[go: up one dir, main page]

US20200400382A1 - Vapor chamber and method for fabricating the same - Google Patents

Vapor chamber and method for fabricating the same Download PDF

Info

Publication number
US20200400382A1
US20200400382A1 US16/837,125 US202016837125A US2020400382A1 US 20200400382 A1 US20200400382 A1 US 20200400382A1 US 202016837125 A US202016837125 A US 202016837125A US 2020400382 A1 US2020400382 A1 US 2020400382A1
Authority
US
United States
Prior art keywords
cover
pressure
pressure welding
posts
chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US16/837,125
Inventor
Jen-Chih CHENG
Lei-Lei LIU
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cooler Master Co Ltd
Original Assignee
Cooler Master Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cooler Master Co Ltd filed Critical Cooler Master Co Ltd
Assigned to COOLER MASTER CO., LTD. reassignment COOLER MASTER CO., LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: CHENG, JEN-CHIH, LIU, Lei-lei
Publication of US20200400382A1 publication Critical patent/US20200400382A1/en
Priority to US18/134,526 priority Critical patent/US11927400B2/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/2029Modifications to facilitate cooling, ventilating, or heating using a liquid coolant with phase change in electronic enclosures
    • H05K7/20336Heat pipes, e.g. wicks or capillary pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D15/00Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies
    • F28D15/02Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes
    • F28D15/04Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes with tubes having a capillary structure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D15/00Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies
    • F28D15/02Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes
    • F28D15/0233Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes the conduits having a particular shape, e.g. non-circular cross-section, annular
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D15/00Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies
    • F28D15/02Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes
    • F28D15/0258Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes with means to remove contaminants, e.g. getters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D15/00Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies
    • F28D15/02Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes
    • F28D15/0283Means for filling or sealing heat pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D15/00Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies
    • F28D15/02Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes
    • F28D15/04Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes with tubes having a capillary structure
    • F28D15/046Heat-exchange apparatus with the intermediate heat-transfer medium in closed tubes passing into or through the conduit walls ; Heat-exchange apparatus employing intermediate heat-transfer medium or bodies in which the medium condenses and evaporates, e.g. heat pipes with tubes having a capillary structure characterised by the material or the construction of the capillary structure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F3/00Plate-like or laminated elements; Assemblies of plate-like or laminated elements
    • F28F3/12Elements constructed in the shape of a hollow panel, e.g. with channels
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/20Modifications to facilitate cooling, ventilating, or heating
    • H05K7/2029Modifications to facilitate cooling, ventilating, or heating using a liquid coolant with phase change in electronic enclosures
    • H05K7/20309Evaporators
    • H10W40/73
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2240/00Spacing means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2275/00Fastening; Joining
    • F28F2275/04Fastening; Joining by brazing
    • F28F2275/045Fastening; Joining by brazing with particular processing steps, e.g. by allowing displacement of parts during brazing or by using a reservoir for storing brazing material
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2275/00Fastening; Joining
    • F28F2275/06Fastening; Joining by welding

Definitions

  • the present disclosure relates to a vapor chamber and a method for fabricating the same, more particularly to a vapor chamber having a post and a method for fabricating the same.
  • the vapor chamber includes a main body and a capillary structure, the main body has a chamber that can accommodate working fluid, and the capillary structure is disposed in the chamber.
  • the main body can be divided into two parts—an evaporation part and a condensation part.
  • the working fluid absorbs heat and will be vaporized to gaseous form in the evaporation part, the working fluid in gaseous form diffuses into the condensation part and will be condensed into liquid state and then returns to the evaporation part via the capillary structure and thus forming a cooling cycle of the working fluid.
  • the main body of the vapor chamber is too thin to have a sufficient structural strength.
  • the vapor chamber is often heated over 90° C., and the high temperature will evaporate most of the working fluid and thus increasing the internal pressure of the vapor chamber to exceed a limit. By that time, the vapor chamber will be deformed or even cracked by the internal pressure.
  • some put support posts in the chamber to reinforce the structural strength of the vapor chamber. And the posts also can enhance the heat conduction of the vapor chamber.
  • the vapor chamber with the supporting posts is easily cracked during the manufacturing process.
  • the present disclosure provides a vapor chamber and a method for fabricating the same that are able to improve the fabrication quality and heat transfer of the vapor chamber.
  • a method for fabricating a vapor chamber includes the following steps. Positioning a capillary structure on a first cover. Forming an accommodation space, a flow channel, and a plurality of posts on a first surface of a second cover. Covering the first cover with the second cover. Positioning the first cover and the second cover such that the plurality of posts are spaced apart from the capillary structure by a distance. Pressure welding the first cover and the second cover so as to form a chamber between the first cover and second cover and a passage connected to the chamber and to pressure weld the plurality of posts with the capillary structure.
  • a vapor chamber includes an upper cover, a lower cover and a capillary structure.
  • the upper cover includes a cover part and a plurality of posts.
  • the cover part has an accommodation space.
  • the plurality of posts are located in the accommodation space and protrude from the cover part.
  • the lower cover and the cover part of the upper cover are in contact with each other so as to form a chamber therebetween.
  • the capillary structure is located in the chamber and disposed on the lower cover.
  • the plurality of posts are pressure welded to the capillary structure which is disposed on the lower cover.
  • the plurality of posts are pressure welded to the capillary structure such that the heat can be conducted not only via the capillary structure but also via the posts, thereby enhancing the heat conduction of the vapor chamber.
  • the pressure welding can be performed at a certain temperature and pressure so as to ensure that the posts to be fully pressure welded to the capillary structure and can accurately control the change in thickness of the posts. Therefore, the vapor chamber is prevented from being cracked during pressure welding and thus enhancing the fabrication quality of the vapor chamber.
  • FIG. 1 is a perspective view of a vapor chamber according to a first embodiment of the present disclosure
  • FIG. 2 is an exploded view of the vapor chamber in FIG. 1 ;
  • FIG. 3 is a cross-sectional view of the vapor chamber in FIG. 1 ;
  • FIG. 4 to FIG. 13 shows a fabricating process of the vapor chamber in FIG. 1 .
  • FIG. 1 is a perspective view of a vapor chamber according to a first embodiment of the present disclosure
  • FIG. 2 is an exploded view of the vapor chamber in FIG. 1
  • FIG. 3 is a cross-sectional view of the vapor chamber in FIG. 1 .
  • the vapor chamber 20 is, for example, in a thin-plate shape and has a thickness of, for example, less than 0.5 millimeters.
  • the vapor chamber 20 includes an upper cover 22 , a lower cover 26 , and a capillary structure 28 .
  • the upper cover 22 and the lower cover 26 may be made of oxygen-free copper, copper alloy containing silicon, or copper alloy plate containing aluminum.
  • the upper cover 22 includes a cover part 23 and a plurality of posts 25 .
  • the cover part 23 has an accommodation space 24 .
  • the posts 25 are located in the accommodation space 24 and protrude from the cover part 23 .
  • the lower cover 26 and the cover part 23 of the upper cover 22 are in contact with each other by pressure welding so as to form a chamber S therebetween, wherein the pressure welding includes, for example, resistance-welding, friction welding, cold welding, and diffusion bonding.
  • the capillary structure 28 is, for example, copper mesh or copper fiber paper and is located in the chamber S.
  • each post 25 is pressure welded to the capillary structure 28 , which is disposed on the lower cover 26 , such that the posts 25 are able to reinforce the structural strength of the vapor chamber 20 .
  • a sealing structure 30 located at an edge of the vapor chamber 20 for preventing working fluid from leaking from the chamber S.
  • the sealing structure 30 is formed by pressure welding. The processes of fabricating the vapor chamber 20 are described below.
  • FIG. 4 to FIG. 13 shows a fabricating process of the vapor chamber in FIG. 1 .
  • the capillary structure 28 is positioned and pressure welded on a first cover 100 where the first cover 100 is in a plate shape.
  • the second cover 200 has a first surface 210 , a second surface 220 , an accommodation space 230 , a flow channel 240 , a groove 250 , and a plurality of posts 260 .
  • the first surface 210 and the second surface 220 are opposite to each other.
  • the accommodation space 230 , the flow channel 240 , the groove 250 , and the plurality of posts 260 are formed on the first surface 210 by, for example, etching, sand blasting, or stamping process.
  • the accommodation space 230 , the flow channel 240 , the groove 250 , and the plurality of posts 260 may be formed by the same or different etching, sand blasting, or stamping processes.
  • the groove 250 is formed along the contour of the edge of the second cover 200 .
  • a solder 300 is injected into the groove 250 .
  • the solder 300 is, for example, a cooper paste, tin paste, or similar substance.
  • the first cover 100 is covered by the second cover 200 , and the second cover 200 is positioned on the first cover 100 .
  • the second cover 200 is stacked on the first cover 100 with the solder 300 in between.
  • the first cover 100 is pressure welded to the first surface 210 of the second cover 200 , meanwhile, the posts 260 are also pressure welded to the capillary structure 28 .
  • the first cover 100 and the second cover 200 are in contact with each other and form a chamber S therebetween and a passage C connected to the chamber S, and the capillary structure 28 is located between and in direct contact with the posts 260 and the first cover 100 at the same time; in such a case, the posts 260 are able to maintain the gap between the capillary structure 28 and the second cover 200 . That is, the posts 260 are able to reinforce the structural strength of the first cover 100 and the second cover 200 .
  • the first cover 100 and the second cover 200 are very thin, such that, if the pressure welding was not performed under some specific conditions, the first cover 100 and the second cover 200 may be cracked and the posts 260 may not be fully pressure welded to the capillary structure 28 .
  • the posts 260 may not be fully pressure welded to the capillary structure 28 . In such a case, the posts 260 will not be able to perfectly maintain the gap between the first cover 100 and the second cover 200 .
  • the pressure welding is not properly controlled to cause a large change in thickness of the first cover 100 and the second cover 200 , the first cover 100 and the second cover 200 may experience too large stress and got penetrated or damage by the posts 260 .
  • the change in thickness refers to the amount of compressing a post 260 which has been heated.
  • the pressure welding is performed at a temperature of 680° C. and at a pressure of 25 kg/cm 2 .
  • the pressure welding is performed at a temperature of 700° C. and at a pressure of 20 kg/cm 2 .
  • the pressure welding is performed at a temperature of 750° C. and at a pressure of 18 kg/cm 2 .
  • the pressure welding is performed at a temperature of 800° C. and at a pressure of 15 kg/cm 2 .
  • the pressure welding is performed at a temperature of 850° C. and at a pressure of 10 kg/cm 2 .
  • the pressure welding can be performed at a temperature and pressure by referring to different parameters.
  • the pressure welding can be performed at a temperature of 680° C. (shown in parameters set 1) and a pressure of 18 kg/cm 2 (shown in parameters set 3) or a pressure of 10 kg/cm 2 (shown in parameters set 5).
  • the pressure welding can be performed at a pressure of 10 kg/cm 2 (shown in parameters set 5) and a temperature of 680° C. (shown in parameters set 1) or a temperature of 800° C. (shown in parameters set 4).
  • the predetermined change of 0.03 mm in thickness is also exemplary and the disclosure is either not limited thereto. In some other embodiments, the change in thickness of the first cover 100 and the second cover 200 can be altered according to different requirements.
  • the first period refers to the duration which the pressure welding is performed at a constant temperature
  • the second period refers to the duration which the pressure welding is performed at a constant pressure and decreasing temperature
  • the third period refers to the duration which the pressure welding is performed at a decreasing temperature and pressure.
  • the first period the pressure welding is performed at a temperature of 680° C. and a pressure of 25 kg/cm 2 , wherein the 680° C. must be constant for 300 seconds.
  • the second period the pressure is fixed but the temperature is decreased down to a range between 300° C. and 400° C.
  • the third period is performed after the second period.
  • the aperture size of the passage C is enlarged.
  • the passage C has been enlarged to a passage C′, and then a degassing tube 400 is inserted into the passage C′.
  • Part of volume of the degassing tube 400 can be removed by, for example, turning process, or the degassing tube 400 can be partially deformed to a smaller volume by, for example, a pressing process, such that the degassing tube 400 can be easily inserted into the passage C′.
  • the part of the degassing tube 400 that is inserted into the passage C′ is pressure welded to the first cover 100 and the second cover 200 by the solder 300 .
  • a leak detection process may be performed on the degassing tube 400 , the first cover 100 , and the second cover 200 , after they had been pressure welded together, in order to ensure the quality of pressure welding.
  • an annealing process may be performed on the degassing tube 400 , the first cover 100 , and the second cover 200 , after they had been pressure welded together, in order to release the stress caused by the pressure welding process and to enhance their mechanical reliability.
  • the degassing tube 400 can be connected to a degassing equipment for drawing gas from the chamber S, and then the degassing tube 400 can be connected to an injecting equipment for injecting working fluid into the chamber S.
  • a joint between the chamber S and the passage C′ is pressure welded so as to form a depressed structure 500 to seal the chamber S.
  • part of the depressed structure 500 is cut off so that part of the first cover 100 (shown in FIG. 12 ) and the second cover (shown in FIG. 12 ) where the passage C′ are disposed are also cut off.
  • the vapor chamber 20 is completed.
  • the remained part of the first cover 100 is the lower cover 26 of the vapor chamber 20
  • the remained part of the second cover 200 is the upper cover 22 of the vapor chamber 20 .
  • the plurality of posts are pressure welded to the capillary structure, such that the heat can be conducted not only via the capillary structure but also via the posts, thereby enhancing the heat conduction of the vapor chamber.
  • the pressure welding performed under the conditions provided above can ensure that the posts to be fully pressure welded to the capillary structure and can accurately control the change in thickness of the posts. Therefore, the vapor chamber is prevented from being cracked during pressure welding and thus enhancing the fabrication quality of the vapor chamber.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Measuring Fluid Pressure (AREA)
  • Treatment Of Fiber Materials (AREA)

Abstract

This disclosure relates to a method for fabricating a vapor chamber. The method includes positioning a capillary structure on a first cover, forming an accommodation space, a flow channel, and a plurality of posts on a first surface of a second cover, covering the first cover with the second cover, positioning the first cover and the second cover such that the plurality of posts are spaced apart from the capillary structure by a distance, and pressure welding the first cover and the second cover so as to form a chamber between the first cover and second cover and a passage connected to the chamber and to pressure weld the plurality of posts with the capillary structure.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This non-provisional application claims priority under 35 U.S.C. § 119(a) on Patent Application No(s). 201910528348.0 filed in China, P.R.C. on Jun. 18, 2019, the entire contents of which are hereby incorporated by reference.
  • TECHNICAL FIELD
  • The present disclosure relates to a vapor chamber and a method for fabricating the same, more particularly to a vapor chamber having a post and a method for fabricating the same.
  • BACKGROUND
  • A vapor chamber and a heat pipe can be applied to dissipate heat. Thermal conduction of a heat pipe occurs in one dimension while thermal conduction of a vapor chamber occurs in two dimensions. Therefore, the vapor chamber is a more effective heat dissipation device to dissipate heat generated by a heat source in an electronic product. Generally, the vapor chamber includes a main body and a capillary structure, the main body has a chamber that can accommodate working fluid, and the capillary structure is disposed in the chamber. The main body can be divided into two parts—an evaporation part and a condensation part. The working fluid absorbs heat and will be vaporized to gaseous form in the evaporation part, the working fluid in gaseous form diffuses into the condensation part and will be condensed into liquid state and then returns to the evaporation part via the capillary structure and thus forming a cooling cycle of the working fluid.
  • However, with the increasing demand for lightweight and small electronic products, the internal space for accommodating electrical components is very limited. Therefore, how to develop a vapor chamber that can catch up the trend is an important topic in the field. Conventionally, the main body of the vapor chamber is too thin to have a sufficient structural strength. The vapor chamber is often heated over 90° C., and the high temperature will evaporate most of the working fluid and thus increasing the internal pressure of the vapor chamber to exceed a limit. By that time, the vapor chamber will be deformed or even cracked by the internal pressure. To prevent this, some put support posts in the chamber to reinforce the structural strength of the vapor chamber. And the posts also can enhance the heat conduction of the vapor chamber. However, the vapor chamber with the supporting posts is easily cracked during the manufacturing process.
  • SUMMARY
  • The present disclosure provides a vapor chamber and a method for fabricating the same that are able to improve the fabrication quality and heat transfer of the vapor chamber.
  • According to one aspect of the present disclosure, a method for fabricating a vapor chamber includes the following steps. Positioning a capillary structure on a first cover. Forming an accommodation space, a flow channel, and a plurality of posts on a first surface of a second cover. Covering the first cover with the second cover. Positioning the first cover and the second cover such that the plurality of posts are spaced apart from the capillary structure by a distance. Pressure welding the first cover and the second cover so as to form a chamber between the first cover and second cover and a passage connected to the chamber and to pressure weld the plurality of posts with the capillary structure.
  • According to another aspect of the present disclosure, a vapor chamber includes an upper cover, a lower cover and a capillary structure. The upper cover includes a cover part and a plurality of posts. The cover part has an accommodation space. The plurality of posts are located in the accommodation space and protrude from the cover part. The lower cover and the cover part of the upper cover are in contact with each other so as to form a chamber therebetween. The capillary structure is located in the chamber and disposed on the lower cover. The plurality of posts are pressure welded to the capillary structure which is disposed on the lower cover.
  • According to the vapor chamber and the method for fabricating the same discussed above, the plurality of posts are pressure welded to the capillary structure such that the heat can be conducted not only via the capillary structure but also via the posts, thereby enhancing the heat conduction of the vapor chamber.
  • Furthermore, the pressure welding can be performed at a certain temperature and pressure so as to ensure that the posts to be fully pressure welded to the capillary structure and can accurately control the change in thickness of the posts. Therefore, the vapor chamber is prevented from being cracked during pressure welding and thus enhancing the fabrication quality of the vapor chamber.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The present disclosure will become more fully understood from the detailed description given hereinbelow and the accompanying drawings which are given by way of illustration only and thus are not intending to limit the present disclosure and wherein:
  • FIG. 1 is a perspective view of a vapor chamber according to a first embodiment of the present disclosure;
  • FIG. 2 is an exploded view of the vapor chamber in FIG. 1;
  • FIG. 3 is a cross-sectional view of the vapor chamber in FIG. 1; and
  • FIG. 4 to FIG. 13 shows a fabricating process of the vapor chamber in FIG. 1.
  • DETAILED DESCRIPTION
  • In the following detailed description, for purposes of explanation, numerous specific details are set forth in order to provide a thorough understanding of the disclosed embodiments. It will be apparent, however, that one or more embodiments may be practiced without these specific details. In other instances, well-known structures and devices are schematically shown in order to simplify the drawing.
  • Please refer to FIG. 1 to FIG. 3, which FIG. 1 is a perspective view of a vapor chamber according to a first embodiment of the present disclosure, FIG. 2 is an exploded view of the vapor chamber in FIG. 1, and FIG. 3 is a cross-sectional view of the vapor chamber in FIG. 1.
  • This embodiment provides a vapor chamber 20. The vapor chamber 20 is, for example, in a thin-plate shape and has a thickness of, for example, less than 0.5 millimeters. The vapor chamber 20 includes an upper cover 22, a lower cover 26, and a capillary structure 28.
  • The upper cover 22 and the lower cover 26 may be made of oxygen-free copper, copper alloy containing silicon, or copper alloy plate containing aluminum. The upper cover 22 includes a cover part 23 and a plurality of posts 25. The cover part 23 has an accommodation space 24. The posts 25 are located in the accommodation space 24 and protrude from the cover part 23. The lower cover 26 and the cover part 23 of the upper cover 22 are in contact with each other by pressure welding so as to form a chamber S therebetween, wherein the pressure welding includes, for example, resistance-welding, friction welding, cold welding, and diffusion bonding. The capillary structure 28 is, for example, copper mesh or copper fiber paper and is located in the chamber S. Further, one end of each post 25 is pressure welded to the capillary structure 28, which is disposed on the lower cover 26, such that the posts 25 are able to reinforce the structural strength of the vapor chamber 20. Furthermore, there is a sealing structure 30 located at an edge of the vapor chamber 20 for preventing working fluid from leaking from the chamber S. The sealing structure 30 is formed by pressure welding. The processes of fabricating the vapor chamber 20 are described below.
  • Please refer to FIG. 4 to FIG. 13, which shows a fabricating process of the vapor chamber in FIG. 1.
  • As shown in FIG. 4, first is to cut a capillary structure 28 to make it fit an accommodation space 230 of the second cover 200. And then is to anneal the capillary structure 28.
  • Then, as shown in FIG. 5, the capillary structure 28 is positioned and pressure welded on a first cover 100 where the first cover 100 is in a plate shape.
  • Then, as shown in FIG. 6, a second cover 200 is provided. The second cover 200 has a first surface 210, a second surface 220, an accommodation space 230, a flow channel 240, a groove 250, and a plurality of posts 260. The first surface 210 and the second surface 220 are opposite to each other. The accommodation space 230, the flow channel 240, the groove 250, and the plurality of posts 260 are formed on the first surface 210 by, for example, etching, sand blasting, or stamping process. The accommodation space 230, the flow channel 240, the groove 250, and the plurality of posts 260 may be formed by the same or different etching, sand blasting, or stamping processes. The groove 250 is formed along the contour of the edge of the second cover 200. Then, a solder 300 is injected into the groove 250. The solder 300 is, for example, a cooper paste, tin paste, or similar substance.
  • Then, as shown in FIG. 7, the first cover 100 is covered by the second cover 200, and the second cover 200 is positioned on the first cover 100. In detail, the second cover 200 is stacked on the first cover 100 with the solder 300 in between.
  • Then, as shown in FIG. 8 and FIG. 9, the first cover 100 is pressure welded to the first surface 210 of the second cover 200, meanwhile, the posts 260 are also pressure welded to the capillary structure 28. By doing so, the first cover 100 and the second cover 200 are in contact with each other and form a chamber S therebetween and a passage C connected to the chamber S, and the capillary structure 28 is located between and in direct contact with the posts 260 and the first cover 100 at the same time; in such a case, the posts 260 are able to maintain the gap between the capillary structure 28 and the second cover 200. That is, the posts 260 are able to reinforce the structural strength of the first cover 100 and the second cover 200.
  • The first cover 100 and the second cover 200 are very thin, such that, if the pressure welding was not performed under some specific conditions, the first cover 100 and the second cover 200 may be cracked and the posts 260 may not be fully pressure welded to the capillary structure 28. In detail, if the first cover 100 and the second cover 200 have a too small change in thickness during the pressure welding or if the chamber S is expanded outward by a large external force, the posts 260 may not be fully pressure welded to the capillary structure 28. In such a case, the posts 260 will not be able to perfectly maintain the gap between the first cover 100 and the second cover 200. On the contrary, if the pressure welding is not properly controlled to cause a large change in thickness of the first cover 100 and the second cover 200, the first cover 100 and the second cover 200 may experience too large stress and got penetrated or damage by the posts 260.
  • Therefore, in order to improve the quality of the pressure welding, in this embodiment, some conditions are given below:
  • Factor
    Time (s) Change in
    Temperature Pressure First Second Third thickness
    Parameter (° C.) (kg/cm2) period period period (mm)
    Parameters 680 25 300 240 180 0.030
    Set 1
    Parameters 700 20 260 220 180 0.030
    Set 2
    Parameters 750 18 260 220 180 0.030
    Set 3
    Parameters 800 15 220 200 240 0.030
    Set 4
    Parameters 850 10 220 200 240 0.030
    Set 5
  • Assume that a predetermined change in thickness is 0.03 mm, the change in thickness refers to the amount of compressing a post 260 which has been heated. In parameters set 1, the pressure welding is performed at a temperature of 680° C. and at a pressure of 25 kg/cm2. In parameters set 2, the pressure welding is performed at a temperature of 700° C. and at a pressure of 20 kg/cm2. In parameters set 3, the pressure welding is performed at a temperature of 750° C. and at a pressure of 18 kg/cm2. In parameters set 4, the pressure welding is performed at a temperature of 800° C. and at a pressure of 15 kg/cm2. In parameters set 5, the pressure welding is performed at a temperature of 850° C. and at a pressure of 10 kg/cm2.
  • It is noted that the parameters sets 1 to 5 are exemplary and the disclosure is not limited thereto. In some other embodiments, the pressure welding can be performed at a temperature and pressure by referring to different parameters. For example, the pressure welding can be performed at a temperature of 680° C. (shown in parameters set 1) and a pressure of 18 kg/cm2 (shown in parameters set 3) or a pressure of 10 kg/cm2 (shown in parameters set 5). Alternatively, the pressure welding can be performed at a pressure of 10 kg/cm2 (shown in parameters set 5) and a temperature of 680° C. (shown in parameters set 1) or a temperature of 800° C. (shown in parameters set 4).
  • The predetermined change of 0.03 mm in thickness is also exemplary and the disclosure is either not limited thereto. In some other embodiments, the change in thickness of the first cover 100 and the second cover 200 can be altered according to different requirements.
  • In addition, in the above table, the first period refers to the duration which the pressure welding is performed at a constant temperature, the second period refers to the duration which the pressure welding is performed at a constant pressure and decreasing temperature, and the third period refers to the duration which the pressure welding is performed at a decreasing temperature and pressure. For example, in the first period, the pressure welding is performed at a temperature of 680° C. and a pressure of 25 kg/cm2, wherein the 680° C. must be constant for 300 seconds. Then, in the second period, the pressure is fixed but the temperature is decreased down to a range between 300° C. and 400° C. And then, the third period is performed after the second period.
  • Then, the aperture size of the passage C is enlarged. As shown in FIG. 10, the passage C has been enlarged to a passage C′, and then a degassing tube 400 is inserted into the passage C′. Part of volume of the degassing tube 400 can be removed by, for example, turning process, or the degassing tube 400 can be partially deformed to a smaller volume by, for example, a pressing process, such that the degassing tube 400 can be easily inserted into the passage C′. And then the part of the degassing tube 400 that is inserted into the passage C′ is pressure welded to the first cover 100 and the second cover 200 by the solder 300.
  • Preferably, a leak detection process may be performed on the degassing tube 400, the first cover 100, and the second cover 200, after they had been pressure welded together, in order to ensure the quality of pressure welding. In addition, an annealing process may be performed on the degassing tube 400, the first cover 100, and the second cover 200, after they had been pressure welded together, in order to release the stress caused by the pressure welding process and to enhance their mechanical reliability.
  • Then, the degassing tube 400 can be connected to a degassing equipment for drawing gas from the chamber S, and then the degassing tube 400 can be connected to an injecting equipment for injecting working fluid into the chamber S.
  • Then, as shown in FIG. 11, another part of the degassing tube 400 which is outside the passage C′ is squeezed by a stamping process and then the squeezed part of the degassing tube 400 is sealed by a pressure welding process, such that the working fluid is prevented from leaking from the chamber S and the low pressure in the chamber S is secured.
  • Then, as shown in FIG. 12, a joint between the chamber S and the passage C′ is pressure welded so as to form a depressed structure 500 to seal the chamber S.
  • Then, as shown in FIG. 13, part of the depressed structure 500 is cut off so that part of the first cover 100 (shown in FIG. 12) and the second cover (shown in FIG. 12) where the passage C′ are disposed are also cut off. By the above steps, the vapor chamber 20 is completed. The remained part of the first cover 100 is the lower cover 26 of the vapor chamber 20, and the remained part of the second cover 200 is the upper cover 22 of the vapor chamber 20.
  • According to the vapor chamber and the method for fabricating the same discussed above, the plurality of posts are pressure welded to the capillary structure, such that the heat can be conducted not only via the capillary structure but also via the posts, thereby enhancing the heat conduction of the vapor chamber.
  • Furthermore, the pressure welding performed under the conditions provided above can ensure that the posts to be fully pressure welded to the capillary structure and can accurately control the change in thickness of the posts. Therefore, the vapor chamber is prevented from being cracked during pressure welding and thus enhancing the fabrication quality of the vapor chamber.
  • The embodiments are chosen and described in order to best explain the principles of the present disclosure and its practical applications, to thereby enable others skilled in the art best utilize the present disclosure and various embodiments with various modifications as are suited to the particular use being contemplated. It is intended that the scope of the present disclosure is defined by the following claims and their equivalents.

Claims (22)

What is claimed is:
1. A method for fabricating a vapor chamber, comprising:
positioning a capillary structure on a first cover;
forming an accommodation space, a flow channel, and a plurality of posts on a first surface of a second cover;
covering the first cover with the second cover;
positioning the first cover and the second cover such that the plurality of posts are spaced apart from the capillary structure by a distance; and
pressure welding the first cover and the second cover so as to form a chamber between the first cover and second cover and a passage connected to the chamber and to pressure weld the plurality of posts with the capillary structure.
2. The method according to claim 1, wherein the pressure welding is performed at a temperature ranging between 680° C. and 850° C.
3. The method according to claim 1, wherein the pressure welding is performed at a pressure ranging between 10 kg/cm2 and 25 kg/cm2.
4. The method according to claim 2, wherein the pressure welding is performed at a pressure ranging between 10 kg/cm2 and 25 kg/cm2.
5. The method according to claim 1, wherein the pressure welding is performed at a temperature ranging between 680° C. and 750° C. and is performed at a pressure ranging between 18 kg/cm2 and 25 kg/cm2.
6. The method according to claim 1, wherein the pressure welding is performed at a temperature ranging between 750° C. and 850° C., and is performed at a pressure ranging between 10 kg/cm2 and 18 kg/cm2.
7. The method according to claim 1, wherein the pressure welding is performed at a temperature of 680° C. and a pressure of 25 kg/cm2.
8. The method according to claim 1, wherein the pressure welding is performed at a temperature of 700° C. and a pressure of 20 kg/cm2.
9. The method according to claim 1, wherein the pressure welding is performed at a temperature of 750° C. and a pressure of 18 kg/cm2.
10. The method according to claim 1, wherein the pressure welding is performed at a temperature of 800° C. and a pressure of 15 kg/cm2.
11. The method according to claim 1, wherein the pressure welding is performed at a temperature of 850° C. and a pressure of 10 kg/cm2.
12. The method according to claim 1, wherein the first cover and the second cover have a change in thickness between 0.015 millimeters and 0.045 millimeters during the pressure welding.
13. The method according to claim 1, wherein the first cover and the second cover have a change of 0.03 millimeters in thickness during the pressure welding.
14. The method according to claim 1, before positioning the capillary structure on the first cover, further comprising:
cutting a capillary structure to fit the accommodation space of the second cover; and annealing the capillary structure.
15. The method according to claim 1, before pressure welding the first cover and the second cover, further comprising:
forming a groove on the first surface of the second cover; and
injecting a solder into the groove.
16. The method according to claim 1, after pressure welding the first cover and the second cover, further comprising:
enlarging an aperture size of the passage; and
inserting a degassing tube into the passage which has been enlarged.
17. The method according to claim 16, after inserting the degassing tube into the passage, further comprising:
drawing gas and filling working fluid via the degassing tube.
18. The method according to claim 17, after drawing gas and filling working fluid via the degassing tube, further comprising:
squeezing part of the degassing tube which is outside the passage; and
sealing the part of the degassing tube, which has been squeezed, by pressure welding.
19. The method according to claim 18, after sealing the part of the degassing tube by pressure welding, further comprising:
pressure welding a joint between the chamber and the passage so as to form a depressed structure to seal the chamber.
20. The method according to claim 19, after sealing the part of the degassing tube by pressure welding, further comprising:
cutting the depressed structure.
21. The method according to claim 1, wherein the accommodation space, the flow channel, and the plurality of posts are formed by an etching process or a stamping process.
22. A vapor chamber, comprising:
an upper cover, comprising a cover part and a plurality of posts, wherein the cover part has an accommodation space, and the plurality of posts are located in the accommodation space and protrude from the cover part;
a lower cover, wherein the lower cover and the cover part of the upper cover are in contact with each other so as to form a chamber therebetween; and
a capillary structure, located in the chamber and disposed on the lower cover;
wherein the plurality of posts are pressure welding to the capillary structure which is disposed on the lower cover.
US16/837,125 2019-06-18 2020-04-01 Vapor chamber and method for fabricating the same Abandoned US20200400382A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US18/134,526 US11927400B2 (en) 2019-06-18 2023-04-13 Method for fabricating vapor chamber

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910528348.0 2019-06-18
CN201910528348.0A CN112105219B (en) 2019-06-18 2019-06-18 Vapor chamber and manufacturing method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US18/134,526 Division US11927400B2 (en) 2019-06-18 2023-04-13 Method for fabricating vapor chamber

Publications (1)

Publication Number Publication Date
US20200400382A1 true US20200400382A1 (en) 2020-12-24

Family

ID=73749163

Family Applications (2)

Application Number Title Priority Date Filing Date
US16/837,125 Abandoned US20200400382A1 (en) 2019-06-18 2020-04-01 Vapor chamber and method for fabricating the same
US18/134,526 Active US11927400B2 (en) 2019-06-18 2023-04-13 Method for fabricating vapor chamber

Family Applications After (1)

Application Number Title Priority Date Filing Date
US18/134,526 Active US11927400B2 (en) 2019-06-18 2023-04-13 Method for fabricating vapor chamber

Country Status (3)

Country Link
US (2) US20200400382A1 (en)
CN (1) CN112105219B (en)
TW (1) TWI788604B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11206746B1 (en) * 2020-06-09 2021-12-21 Chia-Hsing Liu Fluid heat dissipation device
US20220243992A1 (en) * 2021-01-29 2022-08-04 Advanced Semiconductor Engineering, Inc. Heat transfer element, method for forming the same and semiconductor structure comprising the same
US20220299273A1 (en) * 2021-03-16 2022-09-22 Fujitsu Limited Cooling device
CN116412709A (en) * 2021-12-30 2023-07-11 创新服务股份有限公司 Heat conduction plate and manufacturing method thereof

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113437034B (en) * 2021-08-25 2022-02-22 中兴通讯股份有限公司 Temperature equalization plate and electronic equipment
TWI813277B (en) * 2022-05-06 2023-08-21 邁萪科技股份有限公司 Vapor chamber with improved fixed structure of exhaust pipe
FR3147121B1 (en) * 2023-03-27 2025-12-26 Commissariat Energie Atomique METHOD FOR MANUFACTURING A STRUCTURE COMPRISING CAVITIES
TWI874126B (en) * 2024-01-18 2025-02-21 高柏科技股份有限公司 Vapor chamber sealing structure and manufacturing method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040069460A1 (en) * 2002-05-08 2004-04-15 Yasumi Sasaki Thin sheet type heat pipe
US20080216994A1 (en) * 2007-03-08 2008-09-11 Convergence Technologies Limited Vapor-Augmented Heat Spreader Device
US20100065255A1 (en) * 2008-09-18 2010-03-18 Pegatron Corporation Vapor Chamber
US20120168435A1 (en) * 2011-01-04 2012-07-05 Cooler Master Co., Ltd. Folding vapor chamber
WO2018198353A1 (en) * 2017-04-28 2018-11-01 株式会社村田製作所 Vapor chamber

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1784137A (en) * 2004-11-29 2006-06-07 迈萪科技股份有限公司 Curved vapor chamber with metal mesh microstructure and its manufacturing method
US20090260785A1 (en) * 2008-04-17 2009-10-22 Wang Cheng-Tu Heat plate with capillary supporting structure and manufacturing method thereof
CN202750388U (en) * 2012-06-19 2013-02-20 迈萪科技股份有限公司 Efficient vapor chamber
CN104896983B (en) * 2014-03-07 2017-04-26 江苏格业新材料科技有限公司 Manufacturing method of soaking plate with ultrathin foam silver as liquid absorbing core
TWI541487B (en) * 2014-12-05 2016-07-11 Asia Vital Components Co Ltd Mean temperature plate support structure
CN105277032B (en) * 2015-10-21 2018-08-28 上海利正卫星应用技术有限公司 High power low thermal resistance temperature-uniforming plate
TWI612266B (en) * 2016-06-28 2018-01-21 Cai Ming Kun Method for manufacturing cavity of uniform temperature device and structure thereof
CN108323137A (en) * 2017-01-18 2018-07-24 台达电子工业股份有限公司 Vapor chamber
CN107949238A (en) * 2017-11-10 2018-04-20 中国船舶重工集团公司第七六研究所 A kind of soaking plate heat dissipating device with support column arrangement and preparation method thereof
CN211457778U (en) * 2019-06-18 2020-09-08 讯凯国际股份有限公司 Temperature equalizing plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040069460A1 (en) * 2002-05-08 2004-04-15 Yasumi Sasaki Thin sheet type heat pipe
US20080216994A1 (en) * 2007-03-08 2008-09-11 Convergence Technologies Limited Vapor-Augmented Heat Spreader Device
US20100065255A1 (en) * 2008-09-18 2010-03-18 Pegatron Corporation Vapor Chamber
US20120168435A1 (en) * 2011-01-04 2012-07-05 Cooler Master Co., Ltd. Folding vapor chamber
WO2018198353A1 (en) * 2017-04-28 2018-11-01 株式会社村田製作所 Vapor chamber
US20200236810A1 (en) * 2017-04-28 2020-07-23 Murata Manufacturing Co., Ltd. Vapor chamber

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11206746B1 (en) * 2020-06-09 2021-12-21 Chia-Hsing Liu Fluid heat dissipation device
US20220243992A1 (en) * 2021-01-29 2022-08-04 Advanced Semiconductor Engineering, Inc. Heat transfer element, method for forming the same and semiconductor structure comprising the same
US12111114B2 (en) * 2021-01-29 2024-10-08 Advanced Semiconductor Engineering, Inc. Heat transfer element, method for forming the same and semiconductor structure comprising the same
US20220299273A1 (en) * 2021-03-16 2022-09-22 Fujitsu Limited Cooling device
US11892246B2 (en) * 2021-03-16 2024-02-06 Fujitsu Limited Cooling device
CN116412709A (en) * 2021-12-30 2023-07-11 创新服务股份有限公司 Heat conduction plate and manufacturing method thereof

Also Published As

Publication number Publication date
TW202100938A (en) 2021-01-01
US11927400B2 (en) 2024-03-12
CN112105219A (en) 2020-12-18
US20230251044A1 (en) 2023-08-10
TWI788604B (en) 2023-01-01
CN112105219B (en) 2023-06-09

Similar Documents

Publication Publication Date Title
US11927400B2 (en) Method for fabricating vapor chamber
US20240302107A1 (en) Vapor chamber and manufacturing method thereof
JP4035155B1 (en) Heat pipe and manufacturing method thereof
US20100326630A1 (en) Heat spreader with vapor chamber and method for manufacturing the same
JP2010243077A (en) Heat transport device manufacturing method, heat transport device, electronic apparatus, and caulking pin
WO2007026833A1 (en) Heat pipe and method of manufacturing the same
JP7386469B2 (en) heat pipe
CN211425160U (en) Vapor chamber
US20230067112A1 (en) Vapor chamber structure
CN108731523B (en) Heat pipe and method for manufacturing heat pipe
TW201423017A (en) Thin heat pipe manufacturing method
WO2013107026A1 (en) Manufacturing method of temperature equalization device without liquid injection tube and temperature equalization device manufactured by the method
JP4558258B2 (en) Plate heat pipe and manufacturing method thereof
US20250362092A1 (en) Manufacturing method of vapor chamber
TW202020392A (en) Method for manufacturing vapor chamber and vapor chamber structure
CN113692174A (en) The structure of the uniform temperature plate and the uniform temperature plate
CN211457778U (en) Temperature equalizing plate
CN218657302U (en) Copper-free paste welding die applied to ultrathin soaking plate
CN116723679A (en) Ceramic-based vapor chamber and preparation method and application thereof
CN110864193B (en) Method for manufacturing thin vacuum heat insulation sheet
CN117798580B (en) Welding auxiliary tool and welding method
CN113357950A (en) Radiator and manufacturing method thereof
US12261096B2 (en) Radiator module and method of manufacturing the same
US20240027138A1 (en) Chamber Sealing Process for Temperature Equalizing Plate and Temperature Equalizing Plate Manufactured by Same
CN115415658A (en) A copper-free paste welding mold for ultra-thin vapor chamber

Legal Events

Date Code Title Description
AS Assignment

Owner name: COOLER MASTER CO., LTD., TAIWAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:CHENG, JEN-CHIH;LIU, LEI-LEI;REEL/FRAME:052282/0095

Effective date: 20200324

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: FINAL REJECTION MAILED

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION