[go: up one dir, main page]

WO2013051740A1 - 건설기계용 작업장치 구동 제어시스템 - Google Patents

건설기계용 작업장치 구동 제어시스템 Download PDF

Info

Publication number
WO2013051740A1
WO2013051740A1 PCT/KR2011/007439 KR2011007439W WO2013051740A1 WO 2013051740 A1 WO2013051740 A1 WO 2013051740A1 KR 2011007439 W KR2011007439 W KR 2011007439W WO 2013051740 A1 WO2013051740 A1 WO 2013051740A1
Authority
WO
WIPO (PCT)
Prior art keywords
control valve
boom
control
center bypass
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/KR2011/007439
Other languages
English (en)
French (fr)
Inventor
정해균
송영복
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Volvo Construction Equipment AB
Original Assignee
Volvo Construction Equipment AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Volvo Construction Equipment AB filed Critical Volvo Construction Equipment AB
Priority to PCT/KR2011/007439 priority Critical patent/WO2013051740A1/ko
Priority to JP2014534449A priority patent/JP5802338B2/ja
Priority to EP11873593.5A priority patent/EP2772653A4/en
Priority to CN201180073924.9A priority patent/CN103842663A/zh
Priority to US14/348,686 priority patent/US20140238010A1/en
Priority to KR1020147007835A priority patent/KR20140074306A/ko
Publication of WO2013051740A1 publication Critical patent/WO2013051740A1/ko
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2282Systems using center bypass type changeover valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/08Superstructures; Supports for superstructures
    • E02F9/10Supports for movable superstructures mounted on travelling or walking gears or on other superstructures
    • E02F9/12Slewing or traversing gears
    • E02F9/121Turntables, i.e. structure rotatable about 360°
    • E02F9/123Drives or control devices specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2217Hydraulic or pneumatic drives with energy recovery arrangements, e.g. using accumulators, flywheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2225Control of flow rate; Load sensing arrangements using pressure-compensating valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2267Valves or distributors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/16Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors
    • F15B11/17Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors using two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/20Fluid pressure source, e.g. accumulator or variable axial piston pump
    • F15B2211/205Systems with pumps
    • F15B2211/2053Type of pump
    • F15B2211/20546Type of pump variable capacity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/20Fluid pressure source, e.g. accumulator or variable axial piston pump
    • F15B2211/205Systems with pumps
    • F15B2211/20576Systems with pumps with multiple pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/30Directional control
    • F15B2211/31Directional control characterised by the positions of the valve element
    • F15B2211/3105Neutral or centre positions
    • F15B2211/3116Neutral or centre positions the pump port being open in the centre position, e.g. so-called open centre
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/30Directional control
    • F15B2211/31Directional control characterised by the positions of the valve element
    • F15B2211/3122Special positions other than the pump port being connected to working ports or the working ports being connected to the return line
    • F15B2211/3133Regenerative position connecting the working ports or connecting the working ports to the pump, e.g. for high-speed approach stroke

Definitions

  • the present invention relates to a work machine drive control system for a construction machine, and more particularly, when operating a work device having a different operating pressure at the same time (for example, to drive a work device such as a boom down operation of an excavator and a bucket, etc. simultaneously.
  • the present invention relates to a drive system control system for a construction machine that reduces pressure loss inside a control valve by controlling a flow rate so that a parallel passage and a tandem passage can be used at the same time.
  • the engine 1 The engine 1,
  • first and second hydraulic pumps 2 and 3 A variable displacement first and second hydraulic pumps 2 and 3 (hereinafter referred to as "first and second hydraulic pumps") and a pilot pump 4 connected to the engine 1,
  • a swing control valve (7) installed in the first center bypass passage (5) of the first hydraulic pump (2) and connected to a parallel channel (5a), respectively, to control the driving of the swing motor (6);
  • a boom control valve 14 and a bucket cylinder which are installed in the second center bypass passage 12 of the second hydraulic pump 3 and connected to the parallel passage 12a, respectively, and control the driving of the boom cylinder 13; 15) a bucket control valve 16 for controlling the drive, a travel control valve 18 for controlling the drive of the right traveling motor 17,
  • the pilot signal pressure from the pilot pump 4 is supplied to the boom control valve 14 via the pressure generator 19.
  • the boom control valve 14 is switched to the boom up position (switched to the left in the drawing)
  • the hydraulic oil discharged from the second hydraulic pump 3 is loaded with the load check valve 22 and the boom control valve 14. It is supplied to the large chamber of the boom cylinder 13 via).
  • the hydraulic oil flowing out of the small chamber of the boom cylinder 13 is returned to the hydraulic tank T via the boom control valve 14. Therefore, the boom cylinder 13 is extended and driven so that the boom can be raised.
  • the pilot signal pressure from the pilot pump 4 is shown through the pressure generator 19 to the boom control valve 14. Switch to up or right direction. Therefore, the hydraulic oil discharged from the second hydraulic pump 3 is supplied to the small chamber of the boom cylinder 13 via the boom control valve 14. At the same time, the hydraulic oil flowing out of the large chamber of the boom cylinder 13 is returned to the hydraulic tank T via the boom control valve 14 and the back pressure check valve 23. Therefore, the boom cylinder 13 is contracted and driven so that the boom can be lowered.
  • a tandem passage is formed in the bucket control valve 16 and the traveling control valve 18 connected in parallel with the above-described boom control valve 14 through the second center bypass passage 12. That is, when controlling the operation of the bucket cylinder 15 alone, the hydraulic oil from the second hydraulic pump 3 is introduced through the parallel passage 12a and the tandem passage, so that the excessively generated when passing only through the parallel passage 12a. Pressure loss can be reduced.
  • the second center bypass passage 12 is closed by the boom lowering control spool to supply hydraulic oil to the bucket cylinder 15.
  • the passage is provided only through the parallel passage 12a. In this case, a sufficient flow path cannot be secured by the wired control valve installed in the parallel flow path 12a, causing excessive pressure loss, thereby causing energy loss.
  • variable control valve (refer FIG. 2) may be provided as the throttling device 24 of the parallel flow path 12a mentioned above, such a throttling device also has a limitation in ensuring sufficient flow path.
  • the operating oil when operating a work device having a different operating pressure at the same time as in a boom-down operation and a bucket drive, the operating oil is introduced into the bucket control valve through the parallel flow path and the tandem flow path to be generated inside the control valve. It is associated with a work machine drive control system for construction machinery that reduces energy loss by reducing unnecessary pressure losses, thereby increasing hydraulic system efficiency.
  • a swing control valve installed in the first center bypass passage of the first hydraulic pump and connected to the parallel flow path, respectively, to control the swing motor, an arm control valve to control the arm cylinder, and a travel control valve to control the left travel motor.
  • a pressure generator for outputting a control signal corresponding to the manipulated variable
  • a center bypass switching valve installed at the downstreammost side of the second center bypass passage and switched by a control signal pressure for switching the boom control valve
  • the working oil from the second hydraulic pump is introduced into the control valve through the parallel channel and the tandem channel connected to the second center bypass passage.
  • the work device described above is a bucket and the control valve controlling the work device is a bucket control valve.
  • Construction device work control device drive control system according to an embodiment of the present invention configured as described above has the following advantages.
  • the hydraulic fluid is introduced into the bucket control valve through the parallel and tandem flow paths (the flow rate as the flow rate passes along the tandem flow path).
  • the energy loss can be reduced by reducing the pressure loss generated inside the control valve.
  • FIG. 1 is a hydraulic circuit diagram of a control device driving control system for a construction machine according to the prior art
  • Figure 2 is an enlarged view of the main portion extract of the priority control valve applied to the work machine drive control system for construction machinery according to the prior art
  • FIG. 3 is a hydraulic circuit diagram of a control system for driving a work device for a construction machine according to an embodiment of the present invention
  • Figure 4 is an enlarged view of the main portion of the priority control valve in the construction machine work device drive control system according to an embodiment of the present invention.
  • 3 to 4 is a work machine driving control system for a construction machine according to an embodiment of the present invention
  • the engine 1 The engine 1,
  • first and second hydraulic pumps (hereinafter referred to as “first and second hydraulic pumps “ and pilot pumps 4) connected to the engine 1,
  • a swing control valve 7 installed in the first center bypass passage 5 of the first hydraulic pump 2 and connected to the parallel flow passage 5a to control the driving of the swing motor 6, and an arm cylinder ( 8) an arm control valve 9 for controlling driving, a travel control valve 11 for controlling driving of the left traveling motor 10,
  • a boom control valve 14a installed in the second center bypass passage 12 of the second hydraulic pump 3 and connected to the parallel passage 12a to control the boom cylinder 13 driving, and a bucket cylinder ( 15) a bucket control valve 16 for controlling the drive, a travel control valve 18 for controlling the drive of the right traveling motor 17,
  • Pressure generators 19 and 20 for outputting a control signal corresponding to the manipulated variable
  • the second center bypass passage 12 is formed in the boom lower side control spool of the boom control valve 14a and also when the boom control valve 14a is switched so that the boom is turned down by the operation of the pressure generator 19.
  • a bleed flow path 25 which is kept open without blocking;
  • a center bypass switching valve 26 is provided on the downstream side of the second center bypass passage 12 and is switched by a control signal pressure for switching the boom control valve 14a.
  • the boom control valve 14a is switched to the right direction on the drawing via. Therefore, the hydraulic oil discharged from the second hydraulic pump 3 is supplied to the small chamber of the boom cylinder 13 via the rod check valve 22 and the boom control valve 14a. At the same time, the hydraulic oil flowing out of the large chamber of the boom cylinder 13 is returned to the hydraulic tank T via the boom control valve 14a and the back pressure check valve 23. Therefore, the boom cylinder 13 is contracted and driven so that the boom can be lowered.
  • the hydraulic oil discharged from the second hydraulic pump 3 passes through the bleed flow path 25 formed in the boom lower side control spool of the second center bypass passage 12-boom control valve 14a, and passes through the bucket control valve. It is supplied to the inlet side of 16. Therefore, the rod check valve 27 of the bucket control valve 16 is connected to the spool passage of the bucket control valve 16.
  • the flow rate via the priority control valve installed in the parallel flow path 12a joins with the flow rate through the load check valve 27 and flows into the spool of the bucket control valve 16.
  • the flow rate from the second hydraulic pump 3 flows into the spool of the bucket control valve 16 through the parallel flow passage 12a.
  • the flow rate from the second hydraulic pump 3 flows into the spool of the bucket control valve 16 also through the second center bypass passage 12.
  • the pressure loss is reduced by the flow rate flowing through the second center bypass passage 12 to the spool of the bucket control valve 16 (This pressure loss reduction may be equally applied to the travel control valve 18. ).

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

작동 압력이 상이한 작업장치를 동시에 조작할 경우 병렬유로와 텐덤유로를 동시에 사용할 수 있도록 유량을 제어하여 제어밸브 내부의 압력 손실을 저감시킬 수 있도록 한 제어시스템을 개시한다. 본 발명에 따른 작업장치 구동 제어시스템에 있어서, 엔진에 연결되는 제1,2유압펌프와, 제1유압펌프의 제1센터바이패스통로에 설치되어 병렬유로로 각각 연결되는 선회 제어밸브, 아암 제어밸브 및 좌측 주행 제어밸브와, 제2유압펌프의 제2센터바이패스통로에 설치되어 병렬유로로 각각 연결되는 붐 제어밸브, 버킷 제어밸브 및 우측 주행 제어밸브와, 압력 발생장치와, 붐 제어밸브의 붐 하강측 제어스풀에 형성되고 붐을 다운시키도록 붐 제어밸브를 절환시킬 경우에도 제2센터바이패스통로를 차단하지않고 개방상태를 유지하는 블리드 유로와, 제2센터바이패스통로 최하류측에 설치되고 붐 제어밸브를 절환시키는 제어신호압에 의해 절환되는 센터바이패스 절환밸브를 구비하는 것을 특징으로 하는 건설기계용 작업장치 구동 제어시스템을 제공한다.

Description

건설기계용 작업장치 구동 제어시스템
본 발명은 건설기계용 작업장치 구동 제어시스템에 관한 것으로, 더욱 상세하게는 작동 압력이 상이한 작업장치를 동시에 조작할 경우(일 예로서, 굴삭기의 붐 다운 작동과 버킷 등의 작업장치를 동시에 구동시킴을 말함), 병렬유로(parallel)와 텐덤유로(tandem)를 동시에 사용할 수 있도록 유량을 제어하여 제어밸브 내부의 압력 손실을 저감시킬 수 있도록 한 건설기계용 작업장치 구동 제어시스템에 관한 것이다.
도 1에 도시된 종래 기술에 의한 건설기계용 붐 구동 제어시스템은,
엔진(1)과,
엔진(1)에 연결되는 가변용량형 제1,2유압펌프(2,3)(이하 "제1,2유압펌프" 라고 함) 및 파일럿 펌프(4)와,
제1유압펌프(2)의 제1센터바이패스통로(5)에 설치되어 병렬유로(parallel)(5a)로 각각 연결되고, 선회모터(6) 구동을 제어하는 선회 제어밸브(7)와, 아암실린더(8) 구동을 제어하는 아암 제어밸브(9)와, 좌측 주행모터(10) 구동을 제어하는 주행 제어밸브(11)와,
제2유압펌프(3)의 제2센터바이패스통로(12)에 설치되어 병렬유로(12a)로 각각 연결되고, 붐실린더(13) 구동을 제어하는 붐 제어밸브(14)와, 버킷실린더(15) 구동을 제어하는 버킷 제어밸브(16)와, 우측 주행모터(17) 구동을 제어하는 주행 제어밸브(18)와,
조작량에 대응되는 제어신호를 출력하는 압력 발생장치(19,20)를 포함한다.
전술한 압력 발생장치(19)가 중립위치에 놓여 있을 경우에, 제2유압펌프(3)로부터 토출되는 작동유는 제2센터바이패스통로(12) 및 리턴유로(21)를 통과하여 유압탱크(T)로 귀환된다.
붐을 상승시키기 위해 압력 발생장치(19)를 조작할 경우, 파일럿펌프(4)로부터의 파일럿 신호압이 압력 발생장치(19)를 경유하여 붐 제어밸브(14)에 공급된다. 이로 인해 붐 제어밸브(14)가 붐 상승위치로 절환(도면상, 좌측 방향으로 절환됨)되므로, 제2유압펌프(3)로부터 토출되는 작동유는 로드체크밸브(22) 및 붐 제어밸브(14)를 경유하여 붐실린더(13)의 라지챔버에 공급된다. 이와 동시에 붐실린더(13)의 스몰챔버로부터 유출되는 작동유는 붐 제어밸브(14)를 경유하여 유압탱크(T)로 귀환된다. 따라서 붐실린더(13)가 신장구동되므로 붐을 상승시킬 수 있다.
한편, 붐을 하강시키기 위해 압력 발생장치(19)를 붐 다운위치로 조작할 경우, 파일럿펌프(4)로부터의 파일럿 신호압이 압력 발생장치(19)를 경유하여 붐 제어밸브(14)를 도면상, 우측 방향으로 절환시킨다. 따라서 제2유압펌프(3)로부터 토출되는 작동유는 붐 제어밸브(14)를 경유하여 붐실린더(13)의 스몰챔버에 공급된다. 이와 동시에 붐실린더(13)의 라지챔버로부터 유출되는 작동유는 붐 제어밸브(14) 및 배압체크밸브(23)를 경유하여 유압탱크(T)로 귀환된다. 따라서 붐실린더(13)가 수축구동되므로 붐을 하강시킬 수 있다.
이때, 전술한 배압체크밸브(23)에는 밸브스프링이 장착됨에 따라 유량이 통과될 경우 일정한 압력이 형성된다. 또한 붐 제어밸브(14)에는 재생라인이 설치됨에 따라 붐 다운시 붐실린더(13)의 라지챔버로부터 유출되는 유량을 스몰챔버로 재생시킬 수 있다.
전술한 바와 같이 붐을 다운시킬 경우 붐이 자중에 의해 다운되므로 저압력이 작용하게 된다. 한편 붐 다운 조작과 상대적으로 높은 압력이 요구되는 작업장치(일 예로서 버킷을 말함)를 동시에 조작할 경우, 붐과 버킷의 동시 조작성을 유지할 수 있도록 붐 하강측 제어스풀(붐 제어밸브(14)를 말함)의 유량 유입구측에 교축장치를 설치하여 동시 조작성을 유지할 수 있게 된다.
한편, 붐을 상승시키는 압력에 대비하여, 상대적으로 저압에서 작동되는 각 작업장치의 병렬유로에 교축장치를 설치함에 따라, 붐 상승과 다른 작업장치의 동시 조작성을 실현할 수 있게 된다.
또한, 전술한 붐 제어밸브(14)와 병렬으로 연결되는 버킷 제어밸브(16) 및 주행 제어밸브(18)는 제2센터바이패스통로(12)를 통하여 텐뎀유로(tandem)가 형성되어 있다. 즉 버킷실린더(15) 구동을 단독으로 제어할 경우 제2유압펌프(3)로부터의 작동유는 병렬유로(12a) 및 텐덤유로를 통하여 유입됨에 따라, 병렬유로(12a)로만 통과시킬 경우 발생되는 과도한 압력 손실을 줄일 수 있게 된다.
한편, 붐 하강 조작과 버킷 등의 다른 작업장치를 동시에 조작할 경우, 붐 하강측 제어스풀에 의해 제2센터바이패스통로(12)가 차단(close)되고, 버킷실린더(15)에 작동유를 공급하는 통로는 병렬유로(12a)를 통해서만 공급된다. 이 경우 병렬유로(12a)에 설치되는 유선 제어밸브에 의해 충분한 유로를 확보할 수 없어 과대한 압력손실을 유발하게 됨에 따라 에너지 손실이 발생되는 문제점을 갖는다.
또한, 전술한 병렬유로(12a)의 교축장치(24)로서 가변 제어밸브(도 2 참조)를 설치하는 하는 경우도 있으나, 이러한 교축장치도 유로를 충분하게 확보하는데 제한이 있는 실정이다.
본 발명의 실시예는, 붐 다운 작동과 버킷 구동에서와 같이 작동 압력이 상이한 작업장치를 동시에 조작할 경우, 병렬유로와 텐덤유로를 통하여 버킷 제어밸브에 작동유가 유입되도록 하여 제어밸브 내부에 발생되는 불필요한 압력 손실을 저감시킴에 따라 에너지 손실이 감소되어 유압시스템 효율을 증대시킬 수 있도록 한 건설기계용 작업장치 구동 제어시스템과 관련된다.
본 발명의 실시예에 의한 건설기계용 작업장치 구동 제어시스템은,
엔진과,
엔진에 연결되는 가변용량형 제1,2유압펌프 및 파일럿 펌프와,
제1유압펌프의 제1센터바이패스통로에 설치되어 병렬유로로 각각 연결되고, 선회모터를 제어하는 선회 제어밸브와, 아암실린더를 제어하는 아암 제어밸브와, 좌측 주행모터를 제어하는 주행 제어밸브와,
제2유압펌프의 제2센터바이패스통로에 설치되어 병렬유로로 각각 연결되고, 붐실린더를 제어하는 붐 제어밸브와, 버킷실린더를 제어하는 버킷 제어밸브와, 우측 주행모터를 제어하는 주행 제어밸브와,
조작량에 대응되는 제어신호를 출력하는 압력 발생장치와,
붐 제어밸브의 붐 하강측 제어스풀에 형성되고, 압력 발생장치 조작으로 붐을 다운시키도록 붐 제어밸브를 절환시킬 경우에도 제2센터바이패스통로를 차단하지않고 개방상태를 유지하는 블리드 유로와,
제2센터바이패스통로 최하류측에 설치되고, 붐 제어밸브를 절환시키는 제어신호압에 의해 절환되는 센터바이패스 절환밸브를 구비하여,
붐 다운 작동과 상대적으로 작동 압력이 상이한 작업장치를 동시에 조작할 경우, 제2유압펌프로부터의 작동유가 제2센터바이패스통로에 연결되는 병렬유로 및 텐덤유로를 통하여 제어밸브에 유입되도록 이뤄진다.
바람직한 실시예에 의하면, 전술한 작업장치는 버킷이며, 작업장치를 제어하는 제어밸브는 버킷 제어밸브이다.
전술한 바와 같이 구성되는 본 발명의 실시예에 의한 건설기계용 작업장치 구동 제어시스템은 아래와 같은 이점을 갖는다.
붐 다운 작동과 버킷 구동에서와 같이 작동 압력이 상이한 작업장치를 동시에 조작할 경우, 작동유가 병렬유로와 텐덤유로를 통하여 버킷 제어밸브에 유입되도록 하여(텐덤유로를 따라 통과되는 유량만큼 유로를 확보할 수 있음) 제어밸브 내부에 발생되는 압력 손실을 저감시켜 에너지 손실을 줄일 수 있다.
도 1은 종래 기술에 의한 건설기계용 작업장치 구동 제어시스템의 유압회로도,
도 2는 종래 기술에 의한 건설기계용 작업장치 구동 제어시스템에 적용되는 우선제어밸브의 요부발췌확대도,
도 3은 본 발명의 일 실시예에 의한 건설기계용 작업장치 구동 제어시스템의 유압회로도,
도 4는 본 발명의 일 실시예에 의한 건설기계용 작업장치 구동 제어시스템에 있어서, 우선제어밸브의 요부발췌확대도이다.
〈도면의 주요 부분에 대한 참조 부호의 설명〉
1; 엔진
2; 제1유압펌프
3; 제2유압펌프
4; 파일럿 펌프
5; 제1센터바이패스통로
6; 선회모터
7,9,11,14,16,18; 제어밸브
8; 아암실린더
10,17; 주행모터
13; 붐실린더
15; 버킷실린더
19,20; 압력발생장치
25; 블리드 유로
26; 센터바이패스 절환밸브
이하, 본 발명의 바람직한 실시예를 첨부도면을 참조하여 설명하되, 이는 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 발명을 용이하게 실시할 수있을 정도로 상세하게 설명하기 위한 것이지, 이로 인해 본 발명의 기술적인 사상 및 범주가 한정되는 것을 의미하지는 않는 것이다.
도 3 내지 도 4에 도시된 본 발명의 일 실시예에 의한 건설기계용 작업장치 구동 제어시스템은,
엔진(1)과,
엔진(1)에 연결되는 가변용량형 제1,2유압펌프(이하, "제1,2유압펌프" 라고 말함(2,3) 및 파일럿 펌프(4)와,
제1유압펌프(2)의 제1센터바이패스통로(5)에 설치되어 병렬유로(5a)로 각각 연결되고, 선회모터(6) 구동을 제어하는 선회 제어밸브(7)와, 아암실린더(8) 구동을 제어하는 아암 제어밸브(9)와, 좌측 주행모터(10) 구동을 제어하는 주행 제어밸브(11)와,
제2유압펌프(3)의 제2센터바이패스통로(12)에 설치되어 병렬유로(12a)로 각각 연결되고, 붐실린더(13) 구동을 제어하는 붐 제어밸브(14a)와, 버킷실린더(15)구동을 제어하는 버킷 제어밸브(16)와, 우측 주행모터(17) 구동을 제어하는 주행 제어밸브(18)와,
조작량에 대응되는 제어신호를 출력하는 압력 발생장치(19,20)와,
붐 제어밸브(14a)의 붐 하강측 제어스풀에 형성되고, 압력 발생장치(19) 조작으로 붐을 다운시키도록 붐 제어밸브(14a)를 절환시킬 경우에도 제2센터바이패스통로(12)를 차단하지않고 개방상태를 유지하는 블리드(bleed)유로(25)와,
제2센터바이패스통로(12) 최하류측에 설치되고, 붐 제어밸브(14a)를 절환시키는 제어신호압에 의해 절환되는 센터바이패스 절환밸브(26)를 구비하여,
붐 다운 작동과 상대적으로 작동 압력이 상이한 작업장치(일 예로서 버킷을 말함)를 동시에 조작할 경우, 제2유압펌프(3)로부터의 작동유가 제2센터바이패스통로(12)에 연결되는 병렬유로(12a) 및 텐덤유로를 통하여 버킷 제어밸브(16)에 유입되도록 이뤄진다.
이때, 전술한 붐 제어밸브(14a)의 붐 하강측 제어스풀에 형성되고, 붐을 다운시키기 위해 붐 제어밸브(14a)를 절환시킬 경우에도 제2센터바이패스통로(12)를 차단하지않고 개방상태를 유지하는 블리드(bleed)유로(25)와,
제2센터바이패스통로(12) 최하류측에 설치되고, 붐 제어밸브(14a)를 절환시키는 제어신호압에 의해 절환되는 센터바이패스 절환밸브(26)를 제외한 구성은, 도 1에 도시된 작업장치 구동 제어시스템의 구성과 동일하므로 이들의 구성 및 작동의 상세한 설명은 생략하며, 중복되는 구성에 대한 도면부호는 동일하게 표기한다.
이하에서, 본 발명의 일 실시예에 의한 건설기계용 작업장치 구동 제어시스템의 사용예를 첨부도면을 참조하여 상세하게 설명한다.
도 3 내지 도 4에서와 같이, 붐 다운 작동과 버킷 구동을 동시에 조작할 경우, 전술한 압력 발생장치(19)의 조작으로 인해 파일럿 펌프(4)로부터의 파일럿 신호압이 압력 발생장치(19)를 경유하여 붐 제어밸브(14a)를 도면상, 우측 방향으로 절환시킨다. 따라서 제2유압펌프(3)로부터 토출되는 작동유는 로드체크밸브(22) 및 붐 제어밸브(14a)를 경유하여 붐실린더(13)의 스몰챔버에 공급된다. 동시에 붐실린더(13)의 라지챔버로부터 유출되는 작동유는 붐 제어밸브(14a) 및 배압체크밸브(23)를 경유하여 유압탱크(T)로 귀환된다. 따라서 붐실린더(13)가 수축구동되므로 붐을 하강시킬 수 있다.
이때, 전술한 배압체크밸브(23)에 의해 발생된 압력으로 인해 붐실린더(13)의 라지챔버에서 유출되는 일부 유량은 붐 하강측 제어스풀(붐 제어밸브(14a)를 말함)에 형성된 재생라인을 통해 붐실린더(13)의 스몰챔버로 재생되어진다.
한편, 제2유압펌프(3)로부터 토출되는 작동유는, 제2센터바이패스통로(12) - 붐 제어밸브(14a)의 붐 하강측 제어스풀에 형성된 블리드 유로(25)를 통과하여 버킷 제어밸브(16)의 입구측에 공급된다. 따라서 버킷 제어밸브(16)의 로드체크밸브(27)를 통하여 버킷 제어밸브(16)의 스풀 통로에 연결된다. 한편 병렬유로(12a)에 설치되는 우선 제어밸브를 경유한 유량이 로드체크밸브(27)를 경유한 유량과 합류되어 버킷 제어밸브(16)의 스풀에 유입된다.
따라서, 작동 압력이 상이한 붐과 버킷을 동시에 조작하는 경우에, 제2유압펌프(3)로부터의 유량이 병렬유로(12a)를 통하여 버킷 제어밸브(16)의 스풀에 유입된다. 동시에 제2유압펌프(3)로부터의 유량이 제2센터바이패스통로(12)를 통해서도 버킷 제어밸브(16)의 스풀에 유입된다. 이로 인해 제2센터바이패스통로(12)를 통과하여 버킷 제어밸브(16)의 스풀에 유입되는 유량만큼 압력 손실이 줄어든다(이와 같은 압력 손실 감소는 주행 제어밸브(18)에도 동일하게 적용될 수 있다).
전술한 바와 같은 본 발명의 일 실시예에 의한 건설기계용 작업장치 구동 제어시스템에 의하면, 붐 다운 작동과 버킷 구동에서와 같이 작동 압력이 상이한 작업장치를 동시에 조작할 경우, 병렬유로와 텐덤유로를 통하여 버킷 제어밸브에 작동유가 유입되도록 하여 제어밸브 내부에 발생되는 압력 손실을 저감시켜 유압시스템 효율을 증대시킬 수 있다.

Claims (2)

  1. 엔진과,
    상기 엔진에 연결되는 가변용량형 제1,2유압펌프 및 파일럿 펌프와,
    상기 제1유압펌프의 제1센터바이패스통로에 설치되어 병렬유로로 각각 연결되고, 선회모터를 제어하는 선회 제어밸브와, 아암실린더를 제어하는 아암 제어밸브와, 좌측 주행모터를 제어하는 주행 제어밸브와,
    상기 제2유압펌프의 제2센터바이패스통로에 설치되어 병렬유로로 각각 연결되고, 붐실린더를 제어하는 붐 제어밸브와, 버킷실린더를 제어하는 버킷 제어밸브와, 우측 주행모터를 제어하는 주행 제어밸브와,
    조작량에 대응되는 제어신호를 출력하는 압력 발생장치와,
    상기 붐 제어밸브의 붐 하강측 제어스풀에 형성되고, 압력 발생장치 조작으로 붐을 다운시키도록 붐 제어밸브의 절환시 상기 제2센터바이패스통로를 차단하지않고 개방상태를 유지하는 블리드 유로와,
    상기 제2센터바이패스통로 최하류측에 설치되고, 상기 붐 제어밸브를 절환시키는 제어신호압에 의해 절환되는 센터바이패스 절환밸브를 구비하여,
    붐 다운 작동과 상대적으로 작동 압력이 상이한 작업장치를 동시에 조작할 경우, 상기 제2유압펌프로부터의 작동유가 제2센터바이패스통로에 연결되는 병렬유로 및 텐덤유로를 통하여 제어밸브에 유입되도록 이뤄지는 것을 특징으로 하는 건설기계용 작업장치 구동 제어시스템.
  2. 제1항에 있어서, 상기 작업장치는 버킷이며, 상기 작업장치를 제어하는 제어밸브는 버킷 제어밸브인 것을 특징으로 하는 건설기계용 작업장치 구동 제어시스템.
PCT/KR2011/007439 2011-10-07 2011-10-07 건설기계용 작업장치 구동 제어시스템 Ceased WO2013051740A1 (ko)

Priority Applications (6)

Application Number Priority Date Filing Date Title
PCT/KR2011/007439 WO2013051740A1 (ko) 2011-10-07 2011-10-07 건설기계용 작업장치 구동 제어시스템
JP2014534449A JP5802338B2 (ja) 2011-10-07 2011-10-07 建設機械用作業装置の駆動制御システム
EP11873593.5A EP2772653A4 (en) 2011-10-07 2011-10-07 CONTROL SYSTEM FOR OPERATING A WORKING DEVICE OF A CONSTRUCTION MACHINE
CN201180073924.9A CN103842663A (zh) 2011-10-07 2011-10-07 用于施工机械的操作工作装置的控制系统
US14/348,686 US20140238010A1 (en) 2011-10-07 2011-10-07 Control system for operating work device for construction machine
KR1020147007835A KR20140074306A (ko) 2011-10-07 2011-10-07 건설기계용 작업장치 구동 제어시스템

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/KR2011/007439 WO2013051740A1 (ko) 2011-10-07 2011-10-07 건설기계용 작업장치 구동 제어시스템

Publications (1)

Publication Number Publication Date
WO2013051740A1 true WO2013051740A1 (ko) 2013-04-11

Family

ID=48043892

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2011/007439 Ceased WO2013051740A1 (ko) 2011-10-07 2011-10-07 건설기계용 작업장치 구동 제어시스템

Country Status (6)

Country Link
US (1) US20140238010A1 (ko)
EP (1) EP2772653A4 (ko)
JP (1) JP5802338B2 (ko)
KR (1) KR20140074306A (ko)
CN (1) CN103842663A (ko)
WO (1) WO2013051740A1 (ko)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101861856B1 (ko) * 2012-01-27 2018-05-28 두산인프라코어 주식회사 건설기계의 스윙 모터 유압제어장치
WO2014112668A1 (ko) 2013-01-18 2014-07-24 볼보 컨스트럭션 이큅먼트 에이비 건설기계의 유량 제어장치 및 제어방법
EP2960529B1 (en) 2013-02-19 2019-01-02 Volvo Construction Equipment AB Hydraulic system for construction machine, provided with protection device
KR20160023710A (ko) 2013-06-28 2016-03-03 볼보 컨스트럭션 이큅먼트 에이비 플로팅기능을 갖는 건설기계용 유압회로 및 플로팅기능 제어방법
CN105637152B (zh) * 2013-07-24 2017-11-28 沃尔沃建造设备有限公司 用于工程机械的液压回路
CN104179738B (zh) * 2014-08-07 2016-04-13 龙工(上海)精工液压有限公司 一种滑移装载机开式液压系统
US20170276151A1 (en) * 2014-09-19 2017-09-28 Volvo Construction Equipment Ab Hydraulic circuit for construction equipment
WO2016098926A1 (ko) * 2014-12-17 2016-06-23 볼보 컨스트럭션 이큅먼트 에이비 건설기계의 유압액츄에이터 구동 제어방법
WO2016208780A1 (ko) * 2015-06-22 2016-12-29 볼보 컨스트럭션 이큅먼트 에이비 건설기계용 유압회로
JP7198072B2 (ja) * 2018-12-13 2022-12-28 キャタピラー エス エー アール エル 建設機械の油圧制御回路
JP7221101B2 (ja) * 2019-03-20 2023-02-13 日立建機株式会社 油圧ショベル
JP7305532B2 (ja) * 2019-12-28 2023-07-10 株式会社クボタ 流量制御弁
JP7444032B2 (ja) * 2020-11-16 2024-03-06 コベルコ建機株式会社 建設機械

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57184136A (en) * 1981-05-06 1982-11-12 Hitachi Constr Mach Co Ltd Oil-pressure circuit for oil-pressure working machine
JPH08239865A (ja) * 1995-03-03 1996-09-17 Hitachi Constr Mach Co Ltd 建設機械の制御装置
JPH1182413A (ja) * 1997-08-29 1999-03-26 Komatsu Ltd 作業機の油圧制御装置
JP2004324208A (ja) * 2003-04-24 2004-11-18 Hitachi Constr Mach Co Ltd 掘削旋回作業機の油圧回路

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6129813Y2 (ko) * 1980-07-07 1986-09-02
JP3061529B2 (ja) * 1994-05-16 2000-07-10 日立建機株式会社 ローダフロント付き油圧ショベルの油圧駆動装置
JPH07317713A (ja) * 1994-05-27 1995-12-08 Yutani Heavy Ind Ltd 建設機械の油圧回路
JP3777114B2 (ja) * 2001-11-05 2006-05-24 日立建機株式会社 油圧作業機の油圧回路装置
JP4279837B2 (ja) * 2003-01-14 2009-06-17 日立建機株式会社 油圧作業機
US7178333B2 (en) * 2004-03-18 2007-02-20 Kobelco Construction Machinery Co., Ltd. Hydraulic control system for hydraulic excavator
CN100464036C (zh) * 2005-03-28 2009-02-25 广西柳工机械股份有限公司 用于液压挖掘机工作装置的轨迹控制系统及方法
KR100974283B1 (ko) * 2008-08-08 2010-08-06 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 굴삭 및 파이프 레잉 작업을 위한 유량 분배 시스템
KR101112133B1 (ko) * 2009-06-16 2012-02-22 볼보 컨스트럭션 이큅먼트 에이비 플로트 기능을 갖는 건설장비용 유압시스템
KR101637575B1 (ko) * 2009-12-24 2016-07-07 두산인프라코어 주식회사 건설기계의 유압제어장치
JP5079827B2 (ja) * 2010-02-10 2012-11-21 日立建機株式会社 油圧ショベルの油圧駆動装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57184136A (en) * 1981-05-06 1982-11-12 Hitachi Constr Mach Co Ltd Oil-pressure circuit for oil-pressure working machine
JPH08239865A (ja) * 1995-03-03 1996-09-17 Hitachi Constr Mach Co Ltd 建設機械の制御装置
JPH1182413A (ja) * 1997-08-29 1999-03-26 Komatsu Ltd 作業機の油圧制御装置
JP2004324208A (ja) * 2003-04-24 2004-11-18 Hitachi Constr Mach Co Ltd 掘削旋回作業機の油圧回路

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2772653A4 *

Also Published As

Publication number Publication date
CN103842663A (zh) 2014-06-04
US20140238010A1 (en) 2014-08-28
EP2772653A1 (en) 2014-09-03
KR20140074306A (ko) 2014-06-17
EP2772653A4 (en) 2015-10-21
JP5802338B2 (ja) 2015-10-28
JP2014534386A (ja) 2014-12-18

Similar Documents

Publication Publication Date Title
WO2013051740A1 (ko) 건설기계용 작업장치 구동 제어시스템
KR101727636B1 (ko) 건설기계용 유량 컨트롤밸브
WO2012091184A1 (ko) 건설기계의 에너지 재생 시스템
CN103184752A (zh) 工程机械的液压回路
KR102510852B1 (ko) 건설기계의 유압 시스템 및 유압 제어 방법
WO2019074301A1 (ko) 건설기계의 붐 증속 유압 시스템
WO2013062156A1 (ko) 액츄에이터 충격 감소시스템이 구비된 하이브리드 굴삭기
WO2012121427A1 (ko) 파이프 레이어용 유압회로
JP2014118985A (ja) 建設機械の油圧回路
WO2013015467A1 (ko) 건설기계용 유압시스템
WO2016111391A1 (ko) 건설기계용 유량 컨트롤밸브
WO2012091187A1 (ko) 건설기계의 붐-선회 복합구동 유압 제어시스템
WO2014017685A1 (ko) 건설기계용 유압시스템
CN114776670B (zh) 一种多功能作业集成阀、控制模块、液压系统以及破拆机器人
CN102602826A (zh) 一种起重机及其单缸伸缩机构的液压控制系统
WO2013008965A1 (ko) 건설기계용 유량 제어밸브
WO2013180428A1 (ko) 굴삭기용 압력제어방식의 독립 유량제어 유압시스템
WO2013176298A1 (ko) 건설기계용 유압시스템
WO2020166975A1 (ko) 건설 기계
WO2015064785A1 (ko) 플로팅기능이 구비된 건설기계용 유량제어밸브
WO2012074145A1 (ko) 건설기계의 유압펌프 제어시스템
WO2015093791A1 (ko) 건설 기계의 폐회로 유압 시스템
JP2020085078A (ja) 流体圧制御装置
WO2016195134A1 (ko) 건설기계용 유압회로
WO2013089295A1 (ko) 건설기계의 주행 제어시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11873593

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20147007835

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2011873593

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 14348686

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2014534449

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE