US20080304919A1 - Adjustable pier/footing cap for creating an adjustable building foundation - Google Patents

Adjustable pier/footing cap for creating an adjustable building foundation Download PDF

Info

Publication number
US20080304919A1
US20080304919A1 US11/811,336 US81133607A US2008304919A1 US 20080304919 A1 US20080304919 A1 US 20080304919A1 US 81133607 A US81133607 A US 81133607A US 2008304919 A1 US2008304919 A1 US 2008304919A1
Authority
US
United States
Prior art keywords
footing
pier
foundation
plate
adjustable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US11/811,336
Inventor
Michael D. Coyle
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to US11/811,336 priority Critical patent/US20080304919A1/en
Publication of US20080304919A1 publication Critical patent/US20080304919A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/01Flat foundations
    • E02D27/02Flat foundations without substantial excavation

Definitions

  • the invention is directed toward residential and commercial building foundation systems, including the design, engineering, construction, and repairs thereto.
  • the invention creates an adjustable foundation system utilizing conventionally installed drilled piers/footings, modified with the addition of adjustable pier/footing caps, and more particularly to such a system which is an improvement over conventional, non-adjustable foundation supports for residential buildings, light commercial buildings, and the like.
  • Foundations constructed in expansive soil areas, or areas with incompetent bearing soils are generally founded on concrete drilled piers, or pad footings, in lieu of continuous concrete spread footings.
  • Piers are drilled through the upper soils and into underlying bedrock, or rely on frictional interaction along the pier length for support in the deeper soils.
  • the foundation walls typically bear only on the drilled piers/footings, spanning the distance between piers/footings above a void space, such that the foundation walls act as beams. This serves to greatly concentrate the load on the piers/footings such that any uplift pressure from expansive soil is counteracted.
  • the void space may be eliminated in areas where expansive soils are not present.
  • Drilled piers/footings historically contain reinforcing steel that extends upward and into the foundation wall above, thus creating a fixed and non-adjustable connection between the piers and the walls.
  • the geometry, size, diameter, overall minimum length of the pier, and minimum penetration distance into bedrock are typically specified by a Geotechnical Engineer based on analysis of the on-site soil conditions, as determined by sampling and testing methodologies of the profession.
  • the load bearing capacity of the drilled pier/footing is theoretically calculated and predicted, but is typically not field verified via load testing prior to construction of the foundation walls or upper structure.
  • the piers/footings should not settle or heave, or only minimally so, but in practice it is not uncommon for minor to moderate movement to occur, and occasionally major movement occurs, due to unknown conditions and/or inadequacies of the sampling and testing methodologies.
  • U.S. Pat. No. 5,123,209 shows a method of re-leveling a foundation after movement has occurred.
  • U.S. Pat. No. 3,902,326 shows the use of a piling member which is driven into bedrock sufficient to shore a foundation.
  • the system utilizes a hydraulic pump and attachment to the foundation in order to shore up the foundation as shown similarly in Ortez, Freeman, III, Rippe, and McCown, U.S. Pat. Nos., 5,492,437, 5,433,556, 5,234,287, and 5,154,539, respectively.
  • None of the other methodologies provides a mechanism to utilize the original drilled pier/footing via incorporating an adjustable interface into the drilled pier/footing and foundation connection at the time of initial construction.
  • utilization of the invention provides a superior foundation support system as compared to current drilled piers/footings, and provides a superior, simpler, and more cost effective method and mechanism for adjusting a foundation should movement occur, as compared to remedial underpinning systems.
  • the invention provides an adjustable foundation interface between drilled piers/footings and foundation walls in expansive soil areas, or any other areas where drilled piers/pad footings are installed as the primary foundation support.
  • the invention also provides a system that will allow re-leveling adjustments to be made to the foundation, with minimal disruption to the living environment, surrounding soils, and other infrastructure components.
  • the invention eliminates the need for installing remedial underpinning and demolition, disconnection, and abandonment of the original drilled piers/footings.
  • FIG. 1 comprises a plan view and sectional view of a typical drilled pier foundation employing the invention.
  • FIG. 2 is a detailed sectional view of the invention as installed in a foundation.
  • FIG. 3 is a detailed view of the invention, showing its component parts and as described in the Detailed Description of the Invention.
  • the bottom section of the adjustable pier/footing cap consists of a steel base plate 2 , with a hole 3 centered in the plate of diameter sufficient to allow insertion of the threaded rod 10 .
  • Steel nut 6 and steel nut 8 are welded to the base plate 2 , one on the top and one on the underside, centered on the hole 3 to accept the threaded rod 10 which is threaded through nut 6 , hole 3 and nut 8 to the desired position.
  • the rod 10 is then welded to the nuts to create a fixed connection between the rod 10 and the plate 2 .
  • rebar 4 are welded to the underside of the base plate 2 , which imbed into the concrete of the drilled pier/footing and tie to the internal steel rebars of the drilled pier/footing, thus securing the bottom section of the adjustable pier/footing cap to the drilled pier/footing.
  • the bottom section of the adjustable pier/footing cap is inserted into the drilled pier/footing immediately after the concrete for the pier/footing has been placed.
  • the plate 2 is centered on the pier/footing and is flush with the top of the pier/footing.
  • the middle section of the adjustable pier/footing cap consists of a steel plate 12 similar to the base plate 2 , with centered hole 13 to accommodate the threaded rod 10 .
  • a single steel nut 14 is centered on the hole 13 and is welded to the plate 12 .
  • the plate 12 has four additional holes 15 near the plate 12 corners to accept four bolts 16 that create a secure but removable connection between the middle section and the top section.
  • the top section of the adjustable pier/footing cap consists of a steel plate 18 similar to plates 2 and 12 , with similar hole 19 to allow passage of the threaded rod 10 .
  • a steel tube 22 with welded cap plate 23 is welded to the plate 18 , creating a cavity within which the rod 10 can slide up or down as needed.
  • Steel rebar 24 are welded to the steel tube 22 that are imbedded in the foundation wall, creating a secure connection between the top section and the foundation wall.
  • the plate 18 has four holes 20 drilled in alignment with the four holes 15 of the middle section plate 12 .
  • Four cap nuts 21 are centered on the holes and welded to the top plate 18 .
  • the middle and top sections are installed and rotated to the desired elevation such that the top section plate 18 will be flush with the underside of the foundation wall.
  • the affected adjustable pier/footing caps are exposed and temporary support jacks are installed under the walls and adjacent to the pier caps.
  • the bolts 16 are then removed and the middle section plate 12 and nut 14 combination unit is rotated up or down as needed to the point where the foundation can be raised or lowered to the desired elevation.
  • the bolts 16 are reinstalled and the jacks removed.
  • the adjustable pier/footing cap may be inverted such that the “upper” section is imbedded into the pier or footing. The “bottom” section then becomes the attachment to the beam or column/post as the case may be, and the rebar 4 and nut 6 are omitted from the base plate 2 . In this case the threaded rod 10 does not penetrate the base plate 2 and the plate 2 acts as a platform to support the beam or column/post.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

I have invented an apparatus for creating an adjustable foundation, for residential and light commercial structures, that are supported on concrete drilled piers or concrete pad footing supports. The apparatus is an adjustable pier/footing cap, added to conventional drilled piers/footings at the time of foundation construction; said drilled piers are commonly used to support a building foundation in expansive soil areas and/or in other areas where upper bearing soils are weak or incompetent. The adjustable pier/footing caps are partially imbedded in the concrete drilled piers/footings when the piers/footings are poured and then into the foundation walls of the building when said foundation walls are poured. Upon settling or upheaval of the foundation, the adjustable pier/footing caps can be adjusted to lower or raise the building without replacing the drilled pier/footing with an expensive remedial piering device, and without substantial excavation around the foundation.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • Provisional patent application titled “Adjustable Pier/Footing Cap for Creating an Adjustable Building Foundation” filed on Jun. 9, 2006 listing Michael D. Coyle as the inventor.
  • STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT
  • Not Applicable
  • REFERENCE TO SEQUENCE LISTING, TABLES, ETC.
  • Not Applicable
  • FIELD OF THE INVENTION
  • The invention is directed toward residential and commercial building foundation systems, including the design, engineering, construction, and repairs thereto.
  • BACKGROUND OF THE INVENTION
  • The invention creates an adjustable foundation system utilizing conventionally installed drilled piers/footings, modified with the addition of adjustable pier/footing caps, and more particularly to such a system which is an improvement over conventional, non-adjustable foundation supports for residential buildings, light commercial buildings, and the like.
  • Foundations constructed in expansive soil areas, or areas with incompetent bearing soils, are generally founded on concrete drilled piers, or pad footings, in lieu of continuous concrete spread footings. Piers are drilled through the upper soils and into underlying bedrock, or rely on frictional interaction along the pier length for support in the deeper soils. The foundation walls typically bear only on the drilled piers/footings, spanning the distance between piers/footings above a void space, such that the foundation walls act as beams. This serves to greatly concentrate the load on the piers/footings such that any uplift pressure from expansive soil is counteracted. The void space may be eliminated in areas where expansive soils are not present. Drilled piers/footings historically contain reinforcing steel that extends upward and into the foundation wall above, thus creating a fixed and non-adjustable connection between the piers and the walls.
  • The geometry, size, diameter, overall minimum length of the pier, and minimum penetration distance into bedrock are typically specified by a Geotechnical Engineer based on analysis of the on-site soil conditions, as determined by sampling and testing methodologies of the profession. As such, the load bearing capacity of the drilled pier/footing is theoretically calculated and predicted, but is typically not field verified via load testing prior to construction of the foundation walls or upper structure. In theory, the piers/footings should not settle or heave, or only minimally so, but in practice it is not uncommon for minor to moderate movement to occur, and occasionally major movement occurs, due to unknown conditions and/or inadequacies of the sampling and testing methodologies.
  • Historically, as drilled piers/footings could not be adjusted to accommodate any such movement, structural damage has occurred to foundations and upper structures, resulting in millions of dollars in annual repair costs. Ultimately, drilled piers/footings that have experienced movement are replaced with steel piers, helical piers, or offset drilled piers, and foundation adjustments are then made to re-level the structure. These remedial actions, called underpinning, are generally effective, but also very expensive, time consuming, logistically difficult, and excessively interruptive of the normal enjoyment of the property by the owner.
  • With respect to foundation underpinning as a remedy to foundation movement, there are numerous devices currently utilized to underpin and re-level foundations including piering devices such as the piling system of Gregory, U.S. Pat. No. 4,754,588.
  • Nally, U.S. Pat. No. 5,123,209 shows a method of re-leveling a foundation after movement has occurred.
  • Gregory, U.S. Pat. No. 4,695,203 shows a method of shoring buildings relating to the problems set forth earlier.
  • In Langenbach, Jr., U.S. Pat. No. 3,902,326 shows the use of a piling member which is driven into bedrock sufficient to shore a foundation. The system utilizes a hydraulic pump and attachment to the foundation in order to shore up the foundation as shown similarly in Ortez, Freeman, III, Rippe, and McCown, U.S. Pat. Nos., 5,492,437, 5,433,556, 5,234,287, and 5,154,539, respectively.
  • As demonstrated above, there are many methods currently used to shore up, re-support and adjust a foundation after movement has occurred, but when drilled piers/footings are present as the original support system, these remedial systems always require partial demolition, disconnection, and abandonment of the original drilled piers/footings in favor of the newly installed remedial piers.
  • None of the other methodologies provides a mechanism to utilize the original drilled pier/footing via incorporating an adjustable interface into the drilled pier/footing and foundation connection at the time of initial construction.
  • Therefore, utilization of the invention provides a superior foundation support system as compared to current drilled piers/footings, and provides a superior, simpler, and more cost effective method and mechanism for adjusting a foundation should movement occur, as compared to remedial underpinning systems.
  • References Cited - U.S. Patent Documents
    3902326 September, 1975 Langenbach, Jr. 61/51.
    4070867 January, 1978 Cassidy 405/231.
    4695203 September, 1987 Gregory 405/230.
    4765777 August, 1988 Gregory 405/230.
    5011336 April, 1991 Hamilton et al. 405/230.
    5123209 June, 1992 Nally  52/165.
    5135335 August, 1992 Stephens et al. 405/230.
    5154539 October, 1992 McCown, Sr. et al. 405/230.
    5176472 January, 1993 Kinder 405/230.
    5205673 April, 1993 Bolin et al. 405/230.
    5213448 May, 1993 Seider et al. 405/230.
    5234287 August, 1993 Rippe, Jr. 405/230.
    5433556 July, 1995 Freeman, III 405/229.
    5492437 February, 1996 Ortiz 405/230.
    5722798 March, 1998 Gregory 405/230.
    5800094 September, 1998 Jones 405/230.
    6074133 June, 2000 Kelsey 405/244 
    6872031 September, 2003 May 405/232 
  • BRIEF SUMMARY OF THE INVENTION
  • The invention provides an adjustable foundation interface between drilled piers/footings and foundation walls in expansive soil areas, or any other areas where drilled piers/pad footings are installed as the primary foundation support.
  • The invention also provides a system that will allow re-leveling adjustments to be made to the foundation, with minimal disruption to the living environment, surrounding soils, and other infrastructure components.
  • In addition, the invention eliminates the need for installing remedial underpinning and demolition, disconnection, and abandonment of the original drilled piers/footings.
  • Incorporating the invention results in a dramatic reduction in the costs required to repair and/or adjust a foundation via any of the other foundation shoring and underpinning systems, as a new pier is not required and only minimal excavation is required.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The above description of the invention will be more fully appreciated by reference to the following detailed description of the preferred embodiment when taken in conjunction with the accompanying drawings wherein:
  • FIG. 1 comprises a plan view and sectional view of a typical drilled pier foundation employing the invention.
  • FIG. 2 is a detailed sectional view of the invention as installed in a foundation.
  • FIG. 3 is a detailed view of the invention, showing its component parts and as described in the Detailed Description of the Invention.
  • DETAILED DESCRIPTION OF THE INVENTION
  • The bottom section of the adjustable pier/footing cap consists of a steel base plate 2, with a hole 3 centered in the plate of diameter sufficient to allow insertion of the threaded rod 10. Steel nut 6 and steel nut 8 are welded to the base plate 2, one on the top and one on the underside, centered on the hole 3 to accept the threaded rod 10 which is threaded through nut 6, hole 3 and nut 8 to the desired position. The rod 10 is then welded to the nuts to create a fixed connection between the rod 10 and the plate 2. Four rebar 4 are welded to the underside of the base plate 2, which imbed into the concrete of the drilled pier/footing and tie to the internal steel rebars of the drilled pier/footing, thus securing the bottom section of the adjustable pier/footing cap to the drilled pier/footing.
  • The bottom section of the adjustable pier/footing cap is inserted into the drilled pier/footing immediately after the concrete for the pier/footing has been placed. The plate 2 is centered on the pier/footing and is flush with the top of the pier/footing.
  • The middle section of the adjustable pier/footing cap consists of a steel plate 12 similar to the base plate 2, with centered hole 13 to accommodate the threaded rod 10. A single steel nut 14 is centered on the hole 13 and is welded to the plate 12. When threaded onto the rod 10, the plate 12 and nut 14 are free to spin up or down on the rod 10 as needed. The plate 12 has four additional holes 15 near the plate 12 corners to accept four bolts 16 that create a secure but removable connection between the middle section and the top section.
  • The top section of the adjustable pier/footing cap consists of a steel plate 18 similar to plates 2 and 12, with similar hole 19 to allow passage of the threaded rod 10. A steel tube 22 with welded cap plate 23 is welded to the plate 18, creating a cavity within which the rod 10 can slide up or down as needed. Steel rebar 24 are welded to the steel tube 22 that are imbedded in the foundation wall, creating a secure connection between the top section and the foundation wall. The plate 18 has four holes 20 drilled in alignment with the four holes 15 of the middle section plate 12. Four cap nuts 21 are centered on the holes and welded to the top plate 18. When inserted over the threaded rod 10, the top section plate 18 aligns with the middle section plate 12 and the four bolts 16 are inserted through the holes 15 and 20 to create a connection between the middle section and the top section.
  • At the time of forming the foundation walls and prior to placement of concrete, the middle and top sections are installed and rotated to the desired elevation such that the top section plate 18 will be flush with the underside of the foundation wall.
  • In the event of foundation settlement or upheaval, the affected adjustable pier/footing caps are exposed and temporary support jacks are installed under the walls and adjacent to the pier caps. The bolts 16 are then removed and the middle section plate 12 and nut 14 combination unit is rotated up or down as needed to the point where the foundation can be raised or lowered to the desired elevation. Upon successful adjustment the bolts 16 are reinstalled and the jacks removed.
  • It is understood that the foregoing description and alternative embodiments are merely illustrative of the best mode of the invention and the principle thereof, and various modifications and additions may be made to the apparatus and method by those skilled in the art, without departing from the spirit and scope of this invention, which is therefore understood to be limited only by the scope of the appended claims. Sizes and numbers, and strength characteristics of members, including length, width, thickness, diameter, welding, plates, nuts, rods, bolts, etc. are subject to engineering judgment and specifications to accommodate project specific loading requirements.
  • Description of Alternative Embodiment
  • The previously described preferred embodiment describes the invention as it can be used to support foundation walls. However, the invention may also be used to support beams and/or columns/posts that ultimately transfer load to drilled piers or footings. For such alternative applications, the adjustable pier/footing cap may be inverted such that the “upper” section is imbedded into the pier or footing. The “bottom” section then becomes the attachment to the beam or column/post as the case may be, and the rebar 4 and nut 6 are omitted from the base plate 2. In this case the threaded rod 10 does not penetrate the base plate 2 and the plate 2 acts as a platform to support the beam or column/post.
  • In the event of beam settlement or upheaval, temporary support jacks are installed under the beam and adjacent to the pier caps. The bolts 16 are then removed and the middle section plate 12 and nut 14 combination unit is rotated up or down as needed to the point where the beam can be raised or lowered to the desired elevation. Upon successful adjustment the bolts 16 are reinstalled and the jacks removed.

Claims (5)

1. An adjustable pier/footing cap system that adds adjustability to a conventional drilled pier/footing building foundation, comprising a plurality of steel members connected together that create an adjustable load transfer interface between the drilled pier/footing and the foundation wall;
2. The adjustable pier/footing cap system of claim 1 wherein said plurality of steel members includes a threaded rod inserted through a steel base-plate and welded thereto, said base-plate having several reinforcing steel bars attached and extending below that create a tie connection to the reinforcing steel bars typically contained in the drilled pier/footing; the base-plate being located at the top of the drilled pier, thus providing a fixed structural support;
3. The adjustable pier/footing cap system of claim 1 wherein said threaded rod extending upward from the drilled pier and base-plate, through the typical void space provided as part of conventional drilled pier/footing foundation construction, and penetrating a second, upper steel base-plate with hole centered in the plate of sufficient size to allow the threaded rod to slide through unencumbered; said upper base-plate having a steel tube welded to the upper side that creates a cavity within which the threaded rod can slide freely; said tube having several steel reinforcing bars welded thereto that extend upward into the foundation wall; said upper base-plate being located at the bottom of the foundation wall, which is also the top of the foundation void previously described;
4. The adjustable pier/footing cap system of claim 1 wherein said threaded rod containing a third plate with threaded nut welded thereto, such that the nut and plate combination spins along the exposed threads of the threaded rod within the void zone, and when raised to the position of meeting the upper base plate creates the load transfer connection between the foundation wall and the threaded rod, and consequently to the drilled pier/footing below; said adjustment plate containing holes that align with holes in the upper plate that allow for a bolted connection between the two, thus providing for continuity of load transfer in the event of uplift forces.
5. The adjustable pier/footing cap system of claim 1 wherein said adjustment plate is unbolted from the upper plate in the event of foundation movement, and the adjustment plate is rotated to raise or lower the foundation, with the assistance of temporary jacks if needed, to the desired elevation at which point the bolts are re-installed and the jacks (if used) are removed.
US11/811,336 2007-06-08 2007-06-08 Adjustable pier/footing cap for creating an adjustable building foundation Abandoned US20080304919A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US11/811,336 US20080304919A1 (en) 2007-06-08 2007-06-08 Adjustable pier/footing cap for creating an adjustable building foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
US11/811,336 US20080304919A1 (en) 2007-06-08 2007-06-08 Adjustable pier/footing cap for creating an adjustable building foundation

Publications (1)

Publication Number Publication Date
US20080304919A1 true US20080304919A1 (en) 2008-12-11

Family

ID=40096026

Family Applications (1)

Application Number Title Priority Date Filing Date
US11/811,336 Abandoned US20080304919A1 (en) 2007-06-08 2007-06-08 Adjustable pier/footing cap for creating an adjustable building foundation

Country Status (1)

Country Link
US (1) US20080304919A1 (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100166504A1 (en) * 2008-12-30 2010-07-01 Steven Patton Concentrically Loaded, Adjustable Piering System
US20110120028A1 (en) * 2009-11-25 2011-05-26 Alternative Construction Techniques, Llc Moisture Barrier Wall
GB2490941A (en) * 2011-05-19 2012-11-21 Nicholas James Marshall Frame support
US20130099078A1 (en) * 2011-10-21 2013-04-25 Joseph Karl Rafalik Security Mounting Pole Apparatus and Method of Use
USD689207S1 (en) 2012-02-23 2013-09-03 Russell E. Benet Foundation support
US8821073B2 (en) 2008-12-30 2014-09-02 Steve Patton Concentrically loaded, adjustable piering system
US8931219B2 (en) 2012-10-08 2015-01-13 Russell E. Benet Foundation system and method of use for decreasing the effect of wind and flood damage
JP2016180271A (en) * 2015-03-25 2016-10-13 東建コーポレーション株式会社 Building support structure, construction method of the same and pile cover
US9822504B2 (en) 2014-01-10 2017-11-21 Board Of Regents, The University Of Texas System Systems, apparatuses and methods for assessing soil heave
CN107988919A (en) * 2018-01-04 2018-05-04 中铁八局集团第三工程有限公司 A kind of and the pinner and pre-embedded bolt hole forming equipment of bridge pier cap synchronous construction
CN108592858A (en) * 2018-06-25 2018-09-28 中国电建集团中南勘测设计研究院有限公司 A kind of observation pier that can be stealthy
US20180313095A1 (en) * 2017-04-28 2018-11-01 Geoffrey Arthur Heschel Adjustable footing for a post
US10233610B1 (en) * 2017-11-28 2019-03-19 John Nightingale Pier and beam foundation leveling system
US10294628B1 (en) * 2018-03-26 2019-05-21 Tella Firma, Llc Systems and methods for lifted foundation retention with locking cap
CN110823697A (en) * 2019-11-21 2020-02-21 长安大学 Tunnel arch foot foundation load transfer test device and method under support of lock foot anchor pipe
CN111811491A (en) * 2020-07-24 2020-10-23 中建三局集团有限公司 Forced centering device capable of free lifting, recycling and integrated operation
US10961682B1 (en) 2020-01-14 2021-03-30 John Dustin Williams System and methods for concrete slab foundation repair
CN114775676A (en) * 2022-04-05 2022-07-22 中国电建集团华东勘测设计研究院有限公司 Reconstruction method and application suitable for built old wind power plant fan foundation

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3713259A (en) * 1971-04-16 1973-01-30 G Tkach Combination anchor and support utilized to secure a mobile home to an underlying foundation
US3830024A (en) * 1972-09-14 1974-08-20 Warn Key Inc Stabilizing and anchoring device for mobile homes and similar structures
US3963210A (en) * 1975-03-05 1976-06-15 Macklin Charles D Apparatus for setting anchor bolts and other objects in concrete slabs
US4458463A (en) * 1982-07-28 1984-07-10 Behrend Herbert W Universally adjustable building supports
US5800094A (en) * 1997-02-05 1998-09-01 Jones; Robert L. Apparatus for lifting and supporting structures
US6142710A (en) * 1999-07-12 2000-11-07 Holland, Jr.; Thomas Edward Apparatus and method for raising a foundation
US6539685B2 (en) * 2000-11-28 2003-04-01 Thomas A. Bell Apparatus and method for lifting sunken foundations
US6964139B2 (en) * 2002-02-28 2005-11-15 Perma-Column, Inc. Precast concrete column for use in post-frame construction
US7195426B2 (en) * 2005-05-24 2007-03-27 Donald May Structural pier and method for installing the same
US7435038B2 (en) * 2001-10-02 2008-10-14 Peterson James L Method and apparatus for lifting and stabilizing subsided slabs, flatwork and foundations of buildings
US7470090B2 (en) * 2006-06-13 2008-12-30 Edward Heppner Lifting bracket system supported on a pier for lifting a foundation

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3713259A (en) * 1971-04-16 1973-01-30 G Tkach Combination anchor and support utilized to secure a mobile home to an underlying foundation
US3830024A (en) * 1972-09-14 1974-08-20 Warn Key Inc Stabilizing and anchoring device for mobile homes and similar structures
US3963210A (en) * 1975-03-05 1976-06-15 Macklin Charles D Apparatus for setting anchor bolts and other objects in concrete slabs
US4458463A (en) * 1982-07-28 1984-07-10 Behrend Herbert W Universally adjustable building supports
US5800094A (en) * 1997-02-05 1998-09-01 Jones; Robert L. Apparatus for lifting and supporting structures
US6142710A (en) * 1999-07-12 2000-11-07 Holland, Jr.; Thomas Edward Apparatus and method for raising a foundation
US6539685B2 (en) * 2000-11-28 2003-04-01 Thomas A. Bell Apparatus and method for lifting sunken foundations
US7435038B2 (en) * 2001-10-02 2008-10-14 Peterson James L Method and apparatus for lifting and stabilizing subsided slabs, flatwork and foundations of buildings
US6964139B2 (en) * 2002-02-28 2005-11-15 Perma-Column, Inc. Precast concrete column for use in post-frame construction
US7195426B2 (en) * 2005-05-24 2007-03-27 Donald May Structural pier and method for installing the same
US7470090B2 (en) * 2006-06-13 2008-12-30 Edward Heppner Lifting bracket system supported on a pier for lifting a foundation

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100166504A1 (en) * 2008-12-30 2010-07-01 Steven Patton Concentrically Loaded, Adjustable Piering System
US8206063B2 (en) 2008-12-30 2012-06-26 Steven Patton Concentrically loaded, adjustable piering system
US8821073B2 (en) 2008-12-30 2014-09-02 Steve Patton Concentrically loaded, adjustable piering system
US20110120028A1 (en) * 2009-11-25 2011-05-26 Alternative Construction Techniques, Llc Moisture Barrier Wall
US8689506B2 (en) 2009-11-25 2014-04-08 Amil Fornatora Moisture barrier wall
US8851800B2 (en) 2009-12-07 2014-10-07 Steven Patton Concentrically loaded, adjustable piering system
GB2490941A (en) * 2011-05-19 2012-11-21 Nicholas James Marshall Frame support
US20130099078A1 (en) * 2011-10-21 2013-04-25 Joseph Karl Rafalik Security Mounting Pole Apparatus and Method of Use
US8910916B2 (en) * 2011-10-21 2014-12-16 Joseph Karl Rafalik Security mounting pole apparatus and method of use
USD689207S1 (en) 2012-02-23 2013-09-03 Russell E. Benet Foundation support
US8931219B2 (en) 2012-10-08 2015-01-13 Russell E. Benet Foundation system and method of use for decreasing the effect of wind and flood damage
US9822504B2 (en) 2014-01-10 2017-11-21 Board Of Regents, The University Of Texas System Systems, apparatuses and methods for assessing soil heave
JP2016180271A (en) * 2015-03-25 2016-10-13 東建コーポレーション株式会社 Building support structure, construction method of the same and pile cover
US20180313095A1 (en) * 2017-04-28 2018-11-01 Geoffrey Arthur Heschel Adjustable footing for a post
US11162275B2 (en) * 2017-04-28 2021-11-02 Geoffrey Arthur Heschel Adjustable footing for a post
US10233610B1 (en) * 2017-11-28 2019-03-19 John Nightingale Pier and beam foundation leveling system
CN107988919A (en) * 2018-01-04 2018-05-04 中铁八局集团第三工程有限公司 A kind of and the pinner and pre-embedded bolt hole forming equipment of bridge pier cap synchronous construction
US10294628B1 (en) * 2018-03-26 2019-05-21 Tella Firma, Llc Systems and methods for lifted foundation retention with locking cap
CN108592858A (en) * 2018-06-25 2018-09-28 中国电建集团中南勘测设计研究院有限公司 A kind of observation pier that can be stealthy
CN110823697A (en) * 2019-11-21 2020-02-21 长安大学 Tunnel arch foot foundation load transfer test device and method under support of lock foot anchor pipe
US10961682B1 (en) 2020-01-14 2021-03-30 John Dustin Williams System and methods for concrete slab foundation repair
CN111811491A (en) * 2020-07-24 2020-10-23 中建三局集团有限公司 Forced centering device capable of free lifting, recycling and integrated operation
CN114775676A (en) * 2022-04-05 2022-07-22 中国电建集团华东勘测设计研究院有限公司 Reconstruction method and application suitable for built old wind power plant fan foundation

Similar Documents

Publication Publication Date Title
US20080304919A1 (en) Adjustable pier/footing cap for creating an adjustable building foundation
US6539685B2 (en) Apparatus and method for lifting sunken foundations
US6503024B2 (en) Concrete foundation pierhead and method of lifting a foundation using a jack assembly
CN108130910B (en) A support system for actively controlling foundation pit displacement and its design method
US7967531B2 (en) Method of raising a building
US8206063B2 (en) Concentrically loaded, adjustable piering system
US20080175673A1 (en) Foundation lifting assembly and method of use
CN107923136A (en) Beam and stake anchoring base for pylon
US6659692B1 (en) Apparatus and method for supporting a structure with a pier and helix
US7470090B2 (en) Lifting bracket system supported on a pier for lifting a foundation
US6872031B2 (en) Apparatus and method of supporting a structure with a pier
US7108458B1 (en) Interlocking slab leveling system
CN1836075B (en) Bearing pile system and method of installing the bearing pile system
US7044686B2 (en) Apparatus and method for supporting a structure with a pier
US6881012B2 (en) Foundation repair system and method of installation
US12139871B1 (en) Precast deep foundation system
CN112095495A (en) Bridge underpinning support structure and construction method
JP2007192017A (en) Bridge pier anchoring structure and bridge pier construction method
JP3032456B2 (en) Method of pressing structure upward
JP3002126B2 (en) Temporary receiving method for structures
WO2008039225A2 (en) Foundation lifting asembly and method of use
JP7028728B2 (en) Joint structure of foundation pile and foundation slab
US10428516B2 (en) Method and apparatus for repairing a tilt wall construction
Edens et al. Foundation retrofit of three structures utilizing micropiles
JP6334970B2 (en) Temporary support method for foundation

Legal Events

Date Code Title Description
STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION