WO2011048944A1 PCT/JP2010/067456 JP2010067456W WO2011048944A1 WO 2011048944 A1 WO2011048944 A1 WO 2011048944A1 JP 2010067456 W JP2010067456 W JP 2010067456W WO 2011048944 A1 WO2011048944 A1 WO 2011048944A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
node
power source
controllable load
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2010/067456
Other languages
English (en)
French (fr)
Inventor
寿人 佐久間
耕治 工藤
由紀子 森岡
廣生 本郷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2011537199A priority Critical patent/JP5527325B2/ja
Publication of WO2011048944A1 publication Critical patent/WO2011048944A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • H02J2101/20
    • H02J2105/52
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to a control device for controlling an energy system in which a renewable power source is linked to a distribution system, the energy system, and a control method thereof.
  • a solar cell (PV: Photo voltaic) is one of the most promising renewable power sources.
  • PV Photo voltaic
  • solar power generation using solar cells has a problem that the output changes depending on the weather, that is, the power generation amount is unstable. Therefore, when many photovoltaic power generation facilities are connected to the distribution system, it is predicted that the distribution system will be adversely affected and the distribution voltage becomes unstable.
  • the unstable distribution voltage means that the voltage of the low-voltage distribution line (approximately 100V or 200V in Japan) supplied to each consumer such as a private house, business office, or municipal facility is an unstable amount of power generated by the renewable power source. It is a problem that fluctuates and is outside the aptitude range.
  • the electric power sent from the distribution substation at a high voltage is a low voltage (about 100V in Japan) at the lowest voltage transformer (hereinafter referred to as pole transformer) in the distribution system. About 200V) and supplied to each consumer.
  • pole transformer the lowest voltage transformer
  • electric power is distributed from 10 pole transformers to 10 to 20 households (in the case of detached houses).
  • the distribution voltage fluctuates according to the power demand (power consumption).
  • power demand power consumption
  • the direction of current flow is one direction from the distribution substation to each customer, and the fluctuation in power demand was sufficiently small, so the distribution voltage was within the appropriate range (101V ⁇ 6V or 202 ⁇ 20V in Japan). It was.
  • autonomous control or self-end control
  • remote control or centralized control
  • PCS Power Conditioning Subsystem
  • the PCS includes a PV, an inverter that enables the power generated by the PV to be linked to a distribution system, and a storage battery that stores the power generated by the PV.
  • the distribution voltage is monitored by this PCS, and when the distribution voltage approaches the upper limit of the appropriate range, the power generation amount of PV is suppressed, or the increase of the distribution voltage can be suppressed by storing electric power in the storage battery.
  • Patent Document 1 describes that the amount of power generated by a plurality of PV and the storage battery that stores the power generated by the PV are controlled via an information network.
  • Patent Document 2 describes a method for resolving inequalities in the amount of generated power in money while controlling a renewable power source via an information network to optimally adjust the distribution voltage and power flow. Yes.
  • the output suppression described above is a waste of the power generation capability of the renewable power source, it is desirable that the amount of power to be suppressed is as small as possible.
  • the amount of increase in power consumption due to the controllable load is not always effectively used by the controllable load, for example, by heat pumps or storage batteries, so that the energy stored for solving the voltage deviation is not always used effectively. It is desirable to have as little as possible.
  • Patent Document 1 is a configuration intended to increase the power supply capacity to an emergency load or the like during a self-sustained operation, and does not propose a configuration for eliminating voltage deviation.
  • Patent Document 2 since the system described in Patent Document 2 does not consider control of a controllable load, there is a possibility that the amount of electric power that is suppressed by a renewable power source increases.
  • the present invention provides a control device for controlling an energy system capable of minimizing the total amount of output suppression by each renewable power source and the amount of increase in power consumption of a controllable load, the energy system, and a control method thereof. With the goal.
  • the control device of the present invention is provided with each consumer having at least one of a renewable power source and a controllable load connected to a power distribution system via a node, and generates power by the renewable power source.
  • a control device connected via a network with a consumer terminal capable of controlling output and controlling power consumption by the controllable load, When it is detected that the distribution voltage of the power distribution system has deviated from a predetermined voltage, the regeneration provided for the node connected to the customer whose voltage has deviated and the customer connected to the node downstream from the node It has a processing device that outputs a command for suppressing the power generation amount of the power source and increasing the power consumption by the controllable load to the consumer terminal of the consumer.
  • the energy system of the present invention is an energy system in which a customer having at least one of a renewable power source or a controllable load is connected to a power distribution system via a node, A consumer terminal installed for each consumer, capable of controlling power output by the regenerative power source and controlling power consumption by the controllable load; When connected to the customer terminal via a network and detecting that the distribution voltage of the distribution system has deviated from a predetermined voltage, the node to which the customer deviating from the voltage is connected and downstream of the node.
  • the energy system control method of the present invention is a method for controlling an energy system in which a customer having at least one of a renewable power source or a controllable load is connected to a power distribution system via a node, When it is detected that the distribution voltage from the distribution system has deviated from a predetermined voltage, the node connected to the customer detecting the voltage deviation and the customer connected to a node downstream from the node are provided. This is a method for suppressing the output of a renewable power source and increasing the amount of power consumed by the controllable load provided by the consumer.
  • FIG. 1 is a schematic diagram showing a simplified configuration of a power distribution system.
  • FIG. 2 is a schematic diagram showing how each node is connected to a renewable power source and a controllable load via a columnar transformer.
  • FIG. 3 is a block diagram showing a configuration example of the energy system of the present invention.
  • FIG. 4 is a block diagram illustrating a configuration example of the control device illustrated in FIG. 3.
  • FIG. 5 is a block diagram showing a configuration example of the customer terminal shown in FIG.
  • FIG. 6 is a flowchart showing a processing procedure of the control device shown in FIG.
  • the energy system of the present invention includes a control device that collectively manages the output suppression amount of the renewable power source provided to each consumer and the power of the controllable load, and the control device distributes the interconnection points for each consumer. Collects voltage values and allocates the amount of power suppression by each renewable power source and the power consumption by controllable load when voltage deviation occurs.
  • voltage deviation occurs, for example, a renewable power source and a controllable load connected to a pole transformer, a renewable power source connected to each column transformer downstream from the column transformer, and The output control and the controllable load are controlled by the controllable load.
  • downstream refers to a power distribution system including a pole transformer farther from the distribution transformer as viewed from the pole transformer where voltage deviation occurs.
  • the total amount of control power (the output suppression amount of the renewable power source and the power consumption by the controllable load) is minimized. Moreover, since more controllable loads can be used compared to the background art, the amount of power discarded without being used can be reduced.
  • FIG. 1 is a schematic diagram showing a simplified configuration of a power distribution system.
  • FIG. 1 shows a state where a renewable power source (G) and a controllable load (L) are interconnected at four locations to a distribution line connected to a distribution transformer provided in the distribution substation.
  • G renewable power source
  • L controllable load
  • connection point between the renewable power source (G) and the controllable load (L) and the distribution line is referred to as a “node”, and from the connection point close to the distribution transformer toward the connection point far from the distribution transformer. Nodes 1, 2, 3, and 4 are defined.
  • each node, a renewable power source (G), and a controllable load (L) are normally connected via a columnar transformer.
  • a plurality of renewable power sources (G) and controllable loads (L) connected to each node are collectively shown as one.
  • the current flowing from the nodes 1 to 4 to the pole transformer is i 1 to i 4
  • the distribution voltage at the nodes 1 to 4 is V 1 to V 4
  • the resistance value of the distribution line between the nodes is R.
  • the distribution voltages V 2 to V 4 are expressed by the following formulas (1) to (3).
  • the sum of the currents to be suppressed can be minimized, and the distribution voltage V 4 can be reduced. If it is desired to lower the current i 4 flowing from the node 4 to the distribution line, the sum of the currents to be suppressed can be minimized.
  • the renewable power source and the controllable load connected to the node where the voltage deviation occurs, and the renewable power source and the controllable load connected to each node downstream from the node are included.
  • FIG. 3 is a block diagram showing a configuration example of the energy system of the present invention.
  • the energy system of the present invention includes a plurality of customer terminals 2 and a control device 1, and each customer terminal 2 and the control device 1 are connected via a network.
  • the distribution line connected to the distribution substation is connected to a plurality of consumers (customer groups) via pole transformers, and the consumer terminal 2 can be a renewable power source, a controllable load, or both It is installed for every consumer with
  • the customer terminal 2 is realized by a computer that can communicate with a network, for example.
  • the control device 1 is realized by a computer that can communicate with each customer terminal 2 included in the energy system.
  • the network may have a configuration using PLC (Power Line Communications) or BPL (Broadband over Power Lines) using the power line, the Internet, or a dedicated line.
  • PLC Power Line Communications
  • BPL Broadband over Power Lines
  • FIG. 4 is a block diagram showing a configuration example of the control apparatus shown in FIG. 3
  • FIG. 5 is a block diagram showing a configuration example of the customer terminal shown in FIG.
  • control device 1 includes a communication device 11, a processing device 12, and a storage device 13.
  • the communication device 11 is an interface for communicating with each customer terminal 2 via a network.
  • the processing device 12 includes a CPU that executes processing according to a program, and executes processing as the control device 1 described later.
  • the storage device 13 includes a distribution network information database in which information indicating the configuration of the distribution network and the regenerative power supply for each customer, and information indicating the interconnection position of the controllable load with respect to the distribution network, the regenerative power supply and the controllable load And a control record database in which the control records are stored.
  • the customer terminal 2 includes a communication device 21, a processing device 25, a storage device 26, a voltage measurement unit 22, a first control interface 23, a second control interface 24, and a user interface 27. Yes.
  • the processing device 25 includes a CPU that executes processing according to a program, measures the distribution voltage using the voltage measurement unit 22, and is provided by the customer via the first control interface 23 and the second control interface 24. Controls renewable power such as PCS and controllable load.
  • the storage device 26 stores a control record of the power generation amount and output suppression amount of the renewable power source and the power consumption amount by the controllable load.
  • the voltage measurement unit 22 includes a sensor (not shown) for measuring the distribution voltage, and outputs the measurement result of the distribution voltage by the sensor to the processing device 25.
  • the first control interface 23 is a renewable power source, for example, measures the reverse power flow from the PCS or outputs an output suppression command to the PCS.
  • the second control interface 24 controls the power consumption by the controllable load.
  • the user interface 27 includes an input device (not shown) such as a keyboard and a mouse and an output device (not shown) such as a display device and a printing device, and is controlled by the power generation amount, output suppression amount, or controllable load of a renewable power source. It is used to input controllable load information indicating a history display of electric energy, control conditions permitting control of a renewable power source and controllable load, and the like.
  • FIG. 6 is a flowchart showing a processing procedure of the control apparatus shown in FIG.
  • control device 1 periodically collects the distribution voltage measured at each customer terminal 2 and the controllable load information set by the user (step S1).
  • control device 1 determines whether or not there is a node in which a voltage deviation has occurred (step S2).
  • the control device 1 refers to the distribution network information database, and Information for each customer connected to the pole transformer corresponding to the node and the pole transformer corresponding to the downstream node is acquired (step S3).
  • the control device 1 acquires information on the renewable power source and the controllable load included in the node where the voltage deviation has occurred and the customer connected to the downstream node, and controls the controllable load from these control target candidates. Is selected (step S4), and a load control command for increasing the power consumption of the controllable load is output to the customer terminal of the customer (step S5). In addition, when there are sufficiently many consumers permitting control of the controllable load, a load control command for increasing the power consumption with respect to the controllable load selected by the selection method described later may be output.
  • control device 1 extracts a renewable power source that is a candidate for control, and an output suppression command for suppressing a required power generation amount for the renewable power source selected by the selection method described later among the candidates. Is output (step S6).
  • control device 1 When the control device 1 outputs the load control command and the output suppression command, the control device 1 records the load control command for each controllable load and the output suppression command for each renewable power source in the control record database (step S7). The measured value of the distribution voltage by the terminal is acquired, and the above processing is repeated until there are no nodes where voltage deviation has occurred.
  • the manager of the power system refers to the control record database of the control device 1 and pays an incentive for each demand based on the amount of control power periodically, for example, once a month.
  • the distribution network information database may be changed because the configuration of the distribution network may be changed using section switches or interconnection switches in order to relieve accident distribution lines or distribution lines with large voltage drops. It is desirable to update each time the network configuration changes.
  • the following methods can be considered for selecting a controllable load that outputs a load control command and a renewable power source that outputs an output suppression command.
  • the renewable power source and the controllable load of each consumer it is preferable to control the renewable power source and the controllable load of each consumer as equally as possible.
  • the following two methods can be considered. (1) Referring to the control record database, select the power generation amount with the largest power generation amount and the smallest past output suppression allocation amount for renewable power sources, and the largest load capacity for controllable loads. Select the one that is large and has the smallest amount of past power consumption. (2) For a renewable power source, an output suppression amount proportional to the power generation capacity is assigned to all candidates, and for a controllable load, a power consumption proportional to the load capacity is assigned to all candidates.
  • the control power amount (the output suppression amount of the renewable power source and the control power amount) is controlled by controlling the output suppression and the controllable load in the entire node downstream from the node where the voltage deviation has occurred.
  • the total amount of power consumption by the controllable load is minimized.
  • the amount of power discarded without being used can be reduced.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

 配電系統からの配電電圧が所定の電圧から逸脱したのを検出したとき、該電圧逸脱を検出した需要家が接続されるノードおよび該ノードよりも下流のノードに接続される需要家が備える再生可能電源を出力抑制させ、該需要家が備える可制御負荷による電力消費量を増大させる。

Description

制御装置、エネルギーシステム及びその制御方法
 本発明は配電系統に再生可能電源が連系されたエネルギーシステムを制御するための制御装置、該エネルギーシステム及びその制御方法に関する。
 持続可能型社会の実現へ向けて、運用時に温暖化ガスの排出を低減できる再生可能電源の大幅な普及拡大が求められている。特に太陽電池(PV:Photo voltaic)は、現在最も期待されている再生可能電源の一つである。しかしながら、太陽電池を用いた太陽光発電は天候によって出力が変化する、すなわち発電量が不安定であるという問題がある。そのため、配電系統に多数の太陽光発電設備が連系すると、配電系統に悪影響を及ぼし、配電電圧が不安定になることが予測されている。
 配電電圧が不安定になるとは、個人住宅、事業所、自治体施設等の各需要家に供給される低圧配電線の電圧(日本においては約100Vまたは200V)が再生可能電源の不安定な発電量に影響されて変動し、適性範囲を逸脱する問題である。
 配電用変電所から高電圧(日本においては約6600V)で送出された電力は、配電系統の最も低圧側の変圧器(以下、柱上変圧器と称す)で低電圧(日本においては約100Vまたは約200V)に変換されて各需要家へ供給される。なお、1台の柱上変圧器からは、一般に10~20世帯(一戸建ての場合)に電力が分配される。
 ここで、有限の抵抗を有する配電線(フィーダ線)に電流が流れると、電力需要(電力消費量)に応じて配電電圧が変動する。これまでも日中と夜間等では電力需要に差があり、配電電圧の変動が起きていた。但し、電流の流れる方向は配電用変電所から各需要家へ向かう一方向であり、電力需要の変動も十分に小さかったため、配電電圧は適正範囲(日本では101V±6Vまたは202±20V)に収まっていた。
 しかしながら、配電系統に対する再生可能電源の連系量が増大すると、需要の変化に再生可能電源の不安定性が加わり、さらに再生可能電源を所有する需要家が余剰電力を電力会社へ売却する契約を結んでいる場合は、再生可能電源で発電された電力が需要家から配電用変電所の方向へ流れる逆潮流も発生する。そのため、配電電圧の変動幅が従来よりも大きくなり、適正範囲を逸脱する(電圧逸脱)可能性が益々高まってしまう。
 このような配電電圧の不安定化を解決する方法としては、配電電圧が適正範囲から逸脱しそうな場合に、再生可能電源の発電量を減らす(出力抑制)方法と、蓄電池やヒートポンプ等のエネルギーの蓄積が可能な可制御負荷を用いて電力消費量を増大させる方法とがある。
 背景技術のエネルギーシステムでは、例えば任意の柱上変圧器で電圧逸脱が発生した場合、該柱上変圧器に接続された各需要家が備える再生可能電源の出力抑制および可制御負荷による電力消費量を増大させることで配電電圧の上昇を抑制している。
 なお、出力抑制や可制御負荷の制御を実現する構成としては、一般に「自律制御」(または自端制御)型と「遠隔制御」(または集中制御)型の二つに分類できる。
 「自律制御」型のエネルギーシステムとしては、例えばPCS(Power Conditioning Subsystem)が知られている。PCSは、PVと、該PVで発電された電力を配電系統に連系可能にするインバータと、PVで発電された電力を蓄積する蓄電池とを備えている。このPCSにより配電電圧をモニタし、配電電圧が適正範囲の上限に近づいたときにPVの発電量を抑制する、または蓄電池に電力を蓄電することで配電電圧の上昇を抑制できる。
 一方、「遠隔制御」型のエネルギーシステムとしては、例えば特許文献1や特許文献2に記載された構成がある。
 特許文献1には、情報ネットワークを介して複数のPVの発電量や該PVで発電された電力を蓄電する蓄電池を制御することが記載されている。また、特許文献2には、情報ネットワークを介して再生可能電源を制御して配電電圧や潮流を最適に調整しつつ、割り当てられる発電量の不平等性については金銭で解決する方法が記載されている。
 上述した出力抑制は、再生可能電源の発電能力を無駄にすることであるため、出力抑制する電力量はできるだけ少ないことが望ましい。
 また、電圧逸脱が起きるか否かは、配電線に連系されている再生可能電源数と再生可能電源が連系している場所とに依存するため、一部の需要家が所有する再生可能電源に出力抑制が偏るという問題もある。この問題ついては、例えば特許文献2に記載されているように、再生可能電源の出力抑制による損失分を金銭で補えば、出力抑制が偏ることによる不平等はある程度解消できる。しかしながら、その場合でも再生可能電源の発電能力を無駄にしていることに変わりはない。
 一方、可制御負荷を利用する方法は、可制御負荷を所有しない需要家には実施不可能であり、可制御負荷を所有していても、その負荷容量が少なければ出力抑制は避けられない。
 また、可制御負荷である、例えばヒートポンプや蓄電池等によって、電圧逸脱の解決のために蓄積されたエネルギーが必ずしも有効に利用されるとは限らないため、可制御負荷による電力消費量の増加量はできるだけ少ないことが望ましい。
 なお、特許文献1に記載されたシステムは、自立運転時に非常負荷等への給電容量を増大させることを目的とした構成であり、電圧逸脱を解消するための構成を提案したものではない。また、特許文献2に記載されたシステムでは、可制御負荷の制御を考慮していないため、再生可能電源にて出力抑制する電力量が大きくなる可能性がある。
特許第3144323号公報 特開2004-274812号公報
 そこで本発明は、各再生可能電源による出力抑制量の総量及び可制御負荷の消費電力の増大量を最小にできるエネルギーシステムを制御するための制御装置、該エネルギーシステム及びその制御方法を提供することを目的とする。
 上記目的を達成するため本発明の制御装置は、ノードを介して配電系統に接続された、再生可能電源または可制御負荷の少なくとも一方を備えた需要家毎に備える、前記再生可能電源による発電量を抑制する出力抑制、および前記可制御負荷による電力消費量の制御が可能な需要家端末とネットワークを介して接続された制御装置であって、
 前記配電系統の配電電圧が所定の電圧から逸脱したのを検出したとき、該電圧が逸脱した需要家が接続されたノード及び該ノードよりも下流のノードに接続された需要家が備える前記再生可能電源の発電量を抑制させ、前記可制御負荷による電力消費量を増大させるための指令を該需要家の需要家端末に出力する処理装置を有する。
 一方、本発明のエネルギーシステムは、再生可能電源または可制御負荷の少なくとも一方を備えた需要家がノードを介して配電系統に接続されたエネルギーシステムであって、
 前記再生可能電源による発電量を抑制する出力抑制、および前記可制御負荷による電力消費量の制御が可能な、前記需要家毎に設置される需要家端末と、
 前記需要家端末とネットワークを介して接続され、前記配電系統の配電電圧が所定の電圧から逸脱したのを検出したとき、該電圧が逸脱した需要家が接続されたノード及び該ノードよりも下流のノードに接続された需要家が備える前記再生可能電源の発電量を抑制させ、前記可制御負荷による電力消費量を増大させるための指令を該需要家の需要家端末に出力する制御装置と、
を有する。
 また、本発明のエネルギーシステムの制御方法は、再生可能電源または可制御負荷の少なくとも一方を備えた需要家がノードを介して配電系統に接続されたエネルギーシステムの制御方法であって、
 前記配電系統からの配電電圧が所定の電圧から逸脱したのを検出したとき、該電圧逸脱を検出した需要家が接続されたノードおよび該ノードよりも下流のノードに接続された需要家が備える前記再生可能電源を出力抑制させ、該需要家が備える前記可制御負荷による電力消費量を増大させる方法である。
図1は、配電系統の構成を簡略化して示した模式図である。 図2は、各ノードと再生可能電源及び可制御負荷とが柱状変圧器を介して接続される様子を示す模式図である。 図3は、本発明のエネルギーシステムの一構成例を示すブロック図である。 図4は、図3に示した制御装置の一構成例を示すブロック図である。 図5は、図3に示した需要家端末の一構成例を示すブロック図である。 図6は、図3に示した制御装置の処理手順を示すフローチャートである。
 次に本発明について図面を用いて説明する。
 本発明のエネルギーシステムでは、各需要家に備える再生可能電源の出力抑制量や可制御負荷の電力を一括して管理する制御装置を備え、該制御装置により、需要家毎の連系点の配電電圧の値を収集し、電圧逸脱が発生した場合に各再生可能電源の出力抑制量や可制御負荷による電力消費量を割り振る。本実施形態では、電圧逸脱が生じている、例えば柱上変圧器に接続された再生可能電源及び可制御負荷、並びに該柱状変圧器よりも下流の各柱状変圧器に接続された再生可能電源及び可制御負荷にて、出力抑制及び可制御負荷を制御する。なお、「下流」とは、電圧逸脱が生じている柱上変圧器から見て、配電用変圧器からより遠い柱上変圧器を含む配電系統を指す。
 このように電圧逸脱が生じた点よりも下流全体で出力抑制および可制御負荷を制御すると、制御電力量(再生可能電源の出力抑制量及び可制御負荷による電力消費量)の総量が最小となる。また、背景技術と比べて、より多くの可制御負荷を利用できるため、利用されずに捨てられる電力量を低減できる。
 本実施形態のエネルギーシステムにより制御電力量の総和が最小となる理由は以下のとおりである。
 図1は配電系統の構成を簡略化して示した模式図である。
 図1では、配電用変電所が備える配電用変圧器に接続された配電線に、再生可能電源(G)及び可制御負荷(L)が4箇所で連系された様子を示している。
 また、図1では再生可能電源(G)及び可制御負荷(L)と配電線の連系点をそれぞれ「ノード」と称し、配電用変圧器に近い連系点から遠い連系点に向かってノード1,2,3,4と定義している。
 なお、図2に示すように、各ノードと再生可能電源(G)及び可制御負荷(L)とは、通常、柱状変圧器を介して接続される。図1及び図2では、各ノードに接続される複数の再生可能電源(G)及び可制御負荷(L)をまとめてそれぞれ1つで示している。
 ここで、ノード1~4から柱上変圧器に流れこむ電流をi~i、ノード1~4における配電電圧をV~V、各ノード間の配電線の抵抗値をRとすると、
 配電電圧V~Vは、下記式(1)~(3)で表される。
 ノード2:V=R×(1×i+1×i+1×i)+V …(1)
 ノード3:V=R×(1×i+2×i+2×i)+V …(2)
 ノード4:V=R×(1×i+2×i+3×i)+V …(3)
 式(1)~(3)から分るように、例えばノード2で電圧逸脱が発生し、配電電圧Vを下げたい場合、ノード2~4から配電線に流れる電流i~iを抑制すれば、抑制すべき電流の総和が最も小さくて済むことが分かる。
 同様に、配電電圧Vを下げたい場合は、ノード3、4から配電線に流れる電流i、iを抑制すれば、抑制すべき電流の総和が最も小さくて済み、配電電圧Vを下げたい場合は、ノード4から配電線に流れる電流iを抑制すれば、抑制すべき電流の総和が最も小さくて済むことが分かる。
 すなわち、配電電圧を下げたいノードおよびその下流のノードに接続された再生可能電源(G)にて出力抑制を行い、可制御負荷(L)の制御を行えば、電圧逸脱した配電電圧を下げるのに必要な制御電力量の総和が最小で済むことを意味している。
 再生可能電源が連系されるエネルギーシステムのうち、これまでの多くの先行事例では、配電線の末端ノード(図1に示す構成例ではノード4)でのみ電圧逸脱が発生すると考えられてきた。そのため、電圧逸脱が発生したノードに接続された再生可能電源(G)及び可制御負荷(L)でのみ出力抑制や負荷制御が行われていた。
 しかしながら、実際のエネルギーシステムでは、
(1)再生可能電源は、各ノードで一様ではなく、その数や発電量に偏りがある。
(2)配電系統には、配電用変圧器の出力に接続された配電線がさらに分岐される構成もある。
(3)複数の柱上変圧器が連系された配電線では、その連系位置に応じて柱上変圧器に入力される配電電圧が異なるため(配電用変圧器から遠いと入力される配電電圧が低くなる)、柱上変圧器による電圧変換比が異なる場合がある。
等の理由により、配電用変圧器に近いノード2やノード3であっても電圧逸脱が発生することがある。
 そのため、本実施形態のエネルギーシステムでは、電圧逸脱が生じているノードに接続された再生可能電源および可制御負荷、並びに該ノードよりも下流の各ノードに接続された再生可能電源および可制御負荷にて出力抑制および負荷制御を実施する構成を提案する。
 図3は本発明のエネルギーシステムの一構成例を示すブロック図である。
 図3に示すように、本発明のエネルギーシステムは、複数の需要家端末2および制御装置1を備え、各需要家端末2と制御装置1とがネットワークを介して接続された構成である。
 配電用変電所に接続される配電線には、柱上変圧器を介して複数の需要家(需要家群)が接続され、需要家端末2は、再生可能電源または可制御負荷、あるいはその両方を備えた需要家毎に設置される。需要家端末2は、例えばネットワークと通信可能なコンピュータで実現される。
 制御装置1は、エネルギーシステムが備える各需要家端末2と通信が可能な、コンピュータによって実現される。
 ネットワークには、電力線を利用したPLC(Power Line Communications)やBPL(Broadband over Power Lines)、インターネット、専用線を利用した構成等が考えられる。
 図4は図3に示した制御装置の一構成例を示すブロック図であり、図5は図3に示した需要家端末の一構成例を示すブロック図である。
 図4に示すように、制御装置1は、通信装置11、処理装置12及び記憶装置13を備えている。
 通信装置11は、各需要家端末2とネットワークを介して通信するためのインタフェースである。
 処理装置12は、プログラムにしたがって処理を実行するCPUを備え、後述する制御装置1としての処理を実行する。
 記憶装置13は、配電網の構成及び需要家毎の再生可能電源、並びに可制御負荷の該配電網に対する連系位置を示す情報が格納された配電網情報データベースと、再生可能電源及び可制御負荷の制御記録が格納される制御記録データベースとを備えている。
 図5に示すように、需要家端末2は、通信装置21、処理装置25、記憶装置26、電圧測定部22、第1の制御インタフェース23、第2の制御インタフェース24およびユーザインタフェース27を備えている。
 処理装置25は、プログラムにしたがって処理を実行するCPUを備え、電圧測定部22を用いて配電電圧を測定すると共に、第1の制御インタフェース23および第2の制御インタフェース24を介して需要家が備えるPCS等の再生可能電源及び可制御負荷を制御する。
 記憶装置26には、再生可能電源の発電量や出力抑制量と可制御負荷による電力消費量の制御記録が格納される。
 電圧測定部22は、配電電圧を測定するためのセンサ(不図示)を備え、該センサによる配電電圧の測定結果を処理装置25に出力する。
 第1の制御インタフェース23は、再生可能電源である、例えばPCSからの逆潮流量を測定する、またはPCSへ出力抑制指令を出力する。
 第2の制御インタフェース24は、可制御負荷による電力消費量を制御する。
 ユーザインタフェース27は、キーボードやマウス等の入力装置(不図示)と表示装置や印刷装置等の出力装置(不図示)とを備え、再生可能電源の発電量や出力抑制量あるいは可制御負荷による制御電力量の履歴表示、再生可能電源や可制御負荷の制御を許可する制御条件等を示す可制御負荷情報の入力に用いられる。
 図6は図3に示した制御装置の処理手順を示すフローチャートである。
 図6に示すように、制御装置1は、各需要家端末2で測定された配電電圧及びユーザにより設定された可制御負荷情報を定期的に収集する(ステップS1)。
 次に、制御装置1は、電圧逸脱が発生しているノードがあるか否かを判定し(ステップS2)、電圧逸脱が発生しているノードを検出すると、配電網情報データベースを参照し、そのノードに対応する柱上変圧器及びその下流のノードに対応する柱上変圧器に接続された需要家毎の情報を取得する(ステップS3)。
 続いて、制御装置1は、電圧逸脱が発生したノードとその下流ノードに接続された需要家が備える再生可能電源及び可制御負荷の情報を取得し、それらの制御対象候補から可制御負荷の制御を許可する需要家を選択し(ステップS4)、該需要家が備える需要家端末に可制御負荷の電力消費量を増大させるための負荷制御指令を出力する(ステップS5)。なお、可制御負荷の制御を許可する需要家が十分に多い場合は、後述する選択方法により選択した可制御負荷に対して電力消費量を増大させるための負荷制御指令を出力してもよい。
 次に、制御装置1は、制御対象候補となる再生可能電源を抽出し、該候補のうち、後述する選択方法により選択した再生可能電源に対して所要の発電量を抑制させるための出力抑制指令を出力する(ステップS6)。
 制御装置1は、負荷制御指令及び出力抑制指令を出力すると、各可制御負荷に対する負荷制御指令および各再生可能電源に対する出力抑制指令を制御記録データベースに記録し(ステップS7)、再度、各需要家端末による配電電圧の測定値を取得し、電圧逸脱が発生したノードが無くなるまで上記の処理を繰り返す。
 電力系統の管理者は、制御装置1の制御記録データベースを参照し、例えば月に一回など、定期的に制御電力量に基づいて各需要化にインセンティブを支払えばよい。
 なお、配電網の構成は、事故配電線や電圧降下が大きい配電線を救済するために、区間開閉器や連系開閉器を用いて変更されることがあるため、配電網情報データベースは、配電網の構成変更毎に更新することが望ましい。
 負荷制御指令を出力する可制御負荷および出力抑制指令を出力する再生可能電源の選択方法は、以下の方法が考えられる。
 上述したように、任意のノードで電圧逸脱が発生した場合、そのノード及びその下流ノードに接続される再生可能電源及び可制御負荷であれば、どの再生可能電源及び可制御負荷を用いて配電電圧を制御しても制御電力量の総和は最小で済む。
 そこで、各需要家の再生可能電源及び可制御負荷はできるだけ平等に制御することが好ましい。そのための方法としては、例えば以下の2つの方法が考えられる。
(1)制御記録データベースを参照し、再生可能電源の場合は、発電量が最も大きく、かつ過去の出力抑制の割り当て量が最も少ないものを選択し、可制御負荷の場合は、負荷容量が最も大きく、かつ過去の電力消費の割り当て量が最も少ないものを選択する。
(2)全ての候補に対して、再生可能電源の場合は、その発電容量に比例する出力抑制量を割り当て、可制御負荷の場合は、その負荷容量に比例する電力消費量を割り当てる。
 本実施形態のエネルギーシステムによれば、電圧逸脱が生じたノード及び該ノードよりも下流のノード全体で出力抑制および可制御負荷を制御することで、制御電力量(再生可能電源の出力抑制量及び可制御負荷による電力消費量)の総量が最小となる。また、背景技術と比べて、より多くの可制御負荷を利用できるため、利用されずに捨てられる電力量を低減できる。
 以上、実施形態を参照して本願発明を説明したが、本願発明は上記実施形態に限定されものではない。本願発明の構成や詳細は本願発明のスコープ内で当業者が理解し得る様々な変更が可能である。
 この出願は、2009年10月21日に出願された特願2009-242285号を基礎とする優先権を主張し、その開示の全てをここに取り込む。

Claims (12)

  1.  ノードを介して配電系統に接続された、再生可能電源または可制御負荷の少なくとも一方を備えた需要家毎に備える、前記再生可能電源による発電量を抑制する出力抑制、および前記可制御負荷による電力消費量の制御が可能な需要家端末とネットワークを介して接続された制御装置であって、
     前記配電系統の配電電圧が所定の電圧から逸脱したのを検出したとき、該電圧が逸脱した需要家が接続されたノード及び該ノードよりも下流のノードに接続された需要家が備える前記再生可能電源の発電量を抑制させ、前記可制御負荷による電力消費量を増大させるための指令を該需要家の需要家端末に出力する処理装置を有する制御装置。
  2.  前記再生可能電源および前記可制御負荷の制御記録が格納される制御記録データベースを含む記憶装置を備え、
     前記処理装置は、
     前記制御記録データベースを参照して、発電量が最も大きく、かつ過去の出力抑制の割り当て量が最も少ない再生可能電源に発電量を抑制させ、
     負荷容量が最も大きく、かつ過去の電力消費の割り当て量が最も少ない可制御負荷による電力消費量を増大させる請求項1記載の制御装置。
  3.  前記処理装置は、
     前記再生可能電源に対して、その発電容量に比例する出力抑制量を割り当て、
     前記可制御負荷に対して、その負荷容量に比例する電力消費量を割り当てる請求項1記載の制御装置。
  4.  前記需要家と前記ノードとが、柱状変圧器を介して接続された請求項1から3のいずれか1項記載の制御装置。
  5.  再生可能電源または可制御負荷の少なくとも一方を備えた需要家がノードを介して配電系統に接続されたエネルギーシステムであって、
     前記再生可能電源による発電量を抑制する出力抑制、および前記可制御負荷による電力消費量の制御が可能な、前記需要家毎に設置される需要家端末と、
     前記需要家端末とネットワークを介して接続され、前記配電系統の配電電圧が所定の電圧から逸脱したのを検出したとき、該電圧が逸脱した需要家が接続されたノード及び該ノードよりも下流のノードに接続された需要家が備える前記再生可能電源の発電量を抑制させ、前記可制御負荷による電力消費量を増大させるための指令を該需要家の需要家端末に出力する制御装置と、
    を有するエネルギーシステム。
  6.  前記制御装置は、
     前記再生可能電源および前記可制御負荷の制御記録が格納される制御記録データベースを備え、
     前記制御記録データベースを参照して、発電量が最も大きく、かつ過去の出力抑制の割り当て量が最も少ない再生可能電源に発電量を抑制させ、
     負荷容量が最も大きく、かつ過去の電力消費の割り当て量が最も少ない可制御負荷による電力消費量を増大させる請求項5記載のエネルギーシステム。
  7.  前記制御装置は、
     前記再生可能電源に対して、その発電容量に比例する出力抑制量を割り当て、
     前記可制御負荷に対して、その負荷容量に比例する電力消費量を割り当てる請求項5記載のエネルギーシステム。
  8.  前記需要家と前記ノードとが、柱状変圧器を介して接続された請求項5から7のいずれか1項記載のエネルギーシステム。
  9.  再生可能電源または可制御負荷の少なくとも一方を備えた需要家がノードを介して配電系統に接続されたエネルギーシステムの制御方法であって、
     前記配電系統からの配電電圧が所定の電圧から逸脱したのを検出したとき、該電圧逸脱を検出した需要家が接続されたノードおよび該ノードよりも下流のノードに接続された需要家が備える前記再生可能電源を出力抑制させ、該需要家が備える前記可制御負荷による電力消費量を増大させるエネルギーシステムの制御方法。
  10.  再生可能電源および可制御負荷の制御結果をデータベースとして記録し、
     前記データベースを参照して、発電量が最も大きく、かつ過去の出力抑制の割り当て量が最も少ない再生可能電源に発電量を抑制させ、
     負荷容量が最も大きく、かつ過去の電力消費の割り当て量が最も少ない可制御負荷による電力消費量を増大させる請求項9記載のエネルギーシステムの制御方法。
  11.  前記再生可能電源に対して、その発電容量に比例する出力抑制量を割り当て、
     前記可制御負荷に対して、その負荷容量に比例する電力消費量を割り当てる請求項9記載のエネルギーシステムの制御方法。
  12.  前記需要家と前記ノードとが、柱状変圧器を介して接続された請求項9から11のいずれか1項記載のエネルギーシステムの制御方法。
PCT/JP2010/067456 2009-10-21 2010-10-05 制御装置、エネルギーシステム及びその制御方法 Ceased WO2011048944A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011537199A JP5527325B2 (ja) 2009-10-21 2010-10-05 制御装置、エネルギーシステム及びその制御方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-242285 2009-10-21
JP2009242285 2009-10-21

Publications (1)

Publication Number Publication Date
WO2011048944A1 true WO2011048944A1 (ja) 2011-04-28

Family

ID=43900176

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/067456 Ceased WO2011048944A1 (ja) 2009-10-21 2010-10-05 制御装置、エネルギーシステム及びその制御方法

Country Status (2)

Country Link
JP (2) JP5527325B2 (ja)
WO (1) WO2011048944A1 (ja)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013192345A (ja) * 2012-03-13 2013-09-26 Osaka Gas Co Ltd 電圧制御システム
JP2016158347A (ja) * 2015-02-24 2016-09-01 株式会社日立製作所 送電設備計画支援システム及び方法
WO2016147456A1 (ja) * 2015-03-13 2016-09-22 日本電気株式会社 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム
WO2016157577A1 (ja) * 2015-04-03 2016-10-06 日本電気株式会社 発電装置監視制御システム、電力系統システム、管理装置、制御装置及び方法
WO2016157576A1 (ja) * 2015-03-31 2016-10-06 日本電気株式会社 発電装置監視制御システム、制御装置及び制御方法
WO2016189756A1 (ja) * 2015-05-27 2016-12-01 日本電気株式会社 発電制御装置、制御装置、制御方法および記録媒体
JP2017103881A (ja) * 2015-11-30 2017-06-08 株式会社東芝 消費電力制御装置および消費電力制御方法
JP2020141452A (ja) * 2019-02-27 2020-09-03 株式会社ダイヘン 電力管理装置
WO2021005675A1 (ja) * 2019-07-08 2021-01-14 東芝三菱電機産業システム株式会社 エネルギーバランス調整制御方法及び調整制御装置

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016152665A1 (ja) * 2015-03-20 2016-09-29 日本電気株式会社 発電制御装置、発電機器、制御装置、制御システム、制御方法およびプログラム
JP2017046388A (ja) * 2015-08-25 2017-03-02 東芝ライテック株式会社 電力システム
JP6497664B2 (ja) 2015-12-28 2019-04-10 パナソニックIpマネジメント株式会社 情報端末、情報処理方法及び制御プログラム
US11309734B2 (en) * 2018-03-23 2022-04-19 Electricity North West Property Limited System for controlling power consumption on a distribution grid

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001352682A (ja) * 2000-06-09 2001-12-21 Sharp Corp インバータ装置および電力を商用系統に逆潮流する方法
JP2002152976A (ja) * 2000-11-13 2002-05-24 Sharp Corp 分散電源電力供給システム
JP2007267600A (ja) * 2004-03-17 2007-10-11 National Institute Of Advanced Industrial & Technology 系統情報監視システム
JP2007288877A (ja) * 2006-04-14 2007-11-01 Hitachi Ltd 複数の分散型電源が連系された配電系統の電力品質維持支援方法及び電力品質維持支援システム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000232736A (ja) * 1999-02-12 2000-08-22 Tdk Corp 連系分散型発電システム
JP4891851B2 (ja) * 2007-07-09 2012-03-07 株式会社東芝 分散電源装置を連系した低圧配電系統における電圧上昇抑制方法および電圧上昇抑制装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001352682A (ja) * 2000-06-09 2001-12-21 Sharp Corp インバータ装置および電力を商用系統に逆潮流する方法
JP2002152976A (ja) * 2000-11-13 2002-05-24 Sharp Corp 分散電源電力供給システム
JP2007267600A (ja) * 2004-03-17 2007-10-11 National Institute Of Advanced Industrial & Technology 系統情報監視システム
JP2007288877A (ja) * 2006-04-14 2007-11-01 Hitachi Ltd 複数の分散型電源が連系された配電系統の電力品質維持支援方法及び電力品質維持支援システム

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013192345A (ja) * 2012-03-13 2013-09-26 Osaka Gas Co Ltd 電圧制御システム
JP2016158347A (ja) * 2015-02-24 2016-09-01 株式会社日立製作所 送電設備計画支援システム及び方法
JPWO2016147456A1 (ja) * 2015-03-13 2018-01-18 日本電気株式会社 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム
WO2016147456A1 (ja) * 2015-03-13 2016-09-22 日本電気株式会社 発電装置監視制御システム、電力系統システム、制御装置、管理装置、方法及びプログラム
JPWO2016157576A1 (ja) * 2015-03-31 2018-01-25 日本電気株式会社 発電装置監視制御システム、制御装置及び制御方法
WO2016157576A1 (ja) * 2015-03-31 2016-10-06 日本電気株式会社 発電装置監視制御システム、制御装置及び制御方法
JPWO2016157577A1 (ja) * 2015-04-03 2018-01-25 日本電気株式会社 発電装置監視制御システム、電力系統システム、管理装置、制御装置及び方法
WO2016157577A1 (ja) * 2015-04-03 2016-10-06 日本電気株式会社 発電装置監視制御システム、電力系統システム、管理装置、制御装置及び方法
JPWO2016189756A1 (ja) * 2015-05-27 2017-06-15 日本電気株式会社 発電制御装置、制御装置、制御方法及びプログラム
WO2016189756A1 (ja) * 2015-05-27 2016-12-01 日本電気株式会社 発電制御装置、制御装置、制御方法および記録媒体
JP2017103881A (ja) * 2015-11-30 2017-06-08 株式会社東芝 消費電力制御装置および消費電力制御方法
JP2020141452A (ja) * 2019-02-27 2020-09-03 株式会社ダイヘン 電力管理装置
JP7259183B2 (ja) 2019-02-27 2023-04-18 株式会社ダイヘン 電力管理装置
WO2021005675A1 (ja) * 2019-07-08 2021-01-14 東芝三菱電機産業システム株式会社 エネルギーバランス調整制御方法及び調整制御装置
JP6842814B1 (ja) * 2019-07-08 2021-03-17 東芝三菱電機産業システム株式会社 エネルギーバランス調整制御方法及び調整制御装置

Also Published As

Publication number Publication date
JP2014132827A (ja) 2014-07-17
JP5811227B2 (ja) 2015-11-11
JP5527325B2 (ja) 2014-06-18
JPWO2011048944A1 (ja) 2013-03-07

Similar Documents

Publication Publication Date Title
JP5527325B2 (ja) 制御装置、エネルギーシステム及びその制御方法
Islam et al. Control and optimisation of networked microgrids: A review
US12184065B2 (en) Method and regulating device for regulating an electrical power transfer
Zhang et al. Energy management in a microgrid with distributed energy resources
Singh et al. Optimal power scheduling of renewable energy systems in microgrids using distributed energy storage system
Kwasinski et al. Microgrids and other local area power and energy systems
Sachs et al. A two-stage model predictive control strategy for economic diesel-PV-battery island microgrid operation in rural areas
Chen et al. Optimal allocation and economic analysis of energy storage system in microgrids
Khodayar et al. Integration of high reliability distribution system in microgrid operation
US10461535B2 (en) Power management system, power management method, and computer program
JP2007288877A (ja) 複数の分散型電源が連系された配電系統の電力品質維持支援方法及び電力品質維持支援システム
JP2007185008A (ja) 電力供給システムおよびその制御方法
CN103703648A (zh) 电力管理系统及管理方法
JP2017051083A (ja) 発電システム、発電方法およびプログラム
Fesagandis et al. Resilient scheduling of networked microgrids against real-time failures
Datta et al. Photovoltaic output power fluctuations smoothing by selecting optimal capacity of battery for a photovoltaic-diesel hybrid system
JP5948217B2 (ja) 集合住宅における燃料電池の稼動制御方法および稼動制御システム
JP2015092822A (ja) パワーコンディショナー及び算出方法
JP7589680B2 (ja) 電力制御装置、電力制御装置の制御方法、分散型発電システム
Ipach et al. Distributed utility‐based real‐time power flow optimization in ICT‐enabled low voltage distribution grids
JP6584657B2 (ja) 電流電圧制御装置
Alvarez-Mendoza et al. Stochastic model of wind-fuel cell for a semi-dispatchable power generation
Liu et al. Advanced energy storage management in distribution network
Mohammed et al. Decentralized Bus Voltage Restoration for DC Microgrids
WO2017146243A1 (ja) 電力管理サーバ、電力管理システム、及び電力管理方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10824793

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011537199

Country of ref document: JP

122 Ep: pct application non-entry in european phase

Ref document number: 10824793

Country of ref document: EP

Kind code of ref document: A1