US20130111985A1 - Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects - Google Patents
Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects Download PDFInfo
- Publication number
- US20130111985A1 US20130111985A1 US13/671,430 US201213671430A US2013111985A1 US 20130111985 A1 US20130111985 A1 US 20130111985A1 US 201213671430 A US201213671430 A US 201213671430A US 2013111985 A1 US2013111985 A1 US 2013111985A1
- Authority
- US
- United States
- Prior art keywords
- fluid
- pressure
- closeable chamber
- change
- real time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000012530 fluid Substances 0.000 title claims abstract description 227
- 238000012360 testing method Methods 0.000 title claims abstract description 142
- 238000000034 method Methods 0.000 title claims abstract description 70
- 230000000694 effects Effects 0.000 title description 10
- 238000001514 detection method Methods 0.000 title 1
- 238000011002 quantification Methods 0.000 title 1
- 230000008859 change Effects 0.000 claims abstract description 49
- 238000004891 communication Methods 0.000 claims description 37
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 17
- 238000007789 sealing Methods 0.000 claims description 11
- 238000009529 body temperature measurement Methods 0.000 claims description 6
- 238000009530 blood pressure measurement Methods 0.000 claims description 5
- 230000015572 biosynthetic process Effects 0.000 description 38
- 238000005553 drilling Methods 0.000 description 37
- 239000004568 cement Substances 0.000 description 22
- 238000005086 pumping Methods 0.000 description 12
- AKRYBBWYDSDZHG-UHFFFAOYSA-N nitrosobis(2-oxopropyl)amine Chemical compound CC(=O)CN(N=O)CC(C)=O AKRYBBWYDSDZHG-UHFFFAOYSA-N 0.000 description 11
- 230000004888 barrier function Effects 0.000 description 10
- 238000004519 manufacturing process Methods 0.000 description 10
- 230000004941 influx Effects 0.000 description 9
- 230000007423 decrease Effects 0.000 description 8
- 238000012546 transfer Methods 0.000 description 8
- 238000005259 measurement Methods 0.000 description 6
- 230000002706 hydrostatic effect Effects 0.000 description 5
- 239000013535 sea water Substances 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 230000002829 reductive effect Effects 0.000 description 4
- 238000004441 surface measurement Methods 0.000 description 4
- 239000002199 base oil Substances 0.000 description 3
- 239000004020 conductor Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000003921 oil Substances 0.000 description 3
- 230000000712 assembly Effects 0.000 description 2
- 238000000429 assembly Methods 0.000 description 2
- 230000006698 induction Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 238000012956 testing procedure Methods 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002060 fluorescence correlation spectroscopy Methods 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 230000002147 killing effect Effects 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000037361 pathway Effects 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000000246 remedial effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/06—Blow-out preventers, i.e. apparatus closing around a drill pipe, e.g. annular blow-out preventers
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
- E21B47/117—Detecting leaks, e.g. from tubing, by pressure testing
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
Definitions
- the disclosure relates generally to systems and methods for conducting a pressure test of well system equipment. More particularly, the disclosure relates to systems and methods for reliably and efficiently pressure testing wellbore fluid containment system (FCS) equipment, such as blowout preventers (BOPs), choke and kill lines, wellhead hangers, casing, liner and liner hangers, tubing hangers, completions, mechanical barriers such as packers, cement plugs and other equipment. Further, the disclosure relates to both high pressure testing and low pressure testing of FCS equipment.
- FCS wellbore fluid containment system
- a well or well system In drilling for oil and gas from an offshore hydrocarbon producing well, a well or well system is provided that includes a drilling rig with a riser section and a drill string used to convey drilling fluid down the drill string and through a wellhead to a drill bit disposed within a wellbore of a formation.
- a drilling rig with a riser section and a drill string used to convey drilling fluid down the drill string and through a wellhead to a drill bit disposed within a wellbore of a formation.
- the walls of the wellbore are sometimes encased via the installation of tubular casing strings in the wellbore. Cement may be displaced into the wellbore so as to secure the individual casing strings to the wall of the wellbore.
- Drilling fluid and circulation material i.e., cuttings from the formation
- Drilling fluid and circulation material i.e., cuttings from the formation
- Drilling fluid and circulation material recirculate from the drill bit back to the drilling rig via an annulus formed between the drill string and the cased wall of the wellbore, and via the annulus formed between the drill string and the riser section that encircles it.
- a FCS of the well system is configured to provide a fluid tight barrier between fluid within the well system (e.g., drilling fluid, circulation material, formation fluid, etc.) and the surrounding environment.
- the FCS includes all critical sealing points, including the BOP itself and each of its individual rams, the choke manifold and kill manifolds, an internal blowout preventer (IBOP), as well as other components.
- IBOP internal blowout preventer
- the FCS may be stressed in situations where a fluid pressure differential results between the well system and the surrounding environment. For instance, a wellbore or formation fluid influx, also called a “kick”, can cause an unstable and unsafe condition at the drilling rig.
- a FCS of the well system may be used to prevent formation fluid from breaching the well system by “chocking” or “killing” the well and regain control.
- the fluid pressure within the well system may rapidly decrease in the event of a low pressure kick, for instance, when a low pressure cavity within the formation is breached during drilling.
- Some of the seals and sealing points within the well system may be pressure assisted, and thus rely on the pressure of the fluid around it to help seal. Thus, these pressure assisted seals may be jeopardized in the event of a low pressure kick.
- the fluid pressure within the wellbore may decrease substantially as the hydrostatic head of the fluid within the marine riser (e.g., high density drilling fluid, etc.) is typically larger than the hydrostatic head by the seawater
- the FCS is subject to a variety of testing regimens. For instance, components of the FCS undergoes periodic positive testing that includes low pressure testing, which may be performed at approximately 350 pounds per square inch (psi) and high pressure testing which may be conducted at approximately 10,000-15,000 psi, to ensure the FCS is capable of withstanding a pressurization due to an uncontrolled influx of formation fluid or in the event of a low pressure kick that may jeopardize pressure assisted seals. Also, the FCS undergoes inflow or negative pressure testing to ensure the integrity of the casing and cement installed in the wellbore, the wellhead assembly, as well as other components of the FCS, prior to uninstalling the marine riser.
- periodic positive testing that includes low pressure testing, which may be performed at approximately 350 pounds per square inch (psi) and high pressure testing which may be conducted at approximately 10,000-15,000 psi, to ensure the FCS is capable of withstanding a pressurization due to an uncontrolled influx of formation fluid or in the event of a low pressure kick that may je
- FCS test plug may be landed against a sealing surface within the FCS, followed by subsequent pressurization of the FCS.
- pressure testing of the FCS must be conducted upon installation and before 14 days have elapsed since the last BOP pressure test. Low and high pressure tests must be conducted for each individual component, and each component must demonstrate that it holds a reasonably stable pressure. For instance, in practice a pressure decay rate of 4 pounds per square inch (psi) per minute or less is seen as reasonably stable.
- graph 100 illustrates fluid pressures in relation to time at different positions along a vertically-oriented subsea drill string during a high pressure test.
- Pressure curve 110 illustrates the fluid pressure at a point within the drill string near the sea floor, with curves 120 , 130 and 140 illustrating fluid pressure at progressively shallower points along the drill string, with curve 140 illustrating fluid pressure at the shallowest point, near the surface. Due to being located at different vertical depths along the drill string, curve 110 is at the highest pressure, while curve 140 is at the lowest pressure of the curves.
- the high pressure test can be divided into three phases: a pumping phase ( 112 , 122 , 132 and 142 ), a shut-in phase ( 114 , 124 , 134 and 144 ) and a depressurization phase ( 116 , 126 , 136 and 146 ).
- the pumping phase takes places when testing fluid is pumped into the well system in order to pressurize the FCS.
- Testing fluid may be pumped into the drill string by a cement unit or mud pump disposed at the drilling rig of the well system.
- shut-in phases 114 , 124 , 134 and 144 have a beginning ( 114 a, 124 a, 134 a and 144 a ) and an ending ( 114 b, 124 b, 134 b and 144 b ).
- the pressure at the beginning 114 a, 124 a, 134 a and 144 a exceeds the pressure at the end 114 b , 124 b , 134 b and 144 b of the shut-in phase.
- each shut-in phase includes a pressurization point ( 114 c, 124 c, 134 c and 144 c ) where additional testing fluid is pumped into the well system to slightly increase fluid pressure within the FCS, known in the field as “bumping up the pressure.”
- This additional fluid may be pumped in at the pressurization point during the shut-in phase in order to return the fluid pressure within the FCS to the appropriate test pressure, a level similar to that existing near the beginning of the tests, at points 114 a, 124 a, 134 a and 144 a.
- the pressure decay occurring during the shut-in phases (e.g., 114 , 124 , 134 and 144 ) for each pressure curve (e.g., 110 , 120 , 130 and 140 ) is due to heat transfer from pressurized fluid within the FCS to fluid in the surrounding environment.
- heat transfer is greater for testing fluid near the surface, as opposed to testing fluid within the FCS that is disposed farther downhole.
- the greater amount of heat transfer near the surface is due to friction generated during the process of pumping the testing fluid into the well system (e.g., via a cement unit or mud pump) for the purpose of pressurizing testing fluid within the FCS.
- an analog, low resolution circular chart surface recorder may be used by drilling personnel on the drilling rig to observe a continuous pressure reading of the FCS. Even in cases where the tested FCS component is not leaking, the pressure test may often last over half an hour or longer before the pressure within the FCS begins to stabilize enough such that a continuous five minute period of successful pressure stabilization may be recorded.
- FCS pressure tests are sometimes judged as successful before full stabilization (e.g., decay of 4 psi/min or less), thus allowing for the risk that remaining pressure decay may be due to a leak within the FCS, in addition to PVT effects.
- this phenomenon is especially impactful at higher testing pressures, as are required in deeper, hot wells and where oil based mud (OBM) or synthetic oil based mud (SOBM) is used as the testing fluid in offshore wells with a subsea BOP in deepwater.
- OBM oil based mud
- SOBM synthetic oil based mud
- the well may be abandoned by uninstalling the riser, BOP and other components of the well system, and sealing the wellhead to prevent fluid communication between the wellbore and the surrounding environment. Therefore, prior to removing the marine riser, the negative pressure test is conducted to simulate the reduced hydrostatic well pressure that exist if the riser is removed or during abandonment by substituting seawater in the fluid column from the wellhead to surface.
- the reduced fluid pressure during the inflow or negative pressure testing operation creates a negative pressure differential across the wellbore and/or sealed wellhead.
- the process for simulating the negative pressure environment is created within the wellbore prior to abandoning the well via either the mechanical stab-in plug (MSP) method or the choke and kill line (CKL) method.
- MSP mechanical stab-in plug
- CKL choke and kill line
- a temporary or permanently installed tool is disposed within the wellbore configured to act as a barrier preventing inflow into the wellbore.
- a special mechanical stab-in plug which may be either permanent or retrievable, is disposed within the wellbore that is configured to seal off the lower section of wellbore while also providing the ability of allowing the drill string or other conduit to be stabbed through it, once relatively low density fluids (e.g., base oil, water, etc.) was pumped into the lower, sealed portion of the wellbore, creating a negative pressure differential across the MSP plug.
- relatively low density fluids e.g., base oil, water, etc.
- a ram or other sealable mechanism of the BOP is actuated to fluidically isolate the wellbore and wellhead from the riser disposed above the BOP.
- relatively low density fluid is pumped into the wellbore via the choke and/or kill lines in order to create a negative pressure differential across the sealed ram of the BOP.
- a method for pressure testing a well system comprises providing fluid into a closeable chamber of the well system, measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the well system and measuring in real time a temperature change of fluid within the closeable chamber using a sensor disposed within the well system.
- the closeable chamber is provided with a fluid having a higher density than water.
- the closeable chamber is provided with a fluid having a density substantially equal to water.
- the closeable chamber comprises at least a portion of a drill string.
- the closeable chamber comprises at least a portion of a choke line.
- the closeable chamber comprises at least a portion of a kill line.
- the method may further comprise using real time pressure and temperature measurements to calculate real time pressure decay of fluid within the closeable chamber, wherein the pressure decay arises from changes in the volume of fluid within the closeable chamber over time.
- the method may further comprise stabbing into a plug of the well system with the drill string to allow for fluid communication between the drill string and a volume of fluid disposed below the plug.
- the closeable chamber comprises at least a portion of a blowout preventer.
- the method may further comprise sealing the blowout preventer to prevent fluid communication between a drill string of the well system and an annulus adjacent to the blowout preventer.
- the method may further comprise measuring in real time a pressure change in the closeable chamber using a sensor disposed within the well system.
- the closeable chamber comprises a component of a completion system.
- the component of the completion system comprises a tubing hanger.
- the method may further comprise communicating a signal from the sensor using a wired pipe communication network.
- a method for pressure testing a well system comprises providing a fluid into a closeable chamber of the well system and determining in real time a change in fluid pressure in the closeable chamber, wherein the change in pressure arises from a change in the volume of fluid within the closeable chamber.
- the method further comprises determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid.
- determining in real time a change in fluid pressure within the closeable chamber arising from a change in the volume of fluid within the closeable chamber comprises measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the well system.
- determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid comprises measuring in real time a temperature change of fluid within the closeable chamber using a sensor disposed within the well system. In an embodiment, determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid comprises calculating the change in temperature over time for a section of a wired pipe communication network. In an embodiment, the method further comprises summing the pressure decay arising from changes in temperature over time for the section of the wired pipe communication network. In an embodiment, the method further comprises subtracting the summed pressure decay arising from changes in temperature over time from the total fluid pressure decay within the closeable chamber. In an embodiment, the closeable chamber comprises at least a portion of a blowout preventer. In an embodiment, the closeable chamber comprises at least a portion of a wellhead.
- a method for pressure testing a well system comprises providing fluid into a closeable chamber of the well system, measuring in real time a change in fluid pressure within the closeable chamber using a sensor of a wired pipe communication network disposed within the well system, measuring in real time a temperature change of fluid within the closeable chamber using a sensor of the wired pipe communication network disposed within the well system and calculating in real time the pressure decay arising from a change in the volume of fluid disposed within the closeable chamber using the pressure and temperature measurements.
- the closeable chamber comprises at least a portion of a blowout preventer.
- the closeable chamber comprises at least a portion of a component of an upper completion system.
- Embodiments described herein comprise a combination of features and characteristics intended to address various shortcomings associated with certain prior devices, systems, and methods.
- the various features and characteristics described above, as well as others, will be readily apparent to those skilled in the art upon reading the following detailed description, and by referring to the accompanying drawings.
- FIG. 1 is a graph illustrating pressure curves generated during a pressure test of a drilling system
- FIG. 2 is a schematic representation of an embodiment of a well system configured to conduct a fluid containment system pressure test in accordance with principles described herein in accordance with principles described herein;
- FIGS. 3A-3D are perspective views, some in cross-section, showing components of the wired pipe communication network shown in FIG. 2 ;
- FIG. 4A is a graph illustrating pressure curves generated during a pressure test of a well system, such as the well system shown in FIG. 2 ;
- FIG. 4B is a graph illustrating temperature curves generated during a pressure test of a well system, such as the well system shown in FIG. 2 ;
- FIG. 5 is a graph illustrating temperature curves generated during a pressure test of a drilling system, such as the well system shown in FIG. 2 ;
- FIG. 6 is a schematic representation showing the well system shown in FIG. 2 configured to conduct a completion system pressure test in accordance with principles described herein;
- FIGS. 7A-7B are schematic representations of the well system shown in FIG. 2 configured to conduct a negative pressure test using an MSP method in accordance with principles described herein;
- FIGS. 8A and 8B are schematic representations of the well system shown in FIG. 2 configured to conduct a negative pressure test using a CKL method in accordance with principles described herein.
- the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to . . . .”
- the term “couple” or “couples” is intended to mean either an indirect or direct connection. Thus, if a first device couples to a second device, that connection may be through a direct connection, or through an indirect connection via other devices, components, and connections.
- the terms “axial” and “axially” generally mean along or parallel to a given axis (e.g., given axis of a body or a port), while the terms “radial” and “radially” generally mean perpendicular to the given axis.
- an axial distance refers to a distance measured along or parallel to the given axis
- a radial distance means a distance measured perpendicular to the given axis.
- the phrase “communication coupler” refers to a device or structure that communicates a signal across the respective ends of two adjacent tubular members, such as the threaded box/pin ends of adjacent pipe joints; and the phrase “wired drill pipe” or “WDP” refers to one or more tubular members, including drill pipe, drill collars, casing, tubing, subs, and other conduits, that are configured for use in a drill string and include a wired link.
- wireless link refers to a pathway that is at least partially wired along or through a WDP joint for conducting signals
- communication link refers to a plurality of communicatively-connected tubular members, such as interconnected WDP joints for conducting signals over a distance.
- a system and method for pressure testing components of a well system is disclosed herein.
- Embodiments described herein may be employed in various drilling and production applications; however, it has particular application as a system and method for detecting leaks during a test of well system via accounting for and calibrating against PVT effects during the pressure testing of pressure containing components of the well system, such as a fluid containment system (FCS). Further, it has particular application with regard to offshore well drilling and production systems.
- FCS fluid containment system
- an offshore well drilling system 10 generally includes an offshore semi-submersible drilling rig 20 disposed at the water line 12 with a derrick 24 and deck 22 having a testing fluid system (TFS) 21 disposed thereon.
- System 10 further includes a riser 30 that extends between the rig 20 and a wellhead 60 disposed at the sea floor 14 , a FCS 40 , a drill string 50 disposed within a marine riser 30 and having a central axis 55 and internal passageway 50 b .
- Well system 10 further includes casing 70 that extends downward from a casing hanger 61 of wellhead 60 and is secured in place via cement 72 .
- TFS 21 is disposed at rig floor 22 and comprises a mud pit 25 , a cement unit 27 and a fluid conduit 28 .
- Conduit 28 provides a fluid flowpath 29 for the passage of testing fluid 29 a from mud pit 25 , through cement unit 27 , and to the passageway 50 b of drill string 50 .
- Cement unit 27 comprises a high pressure, reciprocating fluid pump. However, in other embodiments cement unit 27 may comprise other components configured to pressurize a fluid.
- Testing fluid 29 comprises a drilling fluid that may be at a high density or high weight (e.g., drilling fluid, SOBM, completion fluid, etc.) relative to the ambient water 13 disposed below water line 12 .
- fluid 29 typically has a high enough density to overcome the pressure of fluid within the adjacent formation 16 .
- testing fluid may also comprise a relatively lower density fluid, such as water.
- FCS 40 generally includes components configured to retain and manage fluid pressure within well system 10 (e.g., drill string 50 , FCS 40 and annulus 35 ).
- FCS 40 includes BOP 41 , choke line 44 , kill line 46 and an internal blowout preventer (IBOP) 48 , wellhead and the casing and or liner and float valves.
- IBOP internal blowout preventer
- Rams 42 of BOP 41 are configured to provide an annular seal 43 about drill string 50 upon actuation, dividing annulus 35 into a first or upper section 35 a extending between rig 20 and seal 43 and a second or middle section 35 b extending from seal 43 downward to a FCS testing plug 49 coupled to drill string 50 .
- a third or lower section 35 c extends from wellhead 60 into the wellbore 62 .
- Testing plug 49 is configured to prevent fluid flow between middle portion 35 b of annulus 35 and a lower portion 35 c extending into wellbore 62 .
- Testing plug 49 forms an annular seal 49 c against an annular surface 61 a of hanger 61 disposed within wellhead 60 .
- Testing plug 49 is coupled to an end of two adjacent tubular joints or sections 52 that extend between nodes 51 and physically engages upper annular surface 61 a of hanger 61 via lower annular surface 49 a.
- a radial port or opening 45 is provided in the drillstring 50 to act as a route of fluid communication between drillstring 50 and the annulus 35 above testing plug 49 .
- a volume of formation fluid or a kick of fluid from the formation 16 that has a relatively higher pressure than drilling fluid disposed within wellbore 62 may flow into wellbore 62 and travel upward through lower section 35 c of annulus 35 (testing plug 49 is not installed in well system 10 during the act of drilling).
- the formation kick may be trapped or isolated within lower section 35 c of annulus 35 via actuating one or more rams 42 of BOP 41 to provide the annular seal 43 .
- Choke line 44 and kill line 46 may be used to provide for alternate routes of fluid communication between rig 20 and annulus 35 such that the kill fluid (e.g., water, weighted drilling mud, etc.) is pumped into FCS 40 to prevent further upward flow of fluid from formation 16 .
- the kill fluid e.g., water, weighted drilling mud, etc.
- Choke line 44 generally includes a lower valve 44 a, a manifold 44 b and an upper valve 44 c. Fluid flow through choke line 44 may be restricted by closing lower valve 44 a or upper valve 44 c.
- choke manifold 44 b includes a plurality of valves, chokes and other equipment, and as such is configured to manage and regulate flow through choke line 44 .
- a kill line such as kill line 46 may be used to “kill” the well by reversing, stopping or at least substantially restricting the flow of fluid from the formation into the wellbore 62 by pumping heavy fluid into the entire fluid circulation system (e.g., annulus 35 , choke line 44 , kill line 46 , etc.) from the rig 20 .
- Kill line 46 comprises a lower valve 46 a, a kill manifold 46 b and an upper valve 46 c.
- flow through kill line 46 may be substantially restricted or controlled via valves 46 a, 46 c and manifold 46 b.
- valves 46 a, 46 c and manifold 46 b are pressure tested as well.
- IBOP 48 is disposed at an upper end 50 a of drill string 50 at the rig 20 and is configured to manage fluid pressure within drill string 50 .
- high pressure formation fluid may begin flowing upward through string 50 via an opening or port of the string 50 disposed within wellbore 62 (e.g., at the drill bit).
- IBOP 48 includes a valve that allows for the passage of fluid into string 50 but may be closed to restrict fluid from flowing out of string 50 through IBOP 48 in the event of a formation kick.
- IBOP 48 may be used in effectively controlling a formation kick, IBOP 48 is pressure tested during the pressure testing of FCS 40 .
- drill string 50 comprises a plurality of nodes 51 (e.g., 51 a - 51 e ) coupled between a plurality of tubular joints 52 .
- Wired or networked drill pipe incorporating distributed sensors can transmit data from anywhere along the drill string 50 to the rig 20 for analysis.
- Nodes 51 are provided at desired intervals along the drill string 50 .
- Network nodes 51 essentially function as signal repeaters to regenerate and/or boost data signals and mitigate signal attenuation as data is transmitted up and down the drill string.
- the nodes 51 may also include measurement assemblies.
- the nodes 51 may be integrated into an existing section of drill string or a downhole tool along the drill string 50 .
- tubular joints 52 include a first pipe end 53 having, for example, a first induction coil 53 a and a second pipe end 54 having, for example, a second induction coil 54 a.
- Nodes 51 comprise a portion of a wired pipe communication network 56 that provides an electromagnetic signal path that is used to transmit information along the drill string 50 .
- the communication network 56 or broadband network telemetry, may thus include multiple nodes 51 based along the drill string 50 .
- Communication links or wired conductors 52 a may be used to connect the nodes 51 to one another, and may comprise cables or other transmission media integrated directly into sections of the drill string 50 .
- the cable may be routed through the central wellbore of the drill string 50 , or routed externally to the drill string 50 , or mounted within a groove, slot or passageway in the drill string 50 .
- Signals from the plurality of sensors of nodes 51 along the drill string 50 are transmitted to rig 20 through wire conductors 52 a along the drill string 50 .
- Communication links 52 a between the nodes 51 may also use wireless connections.
- a plurality of packets may be used to transmit information along the nodes 51 . Further detail with respect to suitable nodes, a network, and data packets are disclosed in U.S. Pat. No. 7,207,396 (Hall et al., 2007), hereby incorporated in its entirety by reference.
- Various types of sensors 57 may be employed along the drill string 50 in various embodiments, including without limitation, axially spaced pressure sensors, temperature sensors, and others.
- the sensors 57 may be disposed on the nodes 51 positioned along the drill string, disposed on tools incorporated into the drill string, or a combination thereof. Thus, sensors 57 of nodes 51 may measure temperature, pressure, etc., of fluid within string 50 or annulus 35 of well system 10 .
- Network nodes 51 are disposed along the drill string 50 between joints 52 .
- the booster assemblies are spaced at 1,500 ft. (500 m) intervals to boost the data signal as it travels the length of the drill string 50 to prevent signal degradation.
- Network nodes 51 are also located at these intervals to allow measurements to be taken along the length of the drill string 50 .
- the distributed network nodes 51 provide measurements that give the driller additional insight into what is happening along the potentially miles-long stretch of the drill string 50 .
- Rig 20 includes a well site computer 58 that may display information for the drilling operator.
- the wired pipe communication network 56 transmits information from each of a plurality of sensors 57 to a surface computer 58 .
- Information may also be transmitted from computer 58 to another computer 59 , located at a site remote from the well, with this computer 59 allowing an individual in the office remote from the well to review the data output by the sensors 57 .
- sensors 57 Although only a few sensors 57 are shown in the figures, those skilled in the art will understand that a larger number of sensors may be disposed along a drill string (e.g., drill string 50 ) when drilling, and that all sensors associated with any particular node may be housed within or annexed to the node 51 , so that a variety of sensors rather than a single sensor will be associated with that particular node.
- a drill string e.g., drill string 50
- a BOP e.g., BOP 41
- FCS FCS 40
- the wired pipe communication network 56 allows wellsite personnel to identify potential remedial actions for the migrated wellbore influx.
- the measurements used are independent from surface measurements.
- One or more embodiments of a well drilling system 10 comprising a fluid containment system 40 and a testing fluid system 21 having been disclosed, one or more embodiments of a method of pressure testing components of the FCS 40 are also disclosed herein. Further, one or more embodiments of a method for evaluating or troubleshooting the results of a failed pressure test of components of FCS 40 are disclosed herein.
- a FCS pressure testing method generally includes the steps of engaging a testing plug of the FCS against a sealing surface within the FCS (e.g., a casing hanger), disposing a quantity of testing fluid (e.g., drilling fluid, etc.) within the FCS, isolating a component of the FCS (e.g., actuating a ram of the BOP, closing a valve of the choke line, etc.), displacing an additional quantity of testing fluid into the FCS to increase the fluid pressure within the FCS to a predetermined testing pressure, shut-in the FCS by ceasing the displacement of testing fluid into the FCS, continuously in real-time monitor fluid pressure within the FCS via an wired pipe communication network for a period of time.
- a testing fluid e.g., drilling fluid, etc.
- ram 42 of BOP 41 may be pressure tested as part of the regime for pressure testing each individual component of FCS 40 .
- testing plug 49 is coupled to drill string 50 and displaced downward through marine riser 30 until annular surface 49 a of tool 49 engages annular surface 61 a of tubing hanger 61 to create annular seal 49 c, which divides annulus 35 into upper section 35 a and lower section 35 c.
- high density testing fluid 29 (e.g., drilling fluid, SOBM, competition fluid, etc.) is disposed within drill string 50 and riser 30 at a relatively low pressure (e.g., approximately 300-350 psi) using cement unit 27 and flowpath 29 a .
- ram 42 of BOP 41 is actuated to form an annular seal 43 against an outer surface of drill string 50 , substantially preventing testing fluid from a port 45 of string 50 from flowing upward into the upper section 35 a of annulus 35 .
- annular seals 49 c and 43 form middle section or closable chamber 35 b within marine riser 30 .
- pressure and temperature of fluid within annulus 35 and drill string 50 is continuously measured at different vertical depths along string 50 via nodes 51 a, 51 b, 51 c, etc.
- pressure and temperature of fluid within chamber 35 b is continuously measured via node 51 c while pressure and temperature in upper portion 35 a are measured via nodes 51 a and 51 b and the temperature and pressure of lower portion 35 c are measured by nodes 51 d and 51 e.
- Measurements taken by sensors 57 at nodes 51 are continuously transmitted to computers 58 or 59 at rig 20 via wired pipe communication network 56 .
- fluid pressure within drillstring 50 and chamber 35 b of annulus 35 is increased to a predetermined testing pressure by displacing a volume of testing fluid 29 into chamber 35 b via port 45 .
- Testing fluid 29 is pumped using cement unit 27 into drill string 50 via fluid flowpath 29 a, which comprises mud pit 25 , cement unit 27 and passageway 50 b of string 50 .
- Testing fluid 29 within chamber 35 b is subsequently pressurized to approximately between 5,000-15,000 psi by cement unit 27 .
- testing fluid 29 is disposed within choke line 44 and kill line 46 , preventing fluid within chamber 35 b from flowing up lines 44 , 46 , via the weight of the fluid 29 disposed within lines 44 , 46 .
- FIGS. 4A and 4B illustrate graphs of data that may be generated by nodes 51 (e.g., 51 a , 51 b and 51 c ) during a high pressure test of components of FCS 40 .
- Curves 502 and 508 illustrate the temperature and pressure curves, respectively, captured in real time by top node 51 a.
- Curves 504 and 510 illustrate the temperature and pressure curves, respectively, captured in real time by middle node 51 b.
- Curves 506 and 512 illustrate the temperature and pressure curves, respectively, captured in real time by bottom node 51 c.
- Nodes 51 a, 51 b and 51 c are each within fluid communication with one another, and thus expansion of fluid disposed proximal to one node will result in a measured fluid pressure increase by all three nodes.
- a pumping phase 207 is followed by a shut-in phase 208 , having a beginning 208 a and an ending 208 b, marks the period of time after pumping has finished and before FCS 40 has been depressurized, which is then followed by a depressurization phase 209 .
- testing fluid 29 is pumped into drillstring 50 via cement unit 27 ,which in turn displaces a volume of fluid into chamber 35 c , pressurizing the chamber 35 c to the BOP testing pressure.
- shut-in phase 208 initiates with the cessation of pumping from cement unit 27 , stopping the flow of testing fluid 29 into drillstring 50 at rig 20 .
- ram 42 must successfully hold the BOP test pressure for a specified period of time. In one example, ram 42 must hold 15,000 psi for a period of five minutes. Friction from pumping results in an increase in temperature of the additional testing fluid 29 pumped into FCS 40 and string 50 from mud pit 25 .
- the data captured by nodes 51 a, 51 b and 51 c of FIG. 2 quantify both pressure and temperature of the fluid within FCS 40 , allowing the computers 58 , 59 , to correct against PVT effects in order to determine the amount of pressure decay during the shut-in phase 208 that is arises from the decay in temperature, and not due to a possible leak. Due to the relationship between pressure, volume, and temperature, a pressure decrease may only be caused by decay in temperature. A leak within a FCS results in a decrease in the volume of fluid present in the FCS and in turn a decrease in fluid pressure within the FCS.
- the ability to extract the amount of pressure decay due to the decay in temperature allows for a more time efficient shut-in phase for non-leaking FCSs as the pressure decay due to decay in fluid temperature will be quantified and extracted, leaving a near-zero change in pressure over time, illustrating that the system is holding pressure and has successfully passed the pressure test.
- FIG. 5 illustrates the relationship between the total pressure decay (dP) 602 , the pressure decay arising from a decay in temperature (dP T ) 604 and the pressure decay arising from a decrease in the volume of fluid (dp V ) 606 disposed in a non-leaking FCS, where the total pressure decay is substantially arising from the decay in temperature and thus the decay in pressure arising from a change in volume is near zero.
- the pressure and temperature of sections of the drill string 50 are measured in real time in order to determine the dP V for each section, and after the dP V is observed from the computers 58 , 59 , as holding substantially constant pressure for approximately five minutes, the pressure test would be successful.
- other components of FCS 40 may be pressure tested in a similar manner. For instance, other individual rams of BOP 41 may be actuated to create an annular seal within annulus 35 , forming a cavity defined by the ram's annular seal and the seal 49 a produced by BOP testing plug 49 .
- lower valves 44 a, 46 a, manifolds 44 b, 46 b, and upper valves 44 c , 46 c , of choke line 44 and kill line 46 may be pressure tested.
- high density testing fluid 29 is pumped into drillstring 50 via cement unit 27 .
- Ram 42 of BOP 41 may be actuated to create annular seal 43 .
- a component of lines 44 , 46 may be sealed (e.g., lower valve 44 a ).
- the sealed component e.g., valve 44 a
- the sealed component may be pressure tested to see if it holds the BOP test pressure for a requisite period of time (e.g., five minutes).
- nodes are placed (e.g., nodes similar to nodes 51 ) within choke line 44 or kill line 46 in order to continuously measure and transmit pressure and temperature readings from lines 44 , 46 and quantify any pressure decay within lines 44 , 46 , due to temperature decay so as to determine if there has been a decay in pressure due to a decrease in the volume of fluid disposed within lines 44 , 46 .
- lines 44 and 46 e.g., wired conductors 52 a, etc.
- lines 44 and 46 e.g., wired conductors 52 a, etc.
- pressure would be measured in real time from nodes disposed in lines 44 , 46
- temperature measurements would be read from nodes disposed within drill string 50 , as heated fluid would be pumped into string 50 from cement unit 27 .
- FIG. 6 illustrates well system 10 configured to conduct a high pressure test of an upper completion system of the FCS 40 , including tubing 81 and casing 70 .
- a lower completion and an upper completion may be installed within wellbore 62 prior to the beginning of the production phase of well system 10 .
- FIG. 6 illustrates well system 10 configured to conduct a high pressure test of an upper completion system of the FCS 40 , including tubing 81 and casing 70 .
- upper completion 80 generally includes tubing 81 coupled to a tubing hanger 82 to serve as the main support for production tubing and to act as a sealing point of the riser 30 at the wellhead 60 , and casing 70 which is installed and cemented in place via cement 72 to seal the wellbore 62 from the formation, thus making wellbore 62 a closeable chamber configured to prevent formation fluid from leaking into the wellbore 62 .
- Tubing 81 includes a port 86 that provides fluid communication between wellbore or chamber 62 and the internal passageway 50 b of string 50 .
- Tubing hanger 82 upon installation in wellhead 60 , creates an annular seal 82 a that prevents fluid communication between wellbore 62 and the annulus 35 within marine riser 30 .
- Tubing 81 and tubing hanger 82 are installed via a tubing hanger running tool 83 that is coupled to the downhole terminal end 50 c of drill pipe 50 .
- tubing hanger 82 and running tool 83 are coupled together as tubing 81 is displaced downward into wellbore 62 .
- a lower completion may be installed within wellbore 62 that includes production packers to isolate particular zones of wellbore 62 , plugs, circulating devices, etc.
- running tool 83 may be decoupled from tubing hanger 82 , allowing for the removal of drill pipe 50 and running tool 83 from the marine riser 30 .
- Testing of seal 82 a includes inflow or negative pressure testing and positive pressure testing at both high (e.g., approximately 70% of maximum capacity) and low pressures.
- high density fluid e.g., drilling fluid, completion fluid, etc.
- a cement unit 27 down through the drill string 50 , out through a port 86 (as indicated by the arrows shown in FIG. 6 ) and into the wellbore 62 .
- Nodes 51 disposed within annulus 35 are used to indicate real time pressure and temperature of the fluid in both passageway 50 b of string 50 and wellbore to determine the real time decay in pressure due to an increase in volume caused by a leak in the upper completion 90 , dP V . If seal 82 a of tubing hanger 82 and the seal between casing 70 and formation 16 are properly sealed, the pressure and temperature data transmitted from nodes 51 (e.g., 51 a - 51 c, etc.) will indicate a nearly constant dP V , thus indicating successful a positive pressure test of upper completion 90 .
- nodes 51 and network 56 may also be used for performing a pressure test of an installed lower completion.
- nodes 51 of tubing 82 may be disposed within individual production zones that are sealed via a plurality of production packers. The annular seal created by each installed production packer may be tested by pressurizing each individual sealed production zone and measuring in real time the fluid pressure and temperature within the particular tested zone.
- inflow or negative pressure testing is commonly required for wells with a subsea BOP or a mudline suspension system to verify barriers and well integrity for those instances that the wellbore may be exposed to a reduced hydrostatic pressure as may be the case once the marine riser is eliminated or during abandonment.
- Wellbores of well systems such as system 10 , may be subjected to negative pressures upon abandonment (e.g., pressure within wellbore 62 may be lower than in the surrounding environment 13 ), when wellhead 60 is sealed and BOP 41 and riser 30 have been removed.
- Formation fluid within the wellbore may be of a higher pressure than the seawater surrounding the wellhead, creating a negative pressure across wellhead 60 that may lead to an inflow of fluid from formation 16 into the wellbore 62 if FCS 40 fails to seal wellbore 62 .
- inflow or negative pressure testing involves creating a negative pressure environment within the wellbore (e.g., wellbore 62 ) through the use of low density fluids, possibly seawater.
- FIGS. 9A and 9B illustrate a negative pressure testing setup using the MSP method.
- a mechanical packer or plug 804 is installed in wellbore 62 .
- barrier 804 may be a temporary or removable plug such as the RTTS (Halliburton tool (3000 N. Sam Houston Pkwy E. Houston, Tex. 77032 U.S.A) which is a retrievable mechanical stab-in packer.
- RTTS Hextstststs, a temporary or removable plug such as the RTTS (Halliburton tool (3000 N. Sam Houston Pkwy E. Houston, Tex. 77032 U.S.A) which is a retrievable mechanical stab-in packer.
- RTTS Real-Time Transporter
- barrier 804 may also be a permanently installed MSP.
- the plug or barrier 804 having a valve 804 a is installed within the wellbore 62 , providing an annular seal 804 b , isolating an upper section 62 a from a lower section or closeable chamber 62 b of wellbore 62 .
- the wellbore 62 is sealed from the surrounding formation using a barrier 806 installed at the downhole end of the casing 70 .
- the plug 804 seals the wellbore 62 from annulus 35 of riser 30 when the drill string 50 is not stabbed (protruding) into it (as shown in FIG. 7A ).
- string 50 may be displaced downward into wellbore 62 and “stabbed” into the plug 804 such that valve 804 a of plug 804 opens, allowing fluid disposed within string 50 to be pumped into the lower portion or chamber 62 b of the wellbore 62 .
- drill string 50 is partially or completely filled with a relatively less dense fluid 829 compared to the heavier drilling or completion fluid.
- the negative pressure testing fluid is water.
- fluid 829 may be base oil or other relatively less dense fluids.
- relatively higher pressure formation fluid may flow upward into the downhole end of drill string 50 , displacing the relatively less dense water 829 upward toward rig.
- the real time pressure and temperature within the drill string 50 may be measured using nodes 51 (e.g., 51 a - 51 d ), which may be used to measure a possible decay in fluid pressure due to an increase in volume caused by a leak, dP V .
- nodes 51 e.g., 51 a - 51 d
- FIGS. 8A and 8B illustrate an alternative method for negative or low pressure testing wellbore 62 before abandoning a well using the CKL method.
- the downhole end of wellbore 62 is sealed by barrier 806 , casing 70 and wellhead 60 , and lower valves 44 a, 46 a, are in a closed position, forming a closeable chamber 831 generally including wellbore 62 , string 50 and annulus 35 .
- kill line 46 is then partially or completely filled with negative testing fluid 829 via being pumped from cement unit 27 while a ram or annular (e.g., ram 42 ) of BOP 41 is actuated to create annular seal 43 , isolating wellbore 62 from annulus 45 of marine riser 30 .
- lower valves 44 a, 46 a are opened to provide fluid communication between wellbore 62 and lines 44 and 46 .
- Nodes 51 a - 51 d measure real time pressure and temperature values within the drill string 50 and wellbore 62 , indicating a real time pressure decay within wellbore 62 due to a leak between wellbore 62 and either the formation 16 or the ambient water 13 .
- an inflow or negative pressure test on a completion of well system 10 such as upper completion 80 .
- relatively low density fluid such as water or base oil may be disposed within passage 50 b of string 50 and put into fluid communication with wellbore 62 via port 86 . Due to the lower density of the fluid disposed within string 50 , the amount of static fluid pressure or head applied to wellbore 62 from passage 50 b is substantially reduced, thus the upper completion 80 's ability to withstand inflow or negative pressure between wellbore 62 and formation 16 .
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Measuring Fluid Pressure (AREA)
Abstract
A method for testing a well system comprising providing fluid into a chamber of the system, measuring a change in fluid pressure within the chamber and measuring a temperature change of fluid within the closeable chamber.
Description
- This application claims the benefit of U.S. Provisional Application No. 61/556,781, filed Nov. 7, 2011 entitled “Method For Efficient Leak Testing With Real Time Measurement of PVT Effects”, which is hereby incorporated herein by reference.
- Not applicable.
- 1. Field of the Disclosure
- The disclosure relates generally to systems and methods for conducting a pressure test of well system equipment. More particularly, the disclosure relates to systems and methods for reliably and efficiently pressure testing wellbore fluid containment system (FCS) equipment, such as blowout preventers (BOPs), choke and kill lines, wellhead hangers, casing, liner and liner hangers, tubing hangers, completions, mechanical barriers such as packers, cement plugs and other equipment. Further, the disclosure relates to both high pressure testing and low pressure testing of FCS equipment.
- 2. Background of the Technology
- In drilling for oil and gas from an offshore hydrocarbon producing well, a well or well system is provided that includes a drilling rig with a riser section and a drill string used to convey drilling fluid down the drill string and through a wellhead to a drill bit disposed within a wellbore of a formation. During drilling, the walls of the wellbore are sometimes encased via the installation of tubular casing strings in the wellbore. Cement may be displaced into the wellbore so as to secure the individual casing strings to the wall of the wellbore. Drilling fluid and circulation material (i.e., cuttings from the formation) recirculate from the drill bit back to the drilling rig via an annulus formed between the drill string and the cased wall of the wellbore, and via the annulus formed between the drill string and the riser section that encircles it.
- A FCS of the well system is configured to provide a fluid tight barrier between fluid within the well system (e.g., drilling fluid, circulation material, formation fluid, etc.) and the surrounding environment. The FCS includes all critical sealing points, including the BOP itself and each of its individual rams, the choke manifold and kill manifolds, an internal blowout preventer (IBOP), as well as other components. The FCS may be stressed in situations where a fluid pressure differential results between the well system and the surrounding environment. For instance, a wellbore or formation fluid influx, also called a “kick”, can cause an unstable and unsafe condition at the drilling rig. When a kick is detected, a FCS of the well system may be used to prevent formation fluid from breaching the well system by “chocking” or “killing” the well and regain control. In another example, the fluid pressure within the well system may rapidly decrease in the event of a low pressure kick, for instance, when a low pressure cavity within the formation is breached during drilling. Some of the seals and sealing points within the well system may be pressure assisted, and thus rely on the pressure of the fluid around it to help seal. Thus, these pressure assisted seals may be jeopardized in the event of a low pressure kick. In another example, at a certain point in time it may be desirable to abandon the well by removing the riser and rig, and sealing the well via the casing, wellhead a cement plug installed in the wellbore. Upon removal of the riser, the fluid pressure within the wellbore may decrease substantially as the hydrostatic head of the fluid within the marine riser (e.g., high density drilling fluid, etc.) is typically larger than the hydrostatic head by the seawater
- In order to ensure the correct functioning of the FCS during the life of the well system, the FCS is subject to a variety of testing regimens. For instance, components of the FCS undergoes periodic positive testing that includes low pressure testing, which may be performed at approximately 350 pounds per square inch (psi) and high pressure testing which may be conducted at approximately 10,000-15,000 psi, to ensure the FCS is capable of withstanding a pressurization due to an uncontrolled influx of formation fluid or in the event of a low pressure kick that may jeopardize pressure assisted seals. Also, the FCS undergoes inflow or negative pressure testing to ensure the integrity of the casing and cement installed in the wellbore, the wellhead assembly, as well as other components of the FCS, prior to uninstalling the marine riser.
- As part of the FCS high pressure testing procedure, a FCS test plug may be landed against a sealing surface within the FCS, followed by subsequent pressurization of the FCS. Per current federal regulations, pressure testing of the FCS must be conducted upon installation and before 14 days have elapsed since the last BOP pressure test. Low and high pressure tests must be conducted for each individual component, and each component must demonstrate that it holds a reasonably stable pressure. For instance, in practice a pressure decay rate of 4 pounds per square inch (psi) per minute or less is seen as reasonably stable.
- Even though components of a FCS need only demonstrate pressure holding capability for five minutes to pass a presently-required pressure test, conducting the individual tests often take much longer due to PVT effects that take place due to the pressurizing of the test fluid. Specifically, friction generated by the action of pumping a fluid (e.g., via a reciprocating pump) increases the temperature as the fluid is pressurized. Referring to
FIG. 1 ,graph 100 illustrates fluid pressures in relation to time at different positions along a vertically-oriented subsea drill string during a high pressure test.Pressure curve 110 illustrates the fluid pressure at a point within the drill string near the sea floor, with 120, 130 and 140 illustrating fluid pressure at progressively shallower points along the drill string, withcurves curve 140 illustrating fluid pressure at the shallowest point, near the surface. Due to being located at different vertical depths along the drill string,curve 110 is at the highest pressure, whilecurve 140 is at the lowest pressure of the curves. - As shown in
FIG. 1 , the high pressure test can be divided into three phases: a pumping phase (112, 122, 132 and 142), a shut-in phase (114, 124, 134 and 144) and a depressurization phase (116, 126, 136 and 146). The pumping phase takes places when testing fluid is pumped into the well system in order to pressurize the FCS. Testing fluid may be pumped into the drill string by a cement unit or mud pump disposed at the drilling rig of the well system. Once the FCS of the well system has been pressurized to the appropriate testing pressure, pumping ceases and the well system is shut-in, such that a portion of the well system containing the system components to be tested is isolated from the outside environment. Shut-in 114, 124, 134 and 144 have a beginning (114 a, 124 a, 134 a and 144 a) and an ending (114 b, 124 b, 134 b and 144 b). As shown byphases FIG. 1 , the pressure at the 114 a, 124 a, 134 a and 144 a exceeds the pressure at thebeginning 114 b, 124 b, 134 b and 144 b of the shut-in phase. Also, in this pressure test, each shut-in phase includes a pressurization point (114 c, 124 c, 134 c and 144 c) where additional testing fluid is pumped into the well system to slightly increase fluid pressure within the FCS, known in the field as “bumping up the pressure.” This additional fluid may be pumped in at the pressurization point during the shut-in phase in order to return the fluid pressure within the FCS to the appropriate test pressure, a level similar to that existing near the beginning of the tests, atend 114 a, 124 a, 134 a and 144 a.points - The pressure decay occurring during the shut-in phases (e.g., 114, 124, 134 and 144) for each pressure curve (e.g., 110, 120, 130 and 140) is due to heat transfer from pressurized fluid within the FCS to fluid in the surrounding environment. As will be discussed in greater detail herein, heat transfer is greater for testing fluid near the surface, as opposed to testing fluid within the FCS that is disposed farther downhole. The greater amount of heat transfer near the surface is due to friction generated during the process of pumping the testing fluid into the well system (e.g., via a cement unit or mud pump) for the purpose of pressurizing testing fluid within the FCS. This heat transfer leads to a greater relative difference in temperature between the testing fluid disposed within the marine riser and ambient water surrounding the drill string at that same vertical depth, resulting in a relatively large amount of heat transfer from the testing fluid disposed near the surface and the ambient water surrounding the drill string at that depth The total or aggregate pressure decay within the FCS, when there is no fluid leak between the FCS and the surrounding environment, corresponds with the total or net heat transfer out of the fluid disposed within the FCS to the surrounding environment.
- During the performance of the FCS low pressure and high pressure test, an analog, low resolution circular chart surface recorder may be used by drilling personnel on the drilling rig to observe a continuous pressure reading of the FCS. Even in cases where the tested FCS component is not leaking, the pressure test may often last over half an hour or longer before the pressure within the FCS begins to stabilize enough such that a continuous five minute period of successful pressure stabilization may be recorded. Further, due to pressure decay caused by PVT effects (e.g., pumping effects) and the low resolution of the analog chart recorder, FCS pressure tests are sometimes judged as successful before full stabilization (e.g., decay of 4 psi/min or less), thus allowing for the risk that remaining pressure decay may be due to a leak within the FCS, in addition to PVT effects. In practice, this phenomenon is especially impactful at higher testing pressures, as are required in deeper, hot wells and where oil based mud (OBM) or synthetic oil based mud (SOBM) is used as the testing fluid in offshore wells with a subsea BOP in deepwater.
- Regarding negative pressure tests, once the drilling, completion and production phases of a well system have been completed, the well may be abandoned by uninstalling the riser, BOP and other components of the well system, and sealing the wellhead to prevent fluid communication between the wellbore and the surrounding environment. Therefore, prior to removing the marine riser, the negative pressure test is conducted to simulate the reduced hydrostatic well pressure that exist if the riser is removed or during abandonment by substituting seawater in the fluid column from the wellhead to surface. Thus, once the subsea wellhead or wellbore has been sealed, the reduced fluid pressure during the inflow or negative pressure testing operation creates a negative pressure differential across the wellbore and/or sealed wellhead. The process for simulating the negative pressure environment is created within the wellbore prior to abandoning the well via either the mechanical stab-in plug (MSP) method or the choke and kill line (CKL) method.
- In the MSP method, a temporary or permanently installed tool is disposed within the wellbore configured to act as a barrier preventing inflow into the wellbore. In this method, a special mechanical stab-in plug, which may be either permanent or retrievable, is disposed within the wellbore that is configured to seal off the lower section of wellbore while also providing the ability of allowing the drill string or other conduit to be stabbed through it, once relatively low density fluids (e.g., base oil, water, etc.) was pumped into the lower, sealed portion of the wellbore, creating a negative pressure differential across the MSP plug. In the CKL method, a ram or other sealable mechanism of the BOP is actuated to fluidically isolate the wellbore and wellhead from the riser disposed above the BOP. Following the actuation of the BOP, relatively low density fluid is pumped into the wellbore via the choke and/or kill lines in order to create a negative pressure differential across the sealed ram of the BOP.
- As with the high pressure tests, in judging the success or failure of the negative pressure test using either the MSP or CKL methods pressures are measured at the surface on the offshore rig. Because surface measurements are relied upon in determining the success of a negative pressure test, the plugging of the drill string by lost circulation material (LCM), the incorrect lining up of valves in performing either the MSP or CKL methods, or other causes may jeopardize the accuracy of the test. Moreover, those ordinarily skilled in the art will readily appreciate that supplementing data from surface measurements with real time downhole information aids in the administering and interpretation of pressure tests, including high, low and negative pressure tests of components of the well system.
- Accordingly, there remains a need in the art for systems and methods that allow for timely and effective high and low pressure testing of well system equipment, such as a fluid containment system. Further, it would be advantageous if such systems and methods would calibrate against PVT effects during a pressure test of well system equipment. Still further, it would be advantageous to provide a system that includes a means providing a continuous pressure signal with a relatively improved resolution and higher efficiency.
- In an embodiment, a method for pressure testing a well system comprises providing fluid into a closeable chamber of the well system, measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the well system and measuring in real time a temperature change of fluid within the closeable chamber using a sensor disposed within the well system. In an embodiment, the closeable chamber is provided with a fluid having a higher density than water. In some embodiments, the closeable chamber is provided with a fluid having a density substantially equal to water. In an embodiment, the closeable chamber comprises at least a portion of a drill string. In an embodiment, the closeable chamber comprises at least a portion of a choke line. In an embodiment, the closeable chamber comprises at least a portion of a kill line.
- In an embodiment, the method may further comprise using real time pressure and temperature measurements to calculate real time pressure decay of fluid within the closeable chamber, wherein the pressure decay arises from changes in the volume of fluid within the closeable chamber over time. In an embodiment, the method may further comprise stabbing into a plug of the well system with the drill string to allow for fluid communication between the drill string and a volume of fluid disposed below the plug. In an embodiment, the closeable chamber comprises at least a portion of a blowout preventer. In an embodiment, the method may further comprise sealing the blowout preventer to prevent fluid communication between a drill string of the well system and an annulus adjacent to the blowout preventer. In an embodiment, the method may further comprise measuring in real time a pressure change in the closeable chamber using a sensor disposed within the well system. In an embodiment, the closeable chamber comprises a component of a completion system. In an embodiment, the component of the completion system comprises a tubing hanger. In an embodiment, the method may further comprise communicating a signal from the sensor using a wired pipe communication network.
- In an embodiment, a method for pressure testing a well system comprises providing a fluid into a closeable chamber of the well system and determining in real time a change in fluid pressure in the closeable chamber, wherein the change in pressure arises from a change in the volume of fluid within the closeable chamber. In an embodiment, the method further comprises determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid. In an embodiment, determining in real time a change in fluid pressure within the closeable chamber arising from a change in the volume of fluid within the closeable chamber comprises measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the well system. In an embodiment, determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid comprises measuring in real time a temperature change of fluid within the closeable chamber using a sensor disposed within the well system. In an embodiment, determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid comprises calculating the change in temperature over time for a section of a wired pipe communication network. In an embodiment, the method further comprises summing the pressure decay arising from changes in temperature over time for the section of the wired pipe communication network. In an embodiment, the method further comprises subtracting the summed pressure decay arising from changes in temperature over time from the total fluid pressure decay within the closeable chamber. In an embodiment, the closeable chamber comprises at least a portion of a blowout preventer. In an embodiment, the closeable chamber comprises at least a portion of a wellhead.
- In an embodiment, a method for pressure testing a well system comprises providing fluid into a closeable chamber of the well system, measuring in real time a change in fluid pressure within the closeable chamber using a sensor of a wired pipe communication network disposed within the well system, measuring in real time a temperature change of fluid within the closeable chamber using a sensor of the wired pipe communication network disposed within the well system and calculating in real time the pressure decay arising from a change in the volume of fluid disposed within the closeable chamber using the pressure and temperature measurements. In an embodiment, the closeable chamber comprises at least a portion of a blowout preventer. In an embodiment, the closeable chamber comprises at least a portion of a component of an upper completion system.
- Embodiments described herein comprise a combination of features and characteristics intended to address various shortcomings associated with certain prior devices, systems, and methods. The various features and characteristics described above, as well as others, will be readily apparent to those skilled in the art upon reading the following detailed description, and by referring to the accompanying drawings.
- For a detailed description of the exemplary embodiments of the invention disclosed herein, reference will now be made to the accompanying drawings in which:
-
FIG. 1 is a graph illustrating pressure curves generated during a pressure test of a drilling system; -
FIG. 2 is a schematic representation of an embodiment of a well system configured to conduct a fluid containment system pressure test in accordance with principles described herein in accordance with principles described herein; -
FIGS. 3A-3D are perspective views, some in cross-section, showing components of the wired pipe communication network shown inFIG. 2 ; -
FIG. 4A is a graph illustrating pressure curves generated during a pressure test of a well system, such as the well system shown inFIG. 2 ; -
FIG. 4B is a graph illustrating temperature curves generated during a pressure test of a well system, such as the well system shown inFIG. 2 ; -
FIG. 5 is a graph illustrating temperature curves generated during a pressure test of a drilling system, such as the well system shown inFIG. 2 ; -
FIG. 6 is a schematic representation showing the well system shown inFIG. 2 configured to conduct a completion system pressure test in accordance with principles described herein; -
FIGS. 7A-7B are schematic representations of the well system shown inFIG. 2 configured to conduct a negative pressure test using an MSP method in accordance with principles described herein; and -
FIGS. 8A and 8B are schematic representations of the well system shown inFIG. 2 configured to conduct a negative pressure test using a CKL method in accordance with principles described herein. - The following discussion is directed to various exemplary embodiments. However, one skilled in the art will understand that the examples disclosed herein have broad application, and that the discussion of any embodiment is meant only to be exemplary of that embodiment, and not intended to suggest that the scope of the disclosure, including the claims, is limited to that embodiment. The drawing figures are not necessarily to scale. Certain features and components herein may be shown exaggerated in scale or in somewhat schematic form and some details of conventional elements may not be shown in interest of clarity and conciseness.
- In the following discussion and in the claims, the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to . . . .” Also, the term “couple” or “couples” is intended to mean either an indirect or direct connection. Thus, if a first device couples to a second device, that connection may be through a direct connection, or through an indirect connection via other devices, components, and connections. In addition, as used herein, the terms “axial” and “axially” generally mean along or parallel to a given axis (e.g., given axis of a body or a port), while the terms “radial” and “radially” generally mean perpendicular to the given axis. For instance, an axial distance refers to a distance measured along or parallel to the given axis, and a radial distance means a distance measured perpendicular to the given axis. Still further, as used herein, the phrase “communication coupler” refers to a device or structure that communicates a signal across the respective ends of two adjacent tubular members, such as the threaded box/pin ends of adjacent pipe joints; and the phrase “wired drill pipe” or “WDP” refers to one or more tubular members, including drill pipe, drill collars, casing, tubing, subs, and other conduits, that are configured for use in a drill string and include a wired link. As used herein, the phrase “wired link” refers to a pathway that is at least partially wired along or through a WDP joint for conducting signals, and “communication link” refers to a plurality of communicatively-connected tubular members, such as interconnected WDP joints for conducting signals over a distance.
- Systems and methods for reliably and efficiently testing components of a well system are described herein. More particularly, systems and methods for detecting leaks within a well system during a pressure or inflow test via accounting for PVT effects are described herein. In some embodiments the disclosure, pressure and temperature measurements of fluid of the well system is taken in real time via a wired pipe communication network.
- A system and method for pressure testing components of a well system is disclosed herein. Embodiments described herein may be employed in various drilling and production applications; however, it has particular application as a system and method for detecting leaks during a test of well system via accounting for and calibrating against PVT effects during the pressure testing of pressure containing components of the well system, such as a fluid containment system (FCS). Further, it has particular application with regard to offshore well drilling and production systems.
- Referring now to
FIG. 2 , an offshorewell drilling system 10 generally includes an offshoresemi-submersible drilling rig 20 disposed at thewater line 12 with aderrick 24 anddeck 22 having a testing fluid system (TFS) 21 disposed thereon.System 10 further includes ariser 30 that extends between therig 20 and awellhead 60 disposed at thesea floor 14, aFCS 40, adrill string 50 disposed within amarine riser 30 and having acentral axis 55 andinternal passageway 50 b. Wellsystem 10 further includescasing 70 that extends downward from acasing hanger 61 ofwellhead 60 and is secured in place viacement 72. -
TFS 21 is disposed atrig floor 22 and comprises amud pit 25, acement unit 27 and afluid conduit 28.Conduit 28 provides afluid flowpath 29 for the passage of testing fluid 29 a frommud pit 25, throughcement unit 27, and to thepassageway 50 b ofdrill string 50.Cement unit 27 comprises a high pressure, reciprocating fluid pump. However, in otherembodiments cement unit 27 may comprise other components configured to pressurize a fluid. Testingfluid 29 comprises a drilling fluid that may be at a high density or high weight (e.g., drilling fluid, SOBM, completion fluid, etc.) relative to theambient water 13 disposed belowwater line 12. For instance, fluid 29 typically has a high enough density to overcome the pressure of fluid within theadjacent formation 16. Alternatively, testing fluid may also comprise a relatively lower density fluid, such as water. - An
annulus 35 is formed betweendrill string 50 andriser 30 and allows for the recirculation of drilling fluid betweenrig 20 and awellbore 62 that extends intosubterranean formation 16 from thesea floor 14.FCS 40 generally includes components configured to retain and manage fluid pressure within well system 10 (e.g.,drill string 50,FCS 40 and annulus 35). In the embodiment ofwell system 10,FCS 40 includesBOP 41,choke line 44, killline 46 and an internal blowout preventer (IBOP) 48, wellhead and the casing and or liner and float valves.Rams 42 ofBOP 41 are configured to provide anannular seal 43 aboutdrill string 50 upon actuation, dividingannulus 35 into a first orupper section 35 a extending betweenrig 20 andseal 43 and a second ormiddle section 35 b extending fromseal 43 downward to a FCS testing plug 49 coupled todrill string 50. - A third or
lower section 35 c extends fromwellhead 60 into thewellbore 62.Testing plug 49 is configured to prevent fluid flow betweenmiddle portion 35 b ofannulus 35 and alower portion 35 c extending intowellbore 62. Testing plug 49 forms anannular seal 49 c against anannular surface 61 a ofhanger 61 disposed withinwellhead 60.Testing plug 49 is coupled to an end of two adjacent tubular joints orsections 52 that extend between nodes 51 and physically engages upperannular surface 61 a ofhanger 61 via lowerannular surface 49 a. A radial port or opening 45 is provided in thedrillstring 50 to act as a route of fluid communication betweendrillstring 50 and theannulus 35 abovetesting plug 49. During drilling, a volume of formation fluid or a kick of fluid from theformation 16 that has a relatively higher pressure than drilling fluid disposed withinwellbore 62 may flow intowellbore 62 and travel upward throughlower section 35 c of annulus 35 (testing plug 49 is not installed inwell system 10 during the act of drilling). The formation kick may be trapped or isolated withinlower section 35 c ofannulus 35 via actuating one ormore rams 42 ofBOP 41 to provide theannular seal 43. Chokeline 44 and killline 46 may be used to provide for alternate routes of fluid communication betweenrig 20 andannulus 35 such that the kill fluid (e.g., water, weighted drilling mud, etc.) is pumped intoFCS 40 to prevent further upward flow of fluid fromformation 16. - During a formation kick, an influx of fluid from the formation may be circulated upward through
choke line 44 to therig 20, in an effort to regain control and stabilize the flow of formation fluid intoannulus 35 by introducing a fluid at sufficient density to provide the minimum required hydrostatic head to balance the formation pressure such that fluid pressure withinFCS 40 may stabilize. Chokeline 44 generally includes alower valve 44 a, a manifold 44 b and anupper valve 44 c. Fluid flow throughchoke line 44 may be restricted by closinglower valve 44 a orupper valve 44 c. Further, chokemanifold 44 b includes a plurality of valves, chokes and other equipment, and as such is configured to manage and regulate flow throughchoke line 44. Because successful control of a formation kick may depend on the effective operation ofchoke line 44 and its components, 44 a, 44 c and manifold 44 b are individually pressure tested during the pressure testing ofvalves FCS 40. Killline 46 is also used to manage a formation kick by allowing for circulation betweenannulus 35 andrig 20. For instance, killline 46 is used as a route of fluid communication to pump high density drilling mud or other fluid downward fromrig 20 to theannulus 35 to forcibly maintain the fluid from the formation kick or influx within thewellbore 62. Thus, a kill line such askill line 46 may be used to “kill” the well by reversing, stopping or at least substantially restricting the flow of fluid from the formation into thewellbore 62 by pumping heavy fluid into the entire fluid circulation system (e.g.,annulus 35,choke line 44, killline 46, etc.) from therig 20. Killline 46 comprises alower valve 46 a, akill manifold 46 b and anupper valve 46 c. As withchoke line 44, flow throughkill line 46 may be substantially restricted or controlled via 46 a, 46 c and manifold 46 b. Thus, during pressure testing ofvalves FCS 40, 46 a, 46 c and manifold 46 b are pressure tested as well.valves - Another component of
FCS 40,IBOP 48, is disposed at anupper end 50 a ofdrill string 50 at therig 20 and is configured to manage fluid pressure withindrill string 50. For instance, during a formation kick, high pressure formation fluid may begin flowing upward throughstring 50 via an opening or port of thestring 50 disposed within wellbore 62 (e.g., at the drill bit). For instance,IBOP 48 includes a valve that allows for the passage of fluid intostring 50 but may be closed to restrict fluid from flowing out ofstring 50 throughIBOP 48 in the event of a formation kick. Thus, becauseIBOP 48 may be used in effectively controlling a formation kick,IBOP 48 is pressure tested during the pressure testing ofFCS 40. - Referring now to FIGS. 2 and 3A-3D,
drill string 50 comprises a plurality of nodes 51 (e.g., 51 a-51 e) coupled between a plurality oftubular joints 52. Wired or networked drill pipe incorporating distributed sensors can transmit data from anywhere along thedrill string 50 to therig 20 for analysis. Nodes 51 are provided at desired intervals along thedrill string 50. Network nodes 51 essentially function as signal repeaters to regenerate and/or boost data signals and mitigate signal attenuation as data is transmitted up and down the drill string. The nodes 51 may also include measurement assemblies. The nodes 51 may be integrated into an existing section of drill string or a downhole tool along thedrill string 50. For purposes of this disclosure, the term “sensors” is understood to comprise sources (to emit/transmit energy/signals), receivers (to receive/detect energy/signals), and transducers (to operate as either source/receiver). Tubular joints 52 include afirst pipe end 53 having, for example, afirst induction coil 53 a and asecond pipe end 54 having, for example, asecond induction coil 54 a. - Nodes 51 comprise a portion of a wired
pipe communication network 56 that provides an electromagnetic signal path that is used to transmit information along thedrill string 50. Thecommunication network 56, or broadband network telemetry, may thus include multiple nodes 51 based along thedrill string 50. Communication links orwired conductors 52 a may be used to connect the nodes 51 to one another, and may comprise cables or other transmission media integrated directly into sections of thedrill string 50. The cable may be routed through the central wellbore of thedrill string 50, or routed externally to thedrill string 50, or mounted within a groove, slot or passageway in thedrill string 50. Signals from the plurality of sensors of nodes 51 along thedrill string 50 are transmitted to rig 20 throughwire conductors 52 a along thedrill string 50. Communication links 52 a between the nodes 51 may also use wireless connections. A plurality of packets may be used to transmit information along the nodes 51. Further detail with respect to suitable nodes, a network, and data packets are disclosed in U.S. Pat. No. 7,207,396 (Hall et al., 2007), hereby incorporated in its entirety by reference. Various types of sensors 57 may be employed along thedrill string 50 in various embodiments, including without limitation, axially spaced pressure sensors, temperature sensors, and others. The sensors 57 may be disposed on the nodes 51 positioned along the drill string, disposed on tools incorporated into the drill string, or a combination thereof. Thus, sensors 57 of nodes 51 may measure temperature, pressure, etc., of fluid withinstring 50 orannulus 35 ofwell system 10. - Network nodes 51 are disposed along the
drill string 50 betweenjoints 52. In some embodiments, the booster assemblies are spaced at 1,500 ft. (500 m) intervals to boost the data signal as it travels the length of thedrill string 50 to prevent signal degradation. Network nodes 51 are also located at these intervals to allow measurements to be taken along the length of thedrill string 50. The distributed network nodes 51 provide measurements that give the driller additional insight into what is happening along the potentially miles-long stretch of thedrill string 50. -
Rig 20 includes a well site computer 58 that may display information for the drilling operator. The wiredpipe communication network 56 transmits information from each of a plurality of sensors 57 to a surface computer 58. Information may also be transmitted from computer 58 to another computer 59, located at a site remote from the well, with this computer 59 allowing an individual in the office remote from the well to review the data output by the sensors 57. Although only a few sensors 57 are shown in the figures, those skilled in the art will understand that a larger number of sensors may be disposed along a drill string (e.g., drill string 50) when drilling, and that all sensors associated with any particular node may be housed within or annexed to the node 51, so that a variety of sensors rather than a single sensor will be associated with that particular node. - Due to the risk of losing control of well system 10 (i.e., the uncontrolled flow of combustible or flammable formation fluids into well system 10) caused by an uncontrolled wellbore influx of fluid from the formation, it is important to detect the influx as soon as possible. In some circumstances, a BOP (e.g., BOP 41) of the FCS (e.g., FCS 40) is actuated to close off the well above the wellbore influx. In some cases, for example in deepwater wells, the wellbore influx may migrate above the BOP before a ram of the BOP fully closes to seal off the wellbore. In the embodiments disclosed herein, the wired
pipe communication network 56 allows wellsite personnel to identify potential remedial actions for the migrated wellbore influx. In some embodiments, the measurements used are independent from surface measurements. - One or more embodiments of a
well drilling system 10 comprising afluid containment system 40 and atesting fluid system 21 having been disclosed, one or more embodiments of a method of pressure testing components of theFCS 40 are also disclosed herein. Further, one or more embodiments of a method for evaluating or troubleshooting the results of a failed pressure test of components ofFCS 40 are disclosed herein. In an embodiment, a FCS pressure testing method generally includes the steps of engaging a testing plug of the FCS against a sealing surface within the FCS (e.g., a casing hanger), disposing a quantity of testing fluid (e.g., drilling fluid, etc.) within the FCS, isolating a component of the FCS (e.g., actuating a ram of the BOP, closing a valve of the choke line, etc.), displacing an additional quantity of testing fluid into the FCS to increase the fluid pressure within the FCS to a predetermined testing pressure, shut-in the FCS by ceasing the displacement of testing fluid into the FCS, continuously in real-time monitor fluid pressure within the FCS via an wired pipe communication network for a period of time. - In an embodiment, ram 42 of
BOP 41 may be pressure tested as part of the regime for pressure testing each individual component ofFCS 40. In this embodiment, testing plug 49 is coupled todrill string 50 and displaced downward throughmarine riser 30 untilannular surface 49 a oftool 49 engagesannular surface 61 a oftubing hanger 61 to createannular seal 49 c, which dividesannulus 35 intoupper section 35 a andlower section 35 c. Before, during or after sealing engagement has been achieved betweentool 49 andhanger 61, high density testing fluid 29 (e.g., drilling fluid, SOBM, competition fluid, etc.) is disposed withindrill string 50 andriser 30 at a relatively low pressure (e.g., approximately 300-350 psi) usingcement unit 27 and flowpath 29 a. Also, prior to commencement of the pressure testing ofFCS 40, ram 42 ofBOP 41 is actuated to form anannular seal 43 against an outer surface ofdrill string 50, substantially preventing testing fluid from aport 45 ofstring 50 from flowing upward into theupper section 35 a ofannulus 35. Thus, 49 c and 43 form middle section orannular seals closable chamber 35 b withinmarine riser 30. During the course of the pressure testing ofram 42, pressure and temperature of fluid withinannulus 35 anddrill string 50 is continuously measured at different vertical depths alongstring 50 via 51 a, 51 b, 51 c, etc. For instance, pressure and temperature of fluid withinnodes chamber 35 b is continuously measured vianode 51 c while pressure and temperature inupper portion 35 a are measured via 51 a and 51 b and the temperature and pressure ofnodes lower portion 35 c are measured by 51 d and 51 e. Measurements taken by sensors 57 at nodes 51 (e.g., nodes 51 a-51 e) are continuously transmitted to computers 58 or 59 atnodes rig 20 via wiredpipe communication network 56. - Following the engagement of
49 c and 43, fluid pressure withinannular seals drillstring 50 andchamber 35 b ofannulus 35 is increased to a predetermined testing pressure by displacing a volume of testingfluid 29 intochamber 35 b viaport 45. Testingfluid 29 is pumped usingcement unit 27 intodrill string 50 viafluid flowpath 29 a, which comprisesmud pit 25,cement unit 27 andpassageway 50 b ofstring 50. Testingfluid 29 withinchamber 35 b is subsequently pressurized to approximately between 5,000-15,000 psi bycement unit 27. During the process of pressurizing testing fluid withinchamber 35 b, testingfluid 29 is disposed withinchoke line 44 and killline 46, preventing fluid withinchamber 35 b from flowing up 44, 46, via the weight of the fluid 29 disposed withinlines 44, 46.lines -
FIGS. 4A and 4B illustrate graphs of data that may be generated by nodes 51 (e.g., 51 a, 51 b and 51 c) during a high pressure test of components ofFCS 40. 502 and 508 illustrate the temperature and pressure curves, respectively, captured in real time byCurves top node 51 a. 504 and 510 illustrate the temperature and pressure curves, respectively, captured in real time byCurves middle node 51 b. 506 and 512 illustrate the temperature and pressure curves, respectively, captured in real time byCurves bottom node 51 c. 51 a, 51 b and 51 c are each within fluid communication with one another, and thus expansion of fluid disposed proximal to one node will result in a measured fluid pressure increase by all three nodes. ANodes pumping phase 207 is followed by a shut-inphase 208, having a beginning 208 a and an ending 208 b, marks the period of time after pumping has finished and beforeFCS 40 has been depressurized, which is then followed by adepressurization phase 209. Specifically, during pumpingphase 207, testingfluid 29 is pumped intodrillstring 50 viacement unit 27,which in turn displaces a volume of fluid intochamber 35 c, pressurizing thechamber 35 c to the BOP testing pressure. Once pressure withinchamber 35 c has reached the BOP testing pressure, the beginning 208 a of shut-inphase 208 initiates with the cessation of pumping fromcement unit 27, stopping the flow of testingfluid 29 intodrillstring 50 atrig 20. As part of the BOP pressure test shown inFIG. 2 , ram 42 must successfully hold the BOP test pressure for a specified period of time. In one example, ram 42 must hold 15,000 psi for a period of five minutes. Friction from pumping results in an increase in temperature of theadditional testing fluid 29 pumped intoFCS 40 andstring 50 frommud pit 25. During shut-inphase 208 heat generated within the pumped-intesting fluid 29 begins to transfer out intofluid occupying riser 30 and/or the ambientseawater surrounding riser 30. Thus, at least partially arising from the transfer of heat from testingfluid 29, fluid pressure withinchamber 35 c steadily decreases in response to the decreasing temperature of fluid withinFCS 40, especially with regard to theadditional testing fluid 29 pumped intoFCS 40 frommud pit 25. - As opposed to traditional surface measurements (e.g., on a circular chart), the data captured by
51 a, 51 b and 51 c ofnodes FIG. 2 quantify both pressure and temperature of the fluid withinFCS 40, allowing the computers 58, 59, to correct against PVT effects in order to determine the amount of pressure decay during the shut-inphase 208 that is arises from the decay in temperature, and not due to a possible leak. Due to the relationship between pressure, volume, and temperature, a pressure decrease may only be caused by decay in temperature. A leak within a FCS results in a decrease in the volume of fluid present in the FCS and in turn a decrease in fluid pressure within the FCS. The ability to extract the amount of pressure decay due to the decay in temperature allows for a more time efficient shut-in phase for non-leaking FCSs as the pressure decay due to decay in fluid temperature will be quantified and extracted, leaving a near-zero change in pressure over time, illustrating that the system is holding pressure and has successfully passed the pressure test. - The total or net pressure decay within the FCS arising from temperature decay(dPT) is calculated from the node data using the equation:
-
- where i denotes the section between nodes (e.g., nodes 51 a-51 e), with the number of sections being a function of the number of nodes (number of sections =(number of nodes)!);
-
- denotes the change in temperature for a given section (dTi) divided by the change in time (dt).
FIG. 5 illustrates the relationship between the total pressure decay (dP) 602, the pressure decay arising from a decay in temperature (dPT) 604 and the pressure decay arising from a decrease in the volume of fluid (dpV) 606 disposed in a non-leaking FCS, where the total pressure decay is substantially arising from the decay in temperature and thus the decay in pressure arising from a change in volume is near zero. This illustrates that when the decay in pressure arising from a decay in temperature is known, it may be accounted for or removed (i.e., subtracted) from the pressure decay measured by the nodes, leaving only the pressure decay to a change in volume. Given that in a non-leaking FCS the volume will remain constant such that the change in pressure due to a change in volume will be approximately zero, if the measured pressure decay and the pressure decay due to temperature are not substantially equal then a leak in the measured system will be indicated. Because the decay in pressure due to temperature has been filtered out, a drilling operator will not have to wait for the temperature within the measured system to stabilize before receiving an indication of whether the system has passed or failed the pressure test, shortening the total time for a given test. - Referring back to
FIG. 2 , in order to test the sealing integrity ofram 42, the pressure and temperature of sections of thedrill string 50 are measured in real time in order to determine the dPV for each section, and after the dPV is observed from the computers 58, 59, as holding substantially constant pressure for approximately five minutes, the pressure test would be successful. In addition to ram 42 ofBOP 41, other components ofFCS 40 may be pressure tested in a similar manner. For instance, other individual rams ofBOP 41 may be actuated to create an annular seal withinannulus 35, forming a cavity defined by the ram's annular seal and theseal 49 a produced byBOP testing plug 49. Likewise, 44 a, 46 a, manifolds 44 b, 46 b, andlower valves 44 c, 46 c, ofupper valves choke line 44 and killline 46, respectively, may be pressure tested. In order to test the components ofchoke line 44 and killline 46, highdensity testing fluid 29 is pumped intodrillstring 50 viacement unit 27.Ram 42 ofBOP 41 may be actuated to createannular seal 43. However, instead of allowing fluid communication betweenchoke line 44 and killline 46 withchamber 35 c, a component of 44, 46, may be sealed (e.g.,lines lower valve 44 a). In this embodiment, the sealed component (e.g.,valve 44 a) may be pressure tested to see if it holds the BOP test pressure for a requisite period of time (e.g., five minutes). In another embodiment, nodes are placed (e.g., nodes similar to nodes 51) withinchoke line 44 or killline 46 in order to continuously measure and transmit pressure and temperature readings from 44, 46 and quantify any pressure decay withinlines 44, 46, due to temperature decay so as to determine if there has been a decay in pressure due to a decrease in the volume of fluid disposed withinlines 44, 46. In this embodiment, other components oflines network 56 would be incorporated intolines 44 and 46 (e.g.,wired conductors 52 a, etc.) to allow for the transference of signals or data from nodes of 44 and 46 to computes 58, 59. Further, while pressure would be measured in real time from nodes disposed inlines 44, 46, temperature measurements would be read from nodes disposed withinlines drill string 50, as heated fluid would be pumped intostring 50 fromcement unit 27. -
FIG. 6 illustrateswell system 10 configured to conduct a high pressure test of an upper completion system of theFCS 40, includingtubing 81 andcasing 70. Upon completion of the drilling phase, a lower completion and an upper completion may be installed withinwellbore 62 prior to the beginning of the production phase ofwell system 10. For instance, in the embodiment illustrated inFIG. 6 ,upper completion 80 generally includestubing 81 coupled to atubing hanger 82 to serve as the main support for production tubing and to act as a sealing point of theriser 30 at thewellhead 60, and casing 70 which is installed and cemented in place viacement 72 to seal thewellbore 62 from the formation, thus makingwellbore 62 a closeable chamber configured to prevent formation fluid from leaking into thewellbore 62. -
Tubing 81 includes aport 86 that provides fluid communication between wellbore orchamber 62 and theinternal passageway 50 b ofstring 50.Tubing hanger 82, upon installation inwellhead 60, creates anannular seal 82 a that prevents fluid communication betweenwellbore 62 and theannulus 35 withinmarine riser 30.Tubing 81 andtubing hanger 82 are installed via a tubinghanger running tool 83 that is coupled to the downholeterminal end 50 c ofdrill pipe 50. Specifically,tubing hanger 82 and runningtool 83 are coupled together astubing 81 is displaced downward intowellbore 62. Following the installation ofupper completion 80, a lower completion may be installed withinwellbore 62 that includes production packers to isolate particular zones ofwellbore 62, plugs, circulating devices, etc. Once the lower and upper completions have been installed, runningtool 83 may be decoupled fromtubing hanger 82, allowing for the removal ofdrill pipe 50 and runningtool 83 from themarine riser 30. - Testing of
seal 82 a includes inflow or negative pressure testing and positive pressure testing at both high (e.g., approximately 70% of maximum capacity) and low pressures. To test the seal integrity ofseal 82 a ofhanger 61 and/or thecasings 70, as well as other components of upper completion 90, high density fluid (e.g., drilling fluid, completion fluid, etc.) is pumped from acement unit 27, down through thedrill string 50, out through a port 86 (as indicated by the arrows shown inFIG. 6 ) and into thewellbore 62. Nodes 51 (e.g., 51 a-51 c, etc.) disposed withinannulus 35 are used to indicate real time pressure and temperature of the fluid in bothpassageway 50 b ofstring 50 and wellbore to determine the real time decay in pressure due to an increase in volume caused by a leak in the upper completion 90, dPV. Ifseal 82 a oftubing hanger 82 and the seal betweencasing 70 andformation 16 are properly sealed, the pressure and temperature data transmitted from nodes 51 (e.g., 51 a-51 c, etc.) will indicate a nearly constant dPV, thus indicating successful a positive pressure test of upper completion 90. - While the embodiment illustrated in
FIG. 6 describes the use of nodes 51 andnetwork 56 in pressure testing an upper completion 90, nodes 51 andnetwork 56 may also be used for performing a pressure test of an installed lower completion. For instance, nodes 51 oftubing 82 may be disposed within individual production zones that are sealed via a plurality of production packers. The annular seal created by each installed production packer may be tested by pressurizing each individual sealed production zone and measuring in real time the fluid pressure and temperature within the particular tested zone. - Besides the positive pressure testing, also inflow or negative pressure testing is commonly required for wells with a subsea BOP or a mudline suspension system to verify barriers and well integrity for those instances that the wellbore may be exposed to a reduced hydrostatic pressure as may be the case once the marine riser is eliminated or during abandonment. Wellbores of well systems, such as
system 10, may be subjected to negative pressures upon abandonment (e.g., pressure withinwellbore 62 may be lower than in the surrounding environment 13), whenwellhead 60 is sealed andBOP 41 andriser 30 have been removed. Formation fluid within the wellbore may be of a higher pressure than the seawater surrounding the wellhead, creating a negative pressure acrosswellhead 60 that may lead to an inflow of fluid fromformation 16 into thewellbore 62 ifFCS 40 fails to sealwellbore 62. As discussed previously, inflow or negative pressure testing involves creating a negative pressure environment within the wellbore (e.g., wellbore 62) through the use of low density fluids, possibly seawater. -
FIGS. 9A and 9B illustrate a negative pressure testing setup using the MSP method. In this embodiment, a mechanical packer or plug 804 is installed inwellbore 62. In some embodiments,barrier 804 may be a temporary or removable plug such as the RTTS (Halliburton tool (3000 N. Sam Houston Pkwy E. Houston, Tex. 77032 U.S.A) which is a retrievable mechanical stab-in packer. Alternatively,barrier 804 may also be a permanently installed MSP. The plug orbarrier 804 having avalve 804 a is installed within thewellbore 62, providing anannular seal 804 b, isolating anupper section 62 a from a lower section orcloseable chamber 62 b ofwellbore 62. Thewellbore 62 is sealed from the surrounding formation using abarrier 806 installed at the downhole end of thecasing 70. Theplug 804 seals the wellbore 62 fromannulus 35 ofriser 30 when thedrill string 50 is not stabbed (protruding) into it (as shown inFIG. 7A ). However,string 50 may be displaced downward intowellbore 62 and “stabbed” into theplug 804 such thatvalve 804 a ofplug 804 opens, allowing fluid disposed withinstring 50 to be pumped into the lower portion orchamber 62 b of thewellbore 62. - In order to conduct the negative pressure test of
wellbore 62 andwellhead 60,drill string 50 is partially or completely filled with a relatively lessdense fluid 829 compared to the heavier drilling or completion fluid. In this example the negative pressure testing fluid is water. However, in other embodiments fluid 829 may be base oil or other relatively less dense fluids. Following the filling ofdrill string 50, thestring 50 is stabbed into the plug 804 (as shown inFIG. 7B ) by displacingstring 50 farther intowellbore 62, which allows for fluid communication between thewater 829 indrill string 50 and thelower portion 62 b ofwellbore 62. Ifwellbore 62 is not isolated by thebarrier 806 and/orcasing 70, or other subsurface components ofFCS 40, then relatively higher pressure formation fluid may flow upward into the downhole end ofdrill string 50, displacing the relatively lessdense water 829 upward toward rig. The real time pressure and temperature within thedrill string 50 may be measured using nodes 51 (e.g., 51 a-51 d), which may be used to measure a possible decay in fluid pressure due to an increase in volume caused by a leak, dPV . Thus, if the dPV indicated by nodes 51 a-51 d remains substantially zero then this indicates a successful negative or low pressure test of the integrity of thewellbore 62. -
FIGS. 8A and 8B illustrate an alternative method for negative or lowpressure testing wellbore 62 before abandoning a well using the CKL method. Referring first toFIG. 8A , the downhole end ofwellbore 62 is sealed bybarrier 806, casing 70 andwellhead 60, and 44 a, 46 a, are in a closed position, forming alower valves closeable chamber 831 generally includingwellbore 62,string 50 andannulus 35. In this method, killline 46 is then partially or completely filled withnegative testing fluid 829 via being pumped fromcement unit 27 while a ram or annular (e.g., ram 42) ofBOP 41 is actuated to createannular seal 43, isolatingwellbore 62 fromannulus 45 ofmarine riser 30. Also, 44 a, 46 a, are opened to provide fluid communication betweenlower valves wellbore 62 and 44 and 46. Nodes 51 a-51 d measure real time pressure and temperature values within thelines drill string 50 and wellbore 62, indicating a real time pressure decay withinwellbore 62 due to a leak betweenwellbore 62 and either theformation 16 or theambient water 13. If thewellbore 62 is sealed fromformation 16, then thelow density fluid 829 disposed within the choke and kill 44, 46, will not be displaced by the relatively higher density and pressure formation fluid, and the dPV measured by nodes 51 a-51 d withinlines drill string 50 will remain substantially zero, indicating a successful negative pressure test of thewellbore 62. Thus, by using nodes 51 to monitor fluid pressure downhole in real time, personnel at therig 20 need not choke manifold 44 b for a fluid flow fromwellbore 62, in order to determine if there was a leak inFCS 40. This may eliminate some issues with current testing procedures. For instance, by using nodes 51, even iflower valve 44 a malfunctioned and remained closed, fluid pressure withinwellbore 62 could still be monitored in real time to determine the presence of a leak. - Referring back to
FIG. 6 , an inflow or negative pressure test on a completion ofwell system 10, such asupper completion 80. For example, relatively low density fluid such as water or base oil may be disposed withinpassage 50 b ofstring 50 and put into fluid communication withwellbore 62 viaport 86. Due to the lower density of the fluid disposed withinstring 50, the amount of static fluid pressure or head applied to wellbore 62 frompassage 50 b is substantially reduced, thus theupper completion 80's ability to withstand inflow or negative pressure betweenwellbore 62 andformation 16. - While embodiments have been shown and described, modifications thereof can be made by one skilled in the art without departing from the scope or teachings herein. The embodiments described herein are exemplary only and are not limiting. Many variations and modifications of the systems, apparatus, and processes described herein are possible and are within the scope of the invention. Accordingly, the scope of protection is not limited to the embodiments described herein, but is only limited by the claims that follow, the scope of which shall include all equivalents of the subject matter of the claims. Unless expressly stated otherwise, the steps in a method claim may be performed in any order. The recitation of identifiers such as (a), (b), (c) or (1), (2), (3) before steps in a method claim are not intended to and do not specify a particular order to the steps, but rather are used to simplify subsequent reference to such steps.
Claims (26)
1. A method for pressure testing a well system comprising:
providing fluid into a closeable chamber of the well system;
measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the well system; and
measuring in real time a temperature change of fluid within the closeable chamber using a sensor disposed within the well system.
2. The method of claim 1 , wherein the closeable chamber is provided with a fluid having a higher density than water.
3. The method of claim 1 , wherein the closeable chamber is provided with a fluid having a density substantially equal to water.
4. The method of claim 1 , wherein the closeable chamber comprises at least a portion of a drill string.
5. The method of claim 1 , wherein the closeable chamber comprises at least a portion of a choke line.
6. The method of claim 1 , wherein the closeable chamber comprises at least a portion of a kill line.
7. The method of claim 1 , further comprising using real time pressure and temperature measurements to calculate real time pressure decay of fluid within the closeable chamber, the calculated pressure decay arising from changes in the volume of fluid within the closeable chamber over time.
8. The method of claim 4 , further comprising stabbing into a plug of the well system with the drill string to allow for fluid communication between the drill string and a volume of fluid disposed below the plug.
9. The method of claim 1 , wherein the closeable chamber comprises at least a portion of a blowout preventer.
10. The method of claim 9 , further comprising sealing the blowout preventer to prevent fluid communication between a drill string of the well system and an annulus adjacent to the blowout preventer.
11. The method of claim 1 , further comprising measuring in real time a pressure change in the closeable chamber using a sensor disposed within the well system.
12. The method of claim 1 , wherein the closeable chamber comprises a component of a completion system.
13. The method of claim 11 , wherein the component of the completion system comprises a tubing hanger.
14. The method of claim 1 , further comprising communicating a signal from the sensor using a wired pipe communication network.
15. A method for pressure testing a well system comprising:
providing fluid into a closeable chamber of the well system; and
determining in real time a change in fluid pressure in the closeable chamber, the determined change in pressure arising from a change in the volume of fluid within the closeable chamber.
16. The method of claim 15 , further comprising determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid.
17. The method of claim 15 , wherein determining in real time a change in fluid pressure within the closeable chamber arising from a change in the volume of fluid within the closeable chamber comprises measuring in real time a change in fluid pressure within the closeable chamber using a sensor disposed within the well system.
18. The method of claim 16 , wherein determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid comprises measuring in real time a temperature change of fluid within the closeable chamber using a sensor disposed within the well system.
19. The method of claim 16 , wherein determining in real time a change in fluid pressure within the closeable chamber arising from a change in temperature of the fluid comprises calculating the change in temperature over time for a section of a wired pipe communication network.
20. The method of claim 19 , further comprising summing the pressure decay arising from changes in temperature over time for the section of the wired pipe communication network.
21. The method of claim 20 , further comprising subtracting the summed pressure decay arising from changes in temperature over time from the total fluid pressure decay within the closeable chamber.
22. The method of claim 15 , wherein the closeable chamber comprises at least a portion of a blowout preventer.
23. The method of claim 15 , wherein the closeable chamber comprises at least a portion of a wellhead.
24. A method for pressure testing a well system comprising:
providing fluid into a closeable chamber of the well system;
measuring in real time a change in fluid pressure within the closeable chamber using a sensor of a wired pipe communication network disposed within the well system;
measuring in real time a temperature change of fluid within the closeable chamber using a sensor of the wired pipe communication network disposed within the well system; and
calculating in real time the pressure decay arising from a change in the volume of fluid disposed within the closeable chamber using the pressure and temperature measurements.
25. The method of claim 24 , wherein the closeable chamber comprises at least a portion of a blowout preventer.
26. The method of claim 24 , wherein the closeable chamber comprises at least a portion of a component of an upper completion system.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/671,430 US20130111985A1 (en) | 2011-11-07 | 2012-11-07 | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
| PCT/US2012/064191 WO2014074099A1 (en) | 2012-11-07 | 2012-11-08 | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201161556781P | 2011-11-07 | 2011-11-07 | |
| US13/671,430 US20130111985A1 (en) | 2011-11-07 | 2012-11-07 | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20130111985A1 true US20130111985A1 (en) | 2013-05-09 |
Family
ID=47263583
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/671,430 Abandoned US20130111985A1 (en) | 2011-11-07 | 2012-11-07 | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20130111985A1 (en) |
| WO (1) | WO2014074099A1 (en) |
Cited By (20)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140123747A1 (en) * | 2012-11-05 | 2014-05-08 | Intelliserv, Llc | Systems and methods for conducting pressure tests on a wellbore fluid containment system |
| US20140262269A1 (en) * | 2013-03-13 | 2014-09-18 | Superior Energy Services, L.L.C. | Method to repair leaks in a cemented annulus |
| WO2016036362A1 (en) * | 2014-09-03 | 2016-03-10 | Halliburton Energy Services, Inc. | Riser isolation tool for deepwater wells |
| WO2016161143A1 (en) | 2015-03-31 | 2016-10-06 | Engip Llc | Hydrostatic and vibration test system for a blowout preventive |
| US9470082B1 (en) * | 2015-05-05 | 2016-10-18 | Backoff, Llc | Blowout-preventer-stack one-trip test tool and method |
| US20160334300A1 (en) * | 2015-05-11 | 2016-11-17 | HilFlo, LLC | Hydrostatic Pressure Test Method |
| US20170074748A1 (en) * | 2015-03-31 | 2017-03-16 | Engip Llc | Normalized Hydrostatic Test Method |
| US20180052071A1 (en) * | 2015-03-31 | 2018-02-22 | Engip Llc | Method and System for Determining a Fluid Leak |
| US10113650B2 (en) | 2016-01-12 | 2018-10-30 | Engip, LLC | Dual seat valve |
| US10132164B2 (en) * | 2015-12-18 | 2018-11-20 | Schlumberger Technology Corporation | Systems and methods for in-situ measurements of mixed formation fluids |
| WO2019097220A1 (en) * | 2017-11-15 | 2019-05-23 | Ardyne Holdings Limited | Improvements in or relating to well abandonment and slot recovery |
| US10330561B2 (en) | 2015-03-31 | 2019-06-25 | Engip, LLC | Method for testing for fluid leaks |
| NO20180592A1 (en) * | 2018-04-26 | 2019-10-28 | Scanwell Tech As | Method of testing an integrity of a structure comprising a chamber, and related apparatus |
| CN111395992A (en) * | 2020-03-27 | 2020-07-10 | 甘肃省建材科研设计院有限责任公司 | Leakage stopping method |
| WO2020223203A1 (en) * | 2019-04-29 | 2020-11-05 | Baker Hughes Oilfield Operations Llc | Temperature based leak detection for blowout preventers |
| US10996132B2 (en) | 2015-03-31 | 2021-05-04 | ENgip, LLP | Method for testing for fluid leaks |
| US11041380B2 (en) | 2016-05-26 | 2021-06-22 | Metrol Technology Limited | Method of pressure testing |
| US11105198B2 (en) | 2016-03-31 | 2021-08-31 | Schlumberger Technology Corporation | Methods for in-situ multi-temperature measurements using downhole acquisition tool |
| WO2022026683A1 (en) | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
| WO2022026727A1 (en) | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2016130612A1 (en) | 2015-02-13 | 2016-08-18 | Schlumberger Technology Corporation | Deployment method for coiled tubing |
| US10590729B2 (en) | 2015-02-13 | 2020-03-17 | Schlumberger Technology Corporation | Sharable deployment bars with multiple passages and cables |
| US10465472B2 (en) | 2015-02-13 | 2019-11-05 | Schlumberger Technology Corporation | Deployment valves operable under pressure |
| WO2016130620A1 (en) * | 2015-02-13 | 2016-08-18 | Schlumberger Technology Corporation | Deployment blow out preventer with interlock |
| US10934792B2 (en) | 2015-02-13 | 2021-03-02 | Schlumberger Technology Corporation | Powered sheave with wireline pushing capability |
| CN110529066B (en) * | 2019-07-12 | 2021-10-29 | 中国石油化工股份有限公司 | Blowout prevention plug for well testing |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050269079A1 (en) * | 2003-12-26 | 2005-12-08 | Franklin Charles M | Blowout preventer testing system |
| US20090236144A1 (en) * | 2006-02-09 | 2009-09-24 | Todd Richard J | Managed pressure and/or temperature drilling system and method |
| US20120316788A1 (en) * | 2009-10-06 | 2012-12-13 | Schlumberger Technology Corporation a corporation | Formation Testing Planning And Monitoring |
| US20130087388A1 (en) * | 2011-10-09 | 2013-04-11 | Intelliserv, Llc | Wellbore influx detection with drill string distributed measurements |
| US20140123747A1 (en) * | 2012-11-05 | 2014-05-08 | Intelliserv, Llc | Systems and methods for conducting pressure tests on a wellbore fluid containment system |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4090395A (en) * | 1977-03-28 | 1978-05-23 | Exxon Production Research Company | Casing seal and blowout preventer tester and test method |
| CA2155918C (en) * | 1994-08-15 | 2001-10-09 | Roger Lynn Schultz | Integrated well drilling and evaluation |
| EP1270870B1 (en) * | 2001-06-22 | 2006-08-16 | Cooper Cameron Corporation | Blow out preventer testing apparatus |
| US7207396B2 (en) | 2002-12-10 | 2007-04-24 | Intelliserv, Inc. | Method and apparatus of assessing down-hole drilling conditions |
-
2012
- 2012-11-07 US US13/671,430 patent/US20130111985A1/en not_active Abandoned
- 2012-11-08 WO PCT/US2012/064191 patent/WO2014074099A1/en not_active Ceased
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20050269079A1 (en) * | 2003-12-26 | 2005-12-08 | Franklin Charles M | Blowout preventer testing system |
| US20090236144A1 (en) * | 2006-02-09 | 2009-09-24 | Todd Richard J | Managed pressure and/or temperature drilling system and method |
| US20120316788A1 (en) * | 2009-10-06 | 2012-12-13 | Schlumberger Technology Corporation a corporation | Formation Testing Planning And Monitoring |
| US20130087388A1 (en) * | 2011-10-09 | 2013-04-11 | Intelliserv, Llc | Wellbore influx detection with drill string distributed measurements |
| US20140123747A1 (en) * | 2012-11-05 | 2014-05-08 | Intelliserv, Llc | Systems and methods for conducting pressure tests on a wellbore fluid containment system |
Cited By (36)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20140123747A1 (en) * | 2012-11-05 | 2014-05-08 | Intelliserv, Llc | Systems and methods for conducting pressure tests on a wellbore fluid containment system |
| US20140262269A1 (en) * | 2013-03-13 | 2014-09-18 | Superior Energy Services, L.L.C. | Method to repair leaks in a cemented annulus |
| US9605490B2 (en) | 2014-09-03 | 2017-03-28 | Halliburton Energy Services, Inc. | Riser isolation tool for deepwater wells |
| WO2016036362A1 (en) * | 2014-09-03 | 2016-03-10 | Halliburton Energy Services, Inc. | Riser isolation tool for deepwater wells |
| GB2544659B (en) * | 2014-09-03 | 2020-12-09 | Halliburton Energy Services Inc | Riser isolation tool for deepwater wells |
| GB2544659A (en) * | 2014-09-03 | 2017-05-24 | Halliburton Energy Services Inc | Riser isolation tool for deepwater wells |
| US20160290889A1 (en) * | 2015-03-31 | 2016-10-06 | Engip Llc | Hydrostatic and Vibration Test System for a Blowout Preventative |
| US20170074748A1 (en) * | 2015-03-31 | 2017-03-16 | Engip Llc | Normalized Hydrostatic Test Method |
| US10996132B2 (en) | 2015-03-31 | 2021-05-04 | ENgip, LLP | Method for testing for fluid leaks |
| US20180052071A1 (en) * | 2015-03-31 | 2018-02-22 | Engip Llc | Method and System for Determining a Fluid Leak |
| US10393616B2 (en) | 2015-03-31 | 2019-08-27 | HilFlo, LLC | Hydrostatic and vibration test method for a blowout preventer |
| US11105706B2 (en) | 2015-03-31 | 2021-08-31 | Engip, LLC | Hydrostatic and vibration test method for a blowout preventer |
| EP3277918A4 (en) * | 2015-03-31 | 2018-11-21 | Engip LLC | Hydrostatic and vibration test system for a blowout preventive |
| US10267705B2 (en) * | 2015-03-31 | 2019-04-23 | HilFlo, LLC | Hydrostatic and vibration test system for a blowout preventative |
| WO2016161143A1 (en) | 2015-03-31 | 2016-10-06 | Engip Llc | Hydrostatic and vibration test system for a blowout preventive |
| US10330561B2 (en) | 2015-03-31 | 2019-06-25 | Engip, LLC | Method for testing for fluid leaks |
| US9470082B1 (en) * | 2015-05-05 | 2016-10-18 | Backoff, Llc | Blowout-preventer-stack one-trip test tool and method |
| US20160334300A1 (en) * | 2015-05-11 | 2016-11-17 | HilFlo, LLC | Hydrostatic Pressure Test Method |
| US10132164B2 (en) * | 2015-12-18 | 2018-11-20 | Schlumberger Technology Corporation | Systems and methods for in-situ measurements of mixed formation fluids |
| US10655737B2 (en) | 2016-01-12 | 2020-05-19 | Engip Llc | Dual seat valve |
| US10113650B2 (en) | 2016-01-12 | 2018-10-30 | Engip, LLC | Dual seat valve |
| US11725511B2 (en) | 2016-03-31 | 2023-08-15 | Schlumberger Technology Corporation | Methods for in-situ multi-temperature measurements using downhole acquisition tool |
| US11105198B2 (en) | 2016-03-31 | 2021-08-31 | Schlumberger Technology Corporation | Methods for in-situ multi-temperature measurements using downhole acquisition tool |
| US11041380B2 (en) | 2016-05-26 | 2021-06-22 | Metrol Technology Limited | Method of pressure testing |
| WO2019097220A1 (en) * | 2017-11-15 | 2019-05-23 | Ardyne Holdings Limited | Improvements in or relating to well abandonment and slot recovery |
| NO20180592A1 (en) * | 2018-04-26 | 2019-10-28 | Scanwell Tech As | Method of testing an integrity of a structure comprising a chamber, and related apparatus |
| NO346330B1 (en) * | 2018-04-26 | 2022-06-07 | Scanwell Tech As | Method of testing an integrity of a structure comprising a chamber, and related apparatus |
| WO2020223203A1 (en) * | 2019-04-29 | 2020-11-05 | Baker Hughes Oilfield Operations Llc | Temperature based leak detection for blowout preventers |
| US11112328B2 (en) | 2019-04-29 | 2021-09-07 | Baker Hughes Oilfield Operations Llc | Temperature based leak detection for blowout preventers |
| CN111395992A (en) * | 2020-03-27 | 2020-07-10 | 甘肃省建材科研设计院有限责任公司 | Leakage stopping method |
| WO2022026683A1 (en) | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
| WO2022026727A1 (en) | 2020-07-31 | 2022-02-03 | Schlumberger Technology Corporation | Bore plug analysis system |
| US20230287785A1 (en) * | 2020-07-31 | 2023-09-14 | Schlumberger Technology Corporation | Bore plug analysis system |
| EP4189212A4 (en) * | 2020-07-31 | 2023-12-20 | Services Pétroliers Schlumberger | HOLE PLUG ANALYSIS SYSTEM |
| EP4189213A4 (en) * | 2020-07-31 | 2023-12-27 | Services Pétroliers Schlumberger | DRILL PAD ANALYSIS SYSTEM |
| US12454885B2 (en) * | 2020-07-31 | 2025-10-28 | Schlumberger Technology Corporation | Bore plug analysis system |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2014074099A1 (en) | 2014-05-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20130111985A1 (en) | Method for efficient pressure and inflow testing of a fluid containment system through real time leak detection with quantification of pvt effects | |
| US6192983B1 (en) | Coiled tubing strings and installation methods | |
| US7062960B2 (en) | Blow out preventer testing apparatus | |
| US7438135B2 (en) | Method of suspending, completing and working over a well | |
| US8899349B2 (en) | Methods for determining formation strength of a wellbore | |
| US7845415B2 (en) | Direct connecting downhole control system | |
| US20140123747A1 (en) | Systems and methods for conducting pressure tests on a wellbore fluid containment system | |
| US20130087388A1 (en) | Wellbore influx detection with drill string distributed measurements | |
| CN105612308A (en) | Riserless completions | |
| US20140027113A1 (en) | Systems and methods for reducing pvt effects during pressure testing of a wellbore fluid containment system | |
| US9359874B2 (en) | Systems and methods for killing a well | |
| US6430990B1 (en) | Pipe testing apparatus | |
| GB2337780A (en) | Surface assembled spoolable coiled tubing strings | |
| AU2014268178B2 (en) | Differential pressure indicator for downhole isolation valve | |
| US8997872B1 (en) | Cap assembly for use with a tubing spool of a wellhead | |
| AU2018283423B2 (en) | Method and system for integrity testing | |
| US20210079750A1 (en) | Method and apparatus for suspending a well | |
| EP4416371A1 (en) | Methods and tools for determining bleed-off pressure after well securement jobs | |
| RU2338058C1 (en) | Garipov's well arrangement | |
| Haris et al. | Workover and Completion Operations in East Java Sour Gas Field, Indonesia | |
| Veeningen | Better well control through safe drilling margin identification, influx analysis and direct measurement method for deepwater | |
| Ashena | Barriers | |
| US10280740B2 (en) | Sandface liner with power, control and communication link via a tie back string | |
| Rahmani et al. | Full-scale testing shows advantages of a quantitative approach to interpreting inflow tests | |
| Fleckenstein et al. | Annular Casing Seal Test Method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: INTELLISERV, L.L.C., TEXAS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:VEENINGEN, DANIEL MARCO;REEL/FRAME:029842/0312 Effective date: 20121108 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |