[go: up one dir, main page]

RU2016101330A - Алгоритм для оптимальной конфигурации устройств контроля притока с использованием модели взаимодействия ствола скважины и коллектора - Google Patents

Алгоритм для оптимальной конфигурации устройств контроля притока с использованием модели взаимодействия ствола скважины и коллектора Download PDF

Info

Publication number
RU2016101330A
RU2016101330A RU2016101330A RU2016101330A RU2016101330A RU 2016101330 A RU2016101330 A RU 2016101330A RU 2016101330 A RU2016101330 A RU 2016101330A RU 2016101330 A RU2016101330 A RU 2016101330A RU 2016101330 A RU2016101330 A RU 2016101330A
Authority
RU
Russia
Prior art keywords
wellbore
control devices
computer
horizontal part
along
Prior art date
Application number
RU2016101330A
Other languages
English (en)
Inventor
Андрей ФИЛИППОВ
Виталий ХОРЯКОВ
Original Assignee
Лэндмарк Графикс Корпорейшн
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Лэндмарк Графикс Корпорейшн filed Critical Лэндмарк Графикс Корпорейшн
Publication of RU2016101330A publication Critical patent/RU2016101330A/ru

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/28Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Fluid Mechanics (AREA)
  • Mathematical Physics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mathematical Optimization (AREA)
  • Algebra (AREA)
  • Pure & Applied Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Computing Systems (AREA)
  • Geometry (AREA)
  • Evolutionary Computation (AREA)
  • Computer Hardware Design (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Computational Mathematics (AREA)
  • Software Systems (AREA)
  • Geophysics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Flow Control (AREA)
  • Operations Research (AREA)
  • Feedback Control In General (AREA)

Claims (32)

1. Реализуемый с помощью компьютера способ улучшения добычи из нефтяной скважины, содержащий:
генерацию модели ствола скважины в моделирующей системе для ствола скважины и
выполнение алгоритма, который определяет оптимальные параметры устройств контроля притока (ICD) вдоль горизонтальной части ствола скважины, причем определенные оптимальные параметры устройств контроля притока дают по существу равномерное приближение по меньшей мере одного из числа воды и газа вдоль горизонтальной части ствола скважины.
2. Реализуемый с помощью компьютера способ по п. 1, дополнительно включающий экспорт модели в моделирующую систему для коллектора для моделирования в зависимости по времени.
3. Реализуемый с помощью компьютера способ по п. 1, в котором алгоритм содержит инструкции для инициализации фиксированного значения давления на забойном конце ствола скважины.
4. Реализуемый с помощью компьютера способ по п. 1, в котором алгоритм содержит инструкции для выполнения цикла инструкций до тех пор, пока распределение потока не сойдется в достаточной степени, причем указанный цикл изначально начинается с равномерного распределения ICD вдоль горизонтальной части ствола скважины и использует результаты распределения ICD из предыдущего цикла для последующего цикла.
5. Реализуемый с помощью компьютера способ по п. 1, в котором алгоритм содержит инструкции для определения точки вдоль горизонтальной части ствола скважины, которая имеет максимальное время приближения.
6. Реализуемый с помощью компьютера способ по п. 1, в котором алгоритм содержит инструкции для определения распределения давления вдоль горизонтальной части ствола скважины, которое дает равномерное время приближения.
7. Реализуемый с помощью компьютера способ по п. 1, в котором определенные оптимальные параметры устройств контроля притока изменяют диаметр отверстий устройств контроля притока вдоль горизонтальной части ствола скважины.
8. Реализуемый с помощью компьютера способ по п. 1, в котором определенные оптимальные параметры устройств контроля притока изменяют расстояние между устройствами контроля притока вдоль горизонтальной части ствола скважины.
9. Реализуемый с помощью компьютера способ по п. 1, в котором определенные оптимальные параметры устройств контроля притока изменяют диаметр отверстий устройств контроля притока и расстояние между устройствами контроля притока вдоль горизонтальной части ствола скважины.
10. Реализуемый с помощью компьютера способ по п. 1, в котором алгоритм применяют к числовой модели.
11. Система, содержащая:
по меньшей мере один процессор и
по меньшей мере одно запоминающее устройство, соединенное с указанным по меньшей мере одним процессором и хранящее выполняемые компьютером инструкции для улучшения добычи из нефтяной скважины, а выполняемые компьютером инструкции содержат инструкции для:
генерации модели ствола скважины в моделирующей системе для ствола скважины и
выполнения алгоритма, который определяет оптимальные параметры устройств контроля притока (ICD) вдоль горизонтальной части ствола скважины, причем определенные оптимальные параметры устройств контроля притока дают по существу равномерное приближение по меньшей мере одного из числа воды и газа вдоль горизонтальной части ствола скважины.
12. Система по п. 11, дополнительно содержащая выполняемые компьютером инструкции для экспорта указанной модели в моделирующую систему для коллектора для моделирования в зависимости по времени.
13. Система по п. 11, в которой алгоритм содержит инструкции для инициализации фиксированного значения давления на забойном конце ствола скважины.
14. Система по п. 11, в которой алгоритм содержит инструкции для выполнения цикла инструкций до тех пор, пока распределение потока не сойдется в достаточной степени, причем указанный цикл изначально начинается с равномерного распределения вдоль горизонтальной части ствола скважины и использует результаты распределения потока из предыдущего цикла для последующего цикла.
15. Система по п. 11, в которой алгоритм содержит инструкции для определения точки вдоль горизонтальной части ствола скважины, которая имеет максимальное время приближения.
16. Система по п. 11, в которой алгоритм содержит инструкции для определения распределения давления вдоль горизонтальной части ствола скважины, которое дает равномерное время приближения.
17. Система по п. 11, в которой определенные оптимальные параметры устройств контроля притока изменяют диаметр отверстий устройств контроля притока и расстояние между устройствами контроля притока вдоль горизонтальной части ствола скважины.
18. Система по п. 14, в которой распределение потока сходится в достаточной степени в пределах пяти итераций указанного цикла.
19. Энергонезависимый компьютерочитаемый носитель, содержащий выполняемые компьютером инструкции для улучшения добычи из скважины, причем выполняемые компьютером инструкции при их выполнении побуждают один или большее количество машин выполнять операции, включающие:
генерацию модели ствола скважины в моделирующей системе для ствола скважины; и
выполнение алгоритма, который определяет оптимальные параметры устройств контроля притока (ICD) вдоль горизонтальной части ствола скважины, причем определенные оптимальные параметры устройств контроля притока дают по существу равномерное приближение по меньшей мере одного из числа воды и газа вдоль горизонтальной части ствола скважины.
20. Энергонезависимый компьютерочитаемый носитель по п. 19, в котором алгоритм содержит инструкции для выполнения цикла инструкций до тех пор, пока распределение потока не сойдется в достаточной степени, причем указанный цикл изначально начинается с равномерного распределения вдоль горизонтальной части ствола скважины и использует результаты распределения потока из предыдущего цикла для последующего цикла, а также указанный цикл содержит инструкции для:
определения точки вдоль горизонтальной части ствола скважины, которая имеет максимальное время прорыва;
определения распределения давления вдоль горизонтальной части ствола скважины, которое дает равномерное время прорыва;
определения функции распределения устройств ICD, соответствующей определенному распределению давления; и
определения, сходится ли в достаточной степени указанная функция распределения устройств ICD.
RU2016101330A 2013-08-01 2013-08-01 Алгоритм для оптимальной конфигурации устройств контроля притока с использованием модели взаимодействия ствола скважины и коллектора RU2016101330A (ru)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2013/053263 WO2015016932A1 (en) 2013-08-01 2013-08-01 Algorithm for optimal icd configuration using a coupled wellbore-reservoir model

Publications (1)

Publication Number Publication Date
RU2016101330A true RU2016101330A (ru) 2017-09-06

Family

ID=52432288

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016101330A RU2016101330A (ru) 2013-08-01 2013-08-01 Алгоритм для оптимальной конфигурации устройств контроля притока с использованием модели взаимодействия ствола скважины и коллектора

Country Status (10)

Country Link
US (2) US10907449B2 (ru)
CN (1) CN105593460A (ru)
AU (1) AU2013395656B2 (ru)
CA (1) CA2914366C (ru)
DE (1) DE112013007286T5 (ru)
GB (1) GB2528821B (ru)
MX (1) MX2015017430A (ru)
RU (1) RU2016101330A (ru)
SG (1) SG11201510231SA (ru)
WO (1) WO2015016932A1 (ru)

Families Citing this family (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2528821B (en) * 2013-08-01 2020-03-11 Landmark Graphics Corp Algorithm for optimal ICD configuration using a coupled wellbore-reservoir model
CA2930115C (en) 2013-11-15 2018-09-04 Landmark Graphics Corporation Optimizing flow control device properties for a liquid injection well using a coupled wellbore-reservoir model
CA2928548C (en) 2013-11-15 2020-03-31 Landmark Graphics Corporation Optimizing flow control device properties for accumulated liquid injection
WO2015073032A1 (en) 2013-11-15 2015-05-21 Landmark Graphics Corporation Optimizing flow control device properties on a producer well in coupled injector-producer liquid flooding systems
DE112013007601T5 (de) 2013-11-15 2016-08-18 Landmark Graphics Corporation Optimierung der Eigenschaften von Durchflussregulierungseinrichtungen an sowohl Produktions- als auch Injektionsbohrungen in gekoppelten Injektor-Produktions-Flüssigkeitsflutungssystemen
US10526880B2 (en) 2013-11-15 2020-01-07 Landmark Graphics Corporation Optimizing flow control device properties on injector wells in liquid flooding systems
RU2016124674A (ru) 2014-01-24 2018-03-01 Лэндмарк Графикс Корпорейшн Оптимизированная кислотная обработка добывающей скважины вблизи водоносного пласта
EP3063366B1 (en) 2014-01-24 2018-07-25 Landmark Graphics Corporation Optimized acidizing of production and injection wells
WO2016161495A1 (en) * 2015-04-07 2016-10-13 Nexen Energy Ulc Methods, and systems for controlling operation steam stimulated wells
GB2556486B (en) 2015-07-31 2021-07-07 Landmark Graphics Corp System and method to reduce fluid production from a well
WO2018044997A1 (en) * 2016-09-02 2018-03-08 Saudi Arabian Oil Company Controlling hydrocarbon production
CN106407613A (zh) * 2016-11-08 2017-02-15 广东石油化工学院 井筒与油藏耦合条件下的水平井地质优化设计方法
GB201717738D0 (en) * 2017-10-27 2017-12-13 Lloyd's Register Group Ltd Well design and associated well structures
CN109763809B (zh) * 2017-11-01 2022-05-03 中国石油化工股份有限公司 一种优化水平井分段液流控制完井段内参数的方法
CN111322036B (zh) * 2018-11-28 2022-02-08 中国石油化工股份有限公司 气井自适应调流控水装置及其设计方法
US11401786B2 (en) 2019-03-06 2022-08-02 Saudi Arabian Oil Company Systems and methods for hydrocarbon reservoir well connectivity graph optimization, simulation and development
WO2021161057A1 (en) * 2020-02-11 2021-08-19 Total Se Well completion in a hydrocarbon reservoir
US11248455B2 (en) 2020-04-02 2022-02-15 Saudi Arabian Oil Company Acoustic geosteering in directional drilling
US11574083B2 (en) * 2020-05-11 2023-02-07 Saudi Arabian Oil Company Methods and systems for selecting inflow control device design simulations based on case selection factor determinations
WO2021240197A1 (en) 2020-05-26 2021-12-02 Saudi Arabian Oil Company Geosteering in directional drilling
US11781419B2 (en) 2020-05-26 2023-10-10 Saudi Arabian Oil Company Instrumented mandrel for coiled tubing drilling
WO2021240196A1 (en) 2020-05-26 2021-12-02 Saudi Arabian Oil Company Water detection for geosteering in directional drilling
US12024985B2 (en) 2022-03-24 2024-07-02 Saudi Arabian Oil Company Selective inflow control device, system, and method

Family Cites Families (57)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2359579B (en) * 1996-12-31 2001-10-17 Halliburton Energy Serv Inc Production fluid drainage apparatus for a subterranean well
CA2236944C (en) * 1997-05-06 2005-12-13 Baker Hughes Incorporated Flow control apparatus and methods
US6368068B1 (en) * 1997-09-24 2002-04-09 Edward A. Corlew Multi-well computerized control of fluid pumping
US20020177955A1 (en) * 2000-09-28 2002-11-28 Younes Jalali Completions architecture
US7627461B2 (en) * 2004-05-25 2009-12-01 Chevron U.S.A. Inc. Method for field scale production optimization by enhancing the allocation of well flow rates
US8301425B2 (en) * 2005-07-27 2012-10-30 Exxonmobil Upstream Research Company Well modeling associated with extraction of hydrocarbons from subsurface formations
CA2526345C (en) * 2005-10-13 2011-03-01 Pumpwell Solutions Ltd. Method and system for optimizing downhole fluid production
AU2007215550B2 (en) * 2006-02-10 2012-06-28 Exxonmobil Upstream Research Company Flexible well completions
US7469743B2 (en) * 2006-04-24 2008-12-30 Halliburton Energy Services, Inc. Inflow control devices for sand control screens
US7802621B2 (en) * 2006-04-24 2010-09-28 Halliburton Energy Services, Inc. Inflow control devices for sand control screens
US8025072B2 (en) * 2006-12-21 2011-09-27 Schlumberger Technology Corporation Developing a flow control system for a well
US7789145B2 (en) * 2007-06-20 2010-09-07 Schlumberger Technology Corporation Inflow control device
US9004155B2 (en) * 2007-09-06 2015-04-14 Halliburton Energy Services, Inc. Passive completion optimization with fluid loss control
NO20080082L (no) * 2008-01-04 2009-07-06 Statoilhydro Asa Forbedret fremgangsmate for stromningsregulering samt autonom ventil eller stromningsreguleringsanordning
NO20080081L (no) * 2008-01-04 2009-07-06 Statoilhydro Asa Fremgangsmate for autonom justering av en fluidstrom gjennom en ventil eller stromningsreguleringsanordning i injektorer ved oljeproduksjon
US20110073308A1 (en) * 2008-02-14 2011-03-31 Schlumberger Technology Corporation Valve apparatus for inflow control
NO20081078L (no) * 2008-02-29 2009-08-31 Statoilhydro Asa Rørelement med selvregulerende ventiler for styring av strømningen av fluid inn i eller ut av rørelementet
NO337784B1 (no) * 2008-03-12 2016-06-20 Statoil Petroleum As System og fremgangsmåte for styring av fluidstrømmen i grenbrønner
CA2718832A1 (en) * 2008-04-03 2009-10-08 Vidar Mathiesen System and method for recompletion of old wells
NO338988B1 (no) * 2008-11-06 2016-11-07 Statoil Petroleum As Fremgangsmåte og anordning for reversibel temperatursensitiv styring av fluidstrømning ved olje- og/eller gassproduksjon, omfattende en autonom ventil som fungerer etter Bemoulli-prinsippet
BRPI1006862B1 (pt) 2009-01-13 2020-03-17 Exxonmobil Upstream Research Company Método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos
US9109423B2 (en) * 2009-08-18 2015-08-18 Halliburton Energy Services, Inc. Apparatus for autonomous downhole fluid selection with pathway dependent resistance system
US9260952B2 (en) * 2009-08-18 2016-02-16 Halliburton Energy Services, Inc. Method and apparatus for controlling fluid flow in an autonomous valve using a sticky switch
US8104535B2 (en) * 2009-08-20 2012-01-31 Halliburton Energy Services, Inc. Method of improving waterflood performance using barrier fractures and inflow control devices
US8403061B2 (en) * 2009-10-02 2013-03-26 Baker Hughes Incorporated Method of making a flow control device that reduces flow of the fluid when a selected property of the fluid is in selected range
US8291976B2 (en) * 2009-12-10 2012-10-23 Halliburton Energy Services, Inc. Fluid flow control device
US8469107B2 (en) * 2009-12-22 2013-06-25 Baker Hughes Incorporated Downhole-adjustable flow control device for controlling flow of a fluid into a wellbore
NO336424B1 (no) * 2010-02-02 2015-08-17 Statoil Petroleum As Strømningsstyringsanordning, strømningsstyringsfremgangsmåte og anvendelse derav
GB2492292B (en) * 2010-03-18 2016-10-19 Statoil Petroleum As Flow control device and flow control method
US8708050B2 (en) * 2010-04-29 2014-04-29 Halliburton Energy Services, Inc. Method and apparatus for controlling fluid flow using movable flow diverter assembly
US9540911B2 (en) * 2010-06-24 2017-01-10 Schlumberger Technology Corporation Control of multiple tubing string well systems
US8700371B2 (en) * 2010-07-16 2014-04-15 Schlumberger Technology Corporation System and method for controlling an advancing fluid front of a reservoir
US8356669B2 (en) * 2010-09-01 2013-01-22 Halliburton Energy Services, Inc. Downhole adjustable inflow control device for use in a subterranean well
US8910716B2 (en) * 2010-12-16 2014-12-16 Baker Hughes Incorporated Apparatus and method for controlling fluid flow from a formation
GB2502214B (en) * 2011-01-10 2018-12-26 Statoil Petroleum As Valve arrangement for a production pipe
US9074466B2 (en) * 2011-04-26 2015-07-07 Halliburton Energy Services, Inc. Controlled production and injection
US20120278053A1 (en) * 2011-04-28 2012-11-01 Baker Hughes Incorporated Method of Providing Flow Control Devices for a Production Wellbore
US9133683B2 (en) * 2011-07-19 2015-09-15 Schlumberger Technology Corporation Chemically targeted control of downhole flow control devices
US8584762B2 (en) * 2011-08-25 2013-11-19 Halliburton Energy Services, Inc. Downhole fluid flow control system having a fluidic module with a bridge network and method for use of same
EP2570589A1 (en) * 2011-09-16 2013-03-20 Vetco Gray Controls Limited Setting the value of an operational parameter of a well
US8991506B2 (en) * 2011-10-31 2015-03-31 Halliburton Energy Services, Inc. Autonomous fluid control device having a movable valve plate for downhole fluid selection
DK2748417T3 (en) * 2011-10-31 2016-11-28 Halliburton Energy Services Inc AUTONOM fluid control device WITH A reciprocating VALVE BOREHULSFLUIDVALG
CN103114828A (zh) * 2012-02-21 2013-05-22 中国石油化工股份有限公司 一种井下节流工艺参数的设置方法
US8657016B2 (en) * 2012-02-29 2014-02-25 Halliburton Energy Services, Inc. Adjustable flow control device
BR112014025850A8 (pt) * 2012-04-18 2017-07-25 Halliburton Energy Services Inc Dispositivo de controle de fluxo, e, método para controlar o fluxo para dentro de um membro tubular
US9725985B2 (en) * 2012-05-31 2017-08-08 Weatherford Technology Holdings, Llc Inflow control device having externally configurable flow ports
US9404349B2 (en) * 2012-10-22 2016-08-02 Halliburton Energy Services, Inc. Autonomous fluid control system having a fluid diode
BR112015012324A2 (pt) * 2012-12-31 2017-08-29 Halliburton Energy Services Inc Dispositivo de controle de afluxo distribuído
US9562429B2 (en) * 2013-03-12 2017-02-07 Halliburton Energy Services, Inc. Wellbore servicing tools, systems and methods utilizing near-field communication
AU2013394893A1 (en) * 2013-07-25 2015-11-26 Halliburton Energy Services Inc. Adjustable flow control assemblies, systems, and methods
WO2015030837A1 (en) * 2013-08-27 2015-03-05 Halliburton Energy Services, Inc. Simulating fluid leak-off and flow-back in a fractured subterranean
GB2528821B (en) * 2013-08-01 2020-03-11 Landmark Graphics Corp Algorithm for optimal ICD configuration using a coupled wellbore-reservoir model
GB2538370B (en) * 2013-11-11 2020-04-29 Halliburton Energy Services Inc Designing wellbore completion intervals
CA2941406C (en) * 2014-04-01 2018-07-17 Landmark Graphics Corporation Optimizing oil recovery and reducing water production in smart wells
US9896905B2 (en) * 2014-10-10 2018-02-20 Saudi Arabian Oil Company Inflow control system for use in a wellbore
US10280722B2 (en) * 2015-06-02 2019-05-07 Baker Hughes, A Ge Company, Llc System and method for real-time monitoring and estimation of intelligent well system production performance
GB2556486B (en) * 2015-07-31 2021-07-07 Landmark Graphics Corp System and method to reduce fluid production from a well

Also Published As

Publication number Publication date
AU2013395656A1 (en) 2015-12-17
GB2528821A (en) 2016-02-03
SG11201510231SA (en) 2016-02-26
DE112013007286T5 (de) 2016-04-14
CN105593460A (zh) 2016-05-18
US10907449B2 (en) 2021-02-02
US20160153265A1 (en) 2016-06-02
GB2528821B (en) 2020-03-11
GB201521255D0 (en) 2016-01-13
CA2914366C (en) 2017-12-12
WO2015016932A1 (en) 2015-02-05
US11922103B2 (en) 2024-03-05
CA2914366A1 (en) 2015-02-05
MX2015017430A (es) 2016-07-26
US20210115763A1 (en) 2021-04-22
AU2013395656B2 (en) 2017-04-13

Similar Documents

Publication Publication Date Title
RU2016101330A (ru) Алгоритм для оптимальной конфигурации устройств контроля притока с использованием модели взаимодействия ствола скважины и коллектора
Chen et al. Chaotic dynamic weight particle swarm optimization for numerical function optimization
Pavlovic Monoidal computer I: Basic computability by string diagrams
WO2012148688A3 (en) A method of providing flow control devices for a production wellbore
Zihayat et al. Mining top-k high utility patterns over data streams
Xie et al. A multistage stochastic programming model for a multi-period strategic expansion of biofuel supply chain under evolving uncertainties
Wahl et al. Hochschild homology of structured algebras
RU2016118589A (ru) Оптимизация характеристик устройств регулирования потока как на добывающей, так и на нагнетательной скважине в совместных системах жидкостного заводнения нагнетательной и добывающей скважин
RU2016103925A (ru) Создание характеристик виртуального прибора для каротажа в эксплуатационных скважинах для улучшенной адаптации модели
MX2016003567A (es) Automatizacion de la perforacion utilizando control optimo estocastico.
EA201390132A1 (ru) Система и способ для определения характеристик коллектора
WO2014160464A3 (en) A computer-implemented method, a device, and a computer-readable medium for data-driven modeling of oil, gas, and water
CN104008053A (zh) 一种用于漏洞发掘的动态符号执行路径搜索方法
RU2015156421A (ru) Система, способ и компьютерная программа для интегрированного интерфейса "человек-машина" двигателя-генератора
RU2016120202A (ru) Адаптация мультипористых моделей
RU2015142104A (ru) Бессеточное моделирование условий речно-дельтовой среды
RU2016115039A (ru) Решающее устройство эйконала для квази продольных волн в анизотропной среде
Da Costa et al. Atanassov’s intuitionistic fuzzy probability and Markov chains
Abgrall et al. A one-time truncate and encode multiresolution stochastic framework
RU2017145776A (ru) Способ создания стратегии добычи для разработки пласта углеводородов в естественной окружающей среде
MX2016002054A (es) Simulacion de produccion de pseudofase: un enfoque de procesamiento de señales para evaluar la produccion de flujo de cuasi multiples fases mediante modelos controlados de permeabilidad relativa escalonados analogos y sucesivos en la simulacion de flujos en yacimientos para clasificar multiples realizaciones petrofisicas.
RU2016102694A (ru) Процедура замещающего имитационного моделирования течения на основе алгоритма cart для ранжирования геостатистических реализаций свойств горной породы
Zhang et al. Numerical simulation and optimization of CO2 sequestration in saline aquifers
Shen et al. A robust and contact resolving Riemann solver on unstructured mesh, Part II, ALE method
RU2016116315A (ru) Оптимизация характеристик устройств управления потоком в нагнетательных скважинах в системах нагнетания жидкости

Legal Events

Date Code Title Description
FA92 Acknowledgement of application withdrawn (lack of supplementary materials submitted)

Effective date: 20171011