JP5800771B2 - 風力発電システム、風力発電制御装置および風力発電制御方法 - Google Patents
風力発電システム、風力発電制御装置および風力発電制御方法 Download PDFInfo
- Publication number
- JP5800771B2 JP5800771B2 JP2012177788A JP2012177788A JP5800771B2 JP 5800771 B2 JP5800771 B2 JP 5800771B2 JP 2012177788 A JP2012177788 A JP 2012177788A JP 2012177788 A JP2012177788 A JP 2012177788A JP 5800771 B2 JP5800771 B2 JP 5800771B2
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- power
- wind power
- storage battery
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P9/00—Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P9/04—Control effected upon non-electric prime mover and dependent upon electric output value of the generator
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/051—Controlling wind motors the wind motors being supported in air by airborne structures; of the tethered aircraft type
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H02J7/865—
-
- H02J2101/28—
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P2101/00—Special adaptation of control arrangements for generators
- H02P2101/15—Special adaptation of control arrangements for generators for wind-driven turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E70/00—Other energy conversion or management systems reducing GHG emissions
- Y02E70/30—Systems combining energy storage with energy generation of non-fossil origin
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Aviation & Aerospace Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Control Of Eletrric Generators (AREA)
Description
図1は、本発明の第1の実施形態に係る風力発電システム100の構成の例を示した図である。図1に示すように、風力発電システム100は、風力発電装置群1、蓄電池システム2、風力発電制御装置3、連系変圧器4を含んで構成され、連系変圧器4を介して売電先の電力系統5に連系し、システム発電電力PSをその電力系統5に送電する。
なお、充放電電力PBは、蓄電池システム2から電力が放電されるとき、正の値、蓄電池システム2へ充電されるとき、負の値になるものとする。
なお、このときの分割および分配に際しては、
PLC#1+PLC#2+・・・+PLC#n≦PLC
の関係が満たされるようにする。
なお、以下の説明では、風力発電電力PWを取得し、発電電力平均値PAを演算する風力発電制御の単位となる時間(期間)を演算期間と呼ぶ。
なお、充放電電力指令演算部34および発電電力制限指令演算部35における演算処理の詳細については、別途、図8を参照して説明する。
図11は、本発明の第2の実施形態に係る風力発電システム100aの構成の例を示した図である。また、図12は、本発明の第2の実施形態に係る風力発電制御装置3aのブロック構成の例を示した図である。第1の実施形態と第2の実施形態とでは、多くの構成要素が同じなので、同じ構成要素には同じ符号を付し、その説明を省略し、第1の実施形態と相違する構成要素についてのみ説明する。
2 蓄電池システム
3,3a 風力発電制御装置、
4 連系変圧器
5 電力系統
6,7 電力計
8 通信ネットワーク
9 売電先装置
10 風況予測装置
11 風力発電装置
12 SCADA(監視制御データ収集装置)
21 蓄電池
30 平均値演算部
31 蓄電池充電率演算部
32 SOC目標範囲演算部
33,33a 発電計画値演算部
34 充放電電力指令演算部
35 発電電力制限指令演算部
36 充放電電力指令分配部
37 予測発電力演算部
100,100a 風力発電システム
211 二次電池
212 直交流変換器
213 連系変圧器
214 遮断機
215 SOC計測部
216 充放電力制御部
PS システム発電電力
PW 風力発電電力
PB 充放電電力
PA 発電電力平均値
PT 発電計画値
PV 風況予測値
SOC 蓄電池充電率
SOCT 充電率目標範囲
PBC 充放電電力指令
PLC 発電電力制限指令
Claims (9)
- 複数の風力発電装置からなる風力発電装置群と、
複数の蓄電池からなる蓄電池システムと、
前記風力発電装置群が発電する風力発電電力と前記蓄電池システムが充放電する充放電電力とを足し合わせた電力であるシステム発電電力が、事前に設定された発電計画値の許容内範囲に収まるように前記充放電電力を制御する風力発電制御装置と、
を含んで構成され、
前記風力発電制御装置が、
現在時点以前の第1の制御期間内に、前記風力発電装置群により発電される前記風力発電電力の平均値を演算する平均値演算部と、
前記蓄電池システムの蓄電池充電率目標範囲を演算するSOC目標範囲演算部と、
前記平均値演算部で演算される前記風力発電電力の平均値に基づき、現在時点より後に設定される第2の制御期間に対する発電計画値を演算する発電計画値演算部と、
現在以降の風況を予測する風況予測装置から提供される前記第2の制御期間についての風況予測情報に基づき、前記第2の制御期間における予測風力発電電力を演算する予測発電電力演算部と、
を備え、
前記発電計画値演算部の処理として、
前記平均値演算部で演算される前記風力発電電力の平均値と前記予測発電電力演算部で演算される前記予測風力発電電力とを比較し、前記風力発電電力の平均値が前記予測風力発電電力よりも大きい場合には、前記風力発電電力の平均値を前記予測風力発電電力で置き換える補正を施し、その後、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の上限値と下限値の範囲内にある場合には、前記発電計画値として、前記風力発電電力の平均値を設定し、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の上限値を上回っている場合には、前記発電計画値として、前記風力発電電力の平均値に1より大きい正の定数を乗じた値を設定し、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の下限値を下回っている場合には、前記発電計画値として、前記風力発電電力の平均値に1より小さい正の定数を乗じた値を設定すること
を特徴とする風力発電システム。 - 前記風力発電制御装置は、
前記風力発電電力が前記発電計画値の許容範囲の上限値よりも大きいときには、前記システム発電電力が前記発電計画値の許容範囲の上限値と等しくなるように、前記充放電電力を演算し、
前記風力発電電力が前記発電計画値の許容範囲の下限値よりも小さいときには、前記システム発電電力が前記発電計画値の許容範囲の下限値と等しくなるように、前記充放電電力を演算し、
前記演算した充放電電力を充放電するように、前記蓄電池システムを制御すること
を特徴とする請求項1に記載の風力発電システム。 - 前記風力発電制御装置は、
前記風力発電装置群によって発電される前記風力発電電力が、前記発電計画値と前記蓄電池システムのその時点での充電可能電力とを足し合わせた電力を超過する場合には、その超過する電力に相当する電力の発電を制限する指令を、前記風力発電装置群に出力すること
を特徴とする請求項1または請求項2に記載の風力発電システム。 - 複数の風力発電装置からなる風力発電装置群と、
複数の蓄電池からなる蓄電池システムと、
前記風力発電装置群が発電する風力発電電力と前記蓄電池システムが充放電する充放電電力とを足し合わせた電力であるシステム発電電力が、事前に設定された発電計画値の許容範囲内に収まるように前記充放電電力を制御する風力発電制御装置と、
を含んで構成された風力発電システムに適用され、
前記風力発電制御装置が、
現在時点以前の第1の制御期間内に、前記風力発電装置群により発電される前記風力発電電力の平均値を演算する平均値演算部と、
前記蓄電池システムの蓄電池充電率目標範囲を演算するSOC目標範囲演算部と、
前記平均値演算部で演算される前記風力発電電力の平均値に基づき、現在時点より後に設定される第2の制御期間に対する発電計画値を演算する発電計画値演算部と、
現在以降の風況を予測する風況予測装置から提供される前記第2の制御期間についての風況予測情報に基づき、前記第2の制御期間における予測風力発電電力を演算する予測発電電力演算部と、
を備え、
前記発電計画値演算部の処理として、
前記平均値演算部で演算される前記風力発電電力の平均値と前記予測発電電力演算部で演算される前記予測風力発電電力とを比較し、前記風力発電電力の平均値が前記予測風力発電電力よりも大きい場合には、前記風力発電電力の平均値を前記予測風力発電電力で置き換える補正を施し、その後、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の上限値と下限値の範囲内にある場合には、前記発電計画値として、前記風力発電電力の平均値を設定し、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の上限値を上回っている場合には、前記発電計画値として、前記風力発電電力の平均値に1より大きい正の定数を乗じた値を設定し、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の下限値を下回っている場合には、前記発電計画値として、前記風力発電電力の平均値に1より小さい正の定数を乗じた値を設定すること
を特徴とする風力発電制御方法。 - 前記風力発電制御装置は、
前記風力発電電力が前記発電計画値の許容範囲の上限値よりも大きいときには、前記システム発電電力が前記発電計画値の許容範囲の上限値と等しくなるように、前記充放電電力を演算し、
前記風力発電電力が前記発電計画値の許容範囲の下限値よりも小さいときには、前記システム発電電力が前記発電計画値の許容範囲の下限値と等しくなるように、前記充放電電力を演算し、
前記演算した充放電電力を充放電するように、前記蓄電池システムを制御すること
を特徴とする請求項4に記載の風力発電制御方法。 - 前記風力発電制御装置は、
前記風力発電装置群によって発電される前記風力発電電力が、前記発電計画値と前記蓄電池システムのその時点での充電可能電力とを足し合わせた電力を超過する場合には、その超過する電力に相当する電力の発電を制限する指令を、前記風力発電装置群に出力すること
を特徴とする請求項4または請求項5に記載の風力発電制御方法。 - 複数の風力発電装置からなる風力発電装置群と、複数の蓄電池からなる蓄電池システムと、に接続され、
前記風力発電装置群が発電する風力発電電力と前記蓄電池システムが充放電する充放電電力とを足し合わせた電力であるシステム発電電力が、事前に設定された発電計画値の許容範囲内に収まるように前記充放電電力を演算して、前記演算した充放電電力を前記蓄電池システムに出力する充放電電力指令演算部と、
現在時点以前の第1の制御期間内に、前記風力発電装置群により発電される前記風力発電電力の平均値を演算する平均値演算部と、
前記蓄電池システムの蓄電池充電率目標範囲を演算するSOC目標範囲演算部と、
前記平均値演算部で演算される前記風力発電電力の平均値に基づき、現在時点より後に設定される第2の制御期間に対する発電計画値を演算する発電計画値演算部と、
現在以降の風況を予測する風況予測装置から提供される前記第2の制御期間についての風況予測情報に基づき、前記第2の制御期間における予測風力発電電力を演算する予測発電電力演算部と、
を備え、
前記発電計画値演算部の処理として、
前記平均値演算部で演算される前記風力発電電力の平均値と前記予測発電電力演算部で演算される前記予測風力発電電力とを比較し、前記風力発電電力の平均値が前記予測風力発電電力よりも大きい場合には、前記風力発電電力の平均値を前記予測風力発電電力で置き換える補正を施し、その後、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の上限値と下限値の範囲内にある場合には、前記発電計画値として、前記風力発電電力の平均値を設定し、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の上限値を上回っている場合には、前記発電計画値として、前記風力発電電力の平均値に1より大きい正の定数を乗じた値を設定し、
前記蓄電池システムの現在時点の蓄電池充電率が、前記蓄電池充電率目標範囲の下限値を下回っている場合には、前記発電計画値として、前記風力発電電力の平均値に1より小さい正の定数を乗じた値を設定すること
を特徴とする風力発電制御装置。 - 前記風力発電制御装置は、
前記風力発電電力が前記発電計画値の許容範囲の上限値よりも大きいときには、前記システム発電電力が前記発電計画値の許容範囲の上限値と等しくなるように、前記充放電電力を演算し、
前記風力発電電力が前記発電計画値の許容範囲の下限値よりも小さいときには、前記システム発電電力が前記発電計画値の許容範囲の下限値と等しくなるように、前記充放電電力を演算し、
前記演算した充放電電力を充放電するように、前記蓄電池システムを制御すること
を特徴とする請求項7に記載の風力発電制御装置。 - 前記風力発電制御装置は、
前記風力発電装置群によって発電される前記風力発電電力が、前記発電計画値と前記蓄電池システムのその時点での充電可能電力とを足し合わせた電力を超過する場合には、その超過する電力に相当する電力の発電を制限する指令を、前記風力発電装置群に出力すること
を特徴とする請求項7または請求項8に記載の風力発電制御装置。
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2012177788A JP5800771B2 (ja) | 2012-08-10 | 2012-08-10 | 風力発電システム、風力発電制御装置および風力発電制御方法 |
| KR20130093047A KR101490611B1 (ko) | 2012-08-10 | 2013-08-06 | 풍력 발전 시스템, 풍력 발전 제어 장치 및 풍력 발전 제어 방법 |
| CA2823201A CA2823201C (en) | 2012-08-10 | 2013-08-08 | Wind power generation system, wind power generation control device and wind power generation control method |
| EP13179677.3A EP2696463B1 (en) | 2012-08-10 | 2013-08-08 | Wind power generation system, wind power generation control device and wind power generation control method |
| US13/962,753 US8970058B2 (en) | 2012-08-10 | 2013-08-08 | Wind power generation system, wind power generation control device and wind power generation control method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2012177788A JP5800771B2 (ja) | 2012-08-10 | 2012-08-10 | 風力発電システム、風力発電制御装置および風力発電制御方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2014036538A JP2014036538A (ja) | 2014-02-24 |
| JP5800771B2 true JP5800771B2 (ja) | 2015-10-28 |
Family
ID=49000773
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2012177788A Active JP5800771B2 (ja) | 2012-08-10 | 2012-08-10 | 風力発電システム、風力発電制御装置および風力発電制御方法 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US8970058B2 (ja) |
| EP (1) | EP2696463B1 (ja) |
| JP (1) | JP5800771B2 (ja) |
| KR (1) | KR101490611B1 (ja) |
| CA (1) | CA2823201C (ja) |
Families Citing this family (25)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20150130154A (ko) * | 2014-05-13 | 2015-11-23 | 엘에스산전 주식회사 | 고전압 직류 송전 시스템 제어 장치 |
| CN103986189B (zh) * | 2014-05-19 | 2016-06-15 | 华北电力大学(保定) | 一种储能型双馈风电场简化模型建模方法 |
| CN104242403B (zh) * | 2014-09-29 | 2017-07-18 | 西安科技大学 | 一种风力发电系统中的控制装置 |
| JP6314883B2 (ja) * | 2014-10-20 | 2018-04-25 | 富士電機株式会社 | 風車発電システム、風車発電方法、風車発電機制御装置および風車発電機制御方法 |
| JP6287752B2 (ja) * | 2014-10-20 | 2018-03-07 | 富士電機株式会社 | 風車発電システム |
| US10270283B2 (en) * | 2014-10-21 | 2019-04-23 | Toshiba Mitsubishi-Electric Industrial Systems Corporation | Charge/discharge management device |
| CN105720795A (zh) * | 2014-12-02 | 2016-06-29 | 国家电网公司 | 风电变流控制系统 |
| CN104539025A (zh) * | 2015-01-24 | 2015-04-22 | 许云飞 | 一种新能源汽车充电桩 |
| JP6383301B2 (ja) * | 2015-02-10 | 2018-08-29 | 株式会社東芝 | 電力貯蔵装置の制御装置、風力発電システムおよび電力貯蔵装置の制御方法 |
| JP6048527B2 (ja) * | 2015-03-27 | 2016-12-21 | 日本電気株式会社 | 制御装置 |
| JP5943114B1 (ja) * | 2015-03-27 | 2016-06-29 | 日本電気株式会社 | 制御装置 |
| US10095298B2 (en) | 2015-03-27 | 2018-10-09 | Nec Corporation | Control device |
| JP6297522B2 (ja) * | 2015-06-03 | 2018-03-20 | 株式会社日本製鋼所 | 再生可能エネルギー出力システム、再生可能エネルギー出力変動抑制方法および再生可能エネルギー出力変動抑制プログラム |
| CN104882897B (zh) * | 2015-06-18 | 2018-01-19 | 中国电力科学研究院 | 一种平抑光伏功率波动的有功功率优化调度方法 |
| CN106329553A (zh) * | 2015-06-19 | 2017-01-11 | 株式会社日立制作所 | 风电场运行控制装置、方法以及风电场系统 |
| US10700524B2 (en) * | 2016-01-27 | 2020-06-30 | Mitsubishi Electric Corporation | Management device and control method |
| US10581249B2 (en) | 2017-11-14 | 2020-03-03 | Inventus Holdings, Llc | Battery energy storage system integrated with electrical generation site |
| CN109474003B (zh) * | 2018-09-12 | 2022-02-15 | 国网浙江省电力有限公司嘉兴供电公司 | 一种接入风电场的区域电网优化调度方法 |
| JP7059461B2 (ja) * | 2019-02-12 | 2022-04-26 | 東芝三菱電機産業システム株式会社 | 電力システム |
| JP7286382B2 (ja) * | 2019-04-02 | 2023-06-05 | 清水建設株式会社 | 電力管理装置及び電力管理方法 |
| JP2020183658A (ja) * | 2019-05-08 | 2020-11-12 | シンフォニアテクノロジー株式会社 | 波力発電システムおよび波力発電方法 |
| CN110518633B (zh) * | 2019-08-12 | 2023-01-13 | 苏州树森信息科技有限公司 | 考虑线路容量充裕度的电网节点新能源接纳容量获得方法 |
| JP7749999B2 (ja) * | 2021-09-17 | 2025-10-07 | 富士電機株式会社 | 電力安定化装置 |
| CN116505623B (zh) * | 2023-06-27 | 2023-12-26 | 广州汇电云联数科能源有限公司 | 一种储能电站放电功率分配方法、装置、设备及存储介质 |
| CN117087497B (zh) * | 2023-08-17 | 2024-03-08 | 广州巨湾技研有限公司 | 动力电池系统的功率控制方法、动力电池系统及存储介质 |
Family Cites Families (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2001327080A (ja) * | 2000-05-10 | 2001-11-22 | Kansai Electric Power Co Inc:The | 電力貯蔵装置及びそれを備えた分散電源システムの制御方法 |
| JP4170565B2 (ja) * | 2000-06-30 | 2008-10-22 | 株式会社ダイヘン | 電力変動平滑化装置及びそれを備えた分散電源システムの制御方法 |
| JP4639616B2 (ja) * | 2004-03-16 | 2011-02-23 | シンフォニアテクノロジー株式会社 | 発電装置 |
| US7193872B2 (en) * | 2005-01-28 | 2007-03-20 | Kasemsan Siri | Solar array inverter with maximum power tracking |
| JP2007124780A (ja) * | 2005-10-27 | 2007-05-17 | Hitachi Industrial Equipment Systems Co Ltd | 蓄電システム及び風力発電所 |
| JP2008067418A (ja) * | 2006-09-04 | 2008-03-21 | Nippon Telegr & Teleph Corp <Ntt> | 充電制御方法、蓄電装置および充電制御システム |
| US20080091590A1 (en) * | 2006-10-17 | 2008-04-17 | Gary Kremen | Methods, systems and financial instruments for financing renewable energy consumer premises equipment |
| US7890436B2 (en) * | 2006-10-17 | 2011-02-15 | Clean Power Finance, Inc. | Billing and payment methods and systems enabling consumer premises equipment |
| US20080091626A1 (en) * | 2006-10-17 | 2008-04-17 | Gary Kremen | Systems, methods and financial instruments for renewable energy consumer premises equipment financing |
| JP4796974B2 (ja) * | 2007-01-26 | 2011-10-19 | 株式会社日立産機システム | 風力発電装置と蓄電装置のハイブリッドシステム,風力発電システム,電力制御装置 |
| JP2008259357A (ja) * | 2007-04-06 | 2008-10-23 | Mitsubishi Electric Corp | 出力安定化装置 |
| JP4551921B2 (ja) * | 2007-09-27 | 2010-09-29 | 株式会社日立エンジニアリング・アンド・サービス | 蓄電システム併設型風力発電システム |
| JP5373338B2 (ja) | 2008-08-22 | 2013-12-18 | 日本風力開発株式会社 | 風力発電システム |
| JP4808754B2 (ja) * | 2008-08-28 | 2011-11-02 | 三菱電機株式会社 | 自然エネルギー発電制御システム |
| WO2010073310A1 (ja) * | 2008-12-22 | 2010-07-01 | 日本風力開発株式会社 | 蓄電池併設型自然エネルギー発電システムの電力管理制御システム |
| WO2011030380A1 (ja) * | 2009-09-10 | 2011-03-17 | 株式会社日立エンジニアリング・アンド・サービス | 発電システムの電力貯蔵装置およびその電力貯蔵装置の運用方法 |
| US8860236B2 (en) * | 2009-10-19 | 2014-10-14 | Uwm Research Foundation, Inc. | Wind energy power conversion system reducing gearbox stress and improving power stability |
| JP5383902B2 (ja) * | 2010-03-30 | 2014-01-08 | 三洋電機株式会社 | 電力供給システム、電力供給方法および電力供給システムの制御プログラム |
| US8478452B2 (en) * | 2010-04-06 | 2013-07-02 | Battelle Memorial Institute | Grid regulation services for energy storage devices based on grid frequency |
| JP2011229205A (ja) * | 2010-04-15 | 2011-11-10 | Japan Wind Development Co Ltd | 蓄電池併設型自然エネルギー発電システムに用いる電力管理制御システム |
| US9178369B2 (en) * | 2011-01-18 | 2015-11-03 | Mojo Mobility, Inc. | Systems and methods for providing positioning freedom, and support of different voltages, protocols, and power levels in a wireless power system |
| JP5526079B2 (ja) * | 2011-05-30 | 2014-06-18 | 株式会社日立パワーソリューションズ | 風力発電システムおよび風力発電システムにおける風力発電機増設方法 |
| US9007027B2 (en) * | 2012-01-31 | 2015-04-14 | Green Charge Networks Llc | Charge management for energy storage temperature control |
| CA2837414C (en) * | 2012-12-14 | 2022-12-13 | Battelle Memorial Institute | Transactive control and coordination framework and associated toolkit functions |
-
2012
- 2012-08-10 JP JP2012177788A patent/JP5800771B2/ja active Active
-
2013
- 2013-08-06 KR KR20130093047A patent/KR101490611B1/ko not_active Expired - Fee Related
- 2013-08-08 US US13/962,753 patent/US8970058B2/en active Active
- 2013-08-08 CA CA2823201A patent/CA2823201C/en not_active Expired - Fee Related
- 2013-08-08 EP EP13179677.3A patent/EP2696463B1/en not_active Not-in-force
Also Published As
| Publication number | Publication date |
|---|---|
| EP2696463A3 (en) | 2016-07-27 |
| US8970058B2 (en) | 2015-03-03 |
| KR20140020762A (ko) | 2014-02-19 |
| US20140042747A1 (en) | 2014-02-13 |
| KR101490611B1 (ko) | 2015-02-05 |
| CA2823201C (en) | 2015-11-24 |
| JP2014036538A (ja) | 2014-02-24 |
| EP2696463A2 (en) | 2014-02-12 |
| CA2823201A1 (en) | 2014-02-10 |
| EP2696463B1 (en) | 2021-11-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5800771B2 (ja) | 風力発電システム、風力発電制御装置および風力発電制御方法 | |
| JP6070773B2 (ja) | 電力制御システム及び方法 | |
| JP5526079B2 (ja) | 風力発電システムおよび風力発電システムにおける風力発電機増設方法 | |
| WO2011030380A1 (ja) | 発電システムの電力貯蔵装置およびその電力貯蔵装置の運用方法 | |
| JPWO2015037654A1 (ja) | 制御装置、蓄電装置、電池制御システム、電池制御装置、制御方法、電池制御方法および記録媒体 | |
| JP2017022975A (ja) | 風力発電所の運転制御装置、運転制御方法及び風力発電システム | |
| Benini et al. | Battery energy storage systems for the provision of primary and secondary frequency regulation in Italy | |
| Eltamaly | A novel energy storage and demand side management for entire green smart grid system for NEOM city in Saudi Arabia | |
| JPWO2013038482A1 (ja) | ピークカット制御装置 | |
| JP4192131B2 (ja) | 二次電池を用いた発電計画方法および発電計画装置 | |
| JP5453288B2 (ja) | ナトリウム−硫黄電池の制御方法 | |
| JP6705319B2 (ja) | 統括制御装置、統括制御システム、統括制御方法および統括制御プログラム | |
| Yuvaraj et al. | Enhancing Smart Microgrid Resilience and Virtual Power Plant Profitability through Hybrid IGWO-PSO Optimization with a Three-Phase Bidding Strategy | |
| Kadel et al. | On battery storage system for load pickup in power system restoration | |
| Thien et al. | Life cycle cost calculation and comparison for different reference cases and market segments | |
| JP5600066B2 (ja) | ナトリウム−硫黄電池の制御方法 | |
| KR20130077934A (ko) | 배터리 에너지 저장 시스템 | |
| JP7092558B2 (ja) | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム | |
| Koutroulis et al. | Optimal design and economic evaluation of a battery energy storage system for the maximization of the energy generated by wind farms in isolated electric grids | |
| Hu et al. | Evaluation of BESS management strategies for grid primary and enhanced frequency response | |
| Sage et al. | The Economic Dispatch of Power-to-Gas Systems With Deep Reinforcement Learning: Tackling the Challenge of Delayed Rewards With Long-Term Energy Storage | |
| JP2018097802A (ja) | 電力課金システム、蓄電システム、補助システム | |
| Kazari et al. | Predictive utilization of energy storage for wind power fluctuation mitigation | |
| JP2020188521A (ja) | 蓄電池運転装置および蓄電池運転方法 | |
| Durga | Optimizing energy management in hybrid PV-wind-battery |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20140819 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20150520 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20150526 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20150721 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20150818 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20150825 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5800771 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |