IE20040393A1 - A precast reinforced concrete slab - Google Patents
A precast reinforced concrete slab Download PDFInfo
- Publication number
- IE20040393A1 IE20040393A1 IE20040393A IE20040393A IE20040393A1 IE 20040393 A1 IE20040393 A1 IE 20040393A1 IE 20040393 A IE20040393 A IE 20040393A IE 20040393 A IE20040393 A IE 20040393A IE 20040393 A1 IE20040393 A1 IE 20040393A1
- Authority
- IE
- Ireland
- Prior art keywords
- bars
- mould
- formers
- bed
- reinforced concrete
- Prior art date
Links
- 239000011150 reinforced concrete Substances 0.000 title claims description 16
- 238000007493 shaping process Methods 0.000 claims abstract description 26
- 238000000034 method Methods 0.000 claims abstract description 17
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000004567 concrete Substances 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 10
- 238000004519 manufacturing process Methods 0.000 claims abstract description 6
- 238000005452 bending Methods 0.000 claims description 7
- 238000000465 moulding Methods 0.000 claims description 6
- 239000007788 liquid Substances 0.000 claims description 3
- SGPGESCZOCHFCL-UHFFFAOYSA-N Tilisolol hydrochloride Chemical compound [Cl-].C1=CC=C2C(=O)N(C)C=C(OCC(O)C[NH2+]C(C)(C)C)C2=C1 SGPGESCZOCHFCL-UHFFFAOYSA-N 0.000 claims 2
- 241001125929 Trisopterus luscus Species 0.000 claims 1
- 238000003825 pressing Methods 0.000 abstract description 2
- 239000011178 precast concrete Substances 0.000 abstract 2
- 238000010276 construction Methods 0.000 description 2
- 230000000295 complement effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D11/00—Bending not restricted to forms of material mentioned in only one of groups B21D5/00, B21D7/00, B21D9/00; Bending not provided for in groups B21D5/00 - B21D9/00; Twisting
- B21D11/10—Bending specially adapted to produce specific articles, e.g. leaf springs
- B21D11/12—Bending specially adapted to produce specific articles, e.g. leaf springs the articles being reinforcements for concrete
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F27/00—Making wire network, i.e. wire nets
- B21F27/12—Making special types or portions of network by methods or means specially adapted therefor
- B21F27/20—Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F33/00—Tools or devices specially designed for handling or processing wire fabrics or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/02—Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/01—Reinforcing elements of metal, e.g. with non-structural coatings
- E04C5/02—Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
- E04C5/03—Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance with indentations, projections, ribs, or the like, for augmenting the adherence to the concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
A process for manufacturing pre-cast concrete floor slabs includes shaping a number of steel bars at a shaping station. A number of spaced-apart loops are formed in the bars by pressing the bars downwardly between spaced-apart cylindrical formers at the shaping station. A pair of the shaped bars are mounted in a slab-forming mould, at opposite sides of the mould, together with a steel reinforcing frame. The mould is then filled with concrete, leaving the loops of the bars projecting upwardly of the top surface of the concrete. After setting the concrete to form the pre-cast concrete slab, the slab is removed from the mould.
Description
"A pre-cast reinforced concrete slab IE 0 4 039 3 This invention relates to a process and apparatus for manufacturing a pre-cast reinforced concrete slab, and in particular slabs used in the construction of floors in buildings.
According to the invention there is provided a process for manufacturing a pre-cast reinforced concrete slab, comprising the steps: forming a plurality of shaped tie bars by delivering elongate steel bars to a shaping station, at the shaping station laying the steel bars side by side on a shaping bed, the bars extending across a plurality of space-apart formers which are seated on top of the bed, securing the bars on the formers, delivering a press beam on a carriage incrementally along the bed between a 2 0 number of bending positions, at each bending position positioning the press beam between an adjacent pair of formers and stopping the carriage, extending the press beam downwardly to press the bars downwardly together between the formers and then retracting the press beam, shaping a number of spaced-apart loops in the bars in this manner for forming the shaped tie bars, delivering the tie bars to a moulding station, at the moulding station mounting a pair of the tie bars in a slab forming mould, locating the tie bars adjacent opposite sides Te mould, OPEN TO PUBLIC INSPECTION UNDER SECTION 28 AND RULE 23 jwt hoA£z.4...... wt a_-1 /cn-c A!of I IE 0 4 0 3 9 3 - 2 inserting a steel reinforcing frame into the mould with a top of each tie bar projecting above the reinforcing frame, pouring a quantity of liquid concrete into the mould, covering the steel reinforcing frame with the concrete and leaving an uppermost portion of each tie bar projecting upwardly from atop surface of the concrete in the mould, setting the concrete in the mould to form the reinforced concrete slab, and removing the reinforced concrete slab from the mould.
In a preferred embodiment of the invention the process includes clamping the bars at each bending position by extending a clamp beam which is mounted on the carriage to engage and clamp the bars against the bed before extending the press beam downwardly for shaping the bars.
In another embodiment the clamp beam is extended downwardly for engagement with the bars within previously formed looped portions of the bars.
In a further embodiment the process includes securing the bars on the formers by laying a cross bar across the bars at each former and fastening the cross bar to the former for clamping the bars between the cross bar and the former.
In a preferred embodiment the formers are cylindrical in shape, the formers being mounted on the bed in a parallel spaced-apart relationship.
The invention will be more clearly understood by the following description of some embodiments thereof, given by way of example only with reference to the accompanying drawings, in which; Fig. 1 is a perspective view of a pre-cast reinforced concrete slab manufactured according to the process of the invention; Fig. 2 is an elevation view of a shaping station used in the process; IE 0 4 0 3 9 3 - 3 Fig. 3 is an end elevational view of the shaping station; Fig. 4 is a detail perspective view showing portion of the shaping station; Fig. 5 is a schematic elevational view illustrating operation of the shaping station; and Fig. 6 is an elevational view of a shaped tie bar formed during the process at the shaping station.
Referring initially to Fig. 1 there is shown a pre-cast reinforced concrete slab manufactured according to the process of the invention indicated generally by the reference numeral 1. The slab 1 has a reinforced concrete body 2 of generally rectangular shape. It will be noted that roughly midway along a top face 3 of the slab 1 at opposite sides of the slab 1 a number of spaced-apart steel loops 4 project upwardly above top face 3 of the slab 1. These are for the reception of and engagement with tie rods which extend between loops 4 on adjacent slabs 1 which are laid side by side in a building to construct a floor prior to covering the slabs 1 with a further layer of concrete to provide a uniform floor surface.
A process for manufacturing the slab 1 will now be described. Shaped tie bars 10 (Fig. 6) are formed by delivering elongate steel bars to a shaping station 12. The shaping station 12 has a ground engaging frame 13 formed by a pair of spaced-apart elongate I-beams 14 interconnected by a number of box section cross beams 15. A shaping bed 16 is supported on the frame 13 and comprises a bed plate 17 mounted between upper flanges 18 of the I-beams 14. A number of spaced-apart cylindrical formers 20 are mounted spaced-apart on the bed plate 17 in a parallel relationship. Locking bolts 22 project upwardly at each end of each former 20 for engagement by a complementary cross bar 23 which can be extended between the locking bolts 22 and secured thereto by lock nuts 24. Rails 25 extend along an outer edge of each upper flange 18 of the I-beams 14. A carriage 30 is moveable along the rails 25 between opposite ends of the shaping bed 16. Rollers 31 on the carriage 30 engage the rails 25 for rolling the carriage 30 along the shaping bed 16.
IE 0 4 0 3 9 3 - 4 A press ram 34 is mounted on the carriage 30 and comprises a box section press beam 35 mounted by a pair of spaced-apart rams 36 on the carriage 30 above the shaping bed 16. The rams 36 are operable to raise and lower the press beam 35. Mounted on the carriage 30 behind the press beam 35 is a clamp beam 38 which is also of box section and is secured on the carriage 30 by means of a pair of rams 39 which are operable to raise and lower the clamp beam 38 on the carriage 30. All the rams 36, 39 are connected to a hydraulic power supply for operation of the rams 36, 39.
To form the shaped tie bars 10 a number of elongate steel bars 50 are laid side by side on the shaping bed 16, lying across the formers 20 as shown in Figs. 4 and 5. The bars 50 are secured to each former 20 by laying a cross bar 23 over the bars 50 in engagement with the locking bolts 22 and securing the cross bars 23 to each former 20 by means of the lock nuts 24. This prevents any vertical movement of the bars 50 but will allow longitudinal movement if required to accommodate bending as described later. The carriage 30 is advanced to position the press beam 35 between a first pair of formers 20 on the shaping bed 16 and the rams 36 operated to extend the press beam 35 downwardly thus pressing the bars 50 downwardly between the formers 20 forming a loop in the bars 50. The press beam 35 is then retracted and the carriage 30 is moved along the rails 25 to position the press beam 35 above the next pair of formers 20. Before lowering the press beam 35 the clamp beam 38 is lowered by the rams 39 into the previously formed loop 51 to securely clamp the bars 50 against the bed 17. Then the rams 36 are extended to move the press beam 35 downwardly to form the next loop 51 in the bars 50 as shown in Fig. 5. The carriage 30 is moved incrementally along the bed 16 in this fashion forming a new loop 51 in the bars 50 between each pair of formers 20. When the carriage 30 reaches the end of the bed 16 it is returned to the start position and the shaped tie bars 10 with the loops 51 are then removed from the shaping station 12 and delivered to a moulding station.
At the moulding station a pair of the tie bars 10 are mounted in a slab forming mould, the tie bars 10 being located at opposite sides of the mould. A steel reinforcing frame is also inserted into the mould with a semi-circular loop 4 at a top of each tie bar 10 projecting above the reinforcing frame. A quantity of liquid concrete is poured into - 5 IE 0 4 0 3 9 3 the mould covering the steel reinforcing frame but leaving an uppermost portion of each loop 4 of the tie bar 10 projecting upwardly from the top surface of the concrete in the mould (thus leaving the exposed loops 4 shown in Fig. 1). The concrete is allowed to set in the mould to form the reinforced concrete slab 1 and then the reinforced concrete slab 1 is removed from the mould.
The invention is not limited to the embodiments hereinbefore described which may be varied in both construction and detail within the scope of the appended claims.
Claims (7)
1. A process for manufacturing a pre-cast reinforced concrete slab, comprising the steps: forming a plurality of shaped tie bars by delivering elongate steel bars to a shaping station, laying the steel bars side by side on a shaping bed, the bars extending across a plurality of spaced-apart formers which are seated on top of the bed, securing the bars on the formers, delivering a press beam on a carriage incrementally along the bed between a number of bending positions, at each bending position positioning the press beam between an adjacent pair of formers and stopping the carriage, extending the press beam downwardly to press the bars downwardly between the formers and then retracting the press beam, shaping a number of spaced-apart loops in the bars in this manner for forming the shaped tie bars, delivering the tie bars to a moulding station, at the moulding station mounting a^pair of the tie bars in a slab forming mould, locating the tie bars adjacent opposite sides of the mould, inserting a steel reinforcing frame into thembuld with a top of each tie bar projecting above the reinforcing frame, pouting a quantity of liquid concrete into the mould covering the steel ΙΕ θ 4 0 3 9 3 - 7 reinforcing frame with the concrete and leaving an uppermost portion of each tie bar projecting upwardly from a top surface of the concrete in the mould, setting the concrete in the mould to form the reinforced concrete slab, and removing the reinforced concrete slab from the mould.
2. A process as claimed in claim 1 including the step of clamping the bars at each bending position by extending a damp beam which is mounted on the carriage to engage and damp the bars against the bed before extending the press beam downwardly for shaping the bars.
3. A process as claimed in claim 1 or daim 2 including extending the damp beam downwardly for engagement with the bars within previously formed looped portions of the bars.
4. A process as claimed in any preceding daim induding securing the bars on the formers by laying a cross bar on the bars at each former and fastening the cross bar to the former for clamping the bars between the cross bar and the former.
5. A process as claimed in any preceding claim wherein the formers are cylindrical in shape, the formers being mounted on the bed in a parallel spaced-apart relationship.
6. A process for manufacturing a pre-cast reinforced concrete slab substantially as hereinbefore described with reference to the accompanying drawings.
7. A pre-cast reinforced concrete slab whenever produced by the process as claimed in any preceding claim.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| IE2004/0393A IE84516B1 (en) | 2004-06-08 | A precast reinforced concrete slab |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| IEIRELAND09/06/2003S2003/0432 | |||
| IE20030432A IES20030432A2 (en) | 2003-06-09 | 2003-06-09 | A pre-cast reinforced concrete slab |
| IE2004/0393A IE84516B1 (en) | 2004-06-08 | A precast reinforced concrete slab |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| IE20040393A1 true IE20040393A1 (en) | 2005-03-09 |
| IE84516B1 IE84516B1 (en) | 2007-02-21 |
Family
ID=
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013037650A1 (en) | 2011-09-15 | 2013-03-21 | Friulchem Spa | Compositions for oral administration to animals, production methods thereof and uses of same |
| WO2014033230A1 (en) | 2012-08-31 | 2014-03-06 | Friulchem Spa | Compositions for oral administration to animals, production methods thereof and uses of same |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2013037650A1 (en) | 2011-09-15 | 2013-03-21 | Friulchem Spa | Compositions for oral administration to animals, production methods thereof and uses of same |
| US11103524B2 (en) | 2011-09-15 | 2021-08-31 | Friulchem Spa | Compositions for oral administration to animals, processes for obtaining the same and the uses thereof |
| WO2014033230A1 (en) | 2012-08-31 | 2014-03-06 | Friulchem Spa | Compositions for oral administration to animals, production methods thereof and uses of same |
Also Published As
| Publication number | Publication date |
|---|---|
| IES20030432A2 (en) | 2004-03-10 |
| GB0412735D0 (en) | 2004-07-07 |
| GB2402683A (en) | 2004-12-15 |
| GB2402683B (en) | 2006-04-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101081791B1 (en) | Beam manufacturing equipment using side formwork jack device and end formwork rotating device | |
| US6443666B1 (en) | Reinforced concrete panel and method of manufacture | |
| CN110983894B (en) | Prefabricated assembled concrete pavement and construction method | |
| CN212534920U (en) | Super large area concrete heavy load ground pouring support system | |
| US4761126A (en) | Traveling concrete casting mold | |
| KR101230049B1 (en) | Incremental launching apparatus for launching concrete slab for bridge using form and rail, and constructing method for the same | |
| US3879914A (en) | Method of making a platform structure | |
| KR100949785B1 (en) | Mold for making PC beam | |
| KR101084615B1 (en) | Shelf retaining wall structure using PC wall board and construction method | |
| KR100448221B1 (en) | Movable Steel Form for Constructing Culvert and Continuous Constructing Method of Culvert Using the Same | |
| KR101082418B1 (en) | mold apparatus for forming concrete slab of bridge | |
| US3767153A (en) | Platform structure | |
| IE20040393A1 (en) | A precast reinforced concrete slab | |
| IE84516B1 (en) | A precast reinforced concrete slab | |
| IE20030432U1 (en) | A pre-cast reinforced concrete slab | |
| IES83333Y1 (en) | A pre-cast reinforced concrete slab | |
| KR100536772B1 (en) | Form for soil hardened wall and establishing method using the same | |
| CN114893238B (en) | Shield tunnel flue plate mounting structure and construction method thereof | |
| CN110629928A (en) | Site construction method of external wall panel | |
| CN105839824B (en) | Shed deckhead construction method | |
| CN209798958U (en) | Pouring system for drainage ditch of bottom plate post-cast strip and shaping hanging die for drainage ditch | |
| CN107620400B (en) | Assembled concrete variable-section T-shaped shear wall component and construction method thereof | |
| CN115711005B (en) | A prefabricated box-type ribbed floor slab and its construction method | |
| CN219443276U (en) | Novel segmental beam steel bar binding clamping fixture | |
| CN214784685U (en) | Super-long cast-in-place bottom plate post-cast strip |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| MM4A | Patent lapsed |