[go: up one dir, main page]

WO2011020998A3 - Procédé d'amélioration des performances d'injection d'eau à l'aide de ruptures de barrière et de dispositifs de régulation d'écoulement entrant - Google Patents

Procédé d'amélioration des performances d'injection d'eau à l'aide de ruptures de barrière et de dispositifs de régulation d'écoulement entrant Download PDF

Info

Publication number
WO2011020998A3
WO2011020998A3 PCT/GB2010/001557 GB2010001557W WO2011020998A3 WO 2011020998 A3 WO2011020998 A3 WO 2011020998A3 GB 2010001557 W GB2010001557 W GB 2010001557W WO 2011020998 A3 WO2011020998 A3 WO 2011020998A3
Authority
WO
WIPO (PCT)
Prior art keywords
reservoir
substantially horizontal
production
horizontal wellbore
inflow control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/GB2010/001557
Other languages
English (en)
Other versions
WO2011020998A2 (fr
Inventor
Leopoldo Sierra
Loyd E. East
Mohamed Y. Soliman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Priority to CA2770177A priority Critical patent/CA2770177C/fr
Priority to EP10748120A priority patent/EP2467573A2/fr
Publication of WO2011020998A2 publication Critical patent/WO2011020998A2/fr
Publication of WO2011020998A3 publication Critical patent/WO2011020998A3/fr
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/30Specific pattern of wells, e.g. optimising the spacing of wells
    • E21B43/305Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)

Abstract

La présente invention se rapporte à un procédé de production d'hydrocarbures à partir d'un réservoir d'hydrocarbures. Le procédé comprend la réalisation d'un puits de forage sensiblement horizontal ayant au moins un intervalle productif dans un réservoir d'hydrocarbures et la formation d'au moins une rupture transversale non conductrice dans le réservoir le long du puits de forage sensiblement horizontal. Un puits d'injection est également réalisé. Un fluide est injecté dans le réservoir par le puits d'injection afin de déplacer les hydrocarbures se trouvant dans le réservoir vers une partie production du puits de forage sensiblement horizontal. Les hydrocarbures sont évacués depuis le réservoir dans au moins un intervalle de production du puits de forage sensiblement horizontal. La production de fluide provenant du ou des intervalles de production dans le puits de forage sensiblement horizontal s'écoule dans un dispositif de régulation d'écoulement entrant qui peut limiter l'écoulement de fluide. Une rupture transversale non conductrice peut former une barrière dans le réservoir pour dévier les fluides injectés afin d'augmenter l'efficacité de balayage et de réduire l'arrivée de fluides injectés dans l'intervalle de production.
PCT/GB2010/001557 2009-08-20 2010-08-17 Procédé d'amélioration des performances d'injection d'eau à l'aide de ruptures de barrière et de dispositifs de régulation d'écoulement entrant Ceased WO2011020998A2 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CA2770177A CA2770177C (fr) 2009-08-20 2010-08-17 Procede d'amelioration des performances d'injection d'eau a l'aide de ruptures de barriere et de dispositifs de regulation d'ecoulement entrant
EP10748120A EP2467573A2 (fr) 2009-08-20 2010-08-17 Procédé d'amélioration des performances d'injection d'eau à l'aide de ruptures de barrière et de dispositifs de régulation d'écoulement entrant

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US12/583,441 US8104535B2 (en) 2009-08-20 2009-08-20 Method of improving waterflood performance using barrier fractures and inflow control devices
US12/583,441 2009-08-20

Publications (2)

Publication Number Publication Date
WO2011020998A2 WO2011020998A2 (fr) 2011-02-24
WO2011020998A3 true WO2011020998A3 (fr) 2011-06-16

Family

ID=43604374

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/GB2010/001557 Ceased WO2011020998A2 (fr) 2009-08-20 2010-08-17 Procédé d'amélioration des performances d'injection d'eau à l'aide de ruptures de barrière et de dispositifs de régulation d'écoulement entrant

Country Status (5)

Country Link
US (2) US8104535B2 (fr)
EP (1) EP2467573A2 (fr)
AR (1) AR077885A1 (fr)
CA (1) CA2770177C (fr)
WO (1) WO2011020998A2 (fr)

Families Citing this family (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8960292B2 (en) 2008-08-22 2015-02-24 Halliburton Energy Services, Inc. High rate stimulation method for deep, large bore completions
US8439116B2 (en) 2009-07-24 2013-05-14 Halliburton Energy Services, Inc. Method for inducing fracture complexity in hydraulically fractured horizontal well completions
US8631872B2 (en) 2009-09-24 2014-01-21 Halliburton Energy Services, Inc. Complex fracturing using a straddle packer in a horizontal wellbore
US8887803B2 (en) 2012-04-09 2014-11-18 Halliburton Energy Services, Inc. Multi-interval wellbore treatment method
US9796918B2 (en) 2013-01-30 2017-10-24 Halliburton Energy Services, Inc. Wellbore servicing fluids and methods of making and using same
US9016376B2 (en) 2012-08-06 2015-04-28 Halliburton Energy Services, Inc. Method and wellbore servicing apparatus for production completion of an oil and gas well
US8104535B2 (en) * 2009-08-20 2012-01-31 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices
US8700371B2 (en) * 2010-07-16 2014-04-15 Schlumberger Technology Corporation System and method for controlling an advancing fluid front of a reservoir
US8672034B2 (en) * 2011-04-19 2014-03-18 Saudi Arabian Oil Company Well system with lateral main bore and strategically disposed lateral bores and method of forming
US9200502B2 (en) 2011-06-22 2015-12-01 Schlumberger Technology Corporation Well-based fluid communication control assembly
US20140054050A1 (en) * 2012-08-24 2014-02-27 Halliburton Energy Services, Inc. Gas Fracture Injection to Overcome Retrograde Condensation in Gas Wells
CA2820742A1 (fr) * 2013-07-04 2013-09-20 IOR Canada Ltd. Procede ameliore de recuperation des hydrocarbures exploitant plusieurs fractures induites
RU2016101330A (ru) * 2013-08-01 2017-09-06 Лэндмарк Графикс Корпорейшн Алгоритм для оптимальной конфигурации устройств контроля притока с использованием модели взаимодействия ствола скважины и коллектора
WO2015073034A1 (fr) * 2013-11-15 2015-05-21 Landmark Graphics Corporation Optimisation des propriétés d'un dispositif de contrôle d'écoulement à la fois sur des puits de production et des puits d'injection dans des systèmes d'injection de liquide injecteur-producteur couplés
DE112013007603T5 (de) * 2013-11-15 2016-08-18 Landmark Graphics Corporation Optimierung der Eigenschaften von Strömungsregelungsvorrichtungen für kumulierte Flüssigkeitsinjektion
AU2013405169B2 (en) * 2013-11-15 2017-06-22 Landmark Graphics Corporation Optimizing flow control device properties on injector wells in liquid flooding systems
CN105899755A (zh) * 2013-11-15 2016-08-24 界标制图有限公司 在耦接式注入器-生产器调驱液系统中优化生产井上的流量控制设备特性
CN105829644A (zh) * 2014-01-24 2016-08-03 兰德马克绘图国际公司 含水层附近的开采井的优化酸化
US10233727B2 (en) * 2014-07-30 2019-03-19 International Business Machines Corporation Induced control excitation for enhanced reservoir flow characterization
GB2556486B (en) * 2015-07-31 2021-07-07 Landmark Graphics Corp System and method to reduce fluid production from a well
CN105587300B (zh) * 2015-12-31 2019-10-11 中国石油天然气股份有限公司 用于水平井的采油方法
CA2939679A1 (fr) * 2016-08-18 2018-02-18 Velvet Energy Ltd. Methode d'augmentation de la longueur d'une fracture
CA3035243A1 (fr) 2016-09-02 2018-03-08 Saudi Arabian Oil Company Regulation de la production d'hydrocarbures
US10246981B2 (en) 2016-09-23 2019-04-02 Statoil Gulf Services LLC Fluid injection process for hydrocarbon recovery from a subsurface formation
US10246980B2 (en) 2016-09-23 2019-04-02 Statoil Gulf Services LLC Flooding process for hydrocarbon recovery from a subsurface formation
US11274538B2 (en) 2017-07-10 2022-03-15 Texas Tech University System Methods and systems for ballooned hydraulic fractures and complex toe-to-heel flooding
CA3085002A1 (fr) * 2017-12-13 2019-06-20 Source Rock Energy Partners Inc. Systemes et procede d'essai d'ecoulement d'entree pour puits de petrole/de gaz
US11441395B2 (en) 2019-05-16 2022-09-13 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling
US11326423B2 (en) * 2019-05-16 2022-05-10 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings
US11499423B2 (en) 2019-05-16 2022-11-15 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration
US11821289B2 (en) 2019-11-18 2023-11-21 Saudi Arabian Oil Company Automated production optimization technique for smart well completions using real-time nodal analysis
WO2021107953A1 (fr) 2019-11-27 2021-06-03 Halliburton Energy Services, Inc. Bouchons d'isolation mécanique pour dispositifs de régulation d'écoulement entrant
US11248455B2 (en) 2020-04-02 2022-02-15 Saudi Arabian Oil Company Acoustic geosteering in directional drilling
WO2021240197A1 (fr) 2020-05-26 2021-12-02 Saudi Arabian Oil Company Guidage géologique dans un forage directionnel
WO2021240195A1 (fr) 2020-05-26 2021-12-02 Saudi Arabian Oil Company Mandrin instrumenté pour forage à tube spiralé
US12000277B2 (en) 2020-05-26 2024-06-04 Saudi Arabian Oil Company Water detection for geosteering in directional drilling
US11692417B2 (en) * 2020-11-24 2023-07-04 Saudi Arabian Oil Company Advanced lateral accessibility, segmented monitoring, and control of multi-lateral wells
US12387117B2 (en) 2021-11-02 2025-08-12 Saudi Arabian Oil Company Injector riskiness score (IRS) matrix
US12024985B2 (en) 2022-03-24 2024-07-02 Saudi Arabian Oil Company Selective inflow control device, system, and method
US12428913B1 (en) * 2024-03-26 2025-09-30 Saudi Arabian Oil Company Systems and methods for conformance control of a wellbore

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6112817A (en) * 1997-05-06 2000-09-05 Baker Hughes Incorporated Flow control apparatus and methods
US7228908B2 (en) * 2004-12-02 2007-06-12 Halliburton Energy Services, Inc. Hydrocarbon sweep into horizontal transverse fractured wells

Family Cites Families (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878884A (en) * 1973-04-02 1975-04-22 Cecil B Raleigh Formation fracturing method
US4390067A (en) * 1981-04-06 1983-06-28 Exxon Production Research Co. Method of treating reservoirs containing very viscous crude oil or bitumen
US4476932A (en) * 1982-10-12 1984-10-16 Atlantic Richfield Company Method of cold water fracturing in drainholes
US5025859A (en) * 1987-03-31 1991-06-25 Comdisco Resources, Inc. Overlapping horizontal fracture formation and flooding process
US5074360A (en) * 1990-07-10 1991-12-24 Guinn Jerry H Method for repoducing hydrocarbons from low-pressure reservoirs
US5183109A (en) * 1991-10-18 1993-02-02 Halliburton Company Method for optimizing hydraulic fracture treatment of subsurface formations
US5249628A (en) * 1992-09-29 1993-10-05 Halliburton Company Horizontal well completions
US5325923A (en) * 1992-09-29 1994-07-05 Halliburton Company Well completions with expandable casing portions
US5396957A (en) * 1992-09-29 1995-03-14 Halliburton Company Well completions with expandable casing portions
US5533571A (en) * 1994-05-27 1996-07-09 Halliburton Company Surface switchable down-jet/side-jet apparatus
US5499678A (en) * 1994-08-02 1996-03-19 Halliburton Company Coplanar angular jetting head for well perforating
US6047773A (en) * 1996-08-09 2000-04-11 Halliburton Energy Services, Inc. Apparatus and methods for stimulating a subterranean well
US5765642A (en) * 1996-12-23 1998-06-16 Halliburton Energy Services, Inc. Subterranean formation fracturing methods
US6119776A (en) * 1998-02-12 2000-09-19 Halliburton Energy Services, Inc. Methods of stimulating and producing multiple stratified reservoirs
US6095244A (en) * 1998-02-12 2000-08-01 Halliburton Energy Services, Inc. Methods of stimulating and producing multiple stratified reservoirs
US6016867A (en) * 1998-06-24 2000-01-25 World Energy Systems, Incorporated Upgrading and recovery of heavy crude oils and natural bitumens by in situ hydrovisbreaking
US6167966B1 (en) * 1998-09-04 2001-01-02 Alberta Research Council, Inc. Toe-to-heel oil recovery process
US6364015B1 (en) * 1999-08-05 2002-04-02 Phillips Petroleum Company Method of determining fracture closure pressures in hydraulicfracturing of subterranean formations
GB2373520B (en) * 2000-02-18 2004-11-24 Halliburton Energy Serv Inc Downhole drilling apparatus and method for use of same
US6644412B2 (en) * 2001-04-25 2003-11-11 Weatherford/Lamb, Inc. Flow control apparatus for use in a wellbore
US6814141B2 (en) * 2001-06-01 2004-11-09 Exxonmobil Upstream Research Company Method for improving oil recovery by delivering vibrational energy in a well fracture
US6662874B2 (en) * 2001-09-28 2003-12-16 Halliburton Energy Services, Inc. System and method for fracturing a subterranean well formation for improving hydrocarbon production
US6938690B2 (en) * 2001-09-28 2005-09-06 Halliburton Energy Services, Inc. Downhole tool and method for fracturing a subterranean well formation
US20070284107A1 (en) * 2006-06-02 2007-12-13 Crichlow Henry B Heavy Oil Recovery and Apparatus
US20090101354A1 (en) * 2007-10-19 2009-04-23 Baker Hughes Incorporated Water Sensing Devices and Methods Utilizing Same to Control Flow of Subsurface Fluids
US8631877B2 (en) * 2008-06-06 2014-01-21 Schlumberger Technology Corporation Apparatus and methods for inflow control
US8104535B2 (en) * 2009-08-20 2012-01-31 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6112817A (en) * 1997-05-06 2000-09-05 Baker Hughes Incorporated Flow control apparatus and methods
US7228908B2 (en) * 2004-12-02 2007-06-12 Halliburton Energy Services, Inc. Hydrocarbon sweep into horizontal transverse fractured wells

Also Published As

Publication number Publication date
CA2770177C (fr) 2015-04-21
US20120160484A1 (en) 2012-06-28
AR077885A1 (es) 2011-09-28
EP2467573A2 (fr) 2012-06-27
US8104535B2 (en) 2012-01-31
US20110042083A1 (en) 2011-02-24
CA2770177A1 (fr) 2011-02-24
WO2011020998A2 (fr) 2011-02-24
US8307893B2 (en) 2012-11-13

Similar Documents

Publication Publication Date Title
WO2011020998A3 (fr) Procédé d'amélioration des performances d'injection d'eau à l'aide de ruptures de barrière et de dispositifs de régulation d'écoulement entrant
WO2010123886A3 (fr) Procédé et appareil destinés à améliorer la récupération de pétrole dans des puits
EA200870228A1 (ru) Способ и устройство ствола скважины для заканчивания, добычи и нагнетания
SA519400940B1 (ar) طريقة تحسين تعقيد صدع باستخدام أنظمة تحويل لحقل بعيد
EA201070909A1 (ru) Способ гидравлического разрыва горизонтальных скважин для повышения добычи углеводородов
WO2010001087A3 (fr) Dispositif et procédé de régulation de flux d'entrée
WO2010020747A3 (fr) Procédé de stimulation à débit élevé destiné à la réalisation de grands trous profonds
WO2012082488A3 (fr) Régulation du débit de vapeur entrant et/ou sortant d'un puits
MX2015017886A (es) Proceso de recuperación de hidrocarburos mejorado a través de la explotación de múltiples fracturas inducidas.
MX2015010395A (es) Metodo y sistema para produccion e inyeccion de pozo.
WO2013016097A3 (fr) Système et procédé de production de fluides de réservoir
MX2016015616A (es) Aplicaciones de fluidos de viscosidad ultra-baja para estimular a las formaciones ultra-apretadas que contienen hidrocarburos.
MX2017007495A (es) Composiciones y metodos para mejorar una red de fracturas hidraulicas.
WO2014163853A3 (fr) Production d'hydrocarbures à partir d'une formation
WO2013130491A3 (fr) Injection de fluide dans des réservoirs de pétrole étanches à la lumière
WO2009134669A3 (fr) Procédé d’analyse de récupération d'hydrocarbures
WO2011110802A8 (fr) Procédés relatifs à la modification de configurations d'écoulement utilisant des barrières in situ
MX2017015001A (es) Fracturacion de caudal bajo inducida termicamente.
ATE483095T1 (de) Verfahren zur erhöhung der injektivität von fluiden und gasen über hydraulische frakturierung
WO2014088701A3 (fr) Fluides stabilisés dans un traitement de puits
WO2012054139A3 (fr) Procédés d'établissement de réseau de fractures souterrain
WO2012082491A3 (fr) Production d'énergie géothermique
CA2879551A1 (fr) Procede a emissions reduites pour recuperer un produit a partir d'une operation de fracturation hydraulique
MX377371B (es) Proceso de recuperación de hidrocarburos.
MX2016016569A (es) Metodo para el diseño de pozos de produccion y pozos de inyeccion.

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10748120

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 2770177

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2010748120

Country of ref document: EP