IE84516B1 - A precast reinforced concrete slab - Google Patents

A precast reinforced concrete slab Download PDF

Info

Publication number
IE84516B1
IE84516B1 IE2004/0393A IE20040393A IE84516B1 IE 84516 B1 IE84516 B1 IE 84516B1 IE 2004/0393 A IE2004/0393 A IE 2004/0393A IE 20040393 A IE20040393 A IE 20040393A IE 84516 B1 IE84516 B1 IE 84516B1
Authority
IE
Ireland
Prior art keywords
bars
mould
bed
reinforced concrete
shaping
Prior art date
Application number
IE2004/0393A
Other versions
IE20040393A1 (en
Inventor
Doyle Gerard
Original Assignee
Doyle Gerard
Filing date
Publication date
Priority claimed from IE20030432A external-priority patent/IES20030432A2/en
Application filed by Doyle Gerard filed Critical Doyle Gerard
Priority to IE2004/0393A priority Critical patent/IE84516B1/en
Publication of IE20040393A1 publication Critical patent/IE20040393A1/en
Publication of IE84516B1 publication Critical patent/IE84516B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D11/00Bending not restricted to forms of material mentioned in only one of groups B21D5/00, B21D7/00, B21D9/00; Bending not provided for in groups B21D5/00 - B21D9/00; Twisting
    • B21D11/10Bending specially adapted to produce specific articles, e.g. leaf springs
    • B21D11/12Bending specially adapted to produce specific articles, e.g. leaf springs the articles being reinforcements for concrete
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/12Making special types or portions of network by methods or means specially adapted therefor
    • B21F27/20Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F33/00Tools or devices specially designed for handling or processing wire fabrics or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/03Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance with indentations, projections, ribs, or the like, for augmenting the adherence to the concrete

Abstract

ABSTRACT A process for manufacturing pre—cas:gconcrete floor slabs includes shaping a number of steel bars at a shaping station. A number of spaced—apart loops are formed in the bars by pressing the bars downwardly between spaced—apart cylindrical formers at the shaping station. A pair of the shaped bars are mounted in a slab—forming mould, at opposite sides of the mould, together with a steel reinforcing frame. The mould is then filled with concrete, leaving the loops of the bars projecting upwardly of the top surface of the concrete. After setting the concrete to form the pre—cast concrete slab, the slab is removed from the mould.

Description

A pre-cast reinforced concrete slab This invention relates to a process and apparatus for manufacturing a pre-cast reinforced concrete slab, and in particular slabs used in the construction of floors in buildings.
According to the invention there is provided a process for manufacturing a pre-cast reinforced concrete slab, comprising the steps: forming a plurality of shaped tie bars by delivering elongate steel bars to a shaping station, at the shaping station laying the steel bars side by side on a shaping bed, the bars extending across a plurality of space-apart formers which are seated on top of the bed, securing the bars on the formers, delivering a press beam on a carriage incrementally along the bed between a number of bending positions, at each bending position positioning the press beam between an adjacent pair of formers and stopping the carriage, extending the press beam downwardly to press the bars downwardly together between the formers and then retracting the press beam, shaping a number of spaced-apart loops in the bars in this manner for forming the shaped tie bars, delivering the tie bars to a moulding station, at the moulding station mounting a pair of the tie bars in a slab forming mould, locating the tie bars adjacent opposite sides of the mould, '° 84516 inserting a steel reinforcing frame into the mould with a top of each tie bar projecting above the reinforcing frame, pouring a quantity of liquid concrete into the mould, covering the steel reinforcing frame with the concrete and leaving an uppermost portion of each tie bar projecting upwardly from a top surface of the concrete in the mould, setting the concrete in the mould to form the reinforced concrete slab, and removing the reinforced concrete slab from the mould. in a preferred embodiment of the invention the process includes clamping the bars at each bending position by extending a clamp beam which is mounted on the carriage to engage and clamp the bars against the bed before extending the press beam downwardly for shaping the bars.
In another embodiment the clamp beam is extended downwardly for engagement with the bars within previously formed looped portions of the bars.
In a further embodiment the process includes securing the bars on the formers by laying a cross bar across the bars at each former and fastening the cross bar to the former for clamping the bars between the cross bar and the former.
In a preferred embodiment the formers are cylindrical in shape, the formers being mounted on the bed in a parallel spaced-apart relationship.
The invention will be more clearly understood by the following description of some embodiments thereof, given by way of example only with reference to the accompanying drawings, in which; Fig. 1 is a perspective view of a pre-cast reinforced concrete slab manufactured according to the process of the invention; Fig. 2 is an elevation view of a shaping station used in the process; Fig. 3 is an end elevational view of the shaping station; Fig. 4 is a detail perspective view showing portion of the shaping station; Fig. 5 is a schematic elevational view illustrating operation of the shaping station; and Fig. 6 is an elevational view of a shaped tie bar formed during the process at the shaping station.
Referring initially to Fig. 1 there is shown a pre-cast reinforced concrete slab manufactured according to the process of the invention indicated generally by the reference numeral 1. The slab 1 has a reinforced concrete body 2 of generally rectangular shape. it will be noted that roughly midway along a top face 3 of the slab 1 at opposite sides of the slab 1 a number of spaced-apart steel loops 4 project upwardly above top face 3 of the slab 1. These are for the reception of and engagement with tie rods which extend between loops 4 on adjacent slabs 1 which are laidside by side in a building to construct a floor prior to covering the slabs 1 with a further layer of concrete to provide a uniform floor surface.
A process for manufacturing the slab 1 will now be described. Shaped tie bars 10 (Fig. 6) are formed by delivering elongate steel bars to a shaping station 12. The shaping station 12 has a ground engaging frame 13 formed by a pair of spaced-apart elongate I-beams 14 interconnected by a number of box section cross beams 15. A shaping bed 16 is supported on the frame 13 and comprises a bed plate 17 mounted between upper flanges 18 of the I-beams 14. A number of spaced-apart cylindrical formers :20 are mounted spaced-apart on the bed plate 17 in a parallel relationship.
Locking bolts 22 project upwardly at each end of each former 20 for engagement by a complementary cross bar 23 which can be extended between the locking bolts 22 and secured thereto by lock nuts 24. Rails 25 extend along an outer edge of each upper flange 18 of the I-beams 14. A carriage 30 is moveable along the rails 25 between opposite ends of the shaping bed 16. Rollers 31 on the carriage 30 engage the rails 25 for rolling the carriage 30 along the shaping bed 16.
A press ram 34 is mounted on the carriage 30 and comprises a box section press beam 35 mounted by a pair of spaced-apart rams 36 on the carriage 30 above the shaping bed 16. The rams 36 are operable to raise and lower the press beam 35.
Mounted on the carriage 30 behind the press beam 35 is a clamp beam 38 which is also of box section and is secured on the carriage 30 by means of a pair of rams 39 which are operable to raise and lower the clamp beam 38 on the carriage 30. All the rams 38, 39 are connected to a hydraulic power supply for operation of the rams 36, 39.
To form the shaped tie bars 10 a number of elongate steel bars 50 are laid side by side on the shaping bed 16. lying across the formers 20 as shown in Figs. 4 and 5.
The bars 50 are secured to each former 20 by laying a cross bar 23 over the bars 50 in engagement with the locking bolts 22 and securing the cross bars 23 to each former 20 by means of the lock nuts 24. This prevents any vertical movement of the bars 50 but will allow longitudinal movement if required to accommodate bending as described later. The carriage 30 is advanced to position the press beam 35 between a first pair of formers 20 on the shaping bed 16 and the rams 36 operated to extend the press beam 35 downwardly thus pressing the bars 50 downwardly between the formers 20 forming a loop in the bars 50. The press beam 35 is then retracted and the carriage 30 is moved along the rails 25 to position the press beam 35 above the next pair of formers 20. Before lowering the press beam 35 the clamp beam 38 is lowered by the rams 39 into the previously formed loop 51 to securely clamp the bars 50 against the bed 17. Then the rams 36 are extended to move the press beam 35 downwardly to form the next loop 51 in the bars 50 as shown in Fig. 5. The carriage is moved incrementally along the bed 16 in this fashion forming a new loop 51 in the bars 50 between each pair of formers 20. When the carriage 30 reaches the end of the bed 16 it is returned to the start position and the shaped tie bars 10 with the loops 51 are then removed from the shaping station 12 and delivered to a moulding station.
At the moulding station a pair of the tie bars 10 are mounted in a slab forming mould, the tie bars 10 being located at opposite sides of the mould. A steel reinforcing frame is also inserted into the mould with a semi-circular loop 4 at atop of each tie bar 10 projecting above the reinforcing frame. A quantity of liquid concrete is poured into the mould covering the steel reinforcing frame but leaving an uppermost portion of each loop 4 of the tie bar 10 projecting upwardly from the top surface of the concrete in the mould (thus leaving the exposed loops 4 shown in Hg. 1). The concrete is allowed to set in the mould to form the reinforced concrete slab 1 and then the reinforced concrete slab 1 is removed from the mould.
The invention is not limited to the embodiments hereinbefore described which may be varied in both construction and detail within the scope of the appended claims.

Claims (1)

1. A process for manufacturing a pre-cast reinforced concrete slab, comprising the steps: forming a plurality of shaped tie bars by delivering elongate steel bars to a shaping station, laying the steel bars side by side on a shaping bed, the bars extending across a plurality of spaced-apart formers which are seated on top of the bed, securing the bars on the fonners, delivering a press beam on a carriage incrementally along the bed between a number of bending positions, at each bending position positioning the press beam between an adjacent pair of fomrers and stopping the carriage, extending the press beam downwardly to press the bars downwardly between the fonners and then retracting the press beam, shaping a number of spaced-apart loops in the bars in this manner for forrnhg the shaped tie bars, delivering the tie bars to a moulding station, atthe moulding station mounting a pairofthetie bars in a slab forming mould, locating the tie bars adjacent opposite sides of the mould, inserting a steel reinforcing frame into the mould with a top of each tie bar projecting above the reinforcing frame, pouring a quantity of liquid concrete into the mould covering the steel reinforcing frame with the concrete and leaving an uppermost portion of each fie bar projecting upwardly from a top surface of the concrete in the mould, setting the concrete in the mould to form the reinforced concrete slab, and removing the reinforced concrete slab from the mould. A process as claimed in claim 1 induding the step of clamping the bars at each bending position by extending a clamp beam which is mounted on the carriage to engage and clamp the bars against the bed before extending the press beam downwardly for shaping the bars. A process as claimed in claim 1 or claim 2 including extending the clamp beam downwardly for engagement with the bars within previously fonned looped portions of the bars. A process as claimed in any preceding claim including securing the bars on the fomters by laying a cross bar on the bars at each former and fastening the cross bar to the fcmier for clamping the bars between the cross bar and the former. A process as claimed in any preceding claim wherein the fomwers are cylindrical in shape, the fonners being mounted on the bed in a parallel spaced-apart relationship. A process for manufacturing a pre-cast reinforced concrete slab substantially as hereinbefore described with reference to the accompanying drawings. A pie-cast reinforced concrete slab whenever produced by the process as ceimed in any preceding claim.
IE2004/0393A 2004-06-08 A precast reinforced concrete slab IE84516B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
IE2004/0393A IE84516B1 (en) 2004-06-08 A precast reinforced concrete slab

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
IEIRELAND09/06/2003S2003/0432
IE20030432A IES20030432A2 (en) 2003-06-09 2003-06-09 A pre-cast reinforced concrete slab
IE2004/0393A IE84516B1 (en) 2004-06-08 A precast reinforced concrete slab

Publications (2)

Publication Number Publication Date
IE20040393A1 IE20040393A1 (en) 2005-03-09
IE84516B1 true IE84516B1 (en) 2007-02-21

Family

ID=

Similar Documents

Publication Publication Date Title
KR101081791B1 (en) Beam manufacturing equipment using side formwork jack device and end formwork rotating device
CN110983894B (en) Prefabricated assembled concrete pavement and construction method
EP1678396B1 (en) System and method for vertically forming concrete panels
US4761126A (en) Traveling concrete casting mold
US20110131905A1 (en) Cementitious deck or roof panels and modular building construction
US3879914A (en) Method of making a platform structure
KR100949785B1 (en) Mold for making PC beam
KR20040019818A (en) Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
KR100448221B1 (en) Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same
JP7126248B2 (en) Culvert manufacturing method
US3767153A (en) Platform structure
US20090000242A1 (en) Wall forming apparatus and methods
IE84516B1 (en) A precast reinforced concrete slab
IES83333Y1 (en) A pre-cast reinforced concrete slab
IE20030432U1 (en) A pre-cast reinforced concrete slab
IES20030432A2 (en) A pre-cast reinforced concrete slab
CN114893238B (en) Shield tunnel flue plate mounting structure and construction method thereof
CN105839824B (en) Shed deckhead construction method
CN107620400B (en) Assembled concrete variable-section T-shaped shear wall component and construction method thereof
WO2007117133A1 (en) Method for pouring sleepers and formwork used therefore
CN115711005B (en) A prefabricated box-type ribbed floor slab and its construction method
CN223634078U (en) A precast component for window sill coping
CN213499909U (en) Gutter prefabricated part mold
CN215760451U (en) Wet district concrete turn-ups construction mould
CN220014500U (en) Concrete floor thickness control device