Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Linde AgfiledCriticalLinde Ag
Priority to PE2010000345ApriorityCriticalpatent/PE20120092A1/es
Publication of PE20120092A1publicationCriticalpatent/PE20120092A1/es
REFERIDO A UN METODO PARA UNIR UNA PLACA TUBULAR Y TUBOS EN UN DISPOSITIVO DE TRANSFERENCIA DE CALOR QUE CONSTA DE UN GRUPO DE TUBOS, CON LA AYUDA DE UNA HERRAMIENTA DE FRICCION ROTATIVA, LA CUAL ES LLEVADA DENTRO DEL EXTREMO ABIERTO DE UN TUBO CIRCUNDADO POR LA PLACA TUBULAR EN LA DIRECCION AXIAL DE DICHO TUBO, Y PRESIONADA CONTRA LA CARA DEL TUBO, DE MANERA QUE EL EXTREMO DEL TUBO Y LA ZONA DE LA PLACA TUBULAR QUE LO RODEA SE PLASTIFICAN Y SE FUSIONAN EN UNA UNION SOLDADA
PE2010000345A2010-06-082010-06-08Metodo para unir placas tubulares y tubos, y herramientas de friccion para realizar el metodo
PE20120092A1
(es)
Un conjunto de tuberia de perforacion que comprende un cuerpo de la tuberia de perforacion, primeros y segundos adaptadores de union acoplados al cuerpo, una union de extremo con pasador reemplazable acoplada al primer adaptador de union y una union de extremo con pasador reemplazable acoplada al segundo adaptador de union; y conjunto de herramientas.
HYDRAULIC JOINT STRUCTURE, HYDRAULIC CONTROL DEVICE HAVING HYDRAULIC JOINT STRUCTURE, HYDRAULIC JOINT STRUCTURE COMPRISING JOINT PART, HYDRAULIC PRESSURE PRODUCTION UNIT HAVING JOINT PART, FRONT END TOOL UNIT HAVING A PORTION OF JOINT AND HYDRAULIC PIPE UNIT EQUIPPED WITH A SEAL PORTION