TWI843396B TW112101279A TW112101279A TWI843396B TW I843396 B TWI843396 B TW I843396B TW 112101279 A TW112101279 A TW 112101279A TW 112101279 A TW112101279 A TW 112101279A TW I843396 B TWI843396 B TW I843396B
Authority
TW
Taiwan
Prior art keywords
plate structure
floor
steel bars
connecting member
cast plate
Prior art date
Application number
TW112101279A
Other languages
Chinese (zh)
Other versions
TW202428971A (en
Inventor
尹衍樑
莫惟瀚
莊傳業
鍾弦峰
Original Assignee
潤弘精密工程事業股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 潤弘精密工程事業股份有限公司 filed Critical 潤弘精密工程事業股份有限公司
Priority to TW112101279A priority Critical patent/TWI843396B/en
Application granted granted Critical
Publication of TWI843396B publication Critical patent/TWI843396B/en
Publication of TW202428971A publication Critical patent/TW202428971A/en

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present disclosure relates to a method of manufacturing a papapet wall. The method comprises the following steps: (a) pre-embedding a first rebar in a floor and a part of the first rebar protruding from the floor; (b) disposing a precast plate structure on a predetermined position near an edge of the floor and above the floor such that the precast plate structure is substantially perpendicular to the floor, wherein the precast plate structure comprises a concrete base and a plurality of metal supports protruding from the concrete portion; (c) inserting the portion of the first rebar to the plurality of metal supports of the precast plate structure; and (d) disposing a plurality of stiffening rebars and connecting them to the plurality of metal supports of the precast plate structure.

Description

女兒牆之製作方法How to make a parapet

本揭露係關於一種女兒牆之製作方法,特別是關於一種利用預鑄混凝土板製作女兒牆之方法。 The present disclosure relates to a method for manufacturing a parapet, and in particular to a method for manufacturing a parapet using a precast concrete slab.

快速建構高品質的建築物,長久以來是建築及營造產業所追尋的目標。在眾多的施工方法中,預鑄工法因具有品質優異、施工安全迅速、營建成本經濟合理等優點,已成功應用於各種建築及營造工程中。預鑄工法係於預鑄廠或工地周邊,以標準化的作業流程及模組化的模具,製作鋼筋結構,例如鋼筋籠,構築模板並澆置混凝土,快速大量生產高精密度且高品質均一性的柱體、梁體、板體等的結構體構件。隨後,於工地現場中藉由精確的搬運管理及組裝作業,將生產完成之結構體構件於工地現場組合。藉此,工地中的工作量可以降至最低、減少人力及施工時間,進而縮短工期。此外,這種施工法亦可減少或避免鷹架施工,大幅提高了施工安全性。 The goal of the construction and construction industry has long been to quickly build high-quality buildings. Among the many construction methods, the precast method has been successfully applied to various construction and construction projects due to its advantages such as excellent quality, safe and rapid construction, and economical and reasonable construction costs. The precast method uses standardized operating processes and modular molds in the precast factory or around the construction site to manufacture steel structures, such as steel cages, build templates and pour concrete, and quickly mass-produce high-precision and high-quality uniformity columns, beams, plates and other structural components. Subsequently, the completed structural components are assembled on site through precise transportation management and assembly operations. In this way, the workload on the construction site can be reduced to a minimum, reducing manpower and construction time, thereby shortening the construction period. In addition, this construction method can also reduce or avoid scaffolding construction, greatly improving construction safety.

習知建築物之女兒牆的施作,需於女兒牆內側與外側皆設置模板,並於模板之間進行混凝土灌漿。然而,女兒牆外側的模板安裝不易,因此兒牆外側的施工品質不易掌控。有鑑於此,發展出嶄新的利用預鑄混凝土板之女兒牆製作方法,以進一步改良現有的女兒牆施作,實為建 築及營造業所長久企盼。 It is known that the construction of parapets in buildings requires the installation of formwork on both the inside and outside of the parapet, and the concrete mortar is poured between the formwork. However, the formwork on the outside of the parapet is not easy to install, so the construction quality of the outside of the parapet is not easy to control. In view of this, a new parapet manufacturing method using precast concrete slabs has been developed to further improve the existing parapet construction, which is long-awaited by the construction and construction industry.

緣是,為達上述目的,本揭露之一實施例係關於一種女兒牆之製作方法,該製作方法包括以下步驟:(a)預埋一第一鋼筋於一樓地板中,該第一鋼筋之一部分突出於該樓地板;(b)設置一預鑄板結構於一預定位置,該預定位置係鄰近該樓地板之一邊緣並位於該樓地板之上方,該預鑄板結構大致垂直於該樓地板,該預鑄板結構包含一混凝土基底以及自該混凝土基底伸出之複數個金屬支架;(c)將該第一鋼筋之該部分插置於該預鑄板結構之該複數個金屬支架中;及(d)設置複數個加勁鋼筋並將其與該預鑄板結構之該複數個金屬支架連接固定。 Therefore, to achieve the above-mentioned purpose, one embodiment of the present disclosure is related to a method for manufacturing a parapet, which comprises the following steps: (a) pre-embedding a first steel bar in a floor, a portion of the first steel bar protruding from the floor; (b) setting a pre-cast plate structure at a predetermined position, the predetermined position being adjacent to an edge of the floor and located above the floor, the pre-cast plate structure being substantially perpendicular to the floor, the pre-cast plate structure comprising a concrete base and a plurality of metal brackets extending from the concrete base; (c) inserting the portion of the first steel bar into the plurality of metal brackets of the pre-cast plate structure; and (d) setting a plurality of reinforcing steel bars and connecting and fixing them to the plurality of metal brackets of the pre-cast plate structure.

10:第一鋼筋 10: First steel bar

11:第一部分 11: Part 1

12:第二部分 12: Part 2

20:樓地板 20: Floor

30:預鑄板結構 30: Pre-cast plate structure

30':預鑄板結構 30': Pre-cast plate structure

31:第一面 31: First page

31':第一面 31': First side

32:第二面 32: Second side

32':第二面 32': Second side

33:第二鋼筋 33: Second steel bar

33':第二鋼筋 33': Second steel bar

34:第三鋼筋 34: The third steel bar

34':第三鋼筋 34': Third steel bar

35:凸塊 35: Bump

35':凸塊 35': Bump

36:墊片 36: Gasket

37:金屬連接部 37:Metal connection part

37':金屬連接部 37':Metal connection part

40:加勁鋼筋 40: Reinforced steel bars

40':加勁鋼筋 40': Reinforced steel bars

41:第四鋼筋 41: The fourth steel bar

41':第四鋼筋 41': Fourth steel bar

42:第五鋼筋 42: Fifth steel bar

42':第五鋼筋 42': Fifth steel bar

43:第六鋼筋 43: The sixth steel bar

43':第六鋼筋 43': Sixth steel bar

50:第一模板 50: First template

51:內面 51: Inside

60:支撐桿 60: Support rod

61:第一端 61: First end

62:第二端 62: Second end

71:第一連接件 71: First connecting piece

72:第二連接件 72: Second connecting piece

73:第三連接件 73: Third connecting piece

81:第一固定件 81: First fixing member

82:第二固定件 82: Second fixing member

83:第三固定件 83: Third fixing member

371:第一部份 371: Part 1

371':第一部份 371': Part 1

372:第二部分 372: Part 2

372':第二部分 372': Part 2

421':第一部分 421': Part 1

422':第二部分 422': Part 2

423':第三部分 423': Part 3

711:第一面 711: First page

712:第二面 712: Second side

721:第一面 721: First page

722:第二面 722: Second side

731:第一部分 731: Part 1

732:第二部分 732: Part 2

B:基底 B: Base

B':基底 B': base

M:金屬支架 M:Metal bracket

M':金屬支架 M':Metal bracket

S1:第一空間 S1: First Space

S1':第一空間 S1': First Space

S2':第二空間 S2': Second Space

L1:第一距離 L1: First distance

以下所描述的附圖僅是出於示例性目的,並非欲以任何方式限制本揭露之範疇: The following figures are for illustrative purposes only and are not intended to limit the scope of this disclosure in any way:

圖1至圖7展示依照本發明第一實施例製作女兒牆在不同階段之示意圖。 Figures 1 to 7 show schematic diagrams of the parapet at different stages of manufacturing according to the first embodiment of the present invention.

圖2A為圖2中A處之局部放大圖。 Figure 2A is a partial enlarged view of point A in Figure 2.

圖3A及圖3B分別為圖3中A處及B處之局部放大圖。 Figure 3A and Figure 3B are partial enlarged views of point A and point B in Figure 3, respectively.

圖8至圖14展示依照本發明第二實施例製作女兒牆在不同階段之示意圖。 Figures 8 to 14 show schematic diagrams of the parapet at different stages of manufacturing according to the second embodiment of the present invention.

圖9A為圖9中A處之局部放大圖。 Figure 9A is a partial enlarged view of point A in Figure 9.

圖10A及圖10B分別為圖10中B處及C處之局部放大圖。 Figure 10A and Figure 10B are partial enlarged views of point B and point C in Figure 10, respectively.

為更清楚了解本創作之特徵、內容與優點及其所能達成之 功效,茲將本創作配合附圖,並以實施例之表達形式詳細說明如下,而其中所使用之圖式,其主旨僅為示意及輔助說明書之用,故不應就所附之圖式的比例與配置關係解讀、侷限本創作的申請專利範圍。 In order to better understand the features, content and advantages of this creation and the effects it can achieve, this creation is described in detail as follows with accompanying drawings and in the form of an embodiment. The drawings used therein are only for illustration and auxiliary description purposes, so the proportions and configurations of the attached drawings should not be interpreted to limit the scope of the patent application for this creation.

請參考圖1至圖7,其展示依照本發明第一實施例製作女兒牆在不同階段之示意圖。依照本發明第一實施例製作女兒牆之方法包括以下步驟(a)-(f): Please refer to Figures 1 to 7, which show schematic diagrams of making a parapet at different stages according to the first embodiment of the present invention. The method for making a parapet according to the first embodiment of the present invention includes the following steps (a)-(f):

步驟(a),如圖1所示,預埋第一鋼筋10於樓地板20中,使第一鋼筋10之一部分突出於樓地板20。第一鋼筋10大致呈L形,其包括第一部分11及與第一部分11大致垂直之第二部分12。在埋設第一鋼筋10於樓地板20時,將第一鋼筋10之第二部分12完全埋設於樓地板20中,而將第一鋼筋10之第一部份11至少部分突出於樓地板20,以利後續將女兒牆結構連接至樓地板20。在本發明之一些實施例中,第一鋼筋10之第一部份11約有其總長度的50%-80%突出於樓地板20,然上述比例並非用以限制本發明,個案實際的比列可依照個案實際的需求予以調整。 Step (a), as shown in FIG. 1 , pre-embed the first steel bar 10 in the floor 20 so that a portion of the first steel bar 10 protrudes from the floor 20. The first steel bar 10 is generally L-shaped, and includes a first portion 11 and a second portion 12 that is generally perpendicular to the first portion 11. When burying the first steel bar 10 in the floor 20, the second portion 12 of the first steel bar 10 is completely buried in the floor 20, and the first portion 11 of the first steel bar 10 at least partially protrudes from the floor 20, so as to facilitate the subsequent connection of the parapet structure to the floor 20. In some embodiments of the present invention, the first portion 11 of the first steel bar 10 protrudes from the floor 20 by about 50%-80% of its total length. However, the above ratio is not intended to limit the present invention, and the actual ratio of each case can be adjusted according to the actual needs of the case.

步驟(b),設置預鑄板結構30於如圖2所示之預定位置,其係鄰近樓地板20之左側邊緣並位於樓地板20之上方。在本發明之一些實施例中,在設置預鑄板結構30於上述預定位置之前,先在樓地板20之預定位置處設置至少一墊片36,用以支撐預鑄板結構30之底部。上述墊片36的設置在於調控預鑄板結構30之高度,在設置多片相鄰接之預鑄板結構30時,可藉由不同數量及/或厚度墊片36的設置,使不同片預鑄板結構30之間大致維持相同的高度。除此之外,墊片36亦可用於調節同一片預鑄板結構30之頂面相對於地面之角度,以確保預鑄板結構30之頂面相對於地面保持水平。 Step (b) is to place the pre-cast plate structure 30 at a predetermined position as shown in FIG. 2 , which is adjacent to the left edge of the floor 20 and located above the floor 20. In some embodiments of the present invention, before placing the pre-cast plate structure 30 at the predetermined position, at least one gasket 36 is first placed at the predetermined position of the floor 20 to support the bottom of the pre-cast plate structure 30. The gasket 36 is placed to adjust the height of the pre-cast plate structure 30. When placing multiple adjacent pre-cast plate structures 30, different numbers and/or thicknesses of gaskets 36 can be placed to maintain substantially the same height between different pre-cast plate structures 30. In addition, the gasket 36 can also be used to adjust the angle of the top surface of the same pre-cast plate structure 30 relative to the ground to ensure that the top surface of the pre-cast plate structure 30 remains level relative to the ground.

如圖2所示,預鑄板結構30包含混凝土基底B以及自混凝土基底伸出之複數個金屬支架M。預鑄板結構30之混凝土基底B具有第一面31及與該第一面31相對之第二面32,預鑄板結構30之複數個金屬支架M的每一者具有呈連續彎折形狀之複數個第二鋼筋33,複數個第二鋼筋33自該第一面31至少部分地露出。第二鋼筋33之連續彎折形狀呈現類似波浪形狀而形成多個波峰區與多個波谷區,其中波谷區係埋設於混凝土基底中,波峰區係露出於混凝土基底外,可用於與其他鋼筋結構搭接。例如:在預鑄板結構30設置於預定位置之前或是之後,沿大致垂直於樓地板20之方向(即:圖2中的Y軸方向),將複數個第三鋼筋34穿置並固定於複數個第二鋼筋33中,以進一步強化預鑄板結構30之結構強度。如圖2所示,第三鋼筋34係沿著第二鋼筋33之多個波峰區穿置並與第二鋼筋33之波峰區的頂部位置連接固定。第二鋼筋33與第三鋼筋34的連接處可利用焊接或鐵絲綁紮固定。 As shown in FIG2 , the precast plate structure 30 includes a concrete base B and a plurality of metal brackets M extending from the concrete base. The concrete base B of the precast plate structure 30 has a first surface 31 and a second surface 32 opposite to the first surface 31. Each of the plurality of metal brackets M of the precast plate structure 30 has a plurality of second steel bars 33 in a continuous bending shape, and the plurality of second steel bars 33 are at least partially exposed from the first surface 31. The continuous bending shape of the second steel bars 33 is similar to a wave shape to form a plurality of wave crest areas and a plurality of wave trough areas, wherein the wave trough area is buried in the concrete base, and the wave crest area is exposed outside the concrete base, and can be used for overlapping with other steel bar structures. For example, before or after the precast plate structure 30 is set at a predetermined position, a plurality of third steel bars 34 are inserted and fixed in a plurality of second steel bars 33 along a direction roughly perpendicular to the floor 20 (i.e., the Y-axis direction in FIG. 2 ) to further enhance the structural strength of the precast plate structure 30. As shown in FIG. 2 , the third steel bar 34 is inserted along a plurality of wave crest regions of the second steel bar 33 and connected and fixed to the top position of the wave crest region of the second steel bar 33. The connection between the second steel bar 33 and the third steel bar 34 can be fixed by welding or wire tying.

當預鑄板結構30設置於預定位置時,預鑄板結構30大致垂直於樓地板20。如圖2所示,第一鋼筋10係以第一部分11插置於預鑄板結構30之複數個金屬支架M的複數個第二鋼筋33之波峰區域中。 When the pre-cast plate structure 30 is set at a predetermined position, the pre-cast plate structure 30 is substantially perpendicular to the floor plate 20. As shown in FIG. 2 , the first steel bar 10 is inserted into the crest area of the plurality of second steel bars 33 of the plurality of metal brackets M of the pre-cast plate structure 30 with the first portion 11.

如圖2A所示,在設置預鑄板結構30於預定位置之後,可設置第三連接件73於預鑄板結構30與樓地板20所形成之內側角落,藉此進一步固定預鑄板結構30以避免滑移。第三連接件73大致呈L形的片狀結構,其包括第一部分731及與第一部分731大致垂直之第二部分732。第三連接件73之第一部分731抵靠樓地板20,第三連接件73之第二部分732抵靠預鑄板結構30之底部轉角處的金屬連接部37,藉由將第三固定件83穿置通過第三連接件73之第一部分731至樓地板20,及連接固定第三連接件 73之第二部分732與預鑄板結構30底部轉角處之金屬連接部37。在本發明之一實施例中,第三固定件83可為螺絲或膨脹螺絲,第三連接件73之第二部分732係以焊接固定於預鑄板結構30之金屬連接部37。在圖2A中,設置於預鑄板結構30之底部轉角處的金屬連接部37大致呈L形的片狀結構,其包括第一部份371及與第一部份371大致垂直之第二部分372,以分別固定於預鑄板結構30轉角之一面及其相鄰的另一面。金屬連接部37之第一部份371抵靠墊片36,金屬連接部37之第二部分372抵靠第三連接件73之第二部分732。金屬連接部37除了可用於支撐預鑄板結構30於墊片36之上,亦可用於防止預鑄板結構30之混凝土基底之邊角因碰撞而破損。 As shown in FIG. 2A , after the pre-cast plate structure 30 is set at a predetermined position, the third connecting member 73 can be set at the inner corner formed by the pre-cast plate structure 30 and the floor plate 20 to further fix the pre-cast plate structure 30 to prevent slipping. The third connecting member 73 is a generally L-shaped sheet structure, which includes a first portion 731 and a second portion 732 that is generally perpendicular to the first portion 731. The first portion 731 of the third connecting member 73 abuts against the floor plate 20, and the second portion 732 of the third connecting member 73 abuts against the metal connecting portion 37 at the bottom corner of the pre-cast plate structure 30. The third fixing member 83 is inserted through the first portion 731 of the third connecting member 73 to the floor plate 20, and the second portion 732 of the third connecting member 73 is connected and fixed to the metal connecting portion 37 at the bottom corner of the pre-cast plate structure 30. In one embodiment of the present invention, the third fixing member 83 can be a screw or an expansion screw, and the second portion 732 of the third connecting member 73 is fixed to the metal connecting portion 37 of the pre-cast plate structure 30 by welding. In FIG2A , the metal connecting portion 37 disposed at the bottom corner of the pre-cast plate structure 30 is a generally L-shaped sheet structure, which includes a first portion 371 and a second portion 372 substantially perpendicular to the first portion 371, so as to be fixed to one side of the corner of the pre-cast plate structure 30 and the other side adjacent thereto. The first portion 371 of the metal connecting portion 37 abuts against the gasket 36, and the second portion 372 of the metal connecting portion 37 abuts against the second portion 732 of the third connecting member 73. The metal connection part 37 can be used not only to support the pre-cast plate structure 30 on the gasket 36, but also to prevent the corners of the concrete base of the pre-cast plate structure 30 from being damaged due to collision.

如圖3所示,預鑄板結構30具有凸塊35,其自預鑄板結構30之第一面31沿X軸方向延伸第一距離L1。在圖3所示之實施例中,凸塊35的寬度(即:在圖3中的Z軸方向)比預鑄板結構30的寬度小。在設置預鑄板結構30於預定位置之後,可進一步設置支撐桿60,以加強穩固預鑄板結構30,避免預鑄板結構30歪斜。圖3A為圖3中A處之局部放大圖,如圖3A所示,第一連接件71具有第一面711及與第一面711相對之第二面712,第一面711具有可樞接支撐桿60之第一端61的結構,第二面712大致為平坦的,用於抵靠預鑄板結構30之凸塊35之外表面。將第一固定件81穿置通過第一連接件71至預鑄板結構30之凸塊35,以將第一連接件71之第二面712抵靠固定於凸塊35之外表面,並樞轉連接支撐桿60之第一端61於第一連接件71之第一面711。在本發明之一實施例中,先安裝支撐桿60之第一端61於第一連接件71之第一面711,再穿置第一固定件81通過第一連接件71至預鑄板結構30之凸塊35之外表面。 As shown in FIG3 , the pre-cast plate structure 30 has a protrusion 35 extending from the first surface 31 of the pre-cast plate structure 30 along the X-axis direction by a first distance L1. In the embodiment shown in FIG3 , the width of the protrusion 35 (i.e., in the Z-axis direction in FIG3 ) is smaller than the width of the pre-cast plate structure 30. After the pre-cast plate structure 30 is set at a predetermined position, a support rod 60 may be further set to strengthen and stabilize the pre-cast plate structure 30 to prevent the pre-cast plate structure 30 from being skewed. FIG3A is a partial enlarged view of the A in FIG3 . As shown in FIG3A , the first connecting member 71 has a first surface 711 and a second surface 712 opposite to the first surface 711. The first surface 711 has a structure that can pivotally connect the first end 61 of the support rod 60. The second surface 712 is substantially flat and is used to abut against the outer surface of the protrusion 35 of the pre-cast plate structure 30. The first fixing member 81 is inserted through the first connecting member 71 to the protrusion 35 of the pre-cast plate structure 30 to abut and fix the second surface 712 of the first connecting member 71 against the outer surface of the protrusion 35, and pivotally connect the first end 61 of the support rod 60 to the first surface 711 of the first connecting member 71. In one embodiment of the present invention, the first end 61 of the support rod 60 is first installed on the first surface 711 of the first connecting member 71, and then the first fixing member 81 is inserted through the first connecting member 71 to the outer surface of the protrusion 35 of the pre-cast plate structure 30.

圖3B為圖3中B處之局部放大圖,如圖3B所示,第二連接件 72具有第一面721及與第一面721相對之第二面722,第一面721具有可樞接支撐桿60之第二端62的結構,第二面722大致為平坦的,用於抵靠樓地板20。將第二固定件82穿置通過第二連接件72至樓地板20,以將第二連接件72之第二面722抵靠固定於樓地板20,並樞轉連接支撐桿60之第二端62於第二連接件72之第一面721。在本發明之一些實施例中,先安裝支撐桿60之第二端62於第二連接件72之第一面721,再穿置第二固定件82通過第二連接件72至樓地板20。在本發明之一些實施例中,第一固定件81及第二固定件82可為螺絲或膨脹螺絲。此外,施工現場之樓地板20的部分區域可能因物品遮擋或結構限制而不適於安裝支撐桿60,在此情況下,由於支撐桿60之第一端61及第二端62分別可樞轉連接於第一連接件71及第二連接件72,在安置支撐桿60時,可藉由調節支撐桿60與凸塊35之間的夾角及支撐桿60與樓地板20之間的夾角,以改變第一連接件71固定於預鑄板結構30之凸塊35的位置及第二連接件72固定於樓地板20的位置。在本發明之另一實施例中,支撐桿60的長短設計為可調節,以適應不同的施工環境。在本發明之其他實施例中(圖未示),不設置第一連接件71及第二連接件72,操作上將支撐桿之第一端61直接連接固定於預鑄板30之凸塊35之外表面,且將支撐桿之第二端62直接連接固定樓地板20。 FIG3B is a partial enlarged view of the B position in FIG3 . As shown in FIG3B , the second connecting member 72 has a first surface 721 and a second surface 722 opposite to the first surface 721. The first surface 721 has a structure that can pivotally connect the second end 62 of the supporting rod 60. The second surface 722 is substantially flat and is used to abut against the floor 20. The second fixing member 82 is inserted through the second connecting member 72 to the floor 20 to abut and fix the second surface 722 of the second connecting member 72 to the floor 20, and pivotally connect the second end 62 of the supporting rod 60 to the first surface 721 of the second connecting member 72. In some embodiments of the present invention, the second end 62 of the supporting rod 60 is first installed on the first surface 721 of the second connecting member 72, and then the second fixing member 82 is inserted through the second connecting member 72 to the floor 20. In some embodiments of the present invention, the first fixing member 81 and the second fixing member 82 may be screws or expansion screws. In addition, a part of the floor 20 at the construction site may not be suitable for installing the support rod 60 due to obstruction by objects or structural restrictions. In this case, since the first end 61 and the second end 62 of the support rod 60 can be pivotally connected to the first connecting member 71 and the second connecting member 72 respectively, when installing the support rod 60, the angle between the support rod 60 and the protrusion 35 and the angle between the support rod 60 and the floor 20 can be adjusted to change the position of the first connecting member 71 fixed to the protrusion 35 of the pre-cast plate structure 30 and the position of the second connecting member 72 fixed to the floor 20. In another embodiment of the present invention, the length of the support rod 60 is designed to be adjustable to adapt to different construction environments. In other embodiments of the present invention (not shown), the first connector 71 and the second connector 72 are not provided, and the first end 61 of the support rod is directly connected and fixed to the outer surface of the protrusion 35 of the pre-cast plate 30, and the second end 62 of the support rod is directly connected and fixed to the floor plate 20.

步驟(c),如圖4所示,設置複數個加勁鋼筋40並將其與預鑄板結構30之複數個金屬支架連接固定。複數個加勁鋼筋40包括複數個第四鋼筋41及複數個第五鋼筋42。首先,將複數個第四鋼筋41沿大致垂直於樓地板20之方向(即:圖4中之Y軸方向)大致彼此平行和間隔地配置,且將複數個第四鋼筋41連接固定至預鑄板結構30之複數個第二鋼筋33及複數個第三鋼筋34之至少一者。接著,將複數個第五鋼筋42沿該女 兒牆橫向延伸方向(即:圖4中之Z軸方向)大致彼此平行和間隔地配置,且將複數個第五鋼筋42連接固定至複數個第四鋼筋41。在本發明之一實施例中,第四鋼筋41與第二鋼筋33或第三鋼筋34的連接處可以焊接或鐵絲綁紮固定,而第五鋼筋42與第四鋼筋41的連接處亦可以焊接或鐵絲綁紮固定。 Step (c), as shown in FIG. 4 , a plurality of reinforcing steel bars 40 are provided and connected and fixed to a plurality of metal brackets of the pre-cast plate structure 30. The plurality of reinforcing steel bars 40 include a plurality of fourth steel bars 41 and a plurality of fifth steel bars 42. First, the plurality of fourth steel bars 41 are arranged substantially parallel to each other and spaced apart in a direction substantially perpendicular to the floor plate 20 (i.e., the Y-axis direction in FIG. 4 ), and the plurality of fourth steel bars 41 are connected and fixed to at least one of the plurality of second steel bars 33 and the plurality of third steel bars 34 of the pre-cast plate structure 30. Next, a plurality of fifth steel bars 42 are arranged approximately parallel to each other and spaced apart along the horizontal extension direction of the parapet (i.e., the Z-axis direction in FIG. 4 ), and the plurality of fifth steel bars 42 are connected and fixed to the plurality of fourth steel bars 41. In one embodiment of the present invention, the connection between the fourth steel bar 41 and the second steel bar 33 or the third steel bar 34 can be fixed by welding or wire tying, and the connection between the fifth steel bar 42 and the fourth steel bar 41 can also be fixed by welding or wire tying.

步驟(d),如圖5所示,於預鑄板結構30之內側位置,與預鑄板結構30之第一面31相距第一距離L1的位置設置第一模板50,使第一模板50之內面51與凸塊35之外表面大致位於同一平面(亦即,皆與預鑄板結構30之第一面31相距第一距離L1),而在第一模板50與預鑄板結構30之間形成第一空間S1。當凸塊35已連接固定支撐桿60時,可將設置於凸塊35附近之第一模板50分成兩塊模板,一塊模板設置於凸塊35上方,另一塊模板設置於凸塊35下方,使支撐桿60之第一端61、第一連接件71及第一固定件81露出而不會影響第一模板50的設置。 In step (d), as shown in FIG. 5 , a first template 50 is disposed at an inner side of the pre-cast plate structure 30 at a first distance L1 from the first surface 31 of the pre-cast plate structure 30 so that the inner surface 51 of the first template 50 and the outer surface of the protrusion 35 are substantially in the same plane (i.e., both are at a first distance L1 from the first surface 31 of the pre-cast plate structure 30), and a first space S1 is formed between the first template 50 and the pre-cast plate structure 30. When the protrusion 35 is connected to the fixed support rod 60, the first template 50 disposed near the protrusion 35 can be divided into two templates, one template is disposed above the protrusion 35, and the other template is disposed below the protrusion 35, so that the first end 61 of the support rod 60, the first connecting member 71 and the first fixing member 81 are exposed without affecting the setting of the first template 50.

步驟(e),如圖6所示,在預鑄板結構30與第一模板50之間之第一空間S1進行混凝土灌漿至預鑄板結構30與第一模板50之頂部,使混凝土完全覆蓋第一鋼筋10、第二鋼筋33、第三鋼筋34、第四鋼筋41及第五鋼筋42。 Step (e), as shown in FIG6 , concrete is poured into the first space S1 between the precast plate structure 30 and the first formwork 50 to the top of the precast plate structure 30 and the first formwork 50 so that the concrete completely covers the first steel bar 10, the second steel bar 33, the third steel bar 34, the fourth steel bar 41 and the fifth steel bar 42.

步驟(f),如圖7所示,待混凝土達到初凝以後,拆除第一模板50,並可進一步移除支撐桿60、第一連接件71、第一固定件81、第二連接件72及第二固定件82,以形成女兒牆。 Step (f), as shown in FIG7 , after the concrete reaches initial setting, the first formwork 50 is removed, and the support rod 60, the first connecting member 71, the first fixing member 81, the second connecting member 72 and the second fixing member 82 can be further removed to form a parapet.

請參考圖8至圖14,其為依照本發明第二實施例製作女兒牆在不同階段之示意圖。本發明第二實施例製作女兒牆之方法包括以下步驟(a')至(f'): Please refer to Figures 8 to 14, which are schematic diagrams of making a parapet at different stages according to the second embodiment of the present invention. The method for making a parapet according to the second embodiment of the present invention includes the following steps (a') to (f'):

本發明第二實施例之製作女兒牆之步驟(a')、步驟(d')及步驟(f')與先前第一實施例之步驟(a)、步驟(d)及步驟(f)大致相同。 The steps (a'), (d') and (f') of making the parapet in the second embodiment of the present invention are substantially the same as the steps (a), (d) and (f) of the first embodiment.

步驟(a'),如圖8所示,預埋第一鋼筋10於樓地板20中,使第一鋼筋10之一部分突出於樓地板20。第一鋼筋10大致呈L形,其包括第一部分11及與第一部分11大致垂直之第二部分12。在埋設第一鋼筋10於樓地板20時,將第一鋼筋10之第二部分12完全埋設於樓地板20中,而將第一鋼筋10之第一部份11至少部分突出於樓地板20,以利後續將女兒牆結構連接至樓地板20。在本發明之一些實施例中,第一鋼筋10之第一部份11約有其總長度的50%-80%突出於樓地板20,然上述比例並非用以限制本發明,個案實際的比列可依照個案實際的需求予以調整。 Step (a'), as shown in FIG8, pre-embeds the first steel bar 10 in the floor 20 so that a portion of the first steel bar 10 protrudes from the floor 20. The first steel bar 10 is generally L-shaped, and includes a first portion 11 and a second portion 12 that is generally perpendicular to the first portion 11. When burying the first steel bar 10 in the floor 20, the second portion 12 of the first steel bar 10 is completely buried in the floor 20, and the first portion 11 of the first steel bar 10 at least partially protrudes from the floor 20, so as to facilitate the subsequent connection of the parapet structure to the floor 20. In some embodiments of the present invention, the first portion 11 of the first steel bar 10 protrudes from the floor 20 by about 50%-80% of its total length. However, the above ratio is not intended to limit the present invention, and the actual ratio of each case can be adjusted according to the actual needs of the case.

步驟(b'),如圖9所示,設置預鑄板結構30'於預定位置,其係鄰近樓地板20之左側邊緣並位於樓地板20之上方。在本實施例中所使用之預鑄板結構30'與先前第一實施例中之預鑄板結構30不同,預鑄板結構30'之凸塊35'位於預鑄板結構30'的頂部,使得預鑄板結構30'之頂面與凸塊35'之頂面大致齊平。凸塊35'自預鑄板結構30'之第一面31'沿X軸方向延伸第一距離L1。在本發明之一實施例中,凸塊35'的寬度(即:在圖9中的Z軸方向)比預鑄板結構30'的寬度小。 Step (b'), as shown in FIG9, sets the pre-cast plate structure 30' at a predetermined position, which is adjacent to the left edge of the floor plate 20 and located above the floor plate 20. The pre-cast plate structure 30' used in this embodiment is different from the pre-cast plate structure 30 in the first embodiment. The protrusion 35' of the pre-cast plate structure 30' is located at the top of the pre-cast plate structure 30', so that the top surface of the pre-cast plate structure 30' is roughly flush with the top surface of the protrusion 35'. The protrusion 35' extends from the first surface 31' of the pre-cast plate structure 30' along the X-axis direction by a first distance L1. In one embodiment of the present invention, the width of the protrusion 35' (i.e., in the Z-axis direction in FIG. 9 ) is smaller than the width of the pre-cast plate structure 30'.

在本實施例中設置預鑄板結構30'於預定位置之方式與先前第一實施例大致相同。在設置預鑄板結構30'於預定位置之前,可先在樓地板20之預定位置處設置至少一墊片36,支撐預鑄板結構30'之底部。在本實施例中使用與先前第一實施例相同的墊片36,且施作方式大致相同。上述墊片36的設置在於調控預鑄板結構30'之高度,在設置多片相鄰接之預鑄板結構30'時,可藉由不同數量及/或厚度墊片36的設置,使不同 片預鑄板結構30'之間大致維持相同的高度。除此之外,墊片36亦可用於調節同一片預鑄板結構30'之頂面相對於地面之角度,以確保預鑄板結構30'之頂面相對於地面保持水平。 In this embodiment, the method of setting the precast plate structure 30' at the predetermined position is roughly the same as that of the first embodiment. Before setting the precast plate structure 30' at the predetermined position, at least one gasket 36 can be set at the predetermined position of the floor plate 20 to support the bottom of the precast plate structure 30'. In this embodiment, the same gasket 36 as that of the first embodiment is used, and the method of application is roughly the same. The setting of the gasket 36 is to adjust the height of the precast plate structure 30'. When setting multiple adjacent precast plate structures 30', different numbers and/or thicknesses of gaskets 36 can be set to make the different precast plate structures 30' maintain roughly the same height. In addition, the gasket 36 can also be used to adjust the angle of the top surface of the same pre-cast plate structure 30' relative to the ground to ensure that the top surface of the pre-cast plate structure 30' remains level relative to the ground.

預鑄板結構30'包含混凝土基底B'以及自混凝土基底伸出之複數個金屬支架M'。預鑄板結構30'之混凝土基底B'具有第一面31'及與該第一面31'相對之第二面32',預鑄板結構30'之複數個金屬支架M'的每一者具有呈連續彎折形狀之複數個第二鋼筋33',複數個第二鋼筋33'自該第一面31'至少部分地露出。第二鋼筋33'之連續彎折形狀呈現類似波浪形狀而形成多個波峰區與多個波谷區,其中波谷區係埋設於混凝土基底B'中,波峰區係露出於混凝土基底B'外,可用於與其他鋼筋結構搭接。例如:在預鑄板結構30'設置於該預定位置之前或是之後,沿大致垂直於樓地板20之方向,將複數個第三鋼筋34'穿置並固定於複數個第二鋼筋33'中,以進一步強化預鑄板結構30'之結構強度。如圖9所示實施例中,第三鋼筋34'係沿著第二鋼筋33'之多個波峰區穿置並與第二鋼筋33'之波峰區的頂部位置連接固定。第二鋼筋33'與第三鋼筋34'的連接處可利用焊接或鐵絲綁紮固定。 The precast plate structure 30' comprises a concrete base B' and a plurality of metal brackets M' extending from the concrete base. The concrete base B' of the precast plate structure 30' has a first surface 31' and a second surface 32' opposite to the first surface 31'. Each of the plurality of metal brackets M' of the precast plate structure 30' has a plurality of second steel bars 33' in a continuous bending shape, and the plurality of second steel bars 33' are at least partially exposed from the first surface 31'. The continuous bending shape of the second steel bars 33' presents a wave-like shape to form a plurality of wave crest areas and a plurality of wave trough areas, wherein the wave trough area is buried in the concrete base B', and the wave crest area is exposed outside the concrete base B', and can be used for overlapping with other steel bar structures. For example: before or after the precast plate structure 30' is set at the predetermined position, a plurality of third steel bars 34' are inserted and fixed in a plurality of second steel bars 33' in a direction roughly perpendicular to the floor 20 to further strengthen the structural strength of the precast plate structure 30'. In the embodiment shown in FIG. 9, the third steel bar 34' is inserted along a plurality of wave crest areas of the second steel bar 33' and connected and fixed to the top position of the wave crest area of the second steel bar 33'. The connection between the second steel bar 33' and the third steel bar 34' can be fixed by welding or wire tying.

當預鑄板結構30'設置於預定位置時,預鑄板結構30'大致垂直於樓地板20。如圖9所示,第一鋼筋10係以第一部分11插置於預鑄板結構30'之複數個金屬支架M'的複數個第二鋼筋33'之波峰區域中。 When the precast plate structure 30' is set at a predetermined position, the precast plate structure 30' is substantially perpendicular to the floor plate 20. As shown in FIG9 , the first steel bar 10 is inserted into the crest region of the plurality of second steel bars 33' of the plurality of metal brackets M' of the precast plate structure 30' with the first portion 11.

如圖9A所示,在設置預鑄板結構30'於預定位置之後,可設置第三連接件73於預鑄板結構30'與樓地板20所形成之內側角落,藉此進一步固定預鑄板結構30'以避免滑移。在本實施例中使用與先前第一實施例中相同的第三連接件73及第三固定件83,且施作方式大致相同。第三 連接件73大致呈L形的片狀結構,其包括第一部分731及與第一部分731大致垂直之第二部分732。第三連接件73之第一部分731抵靠樓地板20,第三連接件73之第二部分732抵靠預鑄板結構30'之底部轉角處的金屬連接部37',藉由將第三固定件83穿置通過第三連接件73之第一部分731至樓地板20,及連接固定第三連接件73之第二部分732與預鑄板結構30'底部轉角處之金屬連接部37'。在本發明之一些實施例中,第三固定件83可為螺絲或膨脹螺絲。第三連接件73之第二部分732係以焊接固定於預鑄板結構30之金屬連接部37'。在圖9A中,設置於預鑄板結構30'之底部轉角處的金屬連接部37'大致呈L形的片狀結構,其包括第一部份371'及與第一部份371'大致垂直之第二部分372',以分別固定於預鑄板結構30'轉角之一面及其相鄰的另一面。金屬連接部37'之第一部份371'抵靠墊片36,金屬連接部37'之第二部分372'抵靠第三連接件73之第二部分732'。金屬連接部37除了可用於支撐預鑄板結構30'於墊片36之上,亦可用於防止預鑄板結構30'之混凝土基底之邊角因碰撞而破損。 As shown in FIG. 9A , after the precast plate structure 30' is set at a predetermined position, a third connecting member 73 can be set at the inner corner formed by the precast plate structure 30' and the floor plate 20 to further fix the precast plate structure 30' to prevent slippage. In this embodiment, the same third connecting member 73 and third fixing member 83 as in the first embodiment are used, and the operation method is roughly the same. The third connecting member 73 is a roughly L-shaped sheet structure, which includes a first portion 731 and a second portion 732 roughly perpendicular to the first portion 731. The first part 731 of the third connecting member 73 abuts against the floor plate 20, and the second part 732 of the third connecting member 73 abuts against the metal connecting part 37' at the bottom corner of the pre-cast plate structure 30'. The third fixing member 83 is inserted through the first part 731 of the third connecting member 73 to the floor plate 20, and the second part 732 of the third connecting member 73 is connected and fixed to the metal connecting part 37' at the bottom corner of the pre-cast plate structure 30'. In some embodiments of the present invention, the third fixing member 83 can be a screw or an expansion screw. The second part 732 of the third connecting member 73 is fixed to the metal connecting part 37' of the pre-cast plate structure 30 by welding. In FIG. 9A , the metal connection part 37' disposed at the bottom corner of the precast plate structure 30' is a roughly L-shaped sheet structure, which includes a first part 371' and a second part 372' roughly perpendicular to the first part 371', so as to be fixed to one side of the corner of the precast plate structure 30' and the other side adjacent thereto. The first part 371' of the metal connection part 37' abuts against the gasket 36, and the second part 372' of the metal connection part 37' abuts against the second part 732' of the third connecting member 73. In addition to supporting the precast plate structure 30' on the gasket 36, the metal connection part 37 can also be used to prevent the corners of the concrete base of the precast plate structure 30' from being damaged due to collision.

如圖10所示,在設置預鑄板結構30'於預定位置之後,可進一步設置支撐桿60,以加強穩固預鑄板結構30',避免預鑄板結構30歪斜。在本實施例中使用與先前第一實施例中相同的支撐桿60、第一連接件71、第一固定件81、第二連接件72及第二固定件82,且施作方式亦待大致相同。圖10A為圖10中A處之局部放大圖,如圖10A所示,第一連接件71具有第一面711及與第一面711相對之第二面712,第一面711具有可樞接支撐桿60之第一端61的結構,第二面712大致為平坦的,用於抵靠預鑄板結構30'之凸塊35'之外表面。將第一固定件81穿置通過第一連接件71至預鑄板結構30'之凸塊35',以將第一連接件71之第二面712抵靠固定於 凸塊35'之外表面,並樞轉連接支撐桿60之第一端61於第一連接件71之第一面711。在本發明之一實施例中,先安裝支撐桿60之第一端61於第一連接件71之第一面711,再穿置第一固定件81通過第一連接件71至預鑄板結構30'之凸塊35'之外表面。 As shown in FIG. 10 , after the pre-cast plate structure 30 ′ is set at a predetermined position, a support rod 60 may be further set to strengthen and stabilize the pre-cast plate structure 30 ′ and prevent the pre-cast plate structure 30 from being skewed. In this embodiment, the same support rod 60, first connecting member 71, first fixing member 81, second connecting member 72 and second fixing member 82 as those in the first embodiment are used, and the operation method is also substantially the same. FIG. 10A is a partial enlarged view of point A in FIG. 10 . As shown in FIG. 10A , the first connecting member 71 has a first surface 711 and a second surface 712 opposite to the first surface 711. The first surface 711 has a structure that can pivotally connect the first end 61 of the support rod 60. The second surface 712 is substantially flat and is used to abut against the outer surface of the protrusion 35 ′ of the pre-cast plate structure 30 ′. The first fixing member 81 is inserted through the first connecting member 71 to the protrusion 35' of the pre-cast plate structure 30', so that the second surface 712 of the first connecting member 71 is fixed against the outer surface of the protrusion 35', and the first end 61 of the supporting rod 60 is pivotally connected to the first surface 711 of the first connecting member 71. In one embodiment of the present invention, the first end 61 of the supporting rod 60 is first installed on the first surface 711 of the first connecting member 71, and then the first fixing member 81 is inserted through the first connecting member 71 to the outer surface of the protrusion 35' of the pre-cast plate structure 30'.

圖10B為圖10中B處之局部放大圖,如圖10B所示,第二連接件72具有第一面721及與第一面721相對之第二面722,第一面721具有可樞接支撐桿60之第二端62的結構,第二面722大致為平坦的,用於抵靠樓地板20。將第二固定件82穿置通過第二連接件72至樓地板20,以將第二連接件72之第二面722抵靠固定於樓地板20,並樞轉連接支撐桿60之第二端62於第二連接件72之第一面721。在本發明之一實施例中,先安裝支撐桿60之第二端62於第二連接件72之第一面721,再穿置第二固定件82通過第二連接件72至樓地板20。在本發明之一實施例中,第一固定件81及第二固定件82可為螺絲或膨脹螺絲。此外,施工現場之樓地板20的部分區域可能因物品遮擋或結構限制而不適於安裝支撐桿60,在此情況下,由於支撐桿60之第一端61及第二端62分別可樞轉連接於第一連接件71及第二連接件72,在安置支撐桿60時,可藉由調節支撐桿60與凸塊35'之間的夾角及支撐桿60與樓地板20之間的夾角,以改變第一連接件71固定於預鑄板結構30'之凸塊35'的位置及第二連接件72固定於樓地板20的位置。在本發明之另一實施例中,支撐桿60的長短係為可調節的,以適應不同的施工環境。在本發明之其他實施例中(圖未示),不設置第一連接件71及第二連接件72,施工時係將支撐桿之第一端61直接連接固定於預鑄板30'之凸塊35'之外表面,且將支撐桿之第二端62直接連接固定樓地板20。 FIG. 10B is a partial enlarged view of the B portion in FIG. 10 . As shown in FIG. 10B , the second connecting member 72 has a first surface 721 and a second surface 722 opposite to the first surface 721. The first surface 721 has a structure that can be pivotally connected to the second end 62 of the supporting rod 60. The second surface 722 is substantially flat and is used to abut against the floor plate 20. The second fixing member 82 is inserted through the second connecting member 72 to the floor plate 20 to abut and fix the second surface 722 of the second connecting member 72 against the floor plate 20, and pivotally connect the second end 62 of the supporting rod 60 to the first surface 721 of the second connecting member 72. In one embodiment of the present invention, the second end 62 of the support rod 60 is first installed on the first surface 721 of the second connecting member 72, and then the second fixing member 82 is inserted through the second connecting member 72 to the floor plate 20. In one embodiment of the present invention, the first fixing member 81 and the second fixing member 82 can be screws or expansion screws. In addition, some areas of the floor 20 at the construction site may not be suitable for installing the support rod 60 due to obstruction or structural restrictions. In this case, since the first end 61 and the second end 62 of the support rod 60 can be pivotally connected to the first connector 71 and the second connector 72 respectively, when the support rod 60 is installed, the position where the first connector 71 is fixed to the connector 35' of the pre-cast plate structure 30' and the position where the second connector 72 is fixed to the floor 20 can be changed by adjusting the angle between the support rod 60 and the protrusion 35' and the angle between the support rod 60 and the floor 20. In another embodiment of the present invention, the length of the support rod 60 is adjustable to adapt to different construction environments. In other embodiments of the present invention (not shown), the first connector 71 and the second connector 72 are not provided. During construction, the first end 61 of the support rod is directly connected and fixed to the outer surface of the protrusion 35' of the pre-cast plate 30', and the second end 62 of the support rod is directly connected and fixed to the floor plate 20.

在步驟(c')中,如圖11所示,設置複數個加勁鋼筋40'並將 其與預鑄板結構30'之複數個金屬支架連接固定。複數個加勁鋼筋40'包括複數個第四鋼筋41'及複數個第五鋼筋42'。首先,將複數個第四鋼筋41'沿大致垂直於樓地板20之方向(即:圖11中之Y軸方向)大致彼此平行和間隔地配置,且將複數個第四鋼筋41'連接固定至預鑄板結構30'之複數個第二鋼筋33'及複數個第三鋼筋34'之至少一者。接著,將複數個第五鋼筋42'沿該女兒牆橫向延伸方向(即:圖11中之Z軸方向)大致彼此平行和間隔地配置,且將複數個第五鋼筋42'連接固定至複數個第四鋼筋41'。在本發明之一實施例中,第四鋼筋41'與第二鋼筋33'或第三鋼筋34的連接處以焊接或鐵絲綁紮固定。第五鋼筋42'與第四鋼筋41'的連接處以焊接或鐵絲綁紮固定。此外,在本實施例中,複數個第五鋼筋42'各者具有頂部,當複數個第五鋼筋42'連接固定至複數個第四鋼筋41'時,第五鋼筋42'之頂部位於預鑄板結構30'的上方,頂部具有第一部分421'、一第二部分422'及一第三部分423',第一部份421'及該第三部分423'沿該Y軸方向延伸,第二部分422'沿該X軸方向連接第一部分421'及第三部分423',在第二部分422'與第一部分421'的連接處及第二部分422'與第三部分423'的連接處分別形成圓角。 In step (c'), as shown in FIG. 11, a plurality of reinforcing steel bars 40' are provided and connected and fixed to a plurality of metal brackets of the precast plate structure 30'. The plurality of reinforcing steel bars 40' include a plurality of fourth steel bars 41' and a plurality of fifth steel bars 42'. First, the plurality of fourth steel bars 41' are arranged approximately parallel to each other and spaced apart in a direction approximately perpendicular to the floor plate 20 (i.e., the Y-axis direction in FIG. 11), and the plurality of fourth steel bars 41' are connected and fixed to at least one of the plurality of second steel bars 33' and the plurality of third steel bars 34' of the precast plate structure 30'. Next, a plurality of fifth steel bars 42' are arranged substantially parallel to each other and spaced apart along the horizontal extension direction of the parapet (i.e., the Z-axis direction in FIG. 11), and the plurality of fifth steel bars 42' are connected and fixed to the plurality of fourth steel bars 41'. In one embodiment of the present invention, the connection between the fourth steel bar 41' and the second steel bar 33' or the third steel bar 34 is fixed by welding or wire tying. The connection between the fifth steel bar 42' and the fourth steel bar 41' is fixed by welding or wire tying. In addition, in this embodiment, each of the plurality of fifth steel bars 42' has a top. When the plurality of fifth steel bars 42' are connected and fixed to the plurality of fourth steel bars 41', the top of the fifth steel bar 42' is located above the pre-cast plate structure 30'. The top has a first portion 421', a second portion 422' and a third portion 423'. The first portion 421' and the third portion 423' extend along the Y-axis direction. The second portion 422' connects the first portion 421' and the third portion 423' along the X-axis direction. Fillets are formed at the connection between the second portion 422' and the first portion 421' and at the connection between the second portion 422' and the third portion 423'.

接著,將複數個第六鋼筋43'大致平行地配置且連接固定複數個第五鋼筋42'各者之第一部分421'、第二部分422'及第三部分423'之至少一者。如圖11所示實施例中,複數個第六鋼筋43'中至少兩個分別連接固定第五鋼筋42'之第二部分422'與第一部分421'的連接處及第二部分422'與第三部分423'的連接處。在本發明之一實施例中,第六鋼筋43'與第五鋼筋42'的連接處以焊接或鐵絲綁紮固定。 Next, the plurality of sixth steel bars 43' are arranged roughly in parallel and connected to at least one of the first part 421', the second part 422' and the third part 423' of each of the plurality of fifth steel bars 42'. In the embodiment shown in FIG. 11, at least two of the plurality of sixth steel bars 43' are connected to the connection between the second part 422' and the first part 421' and the connection between the second part 422' and the third part 423' of the fifth steel bar 42'. In one embodiment of the present invention, the connection between the sixth steel bar 43' and the fifth steel bar 42' is fixed by welding or wire tying.

步驟(d'),如圖12所示,於預鑄板結構30'之內側位置,與 預鑄板結構30'之第一面31'相距第一距離L1的位置設置第一模板50,使第一模板50之內表面與凸塊35'之外表面大致位於同一平面(亦即,皆與預鑄板結構30'之第一面31'相距第一距離L1),而在第一模板50與預鑄板結構30'之間形成第一空間S1'。在本實施例中使用與先前第一實施例中相同的第一模板50。當凸塊35'已連接固定支撐桿60時,可將設置於凸塊35'附近之第一模板50分成兩塊模板,一塊模板設置於凸塊35'上方,另一塊模板設置於凸塊35'下方,使支撐桿60之第一端61、第一連接件71及第一固定件81露出。 Step (d'), as shown in FIG. 12, a first template 50 is disposed at a position inside the pre-cast plate structure 30', at a first distance L1 from the first surface 31' of the pre-cast plate structure 30', so that the inner surface of the first template 50 and the outer surface of the protrusion 35' are substantially located in the same plane (that is, both are at a first distance L1 from the first surface 31' of the pre-cast plate structure 30'), and a first space S1' is formed between the first template 50 and the pre-cast plate structure 30'. In this embodiment, the same first template 50 as in the first embodiment is used. When the protrusion 35' is connected to the fixed support rod 60, the first template 50 disposed near the protrusion 35' can be divided into two templates, one template is disposed above the protrusion 35', and the other template is disposed below the protrusion 35', so that the first end 61 of the support rod 60, the first connecting member 71 and the first fixing member 81 are exposed.

在步驟(e')中,如圖13所示,在預鑄板結構30'與第一模板50之間之第一空間S1'及第五鋼筋42'之頂部所佔據之第二空間S2'進行混凝土灌漿,使混凝土完全覆蓋第一鋼筋10、第二鋼筋33'、第三鋼筋34'、第四鋼筋41'、第五鋼筋42'及第六鋼筋43'。在本發明之一實施例中,在對第二空間S2'進行混凝土灌漿,可在預鑄板結構30'之第二面32'外側進一步設置第二模板(圖未示),使第五鋼筋42'之頂部位於第一模板50與第二模板之間。在本發明之另一實施例中,在預鑄板結構30'之第二面32'外側設置有其他板件,例如:三明治板,此板件與第一模板50之間形成第二空間S2',以在其中進行混凝土灌漿。 In step (e'), as shown in FIG. 13, concrete grouting is performed in the first space S1' between the precast plate structure 30' and the first template 50 and the second space S2' occupied by the top of the fifth steel bar 42', so that the concrete completely covers the first steel bar 10, the second steel bar 33', the third steel bar 34', the fourth steel bar 41', the fifth steel bar 42' and the sixth steel bar 43'. In one embodiment of the present invention, before the second space S2' is grouted with concrete, a second template (not shown) may be further arranged outside the second surface 32' of the precast plate structure 30', so that the top of the fifth steel bar 42' is located between the first template 50 and the second template. In another embodiment of the present invention, other panels, such as sandwich panels, are arranged on the outer side of the second surface 32' of the precast panel structure 30', and a second space S2' is formed between the panel and the first formwork 50 for concrete grouting.

步驟(f'),如圖14所示,待混凝土達到初凝以後,拆除第一模板50,並可移除支撐桿60、第一連接件71、第一固定件81、第二連接件72及第二固定件82,以形成女兒牆。 Step (f'), as shown in Figure 14, after the concrete reaches initial setting, the first formwork 50 is removed, and the support rod 60, the first connecting member 71, the first fixing member 81, the second connecting member 72 and the second fixing member 82 can be removed to form a parapet.

本文中的用語「一」或「一種」係用以敘述本創作之元件及成分。此術語僅為了敘述方便及給予本創作之基本觀念。此敘述應被理解為包括一種或至少一種,且除非明顯地另有所指,表示單數時亦包 括複數。於申請專利範圍中和「包含」一詞一起使用時,該用語「一」可意謂一個或超過一個。此外,本文中的用語「或」其意同「及/或」。 The term "a" or "an" in this article is used to describe the elements and components of this invention. This term is only for the convenience of description and to give the basic concept of this invention. This description should be understood to include one or at least one, and unless otherwise clearly indicated, the singular also includes the plural. When used with the word "including" in the scope of the patent application, the term "a" can mean one or more than one. In addition, the term "or" in this article means "and/or".

除非另外規定,否則諸如「上方」、「下方」、「向上」、「左邊」、「右邊」、「向下」、「本體」、「底座」、「垂直」、「水平」、「側」、「較高」、「下部」、「上部」、「上方」、「下面」等空間描述係關於圖中所展示之方向加以指示。應理解,本文中所使用之空間描述僅出於說明之目的,且本文中所描述之結構之實際實施可以任何相對方向在空間上配置,此限制條件不會改變本揭露實施例之優點。舉例來說,在一些實施例之描述中,提供「在」另一元件「上」之一元件可涵蓋前一元件直接在後一元件上(例如,與後一元件實體接觸)的狀況以及一或複數個介入元件位於前一元件與後一元件之間的狀況。 Unless otherwise specified, spatial descriptions such as "above", "below", "upward", "left", "right", "downward", "body", "base", "vertical", "horizontal", "side", "higher", "lower", "upper", "above", "below", etc. are indicated with respect to the directions shown in the figures. It should be understood that the spatial descriptions used herein are for illustrative purposes only, and the actual implementation of the structures described herein can be spatially configured in any relative direction, and this limitation does not change the advantages of the disclosed embodiments. For example, in the description of some embodiments, providing an element "on" another element can cover the situation where the previous element is directly on the latter element (for example, in physical contact with the latter element) and the situation where one or more intervening elements are located between the previous element and the latter element.

如本文中所使用,術語「大致」、「實質上」、「實質的」及「約」用以描述及考慮微小之變化。當與事件或情形結合使用時,該些術語可意指事件或情形明確發生之情況以及事件或情形極近似於發生之情況。 As used herein, the terms "substantially", "substantial", "substantial" and "approximately" are used to describe and take into account minor variations. When used in conjunction with an event or circumstance, these terms may refer to both situations where the event or circumstance definitely occurred and situations where the event or circumstance closely approximates to occurring.

以上所述之實施例僅係為說明本創作之技術思想及特點,其目的在使熟習此項技藝之人士能夠瞭解本創作之內容並據以實施,當不能以之限定本創作之專利範圍,依本創作所揭示之精神所作之均等變化或修飾,仍應涵蓋在本創作之專利範圍內。 The implementation examples described above are only for illustrating the technical ideas and features of this creation. Their purpose is to enable people familiar with this technology to understand the content of this creation and implement it accordingly. They cannot be used to limit the patent scope of this creation. Equal changes or modifications made according to the spirit revealed by this creation should still be covered by the patent scope of this creation.

10:第一鋼筋 10: First steel bar

11:第一部分 11: Part 1

12:第二部分 12: Part 2

20:樓地板 20: Floor

30:預鑄板結構 30: Pre-cast plate structure

31:第一面 31: First page

32:第二面 32: Second side

33:第二鋼筋 33: Second steel bar

34:第三鋼筋 34: The third steel bar

35:凸塊 35: Bump

36:墊片 36: Gasket

40:加勁鋼筋 40: Reinforced steel bars

41:第四鋼筋 41: The fourth steel bar

42:第五鋼筋 42: Fifth steel bar

S1:第一空間 S1: First Space

L1:第一距離 L1: First distance

Claims (10)

一種女兒牆之製作方法,其包括以下步驟:(a)預埋一第一鋼筋於一樓地板中,該第一鋼筋之一部分突出於該樓地板;(b)在設置具有一凸塊之一預鑄板結構於一預定位置之前,先在該預定位置設置一墊片,以調控該預鑄板結構之高度,接著設置該預鑄板結構於該預定位置,該預定位置係鄰近該樓地板之一邊緣並位於該樓地板之上方,該預鑄板結構大致垂直於該樓地板,該預鑄板結構包含一混凝土基底以及自該混凝土基底伸出之複數個金屬支架,且將該第一鋼筋之該部分插置於該預鑄板結構之該複數個金屬支架中;(b1)設置一支撐桿,樞轉連接該支撐桿之一第一端於該預鑄板之該凸塊,且樞轉連接該支撐桿之一第二端於該樓地板;及(c)設置複數個加勁鋼筋並將其與該預鑄板結構之該複數個金屬支架連接固定。 A method for manufacturing a parapet comprises the following steps: (a) pre-embedding a first steel bar in a floor, wherein a portion of the first steel bar protrudes from the floor; (b) before setting a pre-cast plate structure having a protrusion at a predetermined position, first setting a gasket at the predetermined position to adjust the height of the pre-cast plate structure, and then setting the pre-cast plate structure at the predetermined position, wherein the predetermined position is adjacent to an edge of the floor and located above the floor, and the pre-cast plate structure is approximately perpendicular to the floor. The floor, the precast plate structure comprises a concrete base and a plurality of metal brackets extending from the concrete base, and the portion of the first steel bar is inserted into the plurality of metal brackets of the precast plate structure; (b1) a support rod is provided, a first end of the support rod is pivotally connected to the protrusion of the precast plate, and a second end of the support rod is pivotally connected to the floor; and (c) a plurality of reinforcing steel bars are provided and connected and fixed to the plurality of metal brackets of the precast plate structure. 如請求項1之製作方法,進一步包括以下步驟:(d)於該預鑄板結構的一內側位置,設置一第一模板,其與該預鑄板結構形成一第一空間;(e)在該預鑄板結構與該第一模板之間之該第一空間進行混凝土灌漿;及(f)待該混凝土達到初凝以後,拆除該第一模板。 The manufacturing method of claim 1 further comprises the following steps: (d) setting a first template at an inner side position of the precast plate structure, which forms a first space with the precast plate structure; (e) pouring concrete in the first space between the precast plate structure and the first template; and (f) removing the first template after the concrete reaches initial setting. 如請求項1或2之製作方法,其中在步驟(a)中,該第一鋼筋包含一第一部分及與該第一部分大致垂直之一第二部分,其中該第一部分突出於該樓地板,該第二部分埋設於該樓地板中。 The manufacturing method of claim 1 or 2, wherein in step (a), the first steel bar comprises a first portion and a second portion substantially perpendicular to the first portion, wherein the first portion protrudes from the floor slab and the second portion is embedded in the floor slab. 如請求項3之製作方法,其中在步驟(b)中,該預鑄板結構具有一第一面及與該第一面相對之一第二面,該第二面大致為平坦的,該預鑄板結構之該複數個金屬支架的每一者具有呈連續彎折形狀之複數個第二鋼筋自該第一面至少部分地露出,且將該第一鋼筋之該第一部分插置於該預鑄板結構之該複數個金屬支架之該複數個第二鋼筋中。 The manufacturing method of claim 3, wherein in step (b), the pre-cast plate structure has a first surface and a second surface opposite to the first surface, the second surface is substantially flat, each of the plurality of metal brackets of the pre-cast plate structure has a plurality of second steel bars in a continuous bending shape at least partially exposed from the first surface, and the first portion of the first steel bar is inserted into the plurality of second steel bars of the plurality of metal brackets of the pre-cast plate structure. 如請求項4之製作方法,其中步驟(b)進一步包括沿大致垂直於該樓地板之方向,將複數個第三鋼筋穿置並固定於該複數個第二鋼筋中以強化該預鑄板結構。 The manufacturing method of claim 4, wherein step (b) further includes inserting and fixing a plurality of third steel bars in a direction substantially perpendicular to the floor plate to strengthen the precast plate structure. 如請求項4之製作方法,其中在步驟(b)中,該凸塊自該預鑄板結構之該第一面沿一X軸方向延伸一第一距離;其中步驟(e)包括設置該第一模板之一內面使其與該預鑄板結構之該第一面之間距等於該第一距離。 As in the manufacturing method of claim 4, wherein in step (b), the protrusion extends a first distance from the first surface of the pre-cast plate structure along an X-axis direction; wherein step (e) includes setting an inner surface of the first template so that the distance between it and the first surface of the pre-cast plate structure is equal to the first distance. 如請求項6之製作方法,在步驟(b)之後,進一步包括將一第一固定件穿置通過一第一連接件至該預鑄板結構之該凸塊, 以將該第一連接件之一第二面抵靠固定於該凸塊,樞轉連接一支撐桿之一第一端於該第一連接件之相對於該第二面之一第一面,及將一第二固定件穿置通過一第二連接件至該樓地板,以將該第二連接件之一第二面抵靠固定於該樓地板,樞轉連接該支撐桿之一第二端於該第二連接件之相對於該第二面之一第一面。 The manufacturing method of claim 6, after step (b), further includes inserting a first fixing member through a first connecting member to the protrusion of the precast plate structure, to fix a second surface of the first connecting member against the protrusion, pivotally connecting a first end of a supporting rod to a first surface of the first connecting member opposite to the second surface, and inserting a second fixing member through a second connecting member to the floor plate, to fix a second surface of the second connecting member against the floor plate, and pivotally connecting a second end of the supporting rod to a first surface of the second connecting member opposite to the second surface. 如請求項6之製作方法,其中在步驟(c)中,該複數個加勁鋼筋包括複數個第四鋼筋及複數個第五鋼筋,將該複數個第四鋼筋沿大致垂直於該樓地板之方向大致彼此平行和間隔地配置且連接固定至該預鑄板結構之該複數個金屬支架的該複數個第二鋼筋及該複數個第三鋼筋之至少一者,將該複數個第五鋼筋沿該女兒牆橫向延伸方向之大致彼此平行和間隔地配置且連接固定至該複數個第四鋼筋。 The manufacturing method of claim 6, wherein in step (c), the plurality of reinforcing steel bars include a plurality of fourth steel bars and a plurality of fifth steel bars, the plurality of fourth steel bars are arranged approximately parallel to each other and spaced apart in a direction approximately perpendicular to the floor plate and connected and fixed to at least one of the plurality of second steel bars and the plurality of third steel bars of the plurality of metal brackets of the precast plate structure, and the plurality of fifth steel bars are arranged approximately parallel to each other and spaced apart in a direction extending horizontally of the parapet and connected and fixed to the plurality of fourth steel bars. 如請求項8之製作方法,其中在步驟(c)中,該複數個第五鋼筋各者具有一頂部,該頂部位於該預鑄板結構的上方,該頂部具有一第一部分、一第二部分及一第三部分,該第一部份及該第三部分沿一Y軸方向延伸,該第二部分該X軸方向連接該第一部分及該第三部分,在其連接處分別形成一圓角,其中步驟(c)進一步包括將複數個第六鋼筋大致平行地配置且連接固定至該複數個第五鋼筋各者之該第一部分、該第二部分及該第三部分之至少一者,以及其中步驟(e)進一步包括將頂部所佔據之一第二空間進行混凝土灌漿。 As in the manufacturing method of claim 8, wherein in step (c), each of the plurality of fifth steel bars has a top portion, the top portion is located above the precast plate structure, the top portion has a first portion, a second portion and a third portion, the first portion and the third portion extend along a Y-axis direction, the second portion connects the first portion and the third portion in the X-axis direction, and a fillet is formed at the connection, wherein step (c) further includes arranging a plurality of sixth steel bars substantially in parallel and connecting and fixing to at least one of the first portion, the second portion and the third portion of each of the plurality of fifth steel bars, and wherein step (e) further includes filling a second space occupied by the top portion with concrete. 如請求項1或2之製作方法,其中在步驟(b)中,在設置該預鑄板結構於該預定位置之後,設置一第三連接件於該預鑄板結構與該樓地板所形成之一內側角落,將一第三固定件穿置通過該第三連接件之一第一部分至該樓地板,及連接固定該第三連接件之一第二部分與該預鑄板結構,該第三連接件之該第一部分與該第二部分大致垂直。A manufacturing method as claimed in claim 1 or 2, wherein in step (b), after the pre-cast plate structure is set at the predetermined position, a third connecting member is set at an inner corner formed by the pre-cast plate structure and the floor plate, a third fixing member is passed through a first portion of the third connecting member to the floor plate, and a second portion of the third connecting member is connected and fixed to the pre-cast plate structure, and the first portion of the third connecting member is approximately perpendicular to the second portion.
TW112101279A 2023-01-12 2023-01-12 Method for manufacturing parapet wall TWI843396B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
TW112101279A TWI843396B (en) 2023-01-12 2023-01-12 Method for manufacturing parapet wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
TW112101279A TWI843396B (en) 2023-01-12 2023-01-12 Method for manufacturing parapet wall

Publications (2)

Publication Number Publication Date
TWI843396B true TWI843396B (en) 2024-05-21
TW202428971A TW202428971A (en) 2024-07-16

Family

ID=92077076

Family Applications (1)

Application Number Title Priority Date Filing Date
TW112101279A TWI843396B (en) 2023-01-12 2023-01-12 Method for manufacturing parapet wall

Country Status (1)

Country Link
TW (1) TWI843396B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203613792U (en) * 2013-11-12 2014-05-28 中国建筑第八工程局有限公司 Parapet wall formwork pouring structure
CN207582950U (en) * 2017-10-24 2018-07-06 上海宝冶集团有限公司 Steel structural plant roof concrete parapet external mold formwork erecting structure
CN111663766A (en) * 2020-06-18 2020-09-15 北京城建七建设工程有限公司 Overhanging structure parapet single-face formwork connecting system and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203613792U (en) * 2013-11-12 2014-05-28 中国建筑第八工程局有限公司 Parapet wall formwork pouring structure
CN207582950U (en) * 2017-10-24 2018-07-06 上海宝冶集团有限公司 Steel structural plant roof concrete parapet external mold formwork erecting structure
CN111663766A (en) * 2020-06-18 2020-09-15 北京城建七建设工程有限公司 Overhanging structure parapet single-face formwork connecting system and construction method thereof

Also Published As

Publication number Publication date
TW202428971A (en) 2024-07-16

Similar Documents

Publication Publication Date Title
CN103797197B (en) Building structure with precast monolithic walls and floors
CN106285051B (en) A kind of prefabricated toilet and its construction and installation method
CN101839061A (en) Cast-in-place concrete arc outer wall single-side formwork system and construction method thereof
CN110409813A (en) Exempt to split into type beam forms, formwork structure and construction process containing steel reinforcement cage
CN107327050A (en) A kind of avoid-dismantle outer wall of basement flange single side formwork device and construction method
JP2915897B1 (en) Building construction method
TWI843396B (en) Method for manufacturing parapet wall
CN114482304A (en) Construction method of composite insulation board of building
JPH1129910A (en) How to build a concrete pier
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
CN117027262A (en) Construction method of frame structure close-spliced laminated slab building structure
KR200249907Y1 (en) Device for adjusting level of a concrete form
JPH05171717A (en) Method for constructing prefabricated building using precast wall and floor panel
CN207392530U (en) A kind of avoid-dismantle outer wall of basement flange single side formwork device
CN217299404U (en) Prefabricated floor slab structure
TWI844505B (en) Architecture system
KR200340346Y1 (en) Truss deck panel for slab
KR100654822B1 (en) Construction method and construction system of concrete structure curing both floor and wall at the same time
JP7520373B2 (en) Concrete flow prevention frame material
JP7792083B2 (en) Unit structure and unit structure construction method
JP2724891B2 (en) Construction method of pillar half PCa formwork
JP2025122529A (en) Building construction method and joint members used therein
KR20110009741A (en) Reinforcement method of PC beam connected to steel column
JP3249076B2 (en) Building floor and foundation structure
JP2025119714A (en) Standing wall and its construction method