CN114127002B - Method and auxiliary device for installing elevator - Google Patents

Method and auxiliary device for installing elevator Download PDF

Info

Publication number
CN114127002B
CN114127002B CN201980098093.7A CN201980098093A CN114127002B CN 114127002 B CN114127002 B CN 114127002B CN 201980098093 A CN201980098093 A CN 201980098093A CN 114127002 B CN114127002 B CN 114127002B
Authority
CN
China
Prior art keywords
car
guide rail
positioning
car bottom
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201980098093.7A
Other languages
Chinese (zh)
Other versions
CN114127002A (en
Inventor
加藤久仁夫
伊藤陆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Publication of CN114127002A publication Critical patent/CN114127002A/en
Application granted granted Critical
Publication of CN114127002B publication Critical patent/CN114127002B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators
    • B66B7/02Guideways; Guides

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

In the method for installing an elevator, the 1 st positioning step is a step of positioning the car bottom with respect to the 1 st landing sill. The 2 nd positioning step is a step of positioning the 1 st car guide rail bracket by combining the car guide rail and the lower guide shoe. The 3 rd positioning step is a step of raising the car bottom and positioning the car bottom with respect to the 2 nd landing sill. The 4 th positioning step is a step of positioning the 2 nd car guide rail bracket by combining the car guide rail and the lower guide shoe.

Description

电梯的安装方法以及安装辅具Elevator installation method and installation aids

技术领域technical field

本发明涉及电梯的安装方法以及在电梯的安装时所使用的安装辅具。The present invention relates to an elevator installation method and an installation aid used in the elevator installation.

背景技术Background technique

在现有的电梯的导轨定心方法中,在最上层的层站地坎安装支承部件,使一对钢琴(piano)线从支承部件垂下。然后,以一对钢琴线为基准,在井道内临时设置多个导轨托架。In the conventional elevator guide rail centering method, a support member is installed on the uppermost landing sill, and a pair of piano wires are suspended from the support member. Then, using a pair of piano wires as a reference, temporarily set up multiple guide rail brackets in the hoistway.

此外,通过以井道内垂下的多个测锤为位置基准,使用多个导轨量规,来进行多个导轨的定心(例如,参照专利文献1)。In addition, centering of a plurality of guide rails is performed by using a plurality of guide rail gauges with a plurality of measuring hammers hanging down in the hoistway as a position reference (for example, refer to Patent Document 1).

现有技术文献prior art literature

专利文献patent documents

专利文献1:日本特开2001-322776号公报Patent Document 1: Japanese Patent Laid-Open No. 2001-322776

发明内容Contents of the invention

发明所要解决的课题The problem to be solved by the invention

在如上所述的现有的导轨定心方法中,一对钢琴线及多个测锤的设置花费时间。此外,在层站出入口的位置根据楼层的不同而发生偏移的情况下,需要调整导轨的位置,使得层站出入口与轿厢的位置关系适当。In the conventional guide rail centering method as described above, it takes time to install a pair of piano wires and a plurality of measuring hammers. In addition, when the positions of the hall entrances deviate depending on floors, it is necessary to adjust the position of the guide rails so that the positional relationship between the hall entrances and the car is appropriate.

本发明是为了解决上述那样的课题而完成的,其目的在于得到能够容易地进行导轨的位置调整的电梯的安装方法以及安装辅具。The present invention was made to solve the above-mentioned problems, and an object of the present invention is to obtain an elevator installation method and an installation aid that can easily perform position adjustment of guide rails.

用于解决课题的手段means to solve the problem

本发明的电梯的安装方法包括如下工序:第1定位工序,将轿厢底相对于设置于第1层站楼层的第1层站地坎进行定位;第2定位工序,将轿厢导轨与设置于轿厢底的下部导靴进行组合,对第1轿厢导轨托架进行定位;第3定位工序,使轿厢底上升,将轿厢底相对于设置于第2层站楼层的第2层站地坎进行定位;以及第4定位工序,将轿厢导轨与下部导靴进行组合,对位于比第1轿厢导轨托架靠上方的位置的第2轿厢导轨托架进行定位。The installation method of the elevator of the present invention includes the following steps: the first positioning process, positioning the bottom of the car relative to the first floor sill arranged on the first floor; the second positioning process, aligning the car guide rail with the set Combine the lower guide shoes on the car bottom to position the guide rail bracket of the first car; the third positioning process raises the car bottom and aligns the car bottom with the second floor on the second floor Positioning at the sill; and the fourth positioning process, combining the car guide rail with the lower guide shoe, and positioning the second car guide rail bracket positioned above the first car guide rail bracket.

此外,本发明的电梯的安装辅具具备轿厢底连接件,该轿厢底连接件具有:钩部,其挂于层站地坎;和轿厢底接纳部,其接纳轿厢底的层站侧端部,该轿厢底连接件通过将轿厢底与层站地坎连接来进行轿厢底相对于层站地坎的定位。In addition, the installation aid for an elevator of the present invention is provided with a car bottom connecting member having: a hook portion, which is hung on the landing sill; and a car bottom receiving portion, which receives the floor of the car bottom. The end portion on the station side, the car bottom connecting member performs positioning of the car bottom relative to the landing sill by connecting the car bottom to the landing sill.

此外,电梯的安装辅具具备导轨定位件,该导轨定位件具有:轿厢底安装部,其安装于轿厢底;以及定位部,其作为对重导轨的定位基准。In addition, the installation aid of the elevator includes a guide rail positioning member having: a car bottom mounting portion installed on the car bottom; and a positioning portion serving as a positioning reference for the counterweight guide rail.

发明效果Invention effect

根据本发明,能够容易地进行导轨的位置调整。According to the present invention, position adjustment of the guide rail can be easily performed.

附图说明Description of drawings

图1是用于说明本发明的实施方式1的电梯的安装方法的立体图。Fig. 1 is a perspective view illustrating a method of installing an elevator according to Embodiment 1 of the present invention.

图2是从与图1不同的方向观察图1的电梯的立体图。Fig. 2 is a perspective view of the elevator in Fig. 1 viewed from a direction different from Fig. 1 .

图3是示出实施方式1的安装方法中的第1定位工序的立体图。3 is a perspective view showing a first positioning step in the mounting method according to Embodiment 1. FIG.

图4是示出图3的轿厢底及其周边设备的侧视图。Fig. 4 is a side view showing the car bottom of Fig. 3 and its peripheral equipment.

图5是放大示出图3的第1层站地坎和轿厢底的连接部分的立体图。Fig. 5 is an enlarged perspective view showing a connection portion between the first landing sill and the car bottom in Fig. 3 .

图6是放大示出图4的第1层站地坎和轿厢底的连接部分的侧视图。Fig. 6 is an enlarged side view showing the connection portion between the first landing sill and the car bottom in Fig. 4 .

图7是放大示出图3的导轨定位件的立体图。FIG. 7 is an enlarged perspective view showing the rail positioning member of FIG. 3 .

图8是示出图7的导轨定位件的侧视图。FIG. 8 is a side view showing the rail positioner of FIG. 7 .

图9是示出实施方式1的安装方法中的导轨悬吊工序的立体图。9 is a perspective view illustrating a guide rail suspension step in the mounting method according to Embodiment 1. FIG.

图10是从与图9不同的方向观察图9的电梯的立体图。Fig. 10 is a perspective view of the elevator in Fig. 9 viewed from a direction different from Fig. 9 .

图11是示出实施方式1的安装方法中的第2定位工序的立体图。FIG. 11 is a perspective view illustrating a second positioning step in the mounting method according to Embodiment 1. FIG.

图12是从与图11不同的方向观察图11的电梯的立体图。Fig. 12 is a perspective view of the elevator in Fig. 11 viewed from a different direction from Fig. 11 .

图13是示出实施方式1的安装方法中的第3定位工序及第4定位工序的立体图。13 is a perspective view showing a third positioning step and a fourth positioning step in the mounting method according to the first embodiment.

图14是从与图13不同的方向观察图13的电梯的立体图。Fig. 14 is a perspective view of the elevator of Fig. 13 viewed from a direction different from Fig. 13 .

图15是示出实施方式1的安装方法中的第5定位工序的立体图。15 is a perspective view showing a fifth positioning step in the mounting method according to Embodiment 1. FIG.

图16是从与图15不同的方向观察图15的电梯的立体图。Fig. 16 is a perspective view of the elevator in Fig. 15 viewed from a different direction from Fig. 15 .

图17是示出实施方式1的安装方法中的第6定位工序的立体图。17 is a perspective view showing a sixth positioning step in the mounting method according to Embodiment 1. FIG.

图18是从与图17不同的方向观察图17的电梯的立体图。Fig. 18 is a perspective view of the elevator in Fig. 17 viewed from a direction different from Fig. 17 .

具体实施方式Detailed ways

以下,参照附图对用于实施本发明的方式进行说明。Hereinafter, modes for implementing the present invention will be described with reference to the drawings.

实施方式1Embodiment 1

图1是用于说明本发明的实施方式1的电梯的安装方法的立体图。图2是从与图1不同的方向观察图1的电梯的立体图。图1及图2透视表示井道1内。此外,在实施方式1中,示出层站楼层只有1层及2层的无机房电梯。Fig. 1 is a perspective view illustrating a method of installing an elevator according to Embodiment 1 of the present invention. Fig. 2 is a perspective view of the elevator in Fig. 1 viewed from a direction different from Fig. 1 . 1 and 2 perspectively show the interior of the hoistway 1 . In addition, in Embodiment 1, the machine-room-less elevator in which the landing floors are only 1st and 2nd floors is shown.

在井道1内设置有一对轿厢导轨2和一对对重导轨3。一对轿厢导轨2对轿厢的升降进行引导。在图1及图2中,轿厢处于组装中途的状态。一对对重导轨3对未图示的对重的升降进行引导。A pair of car guide rails 2 and a pair of counterweight guide rails 3 are arranged in the hoistway 1 . A pair of car guide rails 2 guides the lifting of the car. In FIGS. 1 and 2 , the car is in a state of being assembled. The pair of counterweight guide rails 3 guides the lifting and lowering of the counterweight (not shown).

轿厢和对重由未图示的悬挂体悬吊,利用未图示的曳引机的驱动力在井道1内升降。The car and the counterweight are suspended by an unillustrated suspension body, and are raised and lowered in the hoistway 1 by the driving force of an unillustrated traction machine.

各轿厢导轨2借助第1轿厢导轨托架4a、第2轿厢导轨托架4b、第3轿厢导轨托架4c、第4轿厢导轨托架4d以及第5轿厢导轨托架4e而固定于井道壁。Each car guide rail 2 is connected via a first car guide rail bracket 4a, a second car guide rail bracket 4b, a third car guide rail bracket 4c, a fourth car guide rail bracket 4d, and a fifth car guide rail bracket 4e. And fixed on the well wall.

第1轿厢导轨托架4a位于比1层的地面靠下方的位置。第2轿厢导轨托架4b位于比第1轿厢导轨托架4a靠上方的位置。第3轿厢导轨托架4c位于比第2轿厢导轨托架4b靠上方的位置。The first car guide rail bracket 4a is located below the ground of the first floor. The second car guide rail bracket 4b is located above the first car guide rail bracket 4a. The third car guide rail bracket 4c is located above the second car guide rail bracket 4b.

第4轿厢导轨托架4d位于第1轿厢导轨托架4a与第2轿厢导轨托架4b之间。第5轿厢导轨托架4e位于第2轿厢导轨托架4b与第3轿厢导轨托架4c之间。The fourth car guide rail bracket 4d is located between the first car guide rail bracket 4a and the second car guide rail bracket 4b. The fifth car guide rail bracket 4e is located between the second car guide rail bracket 4b and the third car guide rail bracket 4c.

各对重导轨3借助第1对重导轨托架5a、第2对重导轨托架5b、第3对重导轨托架5c、第4对重导轨托架5d以及第5对重导轨托架5e而固定于井道壁。Each counterweight guide rail 3 is connected by the first counterweight guide rail bracket 5a, the second counterweight guide rail bracket 5b, the third counterweight guide rail bracket 5c, the fourth counterweight guide rail bracket 5d and the fifth counterweight guide rail bracket 5e And fixed on the well wall.

第1对重导轨托架5a位于比1层的地面靠下方的位置。第2对重导轨托架5b位于比第1对重导轨托架5a靠上方的位置。第3对重导轨托架5c位于比第2对重导轨托架5b靠上方的位置。The 1st counterweight rail bracket 5a is located below the ground of the 1st floor. The 2nd counterweight rail bracket 5b is located above the 1st counterweight rail bracket 5a. The 3rd counterweight rail bracket 5c is located above the 2nd counterweight rail bracket 5b.

第4对重导轨托架5d位于第1对重导轨托架5a与第2对重导轨托架5b之间。第5对重导轨托架5e位于第2对重导轨托架5b与第3对重导轨托架5c之间。The 4th counterweight rail bracket 5d is located between the 1st counterweight rail bracket 5a and the 2nd counterweight rail bracket 5b. The fifth counterweight rail bracket 5e is located between the second counterweight rail bracket 5b and the third counterweight rail bracket 5c.

轿厢具有轿厢底6、轿厢架7、未图示的轿厢室、紧急停止装置8、一对下部导靴9、一对上部导靴10以及一对轿厢吊轮11。The car has a car floor 6 , a car frame 7 , a not-shown car chamber, an emergency stop device 8 , a pair of lower guide shoes 9 , a pair of upper guide shoes 10 , and a pair of car suspension wheels 11 .

轿厢底6具有矩形的平板状的轿厢底主体12和轿厢地坎13。轿厢地坎13固定于轿厢底主体12的层站侧端部。The car floor 6 has a rectangular flat car floor main body 12 and a car sill 13 . The car sill 13 is fixed to the landing-side end portion of the car bottom main body 12 .

轿厢架7具有一对纵柱14、上梁15和4个倾斜部件16。一对纵柱14配置于轿厢底主体12的宽度方向的两侧。轿厢底主体12的宽度方向是与图1的X轴平行的方向。此外,一对纵柱14彼此平行地配置。The car frame 7 has a pair of vertical columns 14 , an upper beam 15 and four inclined members 16 . The pair of vertical columns 14 are arranged on both sides in the width direction of the car floor main body 12 . The width direction of the car bottom body 12 is a direction parallel to the X-axis in FIG. 1 . Moreover, a pair of vertical columns 14 are arrange|positioned parallel to each other.

各纵柱14的下端部固定于轿厢底主体12。上梁15水平地固定在一对纵柱14的上端部之间。各倾斜部件16倾斜地连接在对应的纵柱14与轿厢底主体12之间。The lower end of each vertical column 14 is fixed to the car bottom main body 12 . The upper beam 15 is fixed horizontally between the upper ends of the pair of vertical columns 14 . Each inclined member 16 is obliquely connected between the corresponding vertical column 14 and the car bottom main body 12 .

紧急停止装置8沿着轿厢底主体12的宽度方向固定于轿厢底主体12的下部。一对下部导靴9分别固定于紧急停止装置8。各下部导靴9与对应的轿厢导轨2进行组合。The emergency stop device 8 is fixed to the lower part of the car bottom main body 12 along the width direction of the car bottom main body 12 . A pair of lower guide shoes 9 are respectively fixed to the emergency stop device 8 . Each lower guide shoe 9 is combined with a corresponding car guide rail 2 .

一对上部导靴10分别固定于轿厢架7的上端部。各上部导靴10与对应的轿厢导轨2进行组合。一对轿厢吊轮11安装于轿厢底主体12的下部。A pair of upper guide shoes 10 are respectively fixed to upper ends of the car frame 7 . Each upper guide shoe 10 is combined with a corresponding car guide rail 2 . A pair of car suspending wheels 11 is mounted on the lower part of the car bottom main body 12 .

在井道1的底部1a设置有轿厢缓冲器17。在轿厢底6的下部安装有支柱21。支柱21介于作为轿厢底主体12的端部的与层站相反的一侧的端部与底部1a之间。此外,支柱21能够伸缩。A car buffer 17 is provided at the bottom 1 a of the hoistway 1 . A pillar 21 is attached to the lower portion of the car bottom 6 . The pillar 21 is interposed between the end portion on the side opposite to the hall, which is the end portion of the car bottom main body 12, and the bottom portion 1a. In addition, the support column 21 can expand and contract.

在轿厢底主体12安装有作为安装辅具的导轨定位件22。导轨定位件22从轿厢底主体12向轿厢底主体12的宽度方向外侧水平地突出。A guide rail positioning tool 22 as an installation aid is attached to the car bottom main body 12 . The guide rail positioning member 22 protrudes horizontally from the car floor main body 12 outward in the width direction of the car floor main body 12 .

在作为第1层站楼层的1层的层站设有第1层站地坎31。在作为第2层站楼层的2层的层站设有第2层站地坎32。The first-floor sill 31 is provided in the first-floor landing which is the first-floor floor. A second-floor sill 32 is provided at the second-floor landing that is the second-floor floor.

此外,在1层的层站以及2层的层站分别设有层站门框33。其中,省略1层的层站门框33的图示。In addition, a landing door frame 33 is provided in each of the first-floor landing and the second-floor landing. However, illustration of the landing door frame 33 on the first floor is omitted.

在井道1内设置有脚手架装置23。脚手架装置23由第2层站地坎32和2层的层站门框33支承。此外,脚手架装置23具有脚手架框24、下部作业地板25以及上部作业地板26。A scaffolding device 23 is provided in the hoistway 1 . The scaffolding device 23 is supported by the second landing sill 32 and the second landing door frame 33 . Furthermore, the scaffold device 23 has a scaffold frame 24 , a lower work floor 25 , and an upper work floor 26 .

下部作业地板25的层站侧端部挂在第2层站地坎32上。上部作业地板26水平地配置于下部作业地板25的上方。The landing-side end portion of the lower work floor 25 is hung on the second landing sill 32 . The upper work floor 26 is arranged horizontally above the lower work floor 25 .

对于支柱21、导轨定位件22以及脚手架装置23,在电梯的安装作业中不再需要的时机被撤除。The support 21, the guide rail positioning member 22, and the scaffolding device 23 are removed when they are no longer needed in the installation work of the elevator.

接下来,对电梯的安装方法进行说明。实施方式1的安装方法包括第1定位工序、导轨悬吊工序、第2定位工序、第3定位工序、第4定位工序、第5定位工序以及第6定位工序。Next, how to install the elevator will be described. The mounting method of Embodiment 1 includes a first positioning step, a rail suspension step, a second positioning step, a third positioning step, a fourth positioning step, a fifth positioning step, and a sixth positioning step.

图3是示出实施方式1的安装方法中的第1定位工序的立体图。此外,图4是示出图3的轿厢底6及其周边设备的侧视图。3 is a perspective view showing a first positioning step in the mounting method according to Embodiment 1. FIG. In addition, FIG. 4 is a side view showing the car bottom 6 of FIG. 3 and its peripheral equipment.

第1定位工序是将轿厢底6相对于第1层站地坎31进行定位的工序。紧急停止装置8、一对下部导靴9、一对轿厢吊轮11、轿厢地坎13以及导轨定位件22在工厂相对于轿厢底主体12被预先定位并安装。此外,在底部1a设置有轿厢缓冲器17。The first positioning step is a step of positioning the car bottom 6 with respect to the first landing sill 31 . The emergency stop device 8, the pair of lower guide shoes 9, the pair of car suspension wheels 11, the car sill 13 and the guide rail positioner 22 are pre-positioned and installed relative to the car bottom body 12 at the factory. Furthermore, a car buffer 17 is provided on the bottom 1a.

轿厢底6的定位通过将轿厢底6与第1层站地坎31连接来进行。这时,轿厢底6借助作为安装辅具的一对轿厢底连接件27与第1层站地坎31连接。此外,在轿厢底6安装支柱21。然后,通过调整支柱21的高度,使轿厢底6成为水平。The car bottom 6 is positioned by connecting the car bottom 6 to the first landing sill 31 . At this time, the car bottom 6 is connected to the first landing sill 31 via a pair of car bottom connectors 27 as attachment aids. In addition, pillars 21 are attached to the car bottom 6 . Then, by adjusting the height of the pillars 21, the car bottom 6 is made horizontal.

轿厢地坎13的长度方向上的尺寸大于轿厢底主体12的宽度方向上的尺寸。轿厢地坎13的长度方向是与轿厢底主体12的宽度方向平行的方向,并且是与图3的X轴平行的方向。轿厢地坎13的长度方向的两端部从轿厢底主体12的宽度方向的两端向轿厢底主体12的外侧突出。The lengthwise dimension of the car sill 13 is larger than the widthwise dimension of the car bottom main body 12 . The longitudinal direction of the car sill 13 is a direction parallel to the width direction of the car floor main body 12, and is also a direction parallel to the X-axis in FIG. 3 . Both ends in the longitudinal direction of the car sill 13 protrude from both ends in the width direction of the car bottom body 12 to the outside of the car bottom body 12 .

图5是放大示出图3的第1层站地坎31和轿厢底6的连接部分的立体图。此外,图6是放大示出图4的第1层站地坎31和轿厢底6的连接部分的侧视图。FIG. 5 is an enlarged perspective view showing a connection portion between the first landing sill 31 and the car bottom 6 in FIG. 3 . In addition, FIG. 6 is an enlarged side view showing the connection portion between the first landing sill 31 and the car bottom 6 in FIG. 4 .

在层站地坎31设有层站地坎槽31a。在轿厢地坎13设有轿厢地坎槽13a。The landing sill groove 31a is provided in the landing sill 31 . The car sill 13 is provided with a car sill groove 13a.

各轿厢底连接件27的截面形状为S字状。此外,各轿厢底连接件27具有钩部27a和作为轿厢底接纳部的地坎接纳部27b。The cross-sectional shape of each car bottom connector 27 is S-shaped. Furthermore, each car floor connector 27 has a hook portion 27a and a sill receiving portion 27b as a car floor receiving portion.

钩部27a挂于第1层站地坎31。此外,钩部27a具有插入部27c。插入部27c插入于层站地坎槽31a。此外,在层站地坎槽31a的内壁面与插入部27c之间插入有1片或2片以上的平板状的间隔件28。The hook portion 27a is hung on the first floor sill 31 . Furthermore, the hook portion 27a has an insertion portion 27c. The insertion part 27c is inserted into the hall sill groove 31a. Moreover, between the inner wall surface of the boarding point sill groove 31a and the insertion part 27c, the flat spacer 28 of 1 sheet or 2 sheets or more is inserted.

在地坎接纳部27b设有插入槽27d。在插入槽27d中插入有轿厢地坎13的长度方向的端部。由此,地坎接纳部27b接纳作为轿厢底6的层站侧端部的轿厢地坎13。此外,在插入槽27d的内壁面与轿厢地坎13之间插入有1片或2片以上的间隔件28。An insertion groove 27d is provided in the sill receiving portion 27b. The longitudinal end of the car sill 13 is inserted into the insertion groove 27d. Accordingly, the sill receiving portion 27b receives the car sill 13 which is the landing-side end portion of the car floor 6 . In addition, one or more spacers 28 are inserted between the inner wall surface of the insertion groove 27d and the car sill 13 .

在第1定位工序中,将各轿厢底连接件27的插入部27c插入到层站地坎槽31a,并将轿厢地坎13插入到各轿厢底连接件27的插入槽27d。一对轿厢底连接件27通过将轿厢底6与第1层站地坎31连接,来进行轿厢底6相对于第1层站地坎31的定位。In the first positioning step, the insertion portion 27c of each car bottom connector 27 is inserted into the landing sill groove 31a, and the car sill 13 is inserted into the insertion groove 27d of each car bottom connector 27 . The pair of car floor connectors 27 positions the car floor 6 with respect to the first landing sill 31 by connecting the car floor 6 to the first landing sill 31 .

这时,通过将间隔件28分别插入到层站地坎槽31a以及插入槽27d,能够稳定地将轿厢底6与第1层站地坎31连接。由此,能够更准确地进行轿厢底6相对于第1层站地坎31的定位。此外,能够对层站地坎槽31a的宽度以及轿厢地坎13的宽度不同的电梯应用通用的轿厢底连接件27。At this time, by inserting the spacer 28 into the landing sill groove 31a and the insertion groove 27d, the car bottom 6 and the first landing sill 31 can be stably connected. Thereby, positioning of the car floor 6 with respect to the 1st landing sill 31 can be performed more accurately. In addition, the common car floor connector 27 can be applied to elevators having different widths of the landing sill groove 31a and the width of the car sill 13 .

图7是放大示出图3的导轨定位件22的立体图。此外,图8是示出图7的导轨定位件22的侧视图。FIG. 7 is an enlarged perspective view showing the rail positioning member 22 of FIG. 3 . In addition, FIG. 8 is a side view showing the rail positioner 22 of FIG. 7 .

轿厢底主体12具有轿厢地板18、一对轿厢底梁19以及多个地板固定件20。轿厢地板18由多组地板固定件20固定于一对轿厢底梁19上。作为各地板固定件20,使用螺栓与螺母的组合。The car floor main body 12 has a car floor 18 , a pair of car floor beams 19 , and a plurality of floor fixing members 20 . The car floor 18 is fixed on a pair of car bottom beams 19 by multiple sets of floor fixing members 20 . A combination of a bolt and a nut is used as each floor fixing member 20 .

导轨定位件22具有轿厢底安装部22a和一对定位部22b。轿厢底安装部22a安装于轿厢底主体12。此外,轿厢底安装部22a利用多组地板固定件20中的一部分、例如2组地板固定件20而被安装于轿厢底主体12。The rail positioning tool 22 has a car bottom mounting portion 22a and a pair of positioning portions 22b. The car bottom attachment portion 22a is attached to the car bottom main body 12 . Moreover, the car bottom attachment part 22a is attached to the car bottom main body 12 using some of the floor fixing tools 20 of multiple sets, for example, two sets of floor fixing tools 20 .

连结部件29连结在导轨定位件22与轿厢底梁19之间。连结部件29由多组连结部件固定件30固定于导轨定位件22和轿厢底梁19。作为各连结部件固定件30,使用螺栓与螺母的组合。The connecting member 29 is connected between the guide rail positioner 22 and the car bottom beam 19 . The connecting member 29 is fixed to the guide rail positioning member 22 and the car bottom beam 19 by a plurality of sets of connecting member fixing members 30 . As each connection member fixing tool 30, a combination of a bolt and a nut is used.

各定位部22b是作为对应的对重导轨3的定位基准的部分。此外,在各定位部22b设有凹部22c。将对应的对重导轨3的对重引导部插入到各凹部22c。对重引导部是引导对重的部分。Each positioning portion 22b is a portion serving as a positioning reference for the corresponding counterweight guide rail 3 . Moreover, the recessed part 22c is provided in each positioning part 22b. The counterweight guide part of the corresponding counterweight guide rail 3 is inserted into each recessed part 22c. The counterweight guide is the part that guides the counterweight.

图9是示出实施方式1的安装方法中的导轨悬吊工序的立体图。图10是从与图9不同的方向观察图9的电梯的立体图。9 is a perspective view illustrating a guide rail suspension step in the mounting method according to Embodiment 1. FIG. Fig. 10 is a perspective view of the elevator in Fig. 9 viewed from a direction different from Fig. 9 .

在导轨悬吊工序中,在井道1内的2层部分设置脚手架装置23。并且,利用设置于井道1的顶部的未图示的多个起重装置将一对轿厢导轨2以及一对对重导轨3分别悬吊于井道1内。In the guide rail suspension process, a scaffolding device 23 is installed on the second floor of the hoistway 1 . Furthermore, a pair of car guide rails 2 and a pair of counterweight guide rails 3 are respectively suspended in the hoistway 1 by a plurality of unillustrated lifting devices installed on the ceiling of the hoistway 1 .

一对轿厢导轨2以及一对对重导轨3是分别通过将多个导轨部件沿上下方向连接起来而构成的。各导轨部件由起重装置吊起。然后,由轿厢底6上或脚手架装置23上的作业员来进行上下相邻的导轨部件的连接。The pair of car guide rails 2 and the pair of counterweight guide rails 3 are formed by connecting a plurality of guide rail members vertically. Each rail component is hoisted by a lifting device. Then, the upper and lower adjacent guide rail members are connected by an operator on the car bottom 6 or on the scaffolding device 23 .

图11是示出实施方式1的安装方法中的第2定位工序的立体图。图12是从与图11不同的方向观察图11的电梯的立体图。FIG. 11 is a perspective view illustrating a second positioning step in the mounting method according to Embodiment 1. FIG. Fig. 12 is a perspective view of the elevator in Fig. 11 viewed from a different direction from Fig. 11 .

在第2定位工序中,将一对第1轿厢导轨托架4a分别安装于一对轿厢导轨2。然后,将各轿厢导轨2按压于对应的下部导靴9。即,将一对轿厢导轨2分别与一对下部导靴9进行组合。In the second positioning step, the pair of first car guide rail brackets 4a are attached to the pair of car guide rails 2, respectively. Then, each car guide rail 2 is pressed against the corresponding lower guide shoe 9 . That is, a pair of car guide rails 2 is combined with a pair of lower guide shoes 9, respectively.

由此,分别对一对第1轿厢导轨托架4a进行定位。然后,将进行了定位后的一对第1轿厢导轨托架4a分别固定于井道壁。Thereby, a pair of 1st car guide rail bracket 4a is respectively positioned. Then, the positioned pair of first car guide rail brackets 4a are respectively fixed to the hoistway wall.

此外,在第2定位工序中,将一对第1对重导轨托架5a分别安装于一对对重导轨3。然后,将各对重导轨3按压于对应的定位部22b。即,将一对对重导轨3分别与一对定位部22b进行组合。Moreover, in a 2nd positioning process, a pair of 1st counterweight rail bracket 5a is attached to a pair of counterweight rail 3, respectively. Then, each counterweight guide rail 3 is pressed against the corresponding positioning portion 22b. That is, a pair of counterweight guide rails 3 is combined with a pair of positioning parts 22b, respectively.

由此,对一对第1对重导轨托架5a分别进行定位。然后,将进行了定位后的一对第1对重导轨托架5a分别固定于井道壁。Thereby, a pair of 1st counterweight rail bracket 5a is respectively positioned. Then, the positioned pair of first counterweight guide rail brackets 5a are respectively fixed to the hoistway wall.

图13是示出实施方式1的安装方法中的第3定位工序及第4定位工序的立体图。图14是从与图13不同的方向观察图13的电梯的立体图。13 is a perspective view showing a third positioning step and a fourth positioning step in the mounting method according to the first embodiment. Fig. 14 is a perspective view of the elevator of Fig. 13 viewed from a direction different from Fig. 13 .

第3定位工序是利用多个起重装置使轿厢底6上升,将轿厢底6相对于第2层站地坎32进行定位的工序。这时,通过使用一对轿厢底连接件27将轿厢底6与第2层站地坎32连接,能够将轿厢底6相对于第2层站地坎32进行定位。此外,利用起重装置来维持轿厢底6的水平状态。The third positioning step is a step of raising the car bottom 6 using a plurality of lifting devices to position the car bottom 6 with respect to the second landing sill 32 . At this time, the car bottom 6 can be positioned with respect to the second landing sill 32 by connecting the car bottom 6 to the second landing sill 32 using the pair of car floor connectors 27 . In addition, the horizontal state of the car bottom 6 is maintained by a lifting device.

在第4定位工序中,将一对第2轿厢导轨托架4b分别安装于一对轿厢导轨2。然后,将各轿厢导轨2按压于对应的下部导靴9。即,将一对轿厢导轨2分别与一对下部导靴9进行组合。In the fourth positioning step, the pair of second car guide rail brackets 4b are attached to the pair of car guide rails 2, respectively. Then, each car guide rail 2 is pressed against the corresponding lower guide shoe 9 . That is, a pair of car guide rails 2 is combined with a pair of lower guide shoes 9, respectively.

由此,对一对第2轿厢导轨托架4b分别进行定位。然后,将进行了定位后的一对第2轿厢导轨托架4b分别固定于井道壁。Thereby, a pair of 2nd car guide rail bracket 4b is respectively positioned. Then, the positioned pair of second car guide rail brackets 4b is respectively fixed to the hoistway wall.

此外,在第4定位工序中,将一对第2对重导轨托架5b分别安装于一对对重导轨3。然后,将各对重导轨3按压于对应的定位部22b。即,将一对对重导轨3分别与一对定位部22b进行组合。Moreover, in the 4th positioning process, a pair of 2nd counterweight rail bracket 5b is attached to a pair of counterweight rail 3, respectively. Then, each counterweight guide rail 3 is pressed against the corresponding positioning portion 22b. That is, a pair of counterweight guide rails 3 is combined with a pair of positioning parts 22b, respectively.

由此,对一对第2对重导轨托架5b分别进行定位。然后,将进行了定位后的一对第2对重导轨托架5b分别固定于井道壁。Thereby, a pair of 2nd counterweight rail bracket 5b is respectively positioned. Then, the positioned pair of second counterweight guide rail brackets 5b is respectively fixed to the hoistway wall.

图15是示出实施方式1的安装方法中的第5定位工序的立体图。图16是从与图15不同的方向观察图15的电梯的立体图。15 is a perspective view showing a fifth positioning step in the mounting method according to Embodiment 1. FIG. Fig. 16 is a perspective view of the elevator in Fig. 15 viewed from a different direction from Fig. 15 .

第5定位工序在第4定位工序之后实施。在第5定位工序中,首先使轿厢底6下降至1层。之后,在轿厢底6上组装轿厢架7,并且在轿厢架7安装一对上部导靴10。The fifth positioning step is implemented after the fourth positioning step. In the fifth positioning step, first, the car bottom 6 is lowered to the first floor. After that, the car frame 7 is assembled on the car bottom 6 and a pair of upper guide shoes 10 are attached to the car frame 7 .

这时,将一对上部导靴10分别按压于一对轿厢导轨2。即,将一对上部导靴10分别与一对轿厢导轨2进行组合。由此,对一对上部导靴10、一对纵柱14以及上梁15进行定位。At this time, the pair of upper guide shoes 10 are pressed against the pair of car guide rails 2, respectively. That is, a pair of upper guide shoes 10 is combined with a pair of car guide rails 2, respectively. Accordingly, the pair of upper guide shoes 10, the pair of vertical columns 14, and the upper beam 15 are positioned.

图17是示出实施方式1的安装方法中的第6定位工序的立体图。图18是从与图17不同的方向观察图17的电梯的立体图。17 is a perspective view showing a sixth positioning step in the mounting method according to Embodiment 1. FIG. Fig. 18 is a perspective view of the elevator in Fig. 17 viewed from a direction different from Fig. 17 .

第6定位工序在第5定位工序之后实施。在第6定位工序中,首先撤除脚手架装置23。然后,使轿厢底6上升至2层。The 6th positioning process is implemented after the 5th positioning process. In the sixth positioning process, first, the scaffolding device 23 is removed. Then, the car bottom 6 is raised to the second floor.

之后,在一对轿厢导轨2安装一对第3轿厢导轨托架4c。然后,将各轿厢导轨2按压于对应的上部导靴10。即,将一对轿厢导轨2分别与一对上部导靴10进行组合。Thereafter, a pair of third car guide rail brackets 4c is attached to the pair of car guide rails 2 . Then, each car guide rail 2 is pressed against the corresponding upper guide shoe 10 . That is, a pair of car guide rails 2 is combined with a pair of upper guide shoes 10, respectively.

由此,分别对一对第3轿厢导轨托架4c进行定位。然后,将进行了定位后的一对第3轿厢导轨托架4c固定于井道壁。Thereby, a pair of 3rd car guide rail bracket 4c is respectively positioned. Then, the positioned pair of third car guide rail brackets 4c is fixed to the hoistway wall.

之后,对应于一对轿厢导轨2的位置,进行一对第4轿厢导轨托架4d以及一对第5轿厢导轨托架4e的设置。此外,对应于一对对重导轨3的位置,进行一对第3对重导轨托架5c、第4对重导轨托架5d以及第5对重导轨托架5e的设置。Thereafter, a pair of fourth car guide rail brackets 4d and a pair of fifth car guide rail brackets 4e are installed corresponding to the positions of the pair of car guide rails 2 . Moreover, the installation of a pair of 3rd counterweight rail bracket 5c, 4th counterweight rail bracket 5d, and the 5th counterweight rail bracket 5e is performed corresponding to the position of a pair of counterweight rail 3.

之后,在轿厢底6上组装未图示的轿厢室。此外,在井道1内设置对重、曳引机、悬挂体、未图示的控制盘等设备。Thereafter, a car chamber (not shown) is assembled on the car floor 6 . In addition, equipment such as a counterweight, a traction machine, a suspension body, and a control panel (not shown) are installed in the hoistway 1 .

在这样的电梯的安装方法的第1定位工序中,将轿厢底6相对于第1层站地坎31进行定位。此外,在第2定位工序中,将一对轿厢导轨2分别与设置于轿厢底6的一对下部导靴9进行组合,对一对第1轿厢导轨托架4a进行定位。In the first positioning step of such an elevator installation method, the car bottom 6 is positioned with respect to the first landing sill 31 . In addition, in the second positioning step, the pair of car guide rails 2 are respectively combined with the pair of lower guide shoes 9 provided on the car bottom 6 to position the pair of first car guide rail brackets 4a.

此外,在第3定位工序中,使轿厢底6上升,将轿厢底6相对于第2层站地坎32进行定位。此外,在第4定位工序中,将一对轿厢导轨与一对下部导靴9进行组合,对第2轿厢导轨托架4b分别进行定位。In addition, in the third positioning step, the car bottom 6 is raised to position the car bottom 6 with respect to the second landing sill 32 . In addition, in the fourth positioning step, the pair of car guide rails and the pair of lower guide shoes 9 are combined to respectively position the second car guide rail brackets 4b.

因此,无需在井道1内张设钢琴线,此外无需使用导轨量规,就能够容易地进行一对轿厢导轨2的位置调整。Therefore, the position adjustment of the pair of car guide rails 2 can be easily performed without stretching piano wires in the hoistway 1 and without using guide rail gauges.

此外,即使在各楼层之间层站发生偏移、或者在水平面内层站发生扭转的情况下,也能够以各楼层的层站为基准来进行一对轿厢导轨2的位置调整。因此,能够使各楼层的层站与轿厢底6之间的间隔均等。In addition, even when the landings are shifted between the floors or the landings are twisted in the horizontal plane, the position adjustment of the pair of car guide rails 2 can be performed based on the landings of the respective floors. Therefore, the intervals between the halls of each floor and the car bottom 6 can be made equal.

特别是,即使在保留既有的层站地坎31、32以及既有的层站门框33的改装工程中,也能够使各楼层的层站与轿厢底6之间的间隔均等。In particular, even when the existing hall sills 31 and 32 and the existing hall door frame 33 are retained, the distance between the hall and the car bottom 6 of each floor can be made equal.

此外,通过将紧急停止装置8、一对下部导靴9以及一对轿厢吊轮11预先安装于轿厢底6,能够减轻在现场进行的作业。此外,能够提高轿厢底6、紧急停止装置8、一对下部导靴9以及一对轿厢吊轮11的组装精度。Furthermore, by pre-attaching the emergency stop device 8, the pair of lower guide shoes 9, and the pair of car suspending sheaves 11 to the car bottom 6, it is possible to reduce the work on site. In addition, the assembly accuracy of the car bottom 6, the emergency stop device 8, the pair of lower guide shoes 9, and the pair of car suspension wheels 11 can be improved.

此外,在第1定位工序中,借助轿厢底连接件27将轿厢底6与第1层站地坎31连接。因此,能够将轿厢底6相对于第1层站地坎31更准确地进行定位。In addition, in the first positioning step, the car bottom 6 is connected to the first landing sill 31 via the car bottom connector 27 . Therefore, it is possible to more accurately position the car floor 6 with respect to the first landing sill 31 .

此外,在第1定位工序中,使支柱21介于轿厢底6与底部1a之间,通过调整支柱21的高度,使轿厢底6成为水平。由此,能够降低施加于第1层站地坎31的载荷。此外,能够稳定地将轿厢底6保持为水平,能够容易地进行一对第1轿厢导轨托架4a的定位。In addition, in the first positioning step, the pillars 21 are interposed between the car bottom 6 and the bottom 1a, and the height of the pillars 21 is adjusted so that the car bottom 6 becomes horizontal. Thereby, the load applied to the first landing sill 31 can be reduced. In addition, the car bottom 6 can be stably held horizontally, and the pair of first car guide rail brackets 4a can be easily positioned.

此外,在第5定位工序中,在使轿厢底6下降至第1层站楼层的状态下,将一对上部导靴10分别与一对轿厢导轨2进行组合,对一对上部导靴10进行定位。因此,能够容易地进行一对上部导靴10的定位。In addition, in the fifth positioning process, in the state where the car bottom 6 is lowered to the first landing floor, the pair of upper guide shoes 10 are respectively combined with the pair of car guide rails 2, and the pair of upper guide shoes 10 for positioning. Therefore, positioning of the pair of upper guide shoes 10 can be easily performed.

此外,通过对应于一对上部导靴10的位置来组装轿厢架7,能够容易地进行轿厢架7的组装。Furthermore, by assembling the car frame 7 corresponding to the positions of the pair of upper guide shoes 10, the assembly of the car frame 7 can be easily performed.

此外,在第6定位工序中,在使轿厢底6上升之后,将一对轿厢导轨与一对上部导靴10进行组合,对一对第3轿厢导轨托架4c进行定位。因此,能够容易地进行一对第3轿厢导轨托架4c的定位。In addition, in the sixth positioning step, after raising the car bottom 6, the pair of car guide rails and the pair of upper guide shoes 10 are combined to position the pair of third car guide rail brackets 4c. Therefore, the positioning of the pair of third car guide rail brackets 4c can be easily performed.

此外,在第2定位工序中,将一对对重导轨3分别与导轨定位件22进行组合,对一对第1对重导轨托架5a进行定位。因此,能够容易地进行一对第1对重导轨托架5a的定位。由此,能够容易地进行一对对重导轨3的位置调整。Moreover, in the 2nd positioning process, a pair of counterweight rail 3 is combined with the rail positioner 22, respectively, and a pair of 1st counterweight rail bracket 5a is positioned. Therefore, positioning of a pair of 1st counterweight rail bracket 5a can be performed easily. Thereby, position adjustment of a pair of counterweight guide rail 3 can be performed easily.

此外,在第4定位工序中,将一对对重导轨3与导轨定位件22进行组合,对一对第2对重导轨托架5b进行定位。因此,能够容易地进行一对第2对重导轨托架5b的定位。由此,能够容易地进行一对对重导轨3的位置调整。Moreover, in the 4th positioning process, a pair of counterweight rail 3 and the rail positioner 22 are combined, and a pair of 2nd counterweight rail bracket 5b is positioned. Therefore, positioning of a pair of 2nd counterweight rail bracket 5b can be performed easily. Thereby, position adjustment of a pair of counterweight guide rail 3 can be performed easily.

此外,实施方式1的轿厢底连接件27具有钩部27a以及地坎接纳部27b。因此,能够将轿厢底6相对于第1层站地坎31更准确地进行定位。由此,能够容易地确定一对轿厢导轨2相对于轿厢底6的位置。即,能够容易地进行一对轿厢导轨2的位置调整。Moreover, the car bottom connector 27 of Embodiment 1 has the hook part 27a and the sill receiving part 27b. Therefore, it is possible to more accurately position the car floor 6 with respect to the first landing sill 31 . Accordingly, the position of the pair of car guide rails 2 relative to the car floor 6 can be easily determined. That is, position adjustment of the pair of car guide rails 2 can be easily performed.

此外,由于在钩部27a设有插入部27c,因此能够容易地相对于既有的第1层站地坎31进行轿厢底6的定位。Moreover, since the insertion part 27c is provided in the hook part 27a, positioning of the car floor 6 with respect to the existing 1st landing sill 31 can be performed easily.

此外,由于地坎接纳部27b接纳轿厢地坎13,因此能够容易地将轿厢底6与第1层站地坎31连接。In addition, since the car sill 13 is received in the sill receiving portion 27b, the car bottom 6 and the first landing sill 31 can be easily connected.

此外,实施方式1的导轨定位件22具有轿厢底安装部22a和一对定位部22b。因此,能够容易地进行一对对重导轨3的位置调整。Moreover, the guide rail positioning tool 22 of Embodiment 1 has the car bottom attachment part 22a and a pair of positioning parts 22b. Therefore, the position adjustment of a pair of counterweight guide rail 3 can be performed easily.

另外,在上述例子中,示出了将全部导轨部件连接起来之后进行导轨的定位以及固定的方法。但是,也可以是在进行1个导轨部件的定位以及固定之后,依次进行下一个导轨部件的定位以及固定的方法。In addition, in the above example, the method of positioning and fixing the guide rail after connecting all the guide rail members was shown. However, after positioning and fixing one rail member, the positioning and fixing of the next rail member may be performed sequentially.

此外,由轿厢底接纳部接纳的轿厢底的层站侧端部不限于轿厢地坎。In addition, the landing-side end portion of the car bottom received by the car bottom receiving portion is not limited to the car sill.

此外,本发明也能够应用于层站楼层为3个楼层以上的电梯。In addition, the present invention can also be applied to elevators having three or more landing floors.

此外,第1层站楼层不限于最下层。此外,第2层站楼层不限于第1层站楼层的上一层的楼层。In addition, the first floor station floor is not limited to the lowest floor. In addition, the second floor station floor is not limited to the floor one floor above the first floor station floor.

此外,本发明能够应用于新设的电梯的安装,也能够应用于既有的电梯的翻新。In addition, the present invention can be applied to installation of newly installed elevators, and can also be applied to renovation of existing elevators.

此外,本发明能够应用于具有机房的电梯、双层电梯、单井道多轿厢方式的电梯等各种类型的电梯。单井道多轿厢方式是多个轿厢各自独立地在共用的井道中升降的方式。In addition, the present invention can be applied to various types of elevators, such as an elevator having a machine room, a double-deck elevator, and an elevator of a single-shaft multi-car system. The single-shaft multi-car method is a method in which a plurality of cars independently move up and down in a shared shaft.

标号说明Label description

1:井道;1a:底部;2:轿厢导轨;3:对重导轨;4a:第1轿厢导轨托架;4b:第2轿厢导轨托架;4c:第3轿厢导轨托架;5a:第1对重导轨托架;5b:第2对重导轨托架;6:轿厢底;9:下部导靴;10:上部导靴;13:轿厢地坎(层站侧端部);21:支柱;22:导轨定位件;22a:轿厢底安装部;22b:定位部;27:轿厢底连接件;27a:钩部;27b:地坎接纳部(轿厢底接纳部);27c:插入部;31:第1层站地坎;31a:层站地坎槽;32:第2层站地坎。1: shaft; 1a: bottom; 2: car guide rail; 3: counterweight guide rail; 4a: first car guide rail bracket; 4b: second car guide rail bracket; 4c: third car guide rail bracket; 5a: 1st counterweight guide rail bracket; 5b: 2nd counterweight guide rail bracket; 6: car bottom; 9: lower guide shoe; 10: upper guide shoe; 13: car sill (end of landing side ); 21: pillar; 22: guide rail positioning piece; 22a: car bottom installation part; 22b: positioning part; 27: car bottom connector; 27a: hook part; 27b: sill receiving part (car bottom receiving part ); 27c: insertion part; 31: sill of the first floor; 31a: sill groove of the floor; 32: sill of the second floor.

Claims (11)

1. An elevator installation method, comprising the following steps:
a 1 st positioning step of positioning a car floor with respect to a 1 st landing sill provided on a 1 st landing floor;
a 2 nd positioning step of combining the car guide rail with a lower guide shoe provided at the car bottom to position a 1 st car guide rail bracket;
a 3 rd positioning step of raising the car bottom and positioning the car bottom with respect to a 2 nd landing sill provided on a 2 nd landing floor; and
and a 4 th positioning step of positioning a 2 nd car guide rail bracket located above the 1 st car guide rail bracket by combining the car guide rail and the lower guide shoe.
2. The installation method of an elevator according to claim 1,
in the 1 st positioning procedure, the car bottom is connected with the 1 st landing sill by a car bottom connecting piece.
3. The installation method of an elevator according to claim 1 or 2,
in the 1 st positioning step, a pillar is interposed between the car bottom and a bottom portion of the hoistway, and the car bottom is leveled by adjusting the height of the pillar.
4. The installation method of an elevator according to any one of claims 1 to 3,
the method further includes, after the 4 th positioning step, a 5 th positioning step of: and lowering the car bottom to the 1 st landing floor, and positioning the upper guide shoe by combining the upper guide shoe with the car guide rail.
5. The installation method of an elevator according to claim 4,
the method further includes, after the 5 th positioning step, a 6 th positioning step of: and (3) raising the car platform, combining the car guide rail and the upper guide shoe, and positioning the 3 rd car guide rail bracket located above the 2 nd car guide rail bracket.
6. The installation method of an elevator according to any one of claims 1 to 5,
in the 2 nd positioning step, a counterweight guide rail and a guide rail positioning member provided at the car bottom are combined to position the 1 st counterweight guide rail bracket.
7. The installation method of an elevator according to claim 6,
in the 4 th positioning step, the counterweight guide rail and the guide rail positioning member are combined, and the 2 nd counterweight guide rail bracket located above the 1 st counterweight guide rail bracket is positioned.
8. An installation aid for an elevator, which is used in the 1 st positioning step and the 3 rd positioning step of the installation method for an elevator according to claim 1,
the installation assistant tool of the elevator is provided with a car bottom connecting piece, and the car bottom connecting piece is provided with: a hook portion hung on the landing sill; and a car bottom receiving portion that receives a landing side end portion of a car bottom, wherein the car bottom connecting member connects the car bottom to the landing sill by itself to position the car bottom with respect to the landing sill.
9. The elevator mounting aid of claim 8,
the hook portion has an insertion portion that is inserted into a landing ridge groove.
10. The elevator mounting aid of claim 8 or 9, wherein,
the car bottom receiving portion is a sill receiving portion that receives a car sill as the landing-side end portion.
11. An installation aid for an elevator, which is used in the 1 st positioning step and the 3 rd positioning step of the installation method for an elevator according to claim 1,
the auxiliary installation tool for the elevator is provided with a guide rail positioning piece, and the guide rail positioning piece is provided with: a car bottom mounting portion mounted on a car bottom; and a positioning portion serving as a positioning reference of the counterweight guide rail.
CN201980098093.7A 2019-07-22 2019-07-22 Method and auxiliary device for installing elevator Active CN114127002B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/028641 WO2021014528A1 (en) 2019-07-22 2019-07-22 Installation method and installation jig for elevator

Publications (2)

Publication Number Publication Date
CN114127002A CN114127002A (en) 2022-03-01
CN114127002B true CN114127002B (en) 2023-03-24

Family

ID=74193497

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201980098093.7A Active CN114127002B (en) 2019-07-22 2019-07-22 Method and auxiliary device for installing elevator

Country Status (3)

Country Link
JP (1) JP7113977B2 (en)
CN (1) CN114127002B (en)
WO (1) WO2021014528A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114890268A (en) * 2022-05-13 2022-08-12 康力电梯股份有限公司 Back-to-back guide rail connecting bracket

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0280678U (en) * 1988-12-13 1990-06-21
JP2001322776A (en) * 2000-05-16 2001-11-20 Toshiba Elevator Co Ltd Elevator guide rail centering template and elevator guide rail centering method
JP2002003124A (en) * 2000-06-23 2002-01-09 Mitsubishi Electric Corp Elevator installation device and its installation method
JP2003112875A (en) * 2001-10-03 2003-04-18 Hitachi Building Systems Co Ltd Mounting structure and mounting method of elevator compensation rope
JP2004026429A (en) * 2002-06-26 2004-01-29 Shirai Eremeka:Kk Elevator installing method
CN1669899A (en) * 2004-03-17 2005-09-21 因温特奥股份公司 Equipment for fine positioning of a car of a multi-stage car
JP2009234722A (en) * 2008-03-27 2009-10-15 Mitsubishi Electric Corp Elevator equipment rail attachment tool and elevator device
CN104955754A (en) * 2013-02-01 2015-09-30 通力股份公司 Elevator system and method for installing an elevator
WO2015189950A1 (en) * 2014-06-12 2015-12-17 三菱電機株式会社 Elevator and method for adjusting cab installation orientation
JP2018070362A (en) * 2016-11-02 2018-05-10 株式会社日立ビルシステム Elevator installation method
CN208378160U (en) * 2018-07-17 2019-01-15 苏州富士精工电梯有限公司 A kind of two compact-sized floor common type elevators

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07300284A (en) * 1994-05-09 1995-11-14 Hitachi Building Syst Eng & Service Co Ltd Guide rail centering device
JP3343483B2 (en) * 1996-11-18 2002-11-11 株式会社日立ビルシステム Elevator guide rail centering device
JPH11209026A (en) * 1998-01-19 1999-08-03 Hitachi Building Systems Co Ltd Elevator installation method
US20090065310A1 (en) * 2004-11-16 2009-03-12 Flynn Michael P Installing guide rails in an elevator system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0280678U (en) * 1988-12-13 1990-06-21
JP2001322776A (en) * 2000-05-16 2001-11-20 Toshiba Elevator Co Ltd Elevator guide rail centering template and elevator guide rail centering method
JP2002003124A (en) * 2000-06-23 2002-01-09 Mitsubishi Electric Corp Elevator installation device and its installation method
JP2003112875A (en) * 2001-10-03 2003-04-18 Hitachi Building Systems Co Ltd Mounting structure and mounting method of elevator compensation rope
JP2004026429A (en) * 2002-06-26 2004-01-29 Shirai Eremeka:Kk Elevator installing method
CN1669899A (en) * 2004-03-17 2005-09-21 因温特奥股份公司 Equipment for fine positioning of a car of a multi-stage car
JP2009234722A (en) * 2008-03-27 2009-10-15 Mitsubishi Electric Corp Elevator equipment rail attachment tool and elevator device
CN104955754A (en) * 2013-02-01 2015-09-30 通力股份公司 Elevator system and method for installing an elevator
WO2015189950A1 (en) * 2014-06-12 2015-12-17 三菱電機株式会社 Elevator and method for adjusting cab installation orientation
JP2018070362A (en) * 2016-11-02 2018-05-10 株式会社日立ビルシステム Elevator installation method
CN208378160U (en) * 2018-07-17 2019-01-15 苏州富士精工电梯有限公司 A kind of two compact-sized floor common type elevators

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
无脚手架电梯安装施工技术;林仕超;《施工技术》;全文 *

Also Published As

Publication number Publication date
WO2021014528A1 (en) 2021-01-28
JPWO2021014528A1 (en) 2021-01-28
CN114127002A (en) 2022-03-01
JP7113977B2 (en) 2022-08-05

Similar Documents

Publication Publication Date Title
CN101687613B (en) Elevator cage and its installation method
CN106794965A (en) Ceiling unit and the lift car with ceiling unit
CN108016971A (en) The installation method of elevator
CN114127002B (en) Method and auxiliary device for installing elevator
CN112566864B (en) Application method of lift extension technology of elevator
CN107618959B (en) The installation method and elevator of hoist engine
HK40061657A (en) Installation method and installation jig for elevator
HK40061657B (en) Installation method and installation jig for elevator
CN111566038B (en) Elevator and its modification method
CN104863344B (en) The assemble method of elevator erecting device and the erecting device
CN112299192A (en) Installation method of guide rail fixing device and guide rail fixing device
JP2014218345A (en) Guide rail for elevator and elevator device using the same
JP4454100B2 (en) Elevator guide rail centering template and elevator guide rail centering method
CN114516574B (en) Guide rails and elevators
WO2020261804A1 (en) Method for laying guide rails and rotation prevention jig
CN109641719B (en) Elevator hoisting wheel device and installation method thereof
JP7583224B2 (en) Hoist installation guide device and hoist installation method
CN105000448A (en) Elevator and hanging body support device thereof
JP2006044843A (en) Working bench scaffold for hoistway
CN111936408B (en) Machine base fixing device for elevator traction machine
HK40025699B (en) Elevator and refurbishing method therefor
HK40025699A (en) Elevator and refurbishing method therefor
JP2008189410A (en) Elevator installation apparatus and installation method
JP2023048857A (en) Elevator renewal method and guide rail fixing device
JP2015117085A (en) Elevator work scaffold body, elevator and method of attaching elevator work scaffold body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 40061657

Country of ref document: HK

GR01 Patent grant
GR01 Patent grant