RU1782260C - Method of accomplishment of ceiling in buildings with brick and prefabricated walls - Google Patents

Method of accomplishment of ceiling in buildings with brick and prefabricated walls

Info

Publication number
RU1782260C
RU1782260C SU904786932A SU4786932A RU1782260C RU 1782260 C RU1782260 C RU 1782260C SU 904786932 A SU904786932 A SU 904786932A SU 4786932 A SU4786932 A SU 4786932A RU 1782260 C RU1782260 C RU 1782260C
Authority
RU
Russia
Prior art keywords
plates
seams
walls
monolithic
buildings
Prior art date
Application number
SU904786932A
Other languages
Russian (ru)
Inventor
Арно Яковлевич Эпп
Ирина Ивановна Мыльникова
Николай Александрович Панков
Original Assignee
"Уральский Промстройниипроект" Научная Часть
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by "Уральский Промстройниипроект" Научная Часть filed Critical "Уральский Промстройниипроект" Научная Часть
Priority to SU904786932A priority Critical patent/RU1782260C/en
Application granted granted Critical
Publication of RU1782260C publication Critical patent/RU1782260C/en

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Использование: устройство перекрытий в реконструируемых здани х. Сущность изобретени : в стенах пробивают прерывистые штрабы. Укладывают плиты начина  с крайних , завод  их поочередно одним концом в штрабы. Другой конец плиты опирают на временную опору. Замоноличивают средние участки швов между плитами, равные 0,7 - 0,8 длины пролета. После достижени  бетоном прочности не менее 25% временные опоры удал ют. Затем замоноличивают концевые участки швов и швы между торцевыми гран ми плит и стенами. 1 ил.Usage: flooring in reconstructed buildings. SUMMARY OF THE INVENTION: Intermittent punches pierce walls. The plates are laid starting from the extreme, plant them alternately at one end in shrab. The other end of the plate rests on a temporary support. The middle sections of the seams between the plates are monolithic, equal to 0.7 - 0.8 of the span. After the concrete reaches a strength of at least 25%, the temporary supports are removed. Then, the end sections of the seams and the seams between the end faces of the plates and the walls are monolithic. 1 ill.

Description

Изобретение относитс  к строительству и может быть использовано при устройстве перекрытий в реконструируемых здани х,The invention relates to construction and can be used in the installation of floors in reconstructed buildings,

Цель изобретени  - повышение несущей способности за счет перераспределени  усилий от перерезывающих сил в швах между плитами.The purpose of the invention is to increase the bearing capacity due to the redistribution of forces from shear forces in the joints between the plates.

На чертеже изображен фрагмент перекрыти .The drawing shows a fragment of the overlap.

Плиты 1 перекрыти  уложены поочередно одним концом в штрабы 2 противолежащих стен 3, другим оперты на временные опоры 4. Крайние плиты своими продольными сторонами утоплены в борозды 5, сделанные в торцевых стенах 6 здани  на уровне перекрыти ,The floor slabs 1 are laid alternately at one end in the bays 2 of the opposite walls 3, the other are supported on temporary supports 4. The extreme slabs are recessed with their longitudinal sides into the grooves 5 made in the end walls 6 of the building at the level of the ceiling,

Способ осуществл ют следующим образом .The method is carried out as follows.

В стенах 3 пробивают прерывистые штрабы 2, длина которых соответствует ширине панели перекрыти . В торцевых стенах 6 делают борозды 5 глубиной 30 - 35 см. Затем в штрабы 2 в шахматном пор дке завод т плиты 1 и укладывают их на слой раствора. Свободные концы плит опирают на временные опоры 4. Продольные стороны крайних плит утапливают в борозды 5 торцевых стен 6 здани . После укладки плит 1 ззмоноличивают средние участки швов между плитами 1, равные 0,7 - 0,8 длины пролета. Дл  замонолачивани  швов используют конструкционный мелкозернистый бетон. Выдерживают до достижени  бетоном прочности не менее 25%. Затем удал ют временные опоры 4 и замоноличивают концевые участки швов между плитами 1 и швы между торцами свободных концов плит и несущими стенами 3.Intermittent punches 2 are punched in the walls 3, the length of which corresponds to the width of the floor panel. In the end walls 6, grooves 5 are made with a depth of 30-35 cm. Then, slabs 1 are made into stitches 2 in a checkerboard pattern and laid on a layer of mortar. The free ends of the plates are supported by temporary supports 4. The longitudinal sides of the extreme plates are recessed into the furrows 5 of the end walls 6 of the building. After laying the plates 1, the middle sections of the seams between the plates 1 are monolithic, equal to 0.7 - 0.8 of the span. Structural fine-grained concrete is used to grout the joints. Withstand until concrete reaches a strength of at least 25%. Then the temporary supports 4 are removed and the end sections of the joints between the plates 1 and the joints between the ends of the free ends of the plates and the supporting walls 3 are monolithic.

Двухстадийное замоноличивание шпоночных швов обеспечивает большую равно-чTwo-stage monolithic keyway seams provide greater equal-hour

О)ABOUT)

ю гоth go

о оoh oh

WW

мерность распределени  сдвигающих сил в швах и повышает надежность работы перекрыти .. . ; ; . ..У,...dimensionality of the distribution of shear forces in the seams and increases the reliability of the overlap ... ; ; . ..Uh ...

Claims (1)

Формула изо б ре тени  Способ выполнени  перекрыти  в здани х с кирпичными и блочными стенами, включающий устройство прерывистых штраб, укладку плит в шахматном пор дке с опиранием одного торца их на слой раствора в штрабах, а другого - на временную I .J.v ,--,:-The formula of the shade A method of making ceilings in buildings with brick and block walls, including intermittent grooves, laying tiles in a checkerboard pattern with one end resting on a layer of mortar in the grooves, and the other on a temporary I. Jv, - ,: - опору, и замоноличивание швов, о т л и ч а ю- щ и и с   тем, что, с целью повышени  несущей способности путем перераспределени  усилий от перерезывающих сил в швах, замонолачйвают средние участки швов между плитами, равные 0,7-0,8 длины пролета, выдерживают до достижени  бетоном прочности не менее 25%, удал ют временные опоры и замоноличивают концевые участки швов между плитами и швы между торцевыми гран ми плит и стенами.support, and monolithic seams, with the exception of the fact that, in order to increase the bearing capacity by redistributing the forces from the cutting forces in the seams, the middle sections of the seams between plates are equal to 0.7-0, 8, the span is maintained until concrete reaches a strength of at least 25%, temporary supports are removed and the end sections of the joints between the plates and the joints between the end faces of the plates and the walls are monolithic.
SU904786932A 1990-01-30 1990-01-30 Method of accomplishment of ceiling in buildings with brick and prefabricated walls RU1782260C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904786932A RU1782260C (en) 1990-01-30 1990-01-30 Method of accomplishment of ceiling in buildings with brick and prefabricated walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904786932A RU1782260C (en) 1990-01-30 1990-01-30 Method of accomplishment of ceiling in buildings with brick and prefabricated walls

Publications (1)

Publication Number Publication Date
RU1782260C true RU1782260C (en) 1992-12-15

Family

ID=21493877

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904786932A RU1782260C (en) 1990-01-30 1990-01-30 Method of accomplishment of ceiling in buildings with brick and prefabricated walls

Country Status (1)

Country Link
RU (1) RU1782260C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Пол ков Е.В. и др. Перекрыти из сборного железобетона при капитальном ремонте и реконструкции жилых зданий. М.: Минкомхоз, РСФСР. 1960, с.39-41. *

Similar Documents

Publication Publication Date Title
US8079189B2 (en) Structure system of concrete building for self-heat insulation
EP1445391B1 (en) Assembly of prefabricated components for making floor slabs, floors and walls with exposed wood beams
CA3109393C (en) Precast building construction system
RU2359090C2 (en) Method for erection of structures and device for its realisation
RU10407U1 (en) BUILDING BLOCK
WO2013032349A2 (en) Monolithic- precast housing construction system
RU2459913C2 (en) Set of leave-in-place form by vv podsevalov
CN118814976B (en) Floor splicing modular integrated system and construction method thereof
RU1782260C (en) Method of accomplishment of ceiling in buildings with brick and prefabricated walls
GB1424238A (en) Modular building systems
RU2109896C1 (en) Method for erection of sectional-monolithic covering in non-removable shuttering
RU2095533C1 (en) Method for erection of external wall of building
RU2652402C1 (en) Method of multi-storey building lightened floors installation
RU2084593C1 (en) Wall of building
US20030074852A1 (en) Building-structure seal
SU977639A1 (en) Floor slab
RU2076179C1 (en) Exterior multilayer wall of building
RU24225U1 (en) CONSTRUCTIVE-ARCHITECTURAL SOLUTION OF RECONSTRUCTION OF A SMALL BUILDING
US2211667A (en) Joists and structural connections thereto
WO2007039887A3 (en) A method of constructing a roof or floor slab
RU2024697C1 (en) Building
SU1622545A1 (en) Ferroconcrete roof
RU32803U1 (en) FORMWORK UNIT FOR INTER-FLOOR CEILINGS
RU94026797A (en) Building and method to erect the same
GB2390102A (en) Suspended concrete floor with insulation overlying the support beams