[go: up one dir, main page]

RU2019140039A - ELECTRIC POWER PRODUCTION METHOD - Google Patents

ELECTRIC POWER PRODUCTION METHOD Download PDF

Info

Publication number
RU2019140039A
RU2019140039A RU2019140039A RU2019140039A RU2019140039A RU 2019140039 A RU2019140039 A RU 2019140039A RU 2019140039 A RU2019140039 A RU 2019140039A RU 2019140039 A RU2019140039 A RU 2019140039A RU 2019140039 A RU2019140039 A RU 2019140039A
Authority
RU
Russia
Prior art keywords
pipeline
water
inlet
outlet
filler neck
Prior art date
Application number
RU2019140039A
Other languages
Russian (ru)
Inventor
Борис Валерьевич Журавлев
Original Assignee
Борис Валерьевич Журавлев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Борис Валерьевич Журавлев filed Critical Борис Валерьевич Журавлев
Priority to RU2019140039A priority Critical patent/RU2019140039A/en
Publication of RU2019140039A publication Critical patent/RU2019140039A/en

Links

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Claims (1)

Способ производства электроэнергии, заключающийся в том, что используют деривационную гидроэлектростанцию, состоящую из одного гидроагрегата, который стационарно устанавливают под водой на дне канала, отличающийся тем, что входной патрубок водонаправляющего аппарата гидротурбины, имеющий заливную горловину с герметичной крышкой, герметично соединяют с входным цельным трубопроводом, имеющим заслонку с возможностью полного перекрытия потока воды через трубопровод, а выходной патрубок отводящей камеры гидротурбины - с выходным цельным трубопроводом, также имеющим заслонку с возможностью полного перекрытия потока воды через трубопровод, при том, что трубопроводы стационарно не закрепляют, но располагают таким образом, чтобы открытый конец начала входного трубопровода находился в воде канала, где расположен гидроагрегат, с которым он соединен, а открытый конец выходного трубопровода - в воде искусственного водоема, при условии, что водная поверхность водоема ниже уровня водной поверхности канала в месте нахождения начала входного трубопровода; перед началом работы закрывают заслонки трубопроводов, заполняют систему водой через заливную горловину, после чего заливную горловину герметично закрывают и открывают заслонки трубопроводов.A method of generating electricity, which consists in the fact that a derivative hydroelectric power station is used, consisting of one hydroelectric unit, which is permanently installed under water at the bottom of the channel, characterized in that the inlet pipe of the water guide apparatus of the hydraulic turbine, which has a filler neck with a sealed cover, is hermetically connected to the inlet one-piece pipeline having a damper with the ability to completely block the flow of water through the pipeline, and the outlet pipe of the outlet chamber of the hydraulic turbine - with an outlet one-piece pipeline, also having a damper with the ability to completely block the flow of water through the pipeline, while the pipelines are not permanently fixed, but are positioned in this way, so that the open end of the beginning of the inlet pipeline is in the water of the channel where the hydraulic unit with which it is connected is located, and the open end of the outlet pipeline is in the water of an artificial reservoir, provided that the water surface of the reservoir is below the water surface level to anal at the location of the beginning of the inlet pipeline; before starting work, the pipeline valves are closed, the system is filled with water through the filler neck, after which the filler neck is hermetically closed and the pipeline valves are opened.
RU2019140039A 2019-12-07 2019-12-07 ELECTRIC POWER PRODUCTION METHOD RU2019140039A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2019140039A RU2019140039A (en) 2019-12-07 2019-12-07 ELECTRIC POWER PRODUCTION METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2019140039A RU2019140039A (en) 2019-12-07 2019-12-07 ELECTRIC POWER PRODUCTION METHOD

Publications (1)

Publication Number Publication Date
RU2019140039A true RU2019140039A (en) 2021-06-07

Family

ID=76296445

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2019140039A RU2019140039A (en) 2019-12-07 2019-12-07 ELECTRIC POWER PRODUCTION METHOD

Country Status (1)

Country Link
RU (1) RU2019140039A (en)

Similar Documents

Publication Publication Date Title
RU2019140039A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140530A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019138831A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140040A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140529A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140041A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019138830A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140463A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140118A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140037A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140532A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140528A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140119A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019138913A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140465A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140578A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140579A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140506A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140020A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140507A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140116A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140518A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140462A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140464A (en) ELECTRIC POWER PRODUCTION METHOD
RU2019140452A (en) ELECTRIC POWER PRODUCTION METHOD