[go: up one dir, main page]

WO2018164238A1 - ショベル - Google Patents

ショベル Download PDF

Info

Publication number
WO2018164238A1
WO2018164238A1 PCT/JP2018/009089 JP2018009089W WO2018164238A1 WO 2018164238 A1 WO2018164238 A1 WO 2018164238A1 JP 2018009089 W JP2018009089 W JP 2018009089W WO 2018164238 A1 WO2018164238 A1 WO 2018164238A1
Authority
WO
WIPO (PCT)
Prior art keywords
boom
pressure
hydraulic oil
bucket
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2018/009089
Other languages
English (en)
French (fr)
Inventor
三崎 陽二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo SHI Construction Machinery Co Ltd
Original Assignee
Sumitomo SHI Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo SHI Construction Machinery Co Ltd filed Critical Sumitomo SHI Construction Machinery Co Ltd
Priority to CN201880011572.6A priority Critical patent/CN110291254B/zh
Priority to KR1020197022973A priority patent/KR102456137B1/ko
Priority to EP18764912.4A priority patent/EP3594414B1/en
Priority to JP2019503855A priority patent/JP6915042B2/ja
Publication of WO2018164238A1 publication Critical patent/WO2018164238A1/ja
Priority to US16/558,708 priority patent/US11619030B2/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/264Sensors and their calibration for indicating the position of the work tool
    • E02F9/265Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2225Control of flow rate; Load sensing arrangements using pressure-compensating valves
    • E02F9/2228Control of flow rate; Load sensing arrangements using pressure-compensating valves including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2232Control of flow rate; Load sensing arrangements using one or more variable displacement pumps
    • E02F9/2235Control of flow rate; Load sensing arrangements using one or more variable displacement pumps including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2271Actuators and supports therefor and protection therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2282Systems using center bypass type changeover valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26Indicating devices
    • E02F9/261Surveying the work-site to be treated
    • E02F9/262Surveying the work-site to be treated with follow-up actions to control the work tool, e.g. controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • E02F3/303Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom with the dipper-arm or boom rotatable about its longitudinal axis
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/40Dippers; Buckets ; Grab devices, e.g. manufacturing processes for buckets, form, geometry or material of buckets

Definitions

  • the present invention relates to an excavator provided with an attachment including a boom attached to an upper swing body.
  • an excavator provided with a drilling attachment including a boom, an arm, and a bucket is known (see, for example, Patent Document 1).
  • the boom, arm, and bucket are hydraulically driven by the boom cylinder, arm cylinder, and bucket cylinder, respectively.
  • the operator of the excavator excavates the earth and sand, for example, by performing an arm closing operation, and then lifts the excavated earth and sand by performing a boom raising operation.
  • the flow path area of the pipeline through which the hydraulic oil flowing into and out of the arm cylinder flows is better. This is because generation of useless pressure loss in the pipeline can be suppressed and the closing speed of the arm can be increased.
  • An excavator is attached to a lower traveling body, an upper revolving body that is turnably mounted on the lower traveling body, a cab mounted on the upper revolving body, and the upper revolving body.
  • An attachment including a boom; a boom cylinder that drives the boom; a control device that controls hydraulic oil that can flow into the boom cylinder; and an information acquisition device that acquires information about the attachment; Increases the pressure of hydraulic oil that can flow into the boom cylinder according to the information related to the attachment before the boom raising operation is performed.
  • the above-mentioned means can provide an excavator that makes the boom raising operation more smoothly during excavation.
  • FIG. 1 is a side view of an excavator (excavator) according to an embodiment of the present invention.
  • An upper swing body 3 is mounted on the lower traveling body 1 of the excavator via a swing mechanism 2 so as to be capable of swinging.
  • a boom 4 is attached to the upper swing body 3.
  • An arm 5 is attached to the tip of the boom 4, and a bucket 6 as an end attachment is attached to the tip of the arm 5.
  • the boom 4, the arm 5, and the bucket 6 constitute a drilling attachment as an example of the attachment, and are hydraulically driven by the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9, respectively.
  • a boom angle sensor S1 is attached to the boom 4
  • an arm angle sensor S2 is attached to the arm 5
  • a bucket angle sensor S3 is attached to the bucket 6.
  • the boom angle sensor S1 detects the rotation angle of the boom 4.
  • the boom angle sensor S1 is an acceleration sensor that can detect an inclination with respect to a horizontal plane. Therefore, the rotation angle of the boom 4 with respect to the upper swing body 3 (hereinafter referred to as “boom angle ⁇ ”) can be detected.
  • the boom angle ⁇ is, for example, zero degrees when the boom 4 is lowered most, and increases as the boom 4 is raised.
  • the arm angle sensor S2 detects the rotation angle of the arm 5.
  • the arm angle sensor S2 is an acceleration sensor that can detect an inclination with respect to a horizontal plane. Therefore, the rotation angle of the arm 5 with respect to the boom 4 (hereinafter referred to as “arm angle ⁇ ”) can be detected.
  • the arm angle ⁇ is, for example, zero degrees when the arm 5 is most closed, and increases as the arm 5 is opened.
  • the bucket angle sensor S3 detects the rotation angle of the bucket 6.
  • the bucket angle sensor S3 is an acceleration sensor that can detect an inclination with respect to a horizontal plane. Therefore, the rotation angle of the bucket 6 with respect to the arm 5 (hereinafter referred to as “bucket angle ⁇ ”) can be detected.
  • the bucket angle ⁇ becomes zero degrees when the bucket 6 is most closed, and increases as the bucket 6 is opened.
  • the boom angle sensor S1, the arm angle sensor S2, and the bucket angle sensor S3 respectively detect a potentiometer using a variable resistor, a stroke sensor that detects a stroke amount of a corresponding hydraulic cylinder, and a rotation angle around a connecting pin. It may be a rotary encoder, a gyro sensor, a combination of an acceleration sensor and a gyro sensor, or the like.
  • the boom angle sensor S1, the arm angle sensor S2, and the bucket angle sensor S3 constitute an attitude sensor that detects information related to the attitude of the excavation attachment.
  • Boom rod pressure sensor S7R and boom bottom pressure sensor S7B are attached to boom cylinder 7.
  • An arm rod pressure sensor S8R and an arm bottom pressure sensor S8B are attached to the arm cylinder 8.
  • a bucket rod pressure sensor S9R and a bucket bottom pressure sensor S9B are attached to the bucket cylinder 9.
  • Boom rod pressure sensor S7R, boom bottom pressure sensor S7B, arm rod pressure sensor S8R, arm bottom pressure sensor S8B, bucket rod pressure sensor S9R, and bucket bottom pressure sensor S9B are specific examples of cylinder pressure sensors.
  • the boom rod pressure sensor S7R detects the pressure in the rod side oil chamber of the boom cylinder 7 (hereinafter referred to as “boom rod pressure”), and the boom bottom pressure sensor S7B is the pressure in the bottom side oil chamber of the boom cylinder 7 (hereinafter referred to as “boom rod pressure”). , “Boom bottom pressure”).
  • the arm rod pressure sensor S8R detects the pressure in the rod side oil chamber of the arm cylinder 8 (hereinafter referred to as “arm rod pressure”), and the arm bottom pressure sensor S8B detects the pressure in the bottom side oil chamber of the arm cylinder 8 (hereinafter referred to as “arm rod pressure”). , “Arm bottom pressure”).
  • the bucket rod pressure sensor S9R detects the pressure in the rod side oil chamber of the bucket cylinder 9 (hereinafter referred to as “bucket rod pressure”), and the bucket bottom pressure sensor S9B detects the pressure in the bottom side oil chamber of the bucket cylinder 9 (hereinafter referred to as “bucket rod pressure”). , “Bucket bottom pressure”).
  • the upper swing body 3 is provided with a cabin 10 as a cab and a power source such as an engine 11 is mounted.
  • the upper swing body 3 is provided with a body tilt sensor S4, a swing angular velocity sensor S5, and a camera S6.
  • the body tilt sensor S4 detects the tilt of the upper swing body 3 with respect to the horizontal plane.
  • the body tilt sensor S4 is an acceleration sensor that detects the tilt angles of the upper swing body 3 around the front and rear axes and the left and right axes.
  • the front and rear axes and the left and right axes of the upper swing body 3 are, for example, orthogonal to each other and pass through a shovel center point that is one point on the shovel pivot axis.
  • the turning angular velocity sensor S5 detects the turning angular velocity of the upper turning body 3.
  • it is a gyro sensor.
  • a resolver, a rotary encoder, or the like may be used.
  • Camera S6 is a device that acquires images around the excavator.
  • the camera S6 includes a front camera attached to the upper swing body 3.
  • the front camera is a stereo camera that images the front of the shovel, and is attached to the roof of the cabin 10, that is, outside the cabin 10. You may attach to the ceiling of the cabin 10, ie, the inside of the cabin 10. As shown in FIG.
  • the front camera can image the inside of the bucket 6.
  • the front camera may be a monocular camera.
  • the controller 30 is installed in the cabin 10.
  • the controller 30 functions as a main control unit that performs drive control of the shovel.
  • the controller 30 is configured by a computer including a CPU, a RAM, a ROM, and the like.
  • the various functions of the controller 30 are realized by the CPU executing a program stored in the ROM, for example.
  • FIG. 2 is a block diagram showing a configuration example of the drive system of the excavator of FIG. 1, and a mechanical power system, a high-pressure hydraulic line, a pilot line, and an electric control system are respectively shown as a double line, a thick solid line, a broken line, and a dotted line. Is shown.
  • the drive system of the excavator mainly includes an engine 11, a regulator 13, a main pump 14, a pilot pump 15, a control valve 17, an operating device 26, a discharge pressure sensor 28, an operating pressure sensor 29, a controller 30, a proportional valve 31, and the like. .
  • the engine 11 is a drive source for the excavator.
  • the engine 11 is, for example, a diesel engine that operates so as to maintain a predetermined rotational speed.
  • the output shaft of the engine 11 is connected to the input shafts of the main pump 14 and the pilot pump 15.
  • the main pump 14 supplies hydraulic oil to the control valve 17 through a high pressure hydraulic line.
  • the main pump 14 is a swash plate type variable displacement hydraulic pump.
  • the regulator 13 controls the discharge amount of the main pump 14.
  • the regulator 13 controls the discharge amount of the main pump 14 by adjusting the swash plate tilt angle of the main pump 14 in accordance with a control command from the controller 30.
  • the pilot pump 15 supplies hydraulic oil to various hydraulic control devices including the operation device 26 and the proportional valve 31 through the pilot line.
  • the pilot pump 15 is a fixed displacement hydraulic pump.
  • the control valve 17 is a hydraulic control device that controls a hydraulic system in the excavator.
  • the control valve 17 includes control valves 171 to 177.
  • the control valve 17 can selectively supply hydraulic oil discharged from the main pump 14 to one or a plurality of hydraulic actuators through the control valves 171 to 176.
  • the control valves 171 to 176 control the flow rate of the hydraulic oil flowing from the main pump 14 to the hydraulic actuator and the flow rate of the hydraulic oil flowing from the hydraulic actuator to the hydraulic oil tank.
  • the hydraulic actuator includes a boom cylinder 7, an arm cylinder 8, a bucket cylinder 9, a left traveling hydraulic motor 1A, a right traveling hydraulic motor 1B, and a turning hydraulic motor 2A.
  • the control valve 177 controls the flow rate of hydraulic fluid that passes through each of the arm cylinder 8 and the bucket cylinder 9.
  • the operating device 26 is a device used by an operator for operating the hydraulic actuator.
  • the operating device 26 supplies the hydraulic oil discharged from the pilot pump 15 to the pilot port of the control valve corresponding to each of the hydraulic actuators via the pilot line.
  • the hydraulic oil pressure (pilot pressure) supplied to each pilot port is a pressure corresponding to the operating direction and operating amount of a lever or pedal (not shown) of the operating device 26 corresponding to each hydraulic actuator. .
  • the discharge pressure sensor 28 detects the discharge pressure of the main pump 14. In the present embodiment, the discharge pressure sensor 28 outputs the detected value to the controller 30.
  • the operation pressure sensor 29 detects the operation content of the operator using the operation device 26.
  • the operation pressure sensor 29 detects the operation direction and operation amount of the lever or pedal of the operation device 26 corresponding to each of the hydraulic actuators in the form of pressure, and outputs the detected value to the controller 30.
  • the operation content of the operation device 26 may be detected using a sensor other than the operation pressure sensor.
  • the controller 30 reads a program corresponding to each of the work content determination unit 300 and the boom raising support unit 301 from the ROM, loads the program into the RAM, and causes the CPU to execute a corresponding process.
  • the controller 30 executes processing by each of the work content determination unit 300 and the boom raising support unit 301 based on outputs of various sensors. And the controller 30 outputs the control command according to each processing result of the work content determination part 300 and the boom raising assistance part 301 to the regulator 13, the proportional valve 31, etc. suitably.
  • the work content determination unit 300 determines, for example, whether the closing operation of the arm 5 is an operation for a high load work such as excavation work or a low load work such as a leveling work. In the present embodiment, the work content determination unit 300 determines that the operation is for high-load work when the detection value of the arm bottom pressure sensor S8B is equal to or greater than a predetermined value. When it is determined that the operation is for high-load work, the work content determination unit 300 outputs a control command to the proportional valve 31. However, the work content determination unit 300 is an operation for a high-load operation or an operation for a low-load operation based on the output of one or more other information acquisition devices such as the camera S6, LIDAR, and millimeter wave radar. It may be determined.
  • the proportional valve 31 operates according to a control command output from the controller 30.
  • the proportional valve 31 is an electromagnetic valve that adjusts the control pressure introduced from the pilot pump 15 to the pilot port of the control valve 177 in the control valve 17 in accordance with a current command output from the controller 30.
  • the controller 30 operates a control valve 177 installed in a pipe line connecting the rod side oil chamber of the arm cylinder 8 and the hydraulic oil tank to increase the flow path area of the pipe line. With this configuration, the controller 30 can reduce the pressure loss generated by the hydraulic oil flowing from the rod-side oil chamber of the arm cylinder 8 to the hydraulic oil tank when the arm 5 is closed for high load work.
  • the work content determination unit 300 may determine whether the closing operation of the bucket 6 is an operation for a high load operation or an operation for a low load operation. In this case, the work content determination unit 300 determines that the operation is for high-load work when the detection value of the bucket bottom pressure sensor S9B is equal to or greater than a predetermined value. When it is determined that the operation is a high-load operation, the operation content determination unit 300 outputs a control command to the proportional valve 31.
  • the proportional valve 31 operates a control valve 177 installed in a pipe line connecting the rod side oil chamber of the bucket cylinder 9 and the hydraulic oil tank to increase the flow path area of the pipe line. With this configuration, the controller 30 can reduce the pressure loss generated by the hydraulic oil flowing from the rod side oil chamber of the bucket cylinder 9 to the hydraulic oil tank when the bucket 6 is closed for high load work.
  • the work content determination unit 300 may determine whether excavation is started or whether excavation is in progress. In this case, the work content determination unit 300 may determine, for example, based on information about the attachment acquired by the information acquisition device.
  • the information on the attachment includes boom angle ⁇ , arm angle ⁇ , bucket angle ⁇ , boom rod pressure, boom bottom pressure, arm rod pressure, arm bottom pressure, bucket rod pressure, bucket bottom pressure, captured image of camera S6, and the like. Including at least one.
  • the information acquisition device includes a boom angle sensor S1, an arm angle sensor S2, a bucket angle sensor S3, an airframe tilt sensor S4, a turning angular velocity sensor S5, a camera S6, a boom rod pressure sensor S7R, a boom bottom pressure sensor S7B, and an arm rod pressure sensor S8R.
  • FIG. 3 is a schematic diagram illustrating a configuration example of a hydraulic system mounted on the excavator in FIG. 1.
  • FIG. 3 shows a mechanical power system, a high-pressure hydraulic line, a pilot line, and an electric control system by a double line, a thick solid line, a broken line, and a dotted line, respectively, as in FIG.
  • the hydraulic system circulates hydraulic oil from main pumps 14L and 14R driven by the engine 11 to a hydraulic oil tank through center bypass pipelines 40L and 40R and parallel pipelines 42L and 42R.
  • the main pumps 14L and 14R correspond to the main pump 14 in FIG.
  • the center bypass conduit 40L is a high-pressure hydraulic line that passes through the control valves 171, 173, 175A, and 176A disposed in the control valve 17.
  • the center bypass line 40R is a high-pressure hydraulic line that passes through control valves 172, 174, 175B, and 176B disposed in the control valve 17.
  • the control valve 171 supplies the hydraulic oil discharged from the main pump 14L to the left traveling hydraulic motor 1A, and the hydraulic oil flows to discharge the hydraulic oil discharged from the left traveling hydraulic motor 1A to the hydraulic oil tank.
  • This is a spool valve that switches between the two.
  • the control valve 172 supplies the hydraulic oil discharged from the main pump 14R to the right traveling hydraulic motor 1B, and the hydraulic oil flows to discharge the hydraulic oil discharged from the right traveling hydraulic motor 1B to the hydraulic oil tank.
  • This is a spool valve that switches between the two.
  • the control valve 173 supplies the hydraulic oil discharged from the main pump 14L to the turning hydraulic motor 2A, and switches the flow of the hydraulic oil to discharge the hydraulic oil discharged from the turning hydraulic motor 2A to the hydraulic oil tank. It is a spool valve.
  • the control valve 174 is a spool valve for supplying the hydraulic oil discharged from the main pump 14R to the bucket cylinder 9 and discharging the hydraulic oil in the bucket cylinder 9 to the hydraulic oil tank.
  • Control valves 175A and 175B correspond to the control valve 175 in FIG.
  • the control valves 175A and 175B supply the hydraulic oil discharged from the main pumps 14L and 14R to the boom cylinder 7, and the spool that switches the flow of the hydraulic oil to discharge the hydraulic oil in the boom cylinder 7 to the hydraulic oil tank. It is a valve.
  • the control valves 176A and 176B correspond to the control valve 176 in FIG.
  • the control valves 176A, 176B supply the hydraulic oil discharged from the main pumps 14L, 14R to the arm cylinder 8, and spools for switching the flow of the hydraulic oil to discharge the hydraulic oil in the arm cylinder 8 to the hydraulic oil tank. It is a valve.
  • Control valves 177A and 177B correspond to the control valve 177 in FIG.
  • the control valve 177A is a spool valve that controls the flow rate of the hydraulic oil flowing out from the rod side oil chamber of the arm cylinder 8 to the hydraulic oil tank.
  • the control valve 177B is a spool valve that controls the flow rate of hydraulic oil that flows out from the rod-side oil chamber of the bucket cylinder 9 to the hydraulic oil tank.
  • the control valves 177A and 177B correspond to the control valve 177 in FIG.
  • the control valves 177A and 177B have a first valve position with a minimum opening area (opening degree 0%) and a second valve position with a maximum opening area (opening degree 100%).
  • the control valves 177A and 177B can move steplessly between the first valve position and the second valve position.
  • the parallel pipe line 42L is a high-pressure hydraulic line parallel to the center bypass pipe line 40L.
  • the parallel pipe line 42L can supply hydraulic oil to the control valve further downstream when the flow of the hydraulic oil passing through the center bypass pipe line 40L is restricted or blocked by any of the control valves 171, 173, 175A.
  • the parallel pipe line 42R is a high-pressure hydraulic line parallel to the center bypass pipe line 40R.
  • the parallel pipe line 42R can supply hydraulic oil to the control valve further downstream when the flow of the hydraulic oil passing through the center bypass pipe line 40R is restricted or blocked by any of the control valves 172, 174, and 175B.
  • the regulators 13L and 13R control the discharge amounts of the main pumps 14L and 14R by adjusting the swash plate tilt angles of the main pumps 14L and 14R according to the discharge pressures of the main pumps 14L and 14R.
  • the regulators 13L and 13R correspond to the regulator 13 in FIG.
  • the regulators 13L and 13R adjust the swash plate tilt angles of the main pumps 14L and 14R in accordance with the increase in the discharge pressures of the main pumps 14L and 14R to reduce the discharge amount. This is to prevent the absorption horsepower of the main pump 14 expressed by the product of the discharge pressure and the discharge amount from exceeding the output horsepower of the engine 11.
  • the arm operation lever 26 ⁇ / b> A is an example of the operation device 26 and is used to operate the arm 5.
  • the arm operation lever 26A uses the hydraulic oil discharged from the pilot pump 15 to introduce a control pressure corresponding to the lever operation amount into the pilot ports of the control valves 176A and 176B. Specifically, when the arm operation lever 26A is operated in the arm closing direction, the hydraulic oil is introduced into the right pilot port of the control valve 176A and the hydraulic oil is introduced into the left pilot port of the control valve 176B. . Further, when operated in the arm opening direction, the arm operation lever 26A introduces hydraulic oil into the left pilot port of the control valve 176A and introduces hydraulic oil into the right pilot port of the control valve 176B.
  • the bucket operation lever 26B is an example of the operation device 26, and is used to operate the bucket 6.
  • the bucket operation lever 26B uses hydraulic oil discharged from the pilot pump 15 to introduce a control pressure corresponding to the lever operation amount into the pilot port of the control valve 174. Specifically, when the bucket operating lever 26B is operated in the bucket opening direction, hydraulic oil is introduced into the right pilot port of the control valve 174, and when operated in the bucket closing direction, the left side of the control valve 174 Introduce hydraulic oil to the pilot port.
  • the discharge pressure sensors 28L and 28R are an example of the discharge pressure sensor 28, detect the discharge pressures of the main pumps 14L and 14R, and output the detected values to the controller 30.
  • the operation pressure sensors 29A and 29B are examples of the operation pressure sensor 29.
  • the operation pressure sensors 29A and 29B detect the operation contents of the operator with respect to the arm operation lever 26A and the bucket operation lever 26B in the form of pressure, and output the detected values to the controller 30. To do.
  • the operation content includes, for example, a lever operation direction, a lever operation amount (lever operation angle), and the like.
  • the left and right travel levers (or pedals), the boom operation lever, and the turning operation lever respectively operate the lower traveling body 1, the opening and closing of the bucket 6, and the upper turning body 3. It is the operating device for. Similar to the arm operation lever 26A and the bucket operation lever 26B, these operation devices use hydraulic oil discharged from the pilot pump 15, and control pressure corresponding to the lever operation amount (or pedal operation amount) of each hydraulic actuator. It is introduced into either the left or right pilot port of the control valve corresponding to. Similar to the operation pressure sensors 29 ⁇ / b> A and 29 ⁇ / b> B, the operation content of the operator for each of these operation devices is detected in the form of pressure by the corresponding operation pressure sensor, and the detected value is output to the controller 30.
  • the controller 30 receives outputs from the operation pressure sensors 29A, 29B, etc., and outputs control commands to the regulators 13L, 13R as necessary to change the discharge amounts of the main pumps 14L, 14R.
  • the proportional valves 31A and 31B adjust the control pressure introduced from the pilot pump 15 to the pilot ports of the control valves 177A and 177B according to the current command output by the controller 30.
  • the proportional valves 31A and 31B correspond to the proportional valve 31 of FIG.
  • the proportional valve 31A can adjust the control pressure so that the control valve 177A can be stopped at an arbitrary position between the first valve position and the second valve position.
  • the proportional valve 31B can adjust the control pressure so that the control valve 177B can be stopped at an arbitrary position between the first valve position and the second valve position.
  • negative control employed in the hydraulic system of FIG. 3 will be described.
  • negative control throttles 18L and 18R are arranged between the respective control valves 176A and 176B located on the most downstream side and the hydraulic oil tank.
  • the flow of hydraulic oil discharged from the main pumps 14L and 14R is limited by the negative control throttles 18L and 18R.
  • the negative control throttles 18L and 18R generate a control pressure (hereinafter referred to as “negative control pressure”) for controlling the regulators 13L and 13R.
  • the negative control pressure sensors 19 ⁇ / b> L and 19 ⁇ / b> R are sensors for detecting the negative control pressure, and output the detected value to the controller 30.
  • the controller 30 controls the discharge amounts of the main pumps 14L and 14R by adjusting the swash plate tilt angles of the main pumps 14L and 14R according to the negative control pressure.
  • the controller 30 decreases the discharge amount of the main pumps 14L and 14R as the negative control pressure increases, and increases the discharge amount of the main pumps 14L and 14R as the negative control pressure decreases.
  • the hydraulic oil discharged from the main pumps 14L and 14R passes through the center bypass pipelines 40L and 40R.
  • the flow of hydraulic oil discharged from the main pumps 14L and 14R increases the negative control pressure generated upstream of the negative control throttles 18L and 18R.
  • the controller 30 reduces the discharge amount of the main pumps 14L and 14R to the allowable minimum discharge amount, and suppresses the pressure loss (pumping loss) when the discharged hydraulic oil passes through the center bypass pipelines 40L and 40R. .
  • the hydraulic oil discharged from the main pumps 14L and 14R flows into the operation target hydraulic actuator via the control valve corresponding to the operation target hydraulic actuator.
  • the flow of hydraulic oil discharged from the main pumps 14L and 14R decreases or disappears the amount reaching the negative control throttles 18L and 18R, and lowers the negative control pressure generated upstream of the negative control throttles 18L and 18R.
  • the controller 30 increases the discharge amount of the main pumps 14L and 14R, circulates sufficient hydraulic oil to the hydraulic actuator to be operated, and ensures the driving of the hydraulic actuator to be operated.
  • the hydraulic system of FIG. 3 can suppress wasteful energy consumption in the main pumps 14L and 14R in the standby state.
  • the wasteful energy consumption includes a pumping loss generated by the hydraulic oil discharged from the main pumps 14L and 14R in the center bypass pipes 40L and 40R.
  • the hydraulic system of FIG. 3 can reliably supply necessary and sufficient hydraulic oil from the main pumps 14L and 14R to the hydraulic actuator to be operated.
  • the excavation / loading operation as an example of the excavator operation will be described with reference to FIG.
  • the operator lowers the boom 4 with the bucket 6 positioned above the excavation position, the arm 5 opened, and the bucket 6 opened. This is because the bucket 6 is lowered so that the tip of the bucket 6 is at a desired height from the excavation target.
  • the boom lowering operation is generally performed simultaneously with the turning operation of the upper swing body 3. Therefore, this combined operation is called a boom lowering turning operation.
  • the arm 5 is closed until the arm 5 becomes substantially perpendicular to the ground as shown in FIG. Thereby, the soil to be excavated is attracted by the bucket 6.
  • the operator further closes the arm 5 and the bucket 6 and accommodates the collected soil in the bucket 6.
  • the above operation is called excavation operation.
  • FIG.4 (D) the lower end of the bucket 6 at the time of excavation is located below the surface where the shovel is located.
  • the excavator cannot turn because the periphery of the bucket 6 is surrounded by earth and sand. For this reason, the operator needs to raise the bucket 6 to a height at which the bucket 6 can turn above the surrounding earth and sand by a boom raising operation.
  • the operator closes the bottom of the bucket 6 from the ground while closing the arm 5 and the bucket 6 as shown in FIG.
  • the boom 4 is raised until the height is reached (position higher than the earth and sand around the bucket 6).
  • This combined operation is referred to as a boom raising operation.
  • the hydraulic oil discharged from the main pump 14 flows into the arm cylinder 8 and the bucket cylinder 9.
  • the hydraulic oil flowing out from the arm cylinder 8 is not throttled by the control valve 177A.
  • the hydraulic oil flowing out from the bucket cylinder 9 is not throttled by the control valve 177B.
  • the hydraulic oil that should flow into the boom cylinder 7 flows into the arm cylinder 8 and the bucket cylinder 9 with relatively small loads (pressures), and the boom 4 has a low ascent speed. turn into. For this reason, it is desirable to increase the load (pressure) of the arm cylinder 8 and the bucket cylinder 9 before the boom raising operation is performed so that the hydraulic oil flows into the boom cylinder 7. Therefore, in this embodiment, the hydraulic oil flows into the boom cylinder 7 by increasing the resistance (pressure) of the hydraulic oil in the hydraulic circuit related to the arm 5 and the bucket 6.
  • this embodiment can raise the pressure of the hydraulic fluid which flows into the boom cylinder 7 even if it is the combined operation of the arm 5 and the boom 4 or the combined operation of the bucket 6 and the boom 4.
  • the bucket 6 can be smoothly lifted to a position above the surface on which the shovel is located.
  • Rotation priority control may be performed in the combined operation of the arm 5 and the rotation.
  • the turning priority control is control that gives the highest priority to turning.
  • the turning priority control may be realized by an electromagnetic proportional valve or the like provided in the parallel pipe line 42L between the control valve 176A and the control valve 173.
  • the controller 30 throttles the opening of the electromagnetic proportional valve in the combined operation of the arm 5 and turning.
  • the flow rate of the hydraulic oil flowing through the arm cylinder 8 can be reduced and the pressure of the swing hydraulic circuit can be secured, so that the swing operation can be made smooth.
  • the turning priority control may be performed during the combined operation of the arm 5, the boom 4, and the turning.
  • the turning priority control may be realized by, for example, an electromagnetic proportional valve provided in the parallel pipe line 42L between the control valve 176A and the control valve 173.
  • the controller 30 restricts the opening of the electromagnetic proportional valve in the combined operation of the arm 5, the boom 4 and the turning.
  • the flow rate of the hydraulic oil flowing through the arm cylinder 8 can be reduced and the pressure of the swing hydraulic circuit can be secured, so that the swing operation can be made smooth.
  • boom priority control may be performed.
  • the boom priority control is control that gives the highest priority to raising the boom.
  • the boom priority control may be realized by a variable throttle provided between the turning hydraulic motor 2A and the control valve 173.
  • the controller 30 may throttle the opening of the variable throttle during the combined operation of the boom 4 and the turning. Thereby, the boom raising is prioritized over the turning, and the pressure necessary for the boom raising is ensured.
  • the operator opens the arm 5 and the bucket 6 and discharges the soil in the bucket 6 as shown in FIG.
  • This operation is called a dump operation.
  • the dumping operation only the bucket 6 may be opened and discharged.
  • the operator turns the upper swing body 3 as indicated by the arrow AR2 in FIG. 4G, and moves the bucket 6 directly above the excavation position.
  • the boom 4 is lowered simultaneously with the turning to lower the bucket 6 from the excavation target to a desired height.
  • This combined operation corresponds to the boom lowering turning operation described with reference to FIG.
  • the operator lowers the bucket 6 to a desired height as shown in FIG. 4A, and performs the operation after the excavation operation again.
  • the work content determination unit 300 determines that the excavator work is a high-load work during the excavation operation. Therefore, a control command is output to the proportional valves 31A and 31B (see FIG. 3) to increase the opening area of the control valves 177A and 177B. This is to reduce the pressure loss related to the hydraulic fluid flowing out from each of the arm cylinder 8 and the bucket cylinder 9. In this state, the closing operation of the arm 5 and the bucket 6 is accelerated while the raising operation of the boom 4 is delayed. This is because hydraulic oil that should flow into the boom cylinder 7 flows into the arm cylinder 8 and the bucket cylinder 9.
  • the boom raising support unit 301 executes a boom raising support function before the boom raising operation is performed in order to make the boom raising operation after the excavation operation smoother.
  • the boom raising support function is a function for increasing the pressure of hydraulic oil that can flow into the boom cylinder 7.
  • the boom raising support unit 301 increases the pressure of hydraulic oil that can flow into the boom cylinder 7 in accordance with, for example, information on the attachment acquired by the information acquisition device. For example, before the boom raising operation is performed, the boom raising support unit 301 increases the pressure of hydraulic oil that can flow into the boom cylinder 7 at the assistance start timing determined based on the information regarding the attachment.
  • the support start timing is a timing at which the boom raising support function is started. For example, when the boom raising operation is actually performed, the bucket is filled with earth and sand. Specifically, timing when the attachment is in a predetermined posture, timing when the amount of earth and sand in the bucket 6 reaches a predetermined amount, timing when the arm angle ⁇ is equal to or smaller than the predetermined angle, and bucket angle ⁇ is equal to or smaller than the predetermined angle, etc. It is.
  • FIG. 5 is a flowchart of an example of the boom raising support process.
  • the boom raising support unit 301 repeatedly executes this process at a predetermined control cycle.
  • the boom raising support unit 301 determines whether or not the bucket angle ⁇ is equal to or smaller than the threshold value TH1 and the arm angle ⁇ is equal to or smaller than the threshold value TH2 (hereinafter referred to as “first state”) (step 1). ST1). This is to determine whether or not the attachment posture is in a state suitable for the boom raising operation, that is, whether or not it is immediately before the boom raising operation is performed.
  • the attachment state in the first state corresponds to, for example, the attachment state shown in FIG.
  • the boom raising support unit 301 may determine whether or not the posture of the attachment is in a state suitable for the boom raising operation by additionally considering the boom angle ⁇ . Or you may determine whether the attitude
  • the boom raising support unit 301 estimates the predicted excavation amount based on the information related to the attachment acquired by the information acquisition device, the timing when the boom raising operation is performed based on the estimated predicted excavation amount, and the timing when the excavation operation ends. Etc. may be estimated.
  • the predicted excavation amount is, for example, the amount of earth and sand that is lifted by the bucket 6 when a boom raising operation is performed at the present time.
  • the timing at which the boom raising operation is performed is estimated as, for example, the remaining time until the boom raising operation is performed.
  • the boom raising support unit 301 may determine that it is immediately before the boom raising operation is performed when the remaining time until the boom raising operation is equal to or less than a predetermined value. The same applies to the timing when the excavation operation ends.
  • step ST1 When it is determined that it is not in the first state (NO in step ST1), that is, when it is determined that it is not immediately before the boom raising operation is performed, the boom raising support unit 301 does not execute the boom raising support function, and this boom The lifting support process is terminated.
  • the boom raising support unit 301 executes the boom raising support function (step S1). ST2).
  • the boom raising support unit 301 outputs a control command to the proportional valve 31 to increase the pressure of hydraulic oil that can flow into the boom cylinder 7. If the pressure of the hydraulic oil that can flow into the boom cylinder 7 is increased before the boom raising operation is performed, the hydraulic oil is quickly supplied to the bottom side oil chamber of the boom cylinder 7 when the boom raising operation is actually performed. It is because it can be made to flow into.
  • the hydraulic fluid flows into the boom cylinder 7 when the boom raising operation is actually performed.
  • the hydraulic oil to be made flows into the arm cylinder 8 or the bucket cylinder 9. This is because the hydraulic oil pressure in each of the arm cylinder 8 and the bucket cylinder 9 is lower than the hydraulic oil pressure in the boom cylinder 7.
  • the excavator cannot quickly flow the hydraulic oil into the bottom side oil chamber of the boom cylinder 7 and cannot raise the boom 4 smoothly.
  • the boom raising support unit 301 outputs a control command to the proportional valve 31A (see FIG. 3) to reduce the opening area of the control valve 177A. This is to reduce the flow rate of the hydraulic oil flowing from the rod side oil chamber of the arm cylinder 8 to the hydraulic oil tank.
  • the boom raising support unit 301 outputs a control command to the proportional valve 31B (see FIG. 3) to reduce the opening area of the control valve 177B. This is because the flow rate of the hydraulic oil flowing from the rod side oil chamber of the bucket cylinder 9 to the hydraulic oil tank is reduced.
  • the pressure of hydraulic oil discharged from the main pumps 14L and 14R that is, the pressure of hydraulic oil that can flow into the boom cylinder 7 increases.
  • the excavator can promptly flow the hydraulic oil into the bottom side oil chamber of the boom cylinder 7 when the boom raising operation is actually performed.
  • the boom raising support unit 301 determines the opening areas of the control valves 177A and 177B for each predetermined control cycle according to information (for example, arm angle ⁇ , bucket angle ⁇ , etc.) related to the attachment. However, the boom raising support unit 301 may reduce the opening areas of the control valves 177A and 177B according to a predetermined pattern.
  • the boom raising support unit 301 may increase the engine speed in order to increase the horsepower that can be absorbed by the main pumps 14L and 14R before the boom raising operation is performed. This is because the pressure of hydraulic oil that can flow into the boom cylinder 7 can be increased by increasing the horsepower that can be absorbed by the main pumps 14L and 14R and then increasing the discharge amount of the main pumps 14L and 14R. is there.
  • the boom raising support unit 301 determines whether or not the release condition is satisfied (step ST3).
  • the release condition means a condition for stopping execution of the boom raising support function.
  • the release condition includes, for example, that the boom raising operation is not performed even after a predetermined time has elapsed from the time when it is determined that the state is the first state, the boom raising operation is completed, and the like.
  • the boom raising support unit 301 ends the current boom raising support process without stopping the execution of the boom raising support function.
  • the boom raising support unit 301 stops the execution of the boom raising support function (step ST4).
  • the boom raising support unit 301 outputs a control command to the proportional valve 31 and stops the increase in the pressure of hydraulic oil that can flow into the boom cylinder 7.
  • the boom raising support unit 301 outputs a control command to the proportional valve 31A (see FIG. 3) to stop the reduction of the opening area of the control valve 177A. This is because the restriction on the flow rate of the hydraulic oil flowing from the rod side oil chamber of the arm cylinder 8 to the hydraulic oil tank is released.
  • the boom raising support unit 301 outputs a control command to the proportional valve 31B (see FIG. 3) and stops the reduction of the opening area of the control valve 177B. This is because the restriction of the flow rate of the hydraulic oil flowing from the rod side oil chamber of the bucket cylinder 9 to the hydraulic oil tank is released.
  • FIG. 6 is a diagram illustrating temporal transition of various physical quantities.
  • FIG. 6A shows a temporal transition of the amount of hydraulic oil flowing into the arm cylinder 8 (hereinafter referred to as “arm cylinder inflow amount”).
  • FIG. 6B shows a temporal transition of the amount of hydraulic oil flowing into the bucket cylinder 9 (hereinafter referred to as “bucket cylinder inflow amount”).
  • FIG. 6C shows a temporal transition of a lever operation amount in the raising direction of the boom operation lever (hereinafter referred to as “boom raising operation amount”).
  • FIG. 6D shows the temporal transition of the boom bottom pressure.
  • FIG. 6A shows a temporal transition of the amount of hydraulic oil flowing into the arm cylinder 8 (hereinafter referred to as “arm cylinder inflow amount”).
  • FIG. 6B shows a temporal transition of the amount of hydraulic oil flowing into the bucket cylinder 9 (hereinafter referred to as “bucket cylinder inflow amount”).
  • FIG. 6C shows a temp
  • FIG. 6E shows a temporal transition of the pump discharge pressure.
  • the horizontal axis (time axis) in FIGS. 6A to 6E is common. Further, the solid line in FIG. 6 represents a transition when the boom raising support process is being executed, and the broken line in FIG. 6 represents a transition when the boom raising support process is not being executed.
  • the boom raising assistance unit 301 outputs a control command to the proportional valves 31A and 31B (see FIG. 3) when determining that the boom raising assistance unit 301 is in the first state at time t1.
  • the opening area of the control valves 177A and 177B is reduced.
  • the arm cylinder inflow amount gradually decreases from the flow rate Qa1, and reaches the flow rate Qa2 at time t2.
  • the bucket cylinder inflow amount gradually decreases from the flow rate Qb1 as shown by the solid line in FIG. 6B, and becomes the flow rate Qb2 at time t2.
  • the pump discharge pressure gradually increases from the pressure P1, as indicated by the solid line in FIG. 6E, and reaches the pressure P2 at time t2. This means that the pressure of the hydraulic oil that can flow into the boom cylinder 7 has increased to the pressure P2 at time t2.
  • the boom raising operation amount reaches the maximum value Lmax at time t5 as shown by the solid line in FIG.
  • the boom bottom pressure reaches the pressure Pc at time t5 as shown by the solid line in FIG.
  • the pressure Pc is a boom bottom pressure when the bucket 6 is completely separated from the ground.
  • the arm cylinder inflow amount remains at the flow rate Qa1 until time t3 when the boom raising operation is started, as shown by the broken line in FIG.
  • the bucket cylinder inflow amount changes at the flow rate Qb1 until time t3 when the boom raising operation is started, as indicated by a broken line in FIG. 6B.
  • the pump discharge pressure remains at the pressure P1 until time t3 when the boom raising operation is started, as indicated by a broken line in FIG. This means that the pressure of the hydraulic oil that can flow into the boom cylinder 7 does not reach a pressure sufficient to raise the boom 4 even at time t3.
  • the arm cylinder inflow amount gradually decreases from the flow rate Qa1, as shown by the broken line in FIG.
  • the flow rate becomes Qa2 at t4.
  • the bucket cylinder inflow amount gradually decreases from the flow rate Qb1 and becomes the flow rate Qb2 at time t4, as shown by the broken line in FIG.
  • the pump discharge pressure gradually increases from the pressure P1, as indicated by the broken line in FIG. 6E, and becomes the pressure P2 at time t4.
  • the boom bottom pressure increases at the same rate of increase as when the boom raising support process is executed after time t4 when the pump discharge pressure becomes the pressure P2.
  • the boom raising support unit 301 executes the boom raising support function before the boom raising operation is performed, so that the boom raising operation is actually performed as compared with the case where the boom raising support function is not performed. Sometimes the boom 4 can be raised more smoothly.
  • FIG. 7 is a flowchart of another example of boom raising support processing.
  • the flowchart in FIG. 7 is different from the flowchart in FIG. 5 in that step ST11 is included. Therefore, the description of the common part is omitted, and the different part is described in detail.
  • the boom raising support unit 301 first determines whether excavation is in progress (step ST11).
  • the boom raising support unit 301 uses, for example, the determination result of whether or not excavation by the work content determination unit 300 is in progress.
  • the boom raising support unit 301 may determine whether or not excavation is being performed based on the arm bottom pressure, and may determine whether or not excavation is being performed based on the bucket bottom pressure and the arm bottom pressure. Also good.
  • step ST11 If it is determined that excavation is not in progress (NO in step ST11), the boom raising support unit 301 ends the current boom raising support process without determining whether the state is the first state. On the other hand, when it is determined that excavation is in progress (YES in step ST11), the boom raising support unit 301 executes the processes after step ST1. This is to prevent the movement of the arm 5 and the bucket 6 from being slowed by executing the boom raising support function when low-load work such as floor digging work or leveling work is performed.
  • the boom raising support unit 301 performs the boom raising support function because it is in the first state despite the low load work being performed, and the movement of the arm 5 and the bucket 6 is performed. Can be prevented from becoming slow.
  • FIG. 8 is a flowchart of still another example of boom raising support processing.
  • the flowchart of FIG. 8 is different from the flowchart of FIG. 7 in that step ST12 is included and step ST2A is included instead of step ST2. Therefore, the description of the common part is omitted, and the different part is described in detail.
  • the boom raising support unit 301 estimates the property of the excavation target based on the pump discharge pressure (step ST12). For example, the boom raising support unit 301 estimates that the sediment to be excavated is harder as the pump discharge pressure is higher, and estimates that the sediment to be excavated is softer as the pump discharge pressure is lower. In this case, the boom raising support unit 301 may estimate the hardness of the sediment to be excavated at a plurality of levels. Alternatively, the hardness of the excavation target sediment may be estimated steplessly by calculating the hardness of the excavation target.
  • the boom raising support unit 301 executes a boom raising support function according to the estimation result (step ST2A).
  • the boom raising support unit 301 refers to, for example, a table stored in advance in a ROM or the like, and derives the opening area of the control valve 177 corresponding to the combination of the estimated level, the arm angle ⁇ , and the bucket angle ⁇ .
  • the opening area may be calculated from the hardness of the object to be excavated.
  • the table stored in advance in the ROM or the like may be a table representing the correspondence between the pump discharge pressure, the combination of the arm angle ⁇ and the bucket angle ⁇ , and the opening area.
  • the boom raising support unit 301 may control the opening area of the control valve 177 so that the pump discharge pressure becomes a desired value.
  • the boom raising support unit 301 can adjust the contents of the boom raising support function according to the nature of the excavation target. Therefore, the boom raising support unit 301 can suppress, for example, an excessive increase in the lifting speed of the boom 4 when lifting the soft earth and sand.
  • FIG. 9 is a flowchart of still another example of boom raising support processing.
  • the flowchart of FIG. 9 is different from the flowchart of FIG. 5 in that step ST1A is provided instead of step ST1. Therefore, the description of the common part is omitted, and the different part is described in detail.
  • the boom raising support unit 301 first determines whether or not the estimated soil volume is equal to or greater than the threshold value TH3 (step ST1A). In the example of FIG. 9, the boom raising support unit 301 calculates the predicted excavation amount as the estimated soil amount by performing various kinds of image processing on the soil image in the bucket 6 captured by the camera S ⁇ b> 6.
  • the boom raising support unit 301 may calculate the estimated soil volume based on the output of the information acquisition device. For example, the boom raising support unit 301 may calculate the estimated soil volume based on the output of one or a plurality of other information acquisition devices such as a camera S6, a cylinder pressure sensor, a LIDAR, a millimeter wave radar, and an inertial measurement device. .
  • step ST1A If it is determined that the estimated soil volume is less than the threshold TH3 (NO in step ST1A), the boom raising support unit 301 ends the current boom raising support process without executing the boom raising support function. On the other hand, when it is determined that the estimated amount of soil is equal to or greater than the threshold TH3 (YES in step ST1A), the boom raising support unit 301 executes the processes after step ST2.
  • the boom raising support unit 301 can execute the boom raising support function after confirming that the excavation target such as earth and sand is accommodated in the bucket 6. Therefore, it is possible to prevent a situation where the boom raising support function is executed even though the excavation target such as earth and sand is not accommodated in the bucket 6.
  • FIG. 10 is a schematic diagram illustrating another configuration example of the hydraulic system mounted on the excavator in FIG. 1.
  • the hydraulic system of FIG. 10 differs from the hydraulic system of FIG. 3 in that control valves 177C to 177E are provided instead of the control valves 177A and 177B, and proportional valves 31C to 31E are provided instead of the proportional valves 31A and 31B.
  • control valves 177C to 177E are provided instead of the control valves 177A and 177B
  • proportional valves 31C to 31E are provided instead of the proportional valves 31A and 31B.
  • the control valve 177C is a spool valve that controls the flow rate of the hydraulic oil flowing from the main pump 14R into the arm cylinder 8 through the parallel pipe line 42R.
  • the control valve 177D is a spool valve that controls the flow rate of the hydraulic oil flowing into the arm cylinder 8 from the main pump 14L through the parallel pipeline 42L.
  • the control valve 177E is a spool valve that controls the flow rate of the hydraulic oil flowing from the main pump 14R through the parallel pipeline 42R into the bucket cylinder 9.
  • the control valves 177C to 177E have a first valve position with a minimum opening area (opening degree 0%) and a second valve position with a maximum opening area (opening degree 100%).
  • the control valves 177C to 177E can move steplessly between the first valve position and the second valve position.
  • the proportional valves 31C to 31E adjust the control pressure introduced from the pilot pump 15 to the pilot ports of the control valves 177C to 177E in accordance with the current command output from the controller 30.
  • the proportional valves 31C to 31E correspond to the proportional valve 31 in FIG.
  • the proportional valve 31C can adjust the control pressure so that the control valve 177C can be stopped at an arbitrary position between the first valve position and the second valve position.
  • the proportional valve 31D can adjust the control pressure so that the control valve 177D can be stopped at an arbitrary position between the first valve position and the second valve position.
  • the proportional valve 31E can adjust the control pressure so that the control valve 177E can be stopped at an arbitrary position between the first valve position and the second valve position.
  • the boom raising support unit 301 When executing the boom raising support function, the boom raising support unit 301 outputs a control command to the proportional valve 31E to reduce the opening area of the control valve 177E. This is for reducing the flow rate of the hydraulic oil flowing into the bucket cylinder 9. Similarly, the boom raising support unit 301 outputs control commands to the proportional valves 31C and 31D to reduce the respective opening areas of the control valves 177C and 177D. This is to reduce the flow rate of the hydraulic oil flowing into the arm cylinder 8. As a result, the pressure of hydraulic oil discharged from the main pumps 14L and 14R, that is, the pressure of hydraulic oil that can flow into the boom cylinder 7 increases. As a result, the excavator can promptly flow the hydraulic oil into the bottom side oil chamber of the boom cylinder 7 when the boom raising operation is actually performed.
  • the boom raising support unit 301 can execute the boom raising support function using the hydraulic system shown in FIG. 10 in the same manner as when the boom raising support function is executed using the hydraulic system shown in FIG.
  • FIG. 11 is a schematic diagram showing still another configuration example of the hydraulic system mounted on the shovel of FIG.
  • the hydraulic system of FIG. 11 is different from the hydraulic system of FIG. 3 in that it has proportional valves 31L1, 31L2, 31R1, and 31R2 instead of proportional valves 31A and 31B, and the control valves 177A and 177B are omitted.
  • proportional valves 31L1, 31L2, 31R1, and 31R2 instead of proportional valves 31A and 31B
  • the control valves 177A and 177B are omitted.
  • the proportional valve 31L1 is introduced from the arm operation lever 26A into the right pilot port of the control valve 176A and the arm operation lever 26A into the left pilot port of the control valve 176B in accordance with a control command output from the controller 30. Adjust the pilot pressure. Specifically, the proportional valve 31L1 can adjust the pilot pressure generated by the arm operation lever 26A when the arm closing operation is performed.
  • the proportional valve 31R1 is introduced from the arm operation lever 26A into the left pilot port of the control valve 176A and the arm operation lever 26A into the right pilot port of the control valve 176B in accordance with a control command output from the controller 30. Adjust the pilot pressure. Specifically, the proportional valve 31R1 can adjust the pilot pressure generated by the arm operation lever 26A when the arm opening operation is performed.
  • the proportional valve 31L2 adjusts the pilot pressure introduced from the bucket operation lever 26B to the left pilot port of the control valve 174 in accordance with the control command output by the controller 30. Specifically, the proportional valve 31L2 can adjust the pilot pressure generated by the bucket operation lever 26B when the bucket closing operation is performed.
  • the proportional valve 31R2 adjusts the pilot pressure introduced from the bucket operation lever 26B to the right pilot port of the control valve 174 in accordance with a control command output by the controller 30. Specifically, the proportional valve 31R2 can adjust the pilot pressure generated by the bucket operation lever 26B when the bucket opening operation is performed.
  • the boom raising support unit 301 When executing the boom raising support function, the boom raising support unit 301 outputs a control command to the proportional valve 31L1, and reduces the pilot pressure generated by the arm operation lever 26A when the arm closing operation is performed. For example, the pilot pressure is reduced by 30%. This can bring about the same situation as when the operator reduces the lever operation amount of the arm operation lever 26A by 30%, that is, when the arm operation lever 26A is returned toward the neutral position. Therefore, the boom raising support unit 301 does not force the operator to return the arm operation lever 26A to the neutral position, and the hydraulic oil that flows into the bottom side oil chamber of the arm cylinder 8 when the arm closing operation is performed. The flow rate can be reduced.
  • the boom raising support unit 301 outputs a control command to the proportional valve 31R1, and reduces the pilot pressure generated by the arm operation lever 26A when the arm opening operation is performed. Therefore, the boom raising support unit 301 does not force the operator to return the arm operation lever 26A to the neutral position, and the hydraulic oil that flows into the rod side oil chamber of the arm cylinder 8 when the arm opening operation is performed. The flow rate can be reduced.
  • the boom raising support unit 301 outputs a control command to the proportional valve 31L2, and reduces the pilot pressure generated by the bucket operation lever 26B when the bucket closing operation is performed. Therefore, the boom raising support unit 301 does not force the operator to return the bucket operation lever 26B to the neutral position, and hydraulic oil that flows into the bottom side oil chamber of the bucket cylinder 9 when the bucket closing operation is performed. The flow rate can be reduced.
  • the boom raising support unit 301 outputs a control command to the proportional valve 31R2, and reduces the pilot pressure generated by the bucket operation lever 26B when the bucket opening operation is performed. Therefore, the boom raising support unit 301 does not force the operator to return the bucket operation lever 26B to the neutral position, and the hydraulic oil flows into the rod side oil chamber of the bucket cylinder 9 when the bucket opening operation is performed. The flow rate can be reduced.
  • the pressure of the hydraulic oil discharged from the main pumps 14L and 14R that is, the pressure of the hydraulic oil that can flow into the boom cylinder 7 increases.
  • the excavator can promptly flow the hydraulic oil into the bottom side oil chamber of the boom cylinder 7 when the boom raising operation is actually performed.
  • the boom raising support unit 301 can execute the boom raising support function using the hydraulic system shown in FIG. 11 as in the case where the boom raising support function is executed using the hydraulic system shown in FIG.
  • the controller 30 increases the pressure of the hydraulic oil that can flow into the boom cylinder 7 according to the information regarding the attachment before the boom raising operation is performed. Therefore, the boom raising operation during excavation can be made smoother.
  • the controller 30 preferably increases the pressure of hydraulic fluid that can flow into the boom cylinder 7 at a timing determined based on information about the attachment acquired by the information acquisition device before the boom raising operation is performed.
  • the timing is, for example, the timing when the bucket is filled with earth and sand when the boom raising operation is actually performed. Therefore, the pressure of the hydraulic oil that can flow into the boom cylinder 7 can be increased at a more appropriate time.
  • the controller 30 desirably throttles the flow rate of hydraulic oil flowing into and out of the arm cylinder 8 and the bucket cylinder 9 before the boom raising operation is performed. Therefore, the pressure of the hydraulic oil that can flow into the boom cylinder 7 can be easily and reliably increased.
  • the controller 30 desirably reduces the increased pressure when the boom raising operation is not performed even after a predetermined time has elapsed after increasing the pressure of the hydraulic oil that can flow into the boom cylinder 7. Therefore, it is possible to prevent the state where the flow rate of the hydraulic oil flowing into and out of each of the arm cylinder 8 and the bucket cylinder 9 is limited for a long period of time, even though the boom raising operation is not performed.
  • Operation pressure sensor 30 ... Controller 31, 31A, 31B, 31C, 31D, 31E, 31L1, 31L2, 31R1, 31R2 ... Proportional valves 171 to 177, 175A, 175B, 176A, 176B, 177A to 177E ... control valve 300 ... work content determination unit 301 ... boom raising support unit S1 ... boom angle sensor S2 ... arm angle sensor S3 ... bucket angle sensor S4 ... body Inclination sensor S5 ... Turning angular velocity sensor S6 ... Camera S7B ... Boom bottom pressure sensor S7R ... Boom rod pressure sensor S8B ... Arm bottom pressure sensor S8R ... Arm rod pressure sensor S9B ... Bucket bottom pressure sensor S9R ... Bucket rod pressure sensor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Operation Control Of Excavators (AREA)
  • Component Parts Of Construction Machinery (AREA)

Abstract

本発明の実施形態に係るショベルは、下部走行体(1)と、下部走行体(1)に旋回可能に搭載される上部旋回体(3)と、上部旋回体(3)に搭載されるキャビン(10)と、上部旋回体(3)に取り付けられるブーム(4)を含むアタッチメントと、ブーム(4)を駆動するブームシリンダ(7)と、ブームシリンダ(7)に流入可能な作動油を制御するコントローラ(30)と、アタッチメントに関する情報を取得する情報取得装置(例えばアーム角度センサ(S2))とを有する。コントローラ(30)は、ブーム上げ操作が行われる前に、アタッチメントに関する情報に応じてブームシリンダ(7)に流入可能な作動油の圧力を増大させる。

Description

ショベル
 本発明は、上部旋回体に取り付けられたブームを含むアタッチメントを備えたショベルに関する。
 従来、ブーム、アーム、及びバケットで構成される掘削アタッチメントを備えたショベルが知られている(例えば、特許文献1参照)。ブーム、アーム、バケットは、ブームシリンダ、アームシリンダ、バケットシリンダでそれぞれ油圧駆動される。ショベルの操作者は、例えば、アーム閉じ操作を行うことで土砂を掘削し、その後にブーム上げ操作を行うことで掘削した土砂を持ち上げる。掘削が行われているときには、アームシリンダに流出入する作動油が流れる管路の流路面積は大きいほうがよい。その管路における無駄な圧力損失の発生を抑制でき、アームの閉じ速度を増大させることができるためである。
特開2014-5711号公報
 しかしながら、掘削した土砂を持ち上げるときにその管路の流路面積が大きいと、ブームが上がりにくい。ブームシリンダに流入すべき作動油がアームシリンダに流入してしまうためである。バケット閉じ操作を行うことで土砂を掘削する場合、或いは、バケット閉じ操作とアーム閉じ操作を同時に行うことで土砂を掘削する場合についても同様である。
 上述に鑑み、掘削の際のブーム上げ動作をより円滑にするショベルを提供することが望ましい。
 本発明の実施形態に係るショベルは、下部走行体と、前記下部走行体に旋回可能に搭載される上部旋回体と、前記上部旋回体に搭載される運転室と、前記上部旋回体に取り付けられるブームを含むアタッチメントと、前記ブームを駆動するブームシリンダと、前記ブームシリンダに流入可能な作動油を制御する制御装置と、前記アタッチメントに関する情報を取得する情報取得装置と、を有し、前記制御装置は、ブーム上げ操作が行われる前に、前記アタッチメントに関する情報に応じて前記ブームシリンダに流入可能な作動油の圧力を増大させる。
 上述の手段により、掘削の際のブーム上げ動作をより円滑にするショベルを提供できる。
本発明の実施形態に係るショベルの側面図である。 図1のショベルの駆動系の構成例を示すブロック図である。 図1のショベルに搭載される油圧システムの構成例を示す概略図である。 掘削・積込み動作を説明する図である。 ブーム上げ支援処理の一例のフローチャートである。 各種物理量の時間的推移を示す図である。 ブーム上げ支援処理の別の一例のフローチャートである。 ブーム上げ支援処理の更に別の一例のフローチャートである。 ブーム上げ支援処理の更に別の一例のフローチャートである。 図1のショベルに搭載される油圧システムの別の構成例を示す概略図である。 図1のショベルに搭載される油圧システムの更に別の構成例を示す概略図である。
 図1は本発明の実施形態に係るショベル(掘削機)の側面図である。ショベルの下部走行体1には旋回機構2を介して上部旋回体3が旋回可能に搭載されている。上部旋回体3にはブーム4が取り付けられている。ブーム4の先端にはアーム5が取り付けられ、アーム5の先端にはエンドアタッチメントとしてのバケット6が取り付けられている。
 ブーム4、アーム5、バケット6は、アタッチメントの一例としての掘削アタッチメントを構成し、ブームシリンダ7、アームシリンダ8、バケットシリンダ9によりそれぞれ油圧駆動される。ブーム4にはブーム角度センサS1が取り付けられ、アーム5にはアーム角度センサS2が取り付けられ、バケット6にはバケット角度センサS3が取り付けられている。
 ブーム角度センサS1はブーム4の回動角度を検出する。本実施形態では、ブーム角度センサS1は水平面に対する傾斜を検出可能な加速度センサである。そのため、上部旋回体3に対するブーム4の回動角度(以下、「ブーム角度α」とする。)を検出できる。ブーム角度αは、例えば、ブーム4を最も下げたときにゼロ度となり、ブーム4を上げるにつれて大きくなる。
 アーム角度センサS2はアーム5の回動角度を検出する。本実施形態では、アーム角度センサS2は水平面に対する傾斜を検出可能な加速度センサである。そのため、ブーム4に対するアーム5の回動角度(以下、「アーム角度β」とする。)を検出できる。アーム角度βは、例えば、アーム5を最も閉じたときにゼロ度となり、アーム5を開くにつれて大きくなる。
 バケット角度センサS3はバケット6の回動角度を検出する。本実施形態では、バケット角度センサS3は水平面に対する傾斜を検出可能な加速度センサである。そのため、アーム5に対するバケット6の回動角度(以下、「バケット角度γ」とする。)を検出できる。バケット角度γは、例えば、バケット6を最も閉じたときにゼロ度となり、バケット6を開くにつれて大きくなる。
 ブーム角度センサS1、アーム角度センサS2、及び、バケット角度センサS3はそれぞれ、可変抵抗器を利用したポテンショメータ、対応する油圧シリンダのストローク量を検出するストロークセンサ、連結ピン回りの回動角度を検出するロータリエンコーダ、ジャイロセンサ、加速度センサとジャイロセンサの組み合わせ等であってもよい。ブーム角度センサS1、アーム角度センサS2、及び、バケット角度センサS3は、掘削アタッチメントの姿勢に関する情報を検出する姿勢センサを構成する。
 ブームシリンダ7にはブームロッド圧センサS7R及びブームボトム圧センサS7Bが取り付けられている。アームシリンダ8にはアームロッド圧センサS8R及びアームボトム圧センサS8Bが取り付けられている。バケットシリンダ9にはバケットロッド圧センサS9R及びバケットボトム圧センサS9Bが取り付けられている。ブームロッド圧センサS7R、ブームボトム圧センサS7B、アームロッド圧センサS8R、アームボトム圧センサS8B、バケットロッド圧センサS9R及びバケットボトム圧センサS9Bは、シリンダ圧センサの具体例である。
 ブームロッド圧センサS7Rはブームシリンダ7のロッド側油室の圧力(以下、「ブームロッド圧」とする。)を検出し、ブームボトム圧センサS7Bはブームシリンダ7のボトム側油室の圧力(以下、「ブームボトム圧」とする。)を検出する。アームロッド圧センサS8Rはアームシリンダ8のロッド側油室の圧力(以下、「アームロッド圧」とする。)を検出し、アームボトム圧センサS8Bはアームシリンダ8のボトム側油室の圧力(以下、「アームボトム圧」とする。)を検出する。バケットロッド圧センサS9Rはバケットシリンダ9のロッド側油室の圧力(以下、「バケットロッド圧」とする。)を検出し、バケットボトム圧センサS9Bはバケットシリンダ9のボトム側油室の圧力(以下、「バケットボトム圧」とする。)を検出する。
 上部旋回体3には運転室であるキャビン10が設けられ且つエンジン11等の動力源が搭載されている。また、上部旋回体3には機体傾斜センサS4、旋回角速度センサS5、及びカメラS6が取り付けられている。
 機体傾斜センサS4は水平面に対する上部旋回体3の傾斜を検出する。本実施形態では、機体傾斜センサS4は上部旋回体3の前後軸及び左右軸回りの傾斜角を検出する加速度センサである。上部旋回体3の前後軸及び左右軸は、例えば、互いに直交してショベルの旋回軸上の一点であるショベル中心点を通る。
 旋回角速度センサS5は、上部旋回体3の旋回角速度を検出する。本実施形態では、ジャイロセンサである。レゾルバ、ロータリエンコーダ等であってもよい。
 カメラS6はショベルの周辺の画像を取得する装置である。本実施形態では、カメラS6は上部旋回体3に取り付けられる前方カメラを含む。前方カメラは、ショベルの前方を撮像するステレオカメラであり、キャビン10の屋根、すなわちキャビン10の外部に取り付けられている。キャビン10の天井、すなわちキャビン10の内部に取り付けられていてもよい。前方カメラは、バケット6の内部を撮像可能である。前方カメラは、単眼カメラであってもよい。
 キャビン10内にはコントローラ30が設置されている。コントローラ30は、ショベルの駆動制御を行う主制御部として機能する。本実施形態では、コントローラ30は、CPU、RAM、ROM等を含むコンピュータで構成されている。コントローラ30の各種機能は、例えば、ROMに格納されたプログラムをCPUが実行することで実現される。
 図2は、図1のショベルの駆動系の構成例を示すブロック図であり、機械的動力系、高圧油圧ライン、パイロットライン、及び電気制御系をそれぞれ二重線、太実線、破線、及び点線で示している。
 ショベルの駆動系は、主に、エンジン11、レギュレータ13、メインポンプ14、パイロットポンプ15、コントロールバルブ17、操作装置26、吐出圧センサ28、操作圧センサ29、コントローラ30、比例弁31等を含む。
 エンジン11は、ショベルの駆動源である。本実施形態では、エンジン11は、例えば、所定の回転数を維持するように動作するディーゼルエンジンである。また、エンジン11の出力軸は、メインポンプ14及びパイロットポンプ15の入力軸に連結されている。
 メインポンプ14は、高圧油圧ラインを介して作動油をコントロールバルブ17に供給する。本実施形態では、メインポンプ14は、斜板式可変容量型油圧ポンプである。
 レギュレータ13は、メインポンプ14の吐出量を制御する。本実施形態では、レギュレータ13は、コントローラ30からの制御指令に応じてメインポンプ14の斜板傾転角を調節することによってメインポンプ14の吐出量を制御する。
 パイロットポンプ15は、パイロットラインを介して操作装置26及び比例弁31を含む各種油圧制御機器に作動油を供給する。本実施形態では、パイロットポンプ15は、固定容量型油圧ポンプである。
 コントロールバルブ17は、ショベルにおける油圧システムを制御する油圧制御装置である。コントロールバルブ17は、制御弁171~177を含む。コントロールバルブ17は、制御弁171~176を通じ、メインポンプ14が吐出する作動油を1又は複数の油圧アクチュエータに選択的に供給できる。制御弁171~176は、メインポンプ14から油圧アクチュエータに流れる作動油の流量、及び、油圧アクチュエータから作動油タンクに流れる作動油の流量を制御する。油圧アクチュエータは、ブームシリンダ7、アームシリンダ8、バケットシリンダ9、左側走行用油圧モータ1A、右側走行用油圧モータ1B、及び旋回用油圧モータ2Aを含む。制御弁177は、アームシリンダ8及びバケットシリンダ9のそれぞれを通る作動油の流量を制御する。
 操作装置26は、操作者が油圧アクチュエータの操作のために用いる装置である。本実施形態では、操作装置26は、パイロットラインを介して、パイロットポンプ15が吐出する作動油を油圧アクチュエータのそれぞれに対応する制御弁のパイロットポートに供給する。パイロットポートのそれぞれに供給される作動油の圧力(パイロット圧)は、油圧アクチュエータのそれぞれに対応する操作装置26のレバー又はペダル(図示せず。)の操作方向及び操作量に応じた圧力である。
 吐出圧センサ28は、メインポンプ14の吐出圧を検出する。本実施形態では、吐出圧センサ28は、検出した値をコントローラ30に対して出力する。
 操作圧センサ29は、操作装置26を用いた操作者の操作内容を検出する。本実施形態では、操作圧センサ29は、油圧アクチュエータのそれぞれに対応する操作装置26のレバー又はペダルの操作方向及び操作量を圧力の形で検出し、検出した値をコントローラ30に対して出力する。操作装置26の操作内容は、操作圧センサ以外の他のセンサを用いて検出されてもよい。
 コントローラ30は、作業内容判定部300及びブーム上げ支援部301のそれぞれに対応するプログラムをROMから読み出してRAMにロードし、それぞれに対応する処理をCPUに実行させる。
 具体的には、コントローラ30は、各種センサの出力に基づいて作業内容判定部300及びブーム上げ支援部301のそれぞれによる処理を実行する。そして、コントローラ30は、作業内容判定部300及びブーム上げ支援部301のそれぞれの処理結果に応じた制御指令を適宜にレギュレータ13、比例弁31等に対して出力する。
 作業内容判定部300は、例えば、アーム5の閉じ動作が掘削作業等の高負荷作業のための動作であるか或いは均し作業等の低負荷作業のための動作であるかを判定する。本実施形態では、作業内容判定部300は、アームボトム圧センサS8Bの検出値が所定値以上の場合に高負荷作業のための動作であると判定する。そして、高負荷作業のための動作であると判定した場合、作業内容判定部300は、比例弁31に対して制御指令を出力する。但し、作業内容判定部300は、カメラS6、LIDAR、ミリ波レーダ等の他の1又は複数の情報取得装置の出力に基づいて高負荷作業のための動作であるか低負荷作業の動作であるかを判定してもよい。
 比例弁31は、コントローラ30が出力する制御指令に応じて動作する。本実施形態では、比例弁31は、コントローラ30が出力する電流指令に応じてパイロットポンプ15からコントロールバルブ17内の制御弁177のパイロットポートに導入される制御圧を調整する電磁弁である。コントローラ30は、例えば、アームシリンダ8のロッド側油室と作動油タンクとを繋ぐ管路に設置されている制御弁177を作動させてその管路の流路面積を増大させる。この構成により、コントローラ30は、高負荷作業のためにアーム5を閉じる際にアームシリンダ8のロッド側油室から作動油タンクに流れる作動油が発生させる圧力損失を低減できる。
 作業内容判定部300は、バケット6の閉じ動作が高負荷作業のための動作であるか或いは低負荷作業のための動作であるかを判定してもよい。この場合、作業内容判定部300は、バケットボトム圧センサS9Bの検出値が所定値以上の場合に高負荷作業のための動作であると判定する。そして、高負荷作業の動作であると判定した場合、作業内容判定部300は、比例弁31に対して制御指令を出力する。比例弁31は、バケットシリンダ9のロッド側油室と作動油タンクとを繋ぐ管路に設置されている制御弁177を作動させてその管路の流路面積を増大させる。この構成により、コントローラ30は、高負荷作業のためにバケット6を閉じる際にバケットシリンダ9のロッド側油室から作動油タンクに流れる作動油が発生させる圧力損失を低減できる。
 作業内容判定部300は、掘削が開始されたか否か、或いは、掘削中であるか否かを判定してもよい。この場合、作業内容判定部300は、例えば、情報取得装置が取得するアタッチメントに関する情報に基づいて判定してもよい。アタッチメントに関する情報は、ブーム角度α、アーム角度β、バケット角度γ、ブームロッド圧、ブームボトム圧、アームロッド圧、アームボトム圧、バケットロッド圧、バケットボトム圧、カメラS6の撮像画像等のうちの少なくとも1つを含む。情報取得装置は、ブーム角度センサS1、アーム角度センサS2、バケット角度センサS3、機体傾斜センサS4、旋回角速度センサS5、カメラS6、ブームロッド圧センサS7R、ブームボトム圧センサS7B、アームロッド圧センサS8R、アームボトム圧センサS8B、バケットロッド圧センサS9R、バケットボトム圧センサS9B、吐出圧センサ28、操作圧センサ29、LIDAR、ミリ波レーダ、慣性測定装置等のうちの少なくとも1つを含む。
 次に図3を参照し、ショベルに搭載される油圧システムの構成例について説明する。図3は、図1のショベルに搭載される油圧システムの構成例を示す概略図である。図3は、図2と同様に、機械的動力系、高圧油圧ライン、パイロットライン、及び電気制御系を、それぞれ二重線、太実線、破線、及び点線で示している。
 図3において、油圧システムは、エンジン11によって駆動されるメインポンプ14L、14Rから、センターバイパス管路40L、40R、パラレル管路42L、42Rを経て作動油タンクまで作動油を循環させている。メインポンプ14L、14Rは、図2のメインポンプ14に対応する。
 センターバイパス管路40Lは、コントロールバルブ17内に配置された制御弁171、173、175A及び176Aを通る高圧油圧ラインである。センターバイパス管路40Rは、コントロールバルブ17内に配置された制御弁172、174、175B及び176Bを通る高圧油圧ラインである。
 制御弁171は、メインポンプ14Lが吐出する作動油を左側走行用油圧モータ1Aへ供給し、且つ、左側走行用油圧モータ1Aが吐出する作動油を作動油タンクへ排出するために作動油の流れを切り換えるスプール弁である。
 制御弁172は、メインポンプ14Rが吐出する作動油を右側走行用油圧モータ1Bへ供給し、且つ、右側走行用油圧モータ1Bが吐出する作動油を作動油タンクへ排出するために作動油の流れを切り換えるスプール弁である。
 制御弁173は、メインポンプ14Lが吐出する作動油を旋回用油圧モータ2Aへ供給し、且つ、旋回用油圧モータ2Aが吐出する作動油を作動油タンクへ排出するために作動油の流れを切り換えるスプール弁である。
 制御弁174は、メインポンプ14Rが吐出する作動油をバケットシリンダ9へ供給し、且つ、バケットシリンダ9内の作動油を作動油タンクへ排出するためのスプール弁である。
 制御弁175A、175Bは、図2の制御弁175に対応する。制御弁175A、175Bは、メインポンプ14L、14Rが吐出する作動油をブームシリンダ7へ供給し、且つ、ブームシリンダ7内の作動油を作動油タンクへ排出するために作動油の流れを切り換えるスプール弁である。
 制御弁176A、176Bは、図2の制御弁176に対応する。制御弁176A、176Bは、メインポンプ14L、14Rが吐出する作動油をアームシリンダ8へ供給し、且つ、アームシリンダ8内の作動油を作動油タンクへ排出するために作動油の流れを切り換えるスプール弁である。
 制御弁177A、177Bは、図2の制御弁177に対応する。制御弁177Aは、アームシリンダ8のロッド側油室から作動油タンクに流出する作動油の流量を制御するスプール弁である。制御弁177Bは、バケットシリンダ9のロッド側油室から作動油タンクに流出する作動油の流量を制御するスプール弁である。制御弁177A、177Bは図2の制御弁177に対応する。
 制御弁177A、177Bは、最小開口面積(開度0%)の第1弁位置と最大開口面積(開度100%)の第2弁位置とを有する。制御弁177A、177Bは、第1弁位置と第2弁位置との間で無段階に移動可能である。
 パラレル管路42Lは、センターバイパス管路40Lに並行する高圧油圧ラインである。パラレル管路42Lは、制御弁171、173、175Aの何れかによってセンターバイパス管路40Lを通る作動油の流れが制限或いは遮断された場合に、より下流の制御弁に作動油を供給できる。パラレル管路42Rは、センターバイパス管路40Rに並行する高圧油圧ラインである。パラレル管路42Rは、制御弁172、174、175Bの何れかによってセンターバイパス管路40Rを通る作動油の流れが制限或いは遮断された場合に、より下流の制御弁に作動油を供給できる。
 レギュレータ13L、13Rは、メインポンプ14L、14Rの吐出圧に応じてメインポンプ14L、14Rの斜板傾転角を調節することによって、メインポンプ14L、14Rの吐出量を制御する。レギュレータ13L、13Rは、図2のレギュレータ13に対応する。レギュレータ13L、13Rは、例えば、メインポンプ14L、14Rの吐出圧の増大に応じてメインポンプ14L、14Rの斜板傾転角を調節して吐出量を減少させる。吐出圧と吐出量との積で表されるメインポンプ14の吸収馬力がエンジン11の出力馬力を超えないようにするためである。
 アーム操作レバー26Aは、操作装置26の一例であり、アーム5を操作するために用いられる。アーム操作レバー26Aは、パイロットポンプ15が吐出する作動油を利用し、レバー操作量に応じた制御圧を制御弁176A、176Bのパイロットポートに導入させる。具体的には、アーム操作レバー26Aは、アーム閉じ方向に操作された場合に、制御弁176Aの右側パイロットポートに作動油を導入させ、且つ、制御弁176Bの左側パイロットポートに作動油を導入させる。また、アーム操作レバー26Aは、アーム開き方向に操作された場合には、制御弁176Aの左側パイロットポートに作動油を導入させ、且つ、制御弁176Bの右側パイロットポートに作動油を導入させる。
 バケット操作レバー26Bは、操作装置26の一例であり、バケット6を操作するために用いられる。バケット操作レバー26Bは、パイロットポンプ15が吐出する作動油を利用し、レバー操作量に応じた制御圧を制御弁174のパイロットポートに導入させる。具体的には、バケット操作レバー26Bは、バケット開き方向に操作された場合に、制御弁174の右側パイロットポートに作動油を導入させ、バケット閉じ方向に操作された場合に、制御弁174の左側パイロットポートに作動油を導入させる。
 吐出圧センサ28L、28Rは、吐出圧センサ28の一例であり、メインポンプ14L、14Rの吐出圧を検出し、検出した値をコントローラ30に対して出力する。
 操作圧センサ29A、29Bは、操作圧センサ29の一例であり、アーム操作レバー26A、バケット操作レバー26Bに対する操作者の操作内容を圧力の形で検出し、検出した値をコントローラ30に対して出力する。操作内容は、例えば、レバー操作方向、レバー操作量(レバー操作角度)等である。
 左右走行レバー(又はペダル)、ブーム操作レバー、及び旋回操作レバー(何れも図示せず。)はそれぞれ、下部走行体1の走行、バケット6の開閉、及び、上部旋回体3の旋回を操作するための操作装置である。これらの操作装置は、アーム操作レバー26A、バケット操作レバー26Bと同様に、パイロットポンプ15が吐出する作動油を利用し、レバー操作量(又はペダル操作量)に応じた制御圧を油圧アクチュエータのそれぞれに対応する制御弁の左右何れかのパイロットポートに導入させる。これらの操作装置のそれぞれに対する操作者の操作内容は、操作圧センサ29A、29Bと同様に、対応する操作圧センサによって圧力の形で検出され、検出値がコントローラ30に対して出力される。
 コントローラ30は、操作圧センサ29A、29B等の出力を受信し、必要に応じてレギュレータ13L、13Rに対して制御指令を出力し、メインポンプ14L、14Rの吐出量を変化させる。
 比例弁31A、31Bは、コントローラ30が出力する電流指令に応じてパイロットポンプ15から制御弁177A、177Bのパイロットポートに導入される制御圧を調整する。比例弁31A、31Bは、図2の比例弁31に対応する。
 比例弁31Aは、制御弁177Aを第1弁位置と第2弁位置の間の任意の位置で停止できるように制御圧を調整可能である。比例弁31Bは、制御弁177Bを第1弁位置と第2弁位置の間の任意の位置で停止できるように制御圧を調整可能である。
 ここで、図3の油圧システムで採用されるネガティブコントロール制御(以下、「ネガコン制御」とする。)について説明する。
 センターバイパス管路40L、40Rには、最も下流にある制御弁176A、176Bのそれぞれと作動油タンクとの間にネガティブコントロール絞り18L、18Rが配置されている。メインポンプ14L、14Rが吐出した作動油の流れは、ネガティブコントロール絞り18L、18Rで制限される。そして、ネガティブコントロール絞り18L、18Rは、レギュレータ13L、13Rを制御するための制御圧(以下、「ネガコン圧」とする。)を発生させる。ネガコン圧センサ19L、19Rは、ネガコン圧を検出するためのセンサであり、検出した値をコントローラ30に対して出力する。
 コントローラ30は、ネガコン圧に応じてメインポンプ14L、14Rの斜板傾転角を調節することによって、メインポンプ14L、14Rの吐出量を制御する。コントローラ30は、ネガコン圧が大きいほどメインポンプ14L、14Rの吐出量を減少させ、ネガコン圧が小さいほどメインポンプ14L、14Rの吐出量を増大させる。
 具体的には、図3で示されるように、ショベルにおける油圧アクチュエータが何れも操作されていない待機状態の場合、メインポンプ14L、14Rが吐出する作動油は、センターバイパス管路40L、40Rを通ってネガティブコントロール絞り18L、18Rに至る。そして、メインポンプ14L、14Rが吐出する作動油の流れは、ネガティブコントロール絞り18L、18Rの上流で発生するネガコン圧を増大させる。その結果、コントローラ30は、メインポンプ14L、14Rの吐出量を許容最小吐出量まで減少させ、吐出した作動油がセンターバイパス管路40L、40Rを通過する際の圧力損失(ポンピングロス)を抑制する。
 一方、何れかの油圧アクチュエータが操作された場合、メインポンプ14L、14Rが吐出する作動油は、操作対象の油圧アクチュエータに対応する制御弁を介して、操作対象の油圧アクチュエータに流れ込む。そして、メインポンプ14L、14Rが吐出する作動油の流れは、ネガティブコントロール絞り18L、18Rに至る量を減少或いは消失させ、ネガティブコントロール絞り18L、18Rの上流で発生するネガコン圧を低下させる。その結果、コントローラ30は、メインポンプ14L、14Rの吐出量を増大させ、操作対象の油圧アクチュエータに十分な作動油を循環させ、操作対象の油圧アクチュエータの駆動を確かなものとする。
 上述のような構成により、図3の油圧システムは、待機状態においては、メインポンプ14L、14Rにおける無駄なエネルギ消費を抑制できる。無駄なエネルギ消費は、メインポンプ14L、14Rが吐出する作動油がセンターバイパス管路40L、40Rで発生させるポンピングロスを含む。また、図3の油圧システムは、油圧アクチュエータを作動させる場合には、メインポンプ14L、14Rから必要十分な作動油を作動対象の油圧アクチュエータに確実に供給できるようにする。
 次に、図4を参照しながらショベルの動作の一例である掘削・積込み動作について説明する。最初に、操作者は、図4(A)に示すように、バケット6が掘削位置の上方に位置し、アーム5が開き、且つ、バケット6が開いた状態でブーム4を下降させる。バケット6の先端が掘削対象から所望の高さとなるようにバケット6を下降させるためである。ブーム下げ動作は、上部旋回体3の旋回動作と同時に行われることが一般的である。そのため、この複合動作をブーム下げ旋回動作と称する。
 その後、操作者は、バケット6の先端が所望の高さに到達したと判断した場合、図4(B)に示すように、アーム5が地面に対して略垂直になるまでアーム5を閉じる。これにより、掘削対象の土はバケット6でかき寄せられる。次に、操作者は、図4(C)及び図4(D)に示すように、アーム5及びバケット6を更に閉じ、かき集めた土をバケット6内に収容する。以上の動作を掘削動作と称する。ここで、図4(D)において、掘削する際のバケット6の下端は、ショベルが位置する面よりも下方に位置している。このとき、ショベルは、バケット6の周囲が土砂に囲われているため旋回できない。このため、操作者はブーム上げ操作により、バケット6を周囲の土砂よりも上方の旋回可能な高さまで上げる必要がある。
 次に、操作者は、バケット6がアーム5に対して略垂直になる前に、図4(E)に示すように、アーム5及びバケット6を閉じながら、バケット6の底部が地面から所望の高さ(バケット6の周囲の土砂よりも高い位置)となるまでブーム4を上げる。この複合動作をブーム上げ動作と称する。このブーム上げ動作が行われる前の掘削動作では、メインポンプ14が吐出する作動油は、アームシリンダ8及びバケットシリンダ9に流入している。そして、アームシリンダ8から流出する作動油は、制御弁177Aによって絞られていない。同様に、バケットシリンダ9から流出する作動油も制御弁177Bによって絞られていない。この状態でブーム上げ操作が行われると、ブームシリンダ7に流入すべき作動油は、負荷(圧力)が比較的小さいアームシリンダ8及びバケットシリンダ9に流入してしまい、ブーム4の上昇速度が遅くなってしまう。このため、作動油がブームシリンダ7に流入するように、ブーム上げ動作が行われる前に、アームシリンダ8及びバケットシリンダ9の負荷(圧力)を高めることが望ましい。従って、本実施形態は、アーム5及びバケット6に関する油圧回路における作動油の抵抗(圧力)を高めることで、作動油がブームシリンダ7に流入するようにしている。これにより、本実施形態は、アーム5とブーム4との複合動作、若しくは、バケット6とブーム4との複合動作であっても、ブームシリンダ7へ流入する作動油の圧力を高くすることができ、図4(E)に示すようにショベルが位置する面よりも上方の位置までバケット6をスムーズに持ち上げることができる。
 次に、操作者は、上部旋回体3を旋回させ、矢印AR1で示すようにバケット6を排土位置まで旋回移動させる。この旋回動作は、ブーム上げ動作と同時に行われることが一般的である。そのため、この複合動作をブーム上げ旋回動作と称する。
 アーム5と旋回の複合動作では、旋回優先制御が行われてもよい。旋回優先制御は、旋回を最優先とする制御であり、例えば、制御弁176Aと制御弁173との間のパラレル管路42Lに設けられた電磁比例弁等によって実現されてもよい。この旋回優先制御では、コントローラ30は、例えば、アーム5と旋回の複合動作の際に、この電磁比例弁の開口を絞る。これによって、アームシリンダ8に流れる作動油の流量を絞り、旋回油圧回路の圧力を確保できるため、旋回動作をスムーズにすることができる。同様に、アーム5、ブーム4及び旋回の複合動作中においても、旋回優先制御が行われてもよい。この場合、旋回優先制御は、例えば、制御弁176Aと制御弁173との間のパラレル管路42Lに設けられた電磁比例弁等によって実現されてもよい。この旋回優先制御では、コントローラ30は、例えば、アーム5、ブーム4及び旋回の複合動作の際に、この電磁比例弁の開口を絞る。これによって、アームシリンダ8に流れる作動油の流量を絞り、旋回油圧回路の圧力を確保できるため、旋回動作をスムーズにすることができる。ブーム4と旋回の複合動作では、ブーム優先制御が行われてもよい。ブーム優先制御は、ブーム上げを最優先とする制御であり、例えば、旋回用油圧モータ2Aと制御弁173との間に設けられた可変絞りによって実現されてもよい。このブーム優先制御では、コントローラ30は、例えば、ブーム4と旋回の複合動作の際に、この可変絞りの開口を絞ってもよい。これによって、旋回よりもブーム上げが優先され、ブーム上げに必要な圧力が確保される。
 次に、操作者は、図4(F)に示すようにアーム5及びバケット6を開いてバケット6内の土を排出する。この動作をダンプ動作と称する。ダンプ動作では、バケット6のみを開いて排土してもよい。
 次に、操作者は、図4(G)の矢印AR2で示すように上部旋回体3を旋回させ、バケット6を掘削位置の真上に移動させる。このとき、旋回と同時にブーム4を下げてバケット6を掘削対象から所望の高さのところまで下降させる。この複合動作は図4(A)で説明したブーム下げ旋回動作に相当する。操作者は、図4(A)に示すようにバケット6を所望の高さまで下降させ、再び掘削動作以降の動作を行う。
 操作者は、上述の「ブーム下げ旋回動作」、「掘削動作」、「ブーム上げ旋回動作」及び「ダンプ動作」を一サイクルとするこの一連の掘削・積込み動作を繰り返しながら掘削・積込みを進めていく。
 作業内容判定部300は、掘削動作中、ショベルの作業が高負荷作業であると判定している。そのため、比例弁31A、31B(図3参照。)に対して制御指令を出力し、制御弁177A、177Bの開口面積を増大させている。アームシリンダ8及びバケットシリンダ9のそれぞれから流出する作動油に関する圧力損失を低減させるためである。この状態は、アーム5及びバケット6の閉じ動作が速くなる一方で、ブーム4の上げ動作が遅くなる。ブームシリンダ7に流入すべき作動油がアームシリンダ8、バケットシリンダ9に流入してしまうためである。
 そこで、ブーム上げ支援部301は、掘削動作後のブーム上げ動作をより円滑にするため、ブーム上げ動作が行われる前にブーム上げ支援機能を実行する。ブーム上げ支援機能はブームシリンダ7に流入可能な作動油の圧力を増大させる機能である。
 ブーム上げ支援部301は、例えば、情報取得装置が取得するアタッチメントに関する情報に応じ、ブームシリンダ7に流入可能な作動油の圧力を増大させる。ブーム上げ支援部301は、例えば、ブーム上げ動作が行われる前に、アタッチメントに関する情報に基づいて決定した支援開始タイミングでブームシリンダ7に流入可能な作動油の圧力を増大させる。
 支援開始タイミングは、ブーム上げ支援機能を開始させるタイミングであり、例えば、実際にブーム上げ動作が行われたときにはバケットが土砂で満たされることになるタイミングである。具体的には、アタッチメントが所定の姿勢になったタイミング、バケット6内の土砂の量が所定量に達したタイミング、アーム角度βが所定角度以下で且つバケット角度γが所定角度以下となるタイミング等である。
 ここで、図5を参照し、ブーム上げ支援部301によるブーム上げ支援処理の一例について説明する。図5は、ブーム上げ支援処理の一例のフローチャートである。ブーム上げ支援部301は、例えば、アーム操作レバー26A又はバケット操作レバー26Bが操作されているときにこの処理を所定の制御周期で繰り返し実行する。
 最初に、ブーム上げ支援部301は、バケット角度γが閾値TH1以下で且つアーム角度βが閾値TH2以下の状態(以下、「第1状態」とする。)であるか否かを判定する(ステップST1)。アタッチメントの姿勢がブーム上げ動作に適した状態であるか否か、すなわち、ブーム上げ操作が行われる直前であるか否かを判定するためである。第1状態のときのアタッチメントの状態は、例えば、図4(C)に示すアタッチメントの状態に相当する。ブーム上げ支援部301は、ブーム角度αを追加的に考慮してアタッチメントの姿勢がブーム上げ操作に適した状態であるか否かを判定してもよい。或いは、アーム角度β又はバケット角度γのみに基づいてアタッチメントの姿勢がブーム上げ動作に適した状態であるか否かを判定してもよい。
 或いは、ブーム上げ支援部301は、情報取得装置が取得するアタッチメントに関する情報に基づいて予測掘削量を推定し、推定した予測掘削量に基づいてブーム上げ操作が行われるタイミング、掘削動作が終了するタイミング等を推定してもよい。予測掘削量は、例えば、現時点でブーム上げ操作が行われた場合にバケット6によって持ち上げられる土砂の量である。ブーム上げ操作が行われるタイミングは、例えば、ブーム上げ操作が行われるまでの残り時間として推定される。この場合、ブーム上げ支援部301は、ブーム上げ操作が行われるまでの残り時間が所定値以下となった場合に、ブーム上げ操作が行われる直前であると判定してもよい。掘削動作が終了するタイミングについても同様である。
 第1状態でないと判定した場合(ステップST1のNO)、すなわち、ブーム上げ操作が行われる直前でないと判定した場合、ブーム上げ支援部301は、ブーム上げ支援機能を実行することなく、今回のブーム上げ支援処理を終了させる。
 一方、第1状態であると判定した場合(ステップST1のYES)、すなわち、ブーム上げ操作が行われる直前であると判定した場合、ブーム上げ支援部301は、ブーム上げ支援機能を実行する(ステップST2)。本実施形態では、ブーム上げ支援部301は、比例弁31に対して制御指令を出力し、ブームシリンダ7に流入可能な作動油の圧力を増大させる。ブーム上げ操作が行われる前にブームシリンダ7に流入可能な作動油の圧力を増大させておくと、ブーム上げ操作が実際に行われたときにブームシリンダ7のボトム側油室に作動油を速やかに流入させることができるためである。反対に、ブーム上げ操作が行われる前にブームシリンダ7に流入可能な作動油の圧力を増大させておかなかった場合には、ブーム上げ操作が実際に行われたときに、ブームシリンダ7に流入させたい作動油は、アームシリンダ8又はバケットシリンダ9に流入してしまう。アームシリンダ8及びバケットシリンダ9のそれぞれにおける作動油の圧力が、ブームシリンダ7における作動油の圧力よりも低いためである。その結果、ショベルは、ブーム上げ操作が実際に行われたときにブームシリンダ7のボトム側油室に作動油を速やかに流入させることができず、ブーム4を円滑に上昇させることができない。
 具体的には、ブーム上げ支援部301は、比例弁31A(図3参照。)に制御指令を出力して制御弁177Aの開口面積を低減させる。アームシリンダ8のロッド側油室から作動油タンクに流れる作動油の流量を絞るためである。同様に、ブーム上げ支援部301は、比例弁31B(図3参照。)に制御指令を出力して制御弁177Bの開口面積を低減させる。バケットシリンダ9のロッド側油室から作動油タンクに流れる作動油の流量を絞るためである。結果として、メインポンプ14L、14Rが吐出する作動油の圧力、すなわち、ブームシリンダ7に流入可能な作動油の圧力が増大する。その結果、ショベルは、ブーム上げ操作が実際に行われたときにブームシリンダ7のボトム側油室に作動油を速やかに流入させることができるようになる。
 本実施形態では、ブーム上げ支援部301は、アタッチメントに関する情報(例えば、アーム角度β、バケット角度γ等)に応じ、制御弁177A、177Bの開口面積を所定の制御周期毎に決定する。但し、ブーム上げ支援部301は、所定のパターンに従って制御弁177A、177Bの開口面積を低減させてもよい。
 或いは、ブーム上げ支援部301は、ブーム上げ操作が行われる前に、メインポンプ14L、14Rが吸収可能な馬力を増大させるためにエンジン回転数を増大させてもよい。メインポンプ14L、14Rが吸収可能な馬力を増大させた上でメインポンプ14L、14Rの吐出量を増大させることでブームシリンダ7に流入可能な作動油の圧力を増大させておくことができるためである。
 その後、ブーム上げ支援部301は、解除条件が満たされたか否かを判定する(ステップST3)。解除条件は、ブーム上げ支援機能の実行を中止するための条件を意味する。解除条件は、例えば、第1状態であると判定した時点から所定時間が経過してもブーム上げ操作が行われていないこと、ブーム上げ操作が完了したこと等を含む。
 解除条件が満たされていないと判定した場合(ステップST3のNO)、ブーム上げ支援部301は、ブーム上げ支援機能の実行を中止することなく、今回のブーム上げ支援処理を終了させる。
 一方、解除条件が満たされたと判定した場合(ステップST3のYES)、ブーム上げ支援部301は、ブーム上げ支援機能の実行を中止する(ステップST4)。本実施形態では、ブーム上げ支援部301は、比例弁31に対して制御指令を出力し、ブームシリンダ7に流入可能な作動油の圧力の増大を中止させる。
 具体的には、ブーム上げ支援部301は、比例弁31A(図3参照。)に制御指令を出力して制御弁177Aの開口面積の低減を中止させる。アームシリンダ8のロッド側油室から作動油タンクに流れる作動油の流量制限を解除するためである。同様に、ブーム上げ支援部301は、比例弁31B(図3参照。)に制御指令を出力して制御弁177Bの開口面積の低減を中止させる。バケットシリンダ9のロッド側油室から作動油タンクに流れる作動油の流量制限を解除するためである。結果として、メインポンプ14L、14Rが吐出する作動油の圧力、すなわち、ブームシリンダ7に流入可能な作動油の圧力の増大が中止される。また、ショベルは、アーム5及びバケット6の動作速度を、ブーム上げ支援機能が実行される前の状態に戻すことができる。
 次に、図6を参照し、ブーム上げ支援処理が実行されているときの各種物理量の時間的推移について説明する。図6は、各種物理量の時間的推移を示す図である。具体的には、図6(A)は、アームシリンダ8に流入する作動油の量(以下、「アームシリンダ流入量」とする。)の時間的推移を示す。図6(B)は、バケットシリンダ9に流入する作動油の量(以下、「バケットシリンダ流入量」とする。)の時間的推移を示す。図6(C)は、ブーム操作レバーの上げ方向へのレバー操作量(以下、「ブーム上げ操作量」とする。)の時間的推移を示す。図6(D)は、ブームボトム圧の時間的推移を示す。図6(E)は、ポンプ吐出圧の時間的推移を示す。図6(A)~図6(E)の横軸(時間軸)は共通である。また、図6の実線は、ブーム上げ支援処理が実行されているときの推移を表し、図6の破線は、ブーム上げ支援処理が実行されないときの推移を表す。
 ブーム上げ支援処理が実行されている場合、ブーム上げ支援部301は、時刻t1において第1状態であると判定すると、比例弁31A、31B(図3参照。)に対して制御指令を出力し、制御弁177A、177Bの開口面積を低減させる。その結果、アームシリンダ流入量は、図6(A)の実線で示すように、流量Qa1から徐々に減少し、時刻t2において流量Qa2となる。同様に、バケットシリンダ流入量は、図6(B)の実線で示すように、流量Qb1から徐々に減少し、時刻t2において流量Qb2となる。ポンプ吐出圧は、図6(E)の実線で示すように、圧力P1から徐々に増大し、時刻t2において圧力P2となる。これは、ブームシリンダ7に流入可能な作動油の圧力が時刻t2において圧力P2まで増大したことを意味する。
 その後、図6(C)の実線で示すように、時刻t3において、ブーム上げ操作が開始されると、ブームボトム圧は、図6(D)の実線で示すように速やかに増大し、ブーム4は滑らかに上昇する。本実施形態では、ブーム上げ操作量は、図6(C)の実線で示すように、時刻t5において最大値Lmaxに至る。ブームボトム圧は、図6(D)の実線で示すように、時刻t5において圧力Pcに至る。圧力Pcは、バケット6が地面から完全に離れたときのブームボトム圧である。
 一方、ブーム上げ支援処理が実行されない場合、アームシリンダ流入量は、図6(A)の破線で示すように、ブーム上げ操作が開始される時刻t3まで流量Qa1のまま推移する。同様に、バケットシリンダ流入量は、図6(B)の破線で示すように、ブーム上げ操作が開始される時刻t3まで流量Qb1のまま推移する。ポンプ吐出圧は、図6(E)の破線で示すように、ブーム上げ操作が開始される時刻t3まで圧力P1のまま推移する。これは、ブームシリンダ7に流入可能な作動油の圧力が、時刻t3においても、ブーム4を上昇させるのに十分な圧力に達していないことを意味する。
 その後、図6(C)の破線で示すように、時刻t3において、ブーム上げ操作が開始されると、ブームボトム圧は、図6(D)の破線で示すように、ブーム上げ支援処理が実行されたときのようには速やかに増大しない。そのため、ブーム4も滑らかには上昇しない。
 時刻t3において制御弁177A(図3参照。)の開口面積が低減された場合には、アームシリンダ流入量は、図6(A)の破線で示すように、流量Qa1から徐々に減少し、時刻t4において流量Qa2となる。同様に、バケットシリンダ流入量は、図6(B)の破線で示すように、流量Qb1から徐々に減少し、時刻t4において流量Qb2となる。この場合、ポンプ吐出圧は、図6(E)の破線で示すように、圧力P1から徐々に増大し、時刻t4において圧力P2となる。ブームボトム圧は、図6(D)の破線で示すように、ポンプ吐出圧が圧力P2となった時刻t4以降では、ブーム上げ支援処理が実行されているときと同様の上昇率で増大する。
 上述のように、ブーム上げ支援部301は、ブーム上げ操作が行われる前にブーム上げ支援機能を実行することで、ブーム上げ支援機能を実行しない場合に比べ、ブーム上げ操作が実際に行われたときにブーム4をより滑らかに上昇させることができる。
 次に、図7を参照し、ブーム上げ支援部301によるブーム上げ支援処理の別の一例について説明する。図7は、ブーム上げ支援処理の別の一例のフローチャートである。図7のフローチャートは、ステップST11を有する点で、図5のフローチャートと相違する。そのため、共通部分の説明を省略し、相違部分を詳説する。
 図7に示すブーム上げ支援処理では、ブーム上げ支援部301は、最初に、掘削中であるか否かを判定する(ステップST11)。ブーム上げ支援部301は、例えば、作業内容判定部300による掘削中であるか否かの判定結果を利用する。或いは、ブーム上げ支援部301は、アームボトム圧に基づいて掘削中であるか否かを判定してもよく、バケットボトム圧及びアームボトム圧に基づいて掘削中であるか否かを判定してもよい。或いは、カメラS6の撮像画像に基づいて(画像処理技術を利用して)掘削中であるか否かを判定してもよい。
 掘削中でないと判定した場合(ステップST11のNO)、ブーム上げ支援部301は、第1状態であるか否かの判定を行うことなく、今回のブーム上げ支援処理を終了させる。一方、掘削中であると判定した場合(ステップST11のYES)、ブーム上げ支援部301は、ステップST1以降の処理を実行する。床掘り作業、均し作業等の低負荷作業が行われている場合に、ブーム上げ支援機能を実行してアーム5及びバケット6の動きを遅くしてしまうのを防止するためである。
 この構成により、ブーム上げ支援部301は、低負荷作業が行われているにもかかわらず、第1状態になったという理由でブーム上げ支援機能が実行されてしまい、アーム5及びバケット6の動きが遅くなってしまうのを防止できる。
 次に、図8を参照し、ブーム上げ支援部301によるブーム上げ支援処理の更に別の一例について説明する。図8は、ブーム上げ支援処理の更に別の一例のフローチャートである。図8のフローチャートは、ステップST12を有する点、及び、ステップST2の代わりにステップST2Aを有する点で、図7のフローチャートと相違する。そのため、共通部分の説明を省略し、相違部分を詳説する。
 第1状態であると判定した場合(ステップST1のYES)、ブーム上げ支援部301は、ポンプ吐出圧に基づいて掘削対象の性質を推定する(ステップST12)。ブーム上げ支援部301は、例えば、ポンプ吐出圧が高いほど、掘削対象の土砂が硬いと推定し、ポンプ吐出圧が低いほど、掘削対象の土砂が軟らかいと推定する。この場合、ブーム上げ支援部301は、掘削対象の土砂の硬さを複数段階のレベルで推定してもよい。或いは、掘削対象の硬度を算出することで掘削対象の土砂の硬さを無段階で推定してもよい。
 そして、ブーム上げ支援部301は、その推定結果に応じたブーム上げ支援機能を実行する(ステップST2A)。ブーム上げ支援部301は、例えば、ROM等に予め記憶されているテーブルを参照し、推定したレベルとアーム角度βとバケット角度γとの組み合わせに対応する制御弁177の開口面積を導き出す。或いは、掘削対象の硬度から開口面積を算出してもよい。或いは、ROM等に予め記憶されているテーブルは、ポンプ吐出圧、アーム角度β及びバケット角度γの組み合わせと開口面積との対応関係を表すテーブルであってもよい。或いは、ブーム上げ支援部301は、ポンプ吐出圧が所望の値になるように制御弁177の開口面積を制御してもよい。
 この構成により、ブーム上げ支援部301は、掘削対象の性質に応じてブーム上げ支援機能の内容を調整できる。そのため、ブーム上げ支援部301は、例えば、軟らかい土砂を持ち上げる際のブーム4の上昇速度が過度に大きくなってしまうのを抑制できる。
 次に、図9を参照し、ブーム上げ支援部301によるブーム上げ支援処理の更に別の一例について説明する。図9は、ブーム上げ支援処理の更に別の一例のフローチャートである。図9のフローチャートは、ステップST1の代わりにステップST1Aを有する点で、図5のフローチャートと相違する。そのため、共通部分の説明を省略し、相違部分を詳説する。
 図9に示すブーム上げ支援処理では、ブーム上げ支援部301は、最初に、推定土量が閾値TH3以上であるか否かを判定する(ステップST1A)。図9の例では、ブーム上げ支援部301は、カメラS6が撮像したバケット6内の土砂の画像に各種画像処理を施すことで推定土量としての予測掘削量を算出する。ブーム上げ支援部301は、情報取得装置の出力に基づいて推定土量を算出してもよい。例えば、ブーム上げ支援部301は、カメラS6、シリンダ圧センサ、LIDAR、ミリ波レーダ、慣性測定装置等の他の1又は複数の情報取得装置の出力に基づいて推定土量を算出してもよい。
 推定土量が閾値TH3未満であると判定した場合(ステップST1AのNO)、ブーム上げ支援部301は、ブーム上げ支援機能を実行することなく、今回のブーム上げ支援処理を終了させる。一方、推定土量が閾値TH3以上であると判定した場合(ステップST1AのYES)、ブーム上げ支援部301は、ステップST2以降の処理を実行する。
 この構成により、ブーム上げ支援部301は、バケット6内に土砂等の掘削対象が収容されていることを確認した上で、ブーム上げ支援機能を実行できる。従って、バケット6内に土砂等の掘削対象が収容されていないにもかかわらずブーム上げ支援機能を実行してしまうといった状況を防止できる。
 次に、図10を参照し、図1のショベルに搭載される油圧システムの別の構成例について説明する。図10は、図1のショベルに搭載される油圧システムの別の構成例を示す概略図である。図10の油圧システムは、制御弁177A、177Bの代わりに制御弁177C~177Eを有する点、及び、比例弁31A、31Bの代わりに比例弁31C~31Eを有する点で、図3の油圧システムと相違するが、その他の点で共通する。そのため、共通部分の説明を省略し、相違部分を詳説する。
 制御弁177Cは、メインポンプ14Rからパラレル管路42Rを通ってアームシリンダ8に流入する作動油の流量を制御するスプール弁である。制御弁177Dは、メインポンプ14Lからパラレル管路42Lを通ってアームシリンダ8に流入する作動油の流量を制御するスプール弁である。制御弁177Eは、メインポンプ14Rからパラレル管路42Rを通ってバケットシリンダ9に流入する作動油の流量を制御するスプール弁である。制御弁177C~177Eは、最小開口面積(開度0%)の第1弁位置と最大開口面積(開度100%)の第2弁位置とを有する。制御弁177C~177Eは、第1弁位置と第2弁位置との間で無段階に移動可能である。
 比例弁31C~31Eは、コントローラ30が出力する電流指令に応じてパイロットポンプ15から制御弁177C~177Eのパイロットポートに導入される制御圧を調整する。比例弁31C~31Eは、図2の比例弁31に対応する。
 比例弁31Cは、制御弁177Cを第1弁位置と第2弁位置の間の任意の位置で停止できるように制御圧を調整可能である。比例弁31Dは、制御弁177Dを第1弁位置と第2弁位置の間の任意の位置で停止できるように制御圧を調整可能である。比例弁31Eは、制御弁177Eを第1弁位置と第2弁位置の間の任意の位置で停止できるように制御圧を調整可能である。
 ブーム上げ支援機能を実行する場合、ブーム上げ支援部301は、比例弁31Eに制御指令を出力して制御弁177Eの開口面積を低減させる。バケットシリンダ9に流入する作動油の流量を絞るためである。同様に、ブーム上げ支援部301は、比例弁31C及び31Dに制御指令を出力して制御弁177C及び177Dのそれぞれの開口面積を低減させる。アームシリンダ8に流入する作動油の流量を絞るためである。結果として、メインポンプ14L、14Rが吐出する作動油の圧力、すなわち、ブームシリンダ7に流入可能な作動油の圧力が増大する。その結果、ショベルは、ブーム上げ操作が実際に行われたときにブームシリンダ7のボトム側油室に作動油を速やかに流入させることができるようになる。
 この構成により、ブーム上げ支援部301は、図3の油圧システムを用いてブーム上げ支援機能を実行する場合と同様に、図10の油圧システムを用いてブーム上げ支援機能を実行できる。
 次に、図11を参照し、図1のショベルに搭載される油圧システムの更に別の構成例について説明する。図11は、図1のショベルに搭載される油圧システムの更に別の構成例を示す概略図である。図11の油圧システムは、比例弁31A、31Bの代わりに比例弁31L1、31L2、31R1、31R2を有する点、及び、制御弁177A、177Bが省略されている点で、図3の油圧システムと相違するが、その他の点で共通する。そのため、共通部分の説明を省略し、相違部分を詳説する。
 比例弁31L1は、コントローラ30が出力する制御指令に応じ、アーム操作レバー26Aから制御弁176Aの右側パイロットポートに導入されるパイロット圧と、アーム操作レバー26Aから制御弁176Bの左側パイロットポートに導入されるパイロット圧とを調整する。具体的には、比例弁31L1は、アーム閉じ操作が行われたときにアーム操作レバー26Aが生成するパイロット圧を調整可能である。
 比例弁31R1は、コントローラ30が出力する制御指令に応じ、アーム操作レバー26Aから制御弁176Aの左側パイロットポートに導入されるパイロット圧と、アーム操作レバー26Aから制御弁176Bの右側パイロットポートに導入されるパイロット圧とを調整する。具体的には、比例弁31R1は、アーム開き操作が行われたときにアーム操作レバー26Aが生成するパイロット圧を調整可能である。
 比例弁31L2は、コントローラ30が出力する制御指令に応じ、バケット操作レバー26Bから制御弁174の左側パイロットポートに導入されるパイロット圧を調整する。具体的には、比例弁31L2は、バケット閉じ操作が行われたときにバケット操作レバー26Bが生成するパイロット圧を調整可能である。
 比例弁31R2は、コントローラ30が出力する制御指令に応じ、バケット操作レバー26Bから制御弁174の右側パイロットポートに導入されるパイロット圧を調整する。具体的には、比例弁31R2は、バケット開き操作が行われたときにバケット操作レバー26Bが生成するパイロット圧を調整可能である。
 ブーム上げ支援機能を実行する場合、ブーム上げ支援部301は、比例弁31L1に制御指令を出力し、アーム閉じ操作が行われたときにアーム操作レバー26Aが生成するパイロット圧を低減させる。例えば、パイロット圧を30%だけ低減させる。これは、操作者がアーム操作レバー26Aのレバー操作量を30%だけ低減させた場合、すなわち、アーム操作レバー26Aを中立位置に向けて戻した場合と同じ状況をもたらすことができる。従って、ブーム上げ支援部301は、アーム操作レバー26Aを中立位置に戻す操作を操作者に強いることなく、アーム閉じ操作が行われているときにアームシリンダ8のボトム側油室に流入する作動油の流量を絞ることができる。
 また、ブーム上げ支援部301は、比例弁31R1に制御指令を出力し、アーム開き操作が行われたときにアーム操作レバー26Aが生成するパイロット圧を低減させる。従って、ブーム上げ支援部301は、アーム操作レバー26Aを中立位置に戻す操作を操作者に強いることなく、アーム開き操作が行われているときにアームシリンダ8のロッド側油室に流入する作動油の流量を絞ることができる。
 また、ブーム上げ支援部301は、比例弁31L2に制御指令を出力し、バケット閉じ操作が行われたときにバケット操作レバー26Bが生成するパイロット圧を低減させる。従って、ブーム上げ支援部301は、バケット操作レバー26Bを中立位置に戻す操作を操作者に強いることなく、バケット閉じ操作が行われているときにバケットシリンダ9のボトム側油室に流入する作動油の流量を絞ることができる。
 また、ブーム上げ支援部301は、比例弁31R2に制御指令を出力し、バケット開き操作が行われたときにバケット操作レバー26Bが生成するパイロット圧を低減させる。従って、ブーム上げ支援部301は、バケット操作レバー26Bを中立位置に戻す操作を操作者に強いることなく、バケット開き操作が行われているときにバケットシリンダ9のロッド側油室に流入する作動油の流量を絞ることができる。
 結果として、メインポンプ14L、14Rが吐出する作動油の圧力、すなわち、ブームシリンダ7に流入可能な作動油の圧力が増大する。その結果、ショベルは、ブーム上げ操作が実際に行われたときにブームシリンダ7のボトム側油室に作動油を速やかに流入させることができるようになる。
 この構成により、ブーム上げ支援部301は、図3の油圧システムを用いてブーム上げ支援機能を実行する場合と同様に、図11の油圧システムを用いてブーム上げ支援機能を実行できる。
 上述のように、本願の実施形態に係るショベルにおいて、コントローラ30は、ブーム上げ操作が行われる前に、アタッチメントに関する情報に応じてブームシリンダ7に流入可能な作動油の圧力を増大させる。そのため、掘削の際のブーム上げ動作をより円滑にすることができる。
 コントローラ30は、望ましくは、ブーム上げ操作が行われる前に、情報取得装置が取得するアタッチメントに関する情報に基づいて決定したタイミングで、ブームシリンダ7に流入可能な作動油の圧力を増大させる。そのタイミングは、例えば、実際にブーム上げ操作が行われたときにはバケットが土砂で満たされることになるタイミングである。そのため、より適切な時期に、ブームシリンダ7に流入可能な作動油の圧力を増大させることができる。
 コントローラ30は、望ましくは、ブーム上げ操作が行われる前に、アームシリンダ8及びバケットシリンダ9のそれぞれに流出入する作動油の流量を絞る。そのため、簡易且つ確実に、ブームシリンダ7に流入可能な作動油の圧力を増大させることができる。
 コントローラ30は、望ましくは、ブームシリンダ7に流入可能な作動油の圧力を増大させた後に所定時間が経過してもブーム上げ操作が行われなかった場合には、増大させた圧力を低減させる。そのため、ブーム上げ操作が行われないにもかかわらず、アームシリンダ8及びバケットシリンダ9のそれぞれに流出入する作動油の流量が制限された状態が長期に亘って継続されてしまうのを防止できる。
 以上、本発明の好ましい実施形態について詳説した。しかしながら、本発明は、上述した実施形態に制限されることはない。上述した実施形態は、本発明の範囲を逸脱することなしに、種々の変形、置換等が適用され得る。また、別々に説明された特徴は、技術的な矛盾が生じない限り、組み合わせが可能である。
 本願は、2017年3月10日に出願した日本国特許出願2017-046769号に基づく優先権を主張するものであり、この日本国特許出願の全内容を本願に参照により援用する。
 1・・・下部走行体 1A・・・左側走行用油圧モータ 1B・・・右側走行用油圧モータ 2・・・旋回機構 2A・・・旋回用油圧モータ 3・・・上部旋回体 4・・・ブーム 5・・・アーム 6・・・バケット 7・・・ブームシリンダ 8・・・アームシリンダ 9・・・バケットシリンダ 10・・・キャビン 11・・・エンジン 13、13L、13R・・・レギュレータ 14、14L、14R・・・メインポンプ 15・・・パイロットポンプ 17・・・コントロールバルブ 18L、18R・・・ネガティブコントロール絞り 19L、19R・・・ネガコン圧センサ 26・・・操作装置 26A・・・アーム操作レバー 26B・・・バケット操作レバー 28、28L、28R・・・吐出圧センサ 29、29A、29B・・・操作圧センサ 30・・・コントローラ 31、31A、31B、31C、31D、31E、31L1、31L2、31R1、31R2・・・比例弁 171~177、175A、175B、176A、176B、177A~177E・・・制御弁 300・・・作業内容判定部 301・・・ブーム上げ支援部 S1・・・ブーム角度センサ S2・・・アーム角度センサ S3・・・バケット角度センサ S4・・・機体傾斜センサ S5・・・旋回角速度センサ S6・・・カメラ S7B・・・ブームボトム圧センサ S7R・・・ブームロッド圧センサ S8B・・・アームボトム圧センサ S8R・・・アームロッド圧センサ S9B・・・バケットボトム圧センサ S9R・・・バケットロッド圧センサ

Claims (7)

  1.  下部走行体と、
     前記下部走行体に旋回可能に搭載される上部旋回体と、
     前記上部旋回体に搭載される運転室と、
     前記上部旋回体に取り付けられるブームを含むアタッチメントと、
     前記ブームを駆動するブームシリンダと、
     前記ブームシリンダに流入可能な作動油を制御する制御装置と、
     前記アタッチメントに関する情報を取得する情報取得装置と、を有し、
     前記制御装置は、ブーム上げ操作が行われる前に、前記アタッチメントに関する情報に応じて前記ブームシリンダに流入可能な作動油の圧力を増大させる、
     ショベル。
  2.  前記制御装置は、ブーム上げ操作が行われる前に、前記アタッチメントに関する情報に基づいて決定したタイミングで前記ブームシリンダに流入可能な作動油の圧力を増大させ、
     前記タイミングは、実際にブーム上げ操作が行われたときにはバケットが土砂で満たされることになるタイミングである、
     請求項1に記載のショベル。
  3.  前記情報取得装置は、バケットの内部を撮像可能なカメラ、前記アタッチメントに取り付けられた角度センサ、及び、前記アタッチメントを駆動する油圧シリンダにおける作動油の圧力を検出するシリンダ圧センサのうちの少なくとも1つを含む、
     請求項1に記載のショベル。
  4.  前記制御装置は、ブーム上げ操作が行われる前に、アームシリンダ及びバケットシリンダのそれぞれに流出入する作動油の流量を絞る、
     請求項1に記載のショベル。
  5.  前記制御装置は、前記ブームシリンダに流入可能な作動油の圧力を増大させた後に所定時間が経過してもブーム上げ操作が行われなかった場合、増大させた圧力を低減させる、
     請求項1に記載のショベル。
  6.  アームシリンダに関する操作と旋回用油圧モータに関する操作とが行われる場合、前記旋回用油圧モータに流入可能な作動油の圧力を増大させる、
     請求項1に記載のショベル。
  7.  前記ブーム上げ操作と旋回用油圧モータに関する操作とが行われる場合、前記ブームシリンダに流入可能な作動油の圧力を増大させる、
    請求項1に記載のショベル。
PCT/JP2018/009089 2017-03-10 2018-03-08 ショベル Ceased WO2018164238A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201880011572.6A CN110291254B (zh) 2017-03-10 2018-03-08 挖土机
KR1020197022973A KR102456137B1 (ko) 2017-03-10 2018-03-08 쇼벨
EP18764912.4A EP3594414B1 (en) 2017-03-10 2018-03-08 Shovel
JP2019503855A JP6915042B2 (ja) 2017-03-10 2018-03-08 ショベル
US16/558,708 US11619030B2 (en) 2017-03-10 2019-09-03 Shovel having boom raising assisting function using attachment information

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017-046769 2017-03-10
JP2017046769 2017-03-10

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/558,708 Continuation US11619030B2 (en) 2017-03-10 2019-09-03 Shovel having boom raising assisting function using attachment information

Publications (1)

Publication Number Publication Date
WO2018164238A1 true WO2018164238A1 (ja) 2018-09-13

Family

ID=63448755

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/009089 Ceased WO2018164238A1 (ja) 2017-03-10 2018-03-08 ショベル

Country Status (6)

Country Link
US (1) US11619030B2 (ja)
EP (1) EP3594414B1 (ja)
JP (1) JP6915042B2 (ja)
KR (1) KR102456137B1 (ja)
CN (1) CN110291254B (ja)
WO (1) WO2018164238A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2020189757A1 (ja) * 2019-03-19 2020-09-24

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7449314B2 (ja) * 2020-01-14 2024-03-13 住友重機械工業株式会社 ショベル、遠隔操作支援装置
CN111830032B (zh) * 2020-06-01 2023-10-13 济南液脉智能科技有限公司 基于图像传感的在线多参数液压油智能传感器装置
DE102021106745A1 (de) * 2021-03-19 2022-09-22 Liebherr-Werk Nenzing Gmbh Hebezeug mit einer Vorrichtung zum Unterstützen oder vollautomatischen Durchführen eines Aufricht- und/oder Ablegevorgangs eines Auslegersystems sowie entsprechendes Verfahren
EP4335981B1 (de) * 2022-09-08 2024-10-30 XCMG European Research Center GmbH Baumaschine mit einem hydrauliksystem
JP7377391B1 (ja) * 2023-04-28 2023-11-09 株式会社Earthbrain 推定装置、推定方法及びプログラム

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013185416A (ja) * 2012-03-09 2013-09-19 Sumitomo Heavy Ind Ltd ショベル
JP2014005711A (ja) 2012-06-27 2014-01-16 Takanori Sato 免震床の復元方法
WO2016104016A1 (ja) * 2014-12-26 2016-06-30 住友建機株式会社 ショベル
JP2017046769A (ja) 2015-08-31 2017-03-09 株式会社ヤマナカ 理美容鋏

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5682311A (en) * 1995-11-17 1997-10-28 Clark; George J. Apparatus and method for controlling a hydraulic excavator
US5933346A (en) * 1996-06-05 1999-08-03 Topcon Laser Systems, Inc. Bucket depth and angle controller for excavator
JP5108350B2 (ja) * 2007-03-26 2012-12-26 株式会社小松製作所 油圧ショベルの作業量計測方法および作業量計測装置
JP5204837B2 (ja) * 2008-03-21 2013-06-05 株式会社小松製作所 作業車両、作業車両の制御装置、及び作業車両の制御方法
WO2012121252A1 (ja) * 2011-03-08 2012-09-13 住友建機株式会社 ショベル及びショベルの制御方法
JP5562893B2 (ja) * 2011-03-31 2014-07-30 住友建機株式会社 ショベル
JP5653844B2 (ja) * 2011-06-07 2015-01-14 住友建機株式会社 ショベル
WO2014051170A1 (en) * 2012-09-25 2014-04-03 Volvo Construction Equipment Ab Automatic grading system for construction machine and method for controlling the same
US9938691B2 (en) * 2013-01-08 2018-04-10 Hitachi Construction Machinery Co., Ltd. Hydraulic system for work machine
JP6193075B2 (ja) * 2013-09-30 2017-09-06 株式会社小松製作所 運搬機械
CN106149795B (zh) * 2016-08-24 2018-07-27 四川邦立重机有限责任公司 挖掘机动臂液压控制系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013185416A (ja) * 2012-03-09 2013-09-19 Sumitomo Heavy Ind Ltd ショベル
JP2014005711A (ja) 2012-06-27 2014-01-16 Takanori Sato 免震床の復元方法
WO2016104016A1 (ja) * 2014-12-26 2016-06-30 住友建機株式会社 ショベル
JP2017046769A (ja) 2015-08-31 2017-03-09 株式会社ヤマナカ 理美容鋏

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3594414A4

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2020189757A1 (ja) * 2019-03-19 2020-09-24
WO2020189757A1 (ja) * 2019-03-19 2020-09-24 住友建機株式会社 ショベル
KR20210137014A (ko) * 2019-03-19 2021-11-17 스미토모 겐키 가부시키가이샤 쇼벨
EP3943674A4 (en) * 2019-03-19 2022-07-13 Sumitomo Construction Machinery Co., Ltd. EXCAVATOR
JP7467412B2 (ja) 2019-03-19 2024-04-15 住友建機株式会社 ショベル
KR102708731B1 (ko) * 2019-03-19 2024-09-20 스미토모 겐키 가부시키가이샤 쇼벨
US12428805B2 (en) 2019-03-19 2025-09-30 Sumitomo Construction Machinery Co., Ltd. Shovel

Also Published As

Publication number Publication date
CN110291254B (zh) 2022-07-05
US20190390444A1 (en) 2019-12-26
EP3594414A4 (en) 2020-04-15
EP3594414A1 (en) 2020-01-15
EP3594414B1 (en) 2023-01-18
CN110291254A (zh) 2019-09-27
US11619030B2 (en) 2023-04-04
JP6915042B2 (ja) 2021-08-04
JPWO2018164238A1 (ja) 2020-01-09
KR102456137B1 (ko) 2022-10-17
KR20190123724A (ko) 2019-11-01

Similar Documents

Publication Publication Date Title
JP6915042B2 (ja) ショベル
KR101973872B1 (ko) 작업 기계의 유압 구동 시스템
US8340875B1 (en) Lift system implementing velocity-based feedforward control
US11655611B2 (en) Shovel
US11162244B2 (en) Excavator controlling power of hydraulic pump according to orientation of front work machine
JP6807290B2 (ja) 作業機械
JP2011085198A (ja) 作業機械の油圧システム
JPWO2019182128A1 (ja) ショベル
KR102460499B1 (ko) 쇼벨
JP6450487B1 (ja) 油圧ショベル駆動システム
JP7071339B2 (ja) 建設機械の制御システム及び建設機械の制御方法
JP6231917B2 (ja) 油圧ショベル駆動システム
CN107882789B (zh) 具有负流量控制的电液系统
JP3594680B2 (ja) 油圧機械の油圧再生装置
JPH09203087A (ja) 建設機械
JP6591370B2 (ja) 建設機械の油圧制御装置
JP2010112075A (ja) 作業機械のアクチュエータ速度制御装置
JP2021021199A (ja) ショベル
WO2020071044A1 (ja) 油圧ショベル駆動システム
JP2013249900A (ja) 油圧駆動回路
JP2018159395A (ja) 建設機械の油圧駆動装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18764912

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20197022973

Country of ref document: KR

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2019503855

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2018764912

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 2018764912

Country of ref document: EP

Effective date: 20191010