[go: up one dir, main page]

JP2018070362A - Elevator installation method - Google Patents

Elevator installation method Download PDF

Info

Publication number
JP2018070362A
JP2018070362A JP2016214927A JP2016214927A JP2018070362A JP 2018070362 A JP2018070362 A JP 2018070362A JP 2016214927 A JP2016214927 A JP 2016214927A JP 2016214927 A JP2016214927 A JP 2016214927A JP 2018070362 A JP2018070362 A JP 2018070362A
Authority
JP
Japan
Prior art keywords
guide rail
hoistway
work floor
lowermost
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2016214927A
Other languages
Japanese (ja)
Inventor
伊藤 雅人
Masahito Ito
雅人 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2016214927A priority Critical patent/JP2018070362A/en
Priority to CN201711058923.2A priority patent/CN108016971A/en
Publication of JP2018070362A publication Critical patent/JP2018070362A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides
    • B66B7/023Mounting means therefor
    • B66B7/027Mounting means therefor for mounting auxiliary devices

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

【課題】据付用作業床の昇降を案内するガイドレールを昇降路に取り付ける際に、固定足場を不要として、据付費用を低減することのできるエレベータの据付方法を提供する。【解決手段】エレベータの乗かごが昇降する昇降路の底部にピットベースを組み立てる工程と、ピットベース上の、乗りかごが昇降する空間を挟んで対向する所定の位置に最下部ガイドレールを立設し、ピットベースに最下部ガイドレールの下部を固定する工程と、昇降路底部を足場として、最下部ガイドレールを第1のレールブラケットで昇降路に固定する工程と、最下部ガイドレールに固定支持した状態で据付用作業床を組み上げる工程と、ピットベースを配置する工程の後であって、据付用作業床を組み上げる工程の前までに、ピットベースを昇降路底部に固定する工程と、組み上げた据付用作業床を上昇させる工程とを有する。【選択図】図1Provided is an elevator installation method that does not require a fixed scaffold when mounting a guide rail for guiding the elevation of an installation work floor to a hoistway, thereby reducing installation costs. A step of assembling a pit base at the bottom of a hoistway where a car of an elevator moves up and down, and a lowermost guide rail is erected at a predetermined position on the pit base opposite to a space where the car moves up and down. And fixing the lower part of the lowermost guide rail to the pit base, fixing the lowermost guide rail to the hoistway with the first rail bracket using the hoistway bottom as a scaffold, and fixing and supporting the lowermost guide rail. After the step of assembling the work floor for installation and the step of arranging the pit base, and before the step of assembling the work floor for installation, the step of fixing the pit base to the hoistway bottom was assembled. Elevating the installation work floor. [Selection diagram] Fig. 1

Description

本発明は、エレベータの据付方法に関し、特に、エレベータのガイドレールの据付方法に関する。   The present invention relates to an elevator installation method, and more particularly to an elevator guide rail installation method.

従来のエレベータの据付作業では、昇降路頂部に設けた揚重機に駆動される揚重ロープを昇降路に配置された据付用作業床に固定し、揚重機を駆動することで揚重ロープを介して据付用作業床を昇降させ、据付用作業床に乗った作業者が昇降路内の機器の据付作業を行っている(特許文献1参照)。   In conventional elevator installation work, a lifting rope driven by a lifting machine provided at the top of the hoistway is fixed to an installation work floor disposed in the hoistway, and the lifting machine is driven via the lifting rope. Then, the installation work floor is raised and lowered, and an operator on the installation work floor performs the installation work of the equipment in the hoistway (see Patent Document 1).

特開2005−162416号公報JP 2005-162416 A

ところで、従来のエレベータの据付方法では、据付用作業床の昇降を案内するガイドレールを立設する際は、昇降路底部(床面)に固定の足場を仮設し、その固定足場を用いてガイドレールを昇降路に固定する作業が行われている。このように、昇降路内に固定足場を仮設する場合、機材の運搬、設置等に係る作業量が増大すると共に据付費用が増大してしまう問題がある。   By the way, in the conventional elevator installation method, when a guide rail for guiding the lifting of the work floor for installation is erected, a fixed scaffolding is temporarily installed on the bottom (floor surface) of the hoistway, and the guide is used by using the fixed scaffolding. The work which fixes a rail to a hoistway is performed. As described above, when a fixed scaffold is temporarily installed in the hoistway, there is a problem that the amount of work related to the transportation and installation of equipment increases and the installation cost increases.

そこで、本発明は、据付用作業床の昇降を案内するガイドレールを昇降路に取り付ける際に、固定足場を不要として、据付費用を低減することのできるエレベータの据付方法を提供することを目的とする。   Accordingly, an object of the present invention is to provide an elevator installation method that eliminates the need for a fixed scaffold and reduces the installation cost when a guide rail that guides the elevation of the installation work floor is attached to the hoistway. To do.

上記課題を解決し、本発明の目的を達成するため、本発明のエレベータの据付方法は、エレベータの乗かごが昇降する昇降路の底部にピットベースを組み立てる工程と、ピットベース上の、乗りかごが昇降する空間を挟んで対向する所定の位置に最下部ガイドレールを立設し、ピットベースに最下部ガイドレールの下部を固定する工程と、昇降路底部を足場として、最下部ガイドレールを第1のレールブラケットで昇降路に固定する工程と、最下部ガイドレールに固定支持した状態で据付用作業床を組み上げる工程と、ピットベースを配置する工程の後であって、据付用作業床を組み上げる工程の前までに、ピットベースを昇降路底部に固定する工程と、組み上げた据付用作業床を上昇させる工程とを有する。   In order to solve the above-described problems and achieve the object of the present invention, an elevator installation method according to the present invention includes a step of assembling a pit base at the bottom of a hoistway where an elevator car moves up and down, and a car on the pit base. The lowermost guide rail is erected at a predetermined position facing the space in which the lower and upper walls are lifted, and the lower portion of the lowermost guide rail is fixed to the pit base. After the process of fixing to the hoistway with one rail bracket, the process of assembling the installation work floor while being fixedly supported by the lowermost guide rail, and the process of arranging the pit base, the work floor for installation is assembled Before the process, the process includes a process of fixing the pit base to the bottom of the hoistway and a process of raising the assembled installation work floor.

本発明によれば、ガイドレールを設置する際に、昇降路底部に固定足場を組み立てる必要がないため、据付費用の削減を図ることができる。   According to the present invention, when installing the guide rail, it is not necessary to assemble a fixed scaffold at the bottom of the hoistway, so that the installation cost can be reduced.

本発明の一実施形態に係るエレベータの据付方法を示すフローチャートである。It is a flowchart which shows the installation method of the elevator which concerns on one Embodiment of this invention. 本発明の一実施形態に係るエレベータの据付方法における最下段のガイドレールの取り付け工程及び据付用作業床の組み立て工程を終えた状態を示す図である。It is a figure which shows the state which completed the attachment process of the lowermost guide rail in the elevator installation method which concerns on one Embodiment of this invention, and the assembly process of the work floor for installation. 図3Aは本発明の一実施形態に係るエレベータの据付方法に適用されるピットベースを一方の側から見た場合の構成図であり、図3Bは、ピットベースを上面から見た場合の構成図であり、図3Cはピットベースの他方の側から見た場合の構成図である。FIG. 3A is a configuration diagram when the pit base applied to the elevator installation method according to one embodiment of the present invention is viewed from one side, and FIG. 3B is a configuration diagram when the pit base is viewed from the top surface. FIG. 3C is a configuration diagram when viewed from the other side of the pit base. 本発明の一実施形態に係るエレベータの据付方法に適用されるガイドレールを概略的に示した斜視図である。It is the perspective view which showed schematically the guide rail applied to the installation method of the elevator which concerns on one Embodiment of this invention. 本発明の一実施形態に係るエレベータの据付方法における最下部ガイドレールの2段目レールブラケット取り付け工程を示す図である。It is a figure which shows the 2nd step rail bracket attachment process of the lowest guide rail in the elevator installation method which concerns on one Embodiment of this invention. 本発明の一実施形態に係るエレベータの据付方法における中間部のガイドレールの取り付け工程を示す図である。It is a figure which shows the attachment process of the guide rail of the intermediate part in the elevator installation method which concerns on one Embodiment of this invention. 本発明の一実施形態に係るエレベータの据付方法における最上部のガイドレールの取り付け工程を示す図である。It is a figure which shows the attachment process of the uppermost guide rail in the elevator installation method which concerns on one Embodiment of this invention.

以下、本発明の一実施形態に係るエレベータの据付方法の一例を、図面を参照しながら説明する。なお、本発明は以下の例に限定されるものではない。   Hereinafter, an example of an elevator installation method according to an embodiment of the present invention will be described with reference to the drawings. In addition, this invention is not limited to the following examples.

図1は、本発明の一実施形態に係るエレベータ1の据付方法を示すフローチャートであり、図2は、本発明の一実施形態に係るエレベータ1の据付方法において、最下部のガイドレール11の取り付け工程及び据付用作業床14の組み立て工程を終えた状態を示す昇降路2の断面図である。本実施形態は、図2に示すように、エレベータ1の昇降路2内に、ガイドレール11,12,13を順に組み立てて行く例について説明するものである。なお、以下の説明において、ガイドレール11,12,13を区別する場合には、それぞれ、最下部ガイドレール11,中間部ガイドレール12,最上部ガイドレール13と記す。   FIG. 1 is a flowchart showing a method for installing an elevator 1 according to an embodiment of the present invention, and FIG. 2 shows how to install a lowermost guide rail 11 in the method for installing an elevator 1 according to an embodiment of the present invention. It is sectional drawing of the hoistway 2 which shows the state which finished the process and the assembly process of the work floor 14 for installation. This embodiment demonstrates the example which assembles the guide rails 11, 12, and 13 in order in the hoistway 2 of the elevator 1, as shown in FIG. In the following description, when the guide rails 11, 12, and 13 are distinguished from each other, they are referred to as a lowermost guide rail 11, an intermediate guide rail 12, and an uppermost guide rail 13, respectively.

まず、本実施形態に係るエレベータ1の据付方法では、最下部ガイドレール11の取り付け作業に先立ち、トップステージ3の組立工程と、揚重機5,6の設置工程を行う(ステップS1)。図2に示すように、トップステージ3は、エレベータ1の乗りかごが昇降する昇降路2の頂部に後述のレール揚重機5及び作業床揚重機6を設置するための作業床であり、エレベータ1の最上階の乗り場から昇降路2内に延設して組み上げられた跳ね出しの足場である。トップステージ3は、作業者Xが、昇降路2頂部に、レール揚重機5及び作業床揚重機6を設置可能な程度に昇降路2内に張り出して設けられる。   First, in the elevator 1 installation method according to the present embodiment, prior to the installation work of the lowermost guide rail 11, an assembly process of the top stage 3 and an installation process of the lifting machines 5 and 6 are performed (step S1). As shown in FIG. 2, the top stage 3 is a work floor for installing a rail lifting machine 5 and a work floor lifting machine 6 to be described later on the top of a hoistway 2 in which a car of the elevator 1 moves up and down. This is a jumping-out scaffold built up from the landing on the top floor in the hoistway 2. The top stage 3 is provided so as to project into the hoistway 2 so that the operator X can install the rail hoist 5 and the work floor hoist 6 at the top of the hoistway 2.

作業者Xは、トップステージ3を組み立てた後、トップステージ3を足場として、昇降路2頂部にレール揚重機5及び作業床揚重機6を吊り下げ可能な吊りビーム4を設置する。そして、その吊りビーム4に、ガイドレール11,12,13を吊り上げる為のレール揚重機5と、後述する据付用作業床14を昇降させる作業床揚重機6とを設置する。レール揚重機5及び作業床揚重機6は、それぞれ、フック5a,6aによって吊りビーム4に取り付けられる。そして、レール揚重機5及び作業床揚重機6には、それぞれ揚重ロープ7,8が保持されている。   After assembling the top stage 3, the worker X installs the suspension beam 4 that can suspend the rail lifting machine 5 and the work floor lifting machine 6 on the top of the hoistway 2 using the top stage 3 as a scaffold. Then, a rail lifting machine 5 for lifting the guide rails 11, 12, and 13 and a work floor lifting machine 6 for raising and lowering an installation work floor 14 to be described later are installed on the suspension beam 4. The rail lifting machine 5 and the work floor lifting machine 6 are attached to the suspension beam 4 by hooks 5a and 6a, respectively. The rail hoist 5 and the work floor hoist 6 hold hoisting ropes 7 and 8, respectively.

これらのレール揚重機5及び作業床揚重機6は、建屋電源から引いた動力電源ケーブル(図示を省略する)に接続されており、それぞれの揚重ロープ7,8の吊り上げ吊り下げが行われる。また、レール揚重機5の揚重ロープ7の先端には、ガイドレール保持部9が設けられている。本実施形態では、レール揚重機5及び作業床揚重機6の取り付け後は、所定のタイミングでトップステージ3は取り外される。   The rail lifting machine 5 and the work floor lifting machine 6 are connected to a power supply cable (not shown) drawn from the building power source, and the lifting ropes 7 and 8 are suspended and suspended. Further, a guide rail holding part 9 is provided at the tip of the lifting rope 7 of the rail lifting machine 5. In the present embodiment, after the rail lifting machine 5 and the work floor lifting machine 6 are attached, the top stage 3 is removed at a predetermined timing.

次に、ピットベース10の組立工程、最下部ガイドレール11の配置工程、第1のレールブラケット16(以下、最下段レールブラケット16)の固定工程を順に行う(ステップS2)。図3Aは本実施形態に係るエレベータ1の据付方法に適用されるピットベース10を一方の側から見た場合の構成図であり、図3Bは、ピットベース10を上面から見た場合の構成図であり、図3Cはピットベース10の他方の側から見た場合の構成図である。   Next, an assembly process of the pit base 10, an arrangement process of the lowermost guide rail 11, and a fixing process of the first rail bracket 16 (hereinafter, the lowermost rail bracket 16) are sequentially performed (step S2). 3A is a configuration diagram when the pit base 10 applied to the elevator 1 installation method according to the present embodiment is viewed from one side, and FIG. 3B is a configuration diagram when the pit base 10 is viewed from the top surface. FIG. 3C is a configuration diagram when viewed from the other side of the pit base 10.

本実施形態で用いられるピットベース10は、図3A及び図3Bに示すように、細長い梁状の部材で構成されたピットベース本体18と、そのピットベース本体18の長手方向に沿う両端面にボルト20で固定された2つのガイドレール受け部19とで構成されている。ピットベース本体18は、立設する最下部ガイドレール11の間隔を規定する部材であり、エレベータ毎に所望の長さで構成される。本実施形態では、ピットベース本体18は、図示を省略するが、短手方向に沿う断面がコ字状の部材で構成されており、長手方向の両端部には、その短手方向の両側に張り出すように形成され、ガイドレール受け部19とボルト締結する際に用いられるボルト穴が形成された張り出し部18aが設けられている。   As shown in FIGS. 3A and 3B, the pit base 10 used in the present embodiment includes a pit base main body 18 formed of an elongated beam-like member, and bolts on both end surfaces along the longitudinal direction of the pit base main body 18. And two guide rail receiving portions 19 fixed at 20. The pit base body 18 is a member that defines the interval between the lowermost guide rails 11 to be erected, and is configured with a desired length for each elevator. In the present embodiment, the pit base main body 18 is not shown in the figure, but the cross section along the short direction is configured by a U-shaped member, and both ends in the longitudinal direction are on both sides in the short direction. An overhanging portion 18a is formed which is formed so as to overhang and is formed with a bolt hole used when fastening the bolt with the guide rail receiving portion 19.

ガイドレール受け部19は、最下部ガイドレール11が設置される水平面を有する平面部19aと、その平面部19aを挟んで上方向に延びる外側折り曲げ部19b及びピットベース本体側折り曲げ部19cを有する。ピットベース本体側折り曲げ部19cには、ピットベース本体18の張り出し部18aに設けられたボルト穴に対応する位置にボルト穴が設けられている。外側折り曲げ部19bは、後で設置される最下部ガイドレール11の底部を、レールクリップ23によって外側折り曲げ部19bに固定できる程度の高さに折り曲げられている。外側折り曲げ部19bにおいても、最下部ガイドレール11固定用のレールクリップ23に設けられたボルト穴に対応する位置にボルト穴が設けられている。   The guide rail receiving portion 19 includes a flat portion 19a having a horizontal surface on which the lowermost guide rail 11 is installed, an outer bent portion 19b and a pit base main body side bent portion 19c extending upward with the flat portion 19a interposed therebetween. The pit base body side bent portion 19c is provided with a bolt hole at a position corresponding to the bolt hole provided in the projecting portion 18a of the pit base body 18. The outer bent portion 19b is bent to a height at which the bottom portion of the lowermost guide rail 11 to be installed later can be fixed to the outer bent portion 19b by the rail clip 23. Also in the outer side bending part 19b, the bolt hole is provided in the position corresponding to the bolt hole provided in the rail clip 23 for fixing the lowermost guide rail 11.

ピットベース10は、ピットベース本体18の張り出し部18aと、ガイドレール受け部19のピットベース側折り曲げ部19cとがボルト20によって締結されることによって、ピットベース本体18の長手方向の両端面にガイドレール受け部19が固定されている。そして、ピットベース10は、この状態で昇降路2内に搬入され、昇降路底部31の所定の位置に組み立てられる。   The pit base 10 is guided to both end surfaces in the longitudinal direction of the pit base body 18 by fastening the overhanging portion 18 a of the pit base body 18 and the pit base side bent portion 19 c of the guide rail receiving portion 19 with bolts 20. The rail receiving part 19 is fixed. In this state, the pit base 10 is carried into the hoistway 2 and assembled at a predetermined position on the hoistway bottom 31.

作業者は、ピットベース10を昇降路底部31に組み立てた後、最下部ガイドレール11をレール揚重機5で吊上げながらガイドレール受け部19上に立設する。最下部ガイドレール11は、レール揚重機5の揚重ロープ7の先端に設けられたガイドレール保持部9に保持され、鉛直方向に吊り上げられながら、ガイドレール受け部19の平面部19aに配置される。   After assembling the pit base 10 on the hoistway bottom 31, the operator stands on the guide rail receiving portion 19 while lifting the lowermost guide rail 11 with the rail hoist 5. The lowermost guide rail 11 is held by a guide rail holding portion 9 provided at the tip of the lifting rope 7 of the rail hoist 5 and is arranged on the flat portion 19a of the guide rail receiving portion 19 while being lifted in the vertical direction. The

図4は、本実施形態で用いられる最下部ガイドレール11の概略斜視図である。図4に示すように、本実施形態の最下部ガイドレール11は、壁側に固定する際に、後述するレールブラケット16が取り付けられるフランジ部11bと、後述する据付用作業床14や乗りかごの昇降をガイドするガイド部11cとからなる断面がT字形状の部材で構成されている。最下部ガイドレール11の上端には、フランジ部11bの背面側にボルト26で締結された継目板11aが設けられている。継目板11aには、上側に配置されるガイドレール(本実施形態では、中間部ガイドレール12)とのボルト締結のためのボルト穴25が設けられている。このような構成の最下部ガイドレール11は、継目板11aが上端にくるようにガイドレール受け部19上に設置され、かつ、最下部ガイドレール11のフランジ部11bのガイド部11cが設けられている側とは反対側の背面とガイドレール受け部19の外側折り曲げ部19bとが接するように設置される。   FIG. 4 is a schematic perspective view of the lowermost guide rail 11 used in the present embodiment. As shown in FIG. 4, the lowermost guide rail 11 of the present embodiment has a flange portion 11b to which a rail bracket 16 (to be described later) is attached and a work floor 14 for installation (to be described later) and a passenger car. A cross section composed of a guide portion 11c that guides raising and lowering is constituted by a T-shaped member. At the upper end of the lowermost guide rail 11, a joint plate 11a fastened with a bolt 26 is provided on the back side of the flange portion 11b. The joint plate 11a is provided with a bolt hole 25 for fastening a bolt with a guide rail (in this embodiment, the intermediate guide rail 12) arranged on the upper side. The lowermost guide rail 11 having such a configuration is installed on the guide rail receiving portion 19 so that the joint plate 11a comes to the upper end, and the guide portion 11c of the flange portion 11b of the lowermost guide rail 11 is provided. It is installed so that the back surface on the opposite side to the side where it is and the outer bent portion 19b of the guide rail receiving portion 19 are in contact with each other.

なお、本実施形態は、3段のガイドレール11,12,13を取り付ける例であり、ガイドレールの据付時には、最下部ガイドレール11の他、中間部(2段目)ガイドレール12と最上部(3段目)ガイドレール13とが昇降路2内に搬入されている。ガイドレール12,13についても最下部ガイドレール11と同様、断面T字形状の部材で構成されているが、中間部ガイドレール12には最下部ガイドレール11と同様の上端部に継目板12aが取り付けられており、最上部ガイドレール13には継目板は取り付けられていない。   The present embodiment is an example in which the three-stage guide rails 11, 12, and 13 are attached. When installing the guide rail, in addition to the lowermost guide rail 11, the middle (second stage) guide rail 12 and the uppermost part are provided. (Third stage) A guide rail 13 is carried into the hoistway 2. The guide rails 12 and 13 are also made of a member having a T-shaped cross section like the lowermost guide rail 11, but the intermediate portion guide rail 12 has a joint plate 12 a at the same upper end as the lowermost guide rail 11. The seam plate is not attached to the uppermost guide rail 13.

最下部ガイドレール11をガイドレール受け部19上に立設した後、図3A及び図3Bに示すように、レールクリップ23を用いて最下部ガイドレール11の下部と、ガイドレール受け部19とを固定する。最下部ガイドレール11は、最下部ガイドレール11のフランジ部11bとガイドレール受け部19の外側折り曲げ部19bとをレールクリップ23で挟み、ボルト24で締結することでガイドレール受け部19に固定される。   After the lowermost guide rail 11 is erected on the guide rail receiving portion 19, as shown in FIGS. 3A and 3B, the lower portion of the lowermost guide rail 11 and the guide rail receiving portion 19 are connected using the rail clip 23. Fix it. The lowermost guide rail 11 is fixed to the guide rail receiving portion 19 by sandwiching the flange portion 11b of the lowermost guide rail 11 and the outer bent portion 19b of the guide rail receiving portion 19 with a rail clip 23 and fastening with a bolt 24. The

次に、図2に示すように、作業者Xは昇降路底部31を足場として、最下部ガイドレール11を最下段レールブラケット16で昇降路2の内壁に固定する。最下段レールブラケット16は、昇降路2の壁面や建屋の梁などに設置されているファスナ(図示を省略する)に、例えばボルト等で固定される。最下段レールブラケット16の位置は、エレベータの仕様や、ガイドレールの仕様によって異なるが、作業者が昇降路底部31を足場として取り付けられる位置であればよく、例えば、昇降路底部31から800mm程度の高さに取り付けられる。   Next, as shown in FIG. 2, the worker X fixes the lowermost guide rail 11 to the inner wall of the hoistway 2 with the lowermost rail bracket 16 using the hoistway bottom 31 as a scaffold. The lowermost rail bracket 16 is fixed to a fastener (not shown) installed on a wall surface of the hoistway 2 or a beam of a building with a bolt or the like, for example. The position of the lowermost rail bracket 16 differs depending on the specifications of the elevator and the specifications of the guide rail, but may be any position where an operator can attach the hoistway bottom 31 as a scaffold, for example, about 800 mm from the hoistway bottom 31. Mounted at height.

次に、ピットベース10の固定工程(ステップS3)を行う。ピットベース10の昇降路底部31に対する固定は、図3A、図3B及び図3Cに示すように、ガイドレール受け部19をレールクリップ21とアンカーボルト22で昇降路底部31に固定することで行われる。本実施形態では、図3Bに示すように、ピットベース10は、1つのガイドレール受け部19に対して、最下部ガイドレール11を挟む2箇所で昇降路底部31に固定される。ガイドレール受け部19を昇降路底部31に固定するためのレールクリップ21は、ガイドレール受け部19の平面部19aから昇降路底部31に延在する部材で構成されている。そして、レールクリップ21でガイドレール受け部19の平面部19aを挟み、このレールクリップ23をアンカーボルト22で昇降路底部31に固定することで、ガイドレール受け部19が昇降路底部31に固定されると共に、ピットベース10が昇降路底部31に固定される。   Next, a fixing process (step S3) of the pit base 10 is performed. The pit base 10 is fixed to the hoistway bottom 31 by fixing the guide rail receiving part 19 to the hoistway bottom 31 with a rail clip 21 and an anchor bolt 22 as shown in FIGS. 3A, 3B and 3C. . In the present embodiment, as shown in FIG. 3B, the pit base 10 is fixed to the hoistway bottom 31 at two locations sandwiching the lowermost guide rail 11 with respect to one guide rail receiving portion 19. The rail clip 21 for fixing the guide rail receiving part 19 to the hoistway bottom part 31 is composed of a member extending from the flat part 19 a of the guide rail receiving part 19 to the hoistway bottom part 31. Then, the guide rail receiving portion 19 is fixed to the hoistway bottom portion 31 by sandwiching the flat portion 19a of the guide rail receiving portion 19 with the rail clip 21 and fixing the rail clip 23 to the hoistway bottom portion 31 with the anchor bolts 22. In addition, the pit base 10 is fixed to the hoistway bottom 31.

最下部ガイドレール11を挟んで設けられる2つのアンカーボルト22の幅は、最下部ガイドレール11のフランジ部11bの幅よりも大きければよく、後述する据付用作業床14の昇降に伴うモーメント荷重を支持できる程度にガイドレール受け部19に固定できる幅であればよい。また、アンカーボルト22の深さや、材質等も、エレベータの仕様によって種々選択されるものである。アンカーボルト22としては、耐水性を有するものを用いることが好ましい。耐水性を有するアンカーボルト22としては、例えばケミカルアンカー等が挙げられる。耐水性を有するアンカーボルト22を用いることによって、昇降路底部31の床から地下水等が溢れ出ることを防止することができる。   The width of the two anchor bolts 22 provided across the lowermost guide rail 11 only needs to be larger than the width of the flange portion 11b of the lowermost guide rail 11, and the moment load accompanying the raising and lowering of the installation work floor 14 described later is applied. The width may be any width that can be fixed to the guide rail receiving portion 19 to such an extent that it can be supported. Further, the depth, material, and the like of the anchor bolt 22 are variously selected depending on the specifications of the elevator. As the anchor bolt 22, it is preferable to use a bolt having water resistance. Examples of the anchor bolt 22 having water resistance include a chemical anchor. By using the anchor bolt 22 having water resistance, it is possible to prevent the groundwater and the like from overflowing from the floor of the hoistway bottom 31.

ガイドレール受け部19がアンカーボルト22によって昇降路底部31に固定されることにより、ピットベース10の長手方向の両端部が昇降路底部31に固定される。ここまでの工程により、最下部ガイドレール11は、アンカーボルト22及び最下段レールブラケット16により、昇降路2内に固定されている。   The guide rail receiving portion 19 is fixed to the hoistway bottom 31 by the anchor bolts 22, so that both end portions in the longitudinal direction of the pit base 10 are fixed to the hoistway bottom 31. Through the steps so far, the lowermost guide rail 11 is fixed in the hoistway 2 by the anchor bolt 22 and the lowermost rail bracket 16.

次に、据付用作業床14の組み立て工程(ステップS4)を行う。作業者Xは、昇降路底部31を足場として、最下部ガイドレール11の中間位置であって、最下部乗り場よりも上方位置に、据付用作業床14のストッパーとなる作業床受け雇15を設置する。作業床受け雇15は、据付用作業床14を支持固定可能な部材(例えばアングル)で構成されており、図示を省略するが、最下部ガイドレール11にボルト締結される。   Next, an assembly process (step S4) of the installation work floor 14 is performed. The worker X installs a work floor employee 15 serving as a stopper for the installation work floor 14 at a middle position of the lowermost guide rail 11 and above the lowermost landing with the hoistway bottom 31 as a foothold. To do. The work floor receiver 15 is composed of a member (for example, an angle) capable of supporting and fixing the work floor 14 for installation, and is bolted to the lowermost guide rail 11 although not shown.

そして、作業床受け雇15を設置した後、この作業床受け雇15に支持させながら、最下部ガイドレール11に係合するように据付用作業床14の組み立てを行う。本実施形態の据付用作業床14は、作業者Xの足場となるかご床14a、作業者Xの安全性を確保するための手すり14b、及び、かご床14aの上面側の作業者Xが乗車するスペースよりも上部側に設けられた防護天井14cを有する。   Then, after the work floor supporter 15 is installed, the installation work floor 14 is assembled so as to engage with the lowermost guide rail 11 while being supported by the work floor supporter 15. The installation work floor 14 of the present embodiment is loaded with a car floor 14a that serves as a scaffold for the worker X, a handrail 14b for ensuring the safety of the worker X, and the worker X on the upper surface side of the car floor 14a. A protective ceiling 14c provided on the upper side of the space to be used.

本実施形態では、作業床受け雇15が最下部乗り場よりも上方位置に取り付けられているため、据付用作業床14も最下部乗り場よりも上方位置に組み上げられる。これにより、作業者Xは、据付用作業床14に乗ることもでき、かつ、最下部乗り場と据付用作業床14との隙間から昇降路底部31に入ることもできる。これにより、作業性が向上する。   In this embodiment, since the work floor employee 15 is attached above the lowermost landing, the installation work floor 14 is also assembled above the lowermost landing. Thereby, the worker X can get on the installation work floor 14 and can enter the hoistway bottom 31 through the gap between the lowermost landing and the installation work floor 14. Thereby, workability | operativity improves.

据付用作業床14を組み上げた後、図2に示すように、据付用作業床14と作業床揚重機6によって駆動される揚重ロープ8とを連結する。これにより、据付用作業床14は、昇降路2を最下部ガイドレール11に案内されながら昇降可能になる。また、据付用作業床14を組み立て、作業床揚重機6の揚重ロープ7に連結した後は、作業床受け雇15は取り外してよい。   After assembling the installation work floor 14, the installation work floor 14 and the lifting rope 8 driven by the work floor lifting machine 6 are connected as shown in FIG. 2. Thereby, the installation work floor 14 can be raised and lowered while being guided by the lowermost guide rail 11 in the hoistway 2. Further, after the installation work floor 14 is assembled and connected to the lifting rope 7 of the work floor lifting machine 6, the work floor worker 15 may be removed.

次に、据付用作業床14の上昇工程と第2のレールブラケット27(以下、2段目レールブラケット27)の取り付け工程を順に行う(ステップS5)。図5は、本発明の一実施形態に係るエレベータ1の据付方法における最下部ガイドレール11の2段目レールブラケット27の取り付け工程を示す図である。据付用作業床14の昇降工程では、作業床揚重機6を駆動して揚重ロープ8を上昇させることにより据付用作業床14を上昇させる。このとき、据付用作業床14に乗車した作業車Xが、最下部ガイドレール11の2段目レールブラケット27を取り付ける位置に届く位置まで据付用作業床14を上昇させる。そして、所望の位置に据付用作業床14を上昇させたら、作業者Xは、据付用作業床14を足場として、2段目レールブラケット27で最下部ガイドレール11の上部を昇降路2の内壁に固定する作業を行う。本実施形態では、2段目レールブラケット27は、最下部ガイドレール11の中心よりも上方に取り付けられる。   Next, the ascending process of the installation work floor 14 and the attaching process of the second rail bracket 27 (hereinafter, second-stage rail bracket 27) are sequentially performed (step S5). FIG. 5 is a diagram illustrating a process of attaching the second-stage rail bracket 27 of the lowermost guide rail 11 in the elevator 1 installation method according to the embodiment of the present invention. In the raising / lowering process of the installation work floor 14, the work floor lifting machine 6 is driven to raise the lifting rope 8 to raise the installation work floor 14. At this time, the work vehicle X on the work floor 14 is raised to a position where the work vehicle X reaches the position where the second rail bracket 27 of the lowermost guide rail 11 is attached. When the installation work floor 14 is raised to a desired position, the worker X uses the installation work floor 14 as a foothold, and the second stage rail bracket 27 is used to connect the upper part of the lowermost guide rail 11 to the inner wall of the hoistway 2. Work to fix to. In the present embodiment, the second-stage rail bracket 27 is attached above the center of the lowermost guide rail 11.

本実施形態では、据付用作業床14を上昇させる前の工程において、最下部ガイドレール11は、昇降路底部31に固定されたガイドレール受け部19に固定されると共に、最下段レールブラケット16で昇降路2の内壁に固定されている。したがって、据付用作業床14を上昇させる段階では、最下部ガイドレール11は、2点で昇降路に固定されている。これにより、据付用作業床14を最下部ガイドレール11に案内させて上昇させるときに、最下部ガイドレール11に作用するモーメント荷重を、ガイドレール受け部19と最下段レールブラケット16とで支持することが可能である。これにより、安全に据付用作業床14を最下部ガイドレール11に案内させて昇降させることができる。   In the present embodiment, in the step before raising the installation work floor 14, the lowermost guide rail 11 is fixed to the guide rail receiving portion 19 fixed to the hoistway bottom 31, and the lowermost rail bracket 16 is used. It is fixed to the inner wall of the hoistway 2. Therefore, at the stage where the installation work floor 14 is raised, the lowermost guide rail 11 is fixed to the hoistway at two points. Thereby, when the work floor 14 for installation is guided to the lowermost guide rail 11 and raised, the moment load acting on the lowermost guide rail 11 is supported by the guide rail receiving portion 19 and the lowermost rail bracket 16. It is possible. Thereby, the work floor 14 for installation can be safely raised and lowered while being guided by the lowermost guide rail 11.

次に、中間部ガイドレール12の取り付け工程を行う(ステップS6)。図6は、本実施形態に係るエレベータ1の据付方法における中間部ガイドレール12の取り付け工程を示す図である。中間部ガイドレール12の取り付けは、必要に応じて据付用作業床14を上昇させて行う。まず、最下部ガイドレール11の上端に取り付けられた継目板11aに、据付用作業床14に乗車している作業者Xが届く位置まで据付用作業床14を上昇させる。次に、レール揚重機5を駆動してレール揚重機5の揚重ロープ7に中間部ガイドレール12を保持させて吊り上げ、最下部ガイドレール11の上端側に中間部ガイドレール12を配置する。その状態で、作業者Xは、据付用作業床14を足場として中間部ガイドレール12の継目板12aが固定されていない側の下端と、最下部ガイドレール11の継目板11aとをボルト締結する。   Next, a process of attaching the intermediate guide rail 12 is performed (step S6). FIG. 6 is a diagram illustrating a process of attaching the intermediate guide rail 12 in the elevator 1 installation method according to the present embodiment. The intermediate guide rail 12 is attached by raising the installation work floor 14 as necessary. First, the installation work floor 14 is raised to a position where the worker X riding on the installation work floor 14 reaches the joint plate 11 a attached to the upper end of the lowermost guide rail 11. Next, the rail lifting machine 5 is driven to lift the intermediate guide rail 12 while holding the intermediate guide rail 12 on the lifting rope 7 of the rail lifting machine 5, and the intermediate guide rail 12 is disposed on the upper end side of the lowermost guide rail 11. In this state, the worker X bolts the lower end of the intermediate guide rail 12 on the side where the joint plate 12a is not fixed and the joint plate 11a of the lowermost guide rail 11 using the installation work floor 14 as a scaffold. .

次に、中間部ガイドレール12のレールブラケット取り付け位置に作業者Xが届く位置まで再度据付用作業床14を上昇させる。そして、作業者Xは、据付用作業床14を足場として、中間部ガイドレール12をレールブラケット28により昇降路2の内壁に固定する。本実施形態では、中間部ガイドレール12は1つのレールブラケット28で固定される例としており、例えば、中間部ガイドレール12の中心部にレールブラケット28が取り付けられる。   Next, the installation work floor 14 is raised again to a position where the worker X reaches the rail bracket mounting position of the intermediate guide rail 12. Then, the worker X fixes the intermediate guide rail 12 to the inner wall of the hoistway 2 by the rail bracket 28 using the installation work floor 14 as a scaffold. In the present embodiment, the intermediate guide rail 12 is fixed by one rail bracket 28. For example, the rail bracket 28 is attached to the center of the intermediate guide rail 12.

次に、最上部ガイドレール13の取り付け工程を行う(ステップS7)。図7は、本実施形態に係るエレベータ1の据付方法における最上部ガイドレール13の取り付け工程を示す図である。最上部ガイドレール13の取り付け時においても、中間部ガイドレール12の取り付け時と同様、必要に応じて据付用作業床14を上昇させて行う。まず、中間部ガイドレール12の上端に取り付けられた継目板12aに、据付用作業床14に乗車している作業者Xが届く位置まで据付用作業床14を上昇させる。次に、レール揚重機5を駆動してレール揚重機5の揚重ロープ7に最上部ガイドレール13を保持させて吊り上げ、中間部ガイドレール12の上端側に最上部ガイドレール13を配置する。その状態で、作業者Xは、据付用作業床14を足場として最上部ガイドレール13の下端と、中間部ガイドレール12の継目板12aとをボルト締結する。   Next, an attaching process of the uppermost guide rail 13 is performed (step S7). FIG. 7 is a diagram illustrating a process of attaching the uppermost guide rail 13 in the elevator 1 installation method according to the present embodiment. When the uppermost guide rail 13 is attached, the installation work floor 14 is raised as necessary, as in the case of attaching the intermediate guide rail 12. First, the installation work floor 14 is raised to a position where the worker X riding on the installation work floor 14 reaches the joint plate 12a attached to the upper end of the intermediate guide rail 12. Next, the rail lifting machine 5 is driven to lift the uppermost guide rail 13 while holding the uppermost guide rail 13 on the lifting rope 7 of the rail lifting machine 5, and the uppermost guide rail 13 is disposed on the upper end side of the intermediate guide rail 12. In this state, the worker X bolts the lower end of the uppermost guide rail 13 and the joint plate 12a of the intermediate guide rail 12 using the installation work floor 14 as a scaffold.

次に、最上部ガイドレール13のレールブラケット取り付け位置に作業者Xが届く位置まで再度据付用作業床14を上昇させる。そして、作業者Xは、据付用作業床14を足場として、最上部ガイドレール13をレールブラケット29,30により昇降路2の内壁に固定する。本実施形態では、最上部ガイドレール13は2つのレールブラケット29,30で固定される例としており、例えば、最上部ガイドレール13の中心部と上部側との2箇所にレールブラケット29,30がそれぞれ取り付けられる。そして、ここまでの工程により、エレベータ1のガイドレール11,12,13が昇降路2に固定される。   Next, the installation work floor 14 is raised again to a position where the worker X reaches the rail bracket mounting position of the uppermost guide rail 13. Then, the worker X fixes the uppermost guide rail 13 to the inner wall of the hoistway 2 by the rail brackets 29 and 30 using the installation work floor 14 as a scaffold. In the present embodiment, the uppermost guide rail 13 is fixed by two rail brackets 29, 30. For example, the rail brackets 29, 30 are provided at two locations on the upper side and the center of the uppermost guide rail 13. Each can be attached. And the guide rails 11, 12, and 13 of the elevator 1 are fixed to the hoistway 2 by the process so far.

以降は、昇降路2内の機器の取り付けや、乗りかごの取り付け、エレベータ1のドアの取り付けなど、通常の手順にしたがってエレベータ1を据え付けていく。なお、本実施形態では、図3Cに示すように、ガイドレール受け部19を昇降路底部31に固定するためのアンカーボルト22の頭部が昇降路底部31の床面に露出した状態となるが、メンテナンス作業の安全性確保のため、ガイドレール11,12,13の設置後は、そのアンカーボルト22の頭部を切断処理するのが好ましい。   Thereafter, the elevator 1 is installed according to a normal procedure such as installation of equipment in the hoistway 2, installation of a car, installation of a door of the elevator 1, and the like. In this embodiment, as shown in FIG. 3C, the head of the anchor bolt 22 for fixing the guide rail receiving portion 19 to the hoistway bottom 31 is in a state of being exposed on the floor surface of the hoistway bottom 31. In order to ensure the safety of maintenance work, it is preferable to cut the head of the anchor bolt 22 after the guide rails 11, 12, 13 are installed.

以上のように、本実施形態のエレベータ1の据付方法では、ガイドレール11,12,13の据付作業時において、ガイドレール受け部19(ピットベース10)が昇降路底部31に固定され、そのガイドレール受け部19に最下部ガイドレール11が固定される。このため、最下部ガイドレール11に最下段レールブラケット16を取り付けた後、据付用作業床14を上昇させるときに、最下部ガイドレール11に作用するモーメント荷重をガイドレール受け部19(ピットベース10)と最下段のレールブラケット16とで受けることができる。これにより、作業者Xは、据付用作業床14を足場として2段目レールブラケット27を最下部ガイドレール11の上部に取り付けることができる。   As described above, in the elevator 1 installation method of the present embodiment, the guide rail receiving portion 19 (pit base 10) is fixed to the hoistway bottom 31 during the installation work of the guide rails 11, 12, and 13, and the guide The lowermost guide rail 11 is fixed to the rail receiving portion 19. For this reason, after the lowermost rail bracket 16 is attached to the lowermost guide rail 11, when the installation work floor 14 is raised, the moment load acting on the lowermost guide rail 11 is applied to the guide rail receiving portion 19 (pit base 10). ) And the lowermost rail bracket 16. Thus, the worker X can attach the second-stage rail bracket 27 to the upper part of the lowermost guide rail 11 using the installation work floor 14 as a scaffold.

従来のエレベータの据付方法では、ピットベース10は昇降路底部31には固定されていない。したがって、従来は、最下部ガイドレール11を最下段レールブラケット16と2段目レールブラケット27とで固定するまでは、最下部ガイドレール11は据付用作業床14の昇降時に生じるモーメント荷重に耐えることはできない。すなわち、従来のように、ガイドレール受け部19が昇降路底部31に固定されていない場合に、2段目レールブラケット27の取り付けのために据付用作業床14を昇降させようとすると、そのときに発生するモーメント荷重により、最下部ガイドレール11とピットベース10がずれるおそれがある。このため、従来は、2段目レールブラケット27は、昇降路底部31に組み上げた足場を用いて作業されていた。   In the conventional elevator installation method, the pit base 10 is not fixed to the hoistway bottom 31. Therefore, conventionally, until the lowermost guide rail 11 is fixed by the lowermost rail bracket 16 and the second rail bracket 27, the lowermost guide rail 11 can withstand the moment load generated when the installation work floor 14 is raised and lowered. I can't. That is, when the guide rail receiving part 19 is not fixed to the hoistway bottom part 31 as in the prior art, when the installation work floor 14 is moved up and down for the attachment of the second stage rail bracket 27, There is a possibility that the lowermost guide rail 11 and the pit base 10 are displaced due to a moment load generated in the pit. For this reason, conventionally, the second-stage rail bracket 27 has been operated using a scaffold assembled to the hoistway bottom 31.

これに対して、本実施形態では、2段目レールブラケット27を取り付ける為に据付用作業床14を上昇させることができるので、据付用作業床14を足場として2段目レールブラケット27を取り付けることができるため、昇降路底部31に固定足場を組み上げる必要がない。また、最下段レールブラケット16の取り付け及び据付用作業床14の組み立ても、作業者Xが昇降路底部31を足場として作業できる範囲にあるため、ガイドレール据付工程全体を通して、昇降路底部31に仮設材で固定足場を組み上げる必要がない。したがって、昇降路底部31に固定足場を組むための仮設材を搬入したり、固定足場を組み上げたりする手間や据付作業費を削減することができる。   On the other hand, in this embodiment, since the installation work floor 14 can be raised to attach the second-stage rail bracket 27, the second-stage rail bracket 27 is attached using the installation work floor 14 as a scaffold. Therefore, it is not necessary to assemble a fixed scaffold on the hoistway bottom 31. In addition, since the lower rail bracket 16 is mounted and the work floor 14 for assembly is also within the range in which the worker X can work using the hoistway bottom 31 as a scaffold, temporary installation is performed on the hoistway bottom 31 throughout the guide rail installation process. There is no need to assemble a fixed scaffold with materials. Therefore, it is possible to reduce the labor and installation work cost for carrying in the temporary material for assembling the fixed scaffold to the hoistway bottom 31 or assembling the fixed scaffold.

本実施形態では、昇降路底部31から800mmの位置に最下段レールブラケット16を設ける例としたが、これに限られるものではない。本実施形態では、据付用作業床14の昇降時に発生する荷重モーメントに耐え得るように、最下部ガイドレール11が最下段レールブラケット16とガイドレール受け部19とによって固定されれば良い。したがって、最下段レールブラケット16の高さは、昇降路底部31を足場として取り付けられる範囲内において、最下部ガイドレール11の太さや長さ、固定するために用いられるボルトの数など様々な要因から決定することができる。   In the present embodiment, the lowermost rail bracket 16 is provided at a position 800 mm from the hoistway bottom 31. However, the present invention is not limited to this. In the present embodiment, the lowermost guide rail 11 may be fixed by the lowermost rail bracket 16 and the guide rail receiving portion 19 so as to be able to withstand the load moment generated when the installation work floor 14 is raised and lowered. Therefore, the height of the lowermost rail bracket 16 depends on various factors such as the thickness and length of the lowermost guide rail 11 and the number of bolts used for fixing within the range where the hoistway bottom 31 is attached as a scaffold. Can be determined.

なお、本実施形態では、ガイドレール11,12,13を設置した後は、ガイドレール受け部19を昇降路底部31に固定するためのアンカーボルト22の頭部を切断するのが好ましいとしたが、アンカーボルト22を取り外してもよい。すなわち、ガイドレール11,12,13を設置した後では、ガイドレール受け部19の昇降路底部31への固定は、ガイドレール11,12,13の自重で成されるため、アンカーボルト22は取り外してもよい。   In the present embodiment, after the guide rails 11, 12, and 13 are installed, it is preferable to cut the head of the anchor bolt 22 for fixing the guide rail receiving portion 19 to the hoistway bottom portion 31. The anchor bolt 22 may be removed. That is, after the guide rails 11, 12, and 13 are installed, the guide rail receiving portion 19 is fixed to the hoistway bottom 31 by the weight of the guide rails 11, 12, and 13, so that the anchor bolt 22 is removed. May be.

また、本実施形態では、ピットベース10をピットベース本体18とガイドレール受け部19とで構成する例としたが、ピットベース本体18がガイドレール受け部19を兼ねる構成であってもよく、ピットベース10をガイドレール受け部19のみで構成する例であってもよい。本実施形態のように、ピットベース本体18がガイドレール受け部19に固定されていることにより、最下段レールブラケット16を取り付けた後の据付用作業床14の上昇時にかかるモーメント荷重を支持する力をより安定させることができる。なお、ピットベース本体18の上面には、通常、据付用作業床14や乗りかごが昇降路2の最下部まで落下したときの衝撃を緩和させるための緩衝器が配置される。   In the present embodiment, the pit base 10 is configured by the pit base main body 18 and the guide rail receiving portion 19. However, the pit base main body 18 may also function as the guide rail receiving portion 19. An example in which the base 10 is configured only by the guide rail receiving portion 19 may be used. Since the pit base main body 18 is fixed to the guide rail receiving portion 19 as in the present embodiment, the force that supports the moment load applied when the installation work floor 14 is raised after the lowermost rail bracket 16 is attached. Can be made more stable. In addition, on the upper surface of the pit base main body 18, a shock absorber for reducing the impact when the installation work floor 14 or the car drops to the lowermost part of the hoistway 2 is usually arranged.

また、本実施形態では、最下部ガイドレール11が最下段レールブラケット16と2段目レールブラケット27の2つのレールブラケットで昇降路2に固定される例としたが、エレベータの仕様によっては、最下部ガイドレール11が1つのレールブラケットで固定される場合もある。この場合には、2段目のレールブラケット27は、2段目のガイドレール(本実施形態では中間部ガイドレール12)を昇降路2に固定するためのレールブラケットとなる。このように、最下部ガイドレール11が1つのレールブラケットで固定される場合においても、図1のステップS4までは本実施形態と同様にし、ステップS5において、据付用作業床上昇工程の後、2段目のガイドレール12を最下部ガイドレール11に取り付けた後に、2段目レールブラケット27取り付け工程を行う。そして、この場合においても、2段目レールブラケット27を取り付ける前に据付用作業床14を上昇させることができるので、本実施形態と同様の効果を得ることができる。   In the present embodiment, the lowermost guide rail 11 is fixed to the hoistway 2 with two rail brackets, the lowermost rail bracket 16 and the second rail bracket 27. However, depending on the specifications of the elevator, The lower guide rail 11 may be fixed by one rail bracket. In this case, the second-stage rail bracket 27 is a rail bracket for fixing the second-stage guide rail (the intermediate guide rail 12 in the present embodiment) to the hoistway 2. As described above, even when the lowermost guide rail 11 is fixed by one rail bracket, the process up to step S4 in FIG. 1 is the same as in the present embodiment. After the step guide rail 12 is attached to the lowermost guide rail 11, the step of attaching the second step rail bracket 27 is performed. In this case as well, since the installation work floor 14 can be raised before the second-stage rail bracket 27 is attached, the same effects as in the present embodiment can be obtained.

また、本実施形態では、ピットベース10の昇降路底部31への固定は、最下段レールブラケット16を取り付ける工程(ステップS2)の後であって、据付用作業床14を組み立てる工程(ステップS4)の前に行われていた。しかしながら、ピットベース10の昇降路底部31への固定は、据付用作業床14を組み立てる前の段階であれば、いずれの段階であってもよい。例えば、ピットベース10を昇降路底部31に配置した後であって、最下部ガイドレール11を配置する前であってもよく、最下部ガイドレール11を配置した後であって、最下段レールブラケット16を取り付ける前であってもよい。据付用作業床14を組み立てる前の工程でピットベース10が昇降路底部31に固定されることで、据付用作業床14の組み立て時にかかる荷重モーメントや、据付用作業床14の昇降時に係る荷重モーメントを支持することができる。   In this embodiment, the pit base 10 is fixed to the hoistway bottom 31 after the step of attaching the lowermost rail bracket 16 (step S2) and the step of assembling the installation work floor 14 (step S4). It was done before. However, the pit base 10 may be fixed to the hoistway bottom 31 at any stage as long as it is a stage before the installation work floor 14 is assembled. For example, after the pit base 10 is disposed on the hoistway bottom 31 and before the lowermost guide rail 11 is disposed, after the lowermost guide rail 11 is disposed, the lowermost rail bracket It may be before 16 is attached. By fixing the pit base 10 to the hoistway bottom 31 in the process before assembling the installation work floor 14, the load moment applied when the installation work floor 14 is assembled and the load moment applied when the installation work floor 14 is raised and lowered Can be supported.

なお、本実施形態のように、最下段レールブラケット16で最下部ガイドレール11を固定した後に、ピットベース10をアンカーボルト22で昇降路底部31に固定することで、最下部ガイドレール11を立設した後においても、ピットベース10を微調整することができる。   As in the present embodiment, after fixing the lowermost guide rail 11 with the lowermost rail bracket 16, the pit base 10 is fixed to the hoistway bottom 31 with the anchor bolts 22 so that the lowermost guide rail 11 is raised. Even after installation, the pit base 10 can be finely adjusted.

また、本実施形態では、ピットベース10の固定は、ガイドレール受け部19を、最下部ガイドレール11を挟む2箇所にアンカーボルト22を打ち込むことで行われていたが、アンカーボルト22の数やアンカーボルト22間の幅は、種々の変更が可能である。   Further, in this embodiment, the pit base 10 is fixed by driving the anchor bolts 22 into the guide rail receiving portion 19 at two positions sandwiching the lowermost guide rail 11. The width between the anchor bolts 22 can be variously changed.

また、本実施形態では、ガイドレールを取り付けた後の工程で乗りかごの据付などが行われるが、据付用作業床14をそのまま乗りかごの床として用いてもよい。さらに、本実施形態では、レール揚重機5及び作業床揚重機6は、レールや作業床を揚重できる程度の簡易的な揚重機を用いてもよく、実際のエレベータの乗りかごの昇降に用いられる巻乗機を用いてもよい。   In the present embodiment, the car is installed in the process after the guide rails are attached. However, the installation work floor 14 may be used as it is as the car floor. Further, in this embodiment, the rail lifting machine 5 and the work floor lifting machine 6 may be a simple lifting machine capable of lifting the rails and the work floor, and are used for raising and lowering the elevator car of the actual elevator. It is also possible to use a winding machine.

以上、本発明について、実施形態に基づいて説明したが、本発明は上述の実施形態に記載した構成に限定されるものではなく、その趣旨を逸脱しない範囲において適宜その構成を変更することができるものである。例えば、上述した実施形態例は、本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、また、ある実施形態の構成について他の実施形態の構成を加えることも可能である。また、各実施形態の構成の一部について、他の構成の追加・削除・置換をすることが可能である。   As described above, the present invention has been described based on the embodiment. However, the present invention is not limited to the configuration described in the above-described embodiment, and the configuration can be appropriately changed without departing from the gist thereof. Is. For example, the above-described exemplary embodiments have been described in detail for easy understanding of the present invention, and are not necessarily limited to those having all the configurations described. Further, a part of the configuration of an embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of an embodiment. In addition, it is possible to add, delete, and replace other configurations for a part of the configuration of each embodiment.

1…エレベータ、2…昇降路、3…トップステージ、4…吊りビーム、5…レール揚重機、6…作業床揚重機、10…ピットベース、11…最下部ガイドレール、12…中間部ガイドレール、13…最上部ガイドレール、14…据付用作業床、16…最下段レールブラケット、18…ピットベース本体、19…ガイドレール受け部、21…レールクリップ、22…アンカーボルト、27…2段目レールブラケット、31…昇降路底部

DESCRIPTION OF SYMBOLS 1 ... Elevator, 2 ... Hoistway, 3 ... Top stage, 4 ... Hanging beam, 5 ... Rail lifting machine, 6 ... Work floor lifting machine, 10 ... Pit base, 11 ... Bottom guide rail, 12 ... Middle part guide rail , 13 ... Top guide rail, 14 ... Installation work floor, 16 ... Bottom rail bracket, 18 ... Pit base body, 19 ... Guide rail receiving part, 21 ... Rail clip, 22 ... Anchor bolt, 27 ... Second stage Rail bracket, 31 ... Bottom of hoistway

Claims (4)

エレベータの乗かごが昇降する昇降路の底部にピットベースを組み立てる工程と、
前記ピットベース上の、乗りかごが昇降する空間を挟んで対向する所定の位置に最下部ガイドレールを立設し、前記ピットベースに前記最下部ガイドレールの下部を固定する工程と、
昇降路の底部を足場として、前記最下部ガイドレールを第1のレールブラケットで昇降路に固定する工程と、
前記最下部ガイドレールに固定支持した状態で据付用作業床を組み上げる工程と、
前記ピットベースを配置する工程の後であって、前記据付用作業床を組み上げる工程の前までに、前記ピットベースを昇降路の底部に固定する工程と、
組み上げた前記据付用作業床を上昇させる工程と、
を有するエレベータの据付方法。
Assembling a pit base at the bottom of the hoistway where the elevator car goes up and down;
On the pit base, a lowermost guide rail is erected at a predetermined position facing a space where the car goes up and down, and a lower part of the lowermost guide rail is fixed to the pit base;
Fixing the lowermost guide rail to the hoistway with a first rail bracket using the bottom of the hoistway as a scaffold;
Assembling a work floor for installation in a state of being fixedly supported by the lowermost guide rail;
Fixing the pit base to the bottom of the hoistway after the step of arranging the pit base and before the step of assembling the work floor for installation;
A step of raising the assembled work floor,
An elevator installation method comprising:
前記据付用作業床を上昇させた後、前記据付用作業床を足場として、前記第1のレールブラケットよりも上方において、第2のレールブラケットで前記最下部ガイドレール又は前記最下部ガイドレールの上方に立設される2段目のガイドレールを昇降路に固定する工程
を有する請求項1に記載のエレベータの据付方法。
After raising the work floor for installation, using the work floor for installation as a foothold, above the first rail bracket and above the lowermost guide rail or the lowermost guide rail with a second rail bracket The elevator installation method according to claim 1, further comprising: fixing a second-stage guide rail erected on the hoistway.
前記ピットベースを昇降路の底部に固定する工程は、前記最下部のガイドレールを前記第1のレールブラケットで昇降路に固定する工程の後であって、前記据付用作業床を組み上げる工程の前に行う
請求項1又は2に記載のエレベータの据付方法。
The step of fixing the pit base to the bottom of the hoistway is after the step of fixing the lowermost guide rail to the hoistway with the first rail bracket and before the step of assembling the installation work floor. The elevator installation method according to claim 1 or 2.
前記ピットベースを昇降路の底部に固定する工程は、前記ピットベースに前記最下部ガイドレールの下部を固定する工程の後であって、前記最下部のガイドレールを前記第1のレールブラケットで固定する工程の前に行う
請求項1又は2に記載のエレベータの据付方法。


The step of fixing the pit base to the bottom of the hoistway is after the step of fixing the lower portion of the lowermost guide rail to the pit base, and the lowermost guide rail is fixed by the first rail bracket. The elevator installation method according to claim 1 or 2, wherein the elevator installation method is performed before the step of performing the step.


JP2016214927A 2016-11-02 2016-11-02 Elevator installation method Withdrawn JP2018070362A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016214927A JP2018070362A (en) 2016-11-02 2016-11-02 Elevator installation method
CN201711058923.2A CN108016971A (en) 2016-11-02 2017-11-01 The installation method of elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016214927A JP2018070362A (en) 2016-11-02 2016-11-02 Elevator installation method

Publications (1)

Publication Number Publication Date
JP2018070362A true JP2018070362A (en) 2018-05-10

Family

ID=62079650

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016214927A Withdrawn JP2018070362A (en) 2016-11-02 2016-11-02 Elevator installation method

Country Status (2)

Country Link
JP (1) JP2018070362A (en)
CN (1) CN108016971A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020261804A1 (en) * 2019-06-24 2020-12-30 株式会社日立ビルシステム Method for laying guide rails and rotation prevention jig
CN114127002A (en) * 2019-07-22 2022-03-01 三菱电机株式会社 Elevator installation method and installation aids
CN115321308A (en) * 2022-10-11 2022-11-11 江苏顺捷机电工程有限公司 Elevator T-shaped guide rail mounting tool

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020007095A (en) * 2018-07-06 2020-01-16 株式会社日立ビルシステム Elevator installation device
CN109368446A (en) * 2018-12-12 2019-02-22 北京顺迅电梯设备工程有限公司 A kind of elevator lifting system and its installation method
CN111824901B (en) * 2020-08-06 2022-02-18 深圳市建工中泰机电工程有限公司 Elevator installation construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5020641A (en) * 1990-06-20 1991-06-04 Otis Elevator Company Method and apparatus for erecting hydraulic elevator rails
JP4208499B2 (en) * 2002-06-24 2009-01-14 東芝エレベータ株式会社 Elevator safety device assembly method
NZ546305A (en) * 2005-04-27 2006-09-29 Inventio Ag Method and device for installation of guide rails in a lift shaft
EP2746210A1 (en) * 2012-12-19 2014-06-25 Inventio AG Installation method for a lift
EP2993153B1 (en) * 2014-09-03 2022-01-19 KONE Corporation Guide rail installation arrangement and a method for installing guide rails
EP3081520A1 (en) * 2015-04-17 2016-10-19 Kone Corporation Method for installing a guide rail and a guide rail

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020261804A1 (en) * 2019-06-24 2020-12-30 株式会社日立ビルシステム Method for laying guide rails and rotation prevention jig
JP2021001059A (en) * 2019-06-24 2021-01-07 株式会社日立ビルシステム Guide rail laying method and rotation prevention tool
JP7372765B2 (en) 2019-06-24 2023-11-01 株式会社日立ビルシステム How to install guide rails
CN114127002A (en) * 2019-07-22 2022-03-01 三菱电机株式会社 Elevator installation method and installation aids
CN114127002B (en) * 2019-07-22 2023-03-24 三菱电机株式会社 Method and auxiliary device for installing elevator
CN115321308A (en) * 2022-10-11 2022-11-11 江苏顺捷机电工程有限公司 Elevator T-shaped guide rail mounting tool

Also Published As

Publication number Publication date
CN108016971A (en) 2018-05-11

Similar Documents

Publication Publication Date Title
JP2018070362A (en) Elevator installation method
US8186130B2 (en) Method for installing an elevator and method for installing the guide rails of an elevator
JP5264751B2 (en) Elevator lifting device and elevator lifting method
US6446763B1 (en) Integrated elevator installation hoist tool
EP2844600B1 (en) Method of installing a machine in an elevator system
CN105888229A (en) All-steel attached scaffold mounting method
JP2007099515A (en) Method for mounting support means of lift cage to lift cage and lift shaft
JP6813123B2 (en) How to apply elevator lift extension technology
JP6112954B2 (en) Renewal of hydraulic elevator to rope type elevator
JP2002003124A (en) Elevator installation device and its installation method
CN110697545A (en) Construction elevator and installation method thereof
KR20090084163A (en) Gangform guide member and Gangform guide system using the same
JP4921810B2 (en) Elevator installation apparatus and installation method using the same
JP2000086113A (en) Elevator and its installation method
CN115217314A (en) Hanging basket rail restraining device for building outer vertical face with complex shape and construction method thereof
JP6084936B2 (en) Elevator installation apparatus and method of assembling the installation apparatus
JP4312590B2 (en) Lower assembly method for elevator upper equipment
KR101976724B1 (en) Method for installing elevator guide rails without a machine room
JP2507636B2 (en) Mechanical platform support device for temporary elevator
JP2011195308A (en) Method for renewal of hydraulic elevator and rope elevator renewed by the method
JP2001335255A (en) Elevator installation method and elevator installation unit
JP2000226169A (en) Elevator installation method
JP2002060158A (en) Elevator installation method
JP7583224B2 (en) Hoist installation guide device and hoist installation method
JP3444816B2 (en) How to replace the main elevator cable

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190108

A761 Written withdrawal of application

Free format text: JAPANESE INTERMEDIATE CODE: A761

Effective date: 20190222