US20080199257A1 - Vertical Installation of an Elongated Process Unit - Google Patents
Vertical Installation of an Elongated Process Unit Download PDFInfo
- Publication number
- US20080199257A1 US20080199257A1 US10/595,832 US59583204A US2008199257A1 US 20080199257 A1 US20080199257 A1 US 20080199257A1 US 59583204 A US59583204 A US 59583204A US 2008199257 A1 US2008199257 A1 US 2008199257A1
- Authority
- US
- United States
- Prior art keywords
- process unit
- receptor
- vessel
- unit end
- receptor device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 560
- 238000009434 installation Methods 0.000 title claims abstract description 18
- 230000013011 mating Effects 0.000 claims description 37
- 230000000717 retained effect Effects 0.000 claims description 8
- 230000002829 reductive effect Effects 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- GNFTZDOKVXKIBK-UHFFFAOYSA-N 3-(2-methoxyethoxy)benzohydrazide Chemical compound COCCOC1=CC=CC(C(=O)NN)=C1 GNFTZDOKVXKIBK-UHFFFAOYSA-N 0.000 claims 1
- FGUUSXIOTUKUDN-IBGZPJMESA-N C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 Chemical compound C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 FGUUSXIOTUKUDN-IBGZPJMESA-N 0.000 claims 1
- 230000000284 resting effect Effects 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 230000000452 restraining effect Effects 0.000 description 3
- 239000013536 elastomeric material Substances 0.000 description 2
- 239000004215 Carbon black (E152) Substances 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000010926 purge Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000003019 stabilising effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/013—Connecting a production flow line to an underwater well head
Definitions
- This invention relates to a method for installation of an elongate process unit on the seabed, said process unit having a first process unit end and a second process unit end. A method of retrieving said process unit from the seabed is also provided. Further, this invention relates to a receptor apparatus for use in a process unit handling operation.
- U.S. Pat. No. 4,676,696 (Laursen) relates to an apparatus for securing a flowline to a structure near the seabed, comprising a vertically oriented guide funnel placed atop a guide tube that is provided with a helical shoulder cooperating with an alignment key mounted on the flowline.
- the flowline is stabbed into the guide funnel and guide tube thereby causing the alignment key to slide along the shoulder until a pair of hinge pins mounted on the flowline have entered into a pair of slots in the wall of the guide tube. Subsequently, the flowline is hinged down to a horizontal position.
- U.S. Pat. No. 4,671,702 (Langner) relates to a method and apparatus for connecting a flowline to a subsea structure.
- a riser and flowline connection tool are deployed downwardly to the subsea structure and a flowline terminal head, which is at the end of the flowline, is pulled to the flowline connection tool by means of a pullcable. Then the flowline terminal head is secured to the subsea structure and the flowline connection tool is recovered to the surface.
- the flowline terminal head consists of a connector hub with clamping surface to which the flowline is welded, and a flexible carrier pipe of interlocking metallic rings into which the end of the flowline is inserted.
- the carrier pipe limits the curvature of the flowline as the terminal head is bent into alignment with a flowline receptacle of the subsea structure.
- the flowline terminal head may include buoyant encircling rings which keep it free of difficult terrain in the vicinity of the subsea structure.
- U.S. Pat. No. 4,277,202 (Archambaud et al.) relates to a method and an apparatus for deploying and connecting an end of an underwater flowline to a connecting sleeve.
- U.S. Pat. No. 4,877,356 (Bontenbal) concerns a method and an apparatus for stabbing a flowline into a guide tube near the waterbottom and subsequently hinging over the flowline to a horizontal position.
- the connection operation is facilitated by a vertically oriented guide tube having along the inner wall thereof a pair of parallel slots which provide at the lower ends thereof pivot supports on which a pair of pivots which are mounted near the lower end of the flowline land during the stab in procedure.
- Deflectors are provided for deflecting a lower portion of the flowline while the pivots are lowered through the slots so as to induce the flowline to obtain a curved shape into a predetermined direction before the pivots land onto the pivot supports.
- the flowline is stabbed into the guide funnel and guide tube thereby causing the alignment key to slide along the shoulder until a pair of hinge pins mounted on the flowline have entered into a pair of slots in the wall of the guide tube. Subsequently the flowline is hinged down to a horizontal position.
- the above documents all describe methods and apparatuses for deploying flowlines or risers, whereas the methods and apparatus according to this invention relates to handling process units, in particular elongate process equipment such as separators, heat exchangers, containers, pumps, vessels, tanks or the like.
- the receptor apparatuses according to the above documents are all arranged for receiving an end of a flowline section while deploying a flowline on or near the seabed. Thus, they are not constructed for receiving the much larger load from process equipment.
- the receptor apparatus is designed for receiving such process units, e.g., separators, heat exchangers, containers or the like, in particular elongate process units, and the load such process units exert on the receptor apparatus.
- This invention provides a method for installation of an elongate process unit on the seabed, in which said process unit has a first process unit end and a second process unit end. Said method is characterized in that it comprises the following steps.
- this invention provides a method of retrieving an elongate process unit from the seabed, in which said process unit has a first process unit end and a second process unit end. Said method is characterized in that it comprises the following steps:
- this invention provides a receptor apparatus for use in a process unit handling operation, in which the process unit to be handled comprises a first process unit end and a second process unit end.
- Said receptor apparatus is characterized in that it comprises a receptor device arranged for receiving and engaging a first process unit end, and further arranged for receiving and supporting the load of said process unit, Said receptor device is arranged for receiving and engaging said first process unit end, and said receptor device is further arranged for retaining said first process unit end in position in said receptor device so as to provide a fulcrum for said first process unit end during handling of said second process unit end.
- FIG. 1 a is a schematic sectional side view of a lower portion of the process unit to be lowered and introduced into a receptor according to the invention.
- FIG. 1 b is a corresponding schematic sectional side view of a lower portion of the process unit which has been lowered into a position in the receptor device according to the invention, and now could be further arranged onto the module foundation of the desired deployment site.
- FIG. 2 a is a schematic top view of a vessel from which the process unit installation operation according to one embodiment of the inventtion will take place.
- the process unit has been positioned on the vessel deck in a position to be launched.
- FIG. 2 b is a schematic and partly sectional side view of the process unit being launched over a vessel stern roller of the vessel.
- FIG. 2 c shows a schematic and partly sectional view of the process unit ready to be lowered into the receptor device at the deployment site.
- FIG. 2 d shows a schematic and partly sectional view similar to FIG. 2 c of the process unit in which process unit entry into the receptor device has been completed, and now being ready to be further lowered onto the module foundation of the deployment site.
- FIG. 2 e shows a schematic and partly sectional view similar to FIGS. 2 c - 2 d of the process unit being deployed onto the module foundation of the deployment site.
- FIG. 2 f shows a schematic and cross sectional view of the process unit through line A-A shown in FIG. 2 e.
- FIG. 3 a is a schematic side view of a further embodiment of the invention in which the process unit is raised into a vertical position on board the deployment vessel.
- a receptor device is utilized for keeping control on the first process unit end while lifting the other process unit end, so as to prepare the launching step of the process unit installation operation.
- An important advantage of this embodiment of the invention is better control the process unit movements during the lifting step.
- FIG. 3 b is a schematic and cross sectional view of the process unit shown in FIG. 3 a , taken along line A-A shown in FIG. 3 a.
- FIG. 3 c is a schematic side view similar to FIG. 3 a , in which the process unit has been raised to an upright position on the receptor device.
- FIG. 3 d is a schematic side view similar to FIG. 3 a and 3 b , in which the first process unit end has been lifted from the receptor device.
- FIG. 4 a - f shows schematic and partly sectional views of several lowering and deployment stages of the process unit installation operation according to the second embodiment of the invention, similar to FIG. 2 a - 2 f .
- the process unit is positioned onto the receptor device similarly to FIGS. 2 a - 2 f , but in this embodiment, two shafts are provided which are located opposed to each other at the first process unit end. Each shaft is introduced into a guide in a bracket so as to form support bearings for the process unit in the receptor device.
- FIG. 5 is a schematic and side view similar to FIG. 3 a - 3 d , in which the first process unit end supported by a receptor device arrangement as indicated in FIGS. 4 a - 4 f , and in which lifting of the second process unit end so as to prepare the launching step of the process unit installation operation.
- FIG. 6 a is a schematic and side view of a process unit, in an embodiment according to the invention in which the framework on the first process unit end includes two mating pins located diametrically opposed to each other and protruding outwards from the side wall of the process unit.
- the two mating pins are each retained in a receptor bracket with a guide for the mating pin.
- FIG. 6 b is a schematic and cross sectional view of the process unit shown in FIG. 6 a , taken along line A-A.
- FIG. 6 c is a schematic top view of the process unit shown in FIGS. 6 a - 6 b.
- Said elongate process unit 4 may be any process equipment, such as a pump, a tank, a vessel, a container, a heat exchanger or a separator, e.g., a horizontal gravitational separator.
- the longitudinal length L of said process unit 4 is generally larger than its cross sectional length, or width, W.
- Said method may also include the step of landing said process unit 4 onto the vessel 24 , e.g. onto the deck 14 of the vessel 24 or onto a transport frame 13 , and transporting said process unit 4 to an offshore deployment site.
- Said process unit 4 may include one or more, preferably two, launch beams 5 for facilitating generally horizontal movement of said process unit 4 and for providing support for said process unit 4 on said supporting arrangement 12 a , or a process subsea skid 23 , or on a transport frame 13 .
- said process unit 4 may for example be arranged on said launch beams 5 or on a transport frame 13 .
- said process unit 4 is moved from said transport frame 13 to a vessel deck 14 on said vessel 24 when preparing said process unit 4 for launch into the sea.
- said process unit 4 which may be resting on said transport frame 13 , is moved to said vessel deck 14 .
- Control of said process unit 4 may be kept by means of a vessel wire system 36 .
- Said vessel wire system includes a deployment crane wire 19 or a lowering wire 19 extending from said vessel crane or vessel winch 31 on said vessel 24 to said second process unit end 4 b.
- said process unit 4 When preparing said process unit 4 for launch into the sea, said process unit 4 may be moved and guided towards the stem end of said vessel 24 . Said first process unit end 4 a may face said stern end of said vessel 24 , so that said first process unit end 4 a can be launched into the sea first. Launch of said process unit 4 may take place over a stern roller 29 located at said stern end of said vessel 24 .
- Said wire system 36 on said vessel 24 may include one or more, preferably two launch wires 22 , each extending from said vessel crane or vessel winch 31 via a snatch block 25 or similar for each launch wire 22 to an attachment location on said vessel.
- Said snatch block 25 is preferably being located at the stern end of said vessel 24 .
- said wire system 36 on said vessel 24 may include a launch control-wire bridle 20 retaining said process unit 4 to a heave compensator 37 .
- a lowering wire 19 attached to said vessel crane or vessel winch 31 and extending to said second process unit end 4 b of said process unit 4 may also be included.
- said process unit 4 may be brought to a generally vertical position by lifting said second process unit end 4 b , then disengaging said first process unit end 4 a , hauling said process unit 4 from said transport frame 13 , and bringing it into the sea.
- said vessel 24 When lowering said process unit 4 , said vessel 24 is positioned generally above said receptor device 1 in the sea, and then said process unit 4 is lowered in the sea with its longitudinal axis in a generally vertical orientation down to said receptor device 1 .
- said process unit 4 When said process unit 4 has been lowered to the deployment site at the seabed, said process unit 4 may be guided to said receptor device 1 before entering said first process unit end 4 a of said process unit 4 into said receptor device 1 .
- a framework 34 including one or more process unit mating pins 6 may be attached to said first process unit end 4 a of said process unit 4 , so that said first process unit end 4 a is guided into engagement with said receptor device 1 by means of said one or more process unit mating pins 6 being brought into egagement with said receptor device 1 .
- Said first process unit end is then entered into said receptor device 1 .
- said process unit 4 may be retained in place by means of a lock pin 11 , so as to retain said one or more process unit mating pins 6 included in said framework 34 attached to said first process unit end 4 a of said process unit 4 in said receptor device 1 .
- Said lock pin 11 can be retained in place and operated in any possible manner, such as being manually operated. However, in a preferred embodiment it is spring loaded and ROV releasable.
- said vessel 24 is then positioned so that the weight of said process unit 4 is gradually transferred to said lowering wire 19 , so as to start lowering of said second process unit end 4 b towards the seabed or said module foundation 12 about said fulcrum formed by said first process unit end 4 a engaging said receptor device 1 .
- said vessel 24 is moved to a position so that an axial force component of the tension generated by said process unit 4 in said lowering wire 19 is directed towards said receptor device 1 .
- the vessel 24 is arranged so that said axial force component is generally parallel with the longitudinal, central axis of said process unit 4 ; and so that transversal force components of said tension in said lowering wire 19 from said second process unit end 4 b of said process unit 4 to said vessel 24 are reduced or minimized.
- said first process unit end 4 a is retained in engagement with said receptor device 1 , and the risk of disengagement of said first process unit end 4 a from said receptor device 1 is reduced or minimized.
- said receptor device 1 may be loosened or removed from said first process unit end 4 a of said process unit 4 .
- a receptor apparatus is also provided with this invention for use in a process unit handling operation, for example as a process unit installation operation as described herein, in which the process unit 4 to be handled comprises a first process unit end 4 a and a second process unit end 4 b.
- Said receptor apparatus includes a receptor device 1 which is arranged for receiving and engaging a first process unit end 4 a , and which further is arranged for receiving and engaging said first process unit end 4 a of said process unit 4 , so as to support the load of said process unit 4 , and so as to retain said first process unit end 4 a in position in said receptor device 1 , thus providing a fulcrum for said first process unit end 4 a during handling of said second process unit end 4 b.
- Said receptor device may be arranged directly on the seabed, but it is preferably arranged on a module foundation 12 .
- a process subsea skid 23 arranged for supporting said receptor device 1 and the load from said process unit 4 may also be arranged on said module foundation 12 .
- a framework 34 may be attached to said first process unit end 4 a of said process unit 4 .
- Said framework 34 may include one or more separator mating pins 6 .
- said receptor device 1 may be arranged for receiving said one or more process unit mating pins 6 included in a framework 34 being attached to said first process unit end 4 a of said process unit 4 .
- FIGS. 1 a - 1 b, 2 a - 2 f , 3 a - 3 d and 5 show a process unit 4 with a framework 34 having one mating pin 6
- FIGS. 4 a - 4 f and FIGS. 6 a - 6 c show a process unit having a framework having two mating pins 6 .
- said receptor device 1 comprises two or more receptor brackets 27 in a spaced apart arrangement, each receptor bracket 27 having a receptor bracket guide 28 .
- Said receptor bracket guides 28 included in said receptor brackets 27 may each be arranged for receiving a process unit mating pin 6 included in said framework 34 attached to said first process unit end 4 a , so that said receptor brackets 27 form support bearings for said process unit 4 via said process unit mating pins 6 when engaged with said first process unit end 4 a of said process unit 4 .
- said receptor brackets may form a fulcrum for said first process unit end 4 a of said process unit 4 .
- An elastomeric pad 7 may be arranged in connection with each receptor bracket 27 for dampening the impact and the load of said process unit 4 .
- said receptor device 1 includes a receptor 1 a arranged for receiving and engaging a first process unit end 4 a of a process unit 4 and a receptor cylinder 9 in connection with said receptor 1 a, said receptor cylinder 9 arranged for receiving and engaging said first process unit end 4 b .
- a receptor dampening or yielding member 8 located in said receptor cylinder 9 ; said receptor dampening member 8 being arranged for receiving the load of said process unit 4 and for dampening or minimizing the impact of the load of said process unit 4 by said first process unit end 4 b on said receptor device 1 .
- Said receptor dampening member 8 can for example be made of an elastomeric material, it can be a piston dampened by water hydraulic, a coil spring, or any other kind of dampening member. A further adequate alternative could be water hydraulic dampening of said separator 4 .
- Said receptor 1 a and said receptor cylinder 9 are supported by two or more receptor bearings 2 in a spaced apart arrangement on said module foundation 12 .
- Said receptor bearings 2 are arranged for receiving and supporting the load of said process unit 4 , and each receptor bearing 2 is provided with a receptor rotating pin 3 so as to form a fulcrum for said receptor device 1 .
- Each receptor bearing 2 may also be provided with a dampening pad 7 , so as to dampen the impact when said receptor device 1 receives and engages the load of said process unit 4 and for assisting said dampening member 8 in said receptor device 1 in receiving and supporting this load.
- the dampening pad 7 may, e.g., be made of an elastomeric material.
- a restraining device 35 can be provided for maintaining a generally vertical position of said receptor device 1 during entry of said first process unit end 4 a of said process unit 4 .
- Said restraining device 35 may be releasable, and is arranged to be released prior to lowering said process unit onto said support arrangement 12 a.
- said receptor 1 and said receptor cylinder 9 may be arranged for receiving said process unit mating pin 6 of said framework 34 .
- said receptor cylinder 9 can be provided with a rotational guide 10 a arranged for engaging a corresponding shoulder 10 b on said process unit mating pin 6 , so as to facilitate rotation of said process unit mating pin 6 in said receptor cylinder 9 in order to line up said process unit 4 along said module foundation 12 .
- one or more, preferably two, pairs of alignment devices 26 may be provided for alignment of said process unit 4 onto said module foundation 12 . Subsequently, said process unit 4 may be locked onto said module foundation 12 by means of a locking pin 32
- a receptor apparatus may be located at the seabed, preferably on a module foundation at the seabed, and arranged for facilitating installation of a process unit 4 at the seabed or for retrieval of a process unit from the seabed. It is also possible to locate said receptor apparatus on said transport frame 13 on said vessel 24 , said receptor apparatus being arranged for facilitating transport of said process unit 4 to the offshore deployment site, lifting of said process unit 4 into the sea, or for lifting from the sea and transport of said process unit 4 on said vessel 24 to a desired location, such as the shore.
- a receptor apparatus including a receptor device 1 in which a receptor apparatus including a receptor device 1 is arranged on said vessel 24 , it is preferably arranged for assisting in lifting said process unit 4 from a position in which its longitudinal axis is oriented in a generally horizontal direction on said vessel 24 , to a position in which its longitudinal axis is oriented in a generally vertical direction before launch or overboarding of said process unit 4 .
- the preparing and moving step a and launching step may in such cases include the steps described as follows:
- a very general embodiment according to the invention of such a method may comprise the following steps:
- Said method may also comprise the step of transporting said process unit 4 onboard said vessel 24 for subsequent lift-off.
- a receptor apparatus may be used for handling of said first process unit end 4 a of said process unit 4 so as to facilitate preparation aboard a vessel 24 for launch of said process unit 4 into the sea, but also for handling of said first process unit end 4 a of said process unit 4 so as to facilitate preparation of said process unit 4 aboard a vessel 24 for transport of said process unit 4 .
- said receptor apparatus may be used for handling of said first process unit end 4 a of said process unit 4 for deployment of said process unit 4 onto said module foundation 12 arranged at a deployment site at the seabed, but also for handling of said first process unit end 4 a of process unit 4 for removal of said process unit 4 from said module foundation 12 arranged at a deployment site at the seabed.
- a receptor apparatus according to the invention in an operation for lowering and deploying said process unit 4 onto a deployment site on the seabed.
- a further possibility is to use of a receptor apparatus according to the invention in an operation for removing and hauling said process unit 4 away from a deployment site at the seabed.
- the receptor apparatus with transport frame may be attached to the process-unit already in the workshop, where the process unit is manufactured or assembled, and loaded onto a flatbed of a lorry, truck, railway carriage or other wheel carriage. Thereby the unit with transport frame may be transported in one piece from the workshop to the vessel. This will facilitate the handling of the process unit already from the workshop. After retrieval the process-unit with receptor and transport frame may be loaded onto a lorry, truck, railway carriage or other wheel carriage and transported in one piece back to the workshop for service.
- the process unit 4 to be handled is a horizontal gravitational separator 4 .
- a central mating pin 6 has been fixed to the framework 34 , for example a framework or separator-skirt 34 located at the first separator end 4 a.
- the pin is arranged in a guide-funnel which is pivoting in a base structure situated on a common transport skid 13 .
- This skid is sea-fastened on the vessel deck 14 .
- the separator 4 is resting on cradles 15 on the transport skid 13 and also locked to said skid 13 .
- a pad-eye 33 is arranged on the separator 4 in the opposite end of the mating pin 6 .
- a ROV-shackle 18 with slings from the crane-hook can be connected hereon for the deployment.
- the separator may be resting on the vessel deck by means of two launching beams which may be attached to the separator by welding, and further sea-fastened to the vessel deck 14 .
- FIGS. 3 a - 3 d relate to the case of crane overboarding.
- the separator 4 resting with its saddles 16 on the cradles 15 located on the transport skid 13 situated on the crane vessel deck 14 , is in FIG. 3 a shown to be ready for upending by the vessel-crane.
- the skid 13 is sea-fastened while the separator 4 is unlocked from the skid 13 .
- FIG. 3 a In FIG.
- FIG. 3 b shows a cross section of the separator in FIG. 3 a.
- An alternative deployment operation can be to launch the separator 4 by, e.g., a 500 ton winch 31 over the stern-roller 29 on the deck 14 of an AHV, as shown in FIGS. 2 a - 2 b and 4 a - 4 b.
- the separator 4 can be fitted with two launch beams 5 similar to what is used for launching large suction anchors of similar size as this separator 4 .
- the separator 4 with the launching beams 5 are sea-fastened to the deck 14 of the vessel 24 during the transport to field.
- FIGS. 2 a and 4 a shows the separator 4 rested on deck 14 ready rigged up for launching.
- FIGS. 2 b and 4 b shows the separator 4 being launched over the stern roller 29 by means of a set of winches and launch control wires 22 for subsequent deployment to seabed by the separate lowering wire 19 .
- This wire 19 is connected by shackle 18 to the end of the separator and is heave compensated.
- separator landing on seabed can be made as follows.
- a similar pivoted guide funnel 1 as on the transport skid 13 is located on the base frame 12 , 23 subsea.
- the funnel 1 a will be pointing upward prior to mating to receive one or more mating pins 6 on the end of the separator in FIG. 2 c .
- the separator 4 is suspended in a preferably heave compensated deployment wire 19 from a crane or winch 31 .
- a combined operation of vessel 24 and ROV will assist with aligning the mating pin 6 with the funnel 1 a with subsequent lowering and entry into the funnel 1 within a 90 degrees sector of the latter, as shown in FIG. 2 d .
- An alternative approach is to use two clump weights as proposed for the base frame 12 , 12 a , 23 .
- the funnel cylinder 9 may be fitted with rotational guides 10 a, such as helical groove-slots, which in conjunction with associated control-upsets 10 b on the lower end of the mating pin 6 is forcing the separator to twist the necessary angle during the mating in order to align correctly on the base.
- a dampening mechanism 8 which can be of a water hydraulic or elastomeric design, the latter is indicated in the figures.
- the ROV When landed, the ROV will activate a locking pin locking the separator 4 to the guide funnel 1 a.
- the 90 degrees rotating of the separator onto the process skid 23 can then start by vessel 24 offsetting and lowering of the deployment wire 19 in AHC (active heave compensation) mode.
- the separator saddles 16 will then land in the cradles 15 on the skid 23 , as shown in FIGS. 2 e and 4 e and the shackle 18 , which can be a ROV operated shackle, will be disconnected by the ROV.
- one or more, preferably two screw-adjustable wedge-assemblies 26 underneath the separator are activated by the ROV. Elastomeric pads 7 underneath the funnel-bearings 2 will then allow the separator 4 to be aligned as required on the wedges 26 . A ROV activated locking pin 32 underneath the separator 4 will then lock it to the process skid 23 .
- Separator retrieval from seabed can be made as follows. For retrieval of the separator 4 from the process-skid 23 , the operation will have to be reverted. After all pipe- and cable-connections have been disconnected by ROV, the ROV-shackle 18 from the crane-hook will then be connected up to the separator 4 . The separator is then unlocked and rotated 90 degrees into vertical position by the AHC deployment wire 19 . When mating-pin 6 has been released by the ROV, the separator 4 can be retrieved.
- the separator 4 can be brought onto vessel deck 14 either by crane or by hauling, for example as follows.
- FIGS. 3 a - 3 c For retrieval of a lift installed separator from the sea onto the deck by crane, the operation as illustrated in FIGS. 3 a - 3 c will be reverted. Prior to lift the separator 4 out of water the ROV will connect up two tugger lines 30 to the separator to enable to control it over the deck 14 of the vessel 24 and during entry into the guide-funnel 1 .
- the launch operation shown in FIG. 2 a - 2 b can be reverted, and the separator 4 with launch beams 5 can be sea fastened to deck 14 .
- the control wire and bridle 20 will be connected and used for the hauling over the stern roller 29 and the lowering wire 19 used for stabilising furing the hauling operation.
- the upending of the process unit 4 will give a better opportunity to purge and clear the process unit more efficiently for hydrocarbon gases prior to a retrieval operation. It also provides an improved opportunity for sand removal at the seabed instead of having to retrieve the separator to surface for sand-removal if this is the case.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
- Earth Drilling (AREA)
- Spinning Or Twisting Of Yarns (AREA)
- Supplying Of Containers To The Packaging Station (AREA)
- Paper (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
This invention relates to a method for installation of an elongate process unit (4)on the seabed, said process unit (4) to be handled comprising a first process unit end and a second process unit end. A method of retrieving an elongate process unit (4) from the seabed is also provided. Further, this invention relates to a receptor apparatus for use in a process unit handling operation, such as a process unit installation or retrieval operation.
Description
- This invention relates to a method for installation of an elongate process unit on the seabed, said process unit having a first process unit end and a second process unit end. A method of retrieving said process unit from the seabed is also provided. Further, this invention relates to a receptor apparatus for use in a process unit handling operation.
- Since the installation or retrieval of a process unit, such as a separator, can become a part of the IMR-scheme for a field, it is important that this operation can be done efficiently with a minimum of down time. There is reason to believe that the maximum allowable operational sea-state for a horizontal deployment will be somewhat limited especially for operations from a monohull.
- U.S. Pat. No. 4,676,696 (Laursen) relates to an apparatus for securing a flowline to a structure near the seabed, comprising a vertically oriented guide funnel placed atop a guide tube that is provided with a helical shoulder cooperating with an alignment key mounted on the flowline. During installation, the flowline is stabbed into the guide funnel and guide tube thereby causing the alignment key to slide along the shoulder until a pair of hinge pins mounted on the flowline have entered into a pair of slots in the wall of the guide tube. Subsequently, the flowline is hinged down to a horizontal position.
- U.S. Pat. No. 4,671,702 (Langner) relates to a method and apparatus for connecting a flowline to a subsea structure. A riser and flowline connection tool are deployed downwardly to the subsea structure and a flowline terminal head, which is at the end of the flowline, is pulled to the flowline connection tool by means of a pullcable. Then the flowline terminal head is secured to the subsea structure and the flowline connection tool is recovered to the surface. The flowline terminal head consists of a connector hub with clamping surface to which the flowline is welded, and a flexible carrier pipe of interlocking metallic rings into which the end of the flowline is inserted. The carrier pipe limits the curvature of the flowline as the terminal head is bent into alignment with a flowline receptacle of the subsea structure. The flowline terminal head may include buoyant encircling rings which keep it free of difficult terrain in the vicinity of the subsea structure.
- U.S. Pat. No. 4,277,202 (Archambaud et al.) relates to a method and an apparatus for deploying and connecting an end of an underwater flowline to a connecting sleeve.
- U.S. Pat. No. 4,877,356 (Bontenbal) concerns a method and an apparatus for stabbing a flowline into a guide tube near the waterbottom and subsequently hinging over the flowline to a horizontal position. The connection operation is facilitated by a vertically oriented guide tube having along the inner wall thereof a pair of parallel slots which provide at the lower ends thereof pivot supports on which a pair of pivots which are mounted near the lower end of the flowline land during the stab in procedure. Deflectors are provided for deflecting a lower portion of the flowline while the pivots are lowered through the slots so as to induce the flowline to obtain a curved shape into a predetermined direction before the pivots land onto the pivot supports.
- U.S. Pat. No. 4,676,696 and U.S. Pat. No. 4,717,287 (Laursen) both relate to an apparatus for securing a flowline to a structure near the seabed comprises a vertically oriented guide funnel placed atop a guide tube that is provided with a helical shoulder cooperating with an alignment key mounted on the flowline. During installation the flowline is stabbed into the guide funnel and guide tube thereby causing the alignment key to slide along the shoulder until a pair of hinge pins mounted on the flowline have entered into a pair of slots in the wall of the guide tube. Subsequently the flowline is hinged down to a horizontal position.
- The above documents all describe methods and apparatuses for deploying flowlines or risers, whereas the methods and apparatus according to this invention relates to handling process units, in particular elongate process equipment such as separators, heat exchangers, containers, pumps, vessels, tanks or the like. The receptor apparatuses according to the above documents are all arranged for receiving an end of a flowline section while deploying a flowline on or near the seabed. Thus, they are not constructed for receiving the much larger load from process equipment.
- On the other hand, the receptor apparatus according to this invention is designed for receiving such process units, e.g., separators, heat exchangers, containers or the like, in particular elongate process units, and the load such process units exert on the receptor apparatus.
- This invention provides a method for installation of an elongate process unit on the seabed, in which said process unit has a first process unit end and a second process unit end. Said method is characterized in that it comprises the following steps.
- a) preparing and moving said process unit to a position in which it is ready for being launched from a vessel and lowered through the sea with its longitudinal axis in a generally vertical orientation;
- b) launching said process unit from said vessel;
- c) lowering said process unit through the sea surface, the splash zone and further down to a deployment site on the seabed;
- d) after said process unit lowering step c), entering said first process unit end into a receptor device for said first process unit end, so as to temporarily form a lower end of said first process unit end, the receptor device being located on the seabed or on a module foundation for said process unit at the seabed;
- e) completing said process unit entry in said receptor device and retaining said first process unit end in place in said receptor device; and
- f) lowering said second process unit end so as to bring the process unit (4) to a generally horizontal orientation on the seabed or said module foundation for said process unit, said first process unit end remaining supported by said receptor device, so as to form a fulcrum for said first process unit end, thus facilitating lowering of said second process unit end, and
- g) deploying said process unit at the deployment site.
- Furthermore, this invention provides a method of retrieving an elongate process unit from the seabed, in which said process unit has a first process unit end and a second process unit end. Said method is characterized in that it comprises the following steps:
- a) preparing said process unit for removal from a deployment site;
- b) lifting said second process unit end from the seabed or from on a module foundation for said process unit, said first process unit end being retained in a receptor device, thus temporarily forming a lower end of said first process unit end, and so as to bring the longitudinal axis of said process unit to a generally vertical orientation; said first process unit end of said process unit and said receptor device forming a fulcrum for said first process unit end, thus facilitating lifting of said second process unit end;
- c) disengaging said first process unit end from said receptor device;
- d) hauling said process unit from said deployment site at the seabed, up through the sea, the splash zone and the sea surface to a vessel;
- e) bringing said process unit aboard said vessel, and
- g) preparing and moving said process unit to a generally horizontal position onboard said vessel, in which it is sea-fastened and ready for being transported on said vessel.
- Moreover, this invention provides a receptor apparatus for use in a process unit handling operation, in which the process unit to be handled comprises a first process unit end and a second process unit end. Said receptor apparatus is characterized in that it comprises a receptor device arranged for receiving and engaging a first process unit end, and further arranged for receiving and supporting the load of said process unit, Said receptor device is arranged for receiving and engaging said first process unit end, and said receptor device is further arranged for retaining said first process unit end in position in said receptor device so as to provide a fulcrum for said first process unit end during handling of said second process unit end.
- More features and advantages of said method for lowering and deploying said process unit, of said method for retrieving said process unit, and of said receptor apparatus according to the invention appear from the respective, accompanying dependent claims.
- The following drawings serves to illustrate some embodiments according to the invention. The drawings are not made to scale.
-
FIG. 1 a is a schematic sectional side view of a lower portion of the process unit to be lowered and introduced into a receptor according to the invention. -
FIG. 1 b is a corresponding schematic sectional side view of a lower portion of the process unit which has been lowered into a position in the receptor device according to the invention, and now could be further arranged onto the module foundation of the desired deployment site. -
FIG. 2 a is a schematic top view of a vessel from which the process unit installation operation according to one embodiment of the inventtion will take place. The process unit has been positioned on the vessel deck in a position to be launched. -
FIG. 2 b is a schematic and partly sectional side view of the process unit being launched over a vessel stern roller of the vessel. -
FIG. 2 c shows a schematic and partly sectional view of the process unit ready to be lowered into the receptor device at the deployment site. -
FIG. 2 d shows a schematic and partly sectional view similar toFIG. 2 c of the process unit in which process unit entry into the receptor device has been completed, and now being ready to be further lowered onto the module foundation of the deployment site. -
FIG. 2 e shows a schematic and partly sectional view similar toFIGS. 2 c-2 d of the process unit being deployed onto the module foundation of the deployment site. -
FIG. 2 f shows a schematic and cross sectional view of the process unit through line A-A shown inFIG. 2 e. -
FIG. 3 a is a schematic side view of a further embodiment of the invention in which the process unit is raised into a vertical position on board the deployment vessel. A receptor device is utilized for keeping control on the first process unit end while lifting the other process unit end, so as to prepare the launching step of the process unit installation operation. An important advantage of this embodiment of the invention is better control the process unit movements during the lifting step. -
FIG. 3 b is a schematic and cross sectional view of the process unit shown inFIG. 3 a, taken along line A-A shown inFIG. 3 a. -
FIG. 3 c is a schematic side view similar toFIG. 3 a, in which the process unit has been raised to an upright position on the receptor device. -
FIG. 3 d is a schematic side view similar toFIG. 3 a and 3 b, in which the first process unit end has been lifted from the receptor device. -
FIG. 4 a-f shows schematic and partly sectional views of several lowering and deployment stages of the process unit installation operation according to the second embodiment of the invention, similar toFIG. 2 a-2 f. The process unit is positioned onto the receptor device similarly toFIGS. 2 a-2 f, but in this embodiment, two shafts are provided which are located opposed to each other at the first process unit end. Each shaft is introduced into a guide in a bracket so as to form support bearings for the process unit in the receptor device. -
FIG. 5 is a schematic and side view similar toFIG. 3 a-3 d, in which the first process unit end supported by a receptor device arrangement as indicated inFIGS. 4 a-4 f, and in which lifting of the second process unit end so as to prepare the launching step of the process unit installation operation. -
FIG. 6 a is a schematic and side view of a process unit, in an embodiment according to the invention in which the framework on the first process unit end includes two mating pins located diametrically opposed to each other and protruding outwards from the side wall of the process unit. The two mating pins are each retained in a receptor bracket with a guide for the mating pin. -
FIG. 6 b is a schematic and cross sectional view of the process unit shown inFIG. 6 a, taken along line A-A. -
FIG. 6 c is a schematic top view of the process unit shown inFIGS. 6 a-6 b. - The invention will now be described in more detail, with reference to the accompanying drawings. The drawings should not be interpreted as limiting for the scope of the invention, which should be limited by the accompanying claims only.
- Reference is made to
FIGS. 2 a-f, and toFIGS. 4 a-f, in which a method is illustrated for lowering and deploying an elongate process unit 4 having a first process unit end 4 a and a second process unit end 4 b on the seabed. Said elongate process unit 4 may be any process equipment, such as a pump, a tank, a vessel, a container, a heat exchanger or a separator, e.g., a horizontal gravitational separator. The longitudinal length L of said process unit 4 is generally larger than its cross sectional length, or width, W. - Conducting the lowering and deploying operation with said elongate process unit arranged in a generally vertical or upright manner is a central feature of the invention.
- A general embodiment of the process unit lowering and deploying method will now be described.
- a) Said process unit 4 is prepared and moved to a position in which it is ready for being launched from a
vessel 24 and lowered through the sea with its longitudinal axis in a generally vertical orientation. - b) Said process unit 4 is launched from said
vessel 24. - c) Said process unit 4 is lowered into the sea through the sea surface, the splash zone and further down to a deployment site at the seabed.
- d) After said process unit lowering step c), entering said first process unit end 4 a into a
receptor device 1 for said first process unit end 4 a, so as to temporarily form a lower end of said first process unit end 4 a. Saidreceptor device 1 may be located on the seabed or on amodule foundation 12 for said process unit 4 at the seabed. - e) Then said process unit entry in said
receptor device 1 is completed. Said first process unit end 4 a of said process unit 4 is retained in place in saidreceptor device 1. - f) Said second process unit end 4 b is then lowered so as to bring the process unit 4 to a generally horizontal orientation on the seabed or on said
module foundation 12 for said process unit 4, said first process unit end 4 a remaining supported by saidreceptor device 1, so as to form a fulcrum for said first process unit end 4 a, thus facilitating lowering of said second process unit end 4 b. - g) Said process unit 4 is deployed at the deployment site.
- Said method may also include the step of landing said process unit 4 onto the
vessel 24, e.g. onto thedeck 14 of thevessel 24 or onto atransport frame 13, and transporting said process unit 4 to an offshore deployment site. - Said process unit 4 may include one or more, preferably two,
launch beams 5 for facilitating generally horizontal movement of said process unit 4 and for providing support for said process unit 4 on said supporting arrangement 12 a, or a processsubsea skid 23, or on atransport frame 13. - For transport of said process unit 4 to the deployment site, said process unit 4 may for example be arranged on said
launch beams 5 or on atransport frame 13. In the former case, said process unit 4 is moved from saidtransport frame 13 to avessel deck 14 on saidvessel 24 when preparing said process unit 4 for launch into the sea. When preparing said process unit 4 for lift into the sea by crane, said process unit 4, which may be resting on saidtransport frame 13, is moved to saidvessel deck 14. - During the whole handling process, keeping control of said process unit 4 is very important. Control of said process unit 4 may be kept by means of a
vessel wire system 36. Said vessel wire system includes adeployment crane wire 19 or a loweringwire 19 extending from said vessel crane orvessel winch 31 on saidvessel 24 to said second process unit end 4 b. - When preparing said process unit 4 for launch into the sea, said process unit 4 may be moved and guided towards the stem end of said
vessel 24. Said first process unit end 4 a may face said stern end of saidvessel 24, so that said first process unit end 4 a can be launched into the sea first. Launch of said process unit 4 may take place over astern roller 29 located at said stern end of saidvessel 24. - Said
wire system 36 on saidvessel 24 may include one or more, preferably twolaunch wires 22, each extending from said vessel crane orvessel winch 31 via asnatch block 25 or similar for eachlaunch wire 22 to an attachment location on said vessel. Saidsnatch block 25 is preferably being located at the stern end of saidvessel 24. Further, saidwire system 36 on saidvessel 24 may include a launch control-wire bridle 20 retaining said process unit 4 to aheave compensator 37. For lowering of said process unit 4, a loweringwire 19 attached to said vessel crane orvessel winch 31 and extending to said second process unit end 4 b of said process unit 4 may also be included. - During preparation of said process unit 4 for launch into the sea from said
transport frame 13 on saidvessel deck 14 by means of loweringwire 19, said process unit 4 may be brought to a generally vertical position by lifting said second process unit end 4 b, then disengaging said first process unit end 4 a, hauling said process unit 4 from saidtransport frame 13, and bringing it into the sea. - When lowering said process unit 4, said
vessel 24 is positioned generally above saidreceptor device 1 in the sea, and then said process unit 4 is lowered in the sea with its longitudinal axis in a generally vertical orientation down to saidreceptor device 1. - When said process unit 4 has been lowered to the deployment site at the seabed, said process unit 4 may be guided to said
receptor device 1 before entering said first process unit end 4 a of said process unit 4 into saidreceptor device 1. - A
framework 34 including one or more process unit mating pins 6 may be attached to said first process unit end 4 a of said process unit 4, so that said first process unit end 4 a is guided into engagement with saidreceptor device 1 by means of said one or more process unit mating pins 6 being brought into egagement with saidreceptor device 1. - Said first process unit end is then entered into said
receptor device 1. In order to retain said first process unit end 4 a of said process unit 4 safely in position in saidreceptor device 1, said process unit 4 may be retained in place by means of alock pin 11, so as to retain said one or more process unit mating pins 6 included in saidframework 34 attached to said first process unit end 4 a of said process unit 4 in saidreceptor device 1. Saidlock pin 11 can be retained in place and operated in any possible manner, such as being manually operated. However, in a preferred embodiment it is spring loaded and ROV releasable. - After process unit entry in said
receptor device 1, saidvessel 24 is then positioned so that the weight of said process unit 4 is gradually transferred to said loweringwire 19, so as to start lowering of said second process unit end 4 b towards the seabed or saidmodule foundation 12 about said fulcrum formed by said first process unit end 4 a engaging saidreceptor device 1. When the lowering process for said second process unit end 4 b has started, saidvessel 24 is moved to a position so that an axial force component of the tension generated by said process unit 4 in said loweringwire 19 is directed towards saidreceptor device 1. Thevessel 24 is arranged so that said axial force component is generally parallel with the longitudinal, central axis of said process unit 4; and so that transversal force components of said tension in said loweringwire 19 from said second process unit end 4 b of said process unit 4 to saidvessel 24 are reduced or minimized. - Thus, said first process unit end 4 a is retained in engagement with said
receptor device 1, and the risk of disengagement of said first process unit end 4 a from saidreceptor device 1 is reduced or minimized. - After said process unit 4 has been deployed onto the seabed or said
module foundation 12, saidreceptor device 1 may be loosened or removed from said first process unit end 4 a of said process unit 4. - A receptor apparatus is also provided with this invention for use in a process unit handling operation, for example as a process unit installation operation as described herein, in which the process unit 4 to be handled comprises a first process unit end 4 a and a second process unit end 4 b.
- Said receptor apparatus includes a
receptor device 1 which is arranged for receiving and engaging a first process unit end 4 a, and which further is arranged for receiving and engaging said first process unit end 4 a of said process unit 4, so as to support the load of said process unit 4, and so as to retain said first process unit end 4 a in position in saidreceptor device 1, thus providing a fulcrum for said first process unit end 4 a during handling of said second process unit end 4 b. - Said receptor device may be arranged directly on the seabed, but it is preferably arranged on a
module foundation 12. A processsubsea skid 23, arranged for supporting saidreceptor device 1 and the load from said process unit 4 may also be arranged on saidmodule foundation 12. - A
framework 34 may be attached to said first process unit end 4 a of said process unit 4. Saidframework 34 may include one or more separator mating pins 6. In such cases, saidreceptor device 1 may be arranged for receiving said one or more process unit mating pins 6 included in aframework 34 being attached to said first process unit end 4 a of said process unit 4.FIGS. 1 a-1 b, 2 a-2 f, 3 a-3 d and 5 show a process unit 4 with aframework 34 having onemating pin 6, andFIGS. 4 a-4 f andFIGS. 6 a-6 c show a process unit having a framework having two mating pins 6. - In one preferred embodiment according to the invention of said receptor apparatus, said
receptor device 1 comprises two ormore receptor brackets 27 in a spaced apart arrangement, eachreceptor bracket 27 having a receptor bracket guide 28. Said receptor bracket guides 28 included in saidreceptor brackets 27 may each be arranged for receiving a processunit mating pin 6 included in saidframework 34 attached to said first process unit end 4 a, so that saidreceptor brackets 27 form support bearings for said process unit 4 via said process unit mating pins 6 when engaged with said first process unit end 4 a of said process unit 4. Thus, said receptor brackets may form a fulcrum for said first process unit end 4 a of said process unit 4. Anelastomeric pad 7 may be arranged in connection with eachreceptor bracket 27 for dampening the impact and the load of said process unit 4. - In a second preferred embodiment according to the invention of said receptor apparatus, said
receptor device 1 includes a receptor 1 a arranged for receiving and engaging a first process unit end 4 a of a process unit 4 and a receptor cylinder 9 in connection with said receptor 1 a, said receptor cylinder 9 arranged for receiving and engaging said first process unit end 4 b. A receptor dampening or yielding member 8 located in said receptor cylinder 9; said receptor dampening member 8 being arranged for receiving the load of said process unit 4 and for dampening or minimizing the impact of the load of said process unit 4 by said first process unit end 4 b on saidreceptor device 1. Said receptor dampening member 8 can for example be made of an elastomeric material, it can be a piston dampened by water hydraulic, a coil spring, or any other kind of dampening member. A further adequate alternative could be water hydraulic dampening of said separator 4. Said receptor 1 a and said receptor cylinder 9 are supported by two ormore receptor bearings 2 in a spaced apart arrangement on saidmodule foundation 12. Saidreceptor bearings 2 are arranged for receiving and supporting the load of said process unit 4, and eachreceptor bearing 2 is provided with areceptor rotating pin 3 so as to form a fulcrum for saidreceptor device 1. - Each
receptor bearing 2 may also be provided with a dampeningpad 7, so as to dampen the impact when saidreceptor device 1 receives and engages the load of said process unit 4 and for assisting said dampening member 8 in saidreceptor device 1 in receiving and supporting this load. The dampeningpad 7 may, e.g., be made of an elastomeric material. - A restraining device 35 can be provided for maintaining a generally vertical position of said
receptor device 1 during entry of said first process unit end 4 a of said process unit 4. Said restraining device 35 may be releasable, and is arranged to be released prior to lowering said process unit onto said support arrangement 12 a. - In the cases in which a
framework 34 having one ormore separator pins 6 is attached to said first process unit end 4 a of said process unit 4, saidreceptor 1 and said receptor cylinder 9 may be arranged for receiving said processunit mating pin 6 of saidframework 34. - For better guidance and engagement of said process unit 4 with said receptor apparatus, said receptor cylinder 9 can be provided with a
rotational guide 10 a arranged for engaging a corresponding shoulder 10 b on said processunit mating pin 6, so as to facilitate rotation of said processunit mating pin 6 in said receptor cylinder 9 in order to line up said process unit 4 along saidmodule foundation 12. - After landing of process unit 4 on said
module foundation 12, one or more, preferably two, pairs ofalignment devices 26 may be provided for alignment of said process unit 4 onto saidmodule foundation 12. Subsequently, said process unit 4 may be locked onto saidmodule foundation 12 by means of a locking pin 32 - A receptor apparatus according to the invention may be located at the seabed, preferably on a module foundation at the seabed, and arranged for facilitating installation of a process unit 4 at the seabed or for retrieval of a process unit from the seabed. It is also possible to locate said receptor apparatus on said
transport frame 13 on saidvessel 24, said receptor apparatus being arranged for facilitating transport of said process unit 4 to the offshore deployment site, lifting of said process unit 4 into the sea, or for lifting from the sea and transport of said process unit 4 on saidvessel 24 to a desired location, such as the shore. - In an embodiment according to the invention in which a receptor apparatus including a
receptor device 1 is arranged on saidvessel 24, it is preferably arranged for assisting in lifting said process unit 4 from a position in which its longitudinal axis is oriented in a generally horizontal direction on saidvessel 24, to a position in which its longitudinal axis is oriented in a generally vertical direction before launch or overboarding of said process unit 4. The preparing and moving step a and launching step may in such cases include the steps described as follows: - Entering said first process unit end into said
receptor device 1 for said first process unit end 4 a so that said first process unit end 4 a engages saidreceptor device 1, so as to temporarily form a lower end of said first process unit end 4 a. - Completing said process unit entry in said
receptor device 1 and retaining said first process unit end 4 a in place in saidreceptor device 1, so as to form a fulcrum for said first process unit end 4 a. - Lifting said second process unit end 4 a while said first process unit end 4 a remains supported by said
receptor device 1, thus facilitating lifting of said second process unit end 4 b so as to bring the longitudinal axis of said process unit 4 to a generally vertical orientation. - Moving said process unit 4 in said generally vertical orientation to a position in which it is ready to be launched into the sea; and
- Launching said process unit 4 with its longitudinal axis in a generally vertical orientation into the sea.
In this case, said installation method may also include the step of transporting said process unit 4 on saidtransport frame 13 on saidvessel 24 to the offshore site. - There is also provided a method for retrieving an elongate process unit 4 from the seabed, in which said process unit 4 has a first process unit end 4 a and a second process unit end 4 b. A very general embodiment according to the invention of such a method may comprise the following steps:
- a) preparing said process unit 4 for removal from a deployment site;
- b) lifting said second process unit end 4 b from the seabed or from a
module foundation 12 for said process unit 4, said first process unit end 4 a being retained in areceptor device 1, thus temporarily forming a lower end of said first process unit end 4 a, and so as to bring the longitudinal axis of said process unit 4 to a generally vertical orientation; said first process unit end 4 a of said process unit 4 and saidreceptor device 1 forming a fulcrum for said first process unit end 4 a, thus facilitating lifting of said second process unit end 4 b; - c) disengaging said first process unit end 4 a from said
receptor device 1; - d) hauling said process unit 4 from said deployment site at the seabed, up through the sea, the splash zone and the sea surface to a
vessel 24; - e) bringing said process unit 4 aboard said
vessel 24, and - g) preparing and moving said process unit 4) to a generally horizontal position onboard said vessel, in which it is sea-fastened and ready for being transported on said
vessel 24. - Said method may also comprise the step of transporting said process unit 4 onboard said
vessel 24 for subsequent lift-off. - A receptor apparatus according to the invention may be used for handling of said first process unit end 4 a of said process unit 4 so as to facilitate preparation aboard a
vessel 24 for launch of said process unit 4 into the sea, but also for handling of said first process unit end 4 a of said process unit 4 so as to facilitate preparation of said process unit 4 aboard avessel 24 for transport of said process unit 4. - Further, said receptor apparatus according to the invention may be used for handling of said first process unit end 4 a of said process unit 4 for deployment of said process unit 4 onto said
module foundation 12 arranged at a deployment site at the seabed, but also for handling of said first process unit end 4 a of process unit 4 for removal of said process unit 4 from saidmodule foundation 12 arranged at a deployment site at the seabed. - It is possible to use a receptor apparatus according to the invention in an operation for lowering and deploying said process unit 4 onto a deployment site on the seabed. A further possibility is to use of a receptor apparatus according to the invention in an operation for removing and hauling said process unit 4 away from a deployment site at the seabed.
- The receptor apparatus with transport frame according to the invention may be attached to the process-unit already in the workshop, where the process unit is manufactured or assembled, and loaded onto a flatbed of a lorry, truck, railway carriage or other wheel carriage. Thereby the unit with transport frame may be transported in one piece from the workshop to the vessel. This will facilitate the handling of the process unit already from the workshop. After retrieval the process-unit with receptor and transport frame may be loaded onto a lorry, truck, railway carriage or other wheel carriage and transported in one piece back to the workshop for service.
- In a preferred embodiment of the invention, the process unit 4 to be handled is a horizontal gravitational separator 4.
- Since the installation or retrieval of a process unit, such as a separator, can become a part of the IMR-scheme for a field, it is important that this operation can be done efficiently with a minimum of down time. There is reason to believe that the maximum allowable operational sea-state for a horizontal deployment will be somewhat limited especially for operations from a monohull.
- In order to achieve a controllable operation, a
central mating pin 6 has been fixed to theframework 34, for example a framework or separator-skirt 34 located at thefirst separator end 4 a. - For the lift-option the pin is arranged in a guide-funnel which is pivoting in a base structure situated on a
common transport skid 13. This skid is sea-fastened on thevessel deck 14. - The separator 4 is resting on
cradles 15 on thetransport skid 13 and also locked to saidskid 13. A pad-eye 33 is arranged on the separator 4 in the opposite end of themating pin 6. A ROV-shackle 18 with slings from the crane-hook can be connected hereon for the deployment. - For the launching/hauling option the separator may be resting on the vessel deck by means of two launching beams which may be attached to the separator by welding, and further sea-fastened to the
vessel deck 14. - Separator overboarding may take place for example by crane or by launching.
FIGS. 3 a-3 d relate to the case of crane overboarding. InFIG. 3 a, the separator 4, resting with itssaddles 16 on thecradles 15 located on thetransport skid 13 situated on thecrane vessel deck 14, is inFIG. 3 a shown to be ready for upending by the vessel-crane. Theskid 13 is sea-fastened while the separator 4 is unlocked from theskid 13. InFIG. 3 b, the separator, while still resting in thebearings 2 of the guide-funnel 1, has been rotated about 90 degrees into the vertical position in thebearings 2 under fall control by the crane and the guide-funnel 1. When ready to deploy the separator 4, themating pin 6 is unlocked from the guide-funnel 1 and free to be lifted off by the crane. InFIG. 3 c, the separator is lifted off the guide-funnel 2 and ready to be deployed overboard with the crane.FIG. 3 d shows a cross section of the separator inFIG. 3 a. - Reference is now made to
FIGS. 2 a-2 f and toFIGS. 4 a-4 f. An alternative deployment operation can be to launch the separator 4 by, e.g., a 500ton winch 31 over the stern-roller 29 on thedeck 14 of an AHV, as shown inFIGS. 2 a-2 b and 4 a-4 b. - The separator 4 can be fitted with two
launch beams 5 similar to what is used for launching large suction anchors of similar size as this separator 4. The separator 4 with the launchingbeams 5 are sea-fastened to thedeck 14 of thevessel 24 during the transport to field. - In addition to the
winch lowering wire 19, twolaunch wires 22 and one launch control wire withbridle 20 and associated auxiliary winches are required in this embodiment of said launching operation. -
FIGS. 2 a and 4 a shows the separator 4 rested ondeck 14 ready rigged up for launching. -
FIGS. 2 b and 4 b shows the separator 4 being launched over thestern roller 29 by means of a set of winches and launchcontrol wires 22 for subsequent deployment to seabed by theseparate lowering wire 19. Thiswire 19 is connected byshackle 18 to the end of the separator and is heave compensated. - In the case in which the receptor apparatus comprises an entry funnel, separator landing on seabed can be made as follows. A similar pivoted
guide funnel 1 as on thetransport skid 13 is located on the 12,23 subsea. The funnel 1 a will be pointing upward prior to mating to receive one or more mating pins 6 on the end of the separator inbase frame FIG. 2 c. The separator 4 is suspended in a preferably heave compensateddeployment wire 19 from a crane orwinch 31. - A combined operation of
vessel 24 and ROV will assist with aligning themating pin 6 with the funnel 1 a with subsequent lowering and entry into thefunnel 1 within a 90 degrees sector of the latter, as shown inFIG. 2 d. An alternative approach is to use two clump weights as proposed for the 12,12 a, 23.base frame - The funnel cylinder 9 may be fitted with
rotational guides 10 a, such as helical groove-slots, which in conjunction with associated control-upsets 10 b on the lower end of themating pin 6 is forcing the separator to twist the necessary angle during the mating in order to align correctly on the base. In the bottom of the funnel-cylinder 9 is located a dampening mechanism 8 which can be of a water hydraulic or elastomeric design, the latter is indicated in the figures. - When landed, the ROV will activate a locking pin locking the separator 4 to the guide funnel 1 a. The 90 degrees rotating of the separator onto the
process skid 23 can then start byvessel 24 offsetting and lowering of thedeployment wire 19 in AHC (active heave compensation) mode. - The separator saddles 16 will then land in the
cradles 15 on theskid 23, as shown inFIGS. 2 e and 4 e and theshackle 18, which can be a ROV operated shackle, will be disconnected by the ROV. - For proper alignment of the separator one or more, preferably two screw-adjustable wedge-
assemblies 26 underneath the separator are activated by the ROV.Elastomeric pads 7 underneath the funnel-bearings 2 will then allow the separator 4 to be aligned as required on thewedges 26. A ROV activated locking pin 32 underneath the separator 4 will then lock it to theprocess skid 23. - Separator retrieval from seabed can be made as follows. For retrieval of the separator 4 from the process-
skid 23, the operation will have to be reverted. After all pipe- and cable-connections have been disconnected by ROV, the ROV-shackle 18 from the crane-hook will then be connected up to the separator 4. The separator is then unlocked and rotated 90 degrees into vertical position by theAHC deployment wire 19. When mating-pin 6 has been released by the ROV, the separator 4 can be retrieved. - The separator 4 can be brought onto
vessel deck 14 either by crane or by hauling, for example as follows. - For retrieval of a lift installed separator from the sea onto the deck by crane, the operation as illustrated in
FIGS. 3 a-3 c will be reverted. Prior to lift the separator 4 out of water the ROV will connect up two tugger lines 30 to the separator to enable to control it over thedeck 14 of thevessel 24 and during entry into the guide-funnel 1. - For retrieval of a launched separator from the sea onto the deck by hauling, the launch operation shown in
FIG. 2 a-2 b can be reverted, and the separator 4 withlaunch beams 5 can be sea fastened todeck 14. The control wire andbridle 20 will be connected and used for the hauling over thestern roller 29 and the loweringwire 19 used for stabilising furing the hauling operation. - The above upending-operation of the separator will provide some additional advantages, thus making the IMR-operations more efficient: the upending of the process unit 4 will give a better opportunity to purge and clear the process unit more efficiently for hydrocarbon gases prior to a retrieval operation. It also provides an improved opportunity for sand removal at the seabed instead of having to retrieve the separator to surface for sand-removal if this is the case.
-
- 1 receptor device
- 1 a receptor
- 2 receptor bearing, e.g., funnel bearing
- 3 receptor rotating pin, e.g., funnel rotating pin
- 4 elongate process unit
- 4 a a first process unit end
- 4 b a second process unit end
- 5 launch beam
- 6 process unit mating pin
- 7 dampening pad
- 8 dampening member
- 8 a dampening member, compressed
- 8 b dampening member, extended
- 9 receptor cylinder, e.g., funnel cylinder
- 10 a rotational guide
- 10 b guide formation on said process
unit mating pin 6 corresponding torotational guide 10 a in said receptor cylinder 9 - 11 spring loaded lock pin ROV releasable
- 12 module foundation
- 13 transport frame
- 14 vessel deck
- 15 guide or cradle
- 16 process unit saddle
- 17 process unit locking pin/bucket
- 18 shackle for deployment wire
- 19 lowering wire
- 20 launch control-wire bridle
- 22 launch wire
- 23 process subsea skid
- 24 vessel (AHV)
- 25 snatch-block for launch-wire
- 26 ROV-adjustable wedge for process unit alignment
- 27 receptor bracket, e.g., funnel bracket
- 28 receptor bracket guide, e.g., funnel bracket guide
- 29 stern roller
- 30 tugger line
- 31 vessel crane or vessel winch
- 32 process unit fastening pin, e.g., process unit locking pin
- 33 pad-eye
- 34 framework
- 35 restraining device
- 36 vessel wire system
- 37 heave compensator
Claims (26)
1. A method for installation of an elongate process unit on the seabed, in which said process unit has a first process unit end and a second process unit end, characterized in that said method comprises the following steps:
a) preparing and moving said process unit to a position in which it is ready for being launched from a vessel and lowered through the sea with its longitudinal axis in a generally vertical orientation;
b) launching said process unit from said vessel;
c) lowering said process unit through the sea surface, the splash zone and further down to a deployment site at the seabed;
d) after said process unit lowering step c), entering said first process unit end into a receptor device for said first process unit end, so as to temporarily form a lower end of said first process unit end, the receptor device being located on the seabed or on a module foundation for said process unit at the seabed;
e) completing said process unit entry in said receptor device and retaining said first process unit end in place in said receptor device; and
f) lowering said second process unit end so as to bring the process unit as a whole from the generally vertical orientation to a generally horizontal orientation on the seabed or on said module foundation for said process unit, said first process unit end remaining supported by said receptor device, so as to form a fulcrum for said first process unit end, thus facilitating lowering of said second process unit end, and
g) deploying said process unit at the deployment site.
2. Method according to claim 1 , characterized in that said process unit entry step d) further comprises the step of:
guiding said process unit to said receptor device before entering said first process unit end of said process unit into said receptor device.
3. Method according to claim 1 ,
characterized in that said preparation and moving step a) and said launching step b) further include the following steps:
moving and guiding said process unit towards the stern end of said vessel, said first process unit end facing said stern end of said vessel;
launching said first process unit end over a stern roller located at said stern end of said vessel.
4. Method according to claim 3 , characterized in that said process unit moving and guiding step is accomplished by conveying said process unit to said stern end of said vessel by means of a vessel crane or vessel winch, preferably having a heave compensator, the vessel crane or vessel winch controlling a vessel wire system which is attached to said process unit, so as to safely retain and guide said process unit.
5. Method according to claim 1 , characterized in that a receptor device is arranged on said vessel, and that said preparation and moving step a) and said launching step b) further include the following steps:
entering said first process unit end into said receptor device for said first process unit end so that said first process unit end engages said receptor device, so as to temporarily form a lower end of said first process unit end;
completing said process unit entry in said receptor device and retaining said first process unit end in place in said receptor device, so as to form a fulcrum for said first process unit end;
lifting said second process unit end while said first process unit end remains supported by said receptor device, thus facilitating lifting of said second process unit end so as to bring the longitudinal axis of said process unit to a generally vertical orientation;
moving said process unit in said generally vertical orientation to a position in which it is ready to be launched into the sea; and
launching said process unit with its longitudinal axis in a generally vertical orientation into the sea.
6. Method according to claim 1 , characterized in that said preparing and moving step a) further comprises the step of:
transferring said process unit from a transport frame to a vessel deck on said vessel.
7. Method according to claim 1 , characterized in that a framework including one or more process unit mating pins is attached to said first process unit end of said process unit, so that said process unit entry step d) further includes the following step:
guiding said first process unit end into engagement with said receptor device by means of said one or more process unit mating pins being brought into engagement with said receptor device.
8. Method according to claim 1 , characterized in that said process unit includes at least two launch beams for facilitating generally horizontal movement of said process unit and for providing support for said process unit on the seabed, on said module foundation, on a process subsea skid, said vessel deck, or on said transport frame on said vessel deck.
9. Method according to claim 1 , characterized in that said completing and retaining step e) further includes the following step:
locking and retaining said first process unit end of said process unit in place in said receptor device by means of a lock pin, so as to retain said one or more process unit mating pins included in said frame-work attached said first process unit end of said process unit in said receptor device; said lock pin preferably being spring loaded and ROV releasable.
10. Method according to claim 1 ,
characterized in that
said method further comprises the step of:
keeping control of said second process unit end of said process unit by means of said vessel wire system including a lowering wire from said vessel crane or vessel winch on said vessel;
said process unit lowering step c) further includes the step of
positioning said vessel generally above said receptor device in the sea and lowering said process unit in the sea with its longitudinal axis in a generally vertical orientation down to said receptor device;
said process unit end lowering step f) further includes the step of
positioning said vessel so that the weight of said process unit is gradually transferred to said lowering wire, so as to start lowering of said second process unit end towards the seabed or said module foundation about said fulcrum formed by said first process unit end engaging said receptor device,
moving said vessel to a position so that an axial force component of the tension generated by said process unit in said lowering wire is directed towards said receptor device; so that said axial force component is generally parallel with the longitudinal, central axis of said process unit; and so that transversal force components of said force in said lowering wire from said second process unit end of said process unit to said vessel are reduced or minimized;
thus retaining said first process unit end in engagement with said receptor device, and reducing or minimizing the risk of disengagement of said first process unit end from said receptor device.
11. Method according to claim 1 , characterized in that
said process subsea skid, or said transport frame or similar, includes
guide and cradle arranged for supporting the load of said process unit to said module foundation or said transport frame;
one or more, preferably two pairs of wedges being adjustable in order to align said process unit on said process subsea skid or said transport frame, so as to bring the longitudinal axis of said process unit to the generally same level as said receptor device engaging said first process unit end of said process unit, thus relieving the load of said process unit from said receptor device to the module foundation; and that
said process unit 4 includes a process unit saddle arranged for transferring the load of said process unit to said guide and cradle.
12. Method according to claim 1 , characterized in that said wire system on said vessel includes
one or more launch wires, extending from said vessel winch or a separate winch via a snatch block for each launch wire to an attachment location on said vessel; said snatch block being located at the stern end of said vessel;
a launch control-wire with bridle connected to a separate winch;
a lowering wire connected to a separate winch and to said second process unit end of said process unit.
13. Method according to claim 1 , characterized in that after the deployment step g), it further comprises the step of:
h) loosening or removing said receptor device from said first process unit end.
14. Method according to claim 1 , characterized in that said elongate process unit is a horizontal gravitational separator.
15. Method according to claim 1 , characterized in before said preparation and moving step a) and said launching step b):
placing a receptor device, including a transport frame, with the process unit in engagement with said receptor device on the flatbed of a lorry, truck, railway carriage or other wheel carriage,
transporting said receptor device with said process unit to said vessel, and
lifting said receptor device with said process unit onto said vessel.
16. A method of retrieving an elongate process unit from the seabed, in which said process unit has a first process unit end and a second process unit end, characterized in that said method comprises the following steps:
a) preparing said process unit for removal from a deployment site;
b) lifting said second process unit end from the seabed or from a module foundation for said process unit, said first process unit end being retained in a receptor device, thus temporarily forming a lower end of said first process unit end, and so as to bring the longitudinal axis of said process unit as a whole from the generally horizontal orientation to a generally vertical orientation; said first process unit end of said process unit and said receptor device forming a fulcrum for said first process unit end, thus facilitating lifting of said second process unit end;
c) disengaging said first process unit end from said receptor device;
d) hauling said process unit from said deployment site at the seabed, up through the sea, the splash zone and the sea surface to a vessel;
e) bringing said process unit aboard said vessel, and
g) preparing and moving said process unit to a generally horizontal position onboard said vessel, in which it is sea-fastened and ready for being transported on said vessel.
17. Receptor apparatus for use in a process unit handling operation, in which the process unit to be handled comprises a first process unit end and a second process unit end, characterized by the following features:
a receptor device arranged for receiving and engaging a first process unit end, and further arranged for receiving and supporting the load of said process unit, and
said receptor device being arranged for receiving and engaging said first process unit end, and said receptor device further being arranged for retaining said first process unit end in place in said receptor device and providing a fulcrum for said first process unit end during handling of said second process unit end and being adapted to take up a substantial part of the weight of the process unit when the process unit as a whole is transferred between a substantially vertical position and a substantially horizontal position.
18. Receptor apparatus for use in a process handling operation, in which the process unit to be handled comprises a first process unit end and a second process unit end, characterized by the following features:
a receptor device arranged for receiving and engaging a first process unit end, and further arranged for receiving and supporting the load of said process unit,
said receptor device being arranged for receiving and engaging said first process unit end, and said receptor device further being arranged for retaining said first process unit end in place in said receptor device and providing fulcrum for said first process unit end during handling of said second process unit end and being adapted to take up a substantial part of the weight of the process unit when the process unit as a whole is transferred between a substantially vertical position and a substantially horizontal position,
said receptor device comprises two or more receptor brackets in a space apart arrangement, each receptor bracket having a receptor bracket guide; and that
said receptor bracket guides included in said receptor brackets are each arranged for receiving a process unit mating pin included in said framework which is attached to said first process unit end, so that said receptor brackets form support bearings for said process unit via said process unit mating pins when engaged with said first process unit end of said process unit; thus forming a fulcrum for said first process unit end of said process unit.
19. Receptor apparatus for use in a process unit handling operation, in which the process unit to be handled comprises a first process unit end and a second process unit end,
characterized by the following features:
a receptor device arranged for receiving and engaging a first process unit end, and further arranged for receiving and supporting the load of said process unit,
said receptor device being arranged for receiving and engaging said first process unit end, and said receptor device further being arranged for retaining said first process unit end in place in said receptor device and providing a fulcrum for said first process unit end during handling of said second process unit end and being adapted to take up a substantial part of the weight of the process unit when the process unit as a whole is transferred between a substantially vertical position and a substantially horizontal position,
a receptor cylinder in connection with said receptor, said receptor cylinder arranged for receiving and engaging said first process unit end,
two or more receptor bearings in a spaced apart arrangement for supporting the load of said process unit; each receptor bearing being provided with a receptor rotating pin so as to form a fulcrum for said receptor device.
said receptor and said receptor cylinder being arranged for receiving a process unit mating pin attached to said first process unit end of said process unit.
20. Receptor apparatus according to claim 17 , characterized in that said receptor device is arranged on a module foundation arranged for supporting said receptor device and the load from said process unit.
21. Receptor apparatus according to claim 17 , characterized in that said receptor device is arranged for receiving one or more process unit mating pins included in a framework being attached to said first process unit end of said process unit.
22. Receptor apparatus according to claim 21 , characterized in that
said receptor device comprises two or more receptor brackets in a spaced apart arrangement, each receptor bracket having a receptor bracket guide; and that
said receptor bracket guides included in said receptor brackets are each arranged for receiving a process unit mating pin included in said framework which is attached to said first process unit end, so that said receptor brackets form support bearings for said process unit via said process unit mating pins when engaged with said first process unit end of said process unit; thus forming a fulcrum for said first process unit end of said process unit.
23. Receptor apparatus according to claim 17 , characterized in that said receptor device comprises
a receptor arranged for receiving and engaging a first process unit end of a process unit,
a receptor cylinder in connection with said receptor, said receptor cylinder arranged for receiving and engaging said first process unit end,
a receptor dampening or yielding member located in said receptor cylinder; said receptor dampening member being arranged for receiving the load of said process unit and for dampening or minimizing the impact of the load of said process unit by said first process unit end on said receptor device,
two or more receptor bearings in a spaced apart arrangement on said module foundation; said receptor bearings being arranged for supporting the load of said process unit; each receptor bearing being provided with a receptor rotating pin so as to form a fulcrum for said receptor device,
each receptor bearing optionally being provided with a dampening pad, so as to dampen the impact when said receptor device receives and engages the load of said process unit and for assisting said dampening member in said receptor device in receiving and supporting this load,
said receptor and said receptor cylinder preferably being arranged for receiving a process unit mating pin of a framework attached to said first process unit end of said process unit.
24. Receptor apparatus according to claim 23 , characterized in that said receptor cylinder is provided with a rotational guide arranged for engaging a corresponding guide formation or shoulder on said process unit mating pin, so as to facilitate rotation of said process unit mating pin in said receptor cylinder.
25. Receptor apparatus according to claim 17 characterized in that
it is located at the seabed, preferably on a module foundation at the seabed, and arranged for facilitating deployment or removal of a process unit on the seabed, or that
it is located on said vessel and arranged for facilitating launching of said process unit into the sea, for loading onto said vessel and for transport of said process unit on said vessel.
26. Use of a receptor apparatus according to claim 17 comprising
handling of said first process unit end of said process unit so as to facilitate preparation aboard a vessel for launch of said process unit into the sea, or
handling of said first process unit end of said process unit so as to facilitate preparation of said process unit aboard a vessel for transport of said process unit; or
handling of said first process unit end of said process unit for deployment of said process unit onto said module foundation arranged at a deployment site at the seabed, or
handling of said first process unit end of process unit for removal of said process unit from said module foundation arranged at a deployment site at the seabed.
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| NO20035034A NO322872B1 (en) | 2003-11-13 | 2003-11-13 | Vertical installation of an elongated process unit |
| NO20035034 | 2003-11-13 | ||
| PCT/NO2004/000340 WO2005047642A1 (en) | 2003-11-13 | 2004-11-10 | Vertical installation of an elongated process unit |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20080199257A1 true US20080199257A1 (en) | 2008-08-21 |
Family
ID=29775177
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US10/595,832 Abandoned US20080199257A1 (en) | 2003-11-13 | 2004-11-10 | Vertical Installation of an Elongated Process Unit |
Country Status (6)
| Country | Link |
|---|---|
| US (1) | US20080199257A1 (en) |
| AU (1) | AU2004289926B2 (en) |
| GB (1) | GB2428260B (en) |
| NO (1) | NO322872B1 (en) |
| RU (1) | RU2353755C2 (en) |
| WO (1) | WO2005047642A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110186301A1 (en) * | 2008-08-21 | 2011-08-04 | William Scott Childers | Subsea structure installation or removal |
| US9656800B2 (en) * | 2014-07-24 | 2017-05-23 | Oceaneering International, Inc. | Subsea fluid storage system |
| WO2023201071A1 (en) * | 2022-04-14 | 2023-10-19 | Chevron U.S.A. Inc. | Structural damping for subsea noise mitigation |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB0819400D0 (en) * | 2008-10-22 | 2008-11-26 | Subsea 7 | Offshore lifting operations |
Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3641961A (en) * | 1970-05-25 | 1972-02-15 | Pan American Petroleum Corp | System for lowering a subsea device from a vessel |
| US3690112A (en) * | 1971-02-10 | 1972-09-12 | Exxon Production Research Co | Method and apparatus for attaching pipelines to offshore structures |
| US3953982A (en) * | 1973-12-05 | 1976-05-04 | Subsea Equipment Associates Limited | Method and apparatus for laying and connecting flow lines to submerged structures |
| US4230186A (en) * | 1978-12-11 | 1980-10-28 | Standard Oil Company (Indiana) | Simplified subsea production wellhead |
| US4277202A (en) * | 1978-05-12 | 1981-07-07 | Compagnie Francaise Des Petroles | Positioning of the end of an underwater flowline |
| US4486123A (en) * | 1981-03-31 | 1984-12-04 | Blohm & Voss Ag | Underwater pipe laying vessel |
| US4662788A (en) * | 1985-02-01 | 1987-05-05 | Conoco Inc. | Offshore platform leg-mating apparatus and a method of assembly |
| US4671702A (en) * | 1984-05-25 | 1987-06-09 | Shell Oil Company | Flowline connection means |
| US4676696A (en) * | 1984-08-17 | 1987-06-30 | Shell Oil Company | Apparatus for installing a flowline section near the seabed |
| US4877356A (en) * | 1987-09-30 | 1989-10-31 | Shell Oil Company | Method and apparatus for installing a flowline near the waterbottom |
| US4899822A (en) * | 1987-09-04 | 1990-02-13 | Camco Inc. | Apparatus for controlling the operation of an underwater installation |
| US5464307A (en) * | 1993-12-29 | 1995-11-07 | Mcdermott International, Inc. | Apparatus for near vertical laying of pipeline |
| US6273643B1 (en) * | 1998-05-01 | 2001-08-14 | Oil States Industries | Apparatus for deploying an underwater pipe string |
| US6375407B1 (en) * | 1998-06-08 | 2002-04-23 | Stevedoring Services Of America, Inc. | Method and apparatus for handling, transporting, pallet removal and loading cartons of frozen animal products onto vessels |
| US6405802B1 (en) * | 2000-05-31 | 2002-06-18 | Fmc Corporation | Subsea flowline jumper handling apparatus |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SU1351265A1 (en) * | 1985-06-06 | 1996-07-10 | Дальневосточный политехнический институт им.В.В.Куйбышева | Device for raising minerals from sea bottom |
| RU2214510C1 (en) * | 2002-11-14 | 2003-10-20 | Шестаченко Флориан Александрович | Deep-sea mining complex and telecontrolled underwater robot |
-
2003
- 2003-11-13 NO NO20035034A patent/NO322872B1/en not_active IP Right Cessation
-
2004
- 2004-11-10 AU AU2004289926A patent/AU2004289926B2/en not_active Ceased
- 2004-11-10 GB GB0609922A patent/GB2428260B/en not_active Expired - Fee Related
- 2004-11-10 WO PCT/NO2004/000340 patent/WO2005047642A1/en not_active Ceased
- 2004-11-10 RU RU2006119219/03A patent/RU2353755C2/en not_active IP Right Cessation
- 2004-11-10 US US10/595,832 patent/US20080199257A1/en not_active Abandoned
Patent Citations (16)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3641961A (en) * | 1970-05-25 | 1972-02-15 | Pan American Petroleum Corp | System for lowering a subsea device from a vessel |
| US3690112A (en) * | 1971-02-10 | 1972-09-12 | Exxon Production Research Co | Method and apparatus for attaching pipelines to offshore structures |
| US3953982A (en) * | 1973-12-05 | 1976-05-04 | Subsea Equipment Associates Limited | Method and apparatus for laying and connecting flow lines to submerged structures |
| US4277202A (en) * | 1978-05-12 | 1981-07-07 | Compagnie Francaise Des Petroles | Positioning of the end of an underwater flowline |
| US4230186A (en) * | 1978-12-11 | 1980-10-28 | Standard Oil Company (Indiana) | Simplified subsea production wellhead |
| US4486123A (en) * | 1981-03-31 | 1984-12-04 | Blohm & Voss Ag | Underwater pipe laying vessel |
| US4671702A (en) * | 1984-05-25 | 1987-06-09 | Shell Oil Company | Flowline connection means |
| US4676696A (en) * | 1984-08-17 | 1987-06-30 | Shell Oil Company | Apparatus for installing a flowline section near the seabed |
| US4717287A (en) * | 1984-08-17 | 1988-01-05 | Shell Oil Company | Apparatus for installing a flowline section near the seabed |
| US4662788A (en) * | 1985-02-01 | 1987-05-05 | Conoco Inc. | Offshore platform leg-mating apparatus and a method of assembly |
| US4899822A (en) * | 1987-09-04 | 1990-02-13 | Camco Inc. | Apparatus for controlling the operation of an underwater installation |
| US4877356A (en) * | 1987-09-30 | 1989-10-31 | Shell Oil Company | Method and apparatus for installing a flowline near the waterbottom |
| US5464307A (en) * | 1993-12-29 | 1995-11-07 | Mcdermott International, Inc. | Apparatus for near vertical laying of pipeline |
| US6273643B1 (en) * | 1998-05-01 | 2001-08-14 | Oil States Industries | Apparatus for deploying an underwater pipe string |
| US6375407B1 (en) * | 1998-06-08 | 2002-04-23 | Stevedoring Services Of America, Inc. | Method and apparatus for handling, transporting, pallet removal and loading cartons of frozen animal products onto vessels |
| US6405802B1 (en) * | 2000-05-31 | 2002-06-18 | Fmc Corporation | Subsea flowline jumper handling apparatus |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20110186301A1 (en) * | 2008-08-21 | 2011-08-04 | William Scott Childers | Subsea structure installation or removal |
| US8622137B2 (en) * | 2008-08-21 | 2014-01-07 | Shell Oil Company | Subsea structure installation or removal |
| US9656800B2 (en) * | 2014-07-24 | 2017-05-23 | Oceaneering International, Inc. | Subsea fluid storage system |
| WO2023201071A1 (en) * | 2022-04-14 | 2023-10-19 | Chevron U.S.A. Inc. | Structural damping for subsea noise mitigation |
Also Published As
| Publication number | Publication date |
|---|---|
| GB0609922D0 (en) | 2006-06-28 |
| GB2428260B (en) | 2008-10-08 |
| NO20035034D0 (en) | 2003-11-13 |
| WO2005047642A1 (en) | 2005-05-26 |
| GB2428260A (en) | 2007-01-24 |
| NO322872B1 (en) | 2006-12-18 |
| AU2004289926A1 (en) | 2005-05-26 |
| RU2006119219A (en) | 2007-12-27 |
| RU2353755C2 (en) | 2009-04-27 |
| NO20035034L (en) | 2005-05-18 |
| AU2004289926B2 (en) | 2010-03-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5823131A (en) | Method and apparatus for disconnecting and retrieving multiple risers attached to a floating vessel | |
| AU2007203495B2 (en) | Method and frame | |
| AU722896B2 (en) | Disconnectable turret mooring system utilizing a spider buoy | |
| CN102264596B (en) | For the multi-functional unit of marine transportation of hydrocarbon | |
| JP6448103B1 (en) | Method and apparatus for lifting an SCR tapered stress joint or flex joint above the water surface | |
| KR20150128694A (en) | System and method for transfer of hydrocarbon containing fluids | |
| DK2424775T3 (en) | A method and system for sharing a mooring line | |
| US8734055B2 (en) | Method for assembling an operating rig for a fluid in a body of water and associated operating rig | |
| AU2008288209B2 (en) | Pipe laying apparatus and method | |
| EP3490880B1 (en) | Mooring tensioner and methods thereof | |
| US6923598B2 (en) | Method and apparatus for the lifting of offshore installation jackets | |
| AU2004289926B2 (en) | Vertical installation of an elongated process unit | |
| US8882390B2 (en) | Method for installing an operating rig for a fluid in a body of water with a traction unit | |
| EP0941200B1 (en) | Method and apparatus for disconnecting and retrieving multiple risers attached to a floating vessel | |
| NO334253B1 (en) | ROV-installed suction piles | |
| DK2945849T3 (en) | Apparatus and method for transport, installation and recycling of marine structures | |
| MX2007002166A (en) | Apparatus and method for mooring a floating vessel. | |
| GB2070554A (en) | Method and apparatus for lifting a heavy load from a floating vessel | |
| GB2402422A (en) | Buoyancy body transfer of an offshore structure | |
| HK1232848B (en) | A vessel having a retractable cursor frame assembly |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: AKER MARINE CONTRACTORS AS, NORWAY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HILDITCH, MICHAEL;VASSTRAND, KNUT;REEL/FRAME:019017/0411;SIGNING DATES FROM 20060504 TO 20060509 Owner name: AKER KVAERNER SUBSEA AS, NORWAY Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:HILDITCH, MICHAEL;VASSTRAND, KNUT;REEL/FRAME:019017/0411;SIGNING DATES FROM 20060504 TO 20060509 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |