GB833195A - Improved hollow pile - Google Patents
Improved hollow pileInfo
- Publication number
- GB833195A GB833195A GB3373258A GB3373258A GB833195A GB 833195 A GB833195 A GB 833195A GB 3373258 A GB3373258 A GB 3373258A GB 3373258 A GB3373258 A GB 3373258A GB 833195 A GB833195 A GB 833195A
- Authority
- GB
- United Kingdom
- Prior art keywords
- concrete
- shank
- filled
- pile
- point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004567 concrete Substances 0.000 abstract 8
- 230000004048 modification Effects 0.000 abstract 2
- 238000012986 modification Methods 0.000 abstract 2
- 239000011150 reinforced concrete Substances 0.000 abstract 2
- 230000002787 reinforcement Effects 0.000 abstract 2
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 230000009172 bursting Effects 0.000 abstract 1
- 239000002131 composite material Substances 0.000 abstract 1
- 239000000835 fiber Substances 0.000 abstract 1
- 238000011065 in-situ storage Methods 0.000 abstract 1
- 239000002184 metal Substances 0.000 abstract 1
- 239000007787 solid Substances 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
- E02D7/30—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes by driving cores
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
833,195. Cast-in-situ concrete piles. MAUNSELL, G. A. Oct. 22, 1958, No. 33732/58. Class 68(2) A composite pile comprises a tubular metal upper part and a solid concrete lower part. The upper part may be filled with reinforced concrete and/or protected by an outer concrete sheath. The pile comprises a cylindrical precast reinforced concrete point F which has a socket A which accepts the end of a steel shank S. The annular space between the two parts is filled with concrete L to provide a rigid water-tight joint, before the pile is driven. The end of the shank is coned C and contains a plug of concrete E in which is embedded reinforcement K. A hammer H, guided by wings V slides inside the shank S and strikes a fibre pad U covered by a plate T. The point F is reinforced around the socket to withstand the bursting stress caused by the hammer blows, the weight of the hammer is equal to the combined weights of the shank and the point. In a modification reinforcement R is lowered on to the plug E after the pile has been driven and the shank is filled with concrete. In a further modification a concrete sheath D is lowered over the shank S and the annular space between is filled with concrete M. Dimensions of a typical pile according to the invention are given.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB3373258A GB833195A (en) | 1958-10-22 | 1958-10-22 | Improved hollow pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB3373258A GB833195A (en) | 1958-10-22 | 1958-10-22 | Improved hollow pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| GB833195A true GB833195A (en) | 1960-04-21 |
Family
ID=10356748
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| GB3373258A Expired GB833195A (en) | 1958-10-22 | 1958-10-22 | Improved hollow pile |
Country Status (1)
| Country | Link |
|---|---|
| GB (1) | GB833195A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2120305A (en) * | 1982-03-01 | 1983-11-30 | Pynford Ltd | Foundation pile |
| GB2152121A (en) * | 1983-12-27 | 1985-07-31 | Vyzk Ustav Inzhenerskikh | A compacting deep foundation structure |
-
1958
- 1958-10-22 GB GB3373258A patent/GB833195A/en not_active Expired
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2120305A (en) * | 1982-03-01 | 1983-11-30 | Pynford Ltd | Foundation pile |
| GB2152121A (en) * | 1983-12-27 | 1985-07-31 | Vyzk Ustav Inzhenerskikh | A compacting deep foundation structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3963056A (en) | Concrete piles, poles or the like | |
| GB833195A (en) | Improved hollow pile | |
| GB862630A (en) | Method of and apparatus for the construction of piles cast in situ from concrete | |
| GB796262A (en) | Improvements in or relating to piles | |
| US3543524A (en) | Thin-walled pile with closure plug | |
| GB910089A (en) | Improvements in or relating to pile construction and pile driving | |
| US4006600A (en) | Tapered pile tips | |
| US3399928A (en) | Ram impactor | |
| GB576236A (en) | Improvements relating to the driving of piles | |
| GB1030619A (en) | A process for the production of piles | |
| CN212270905U (en) | All-steel enclosure structure with locking device | |
| GB897028A (en) | Improvements in foundation piles and methods of making them | |
| JPS6421117A (en) | Upper pile reinforcing work for pc pile | |
| CN202492838U (en) | Full-tamping-type pedestal pile diesel hammer piling-expansion device | |
| CN112647489A (en) | All-steel enclosure structure with locking device | |
| CN209114494U (en) | A kind of auxiliary mould for installing prefabricated pile waterborne | |
| JPS5758722A (en) | In-situ prestresed concrete pile work | |
| GB605962A (en) | Improvements relating to processes for the production of foundation piles in reinforced concrete or the like | |
| US673443A (en) | Pile. | |
| GB862703A (en) | Improvements in concrete piles | |
| GB538647A (en) | Improvements relating to the construction of piles, caissons and the like in situ | |
| GB699325A (en) | Methods and devices for the manufacture of pre-stressed concrete structural members | |
| GB819828A (en) | Improvements in anchorage devices for pre-stress reinforcement members | |
| JPS646414A (en) | Construction work of in-site concrete pile | |
| GB333069A (en) |