GB1117706A - Elevated traffic surface and method of building same - Google Patents
Elevated traffic surface and method of building sameInfo
- Publication number
- GB1117706A GB1117706A GB5386865A GB5386865A GB1117706A GB 1117706 A GB1117706 A GB 1117706A GB 5386865 A GB5386865 A GB 5386865A GB 5386865 A GB5386865 A GB 5386865A GB 1117706 A GB1117706 A GB 1117706A
- Authority
- GB
- United Kingdom
- Prior art keywords
- beams
- pillars
- overhead
- railway
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004567 concrete Substances 0.000 abstract 2
- 239000011150 reinforced concrete Substances 0.000 abstract 2
- 229910000831 Steel Inorganic materials 0.000 abstract 1
- 238000010276 construction Methods 0.000 abstract 1
- 239000010959 steel Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
- E01B25/08—Tracks for mono-rails with centre of gravity of vehicle above the load-bearing rail
- E01B25/10—Mono-rails; Auxiliary balancing rails; Supports or connections for rails
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B25/00—Tracks for special kinds of railways
- E01B25/22—Tracks for railways with the vehicle suspended from rigid supporting rails
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/10—Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
- E01D19/103—Parapets, railings ; Guard barriers or road-bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
- E01D2/02—Bridges characterised by the cross-section of their bearing spanning structure of the I-girder type
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
- E01D2101/26—Concrete reinforced
- E01D2101/28—Concrete reinforced prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
1,117,706. Overhead roadways. G. HUBMANN. 20 Dec., 1965 [21 Dec., 1964; 25 Oct., 1965], No. 53868/65. Heading E1G. An overhead roadway is constructed of a plurality of vertical pillars 3 of reinforced concrete joined by a plurality of contiguously juxtaposed elongated reinforced concrete beams 25. In one form of construction, the pillars 3 are formed from tubular sections spigoted together and filled with reinforced poured concrete. Precast hollow beams 5 and 6 are mounted on the pillars and similarly filled, the beams 5 being joined in the direction of the roadway by steel girders 17 which support a working staging during erection and a monorail after erection. Longitudinal concrete beams 25 are placed on the cross beams 6 to carry the roadbed 28 and have railway plates 31 concreted at their edges. The beams 25 may be of hollow section and secured transversely by tension members. The pillars and transverse beams may also be held together by tensioned cables. The working staging may be supported from the railing plates and have provision for passing the pillars 3 by the use of hinged or sliding sections. The invention may be used for overhead roadways or to provide parking areas over railway stations without disturbing the function of the underneath road or railway during erection. The beams may be lifted by members wedged into half dovetail recesses in their upper surfaces.
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DEH0054659 | 1964-12-21 | ||
| DEH0057511 | 1965-10-25 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| GB1117706A true GB1117706A (en) | 1968-06-19 |
Family
ID=25980243
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| GB5386865A Expired GB1117706A (en) | 1964-12-21 | 1965-12-20 | Elevated traffic surface and method of building same |
Country Status (3)
| Country | Link |
|---|---|
| JP (1) | JPS493534B1 (en) |
| BE (1) | BE674105A (en) |
| GB (1) | GB1117706A (en) |
Cited By (24)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2243637A (en) * | 1990-04-30 | 1991-11-06 | Heng Beng Lam | Method of constructing a roadway |
| WO2010024663A1 (en) * | 2008-08-26 | 2010-03-04 | Ots B.V. | Transport system |
| CN105568784A (en) * | 2015-11-10 | 2016-05-11 | 北京交通大学 | Support system for suspension type monorail traffic track beam |
| CN105568844A (en) * | 2015-11-10 | 2016-05-11 | 北京交通大学 | Concrete pier system for suspension type monorail traffic and construction process |
| CN107738879A (en) * | 2017-10-31 | 2018-02-27 | 广州智网联运物流有限公司 | A kind of low latitude logistics transportation runway |
| CN108252514A (en) * | 2018-03-23 | 2018-07-06 | 中冶建工集团有限公司 | A kind of punching block column construction platform |
| CN108505405A (en) * | 2018-04-11 | 2018-09-07 | 中铁第四勘察设计院集团有限公司 | A kind of suspension type monorail and highway bridge build structure jointly |
| CN108505406A (en) * | 2018-05-18 | 2018-09-07 | 中铁二院工程集团有限责任公司 | A fully prefabricated concrete freight suspension monorail structure |
| CN108547187A (en) * | 2018-06-15 | 2018-09-18 | 湖南磁浮技术研究中心有限公司 | Magnetic suspension train rail, the section of track and the F rail piecing devices that can uniformly adjust rail gap |
| CN108824104A (en) * | 2018-07-25 | 2018-11-16 | 中铁第五勘察设计院集团有限公司 | A kind of suspension type rail traffic two-wire concrete pier girder system system |
| CN108978366A (en) * | 2018-09-30 | 2018-12-11 | 中车资阳机车有限公司 | A kind of beams of concrete steel wheel rail suspension type monorail freight shipments structure |
| CN109137653A (en) * | 2018-09-03 | 2019-01-04 | 北京交通大学 | A kind of space transoportation system based on monorail transit |
| CN109162157A (en) * | 2018-09-17 | 2019-01-08 | 中国建筑第八工程局有限公司 | The construction method of track girder |
| CN109653106A (en) * | 2019-01-03 | 2019-04-19 | 济南城建集团有限公司 | City overhead road prestressed cored slab end web inclined crack Disease Processing technology |
| CN110562407A (en) * | 2019-09-26 | 2019-12-13 | 中建空列(北京)科技有限公司 | Air-railway ferry boat |
| CN110644345A (en) * | 2019-10-29 | 2020-01-03 | 中唐空铁科技有限公司 | Landscape footpath suitable for suspension type monorail |
| CN112144405A (en) * | 2020-09-14 | 2020-12-29 | 中铁六局集团石家庄铁路建设有限公司 | Construction method of main pier of super bridge |
| NO345655B1 (en) * | 2019-03-28 | 2021-05-31 | Selvaag Gruppen As | A building structure for building an underground garage structure using reinforced prefabricated concrete elements. |
| CN113006273A (en) * | 2021-02-07 | 2021-06-22 | 广州地铁设计研究院股份有限公司 | Prefabricated transverse frame beam, frame structure and construction method thereof |
| CN113774802A (en) * | 2021-09-17 | 2021-12-10 | 黑龙江省龙建路桥第五工程有限公司 | Cast-in-place box girder edge protection structure and construction method |
| CN113818364A (en) * | 2021-10-14 | 2021-12-21 | 上海公路桥梁(集团)有限公司 | Girder body transporting and erecting device of viaduct and replacing method |
| CN114319717A (en) * | 2020-09-30 | 2022-04-12 | 华中科技大学 | Prefabricated assembled steel-concrete composite beam |
| CN115094778A (en) * | 2022-08-10 | 2022-09-23 | 北京城建设计发展集团股份有限公司 | Method for connecting prefabricated T-shaped piers through bonded prestressed tendons and steel bars |
| CN115897430A (en) * | 2022-11-17 | 2023-04-04 | 上海市建筑科学研究院有限公司 | A kind of anti-overturning structure of toughened column pier bridge |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106758581B (en) * | 2017-01-24 | 2024-01-16 | 北京交通大学 | Suspension type monorail traffic structure system based on assembly technology |
| CN107254815B (en) * | 2017-07-02 | 2018-05-22 | 中建空列(北京)科技有限公司 | Suspension type erecting machine |
| CN110886220A (en) * | 2019-10-31 | 2020-03-17 | 柳州市轨道交通工程有限责任公司 | Continuous system track beam erecting method |
| JP7425529B2 (en) * | 2020-06-30 | 2024-01-31 | 第一建設工業株式会社 | Mobile scaffolding equipment for viaducts |
| CN114395978A (en) * | 2021-12-24 | 2022-04-26 | 中铁第四勘察设计院集团有限公司 | Highway-railway combined-construction pier structure and bridge structure |
| CN114808563B (en) * | 2022-04-28 | 2023-11-24 | 中国铁建重工集团股份有限公司 | Suspension type monorail girder erecting system |
-
1965
- 1965-12-20 GB GB5386865A patent/GB1117706A/en not_active Expired
- 1965-12-21 JP JP7829165A patent/JPS493534B1/ja active Pending
- 1965-12-21 BE BE674105D patent/BE674105A/xx unknown
Cited By (35)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2243637A (en) * | 1990-04-30 | 1991-11-06 | Heng Beng Lam | Method of constructing a roadway |
| GB2243637B (en) * | 1990-04-30 | 1994-12-07 | Heng Beng Lam | Method of constructing an elevated roadway |
| WO2010024663A1 (en) * | 2008-08-26 | 2010-03-04 | Ots B.V. | Transport system |
| NL1035873C (en) * | 2008-08-26 | 2010-03-11 | Ots B V | TRANSPORT SYSTEM WITH A TRACK HANGED AT A DISTANCE ABOVE A GROUND AND A NUMBER OF TRANSPORT UNIT MOVABLE. |
| CN105568784A (en) * | 2015-11-10 | 2016-05-11 | 北京交通大学 | Support system for suspension type monorail traffic track beam |
| CN105568844A (en) * | 2015-11-10 | 2016-05-11 | 北京交通大学 | Concrete pier system for suspension type monorail traffic and construction process |
| CN105568784B (en) * | 2015-11-10 | 2024-04-09 | 北京交通大学 | Support system for suspended type monorail traffic track beam |
| CN107738879A (en) * | 2017-10-31 | 2018-02-27 | 广州智网联运物流有限公司 | A kind of low latitude logistics transportation runway |
| CN108252514A (en) * | 2018-03-23 | 2018-07-06 | 中冶建工集团有限公司 | A kind of punching block column construction platform |
| CN108252514B (en) * | 2018-03-23 | 2023-05-26 | 中冶建工集团有限公司 | Construction platform for steel form column |
| CN108505405B (en) * | 2018-04-11 | 2023-08-25 | 中铁第四勘察设计院集团有限公司 | Combined construction structure of suspension type monorail and highway bridge |
| CN108505405A (en) * | 2018-04-11 | 2018-09-07 | 中铁第四勘察设计院集团有限公司 | A kind of suspension type monorail and highway bridge build structure jointly |
| CN108505406A (en) * | 2018-05-18 | 2018-09-07 | 中铁二院工程集团有限责任公司 | A fully prefabricated concrete freight suspension monorail structure |
| CN108547187A (en) * | 2018-06-15 | 2018-09-18 | 湖南磁浮技术研究中心有限公司 | Magnetic suspension train rail, the section of track and the F rail piecing devices that can uniformly adjust rail gap |
| CN108547187B (en) * | 2018-06-15 | 2024-06-11 | 湖南磁浮技术研究中心有限公司 | Maglev train track, rail row and F rail joint device capable of evenly adjusting rail gap |
| CN108824104A (en) * | 2018-07-25 | 2018-11-16 | 中铁第五勘察设计院集团有限公司 | A kind of suspension type rail traffic two-wire concrete pier girder system system |
| CN108824104B (en) * | 2018-07-25 | 2023-07-25 | 中铁第五勘察设计院集团有限公司 | Suspension type track traffic double-line concrete pier beam system |
| CN109137653A (en) * | 2018-09-03 | 2019-01-04 | 北京交通大学 | A kind of space transoportation system based on monorail transit |
| CN109162157A (en) * | 2018-09-17 | 2019-01-08 | 中国建筑第八工程局有限公司 | The construction method of track girder |
| CN108978366A (en) * | 2018-09-30 | 2018-12-11 | 中车资阳机车有限公司 | A kind of beams of concrete steel wheel rail suspension type monorail freight shipments structure |
| CN108978366B (en) * | 2018-09-30 | 2023-10-31 | 中车资阳机车有限公司 | Concrete beam steel wheel rail suspension type monorail freight transportation structure |
| CN109653106B (en) * | 2019-01-03 | 2023-10-27 | 济南城建集团有限公司 | Oblique crack disease treatment technology for end web plate of prestressed hollow slab of urban overhead road |
| CN109653106A (en) * | 2019-01-03 | 2019-04-19 | 济南城建集团有限公司 | City overhead road prestressed cored slab end web inclined crack Disease Processing technology |
| NO345655B1 (en) * | 2019-03-28 | 2021-05-31 | Selvaag Gruppen As | A building structure for building an underground garage structure using reinforced prefabricated concrete elements. |
| CN110562407A (en) * | 2019-09-26 | 2019-12-13 | 中建空列(北京)科技有限公司 | Air-railway ferry boat |
| CN110644345A (en) * | 2019-10-29 | 2020-01-03 | 中唐空铁科技有限公司 | Landscape footpath suitable for suspension type monorail |
| CN112144405A (en) * | 2020-09-14 | 2020-12-29 | 中铁六局集团石家庄铁路建设有限公司 | Construction method of main pier of super bridge |
| CN114319717A (en) * | 2020-09-30 | 2022-04-12 | 华中科技大学 | Prefabricated assembled steel-concrete composite beam |
| CN113006273A (en) * | 2021-02-07 | 2021-06-22 | 广州地铁设计研究院股份有限公司 | Prefabricated transverse frame beam, frame structure and construction method thereof |
| CN113774802A (en) * | 2021-09-17 | 2021-12-10 | 黑龙江省龙建路桥第五工程有限公司 | Cast-in-place box girder edge protection structure and construction method |
| CN113818364B (en) * | 2021-10-14 | 2023-05-26 | 上海公路桥梁(集团)有限公司 | Girder transporting device and replacement method for viaduct |
| CN113818364A (en) * | 2021-10-14 | 2021-12-21 | 上海公路桥梁(集团)有限公司 | Girder body transporting and erecting device of viaduct and replacing method |
| CN115094778B (en) * | 2022-08-10 | 2023-01-06 | 北京城建设计发展集团股份有限公司 | Method for connecting prefabricated T-shaped piers through bonded prestressed tendons and steel bars |
| CN115094778A (en) * | 2022-08-10 | 2022-09-23 | 北京城建设计发展集团股份有限公司 | Method for connecting prefabricated T-shaped piers through bonded prestressed tendons and steel bars |
| CN115897430A (en) * | 2022-11-17 | 2023-04-04 | 上海市建筑科学研究院有限公司 | A kind of anti-overturning structure of toughened column pier bridge |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS493534B1 (en) | 1974-01-26 |
| BE674105A (en) | 1966-04-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| GB1117706A (en) | Elevated traffic surface and method of building same | |
| GB1043421A (en) | Prestressed concrete bridge-like elevated highway | |
| GB1189212A (en) | Improvements in and relating to the Construction of a Multi-Span Bridge | |
| GB1448624A (en) | Method of and apparatus for forming rail-road level corssing | |
| US3136092A (en) | Prefabricated concrete parking structure or the like | |
| CN211596455U (en) | A kind of fast construction hanging basket for double-layer flange concrete box girder bridge | |
| GB1450799A (en) | Method of forming a bridge girder system of prestressed concrete by sectional cantilever construction | |
| DE60023795D1 (en) | Reinforced concrete composite bridge or walkway construction, in particular bridge with two composite beams under the ceiling | |
| RO64335A (en) | RAILWAY ROAD IN THE CONCRETE SLABS OF ROADS | |
| GB709706A (en) | An improved structional unit and structures built up from such units | |
| RU2237124C1 (en) | Reconstruction method for beam bridge | |
| GB1402259A (en) | Building method and structure using prefabricated elements | |
| GB1024007A (en) | A load-bearing structure for an elevated roadway | |
| JPH06128913A (en) | Construction device of arch type shelter | |
| JPS5845522B2 (en) | How to build a bridge | |
| GB931297A (en) | An arrangement for the construction of concrete bridges and like structures | |
| GB999771A (en) | Improvements in or relating to joint constructions between prestressed concrete slabs | |
| JPH0730527B2 (en) | Bridge and its construction method | |
| US1212759A (en) | Composite beam. | |
| JP7129567B2 (en) | System for the construction of double U and single U steel concrete composite structures for bridges | |
| US2405335A (en) | Concrete bridge superstructure | |
| SU114959A1 (en) | A method of converting existing railway bridges intended for movement of trains only into traffic bridges and other types of transport | |
| GB1046452A (en) | Improvements in or relating to flyover roadways | |
| JPS62185905A (en) | Moving type mold frame construction method of slab of high bridge | |
| SU87055A1 (en) | Small span precast concrete bridge |