SU41893A1 - Installation for molding refractories compressed air - Google Patents
Installation for molding refractories compressed airInfo
- Publication number
- SU41893A1 SU41893A1 SU139467A SU139467A SU41893A1 SU 41893 A1 SU41893 A1 SU 41893A1 SU 139467 A SU139467 A SU 139467A SU 139467 A SU139467 A SU 139467A SU 41893 A1 SU41893 A1 SU 41893A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- compressed air
- installation
- refractories
- molding
- bunker
- Prior art date
Links
- 238000009434 installation Methods 0.000 title description 5
- 239000011819 refractory material Substances 0.000 title description 3
- 238000000465 moulding Methods 0.000 title description 2
- 241000273930 Brevoortia tyrannus Species 0.000 description 8
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 2
- 235000011941 Tilia x europaea Nutrition 0.000 description 2
- 239000011230 binding agent Substances 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 239000004571 lime Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 241001649081 Dina Species 0.000 description 1
- 239000006105 batch ingredient Substances 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 235000013379 molasses Nutrition 0.000 description 1
- 239000010453 quartz Substances 0.000 description 1
- VYPSYNLAJGMNEJ-UHFFFAOYSA-N silicon dioxide Inorganic materials O=[Si]=O VYPSYNLAJGMNEJ-UHFFFAOYSA-N 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
Description
Дл формовани изделий из бетонных масс с влажностью около 8-10% было предложено примен ть сжатый воздух.Compressed air has been proposed for forming concrete masses with a moisture content of about 8-10%.
Насто щее изобретение имеет в виду формование посредством сжатого воздуха огнеупоров как шамотовых, так и динасовых, из шихты малой влажности, причем суха шихта из бункеров передаетс по трубам в смесительную камеру , к которой присоединен ленточный пресс, подающий в нее более влажное св зующее (глина или известь). Дл непрерывности работы установки дл каждого сухого ингредиента шихты предусмотрены по два бункера дл поочередного наполнени и опорожнени .The present invention refers to the molding by means of compressed air of refractories of both chamotte and dinas refractories from a mixture of low humidity, the dry charge from the bins being transferred through pipes into a mixing chamber, to which a belt press is attached, supplying a wetter binder (clay or lime). For the continuity of the installation, for each dry batch ingredient, two bins are provided for alternately filling and emptying.
На схематическом чертеже фиг. 1 изображает вид спереди предлагаемой установки с частичным разрезом и фиг. 2 - то же, вид сбоку.In the schematic drawing of FIG. 1 shows a front view of the proposed plant with a partial section; and FIG. 2 - the same, side view.
Предлагаема установка состоит из шести загрузочных воронок 1, шести бункеров 5, шести питательных воронок 8, уход щих к загрузочному отверстию в поток сжатого воздуха, газопровода Ни смесительной камеры 17 с соплом на конце.The proposed installation consists of six feed hoppers 1, six bunkers 5, six feeding hoppers 8 leaving the feed opening into the compressed air flow, the gas pipeline No mixing chamber 17 with a nozzle at the end.
Установка рассчитана на непрерывную работу с производительностью 1 кгThe unit is designed for continuous operation with a capacity of 1 kg
(331)(331)
массы в секунду, составл емой из трех фракций шамота или кварца и одной фракции св зывающего компонента, подаваемого или в виде м гкой ленты глины, или шликера, или взмученной извести, мелассы и пр.mass per second, composed of three fractions of chamotte or quartz and one fraction of the binding component, either in the form of a soft ribbon of clay, or a slip, or crushed lime, molasses, etc.
Работа установки начинаетс с загрузки воронки 1,The installation starts with the loading of funnel 1,
Ёмкость воронки и соответствующего бункера рассчитаны на работу в течение 15 минут; таким образом в работе всегда наход тс три бункера, а остальные- на загрузке.Capacity of a funnel and the corresponding bunker are calculated on work within 15 minutes; thus, there are always three bunkers in operation, and the rest are on load.
Каждый бункер имеет по два клапана 3 и 7, из которых первый - пружинный . Во врем работы клапан 3 закрыт , а клапан 7 открыт соответственно с требуемой подачей материала в смесительную камеру. Каждый бункер снабжен воздушным трубопроводом 9, через который в бункер подаетс сжаты воздух. Сжатый воздух, идущий от компрессора по трубе 11, поступает по трубе 9 в бункер, а по трубе 10, проход щей под питательной воронкой 8, захватыва текущий материал, - в смесительную камеру 17.Each bunker has two valves 3 and 7, of which the first one is spring. During operation, the valve 3 is closed, and the valve 7 is open, respectively, with the desired flow of material into the mixing chamber. Each bunker is provided with an air duct 9 through which compressed air is supplied to the bunker. Compressed air coming from the compressor through the pipe 11 enters through the pipe 9 into the bunker, and through the pipe 10 passing under the feed funnel 8, capturing the flowing material, into the mixing chamber 17.
В момент включени загруженного бункера на пульверизацию открываетс кран 12, воздух входит в бункер, заWhen the loaded hopper is switched on for spraying, the valve 12 opens, air enters the bunker, after
Эксперт It редактор П. А. ПетровExpert It editor P.A. Petrov
Гйв. .ПромвоД граф. Тамбовска . 12. Зак. 2224Gyve. .PromvoD Count. Tambovsk. 12. Zack. 2224
керрв с приемными и питательными воронками, трубопроводов и смесительной камеры с соплом отличающа с тем, что дл сузсих ингредаентлв ШАКТЫ служат бункеры 5 с нижним клапаном 7 и верхним пружинным клапаном 3, а дл более влажного св зующего - ленточный пресс 14, приключенный непосредственно к смесительной камере 17.Kerrv with receiving and feeding funnels, piping and mixing chamber with a nozzle is different in that for suzsyh shreds there are bins 5 with bottom valve 7 and top spring valve 3, and for a wetter binder - a belt press 14, directly to the mixing press camera 17.
2. Форма выполнени установки по л. I, личаю ща с тем, что дл каждого сухого ингредиента шихты предназначено по два бункера дл поочередного наполнени и опорожнени .2. Installation form for l. I, deviating with the fact that for each dry ingredient of the charge there are two bins for alternately filling and emptying.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU139467A SU41893A1 (en) | 1933-12-25 | 1933-12-25 | Installation for molding refractories compressed air |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| SU139467A SU41893A1 (en) | 1933-12-25 | 1933-12-25 | Installation for molding refractories compressed air |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| SU41893A1 true SU41893A1 (en) | 1935-02-28 |
Family
ID=48356666
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| SU139467A SU41893A1 (en) | 1933-12-25 | 1933-12-25 | Installation for molding refractories compressed air |
Country Status (1)
| Country | Link |
|---|---|
| SU (1) | SU41893A1 (en) |
-
1933
- 1933-12-25 SU SU139467A patent/SU41893A1/en active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US2027697A (en) | Homogenizing pulverulent materials | |
| US1566517A (en) | Ing co | |
| US1946780A (en) | Powder loading device | |
| SU41893A1 (en) | Installation for molding refractories compressed air | |
| US3753867A (en) | Apparatus for charging coke ovens | |
| US3320640A (en) | System for supplying seed cotton to gins | |
| US2739522A (en) | Apparatus for deaerating and storing oxidizable material | |
| US2873143A (en) | Apparatus for and method of handling fine pulverulent material in a vacuum conveyor | |
| RU2191734C1 (en) | Loose materials pneumatic transportation plant | |
| JPS6151206B2 (en) | ||
| GB331322A (en) | Process for pneumatically transporting pulverulent material | |
| US2955879A (en) | Ash feed control | |
| US3147892A (en) | Aeration unloading attachment for fine solids | |
| US1491401A (en) | Coal spreader | |
| GB979587A (en) | Improvements relating to methods of and apparatus for mixing concrete and other cementitious material | |
| US773030A (en) | Process of converting quicklime into powdered hydrated lime. | |
| GB728471A (en) | Cement batching plant | |
| US1306447A (en) | Peter stepanofp | |
| US1682872A (en) | Method of and apparatus for handling, storing, and measuring bulk material into batches | |
| US533488A (en) | Machine for manufacturing artificial fuel | |
| US669409A (en) | Apparatus for handling ground finished cement. | |
| US1062259A (en) | Rotary cement-kiln. | |
| SU92697A1 (en) | Dryer for oilseed | |
| SU740649A1 (en) | Plant for pneumatic conveying of loose materials | |
| SU369081A1 (en) | DEVICE FOR TRANSPORTATION OF BULK |