US20140123747A1 - Systems and methods for conducting pressure tests on a wellbore fluid containment system - Google Patents
Systems and methods for conducting pressure tests on a wellbore fluid containment system Download PDFInfo
- Publication number
- US20140123747A1 US20140123747A1 US13/668,680 US201213668680A US2014123747A1 US 20140123747 A1 US20140123747 A1 US 20140123747A1 US 201213668680 A US201213668680 A US 201213668680A US 2014123747 A1 US2014123747 A1 US 2014123747A1
- Authority
- US
- United States
- Prior art keywords
- fluid
- pressure
- volume
- testing
- closeable chamber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/001—Survey of boreholes or wells for underwater installation
Definitions
- the disclosure relates generally to systems and methods for conducting a pressure test of wellbore service equipment. More particularly, the disclosure relates to systems and methods for reliably and effectively troubleshooting a failed pressure test of wellbore fluid containment system (FCS) equipment, such as blowout preventers (BOPs), choke and kill lines, wellhead hangers, casing, liner and liner hangers, tubing hangers, completions and other equipment.
- FCS wellbore fluid containment system
- BOPs blowout preventers
- choke and kill lines such as wellhead hangers, casing, liner and liner hangers, tubing hangers, completions and other equipment.
- a well or well system In drilling for oil and gas from a hydrocarbon producing well, a well or well system is provided that includes a drilling rig with a riser section and a drill string used to convey drilling fluid down the drill string and through a wellhead to a drill bit disposed within a wellbore of a formation.
- the fluid recirculates from the drill bit back to the drilling rig via an annulus formed between the drill string and walls of the wellbore, and via the annulus formed between the drill string and the riser section that encircles it.
- a wellbore or formation fluid influx also called a “kick”, can cause an unstable and unsafe condition at the drilling rig.
- FCS When a kick is detected, a FCS of the well system may be actuated and steps may be taken to “kill” the well and regain control.
- the FCS includes all critical sealing points, including the BOP itself and each of its individual rams, the choke manifold and kill manifolds, an internal blowout preventer (IBOP), as well as other components.
- IBOP internal blowout preventer
- FCS testing plug may be landed against a sealing surface within the FCS, followed by subsequent pressurization of the FCS.
- pressure testing of the FCS must be conducted upon installation and before 14 days have elapsed since the last BOP pressure test. Low and high pressure tests must be conducted for each individual component, and each component must demonstrate that it holds a reasonably stable pressure. For instance, in practice a pressure decay rate of 4 pounds per square inch (psi) per minute or less is seen as reasonably stable.
- graph 100 illustrates fluid pressures in relation to time at different positions along a vertically-oriented subsea drill string during a high pressure test.
- Pressure curve 110 illustrates the fluid pressure at a point within the drill string near the sea floor, with curves 120 , 130 and 140 illustrating fluid pressure at progressively shallower points along the drill string, with curve 140 illustrating fluid pressure at the shallowest point, near the surface. Due to being located at different vertical depths along the drill string, curve 110 is at the highest pressure, while curve 140 is at the lowest pressure of the curves.
- the high pressure test can be divided into three phases: a pumping phase ( 112 , 122 , 132 and 142 ), a shut-in phase ( 114 , 124 , 134 and 144 ) and a depressurization phase ( 116 , 126 , 136 and 146 ).
- the pumping phase takes places when testing fluid is pumped into the well system in order to pressurize the FCS.
- Testing fluid may be pumped into the drill string by a cement unit or mud pump disposed at the drilling rig of the well system.
- shut-in phases 114 , 124 , 134 and 144 have a beginning ( 114 a , 124 a , 134 a and 144 a ) and an ending ( 114 b , 124 b , 134 b and 144 b ). As shown by FIG.
- the pressure at the beginning 114 a , 124 a , 134 a and 144 a exceeds the pressure at the end 114 b , 124 b , 134 b and 144 b of the shut-in phase.
- each shut-in phase includes a pressurization point ( 114 c , 124 c , 134 c and 144 c ) where additional testing fluid is pumped into the well system to slightly increase fluid pressure within the FCS, known in the field as “bumping up the pressure.”
- This additional fluid may be pumped in at the pressurization point during the shut-in phase in order to return the fluid pressure within the FCS to the appropriate test pressure, a level similar to that existing near the beginning of the tests, at points 114 a , 124 a , 134 a and 144 a.
- the pressure decay occurring during the shut-in phases (e.g., 114 , 124 , 134 and 144 ) for each pressure curve (e.g., 110 , 120 , 130 and 140 ) is due to heat transfer from pressurized fluid within the FCS to fluid in the surrounding environment.
- heat transfer is greater for testing fluid near the surface, as opposed to testing fluid within the FCS that is disposed farther downhole.
- the greater amount of heat transfer near the surface is due to friction generated during the process of pumping the testing fluid into the well system (e.g., via a cement unit or mud pump) for the purpose of pressurizing testing fluid within the FCS.
- an analog, low resolution circular chart surface recorder may be used by drilling personnel on the drilling rig to observe a continuous pressure reading of the FCS. Even in cases where the tested FCS component is not leaking, the pressure test may often last over half an hour or longer before the pressure within the FCS begins to stabilize enough such that a continuous five minute period of successful pressure stabilization may be recorded.
- FCS pressure tests are sometimes judged as successful before full stabilization (e.g., decay of 4 psi/min or less), thus allowing for the risk that remaining pressure decay may be due to a leak within the FCS, in addition to PVT effects.
- this phenomenon is especially impactful at higher testing pressures, as are required in deeper, hot wells and where oil based mud (OBM) or synthetic oil.
- OBM oil based mud
- a method for pressure testing a well system comprises pressurizing a volume of testing fluid within a closeable chamber of a well system, determining a leak within the closeable chamber using real time pressure and temperature measurements of the volume of testing fluid within the closeable chamber and determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to the closeable chamber.
- determining a leak within the closeable chamber comprises determining the change in fluid pressure within the closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber.
- determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises subtracting the change in fluid pressure within the closeable chamber due to a change in temperature of the volume of testing fluid within the closeable chamber from the total change in fluid pressure within the closeable chamber.
- pressurizing fluid within a closeable chamber of a well system comprises flowing fluid into the closeable chamber.
- determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the closeable chamber.
- determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises measuring in real time a change in fluid temperature within the closeable chamber using a sensor disposed within the closeable chamber.
- determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to the closeable chamber comprises disposing a sensor within the volume of fluid disposed adjacent to the closeable chamber.
- determining the pathway of the leak comprises detecting a fluid pressure increase in real time within the volume of fluid disposed adjacent to the closeable chamber.
- detecting a pressure increase within the volume of fluid disposed adjacent to the closeable chamber comprises determining the change in fluid pressure within the volume due to a change in volume of the volume of fluid disposed adjacent to the closeable chamber. In some embodiments, determining a leak within the closeable chamber using real time pressure and temperature measurements comprises transmitting the pressure and temperature measurements of the volume of testing fluid to a computer of the well system.
- the closeable chamber is formed using a blowout preventer and a testing plug.
- the pathway of the leak comprises a sealing surface of the blowout preventer.
- the pathway of the leak comprises a sealing surface of the testing plug.
- the closeable chamber comprises a component of a fluid containment system.
- a method for pressure testing a blowout preventer comprises pressurizing a volume of testing fluid within the blowout preventer, determining a leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system and determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to blowout preventer.
- pressurizing the volume of testing fluid within the blowout preventer comprises actuating a ram of the blowout preventer.
- pressurizing the volume of testing fluid within the blowout preventer comprises actuating an annular of the blowout preventer.
- determining the leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system comprises determining a leak across a ram of the blowout preventer. In some embodiments, determining the leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system comprises determining a leak across an annular of the blowout preventer.
- Embodiments described herein comprise a combination of features and characteristics intended to address various shortcomings associated with certain prior devices, systems, and methods.
- the various features and characteristics described above, as well as others, will be readily apparent to those skilled in the art upon reading the following detailed description, and by referring to the accompanying drawings.
- FIG. 1 is a graph illustrating pressure curves generated during a pressure test of a well system
- FIG. 2 is a schematic view of an embodiment of a well system configured to conduct a fluid containment system pressure test in accordance with principles described herein;
- FIGS. 3A-3D are perspective views, some in cross-section, showing components of the wired pipe communication network shown in FIG. 3 ;
- FIG. 4A is a graph illustrating a pressure curve generated during a pressure test of the well system shown in FIG. 3 ;
- FIG. 4B is a graph illustrating a temperature curve generated a pressure test of the well system shown in FIG. 3 .
- the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to . . . ”
- the term “couple” or “couples” is intended to mean either an indirect or direct connection. Thus, if a first device couples to a second device, that connection may be through a direct connection, or through an indirect connection via other devices, components, and connections.
- the terms “axial” and “axially” generally mean along or parallel to a given axis (e.g., given axis of a body or a port), while the terms “radial” and “radially” generally mean perpendicular to the given axis.
- an axial distance refers to a distance measured along or parallel to the given axis
- a radial distance means a distance measured perpendicular to the given axis.
- the phrase “communication coupler” refers to a device or structure that communicates a signal across the respective ends of two adjacent tubular members, such as the threaded box/pin ends of adjacent pipe joints; and the phrase “wired drill pipe” or “WDP” refers to one or more tubular members, including drill pipe, drill collars, casing, tubing, subs, and other conduits, that are configured for use in a drill string and include a wired link.
- wireless link refers to a pathway that is at least partially wired along or through a WDP joint for conducting signals
- communication link refers to a plurality of communicatively-connected tubular members, such as interconnected WDP joints for conducting signals over a distance.
- a system and method for pressure testing components of a well system is disclosed herein.
- Embodiments described herein may be employed in various drilling and production applications; however, it has particular application as a system and method for mitigating PVT effects during the pressure testing of pressure containing components of a well system, such as a fluid containment system (FCS). Further, it has particular application with regard to offshore well drilling and production systems.
- FCS fluid containment system
- an offshore well drilling system 10 generally includes an offshore semi-submersible drilling rig 20 disposed at the water line 12 with a derrick 24 and deck 22 having a testing fluid system (TFS) 21 disposed thereon.
- System 10 further includes a riser 30 that extends between the rig 20 and a wellhead 60 disposed at the sea floor 14 , a FCS 40 , a drill string 50 disposed within a marine riser 30 and having a central axis 55 and internal passageway 50 a . . .
- Well system 10 further includes casing 70 that extends downward from a wellhead spool 61 of wellhead 60 and is secured in place via cement 72 .
- TFS 21 is disposed at rig floor 22 and comprises a mud pit 25 , a cement unit 27 and a fluid conduit 28 .
- Conduit 28 provides a fluid flowpath 29 for the passage of testing fluid 29 a from mud pit 25 , through cement unit 27 , and to the passageway 50 a of drill string 50 .
- Cement unit 27 comprises a high pressure, reciprocating triplex pump. However, in other embodiments cement unit 27 may comprise other components configured to pressurize a fluid.
- Testing fluid 29 comprises a drilling fluid that may be at a high density or high weight (e.g., drilling fluid, SOBM, completion fluid, etc.) relative to the ambient water 13 disposed below water line 12 .
- fluid 29 typically has a high enough density to overcome the pressure of fluid within the adjacent formation 16 .
- testing fluid may also comprise a relatively lower density fluid, such as water or base oil.
- FCS 40 generally includes components configured to retain and manage fluid pressure within well system 10 (e.g., drill string 50 , FCS 40 , annulus 35 , wellbore 62 , etc.) by acting as a closeable chamber isolating or sealing fluid disposed within well system 10 and the surrounding environment.
- FCS 40 includes BOP 41 , choke line 44 , kill line 46 and an internal blowout preventer (IBOP) 48 , wellhead 60 , wellbore 62 , casing 70 as well as other components.
- IBOP internal blowout preventer
- BOP 41 includes annular 41 a and rams 42 , each configured to create an annular seal about drill string 50 .
- rams 42 of BOP 41 are configured to provide an annular seal 43 about drill string 50 upon actuation, dividing annulus 35 into a first or upper section 35 a extending between rig 20 and seal 43 and a second or middle section 35 b extending from seal 43 downward to a FCS testing plug 49 coupled to drill string 50 .
- a third or lower section 35 c extends from wellhead 60 into the wellbore 62 .
- Testing plug 49 is configured to prevent fluid flow between middle portion 35 b of annulus 35 and a lower portion 35 c extending into wellbore 62 .
- Testing plug 49 forms an annular seal 49 c against an annular surface 61 a of a wellhead spool 61 disposed within wellhead 60 .
- Testing plug 49 is coupled to an end of two adjacent tubular joints 52 extending between adjacent nodes 51 and physically engages upper annular surface 61 a of wellhead spool 61 via lower annular surface 49 a .
- a radial port or opening 45 is provided in the drillstring 50 to act as a route of fluid communication between drillstring 50 and the annulus 35 above testing plug 49 .
- a pressure spike or kick of fluid from the formation 16 that has a relatively higher pressure than drilling fluid disposed within wellbore 62 may flow into wellbore 62 and travel upward through lower section 35 c of annulus 35 (testing plug 49 is not installed in well system 10 during the act of drilling).
- the formation kick may be trapped or isolated below upper section 35 a of annulus 35 via actuating one or more rams 42 of BOP 41 to provide the annular seal 43 .
- Choke line 44 and kill line 46 may be used to provide for alternate routes of fluid communication between rig 20 and annulus 35 such that the testing fluid (e.g., water, drilling mud, etc.) is pumped into FCS 40 to prevent further upward flow of fluid from formation 16 .
- Choke line 44 generally includes a lower valve 44 a , a manifold 44 b and an upper valve 44 c . Fluid flow through choke line 44 may be restricted by closing lower valve 44 a or upper valve 44 c .
- choke manifold 44 b includes a plurality of valves, chokes and other equipment, and as such is configured to manage and regulate flow through choke line 44 .
- Kill line 46 is also used to manage a formation kick by allowing for circulation between annulus 35 and rig 20 .
- kill line 46 is used as a route of fluid communication to pump high density drilling mud or other fluid downward from rig 20 to the annulus 35 to forcibly maintain the fluid from the formation kick or influx within the wellbore 62 .
- a kill line such as kill line 46 may be used to “kill” the well by reversing, stopping or at least substantially restricting the flow of fluid from the formation into the wellbore 62 by pumping heavy fluid into the entire fluid circulation system (e.g., annulus 35 , choke line 44 , kill line 46 , etc.) from the rig 20 .
- Kill line 46 comprises a lower valve 46 a , a kill manifold 46 b and an upper valve 46 c .
- flow through kill line 46 may be substantially restricted or controlled via valves 46 a , 46 c and manifold 46 b .
- valves 46 a , 46 c and manifold 46 b are pressure tested as well.
- IBOP 48 is disposed at an upper end 50 b of drill string 50 at the rig 20 and is configured to manage fluid pressure within drill string 50 .
- high pressure formation fluid may begin flowing upward through string 50 via an opening or port of the string 50 disposed within wellbore 62 (e.g., at the drill bit).
- IBOP 48 includes a valve that allows for the passage of fluid into string 50 but may be closed to restrict fluid from flowing out of string 50 through IBOP 48 in the event of a formation kick.
- IBOP 48 may be used in effectively controlling a formation kick, IBOP 48 is pressure tested during the pressure testing of FCS 40 .
- drill string 50 comprises a plurality of nodes 51 (e.g., 51 a - 51 d , etc.) coupled between the plurality of tubular joints 52 .
- Wired or networked drill pipe incorporating distributed sensors can transmit data from anywhere along the drill string 50 to the rig 20 for analysis.
- Nodes 51 are provided at desired intervals along the drill string 50 .
- Network nodes 51 essentially function as signal repeaters to regenerate and/or boost data signals and mitigate signal attenuation as data is transmitted up and down the drill string.
- the nodes 51 may also include measurement assemblies.
- the nodes 51 may be integrated into an existing section of drill string or a downhole tool along the drill string 50 .
- tubular joints 52 include a first pipe end 53 having, for example, a first induction coil 53 a and a second pipe end 54 having, for example, a second induction coil 54 a.
- Nodes 51 comprise a portion of a wired pipe communication network 56 that provides an electromagnetic signal path that is used to transmit information along the drill string 50 .
- the communication network 56 or broadband network telemetry, may thus include multiple nodes 51 based along the drill string 50 .
- Communication links or wired conductors 52 a may be used to connect the nodes 51 to one another, and may comprise cables or other transmission media integrated directly into sections of the drill string 50 .
- the cable may be routed through the central borehole of the drill string 50 , or routed externally to the drill string 50 , or mounted within a groove, slot or passageway in the drill string 50 .
- Signals from the plurality of sensors of nodes 51 along the drill string 50 are transmitted to rig 20 through wire conductors 52 a along the drill string 50 .
- Communication links 52 a between the nodes 51 may also use wireless connections.
- a plurality of packets may be used to transmit information along the nodes 51 . Further detail with respect to suitable nodes, a network, and data packets are disclosed in U.S. Pat. No. 7,207,396 (Hall et al., 2007), hereby incorporated in its entirety by reference.
- Various types of sensors 57 may be employed along the drill string 50 in various embodiments, including without limitation, axially spaced pressure sensors, temperature sensors, and others.
- the sensors 57 may be disposed on the nodes 51 positioned along the drill string, disposed on tools incorporated into the drill string, or a combination thereof. Sensors 57 of nodes 51 may measure properties of fluid disposed within string 50 or within annulus 35 or wellbore 62 . Thus, sensors 57 of nodes 51 (e.g., nodes 51 a - 51 d ) may measure temperature, pressure, etc., of fluid within string 50 or annulus 35 of well system 10 .
- Network nodes 51 are disposed along the drill string 50 between joints 52 .
- the booster assemblies are spaced at 1,500 ft. (500 m) intervals to boost the data signal as it travels the length of the drill string 50 to prevent signal degradation.
- Network nodes 51 are also located at these intervals to allow measurements to be taken along the length of the drill string 50 .
- the distributed network nodes 51 provide measurements that give the driller additional insight into what is happening along the potentially miles-long stretch of the drill string 50 .
- Rig 20 includes a well site computer 58 that may display information for the drilling operator.
- the wired pipe communication network 56 transmits information from each of a plurality of sensors 57 to a surface computer 58 .
- Information may also be transmitted from computer 58 to another computer 59 , located at a site remote from the well, with this computer 59 allowing an individual in the office remote from the well to review the data output by the sensors 57 .
- sensors 57 Although only a few sensors 57 are shown in the figures, those skilled in the art will understand that a larger number of sensors may be disposed along a drill string (e.g., drill string 50 ) when drilling, and that all sensors associated with any particular node may be housed within or annexed to the node 51 , so that a variety of sensors rather than a single sensor will be associated with that particular node.
- a drill string e.g., drill string 50
- a BOP e.g., BOP 41
- FCS FCS 40
- the wired pipe communication network 56 allows wellsite personnel to identify potential remedial actions for the migrated wellbore influx.
- the measurements used are independent from surface measurements.
- One or more embodiments of a well drilling system 10 comprising a fluid containment system 40 and a testing fluid system 21 having been disclosed, one or more embodiments of a method of pressure testing components of the FCS 40 are also disclosed herein. Further, one or more embodiments of a method for evaluating or troubleshooting the results of a failed pressure test of components of FCS 40 are disclosed herein.
- a FCS pressure testing method generally includes the steps of engaging a testing plug of the FCS against a sealing surface within the FCS (e.g., a wellhead spool), disposing a quantity of testing fluid (e.g., drilling fluid, etc.) within the FCS, isolating a component of the FCS (e.g., actuating a ram or annular of the BOP, closing a valve of the choke line, etc.), displacing an additional quantity of testing fluid into the FCS to increase the fluid pressure within the FCS to a predetermined testing pressure, shut-in the FCS by ceasing the displacement of testing fluid into the FCS, continuously in real-time monitor fluid pressure within the FCS via an wired pipe communication network for a period of time.
- a testing fluid e.g., drilling fluid, etc.
- the failed pressure test may be evaluated by continuously monitoring fluid pressure during the shut-in phase within cavities adjacent to the FCS component being tested.
- the particular leak path resulting in the failed FCS pressure test may be determined by determining which adjacent cavity of the FCS increased in fluid pressure during the course of the shut-in phase of the pressure test.
- the particular FCS component being tested e.g., a ram of the BOP
- the particular FCS component being tested was at least partially responsible for the leak or whether another component was responsible for the leak path (e.g., the FCS testing plug).
- the particular components of the well system responsible for the leak path may be replaced and the pressure test may be conducted again in an effort to achieve a successful pressure test of the particular FCS component.
- ram 42 of BOP 41 may be pressure tested as part of the regime for pressure testing each individual component of FCS 40 .
- testing plug 49 is coupled to drill string 50 and displaced downward through marine riser 30 until annular surface 49 a of tool 49 engages annular surface 61 a of wellhead spool 61 to create annular seal 49 c , which divides annulus 35 into upper section 35 a and lower section 35 c .
- high density testing fluid 29 e.g., drilling fluid, SOBM, competition fluid, etc.
- cement unit 27 and flowpath 29 a is disposed within drill string 50 and riser 30 at a relatively low pressure using cement unit 27 and flowpath 29 a .
- annular seal 43 Prior to commencement of the pressure testing of FCS 40 , ram 42 of BOP 41 is actuated to form an annular seal 43 against an outer surface of drill string 50 , substantially preventing testing fluid from a port 45 of string 50 from flowing upward into the upper section 35 a of annulus 35 .
- annular seals 49 c and 43 form middle section or closable annular chamber 35 b within marine riser 30 .
- pressure and temperature of fluid within annulus 35 and drill string 50 is continuously measured at different vertical depths along string 50 via nodes 51 a - 51 d etc.
- pressure and temperature of fluid within chamber 35 b is continuously measured via node 51 b while pressure and temperature in upper portion 35 a and lower portion 35 c are measured via nodes 51 d and 51 c , respectively.
- Measurements taken by sensors 57 at nodes 51 are continuously transmitted to computers 58 or 59 at rig 20 via wired pipe communication network 56 .
- fluid pressure within drillstring 50 and chamber 35 c of annulus 35 is increased to a predetermined testing pressure by displacing a volume of testing fluid 29 into chamber 35 c via port 45 .
- Testing fluid 29 is pumped using cement unit 27 into drill string 50 via fluid flowpath 29 a , which comprises mud pit 25 , cement unit 27 and passageway 50 a of string 50 .
- Testing fluid 29 within chamber 35 c is subsequently pressurized to approximately between 5,000-15,000 psi by cement unit 27 .
- testing fluid 29 is disposed within choke line 44 and kill line 46 , preventing fluid within chamber 35 c from flowing up lines 44 , 46 , via the weight of the fluid 29 disposed within lines 44 , 46 .
- pressure graph 500 illustrates pressure curve 510 as measured by and transmitted from node 51 b
- temperature graph 600 illustrates temperature curve 610 of additional testing fluid 29 pumped into FCS 40 as measured by and transmitted from node 51 b during the FCS 40 pressure test illustrated in FIG. 2
- pressure curve 510 comprises a pumping phase 512 , a shut-in phase 514 having a beginning 514 a and an end 514 , and a depressurization phase 516 .
- testing fluid 29 is pumped into drillstring 50 via cement unit 27 , which in turn displaces a volume of fluid into chamber 35 b , pressurizing the chamber 35 b to the predetermined testing pressure.
- the beginning 514 a of shut-in phase 514 initiates with the cessation of pumping from cement unit 27 , stopping the flow of testing fluid 29 into drillstring 50 at rig 20 .
- ram 42 must successfully hold the FCS test pressure for a specified period of time. In one example, ram 42 must hold 15,000 psi for a period of five minutes.
- Friction from pumping results in an increase in temperature of the additional testing fluid 29 pumped into FCS 40 and string 50 from mud pit 25 .
- heat generated within the pumped-in testing fluid 29 begins to transfer out into fluid occupying riser 30 and/or the ambient seawater 13 surrounding riser 30 .
- fluid pressure within chamber 35 b steadily decreases in response to the decreasing temperature of fluid within FCS 40 , especially with regard to the additional testing fluid 29 pumped into FCS 40 from mud pit 25 .
- temperature curve 610 illustrates the transfer of heat from the pumped-in testing fluid 29 into fluid within riser 30 and/or ambient sea water 13 surrounding riser 30 .
- fluid 29 decreases in temperature (as measured near the water line 12 by node 51 d )
- it decreases in volume due to PVT effects, resulting in a corresponding decrease in pressure over time of fluid within chamber 35 b (as measured by node 51 b ).
- the pressure loss within chamber 35 b due to the drop in temperature (dP T ) of the pumped-in testing fluid 29 may be calculated in real time and subtracted from the total pressure drop (dP) to arrive at a pressure drop due to a change in volume of FCS 40 (i.e., pressure drop caused by a leak within chamber 35 c ) (dP V ) over a given period of time.
- the dP T of testing fluid 29 within chamber 35 b may be calculated given the volumetric coefficient of thermal expansion ( ⁇ f ) and the compressibility factor ( ⁇ ) of the testing fluid 29 (e.g., SOBM, completion fluid, etc.).
- the dP V of fluid within chamber 35 c is calculated in real time.
- the dP V should remain substantially stable during the shut-in phase of the BOP test, with five minutes of stable dP V satisfying the conditions of the BOP test.
- the real time dP V of fluid within chamber 35 b allows for a relatively timelier BOP pressure test because the test conductor (e.g., drilling operator at rig 20 ) will not have to wait on the dP of fluid within testing fluid system 21 , which must follow stabilization of the temperature of fluid within FCS 40 (especially the additional pumped-in testing fluid).
- shut-in phase 514 may have a relatively shorter duration than the shut-in phases shown in FIG. 1 , as the requirement of holding the BOP test pressure (e.g., 15,000 psi) within chamber 35 b for a specified amount of time (e.g., five minutes) will be satisfied more quickly due to the stability of calculated dP V versus measured dP, allowing for a faster BOP pressure test.
- BOP test pressure e.g., 15,000 psi
- a specified amount of time e.g., five minutes
- temperature data from node 51 d is relied upon in determining dP T
- temperature data may be measured and transmitted from a plurality of nodes spanning the length of drill string 50 between test plug 49 and rig 20 , allowing for the computation of the overall dP T for all of the testing fluid 29 within string 50 , flowpath 29 a and chamber 35 b of FCS 40 .
- a leak will occur within chamber 35 b , possibly at seal 43 provided by ram 42 or at seal 49 c provided by BOP testing tool 49 .
- a leak may be determined by a drilling operator at rig 20 in real time via the dP V of fluid within chamber 35 b during shut-in phase 514 , which may be calculated from the measured pressure curve 510 and temperature curve 610 of the fluid. For instance, if the dP V steadily decreases during shut-in phase 514 , then a leak has occurred within chamber 35 b , regardless of any temperature changes in the fluid within chamber 35 b .
- seal 43 is allowing fluid within chamber 35 b to pass into upper portion 35 a of annulus 35 , then BOP 41 has failed the BOP pressure test and a new ram 42 , annular BOP or BOP 41 may need to be installed before the drilling operation may be continued.
- a faulty seal 49 c is responsible for the fluctuation of the dP V of fluid within chamber 35 b , then a new BOP testing tool 49 may be installed and a new BOP pressure test conducted, without yet having to replace ram 42 or BOP 41 .
- continuous pressure and temperature measurements of fluid within lower portion 35 c of annulus 35 may be taken at node 51 c to calculate a real time dP V of fluid within lower portion 35 c .
- a real time dP V of fluid within upper portion 35 a of annulus 35 may be calculated using real time temperature and pressure measurements of the fluid via node 51 a .
- FCS 40 may be pressure tested in a similar manner.
- other individual rams of BOP 41 may be actuated to create an annular seal within annulus 35 , forming a cavity defined by the ram's annular seal and the seal 49 a produced by BOP testing plug 49 .
- lower valves 44 a , 46 a , manifolds 44 b , 46 b , and upper valves 44 c , 46 c , of choke line 44 and kill line 46 may be pressure tested by placing nodes (e.g., nodes similar to nodes 51 ) within choke line 44 or kill line 46 in order to continuously measure and transmit pressure and temperature readings from lines 44 , 46 .
- nodes e.g., nodes similar to nodes 51
- high density testing fluid 29 is pumped into drillstring 50 via cement unit 27 .
- Ram 42 of BOP 41 may be actuated to create annular seal 43 .
- a component of lines 44 , 46 may be sealed (e.g., lower valve 44 a ).
- the sealed component e.g., valve 44 a
- the sealed component may be pressure tested to see if it holds the BOP test pressure for a requisite period of time (e.g., five minutes).
Landscapes
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Geophysics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Examining Or Testing Airtightness (AREA)
Abstract
A method for pressure testing a well system includes: pressurizing testing fluid within a closeable chamber of a well system; determining a leak within the closeable chamber using real time pressure and temperature measurements of the volume of testing fluid within the closeable chamber; and determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid that is disposed adjacent to the closeable chamber.
Description
- Not applicable.
- Not applicable.
- 1. Field of the Disclosure
- The disclosure relates generally to systems and methods for conducting a pressure test of wellbore service equipment. More particularly, the disclosure relates to systems and methods for reliably and effectively troubleshooting a failed pressure test of wellbore fluid containment system (FCS) equipment, such as blowout preventers (BOPs), choke and kill lines, wellhead hangers, casing, liner and liner hangers, tubing hangers, completions and other equipment.
- 2. Background of the Technology
- In drilling for oil and gas from a hydrocarbon producing well, a well or well system is provided that includes a drilling rig with a riser section and a drill string used to convey drilling fluid down the drill string and through a wellhead to a drill bit disposed within a wellbore of a formation. The fluid recirculates from the drill bit back to the drilling rig via an annulus formed between the drill string and walls of the wellbore, and via the annulus formed between the drill string and the riser section that encircles it. A wellbore or formation fluid influx, also called a “kick”, can cause an unstable and unsafe condition at the drilling rig. When a kick is detected, a FCS of the well system may be actuated and steps may be taken to “kill” the well and regain control. The FCS includes all critical sealing points, including the BOP itself and each of its individual rams, the choke manifold and kill manifolds, an internal blowout preventer (IBOP), as well as other components.
- Due to the criticality of the functional operation of the FCS with regard to containing and managing fluid pressurizations within the drilling or well system, periodic testing of the FCS is required. As part of the FCS testing procedure, a FCS testing plug may be landed against a sealing surface within the FCS, followed by subsequent pressurization of the FCS. Per current federal regulations, pressure testing of the FCS must be conducted upon installation and before 14 days have elapsed since the last BOP pressure test. Low and high pressure tests must be conducted for each individual component, and each component must demonstrate that it holds a reasonably stable pressure. For instance, in practice a pressure decay rate of 4 pounds per square inch (psi) per minute or less is seen as reasonably stable.
- Even though components of a FCS need only demonstrate pressure holding capability for five minutes to pass a presently-required pressure test, conducting the individual tests often take much longer due to PVT effects that take place due to the pressurizing of the test fluid. Specifically, friction generated by the action of pumping a fluid (e.g., via a reciprocating pump) increases the temperature as the fluid is pressurized. Referring to
FIG. 1 ,graph 100 illustrates fluid pressures in relation to time at different positions along a vertically-oriented subsea drill string during a high pressure test.Pressure curve 110 illustrates the fluid pressure at a point within the drill string near the sea floor, with 120, 130 and 140 illustrating fluid pressure at progressively shallower points along the drill string, withcurves curve 140 illustrating fluid pressure at the shallowest point, near the surface. Due to being located at different vertical depths along the drill string,curve 110 is at the highest pressure, whilecurve 140 is at the lowest pressure of the curves. - As shown in
FIG. 1 , the high pressure test can be divided into three phases: a pumping phase (112, 122, 132 and 142), a shut-in phase (114, 124, 134 and 144) and a depressurization phase (116, 126, 136 and 146). The pumping phase takes places when testing fluid is pumped into the well system in order to pressurize the FCS. Testing fluid may be pumped into the drill string by a cement unit or mud pump disposed at the drilling rig of the well system. Once the FCS of the well system has been pressurized to the appropriate testing pressure, pumping ceases and the well system is shut-in, such that a portion of the well system containing the system components to be tested is isolated from the outside environment. Shut-in 114, 124, 134 and 144 have a beginning (114 a, 124 a, 134 a and 144 a) and an ending (114 b, 124 b, 134 b and 144 b). As shown byphases FIG. 1 , the pressure at the 114 a, 124 a, 134 a and 144 a exceeds the pressure at thebeginning 114 b, 124 b, 134 b and 144 b of the shut-in phase. Also, in this pressure test, each shut-in phase includes a pressurization point (114 c, 124 c, 134 c and 144 c) where additional testing fluid is pumped into the well system to slightly increase fluid pressure within the FCS, known in the field as “bumping up the pressure.” This additional fluid may be pumped in at the pressurization point during the shut-in phase in order to return the fluid pressure within the FCS to the appropriate test pressure, a level similar to that existing near the beginning of the tests, atend 114 a, 124 a, 134 a and 144 a.points - The pressure decay occurring during the shut-in phases (e.g., 114, 124, 134 and 144) for each pressure curve (e.g., 110, 120, 130 and 140) is due to heat transfer from pressurized fluid within the FCS to fluid in the surrounding environment. As will be discussed in greater detail herein, heat transfer is greater for testing fluid near the surface, as opposed to testing fluid within the FCS that is disposed farther downhole. The greater amount of heat transfer near the surface is due to friction generated during the process of pumping the testing fluid into the well system (e.g., via a cement unit or mud pump) for the purpose of pressurizing testing fluid within the FCS. This heat transfer leads to a greater relative difference in temperature between the testing fluid disposed within the marine riser and ambient water surrounding the drill string at that same vertical depth, resulting in a relatively large amount of heat transfer from the testing fluid disposed near the surface and the ambient water surrounding the drill string at that depth The total or aggregate pressure decay within the FCS, when there is no fluid leak between the FCS and the surrounding environment, corresponds with the total or net heat transfer out of the fluid disposed within the FCS to the surrounding environment.
- During the performance of the FCS low pressure and high pressure test, an analog, low resolution circular chart surface recorder may be used by drilling personnel on the drilling rig to observe a continuous pressure reading of the FCS. Even in cases where the tested FCS component is not leaking, the pressure test may often last over half an hour or longer before the pressure within the FCS begins to stabilize enough such that a continuous five minute period of successful pressure stabilization may be recorded. Further, due to pressure decay caused by PVT effects (e.g., pumping effects) and the low resolution of the analog chart recorder, FCS pressure tests are sometimes judged as successful before full stabilization (e.g., decay of 4 psi/min or less), thus allowing for the risk that remaining pressure decay may be due to a leak within the FCS, in addition to PVT effects. In practice, this phenomenon is especially impactful at higher testing pressures, as are required in deeper, hot wells and where oil based mud (OBM) or synthetic oil Accordingly, there remains a need in the art for systems and methods that allow for quick and effective pressure testing of well system equipment, such as a FCS. Further, it would be advantageous if such systems and methods would mitigate the PVT effects that take place during a pressure test of well system equipment. Still further, it would be advantageous to provide a system that includes a means providing a continuous pressure signal with a relatively high resolution.
- 1. In an embodiment, a method for pressure testing a well system comprises pressurizing a volume of testing fluid within a closeable chamber of a well system, determining a leak within the closeable chamber using real time pressure and temperature measurements of the volume of testing fluid within the closeable chamber and determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to the closeable chamber. In some embodiments, determining a leak within the closeable chamber comprises determining the change in fluid pressure within the closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber. In some embodiments, determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises subtracting the change in fluid pressure within the closeable chamber due to a change in temperature of the volume of testing fluid within the closeable chamber from the total change in fluid pressure within the closeable chamber. In some embodiments, pressurizing fluid within a closeable chamber of a well system comprises flowing fluid into the closeable chamber. In some embodiments, determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the closeable chamber.
- In other embodiments, determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises measuring in real time a change in fluid temperature within the closeable chamber using a sensor disposed within the closeable chamber. In some embodiments, determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to the closeable chamber comprises disposing a sensor within the volume of fluid disposed adjacent to the closeable chamber. In some embodiments, determining the pathway of the leak comprises detecting a fluid pressure increase in real time within the volume of fluid disposed adjacent to the closeable chamber. In some embodiments, detecting a pressure increase within the volume of fluid disposed adjacent to the closeable chamber comprises determining the change in fluid pressure within the volume due to a change in volume of the volume of fluid disposed adjacent to the closeable chamber. In some embodiments, determining a leak within the closeable chamber using real time pressure and temperature measurements comprises transmitting the pressure and temperature measurements of the volume of testing fluid to a computer of the well system. In some embodiments, the closeable chamber is formed using a blowout preventer and a testing plug. In some embodiments, the pathway of the leak comprises a sealing surface of the blowout preventer. In some embodiments, the pathway of the leak comprises a sealing surface of the testing plug. In some embodiments, the closeable chamber comprises a component of a fluid containment system.
- In an embodiment, a method for pressure testing a blowout preventer comprises pressurizing a volume of testing fluid within the blowout preventer, determining a leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system and determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to blowout preventer. In some embodiments, pressurizing the volume of testing fluid within the blowout preventer comprises actuating a ram of the blowout preventer. In some embodiments, pressurizing the volume of testing fluid within the blowout preventer comprises actuating an annular of the blowout preventer. In some embodiments, determining the leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system comprises determining a leak across a ram of the blowout preventer. In some embodiments, determining the leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system comprises determining a leak across an annular of the blowout preventer.
- Embodiments described herein comprise a combination of features and characteristics intended to address various shortcomings associated with certain prior devices, systems, and methods. The various features and characteristics described above, as well as others, will be readily apparent to those skilled in the art upon reading the following detailed description, and by referring to the accompanying drawings.
- For a detailed description of the exemplary embodiments of the invention disclosed herein, reference will now be made to the accompanying drawings in which:
-
FIG. 1 is a graph illustrating pressure curves generated during a pressure test of a well system; -
FIG. 2 is a schematic view of an embodiment of a well system configured to conduct a fluid containment system pressure test in accordance with principles described herein; -
FIGS. 3A-3D are perspective views, some in cross-section, showing components of the wired pipe communication network shown inFIG. 3 ; -
FIG. 4A is a graph illustrating a pressure curve generated during a pressure test of the well system shown inFIG. 3 ; and -
FIG. 4B is a graph illustrating a temperature curve generated a pressure test of the well system shown inFIG. 3 . - The following discussion is directed to various exemplary embodiments. However, one skilled in the art will understand that the examples disclosed herein have broad application, and that the discussion of any embodiment is meant only to be exemplary of that embodiment, and not intended to suggest that the scope of the disclosure, including the claims, is limited to that embodiment. The drawing figures are not necessarily to scale. Certain features and components herein may be shown exaggerated in scale or in somewhat schematic form and some details of conventional elements may not be shown in interest of clarity and conciseness.
- In the following discussion and in the claims, the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to . . . ” Also, the term “couple” or “couples” is intended to mean either an indirect or direct connection. Thus, if a first device couples to a second device, that connection may be through a direct connection, or through an indirect connection via other devices, components, and connections. In addition, as used herein, the terms “axial” and “axially” generally mean along or parallel to a given axis (e.g., given axis of a body or a port), while the terms “radial” and “radially” generally mean perpendicular to the given axis. For instance, an axial distance refers to a distance measured along or parallel to the given axis, and a radial distance means a distance measured perpendicular to the given axis. Still further, as used herein, the phrase “communication coupler” refers to a device or structure that communicates a signal across the respective ends of two adjacent tubular members, such as the threaded box/pin ends of adjacent pipe joints; and the phrase “wired drill pipe” or “WDP” refers to one or more tubular members, including drill pipe, drill collars, casing, tubing, subs, and other conduits, that are configured for use in a drill string and include a wired link. As used herein, the phrase “wired link” refers to a pathway that is at least partially wired along or through a WDP joint for conducting signals, and “communication link” refers to a plurality of communicatively-connected tubular members, such as interconnected WDP joints for conducting signals over a distance.
- A system and method for pressure testing components of a well system is disclosed herein. Embodiments described herein may be employed in various drilling and production applications; however, it has particular application as a system and method for mitigating PVT effects during the pressure testing of pressure containing components of a well system, such as a fluid containment system (FCS). Further, it has particular application with regard to offshore well drilling and production systems.
- Referring now to
FIG. 2 , an offshorewell drilling system 10 generally includes an offshoresemi-submersible drilling rig 20 disposed at thewater line 12 with aderrick 24 anddeck 22 having a testing fluid system (TFS) 21 disposed thereon.System 10 further includes ariser 30 that extends between therig 20 and a wellhead 60 disposed at thesea floor 14, aFCS 40, adrill string 50 disposed within amarine riser 30 and having acentral axis 55 andinternal passageway 50 a. . . Wellsystem 10 further includescasing 70 that extends downward from awellhead spool 61 of wellhead 60 and is secured in place viacement 72. -
TFS 21 is disposed atrig floor 22 and comprises amud pit 25, acement unit 27 and afluid conduit 28.Conduit 28 provides afluid flowpath 29 for the passage of testing fluid 29 a frommud pit 25, throughcement unit 27, and to thepassageway 50 a ofdrill string 50.Cement unit 27 comprises a high pressure, reciprocating triplex pump. However, in otherembodiments cement unit 27 may comprise other components configured to pressurize a fluid. Testingfluid 29 comprises a drilling fluid that may be at a high density or high weight (e.g., drilling fluid, SOBM, completion fluid, etc.) relative to theambient water 13 disposed belowwater line 12. For instance, fluid 29 typically has a high enough density to overcome the pressure of fluid within theadjacent formation 16. Alternatively, testing fluid may also comprise a relatively lower density fluid, such as water or base oil. - An
annulus 35 is formed betweendrill string 50 andriser 30 and allows for the recirculation of drilling fluid betweenrig 20 and awellbore 62 that extends intosubterranean formation 16 from thesea floor 14.FCS 40 generally includes components configured to retain and manage fluid pressure within well system 10 (e.g.,drill string 50,FCS 40,annulus 35, wellbore 62, etc.) by acting as a closeable chamber isolating or sealing fluid disposed withinwell system 10 and the surrounding environment. In the embodiment ofwell system 10,FCS 40 includesBOP 41,choke line 44, killline 46 and an internal blowout preventer (IBOP) 48, wellhead 60, wellbore 62, casing 70 as well as other components.BOP 41 includes annular 41 a and rams 42, each configured to create an annular seal aboutdrill string 50. For instance, rams 42 ofBOP 41 are configured to provide anannular seal 43 aboutdrill string 50 upon actuation, dividingannulus 35 into a first orupper section 35 a extending betweenrig 20 andseal 43 and a second ormiddle section 35 b extending fromseal 43 downward to a FCS testing plug 49 coupled todrill string 50. - A third or
lower section 35 c extends from wellhead 60 into thewellbore 62.Testing plug 49 is configured to prevent fluid flow betweenmiddle portion 35 b ofannulus 35 and alower portion 35 c extending intowellbore 62. Testing plug 49 forms anannular seal 49 c against anannular surface 61 a of awellhead spool 61 disposed within wellhead 60.Testing plug 49 is coupled to an end of two adjacenttubular joints 52 extending betweenadjacent nodes 51 and physically engages upperannular surface 61 a ofwellhead spool 61 via lowerannular surface 49 a. A radial port or opening 45 is provided in thedrillstring 50 to act as a route of fluid communication betweendrillstring 50 and theannulus 35 abovetesting plug 49. During drilling, a pressure spike or kick of fluid from theformation 16 that has a relatively higher pressure than drilling fluid disposed withinwellbore 62 may flow intowellbore 62 and travel upward throughlower section 35 c of annulus 35 (testing plug 49 is not installed inwell system 10 during the act of drilling). The formation kick may be trapped or isolated belowupper section 35 a ofannulus 35 via actuating one ormore rams 42 ofBOP 41 to provide theannular seal 43. Chokeline 44 and killline 46 may be used to provide for alternate routes of fluid communication betweenrig 20 andannulus 35 such that the testing fluid (e.g., water, drilling mud, etc.) is pumped intoFCS 40 to prevent further upward flow of fluid fromformation 16. - During a formation kick, an influx of fluid from the formation may be circulated upward through
choke line 44 to therig 20, in an effort to regain control and stabilize the flow of formation fluid intoannulus 35 such that fluid pressure withinFCS 40 may stabilize. Chokeline 44 generally includes alower valve 44 a, a manifold 44 b and anupper valve 44 c. Fluid flow throughchoke line 44 may be restricted by closinglower valve 44 a orupper valve 44 c. Further, chokemanifold 44 b includes a plurality of valves, chokes and other equipment, and as such is configured to manage and regulate flow throughchoke line 44. Because successful control of a formation kick may depend on the effective operation ofchoke line 44 and its components, 44 a, 44 c and manifold 44 b are individually pressure tested during the pressure testing ofvalves FCS 40. Killline 46 is also used to manage a formation kick by allowing for circulation betweenannulus 35 andrig 20. For instance, killline 46 is used as a route of fluid communication to pump high density drilling mud or other fluid downward fromrig 20 to theannulus 35 to forcibly maintain the fluid from the formation kick or influx within thewellbore 62. Thus, a kill line such askill line 46 may be used to “kill” the well by reversing, stopping or at least substantially restricting the flow of fluid from the formation into thewellbore 62 by pumping heavy fluid into the entire fluid circulation system (e.g.,annulus 35,choke line 44, killline 46, etc.) from therig 20. Killline 46 comprises alower valve 46 a, akill manifold 46 b and anupper valve 46 c. As withchoke line 44, flow throughkill line 46 may be substantially restricted or controlled via 46 a, 46 c and manifold 46 b. Thus, during pressure testing ofvalves FCS 40, 46 a, 46 c and manifold 46 b are pressure tested as well.valves - Another component of
FCS 40,IBOP 48, is disposed at an upper end 50 b ofdrill string 50 at therig 20 and is configured to manage fluid pressure withindrill string 50. For instance, during a formation kick, high pressure formation fluid may begin flowing upward throughstring 50 via an opening or port of thestring 50 disposed within wellbore 62 (e.g., at the drill bit). For instance,IBOP 48 includes a valve that allows for the passage of fluid intostring 50 but may be closed to restrict fluid from flowing out ofstring 50 throughIBOP 48 in the event of a formation kick. Thus, becauseIBOP 48 may be used in effectively controlling a formation kick,IBOP 48 is pressure tested during the pressure testing ofFCS 40. - Referring now to FIGS. 2 and 3A-3D,
drill string 50 comprises a plurality of nodes 51 (e.g., 51 a-51 d, etc.) coupled between the plurality oftubular joints 52. Wired or networked drill pipe incorporating distributed sensors can transmit data from anywhere along thedrill string 50 to therig 20 for analysis.Nodes 51 are provided at desired intervals along thedrill string 50.Network nodes 51 essentially function as signal repeaters to regenerate and/or boost data signals and mitigate signal attenuation as data is transmitted up and down the drill string. Thenodes 51 may also include measurement assemblies. Thenodes 51 may be integrated into an existing section of drill string or a downhole tool along thedrill string 50. For purposes of this disclosure, the term “sensors” is understood to comprise sources (to emit/transmit energy/signals), receivers (to receive/detect energy/signals), and transducers (to operate as either source/receiver). Tubular joints 52 include afirst pipe end 53 having, for example, afirst induction coil 53 a and asecond pipe end 54 having, for example, asecond induction coil 54 a. -
Nodes 51 comprise a portion of a wiredpipe communication network 56 that provides an electromagnetic signal path that is used to transmit information along thedrill string 50. Thecommunication network 56, or broadband network telemetry, may thus includemultiple nodes 51 based along thedrill string 50. Communication links orwired conductors 52 a may be used to connect thenodes 51 to one another, and may comprise cables or other transmission media integrated directly into sections of thedrill string 50. The cable may be routed through the central borehole of thedrill string 50, or routed externally to thedrill string 50, or mounted within a groove, slot or passageway in thedrill string 50. Signals from the plurality of sensors ofnodes 51 along thedrill string 50 are transmitted to rig 20 throughwire conductors 52 a along thedrill string 50. Communication links 52 a between thenodes 51 may also use wireless connections. A plurality of packets may be used to transmit information along thenodes 51. Further detail with respect to suitable nodes, a network, and data packets are disclosed in U.S. Pat. No. 7,207,396 (Hall et al., 2007), hereby incorporated in its entirety by reference. Various types ofsensors 57 may be employed along thedrill string 50 in various embodiments, including without limitation, axially spaced pressure sensors, temperature sensors, and others. Thesensors 57 may be disposed on thenodes 51 positioned along the drill string, disposed on tools incorporated into the drill string, or a combination thereof.Sensors 57 ofnodes 51 may measure properties of fluid disposed withinstring 50 or withinannulus 35 orwellbore 62. Thus,sensors 57 of nodes 51 (e.g.,nodes 51 a-51 d) may measure temperature, pressure, etc., of fluid withinstring 50 orannulus 35 ofwell system 10. -
Network nodes 51 are disposed along thedrill string 50 betweenjoints 52. In some embodiments, the booster assemblies are spaced at 1,500 ft. (500 m) intervals to boost the data signal as it travels the length of thedrill string 50 to prevent signal degradation.Network nodes 51 are also located at these intervals to allow measurements to be taken along the length of thedrill string 50. The distributednetwork nodes 51 provide measurements that give the driller additional insight into what is happening along the potentially miles-long stretch of thedrill string 50. -
Rig 20 includes a well site computer 58 that may display information for the drilling operator. The wiredpipe communication network 56 transmits information from each of a plurality ofsensors 57 to a surface computer 58. Information may also be transmitted from computer 58 to another computer 59, located at a site remote from the well, with this computer 59 allowing an individual in the office remote from the well to review the data output by thesensors 57. Although only afew sensors 57 are shown in the figures, those skilled in the art will understand that a larger number of sensors may be disposed along a drill string (e.g., drill string 50) when drilling, and that all sensors associated with any particular node may be housed within or annexed to thenode 51, so that a variety of sensors rather than a single sensor will be associated with that particular node. - Due to the risk of losing control of well system 10 (i.e., the uncontrolled flow of formation fluids into well system 10) caused by an uncontrolled wellbore influx of fluid from the formation, it is important to detect the influx as soon as possible. In some circumstances, a BOP (e.g., BOP 41) of the FCS (e.g., FCS 40) is actuated to close off the well above the wellbore influx. In some cases, for example in deepwater wells, the wellbore influx may migrate above the BOP before a ram of the BOP fully closes to seal off the wellbore. In the embodiments disclosed herein, the wired
pipe communication network 56 allows wellsite personnel to identify potential remedial actions for the migrated wellbore influx. In some embodiments, the measurements used are independent from surface measurements. - One or more embodiments of a
well drilling system 10 comprising afluid containment system 40 and atesting fluid system 21 having been disclosed, one or more embodiments of a method of pressure testing components of theFCS 40 are also disclosed herein. Further, one or more embodiments of a method for evaluating or troubleshooting the results of a failed pressure test of components ofFCS 40 are disclosed herein. In an embodiment, a FCS pressure testing method generally includes the steps of engaging a testing plug of the FCS against a sealing surface within the FCS (e.g., a wellhead spool), disposing a quantity of testing fluid (e.g., drilling fluid, etc.) within the FCS, isolating a component of the FCS (e.g., actuating a ram or annular of the BOP, closing a valve of the choke line, etc.), displacing an additional quantity of testing fluid into the FCS to increase the fluid pressure within the FCS to a predetermined testing pressure, shut-in the FCS by ceasing the displacement of testing fluid into the FCS, continuously in real-time monitor fluid pressure within the FCS via an wired pipe communication network for a period of time. - In the event that the FCS is unable to hold a relatively stable fluid pressure for a predetermined period of time (e.g., five minutes), the failed pressure test may be evaluated by continuously monitoring fluid pressure during the shut-in phase within cavities adjacent to the FCS component being tested. Following this, the particular leak path resulting in the failed FCS pressure test may be determined by determining which adjacent cavity of the FCS increased in fluid pressure during the course of the shut-in phase of the pressure test. By determining the particular leak path, it may be further determined whether the particular FCS component being tested (e.g., a ram of the BOP) was at least partially responsible for the leak or whether another component was responsible for the leak path (e.g., the FCS testing plug). Optionally, following the methods of FCS pressure testing and evaluation, the particular components of the well system responsible for the leak path may be replaced and the pressure test may be conducted again in an effort to achieve a successful pressure test of the particular FCS component.
- In an embodiment, ram 42 of
BOP 41 may be pressure tested as part of the regime for pressure testing each individual component ofFCS 40. In this embodiment, testing plug 49 is coupled todrill string 50 and displaced downward throughmarine riser 30 untilannular surface 49 a oftool 49 engagesannular surface 61 a ofwellhead spool 61 to createannular seal 49 c, which dividesannulus 35 intoupper section 35 a andlower section 35 c. Before, during or after sealing engagement has been achieved betweentool 49 andspool 61, high density testing fluid 29 (e.g., drilling fluid, SOBM, competition fluid, etc.) is disposed withindrill string 50 andriser 30 at a relatively low pressure usingcement unit 27 and flowpath 29 a. Also, prior to commencement of the pressure testing ofFCS 40, ram 42 ofBOP 41 is actuated to form anannular seal 43 against an outer surface ofdrill string 50, substantially preventing testing fluid from aport 45 ofstring 50 from flowing upward into theupper section 35 a ofannulus 35. Thus, 49 c and 43 form middle section or closableannular seals annular chamber 35 b withinmarine riser 30. During the course of the pressure testing ofram 42, pressure and temperature of fluid withinannulus 35 anddrill string 50 is continuously measured at different vertical depths alongstring 50 vianodes 51 a-51 d etc. For instance, pressure and temperature of fluid withinchamber 35 b is continuously measured vianode 51 b while pressure and temperature inupper portion 35 a andlower portion 35 c are measured via 51 d and 51 c, respectively. Measurements taken bynodes sensors 57 at nodes 51 (e.g.,nodes 51 a-51 d) are continuously transmitted to computers 58 or 59 atrig 20 via wiredpipe communication network 56. - Following the engagement of
49 c and 43, fluid pressure withinannular seals drillstring 50 andchamber 35 c ofannulus 35 is increased to a predetermined testing pressure by displacing a volume of testingfluid 29 intochamber 35 c viaport 45. Testingfluid 29 is pumped usingcement unit 27 intodrill string 50 viafluid flowpath 29 a, which comprisesmud pit 25,cement unit 27 andpassageway 50 a ofstring 50. Testingfluid 29 withinchamber 35 c is subsequently pressurized to approximately between 5,000-15,000 psi bycement unit 27. During the process of pressurizing testing fluid withinchamber 35 c, testingfluid 29 is disposed withinchoke line 44 and killline 46, preventing fluid withinchamber 35 c from flowing up 44, 46, via the weight of the fluid 29 disposed withinlines 44, 46.lines - Referring now to
FIGS. 2 , 4A and 4B,pressure graph 500 illustratespressure curve 510 as measured by and transmitted fromnode 51 b, andtemperature graph 600 illustrates temperature curve 610 ofadditional testing fluid 29 pumped intoFCS 40 as measured by and transmitted fromnode 51 b during theFCS 40 pressure test illustrated inFIG. 2 . As shown inFIG. 2A ,pressure curve 510 comprises a pumping phase 512, a shut-inphase 514 having a beginning 514 a and anend 514, and adepressurization phase 516. During pumping phase 512, testingfluid 29 is pumped intodrillstring 50 viacement unit 27, which in turn displaces a volume of fluid intochamber 35 b, pressurizing thechamber 35 b to the predetermined testing pressure. Once pressure withinchamber 35 b has reached the FCS testing pressure, the beginning 514 a of shut-inphase 514 initiates with the cessation of pumping fromcement unit 27, stopping the flow of testingfluid 29 intodrillstring 50 atrig 20. As part of the BOP pressure test shown inFIG. 2 , ram 42 must successfully hold the FCS test pressure for a specified period of time. In one example, ram 42 must hold 15,000 psi for a period of five minutes. Friction from pumping results in an increase in temperature of theadditional testing fluid 29 pumped intoFCS 40 andstring 50 frommud pit 25. During shut-inphase 514, heat generated within the pumped-intesting fluid 29 begins to transfer out intofluid occupying riser 30 and/or theambient seawater 13 surroundingriser 30. Thus, at least partially due to the transfer of heat from testingfluid 29, fluid pressure withinchamber 35 b steadily decreases in response to the decreasing temperature of fluid withinFCS 40, especially with regard to theadditional testing fluid 29 pumped intoFCS 40 frommud pit 25. - As discussed previously, friction from pumping results in an increase in temperature of testing
fluid 29 pumped intoFCS 40. As shown inFIG. 4B , temperature curve 610 illustrates the transfer of heat from the pumped-intesting fluid 29 into fluid withinriser 30 and/orambient sea water 13 surroundingriser 30. Asfluid 29 decreases in temperature (as measured near thewater line 12 bynode 51 d), it in turn decreases in volume due to PVT effects, resulting in a corresponding decrease in pressure over time of fluid withinchamber 35 b (as measured bynode 51 b). The pressure loss withinchamber 35 b due to the drop in temperature (dPT) of the pumped-intesting fluid 29 may be calculated in real time and subtracted from the total pressure drop (dP) to arrive at a pressure drop due to a change in volume of FCS 40 (i.e., pressure drop caused by a leak withinchamber 35 c) (dPV) over a given period of time. The dPT of testingfluid 29 withinchamber 35 b may be calculated given the volumetric coefficient of thermal expansion (αf) and the compressibility factor (β) of the testing fluid 29 (e.g., SOBM, completion fluid, etc.). - Using the
pressure curve 510 and temperature curve 610 data measured by 51 b and 51 d, the dPV of fluid withinnodes chamber 35 c is calculated in real time. Thus, in the absence of a leak, the dPV should remain substantially stable during the shut-in phase of the BOP test, with five minutes of stable dPV satisfying the conditions of the BOP test. Thus, relying on the real time dPV of fluid withinchamber 35 b allows for a relatively timelier BOP pressure test because the test conductor (e.g., drilling operator at rig 20) will not have to wait on the dP of fluid withintesting fluid system 21, which must follow stabilization of the temperature of fluid within FCS 40 (especially the additional pumped-in testing fluid). Thus, shut-inphase 514 may have a relatively shorter duration than the shut-in phases shown inFIG. 1 , as the requirement of holding the BOP test pressure (e.g., 15,000 psi) withinchamber 35 b for a specified amount of time (e.g., five minutes) will be satisfied more quickly due to the stability of calculated dPV versus measured dP, allowing for a faster BOP pressure test. - Further, while in this example temperature data from
node 51 d is relied upon in determining dPT, in other embodiments temperature data may be measured and transmitted from a plurality of nodes spanning the length ofdrill string 50 betweentest plug 49 andrig 20, allowing for the computation of the overall dPT for all of thetesting fluid 29 withinstring 50, flowpath 29 a andchamber 35 b ofFCS 40. - In some cases, a leak will occur within
chamber 35 b, possibly atseal 43 provided byram 42 or atseal 49 c provided byBOP testing tool 49. A leak may be determined by a drilling operator atrig 20 in real time via the dPV of fluid withinchamber 35 b during shut-inphase 514, which may be calculated from the measuredpressure curve 510 and temperature curve 610 of the fluid. For instance, if the dPV steadily decreases during shut-inphase 514, then a leak has occurred withinchamber 35 b, regardless of any temperature changes in the fluid withinchamber 35 b. Ifseal 43 is allowing fluid withinchamber 35 b to pass intoupper portion 35 a ofannulus 35, thenBOP 41 has failed the BOP pressure test and anew ram 42, annular BOP orBOP 41 may need to be installed before the drilling operation may be continued. However, if afaulty seal 49 c is responsible for the fluctuation of the dPV of fluid withinchamber 35 b, then a newBOP testing tool 49 may be installed and a new BOP pressure test conducted, without yet having to replaceram 42 orBOP 41. For instance, continuous pressure and temperature measurements of fluid withinlower portion 35 c ofannulus 35 may be taken atnode 51 c to calculate a real time dPV of fluid withinlower portion 35 c. If the dPV of fluid withinlower portion 35 c increases during shut-inphase 514, then fluid withinpressurized chamber 35 b is leakingpast seal 49 c oftool 49 and intolower portion 35 c ofannulus 35. However, if the dPV of fluid withinlower portion 35 c remains stable during shut-inphase 514, then fluid is not leaking intolower portion 35 c, and the cause of the leak withinchamber 35 b must extend to a different portion of theFCS 40 and/orwell system 10. Also, a real time dPV of fluid withinupper portion 35 a ofannulus 35 may be calculated using real time temperature and pressure measurements of the fluid vianode 51 a. In this example, if the dPV of fluid withinupper portion 35 a increases during shut-inphase 514, then fluid is leaking intoupper portion 35 a via a leak withinseal 43 ofram 42, resulting in a failure byBOP 41 of the BOP pressure test. - Referring back to
FIG. 2 , in addition to ram 42 ofBOP 41, other components ofFCS 40 may be pressure tested in a similar manner. For instance, other individual rams ofBOP 41 may be actuated to create an annular seal withinannulus 35, forming a cavity defined by the ram's annular seal and theseal 49 a produced byBOP testing plug 49. Likewise, 44 a, 46 a, manifolds 44 b, 46 b, andlower valves 44 c, 46 c, ofupper valves choke line 44 and killline 46, respectively, may be pressure tested by placing nodes (e.g., nodes similar to nodes 51) withinchoke line 44 or killline 46 in order to continuously measure and transmit pressure and temperature readings from 44, 46. In order to test the components oflines choke line 44 and killline 46, highdensity testing fluid 29 is pumped intodrillstring 50 viacement unit 27.Ram 42 ofBOP 41 may be actuated to createannular seal 43. However, instead of allowing fluid communication betweenchoke line 44 and killline 46 withchamber 35 c b a component of 44, 46, may be sealed (e.g.,lines lower valve 44 a). In this embodiment, the sealed component (e.g.,valve 44 a) may be pressure tested to see if it holds the BOP test pressure for a requisite period of time (e.g., five minutes). - While embodiments have been shown and described, modifications thereof can be made by one skilled in the art without departing from the scope or teachings herein. The embodiments described herein are exemplary only and are not limiting. Many variations and modifications of the systems, apparatus, and processes described herein are possible and are within the scope of the invention. Accordingly, the scope of protection is not limited to the embodiments described herein, but is only limited by the claims that follow, the scope of which shall include all equivalents of the subject matter of the claims. Unless expressly stated otherwise, the steps in a method claim may be performed in any order. The recitation of identifiers such as (a), (b), (c) or (1), (2), (3) before steps in a method claim are not intended to and do not specify a particular order to the steps, but rather are used to simplify subsequent reference to such steps.
Claims (19)
1. A method for pressure testing a well system comprising:
pressurizing a volume of testing fluid within a closeable chamber of a well system;
determining a leak within the closeable chamber using real time pressure and temperature measurements of the volume of testing fluid within the closeable chamber; and
determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to the closeable chamber.
2. The method of claim 1 , wherein determining a leak within the closeable chamber comprises determining the change in fluid pressure within the closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber.
3. The method of claim 2 , wherein determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises subtracting the change in fluid pressure within the closeable chamber due to a change in temperature of the volume of testing fluid within the closeable chamber from the total change in fluid pressure within the closeable chamber.
4. The method of claim 1 , wherein pressurizing fluid within a closeable chamber of a well system comprises flowing fluid into the closeable chamber.
6. The method of claim 2 , wherein determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the closeable chamber.
7. The method of claim 2 , wherein determining the change in fluid pressure within closeable chamber due to a change in volume of the volume of testing fluid within the closeable chamber comprises measuring in real time a change in fluid temperature within the closeable chamber using a sensor disposed within the closeable chamber.
8. The method of claim 1 , wherein determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to the closeable chamber comprises disposing a sensor within the volume of fluid disposed adjacent to the closeable chamber.
8. The method of claim 1 , wherein determining the pathway of the leak comprises detecting a fluid pressure increase in real time within the volume of fluid disposed adjacent to the closeable chamber.
9. The method of claim 8 , wherein detecting a pressure increase within the volume of fluid disposed adjacent to the closeable chamber comprises determining the change in fluid pressure within the volume due to a change in volume of the volume of fluid disposed adjacent to the closeable chamber.
10. The method of claim 1 , wherein determining a leak within the closeable chamber using real time pressure and temperature measurements comprises transmitting the pressure and temperature measurements of the volume of testing fluid to a computer of the well system.
11. The method of claim 1 , wherein the closeable chamber is formed using a blowout preventer and a testing plug.
12. The method of claim 11 , wherein the pathway of the leak comprises a sealing surface of the blowout preventer.
13. The method of claim 11 , wherein the pathway of the leak comprises a sealing surface of the testing plug.
14. The method of claim 1 , wherein the closeable chamber comprises a component of a fluid containment system.
15. A method for pressure testing a blowout preventer comprising:
pressurizing a volume of testing fluid within the blowout preventer;
determining a leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system; and
determining the pathway of the leak using real time pressure and temperature measurements of a volume of fluid disposed adjacent to blowout preventer.
16. The method of claim 15 , wherein pressurizing the volume of testing fluid within the blowout preventer comprises actuating a ram of the blowout preventer.
17. The method of claim 15 , wherein pressurizing the volume of testing fluid within the blowout preventer comprises actuating an annular of the blowout preventer.
18. The method of claim 15 , wherein determining the leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system comprises determining a leak across a ram of the blowout preventer.
19. The method of claim 15 , wherein determining the leak within the blowout preventer using real time pressure and temperature measurements of fluid disposed within the well system comprises determining a leak across an annular of the blowout preventer.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/668,680 US20140123747A1 (en) | 2012-11-05 | 2012-11-05 | Systems and methods for conducting pressure tests on a wellbore fluid containment system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/668,680 US20140123747A1 (en) | 2012-11-05 | 2012-11-05 | Systems and methods for conducting pressure tests on a wellbore fluid containment system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20140123747A1 true US20140123747A1 (en) | 2014-05-08 |
Family
ID=50621122
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/668,680 Abandoned US20140123747A1 (en) | 2012-11-05 | 2012-11-05 | Systems and methods for conducting pressure tests on a wellbore fluid containment system |
Country Status (1)
| Country | Link |
|---|---|
| US (1) | US20140123747A1 (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130111985A1 (en) * | 2011-11-07 | 2013-05-09 | Intelliserv, Llc | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
| US20160091389A1 (en) * | 2014-09-30 | 2016-03-31 | Schlumberger Technology Corporation | Systems and Methods for Sample Characterization |
| US9470082B1 (en) * | 2015-05-05 | 2016-10-18 | Backoff, Llc | Blowout-preventer-stack one-trip test tool and method |
| WO2022026683A1 (en) * | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
| WO2022026727A1 (en) * | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
| CN114303001A (en) * | 2019-04-29 | 2022-04-08 | 贝克休斯油田运营有限责任公司 | Temperature-based leak detection for blowout preventers |
| US11821273B1 (en) * | 2022-07-28 | 2023-11-21 | Southwest Petroleum University | Experimental system and a method for wellbore pressure testing under the coexistence of gas-kick and loss-circulation |
Citations (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4030354A (en) * | 1976-02-27 | 1977-06-21 | Scott Kenneth F | Testing of ram and annular blowout preventers |
| US4090395A (en) * | 1977-03-28 | 1978-05-23 | Exxon Production Research Company | Casing seal and blowout preventer tester and test method |
| US4159637A (en) * | 1977-12-05 | 1979-07-03 | Baylor College Of Medicine | Hydraulic test tool and method |
| US4578987A (en) * | 1984-06-12 | 1986-04-01 | Mayo John H | Test and isolation tool |
| US4880061A (en) * | 1987-01-14 | 1989-11-14 | Cameron Iron Works Usa, Inc. | Tool for running structures in a well |
| US4986511A (en) * | 1989-12-14 | 1991-01-22 | Dresser Industries, Inc. | Seal structure for elevated temperature service |
| US6152225A (en) * | 1998-06-02 | 2000-11-28 | Young; Joe Alfred | Method and apparatus for multi-diameter testing of blowout preventer assemblies |
| US20050269079A1 (en) * | 2003-12-26 | 2005-12-08 | Franklin Charles M | Blowout preventer testing system |
| US7062960B2 (en) * | 2001-06-22 | 2006-06-20 | Cooper Cameron Corporation | Blow out preventer testing apparatus |
| US20080185143A1 (en) * | 2007-02-01 | 2008-08-07 | Bp Corporation North America Inc. | Blowout Preventer Testing System And Method |
| US20110046903A1 (en) * | 2009-08-18 | 2011-02-24 | Franklin Charles M | System And Method For Detecting Leaks |
| US20130111985A1 (en) * | 2011-11-07 | 2013-05-09 | Intelliserv, Llc | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
| US20140027113A1 (en) * | 2012-07-26 | 2014-01-30 | Intelliserv, Llc | Systems and methods for reducing pvt effects during pressure testing of a wellbore fluid containment system |
| US20140288858A1 (en) * | 2009-08-18 | 2014-09-25 | Innovative Pressure Testing, Llc | System and method for detecting leaks |
-
2012
- 2012-11-05 US US13/668,680 patent/US20140123747A1/en not_active Abandoned
Patent Citations (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4030354A (en) * | 1976-02-27 | 1977-06-21 | Scott Kenneth F | Testing of ram and annular blowout preventers |
| US4090395A (en) * | 1977-03-28 | 1978-05-23 | Exxon Production Research Company | Casing seal and blowout preventer tester and test method |
| US4159637A (en) * | 1977-12-05 | 1979-07-03 | Baylor College Of Medicine | Hydraulic test tool and method |
| US4578987A (en) * | 1984-06-12 | 1986-04-01 | Mayo John H | Test and isolation tool |
| US4880061A (en) * | 1987-01-14 | 1989-11-14 | Cameron Iron Works Usa, Inc. | Tool for running structures in a well |
| US4986511A (en) * | 1989-12-14 | 1991-01-22 | Dresser Industries, Inc. | Seal structure for elevated temperature service |
| US6152225A (en) * | 1998-06-02 | 2000-11-28 | Young; Joe Alfred | Method and apparatus for multi-diameter testing of blowout preventer assemblies |
| US6390194B1 (en) * | 1998-06-02 | 2002-05-21 | Joe Alfred Young | Method and apparatus for multi-diameter testing of blowout preventer assemblies |
| US7062960B2 (en) * | 2001-06-22 | 2006-06-20 | Cooper Cameron Corporation | Blow out preventer testing apparatus |
| US20050269079A1 (en) * | 2003-12-26 | 2005-12-08 | Franklin Charles M | Blowout preventer testing system |
| US7401654B2 (en) * | 2003-12-26 | 2008-07-22 | Bp Corporation North America Inc. | Blowout preventer testing system |
| US20080185143A1 (en) * | 2007-02-01 | 2008-08-07 | Bp Corporation North America Inc. | Blowout Preventer Testing System And Method |
| US7706980B2 (en) * | 2007-02-01 | 2010-04-27 | Bp Corporation North America Inc. | Blowout preventer testing system and method |
| US20110046903A1 (en) * | 2009-08-18 | 2011-02-24 | Franklin Charles M | System And Method For Detecting Leaks |
| US8380448B2 (en) * | 2009-08-18 | 2013-02-19 | Innovative Pressure Testing, Llc | System and method for detecting leaks |
| US8756022B2 (en) * | 2009-08-18 | 2014-06-17 | Innovative Pressure Testing, Llc | System and method for detecting leaks |
| US20140288858A1 (en) * | 2009-08-18 | 2014-09-25 | Innovative Pressure Testing, Llc | System and method for detecting leaks |
| US20130111985A1 (en) * | 2011-11-07 | 2013-05-09 | Intelliserv, Llc | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
| US20140027113A1 (en) * | 2012-07-26 | 2014-01-30 | Intelliserv, Llc | Systems and methods for reducing pvt effects during pressure testing of a wellbore fluid containment system |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20130111985A1 (en) * | 2011-11-07 | 2013-05-09 | Intelliserv, Llc | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
| US20160091389A1 (en) * | 2014-09-30 | 2016-03-31 | Schlumberger Technology Corporation | Systems and Methods for Sample Characterization |
| US10024755B2 (en) * | 2014-09-30 | 2018-07-17 | Schlumberger Technology Corporation | Systems and methods for sample characterization |
| US9470082B1 (en) * | 2015-05-05 | 2016-10-18 | Backoff, Llc | Blowout-preventer-stack one-trip test tool and method |
| CN114303001A (en) * | 2019-04-29 | 2022-04-08 | 贝克休斯油田运营有限责任公司 | Temperature-based leak detection for blowout preventers |
| WO2022026683A1 (en) * | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
| WO2022026727A1 (en) * | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
| EP4189212A4 (en) * | 2020-07-31 | 2023-12-20 | Services Pétroliers Schlumberger | HOLE PLUG ANALYSIS SYSTEM |
| EP4189213A4 (en) * | 2020-07-31 | 2023-12-27 | Services Pétroliers Schlumberger | DRILL PAD ANALYSIS SYSTEM |
| US12454885B2 (en) | 2020-07-31 | 2025-10-28 | Schlumberger Technology Corporation | Bore plug analysis system |
| US11821273B1 (en) * | 2022-07-28 | 2023-11-21 | Southwest Petroleum University | Experimental system and a method for wellbore pressure testing under the coexistence of gas-kick and loss-circulation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20130111985A1 (en) | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects | |
| US6192983B1 (en) | Coiled tubing strings and installation methods | |
| US7062960B2 (en) | Blow out preventer testing apparatus | |
| US20140123747A1 (en) | Systems and methods for conducting pressure tests on a wellbore fluid containment system | |
| US10329860B2 (en) | Managed pressure drilling system having well control mode | |
| US6513596B2 (en) | Non-intrusive pressure measurement device for subsea well casing annuli | |
| US6913083B2 (en) | Method and apparatus to monitor, control and log subsea oil and gas wells | |
| US8579504B2 (en) | Subsea and landing string distributed temperature sensor system | |
| US20140027113A1 (en) | Systems and methods for reducing pvt effects during pressure testing of a wellbore fluid containment system | |
| CA2922895C (en) | Use of downhole isolation valve to sense annulus pressure | |
| CN101586462A (en) | Method of suspending, completing and working over a well | |
| US20130087388A1 (en) | Wellbore influx detection with drill string distributed measurements | |
| US10081987B2 (en) | Systems and methods for killing a well | |
| US12454876B2 (en) | Methods and systems for a subsurface safety valve opening sleeve tool | |
| GB2337780A (en) | Surface assembled spoolable coiled tubing strings | |
| US10844676B2 (en) | Pipe ram annular adjustable restriction for managed pressure drilling with changeable rams | |
| US20140124197A1 (en) | Systems and methods for maneuvering downhole tools in a subsea well | |
| WO2023064396A1 (en) | Methods and tools for determining bleed-off pressure after well securement jobs | |
| Stalford et al. | Intelligent Casing-Intelligent Formation (ICIF) Design | |
| Carpenter | Detection of kicks with networked drillstring and along-string pressure evaluation | |
| Ashena | Barriers | |
| van der Linden et al. | Experiences with CML on the Troll Field, Norway: A Case History | |
| US10280740B2 (en) | Sandface liner with power, control and communication link via a tie back string |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: INTELLISERV, LLC, TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:VEENINGEN, DANIEL MARCO;REEL/FRAME:029343/0978 Effective date: 20121108 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |