050044W WO2020261610A1 WO 2020261610 A1 WO2020261610 A1 WO 2020261610A1 JP 2019050044 W JP2019050044 W JP 2019050044W WO 2020261610 A1 WO2020261610 A1 WO 2020261610A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- metal member
- side pin
- friction stir
- stir welding
- peripheral surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K20/00—Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
- B23K20/12—Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating the heat being generated by friction; Friction welding
Definitions
- the present invention relates to a friction stir welding method.
- Patent Document 1 discloses an invention in which a cylindrical first metal member and a cylindrical second metal member are friction-stir welded using a rotary tool.
- FIG. 14 is a cross-sectional view showing a conventional friction stir welding method.
- the butt portion J10 formed by abutting the first metal member 101 and the second metal member 102 is friction stir welded.
- the rotation tool G includes a columnar shoulder portion G1 and a stirring pin G2.
- the step side surface 101a and the step bottom surface 101b are formed on the first metal member 1.
- the butt portion J10 is formed by abutting the step bottom surface 101b of the first metal member 101 and the end surface 102a of the second metal member 102.
- the first metal member 101 is formed of, for example, a cast material of a 4000 series aluminum alloy
- the second metal member 102 is formed of a wrought material of a 1000 series aluminum alloy. That is, there are cases where members of different grades of aluminum alloy are friction-stir welded.
- the first metal member 101 is made of a cast material and the second metal member 102 is made of a wrought material
- the first metal member is compared with the material resistance that the stirring pin G2 receives from the second metal member 102 side.
- the material resistance received from the 101 side increases. Therefore, it becomes difficult to stir different grades in a well-balanced manner by the stirring pin G2 of the rotating tool G, and there is a problem that cavity defects occur in the plasticized region after joining and the joining strength decreases.
- the present invention comprises a columnar first metal member having a small diameter portion at the end of the large diameter portion, and a tubular second metal member having an inner diameter substantially equal to that of the small diameter portion.
- the first method is a friction-stirring joining method in which friction-stirring is performed on a butt portion of a metal member to be joined, which is formed by abutting the ends of each other, using a rotation tool provided with a base end side pin and a tip end side pin.
- the metal member is formed of a first aluminum alloy
- the second metal member is formed of a second aluminum alloy
- the first aluminum alloy is a grade having a higher hardness than the second aluminum alloy.
- the taper angle of the base end side pin is larger than the taper angle of the tip end side pin, and a stepped pin step portion is formed on the outer peripheral surface of the base end side pin, and the second metal
- the inner peripheral surface of the second metal member and the stepped side surface of the first metal member are overlapped, and the second metal member A butt step in which an end surface and a stepped inclined surface of the first metal member are abutted to form a gap having a V-shaped cross section in the butt portion, and a pin on the tip side of the rotating tool is used as an outer peripheral surface of the second metal member.
- the outer peripheral surface of the tip end side pin was slightly brought into contact with the stepped inclined surface of the first metal member, and the outer peripheral surface of the base end side pin was brought into contact with the outer peripheral surface of the second metal member.
- the outer peripheral surface of the second metal member while flowing the second aluminum alloy into the gap, the outer peripheral surface of the second metal member at a predetermined depth along a set movement route set on the second metal member side of the butt portion. It is characterized by including a main joining step of rubbing and stirring the butt portion by making a round around the butt portion.
- a columnar first metal member having a small diameter portion at the end of a large diameter portion and a cylindrical second metal member having an inner diameter substantially equal to that of the small diameter portion are butted against each other.
- This is a friction stirring joining method in which friction stirring is performed using a rotating tool provided with a base end side pin and a tip end side pin for the abutting portion of the metal member to be joined, wherein the first metal member is a first aluminum alloy.
- the second metal member is made of a second aluminum alloy, the first aluminum alloy is a grade having a higher hardness than the second aluminum alloy, and the taper of the base end side pin.
- the angle is larger than the taper angle of the tip end side pin, a stepped pin step portion is formed on the outer peripheral surface of the base end side pin, and the first metal member has an opening.
- the inner peripheral surface of the second metal member and the stepped side surface of the first metal member are overlapped, and the end surface of the second metal member and the first metal member are overlapped.
- the outer peripheral surface of the base end side pin is in contact with the outer peripheral surface of the second metal member while the outer peripheral surface of the side pin is slightly in contact with the stepped inclined surface of the first metal member.
- the second metal member is made to go around the outer peripheral surface of the second metal member at a predetermined depth along a set movement route set on the second metal member side of the butt portion. It is characterized by including a main joining step of rubbing and stirring the butt portion.
- the frictional heat between the second metal member and the tip side pin stirs and plastically fluidizes the second aluminum alloy mainly on the second metal member side of the butt portion, and causes the butt portion to become the first metal member. It can be joined to the second metal member. Further, since the outer peripheral surface of the tip side pin is kept slightly in contact with the stepped inclined surface of the first metal member, it is possible to minimize the mixing of the first aluminum alloy from the first metal member to the second metal member. .. As a result, in the butt portion, the second aluminum alloy on the second metal member side is mainly frictionally agitated, so that a decrease in joint strength can be suppressed. Further, since friction stir welding is performed in a state where the outer peripheral surface of the base end side pin is in contact with the outer peripheral surface of the second metal member, the generation of burrs can be suppressed.
- the start end and the end of the plasticized region formed in the butt portion overlap, and a part of the plasticized region overlaps.
- the watertightness and airtightness of the metal member to be joined can be improved.
- the outer diameter of the second metal member is larger than the outer diameter of the large diameter portion of the first metal member.
- the rotating tool When the first metal member is located on the left side in the traveling direction of the rotating tool, the rotating tool is rotated clockwise, and when the first metal member is located on the right side in the traveling direction of the rotating tool, the rotating tool is rotated. It is preferable to rotate it counterclockwise.
- the tip side pin that rotates from the start position set on the set movement route is inserted, and the tip side pin is gradually pushed in until it reaches a predetermined depth while moving in the traveling direction. Is preferable. Further, in the main joining step, after inserting the rotating tip-side pin into a set start position on the side further separated from the first metal member from the set movement route, the rotation center axis of the rotation tool is inserted. It is preferable to gradually push in the tip side pin until the predetermined depth is reached while moving to a position overlapping the set movement route.
- the end position is set on the set movement route, and after frictional stirring with respect to the butt portion, the tip side pin is gradually pulled out while moving the rotation tool to the end position. It is preferable to separate the rotating tool from the second metal member at the end position. Further, in the main joining step, the end position is set on the side further separated from the first metal member from the set movement route, and after frictional stirring with respect to the butt portion, the rotation tool is moved to the end position. It is preferable that the tip side pin is gradually pulled out while the rotating tool is separated from the second metal member at the end position.
- the main joining step it is preferable to perform friction stir welding of the butt portion in a state where the tip of the tip side pin penetrates the step side surface of the first metal member.
- the joining strength between the first metal member and the second metal member can be further increased.
- the rotary tool is a tool used for friction stir welding.
- the rotary tool F is made of, for example, tool steel, and is mainly composed of a base shaft portion F1, a base end side pin F2, and a tip end side pin F3.
- the base shaft portion F1 has a columnar shape and is a portion connected to the main shaft of the friction stir welder.
- the base end side pin F2 is continuous with the base shaft portion F1 and is tapered toward the tip end.
- the proximal end side pin F2 has a truncated cone shape.
- the taper angle A of the base end side pin F2 may be appropriately set, but is, for example, 135 to 160 °. If the taper angle A is less than 135 ° or exceeds 160 °, the joint surface roughness after friction stir welding becomes large.
- the taper angle A is larger than the taper angle B of the tip side pin F3 described later.
- a stepped pin step portion F21 is formed on the outer peripheral surface of the base end side pin F2 over the entire height direction.
- the pin step portion F21 is formed in a clockwise or counterclockwise spiral shape.
- the pin step portion F21 has a spiral shape when viewed in a plane and a step shape when viewed from a side surface.
- the pin step portion F21 in order to rotate the rotation tool F clockwise, is set counterclockwise from the base end side to the tip end side.
- the pin step portion F21 is composed of a step bottom surface F21a and a step side surface F21b.
- the distance X1 (horizontal distance) between the vertices F21c and F21c of the adjacent pin step portions F21 is appropriately set according to the step angle C and the height Y1 of the step side surface F21b described later.
- the height Y1 of the step side surface F21b may be appropriately set, but is set to, for example, 0.1 to 0.4 mm. If the height Y1 is less than 0.1 mm, the joint surface roughness becomes large. On the other hand, when the height Y1 exceeds 0.4 mm, the joint surface roughness tends to increase, and the number of effective step portions (the number of pin step portions F21 in contact with the metal member to be joined) also decreases.
- the step angle C formed by the step bottom surface F21a and the step side surface F21b may be appropriately set, but is set to, for example, 85 to 120 °.
- the step bottom surface F21a is parallel to the horizontal plane in this embodiment.
- the step bottom surface F21a may be inclined in the range of -5 ° to 15 ° with respect to the horizontal plane from the rotation axis of the tool toward the outer peripheral direction (minus is downward with respect to the horizontal plane, plus is with respect to the horizontal plane).
- the distance X1, the height Y1 of the step side surface F21b, the step angle C, and the angle of the step bottom surface F21a with respect to the horizontal plane are such that the plastic fluid material does not stay inside the pin step portion F21 and adhere to the outside during friction stir welding. It is appropriately set so that the joint surface roughness can be reduced by pressing the plastic fluid material with the step bottom surface F21a.
- the distal end side pin F3 is continuously formed on the proximal end side pin F2.
- the tip side pin F3 has a truncated cone shape.
- the tip of the tip side pin F3 is a flat surface F4 perpendicular to the rotation axis.
- the taper angle B of the tip end side pin F3 is smaller than the taper angle A of the base end side pin F2.
- a spiral groove F31 is engraved on the outer peripheral surface of the tip end side pin F3.
- the spiral groove F31 may be clockwise or counterclockwise, but in the first embodiment, the spiral groove F31 is carved counterclockwise from the base end side to the tip end side in order to rotate the rotation tool F clockwise.
- the spiral groove F31 is composed of a spiral bottom surface F31a and a spiral side surface F31b.
- the distance (horizontal distance) between the vertices F31c and F31c of the adjacent spiral grooves F31 is defined as the length X2.
- the height of the spiral side surface F31b is defined as the height Y2.
- the spiral angle D composed of the spiral bottom surface F31a and the spiral side surface F31b is formed at, for example, 45 to 90 °.
- the spiral groove F31 has a role of increasing frictional heat by coming into contact with the metal member to be joined and guiding the plastic fluid material to the tip side.
- the rotation tool F may be attached to a robot arm having a rotation driving means such as a spindle unit at the tip thereof.
- FIG. 3 is a side view showing a first modification of the rotation tool of the present invention.
- the step angle C formed by the step bottom surface F21a of the pin step portion F21 and the step side surface F21b is 85 °.
- the step bottom surface F21a is parallel to the horizontal plane.
- the step bottom surface F21a is parallel to the horizontal plane, and the step angle C may be an acute angle within a range in which the plastic fluid material stays in the pin step portion F21 during friction stir welding and escapes to the outside without adhering. ..
- FIG. 4 is a side view showing a second modification of the rotation tool of the present invention.
- the step angle C of the pin step portion F21 is 115 °.
- the step bottom surface F21a is parallel to the horizontal plane.
- the step bottom surface F21a is parallel to the horizontal plane, and the step angle C may be an obtuse angle within the range of functioning as the pin step portion F21.
- FIG. 5 is a side view showing a third modification of the rotation tool of the present invention.
- the step bottom surface F21a is inclined 10 ° upward with respect to the horizontal plane from the rotation axis of the tool toward the outer peripheral direction.
- the step side surface F21b is parallel to the vertical surface.
- the step bottom surface F21a may be formed so as to incline upward from the horizontal plane from the rotation axis of the tool toward the outer peripheral direction within a range in which the plastic fluid material can be pressed during friction stir welding.
- the same effect as that of the following embodiment can be obtained by the first to third modifications of the rotation tool.
- the first embodiment of the present invention will be described with reference to the drawings as appropriate.
- the first metal member 1 and the second metal member 2 are friction stir welded.
- the first metal member 1 and the second metal member 2 are collectively referred to as a metal member H to be joined.
- a preparation step, a butt step, and a main joining step are performed.
- the preparation process is a process of preparing the first metal member 1 and the second metal member 2.
- the first metal member 1 is a solid metal member having a large diameter portion 11 and a small diameter portion 12.
- the first metal member 1 is not particularly limited as long as it is a metal capable of friction stir welding, but in the present embodiment, it is formed mainly containing a first aluminum alloy.
- the first aluminum alloy for example, an aluminum alloy casting material such as JISH5302 ADC12 (Al—Si—Cu system) is used.
- the large diameter portion 11 has a columnar shape.
- the small diameter portion 12 has a columnar shape and is concentrically formed on the tip end side of the large diameter portion 11.
- a step portion 13 is formed by the large diameter portion 11 and the small diameter portion 12.
- the step portion 13 is composed of a step inclined surface 13a and a step side surface 13b. As shown in FIG. 8, the step inclined surface 13a is inclined in a direction away from the second metal member 2 toward the outer diameter direction.
- the inclination angle ⁇ of the step inclined surface 13a is the same as the inclination angle ⁇ (see FIG. 1) of the tip side pin F3.
- the step side surface 13b is perpendicular to the end surface 12a of the small diameter portion 12. That is, the step side surface 13b is parallel to the axial direction of the first metal member 1.
- the second metal member 2 is a metal member having a cylindrical shape.
- the metal is not particularly limited as long as it is a metal capable of friction stir welding, but in the present embodiment, it is formed mainly containing a second aluminum alloy.
- the second aluminum alloy is a material having a lower hardness than the first aluminum alloy.
- the second aluminum alloy is formed of, for example, an aluminum alloy wrought material such as JIS A1050, A1100, A6063.
- the end surface 21a of the second metal member 2 is perpendicular to the outer peripheral surface 21b and the inner peripheral surface 21c.
- the outer diameter of the first metal member 1 and the outer diameter of the second metal member 2 may be the same, but in the present embodiment, the outer diameter of the second metal member 2 is formed larger than the outer diameter of the first metal member 1. ing. Further, the outer diameter of the inner peripheral surface 21c of the second metal member 2 is the same as or substantially the same as the outer diameter of the small diameter portion 12 of the first metal member 1.
- the butt step is a step of butting the end portion of the first metal member 1 and the end portion of the second metal member 2.
- the small diameter portion 12 of the first metal member 1 is inserted into the opening of the second metal member 2.
- the stepped inclined surface 13a of the first metal member 1 and the end surface 21a of the second metal member 2 are abutted to form the butt portion J1.
- a gap having a V-shaped cross section is formed in the butt portion J1 over the circumferential direction.
- the stepped side surface 13b of the first metal member 1 and the inner peripheral surface 21c of the second metal member 2 are overlapped to form the butt portion J2.
- a set movement route L1 is set on the outer peripheral surface 21b of the second metal member 2.
- the set movement route L1 is set closer to the second metal member 2 than the butt portion J1 and is parallel to the butt portion J1.
- the set movement route L1 is a movement route of the rotation tool F necessary for joining the butt portion J1 in the main joining step described later.
- the set movement route L1 will be described in detail later.
- this joining step is a step of friction stir welding of the butt portion J1 using the rotary tool F.
- the rotation tool F may be fixed to rotate the metal member H to be joined in the circumferential direction, or the metal member H to be joined may be fixed and the rotation tool F may be placed around the metal member H to be joined. You may move it.
- Three sections of the detachment section from to the end position EP1 are continuously friction-stir welded.
- the intermediate points S1 and S2 are set on the set movement route L1.
- the start position SP1 is set on the outer peripheral surface 21b of the second metal member 2 on the side away from the first metal member 1 with respect to the set movement route L1.
- the angle formed by the line segment connecting the start position SP1 and the intermediate point S1 and the set movement route L1 is set to an obtuse angle.
- the outer peripheral surface of the tip side pin F3 and the stepped inclined surface 13a of the first metal member 1 are set to slightly contact each other. Further, the flat surface F4 of the tip end side pin F3 is set to penetrate the step side surface 13b while the outer peripheral surface of the base end side pin F2 is set to be in contact with the outer peripheral surface 21b of the second metal member 2. Then, the process shifts to friction stir welding in this section as it is.
- the contact allowance (offset amount) N between the outer peripheral surface of the tip side pin F3 and the stepped inclined surface 13a of the first metal member 1 is set, for example, between 0 ⁇ N ⁇ 1.0 mm, preferably 0 ⁇ N ⁇ . It is set between 0.85 mm, and more preferably between 0 ⁇ N ⁇ 0.65 mm.
- the set movement route L1 shows a locus through which the center of the flat surface F4 of the tip side pin F3 passes. That is, the set movement route L1 is set so that the stepped inclined surface 13a of the first metal member 1 and the outer peripheral surface of the tip side pin F3 are made parallel to each other and slightly contact each other in the circumferential direction of the butt portion J1. There is.
- the rotation tool F is relatively moved so that the center of the flat surface F4 overlaps with the set movement route L1 when viewed from above (when viewed from the outer peripheral surface 21b side).
- friction stir welding is performed while the second aluminum alloy of the second metal member 2 is allowed to flow into the gap of the butt portion J1. If the outer peripheral surface of the tip side pin F3 and the stepped inclined surface 13a are set so as not to come into contact with each other, the joint strength of the butt portion J1 becomes low.
- the contact allowance N between the outer peripheral surface of the tip side pin F3 and the stepped inclined surface 13a exceeds 1.0 mm, a large amount of the first aluminum alloy of the first metal member 1 is mixed into the second metal member 2 side. There is a risk of poor joining.
- the section shifts to the departure section as it is.
- the tip side pin F3 is gradually moved upward from the intermediate point S2 toward the end position EP1, and the tip end side pin F3 is detached from the second metal member 2 at the end position EP1. That is, without keeping the rotation tool F in one place, the rotation tool F is gradually pulled out in the direction away from the second metal member 2 while moving to the end position EP1.
- the end position EP1 is set at a position where the angle formed by the line segment connecting the end position EP1 and the intermediate point S2 and the set movement route L1 is an obtuse angle.
- a plasticized region W is formed in the movement locus of the rotation tool F.
- the second aluminum alloy mainly on the second metal member 2 side of the butt portion J1 is agitated by the frictional heat between the second metal member 2 and the tip side pin F3. It is plastically fluidized, and the stepped inclined surface 13a of the first metal member 1 and the end surface 21a of the second metal member 2 can be joined at the butt portion J1.
- the first aluminum from the first metal member 1 to the second metal member 2 is maintained. Mixing of alloy can be reduced as much as possible.
- the second aluminum alloy on the second metal member 2 side is mainly frictionally agitated, so that a decrease in joint strength can be suppressed. That is, in this joining step, the imbalance of the material resistance received by the tip side pin F3 on one side and the other side with respect to the rotation center axis Z of the tip side pin F3 can be minimized.
- the plastic fluid material is frictionally agitated in a well-balanced manner, so that a decrease in joint strength can be suppressed.
- the position of the rotation tool F is set so that the outer peripheral surface of the tip side pin F3 and the stepped inclined surface 13a of the first metal member 1 are parallel to each other, so that the tip side pin F3 and the first The metal member 1 can be brought into contact with the metal member 1 in a well-balanced manner. Further, by setting the outer diameter of the second metal member 2 to be larger than the outer diameter of the first metal member 1, it is possible to prevent the joint portion from becoming short of metal. Further, by setting the tip of the tip side pin F3 so as to reach the step side surface 13b of the first metal member 1, the butt portion J2 can also be reliably rubbed and agitated, so that the joint strength can be increased.
- the outer peripheral surface of the base end side pin F2 and the outer peripheral surface 21b of the second metal member 2 are brought into contact with each other, and friction stirring is performed while pressing the plastic fluid material, so that burrs are generated. Can be suppressed.
- the plastic fluid material can be pressed on the outer peripheral surface of the base end side pin F2, the step recess formed on the joint surface (the outer peripheral surface 11b of the first metal member 1 and the outer peripheral surface 21b of the second metal member 2).
- the groove can be made smaller, and the bulging portion formed on the side of the stepped concave groove can be eliminated or made smaller.
- the stepped pin step portion F21 of the base end side pin F2 is shallow and the outlet is wide, the plastic fluid material is easily pulled out of the pin step portion F21 while being pressed by the step bottom surface F21a. There is. Therefore, even if the plastic fluid material is pressed by the base end side pin F2, the plastic fluid material is unlikely to adhere to the outer peripheral surface of the base end side pin F2. Therefore, the roughness of the joint surface can be reduced, and the joint quality can be suitably stabilized.
- the tip side pin F3 when the tip side pin F3 is inserted into the set movement route L1, if the tip side pin F3 is pushed in in the vertical direction until it reaches a predetermined depth, the frictional heat at the start position of friction stir welding becomes excessive. As a result, at the start position, the metal on the first metal member 1 side is likely to be mixed on the second metal member 2 side, which causes a problem of contributing to poor joining.
- the tip side pin F3 is gradually pushed in while moving the rotation tool F from the start position SP1 to a position overlapping the set movement route L1 until it reaches a predetermined depth. By doing so, it is possible to prevent the rotation tool F from stopping on the set movement route L1 and causing the frictional heat to be locally excessive.
- the set movement route L1 is separated by gradually pulling out the tip side pin F3 from a predetermined depth while moving the rotation tool F from the set movement route L1 to the end position EP1. It is possible to prevent the rotating tool F from stopping and the frictional heat locally becoming excessive.
- the positions of the start position SP1 and the end position EP1 may be appropriately set, but the angle formed by the start position SP1 and the set movement route L1 and the angle formed by the end position EP1 and the set movement route L1 are different.
- the rotation tool F may be moved from the start position SP1 to the set movement route L1 so that the locus of the rotation tool F draws an arc when viewed from above.
- the rotation tool F may be moved from the set movement route L1 to the end position EP1 so that the locus of the rotation tool F draws an arc when viewed from above.
- the rotation direction and the traveling direction of the rotation tool F may be appropriately set, but among the plasticized regions W formed in the movement locus of the rotation tool F, the first metal member 1
- the rotation direction and the traveling direction of the rotation tool F are set so that (butting portion J1 side) is on the shear side and the second metal member 2 side is on the flow side.
- the stirring action by the tip side pin F3 around the butt portion J1 is enhanced, the temperature rise in the butt portion J1 can be expected, and the first metal in the butt portion J1.
- the stepped inclined surface 13a of the member 1 and the end surface 21a of the second metal member 2 can be joined more reliably.
- the shear side means the side where the relative speed of the outer circumference of the rotating tool with respect to the jointed portion is the value obtained by adding the magnitude of the moving speed to the magnitude of the tangential velocity on the outer circumference of the rotating tool. ..
- the flow side refers to the side where the relative speed of the rotating tool with respect to the jointed portion becomes low due to the rotation of the rotating tool in the direction opposite to the moving direction of the rotating tool.
- the first aluminum alloy of the first metal member 1 is a material having a higher hardness than the second aluminum alloy of the second metal member 2. Thereby, the durability of the metal member H to be joined can be enhanced. Further, it is preferable that the first aluminum alloy of the first metal member 1 is an aluminum alloy casting material and the second aluminum alloy of the second metal member 2 is an aluminum alloy wrought material.
- an Al—Si—Cu based aluminum alloy casting material such as JIS H5302 ADC12 as the first aluminum alloy, the castability, strength, machinability, etc. of the first metal member 1 can be improved. Further, by using, for example, JIS A1000 series or A6000 series as the second aluminum alloy, processability and thermal conductivity can be improved.
- the airtightness and watertightness of the metal member H to be joined can be improved.
- the rotation tool F is made to move toward the end position EP1 after completely passing through the intermediate point S1. That is, the airtightness and watertightness can be further improved by overlapping the ends of the plasticized region W formed by this joining step with each other.
- the rotation speed of the rotation tool F may be constant, but may be variable.
- V1 the rotation speed of the rotation tool F at the start position SP1
- V2 the rotation speed of the rotation tool F in this section
- V1> V2 may be satisfied.
- the rotation speed V2 is a preset constant rotation speed in the set movement route L1. That is, at the start position SP1, the rotation speed may be set high, and the rotation speed may be gradually reduced in the closet section to shift to the main section.
- the rotation speed of the rotation tool F in this section is V2 and the rotation speed of the rotation tool F at the end position EP1 is V3, V3> V2 may be satisfied. That is, after shifting to the detachment section, the rotation tool F may be detached from the second metal member 2 while gradually increasing the rotation speed toward the end position EP1.
- the rotary tool F is pushed into the second metal member 2 or separated from the second metal member 2, by setting as described above, the small pressing force in the indentation section or the detachment section is compensated by the rotation speed. Therefore, friction stir welding can be preferably performed.
- the second embodiment is different from the first embodiment in that both the start position SP1 and the end position EP1 in the main joining step are set on the set movement route L1 as shown in FIGS. 12 and 13.
- the parts different from the first embodiment will be mainly described.
- the preparation process, the butt process, and the main joining process are performed.
- the preparation step and the butt step are the same as those in the first embodiment.
- the start position SP1 is set on the set movement route L1.
- the intrusion section from the start position SP1 to the intermediate point S1, the main section from the intermediate point S1 on the set movement route L1 to the intermediate point S2, and the intermediate point S2 to the end position EP1 (FIG. 13).
- the three sections of the detachment section up to (see) are continuously rubbed and agitated.
- the outer peripheral surface of the tip side pin F3 and the stepped inclined surface 13a of the first metal member 1 are set to slightly contact each other. Further, the outer peripheral surface of the base end side pin F2 and the outer peripheral surface 21b of the second metal member 2 are set to be in contact with each other, and the flat surface F4 of the base end side pin F2 forms a stepped side surface 13b of the first metal member 1. Set to penetrate. While maintaining the posture of the rotary tool F, the process shifts to friction stir welding in this section as it is.
- the contact allowance (offset amount) N between the outer peripheral surface of the tip end side pin F3 and the stepped inclined surface 13a of the first metal member 1 and the setting of the set movement route L1 are the same as those in the first embodiment.
- the rotation tool F is made to go around along the set movement route L1 as shown in FIG.
- the tip side pin F3 reaches the intermediate point S2 by rotating the rotation tool F once, the process shifts to the detachment section as it is.
- the end position EP1 is set on the set movement route L1.
- the tip side pin F3 is gradually pulled out from the intermediate point S2 toward the end position EP1, and the tip end side pin F3 is detached from the second metal member 2 at the end position EP1. That is, the rotation tool F is gradually pulled out while being moved to the end position EP1 without staying in one place.
- the friction stir welding method according to the second embodiment described above can also achieve substantially the same effect as that of the first embodiment.
- the start position SP1 and the end position EP1 in the main joining step may be set on the set movement route L1.
- first metal member 1 and the second metal member 2 may be columnar members having other cross-sectional shapes such as a rectangle, a polygon, and an ellipse. Further, both may be solid members, or both may be tubular members.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Pressure Welding/Diffusion-Bonding (AREA)
Abstract
回転する回転ツール(F)の先端側ピン(F3)を第二金属部材(2)の外周面(21b)に挿入し、先端側ピン(F3)の外周面を第一金属部材(1)の段差傾斜面(13a)にわずかに接触させつつ、基端側ピン(F2)の外周面を第二金属部材(2)の外周面(21b)に接触させた状態で、隙間に第二アルミニウム合金を流入させながら、突合せ部(J1)よりも第二金属部材(2)側に設定された設定移動ルート(L1)に沿って所定の深さで第二金属部材(2)の外周面(21b)の廻りに一周させて突合せ部(J1)を摩擦攪拌する本接合工程と、を含むことを特徴とする。
Description
本発明は、摩擦攪拌接合方法に関する。
例えば、特許文献1には、円柱状の第一金属部材と、円筒状の第二金属部材とを回転ツールを用いて摩擦攪拌接合する発明が開示されている。図14は、従来の摩擦攪拌接合方法を示す断面図である。
図14に示すように、従来の摩擦攪拌接合方法では、第一金属部材101と、第二金属部材102とを突き合わせて形成された突合せ部J10を摩擦攪拌接合する。回転ツールGは、円柱状のショルダ部G1と、攪拌ピンG2とを備えている。第一金属部材1には、段差側面101aと、段差底面101bとが形成されている。突合せ部J10は、第一金属部材101の段差底面101bと、第二金属部材102の端面102aとを突き合わせて形成されている。
ここで、第一金属部材101を例えば、4000系アルミニウム合金の鋳造材で形成し、第二金属部材102を1000系アルミニウム合金の展伸材で形成するというような場合がある。つまり、アルミニウム合金の材種の異なる部材同士を摩擦攪拌接合する場合がある。
例えば、第一金属部材101を鋳造材で形成し、第二金属部材102を展伸材で形成する場合、攪拌ピンG2が第二金属部材102側から受ける材料抵抗に比べて、第一金属部材101側から受ける材料抵抗が大きくなる。そのため、回転ツールGの攪拌ピンG2によって異なる材種をバランスよく攪拌することが困難となり、接合後の塑性化領域に空洞欠陥が発生し接合強度が低下するという問題がある。
このような観点から、本発明は、材種の異なるアルミニウム合金を好適に接合することができる摩擦攪拌接合方法を提供することを課題とする。
前記課題を解決するために、本発明は、大径部の端部に小径部を備えた柱状の第一金属部材と、前記小径部と略同等の内径を有する筒状の第二金属部材とを端部同士で突き合わせて形成された被接合金属部材の突合せ部に対して、基端側ピンと先端側ピンとを備える回転ツールを用いて摩擦攪拌を行う摩擦攪拌接合方法であって、前記第一金属部材は第一アルミニウム合金で形成されており、前記第二金属部材は第二アルミニウム合金で形成されており、前記第一アルミニウム合金は前記第二アルミニウム合金よりも硬度が高い材種であり、前記基端側ピンのテーパー角度は、前記先端側ピンのテーパー角度よりも大きくなっており、前記基端側ピンの外周面には階段状のピン段差部が形成されており、前記第二金属部材の開口部に前記第一金属部材の前記小径部を挿入することにより、前記第二金属部材の内周面と前記第一金属部材の段差側面とを重ね合わせるとともに、前記第二金属部材の端面と前記第一金属部材の段差傾斜面とを突き合わせて突合せ部に断面V字状の隙間を形成する突合せ工程と、回転する前記回転ツールの前記先端側ピンを前記第二金属部材の外周面に挿入し、前記先端側ピンの外周面を前記第一金属部材の前記段差傾斜面にわずかに接触させつつ、前記基端側ピンの外周面を前記第二金属部材の外周面に接触させた状態で、前記隙間に前記第二アルミニウム合金を流入させながら、前記突合せ部よりも前記第二金属部材側に設定された設定移動ルートに沿って所定の深さで前記第二金属部材の外周面の廻りに一周させて前記突合せ部を摩擦攪拌する本接合工程と、を含むことを特徴とする。
また、本発明は、大径部の端部に小径部を備えた円柱状の第一金属部材と、前記小径部と略同等の内径を有する円筒状の第二金属部材とを端面同士で突き合わせて形成された被接合金属部材の突合せ部に対して基端側ピンと先端側ピンとを備える回転ツールを用いて摩擦攪拌を行う摩擦攪拌接合方法であって、前記第一金属部材は第一アルミニウム合金で形成されており、前記第二金属部材は第二アルミニウム合金で形成されており、前記第一アルミニウム合金は前記第二アルミニウム合金よりも硬度が高い材種であり、前記基端側ピンのテーパー角度は、前記先端側ピンのテーパー角度よりも大きくなっており、前記基端側ピンの外周面には階段状のピン段差部が形成されており、前記第二金属部材の開口部に前記第一金属部材の前記小径部を挿入することにより、前記第二金属部材の内周面と前記第一金属部材の段差側面とを重ね合わせるとともに、前記第二金属部材の端面と前記第一金属部材の前記段差傾斜面とを突き合わせて突合せ部に断面V字状の隙間を形成する突合せ工程と、回転する前記回転ツールの前記先端側ピンを前記第二金属部材の外周面に挿入し、前記先端側ピンの外周面を前記第一金属部材の前記段差傾斜面にわずかに接触させつつ、前記基端側ピンの外周面を前記第二金属部材の外周面に接触させた状態で、前記隙間に前記第二アルミニウム合金を流入させながら、前記突合せ部よりも前記第二金属部材側に設定された設定移動ルートに沿って所定の深さで前記第二金属部材の外周面の廻りに一周させて前記突合せ部を摩擦攪拌する本接合工程と、を含むことを特徴とする。
かかる接合方法によれば、第二金属部材と先端側ピンとの摩擦熱によって突合せ部の主として第二金属部材側の第二アルミニウム合金が攪拌されて塑性流動化され、突合せ部において第一金属部材と第二金属部材とを接合することができる。また、先端側ピンの外周面を第一金属部材の段差傾斜面にわずかに接触させるに留めるため、第一金属部材から第二金属部材への第一アルミニウム合金の混入を極力少なくすることができる。これにより、突合せ部においては主として第二金属部材側の第二アルミニウム合金が摩擦攪拌されるため、接合強度の低下を抑制することができる。また、基端側ピンの外周面を第二金属部材の外周面に接触させた状態で摩擦攪拌を行うため、バリの発生を抑制することができる。
また、前記突合せ部に形成される塑性化領域の始端と終端とがオーバーラップしており、前記塑性化領域の一部が重複していることが好ましい。
かかる接合方法によれば、被接合金属部材の水密性及び気密性を高めることができる。
また、前記第二金属部材の外径は、前記第一金属部材の大径部の外径よりも大きいことが好ましい。
かかる接合方法によれば、接合部が金属不足になるのを防ぐことができる。
また、前記第一金属部材が前記回転ツールの進行方向左側に位置する場合、前記回転ツールを右回転させ、前記第一金属部材が前記回転ツールの進行方向右側に位置する場合、前記回転ツールを左回転させることが好ましい。
かかる接合方法によれば、塑性化領域のうち突合せ部側の摩擦攪拌が促進され、より好適に接合することができる。
また、前記本接合工程において、前記設定移動ルート上に設定した開始位置から回転する前記先端側ピンを挿入し、進行方向に移動させつつ所定の深さとなるまで徐々に前記先端側ピンを押入することが好ましい。
また、前記本接合工程において、回転する前記先端側ピンを前記設定移動ルートよりもさらに前記第一金属部材から離間した側に設定した開始位置に挿入した後、前記回転ツールの回転中心軸を前記設定移動ルートと重複する位置まで移動させつつ前記所定の深さとなるまで前記先端側ピンを徐々に押入することが好ましい。
また、前記本接合工程において、回転する前記先端側ピンを前記設定移動ルートよりもさらに前記第一金属部材から離間した側に設定した開始位置に挿入した後、前記回転ツールの回転中心軸を前記設定移動ルートと重複する位置まで移動させつつ前記所定の深さとなるまで前記先端側ピンを徐々に押入することが好ましい。
かかる接合方法によれば、回転ツールを挿入する際に、設定移動ルート上で摩擦熱が過大になるのを防ぐことができ、第一金属部材側から第二金属部材側への第一アルミニウム合金の混入を防ぐことができる。
また、前記本接合工程において、前記設定移動ルート上に終了位置を設定し、前記突合せ部に対する摩擦攪拌の後、前記回転ツールを前記終了位置に移動させつつ前記先端側ピンを徐々に引き抜いて前記終了位置で前記第二金属部材から前記回転ツールを離脱させることが好ましい。
また、前記本接合工程において、前記設定移動ルートよりもさらに前記第一金属部材から離間した側に終了位置を設定し、前記突合せ部に対する摩擦攪拌の後、前記回転ツールを前記終了位置に移動させつつ前記先端側ピンを徐々に引き抜いて前記終了位置で前記第二金属部材から前記回転ツールを離脱させることが好ましい。
また、前記本接合工程において、前記設定移動ルートよりもさらに前記第一金属部材から離間した側に終了位置を設定し、前記突合せ部に対する摩擦攪拌の後、前記回転ツールを前記終了位置に移動させつつ前記先端側ピンを徐々に引き抜いて前記終了位置で前記第二金属部材から前記回転ツールを離脱させることが好ましい。
かかる接合方法によれば、回転ツールを離脱させる際に、設定移動ルート上で摩擦熱が過大になるのを防ぐことができ、第一金属部材側から第二金属部材側への第一アルミニウム合金の混入を防ぐことができる。
また、前記本接合工程において、前記先端側ピンの先端が、前記第一金属部材の段差側面を突き抜けた状態で前記突合せ部の摩擦攪拌を行うことが好ましい。
かかる接合方法によれば、第一金属部材と第二金属部材との接合強度をより高めることができる。
本発明に係る摩擦攪拌接合方法によれば、材種の異なるアルミニウム合金を好適に接合することができる。
本発明の実施形態について、適宜図面を参照しながら説明する。まずは、本実施形態に係る接合方法で用いる回転ツールについて説明する。回転ツールは、摩擦攪拌接合に用いられるツールである。図1に示すように、回転ツールFは、例えば工具鋼で形成されており、基軸部F1と、基端側ピンF2と、先端側ピンF3とで主に構成されている。基軸部F1は、円柱状を呈し、摩擦攪拌装置の主軸に接続される部位である。
基端側ピンF2は、基軸部F1に連続し、先端に向けて先細りになっている。基端側ピンF2は、円錐台形状を呈する。基端側ピンF2のテーパー角度Aは適宜設定すればよいが、例えば、135~160°になっている。テーパー角度Aが135°未満であるか、又は、160°を超えると摩擦攪拌後の接合表面粗さが大きくなる。テーパー角度Aは、後記する先端側ピンF3のテーパー角度Bよりも大きくなっている。図2に示すように、基端側ピンF2の外周面には、階段状のピン段差部F21が高さ方向の全体に亘って形成されている。ピン段差部F21は、右回り又は左回りで螺旋状に形成されている。つまり、ピン段差部F21は、平面視して螺旋状であり、側面視すると階段状になっている。本第一実施形態では、回転ツールFを右回転させるため、ピン段差部F21は基端側から先端側に向けて左回りに設定している。
なお、回転ツールFを左回転させる場合は、ピン段差部F21を基端側から先端側に向けて右回りに設定することが好ましい。これにより、ピン段差部F21によって塑性流動材が先端側に導かれるため、被接合金属部材の外部に溢れ出る金属を低減することができる。ピン段差部F21は、段差底面F21aと、段差側面F21bとで構成されている。隣り合うピン段差部F21の各頂点F21c,F21cの距離X1(水平方向距離)は、後記する段差角度C及び段差側面F21bの高さY1に応じて適宜設定される。
段差側面F21bの高さY1は適宜設定すればよいが、例えば、0.1~0.4mmで設定されている。高さY1が0.1mm未満であると接合表面粗さが大きくなる。一方、高さY1が0.4mmを超えると接合表面粗さが大きくなる傾向があるとともに、有効段差部数(被接合金属部材と接触しているピン段差部F21の数)も減少する。
段差底面F21aと段差側面F21bとでなす段差角度Cは適宜設定すればよいが、例えば、85~120°で設定されている。段差底面F21aは、本実施形態では水平面と平行になっている。段差底面F21aは、ツールの回転軸から外周方向に向かって水平面に対して-5°~15°内の範囲で傾斜していてもよい(マイナスは水平面に対して下方、プラスは水平面に対して上方)。距離X1、段差側面F21bの高さY1、段差角度C及び水平面に対する段差底面F21aの角度は、摩擦攪拌を行う際に、塑性流動材がピン段差部F21の内部に滞留して付着することなく外部に抜けるとともに、段差底面F21aで塑性流動材を押えて接合表面粗さを小さくすることができるように適宜設定する。
図1に示すように、先端側ピンF3は、基端側ピンF2に連続して形成されている。先端側ピンF3は円錐台形状を呈する。先端側ピンF3の先端は回転軸に対して垂直な平坦面F4になっている。先端側ピンF3のテーパー角度Bは、基端側ピンF2のテーパー角度Aよりも小さくなっている。図2に示すように、先端側ピンF3の外周面には、螺旋溝F31が刻設されている。螺旋溝F31は、右回り、左回りのどちらでもよいが、本第一実施形態では回転ツールFを右回転させるため、基端側から先端側に向けて左回りに刻設されている。
なお、回転ツールFを左回転させる場合は、螺旋溝F31を基端側から先端側に向けて右回りに設定することが好ましい。これにより、螺旋溝F31によって塑性流動材が先端側に導かれるため、被接合金属部材の外部に溢れ出る金属を低減することができる。螺旋溝F31は、螺旋底面F31aと、螺旋側面F31bとで構成されている。隣り合う螺旋溝F31の頂点F31c,F31cの距離(水平方向距離)を長さX2とする。螺旋側面F31bの高さを高さY2とする。螺旋底面F31aと、螺旋側面F31bとで構成される螺旋角度Dは例えば、45~90°で形成されている。螺旋溝F31は、被接合金属部材と接触することにより摩擦熱を上昇させるとともに、塑性流動材を先端側に導く役割を備えている。また、回転ツールFは、先端にスピンドルユニット等の回転駆動手段を備えたロボットアームに取り付けてもよい。
回転ツールFは、適宜設計変更が可能である。図3は、本発明の回転ツールの第一変形例を示す側面図である。図3に示すように、第一変形例に係る回転ツールFAでは、ピン段差部F21の段差底面F21aと段差側面F21bとのなす段差角度Cが85°になっている。段差底面F21aは、水平面と平行である。このように、段差底面F21aは水平面と平行であるとともに、段差角度Cは、摩擦攪拌中にピン段差部F21内に塑性流動材が滞留して付着することなく外部に抜ける範囲で鋭角としてもよい。
図4は、本発明の回転ツールの第二変形例を示す側面図である。図4に示すように、第二変形例に係る回転ツールFBでは、ピン段差部F21の段差角度Cが115°になっている。段差底面F21aは水平面と平行になっている。このように、段差底面F21aは水平面と平行であるとともに、ピン段差部F21として機能する範囲で段差角度Cが鈍角となってもよい。
図5は、本発明の回転ツールの第三変形例を示す側面図である。図5に示すように、第三変形例に係る回転ツールFCでは、段差底面F21aがツールの回転軸から外周方向に向かって水平面に対して10°上方に傾斜している。段差側面F21bは、鉛直面と平行になっている。このように、摩擦攪拌中に塑性流動材を押さえることができる範囲で、段差底面F21aがツールの回転軸から外周方向に向かって水平面よりも上方に傾斜するように形成されていてもよい。上記の回転ツールの第一~第三変形例によっても、下記の実施形態と同等の効果を奏することができる。
[第一実施形態]
本発明の第一実施形態について、適宜図面を参照しながら説明する。本実施形態に係る摩擦攪拌接合方法では、図6に示すように、第一金属部材1と、第二金属部材2を摩擦攪拌接合するというものである。第一金属部材1と第二金属部材2とを合わせて被接合金属部材Hとも言う。本実施形態に係る摩擦攪拌接合方法では、準備工程と、突合せ工程と、本接合工程と、を行う。
本発明の第一実施形態について、適宜図面を参照しながら説明する。本実施形態に係る摩擦攪拌接合方法では、図6に示すように、第一金属部材1と、第二金属部材2を摩擦攪拌接合するというものである。第一金属部材1と第二金属部材2とを合わせて被接合金属部材Hとも言う。本実施形態に係る摩擦攪拌接合方法では、準備工程と、突合せ工程と、本接合工程と、を行う。
準備工程は、第一金属部材1及び第二金属部材2を準備する工程である。図7に示すように、第一金属部材1は、大径部11と、小径部12を備えた中実の金属部材である。第一金属部材1は、摩擦攪拌可能な金属であれば特に制限されないが、本実施形態では第一アルミニウム合金を主に含んで形成されている。第一アルミニウム合金は、例えば、JISH5302 ADC12(Al-Si-Cu系)等のアルミニウム合金鋳造材を用いている。
大径部11は、円柱状を呈する。小径部12は、円柱状を呈し、大径部11の先端側に同心で形成されている。大径部11と小径部12とで段差部13が形成されている。段差部13は、段差傾斜面13aと、段差側面13bとで構成されている。図8に示すように、段差傾斜面13aは、径外方向に向かうにつれて第二金属部材2から離間する方向に傾斜している。段差傾斜面13aの傾斜角度βは、先端側ピンF3の傾斜角度α(図1参照)と同一になっている。段差側面13bは、小径部12の端面12aに対して垂直になっている。つまり、段差側面13bは、第一金属部材1の軸方向と平行になっている。
第二金属部材2は、円筒状を呈する金属部材である。摩擦攪拌可能な金属であれば特に制限されないが、本実施形態では第二アルミニウム合金を主に含んで形成されている。第二アルミニウム合金は、第一アルミニウム合金よりも硬度の低い材料である。第二アルミニウム合金は、例えば、JIS A1050,A1100,A6063等のアルミニウム合金展伸材で形成されている。第二金属部材2の端面21aは、外周面21b及び内周面21cに対して垂直になっている。第一金属部材1の外径と第二金属部材2の外径は同一でもよいが、本実施形態では、第二金属部材2の外径を第一金属部材1の外径よりも大きく形成している。また、第二金属部材2の内周面21cの外径は、第一金属部材1の小径部12の外径と同一又は略同一になっている。
突合せ工程は、図8に示すように、第一金属部材1の端部と、第二金属部材2の端部とを突き合わせる工程である。突合せ工程では、第一金属部材1の小径部12を、第二金属部材2の開口部に挿入する。これにより、第一金属部材1の段差傾斜面13aと、第二金属部材2の端面21aとが突き合わされて突合せ部J1が形成される。突合せ部J1には、周方向にわたって断面V字状の隙間が形成される。また、第一金属部材1の段差側面13bと、第二金属部材2の内周面21cとが重ね合わされて突合せ部J2が形成される。
図9に示すように、第二金属部材2の外周面21bには、設定移動ルートL1を設定する。設定移動ルートL1は、突合せ部J1よりも第二金属部材2側に設定されており、突合せ部J1と平行になっている。設定移動ルートL1は、後記する本接合工程において、突合せ部J1を接合するために必要な回転ツールFの移動ルートである。設定移動ルートL1については追って詳述する。
本接合工程は、図10及び図11に示すように、回転ツールFを用いて突合せ部J1を摩擦攪拌接合する工程である。本接合工程では、回転ツールFを固定して、被接合金属部材Hを周方向に回転させてもよいし、被接合金属部材Hを固定して被接合金属部材Hの周りに回転ツールFを移動させてもよい。
図10に示すように、本接合工程では、開始位置SP1から中間点S1までの押入区間と、設定移動ルートL1上の中間点S1から一周廻って中間点S2までの本区間と、中間点S2から終了位置EP1までの離脱区間の三つの区間を連続して摩擦攪拌接合する。中間点S1,S2は、設定移動ルートL1上に設定されている。開始位置SP1は、第二金属部材2の外周面21bにおいて、設定移動ルートL1よりも第一金属部材1から離間する側に設定されている。本実施形態では、開始位置SP1と中間点S1とを結ぶ線分と、設定移動ルートL1とのなす角度が鈍角となる位置に設定している。
本接合工程の押入区間では、図10及び図11に示すように、開始位置SP1から中間点S1までの摩擦攪拌を行う。押入区間では、外周面21bに対して回転中心軸Zを垂直にしつつ、右回転させた先端側ピンF3を開始位置SP1に挿入し、中間点S1まで移動させる。つまり、回転ツールFが相対移動する間、回転中心軸Zが第二金属部材2の外周面21bの法線と重なるように設定する。この際、図10に示すように、少なくとも中間点S1に到達するまでに予め設定された「所定の深さ」に達するように先端側ピンF3を徐々に押し入れていく。つまり、回転ツールFを一ヶ所に留まらせることなく、回転ツールFを設定移動ルートL1に移動させながら徐々に下降させていく。
また、中間点S1に達した際に、先端側ピンF3の外周面と第一金属部材1の段差傾斜面13aとがわずかに接触するように設定する。さらに、基端側ピンF2の外周面と第二金属部材2の外周面21bとが接触するように設定しつつ先端側ピンF3の平坦面F4が段差側面13bを突き抜けるように設定する。そして、そのまま本区間の摩擦攪拌接合に移行する。
先端側ピンF3の外周面と第一金属部材1の段差傾斜面13aとの接触代(オフセット量)Nは、例えば、0<N≦1.0mmの間で設定し、好ましくは0<N≦0.85mmの間で設定し、より好ましくは0<N≦0.65mmの間で設定する。
設定移動ルートL1は、図11に示すように、先端側ピンF3の平坦面F4の中心が通過する軌跡を示している。つまり、設定移動ルートL1は、突合せ部J1の周方向において、第一金属部材1の段差傾斜面13aと先端側ピンF3の外周面とを平行にしつつ両者がわずかに接触するように設定されている。
本区間においては、上方から見た場合(外周面21b側から見た場合)に、平坦面F4の中心が、設定移動ルートL1と重なるように回転ツールFを相対移動させる。本区間においては、第二金属部材2の第二アルミニウム合金を突合せ部J1の隙間に流入させながら摩擦攪拌接合を行う。先端側ピンF3の外周面と段差傾斜面13aとが接触しないように設定すると、突合せ部J1の接合強度が低くなる。一方、先端側ピンF3の外周面と段差傾斜面13aとの接触代Nが1.0mmを超えると第一金属部材1の第一アルミニウム合金が、第二金属部材2側に大量に混入して接合不良となるおそれがある。
本区間では、図6に示すように、回転ツールFを一周させて先端側ピンF3が中間点S2に到達したら、そのまま離脱区間に移行する。離脱区間では、中間点S2から終了位置EP1に向かうまでの間に先端側ピンF3を徐々に上方に移動させて、終了位置EP1で第二金属部材2から先端側ピンF3を離脱させる。つまり、回転ツールFを一ヶ所に留まらせることなく、回転ツールFを終了位置EP1に移動させながら第二金属部材2から離間する方向に徐々に引抜いていく。終了位置EP1は、終了位置EP1と中間点S2とが結ぶ線分と設定移動ルートL1とでなす角度が鈍角となる位置に設定する。回転ツールFの移動軌跡には塑性化領域Wが形成される。
以上説明した本実施形態における摩擦攪拌接合方法によれば、第二金属部材2と先端側ピンF3との摩擦熱によって突合せ部J1の主として第二金属部材2側の第二アルミニウム合金が攪拌されて塑性流動化され、突合せ部J1において第一金属部材1の段差傾斜面13aと、第二金属部材2の端面21aとを接合することができる。
また、先端側ピンF3の先端側ピンF3の外周面を第一金属部材1の段差傾斜面13aにわずかに接触させるに留めるため、第一金属部材1から第二金属部材2への第一アルミニウム合金の混入を極力少なくすることができる。これにより、突合せ部J1においては主として第二金属部材2側の第二アルミニウム合金が摩擦攪拌されるため、接合強度の低下を抑制することができる。つまり、本接合工程では、先端側ピンF3の回転中心軸Zに対して一方側と他方側で、先端側ピンF3が受ける材料抵抗の不均衡を極力少なくすることができる。これにより、塑性流動材がバランス良く摩擦攪拌されるため、接合強度の低下を抑制することができる。
また、本接合工程において、先端側ピンF3の外周面と第一金属部材1の段差傾斜面13aとが平行となるように回転ツールFの位置を設定することで、先端側ピンF3と第一金属部材1とをバランスよく接触させることができる。また、第二金属部材2の外径を、第一金属部材1の外径よりも大きく設定することにより、接合部が金属不足になるのを防ぐことができる。また、先端側ピンF3の先端を、第一金属部材1の段差側面13bに達するように設定することで、突合せ部J2も確実に摩擦攪拌できるため、接合強度を高めることができる。
また、本実施形態では、本接合工程において、基端側ピンF2の外周面と第二金属部材2の外周面21bとを接触させ、塑性流動材を押さえながら摩擦攪拌を行うため、バリの発生を抑制することができる。また、基端側ピンF2の外周面で塑性流動材を押えることができるため、接合表面(第一金属部材1の外周面11b及び第二金属部材2の外周面21b)に形成される段差凹溝を小さくすることができるとともに、段差凹溝の脇に形成される膨出部を無くすか若しくは小さくすることができる。また、基端側ピンF2の階段状のピン段差部F21は浅く、かつ、出口が広いため、塑性流動材を段差底面F21aで押えつつ塑性流動材がピン段差部F21の外部に抜けやすくなっている。そのため、基端側ピンF2で塑性流動材を押えても基端側ピンF2の外周面に塑性流動材が付着し難い。よって、接合表面粗さを小さくすることができるとともに、接合品質を好適に安定させることができる。
ここで、先端側ピンF3を設定移動ルートL1に挿入する際、所定の深さとなるまで鉛直方向に先端側ピンF3を押入すると、摩擦攪拌の開始位置における摩擦熱が過大となる。これにより、当該開始位置において、第一金属部材1側の金属が第二金属部材2側に混入しやすくなり、接合不良の一因となるという問題がある。
これに対し、本実施形態の本接合工程の押入区間では、開始位置SP1から設定移動ルートL1と重複する位置まで回転ツールFを移動させつつ所定の深さとなるまで先端側ピンF3を徐々に押入することにより、設定移動ルートL1上で回転ツールFが停止して摩擦熱が局所的に過大になるのを防ぐことができる。
同様に、本接合工程の離脱区間では、設定移動ルートL1から終了位置EP1まで回転ツールFを移動させつつ所定の深さから先端側ピンF3を徐々に引き抜いて離脱させることにより、設定移動ルートL1上で回転ツールFが停止して摩擦熱が局所的に過大になるのを防ぐことができる。
同様に、本接合工程の離脱区間では、設定移動ルートL1から終了位置EP1まで回転ツールFを移動させつつ所定の深さから先端側ピンF3を徐々に引き抜いて離脱させることにより、設定移動ルートL1上で回転ツールFが停止して摩擦熱が局所的に過大になるのを防ぐことができる。
これらにより、設定移動ルートL1上で摩擦熱が過大となり、第一金属部材1から第二金属部材2へ第一アルミニウム合金が過剰に混入して接合不良となるのを防ぐことができる。
また、本接合工程において、開始位置SP1及び終了位置EP1の位置は適宜設定すればよいが、開始位置SP1と設定移動ルートL1とのなす角度、終了位置EP1と設定移動ルートL1とのなす角度が鈍角となるように設定することにより、中間点S1,S2で回転ツールFの移動速度が低下することなくスムーズに本区間又は離脱区間に移行することができる。これにより、設定移動ルートL1上で回転ツールFが停止又は移動速度が低下することにより、摩擦熱が過大となることを防ぐことができる。なお、上方から見て回転ツールFの軌跡が円弧を描くように開始位置SP1から設定移動ルートL1に回転ツールFを移動させてもよい。同様に、上方から見て回転ツールFの軌跡が円弧を描くように設定移動ルートL1から終了位置EP1に回転ツールFを移動させてもよい。
また、本実施形態の本接合工程では、回転ツールFの回転方向及び進行方向は適宜設定すればよいが、回転ツールFの移動軌跡に形成される塑性化領域Wのうち、第一金属部材1(突合せ部J1側)がシアー側となり、第二金属部材2側がフロー側となるように回転ツールFの回転方向及び進行方向を設定した。第一金属部材1側がシアー側となるように設定することで、突合せ部J1の周囲における先端側ピンF3による攪拌作用が高まり、突合せ部J1における温度上昇が期待でき、突合せ部J1において第一金属部材1の段差傾斜面13aと、第二金属部材2の端面21aとをより確実に接合することができる。
なお、シアー側(Advancing side)とは、被接合部に対する回転ツールの外周の相対速度が、回転ツールの外周における接線速度の大きさに移動速度の大きさを加算した値となる側を意味する。一方、フロー側(Retreating side)とは、回転ツールの移動方向の反対方向に回転ツールが回動することで、被接合部に対する回転ツールの相対速度が低速になる側を言う。
また、第一金属部材1の第一アルミニウム合金は、第二金属部材2の第二アルミニウム合金よりも硬度の高い材料になっている。これにより、被接合金属部材Hの耐久性を高めることができる。また、第一金属部材1の第一アルミニウム合金をアルミニウム合金鋳造材とし、第二金属部材2の第二アルミニウム合金をアルミニウム合金展伸材とすることが好ましい。第一アルミニウム合金を例えば、JISH5302 ADC12等のAl-Si-Cu系アルミニウム合金鋳造材とすることにより、第一金属部材1の鋳造性、強度、被削性等を高めることができる。また、第二アルミニウム合金を例えば、JIS A1000系又はA6000系とすることにより、加工性、熱伝導性を高めることができる。
また、本接合工程においては、突合せ部J1の全周を摩擦攪拌接合するため、被接合金属部材Hの気密性及び水密性を高めることができる。また、本接合工程の終端部分において、回転ツールFが中間点S1を完全に通過してから終了位置EP1に向かうようにする。つまり、本接合工程によって形成された塑性化領域Wの各端部同士をオーバーラップさせることにより、より気密性及び水密性を高めることができる。
なお、本接合工程では、回転ツールFの回転速度を一定としてもよいが、可変させてもよい。本接合工程の押入区間において、開始位置SP1における回転ツールFの回転速度をV1とし、本区間における回転ツールFの回転速度をV2とすると、V1>V2としてもよい。回転速度のV2は、設定移動ルートL1における予め設定された一定の回転速度である。つまり、開始位置SP1では、回転速度を高く設定しておき、押入区間内で徐々に回転速度を低減させながら本区間に移行してもよい。
また、本接合工程の離脱区間において、本区間における回転ツールFの回転速度をV2、終了位置EP1において離脱させるときの回転ツールFの回転速度をV3とすると、V3>V2としてもよい。つまり、離脱区間に移行したら、終了位置EP1に向けて徐々に回転速度を上げながら第二金属部材2から回転ツールFを離脱させてもよい。回転ツールFを第二金属部材2に押し入れる際又は第二金属部材2から離脱させる際に、前記のように設定することで、押入区間又は離脱区間時における少ない押圧力を、回転速度で補うことができるため、摩擦攪拌を好適に行うことができる。
[第二実施形態]
次に、本発明の第二実施形態に係る摩擦攪拌接合方法について説明する。第二実施形態では、図12及び図13に示すように、本接合工程における開始位置SP1及び終了位置EP1の位置をいずれも設定移動ルートL1上に設定する点で第一実施形態と相違する。第二実施形態では、第一実施形態と相違する部分を中心に説明する。
次に、本発明の第二実施形態に係る摩擦攪拌接合方法について説明する。第二実施形態では、図12及び図13に示すように、本接合工程における開始位置SP1及び終了位置EP1の位置をいずれも設定移動ルートL1上に設定する点で第一実施形態と相違する。第二実施形態では、第一実施形態と相違する部分を中心に説明する。
第二実施形態に係る液冷ジャケットの製造では、準備工程と、突合せ工程と、本接合工程とを行う。準備工程及び突合せ工程は、第一実施形態と同一である。
本接合工程では、図12に示すように、開始位置SP1を設定移動ルートL1上に設定する。本接合工程では、開始位置SP1から中間点S1までの押入区間と、設定移動ルートL1上の中間点S1から一周廻って中間点S2までの本区間と、中間点S2から終了位置EP1(図13参照)までの離脱区間の三つの区間を連続して摩擦攪拌する。
押入区間では、図12に示すように、開始位置SP1から中間点S1までの摩擦攪拌を行う。押入区間では、回転中心軸Zを垂直となるようにしつつ、右回転させた先端側ピンF3を開始位置SP1に挿入し、中間点S1まで移動させる。この際、少なくとも中間点S1に到達するまでに予め設定された「所定の深さ」に達するように先端側ピンF3を徐々に押し入れていく。つまり、回転ツールFを一ヶ所に留まらせることなく、回転ツールFを設定移動ルートL1に移動させながら徐々に下降させていく。
また、押入区間においては、中間点S1に達した際に、先端側ピンF3の外周面と第一金属部材1の段差傾斜面13aとがわずかに接触するように設定する。さらに、基端側ピンF2の外周面と第二金属部材2の外周面21bとが接触するように設定するとともに、基端側ピンF2の平坦面F4が第一金属部材1の段差側面13bを突き抜けるように設定する。この回転ツールFの姿勢を維持した状態で、そのまま本区間の摩擦攪拌接合に移行する。先端側ピンF3の外周面と第一金属部材1の段差傾斜面13aとの接触代(オフセット量)N及び設定移動ルートL1の設定は第一実施形態と同一である。
本区間では、図13のように設定移動ルートL1に沿って回転ツールFを一周させる。回転ツールFを一周させて先端側ピンF3が中間点S2に到達したら、そのまま離脱区間に移行する。終了位置EP1は、設定移動ルートL1上に設定されている。離脱区間では、中間点S2から終了位置EP1に向かうまでの間に先端側ピンF3を徐々に引き抜いて、終了位置EP1で第二金属部材2から先端側ピンF3を離脱させる。つまり、回転ツールFを一ヶ所に留まらせることなく、回転ツールFを終了位置EP1に移動させながら徐々に引抜いていく。
以上説明した第二実施形態に係る摩擦攪拌接合方法によっても第一実施形態と略同等の効果を奏することができる。第二実施形態のように本接合工程における開始位置SP1及び終了位置EP1は、設定移動ルートL1上に設定してもよい。
以上、本発明の実施形態について説明したが、適宜設計変更が可能である。例えば、第一金属部材1及び第二金属部材2は、矩形、多角形、楕円形等他の断面形状の柱状部材でもよい。また、両方とも中実部材でもよいし、両方とも筒状部材でもよい。
1 第一金属部材
2 第二金属部材
F 回転ツール
F2 基端側ピン
F3 先端側ピン
F4 平坦面
J1 突合せ部
SP1 開始位置
EP1 終了位置
W 塑性化領域
2 第二金属部材
F 回転ツール
F2 基端側ピン
F3 先端側ピン
F4 平坦面
J1 突合せ部
SP1 開始位置
EP1 終了位置
W 塑性化領域
Claims (10)
- 大径部の端部に小径部を備えた柱状の第一金属部材と、前記小径部と略同等の内径を有する筒状の第二金属部材とを端部同士で突き合わせて形成された被接合金属部材の突合せ部に対して、基端側ピンと先端側ピンとを備える回転ツールを用いて摩擦攪拌を行う摩擦攪拌接合方法であって、
前記第一金属部材は第一アルミニウム合金で形成されており、前記第二金属部材は第二アルミニウム合金で形成されており、前記第一アルミニウム合金は前記第二アルミニウム合金よりも硬度が高い材種であり、
前記基端側ピンのテーパー角度は、前記先端側ピンのテーパー角度よりも大きくなっており、前記基端側ピンの外周面には階段状のピン段差部が形成されており、
前記第二金属部材の開口部に前記第一金属部材の前記小径部を挿入することにより、前記第二金属部材の内周面と前記第一金属部材の段差側面とを重ね合わせるとともに、前記第二金属部材の端面と前記第一金属部材の段差傾斜面とを突き合わせて突合せ部に断面V字状の隙間を形成する突合せ工程と、
回転する前記回転ツールの前記先端側ピンを前記第二金属部材の外周面に挿入し、前記先端側ピンの外周面を前記第一金属部材の前記段差傾斜面にわずかに接触させつつ、前記基端側ピンの外周面を前記第二金属部材の外周面に接触させた状態で、前記隙間に前記第二アルミニウム合金を流入させながら、前記突合せ部よりも前記第二金属部材側に設定された設定移動ルートに沿って所定の深さで前記第二金属部材の外周面の廻りに一周させて前記突合せ部を摩擦攪拌する本接合工程と、を含むことを特徴とする摩擦攪拌接合方法。 - 前記突合せ部に形成される塑性化領域の始端と終端とがオーバーラップしており、前記塑性化領域の一部が重複していることを特徴とする請求項1に記載の摩擦攪拌接合方法。
- 前記第二金属部材の外径は、前記第一金属部材の大径部の外径よりも大きいことを特徴とする請求項1又は請求項2に記載の摩擦攪拌接合方法。
- 前記第一金属部材が前記回転ツールの進行方向左側に位置する場合、前記回転ツールを右回転させ、
前記第一金属部材が前記回転ツールの進行方向右側に位置する場合、前記回転ツールを左回転させることを特徴とする請求項1に記載の摩擦攪拌接合方法。 - 前記本接合工程において、前記設定移動ルート上に設定した開始位置から回転する前記先端側ピンを挿入し、進行方向に移動させつつ所定の深さとなるまで徐々に前記先端側ピンを押入することを特徴とする請求項1に記載の摩擦攪拌接合方法。
- 前記本接合工程において、回転する前記先端側ピンを前記設定移動ルートよりもさらに前記第一金属部材から離間した側に設定した開始位置に挿入した後、前記回転ツールの回転中心軸を前記設定移動ルートと重複する位置まで移動させつつ前記所定の深さとなるまで前記先端側ピンを徐々に押入することを特徴とする請求項1に記載の摩擦攪拌接合方法。
- 前記本接合工程において、前記設定移動ルート上に終了位置を設定し、前記突合せ部に対する摩擦攪拌の後、前記回転ツールを前記終了位置に移動させつつ前記先端側ピンを徐々に引き抜いて前記終了位置で前記第二金属部材から前記回転ツールを離脱させることを特徴とする請求項1に記載の摩擦攪拌接合方法。
- 前記本接合工程において、前記設定移動ルートよりもさらに前記第一金属部材から離間した側に終了位置を設定し、前記突合せ部に対する摩擦攪拌の後、前記回転ツールを前記終了位置に移動させつつ前記先端側ピンを徐々に引き抜いて前記終了位置で前記第二金属部材から前記回転ツールを離脱させることを特徴とする請求項1に記載の摩擦攪拌接合方法。
- 前記本接合工程において、前記先端側ピンの先端が、前記第一金属部材の前記段差側面を突き抜けた状態で前記突合せ部の摩擦攪拌を行うことを特徴とする請求項1に記載の摩擦攪拌接合方法。
- 大径部の端部に小径部を備えた円柱状の第一金属部材と、前記小径部と略同等の内径を有する円筒状の第二金属部材とを端面同士で突き合わせて形成された被接合金属部材の突合せ部に対して基端側ピンと先端側ピンとを備える回転ツールを用いて摩擦攪拌を行う摩擦攪拌接合方法であって、
前記第一金属部材は第一アルミニウム合金で形成されており、前記第二金属部材は第二アルミニウム合金で形成されており、前記第一アルミニウム合金は前記第二アルミニウム合金よりも硬度が高い材種であり、
前記基端側ピンのテーパー角度は、前記先端側ピンのテーパー角度よりも大きくなっており、前記基端側ピンの外周面には階段状のピン段差部が形成されており、
前記第二金属部材の開口部に前記第一金属部材の前記小径部を挿入することにより、前記第二金属部材の内周面と前記第一金属部材の段差側面とを重ね合わせるとともに、前記第二金属部材の端面と前記第一金属部材の段差傾斜面とを突き合わせて突合せ部に断面V字状の隙間を形成する突合せ工程と、
回転する前記回転ツールの前記先端側ピンを前記第二金属部材の外周面に挿入し、前記先端側ピンの外周面を前記第一金属部材の前記段差傾斜面にわずかに接触させつつ、前記基端側ピンの外周面を前記第二金属部材の外周面に接触させた状態で、前記隙間に前記第二アルミニウム合金を流入させながら、前記突合せ部よりも前記第二金属部材側に設定された設定移動ルートに沿って所定の深さで前記第二金属部材の外周面の廻りに一周させて前記突合せ部を摩擦攪拌する本接合工程と、を含むことを特徴とする摩擦攪拌接合方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201980097739.XA CN114007799A (zh) | 2019-06-28 | 2019-12-20 | 摩擦搅拌接合方法 |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2019-120712 | 2019-06-28 | ||
| JP2019120712A JP7140062B2 (ja) | 2019-06-28 | 2019-06-28 | 摩擦攪拌接合方法 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2020261610A1 true WO2020261610A1 (ja) | 2020-12-30 |
Family
ID=74061108
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2019/050044 Ceased WO2020261610A1 (ja) | 2019-06-28 | 2019-12-20 | 摩擦攪拌接合方法 |
Country Status (3)
| Country | Link |
|---|---|
| JP (1) | JP7140062B2 (ja) |
| CN (1) | CN114007799A (ja) |
| WO (1) | WO2020261610A1 (ja) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015131322A (ja) * | 2014-01-14 | 2015-07-23 | 日本軽金属株式会社 | 摩擦攪拌接合方法 |
| JP2017070994A (ja) * | 2015-10-09 | 2017-04-13 | 株式会社Uacj | 摩擦攪拌接合用工具及び摩擦攪拌接合方法 |
| WO2019064848A1 (ja) * | 2017-09-27 | 2019-04-04 | 日本軽金属株式会社 | 液冷ジャケットの製造方法 |
| WO2019082435A1 (ja) * | 2017-10-27 | 2019-05-02 | 日本軽金属株式会社 | 液冷ジャケットの製造方法 |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103008870A (zh) * | 2012-11-28 | 2013-04-03 | 上海交通大学 | 异种材料薄壁细圆管的搅拌摩擦焊焊接方法 |
| JP6028674B2 (ja) * | 2013-05-09 | 2016-11-16 | 日本軽金属株式会社 | 部材の接合方法 |
| CN104107978A (zh) * | 2014-07-17 | 2014-10-22 | 上海交通大学 | 一种提高异种材料搅拌摩擦焊接接头强度和塑性的方法 |
| CN105108308A (zh) * | 2015-09-07 | 2015-12-02 | 西南石油大学 | 一种含有纳米晶复相组织的高性能异种铝合金焊接接头 |
| JP6766956B2 (ja) * | 2017-04-18 | 2020-10-14 | 日本軽金属株式会社 | 液冷ジャケットの製造方法 |
-
2019
- 2019-06-28 JP JP2019120712A patent/JP7140062B2/ja active Active
- 2019-12-20 CN CN201980097739.XA patent/CN114007799A/zh active Pending
- 2019-12-20 WO PCT/JP2019/050044 patent/WO2020261610A1/ja not_active Ceased
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015131322A (ja) * | 2014-01-14 | 2015-07-23 | 日本軽金属株式会社 | 摩擦攪拌接合方法 |
| JP2017070994A (ja) * | 2015-10-09 | 2017-04-13 | 株式会社Uacj | 摩擦攪拌接合用工具及び摩擦攪拌接合方法 |
| WO2019064848A1 (ja) * | 2017-09-27 | 2019-04-04 | 日本軽金属株式会社 | 液冷ジャケットの製造方法 |
| WO2019082435A1 (ja) * | 2017-10-27 | 2019-05-02 | 日本軽金属株式会社 | 液冷ジャケットの製造方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP7140062B2 (ja) | 2022-09-21 |
| CN114007799A (zh) | 2022-02-01 |
| JP2021006351A (ja) | 2021-01-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2020158081A1 (ja) | 接合方法 | |
| WO2020208844A1 (ja) | 接合方法 | |
| JP2002096183A (ja) | 摩擦撹拌接合用接合工具及び摩擦撹拌接合法 | |
| JP7020562B2 (ja) | 液冷ジャケットの製造方法 | |
| WO2021053839A1 (ja) | 摩擦攪拌接合方法 | |
| WO2020261610A1 (ja) | 摩擦攪拌接合方法 | |
| JP2021112749A (ja) | 摩擦攪拌接合方法 | |
| JP7127618B2 (ja) | 熱交換器の製造方法 | |
| JP2021079424A (ja) | 摩擦攪拌接合方法 | |
| JP2021115588A (ja) | 摩擦攪拌接合方法 | |
| JP7140061B2 (ja) | 熱交換器の製造方法 | |
| JP7024460B2 (ja) | 接合方法 | |
| JP2021112757A (ja) | 液冷ジャケットの製造方法 | |
| JP7272153B2 (ja) | 接合方法及び複合圧延材の製造方法 | |
| WO2021144999A1 (ja) | 接合方法 | |
| JP2021112750A (ja) | 熱交換器の製造方法 | |
| JP2021079423A (ja) | 摩擦攪拌接合方法 | |
| JP7226241B2 (ja) | 液冷ジャケットの製造方法 | |
| JP2020131246A (ja) | 接合方法及び複合圧延材の製造方法 | |
| JP7226242B2 (ja) | 液冷ジャケットの製造方法 | |
| JP2021074735A (ja) | 液冷ジャケットの製造方法 | |
| JP2020151753A (ja) | 液冷ジャケットの製造方法 | |
| WO2020188858A1 (ja) | 液冷ジャケットの製造方法 | |
| WO2021111646A1 (ja) | 伝熱板の製造方法 | |
| WO2021171636A1 (ja) | 熱交換器の製造方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 19935126 Country of ref document: EP Kind code of ref document: A1 |
|
| NENP | Non-entry into the national phase |
Ref country code: DE |
|
| 122 | Ep: pct application non-entry in european phase |
Ref document number: 19935126 Country of ref document: EP Kind code of ref document: A1 |