EP3014070A2 - Vorrichtung zum abteufen eines schachts und verfahren zum abteufen eines schachts - Google Patents
Vorrichtung zum abteufen eines schachts und verfahren zum abteufen eines schachtsInfo
- Publication number
- EP3014070A2 EP3014070A2 EP14727531.7A EP14727531A EP3014070A2 EP 3014070 A2 EP3014070 A2 EP 3014070A2 EP 14727531 A EP14727531 A EP 14727531A EP 3014070 A2 EP3014070 A2 EP 3014070A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- unit
- shaft
- drilling unit
- drilling
- cylinder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/03—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D1/00—Sinking shafts
- E21D1/03—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws
- E21D1/06—Sinking shafts mechanically, e.g. by loading shovels or loading buckets, scraping devices, conveying screws with shaft-boring cutters
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
Definitions
- the invention relates to a device for sinking a shaft according to the preamble of claim 1.
- the invention further relates to a method for sinking a shaft.
- a generic apparatus and method for sinking a manhole are known from US-A-4,646,853.
- the generic device has a carrier unit rear-side arranged in the lowering direction and a drilling unit arranged on the front side in the direction of lowering.
- the carrier unit and the drilling unit are connected to each other via a number of working in Abteufraum carrier cylinders.
- the drilling unit includes a number of radial and axial bracing brace modules, a number of down-dip shift cylinders, and a drill head connected to the shift cylinders and configured for tensioning the shaft in tension-activated brace modules.
- the generic device is equipped with security modules, which are mounted on the support unit and are set up for the radial and axial clamping of the support unit temporarily in alternation with the bracing of the drilling unit.
- a Abteufzyklus begins with the fact that the Verspannmodule and the fuse modules for clamping the drilling unit and the carrier unit are activated.
- the carrying cylinders are fully extended while the shift cylinders are retracted.
- the displacement cylinders fully retract and lift the drill head.
- the fuse modules are deactivated and the carrying cylinders retracted, so that the carrier unit lowers while the drilling unit is still braced.
- the fuse modules are activated again, so that the carrier unit is braced.
- Verspannmodule be disabled and thus released drilling unit is lowered by extending the carrying cylinder. Subsequently, the clamping modules are again activated for axial and radial clamping of the drilling unit, so that a new Abteufzyklus can begin.
- the invention has for its object to provide a device of the type mentioned above and a method for sinking a shaft, with which a shaft can be lowered efficiently.
- FIG. 1 is a schematic side view of an embodiment of a device according to the invention at the beginning of a Abteufzyklus with a carrier unit and with a drilling unit, which are minimally spaced from each other,
- FIG. 2 is a schematic side view of the embodiment according to FIG. 1 with a boring head of the drilling unit, which is pushed forward in the lowering direction relative to the arrangement according to FIG.
- FIG. 3 is a schematic side view of the embodiment of FIG. 1 with respect to the arrangement of FIG. 1 lowered over carrying cylinder drilling unit and a relative to the arrangement of FIG. 2 retracted drill head,
- FIG. 4 is a schematic side view of the embodiment of FIG. 1 with a starting from the arrangement of FIG. 3 corresponding to the arrangement of FIG. 2 in Abteufraum by means of the displacement cylinders advanced drill head,
- FIG. 5 is a schematic side view of the embodiment of FIG. 1 at the beginning of a next Abteufzyklus with respect to the arrangement of FIG. 1 in the total direction in Abteufraum offset carrier unit and drilling unit
- 6 is a schematic side view of a development of the embodiment of FIG. 1 to FIG. 5, which is adapted for lining the shaft wall of the shaft with tubbing
- FIG. 7 is a schematic side view of the embodiment of FIG. 6 during the final assembly of a tubbing ring
- FIG. 8 is a schematic side view of a further embodiment of a device according to the invention with a conveying vessel having a conveyor unit,
- Fig. 9 in a sectional view of the embodiment according to
- FIG. 1 1 is a schematic side view of a development of the embodiment of a device according to the invention according to FIG. 8 to FIG. 1 0 with a delivery unit having two delivery vessels, FIG.
- FIG. 1 2 in a sectional view through a carrier unit, the development according to FIG. 1 1 with an aligned to a bucket pivot chute,
- FIG. 1 3 in a sectional view through the carrier unit, the development according to FIG. 1 1 with the aligned to the other bucket pivoting chute, 14 is a schematic side view of another embodiment of a device according to the invention, which is formed with a hydraulic conveyor unit,
- Fig. 15 in a sectional view of the embodiment according to
- FIG. 16 shows a further sectional view of the exemplary embodiment according to FIG. 14.
- FIG. 16 shows a further sectional view of the exemplary embodiment according to FIG. 14.
- Fig. 1 shows a schematic side view of an embodiment of an inventive device for sinking a main shaft 1 as a shaft in a substantially vertically running and the direction of gravity following Abteufraum.
- the carrier element 2 has a number of shaft platforms 4, 5, 6, 7 which extend radially over the largest area of the shaft Cross-section of the main shaft 1 extend and are arranged in the direction of removal in the direction of removal in the direction of disposal in accordance with the intended arrangement in the main shaft.
- Radial stabilizers 8 are provided for stabilizing the carrier unit 2 in the radial direction.
- a group of radial stabilizers 8 are mounted on the shaft bottom side shaft platform 4 next to the drilling unit 3.
- radial stabilizers 8 is attached to struts 9, which extend between the bay bottom side shaft platform 4 furthest lying shaft mouth side shaft platform 7 and one of the shaft bottom side shaft platform 7 adjacent intermediate shaft platform 6 and are connected thereto.
- the radial stabilizers 8 are only adapted to stabilize the carrier unit 2 against movement in the radial direction without play. However, the radial stabilizers 8 are not adapted to brace the carrier unit 2 in the sense in the radial and axial direction of the main shaft 1 that the carrier unit 2 during operation of the drilling unit 3 for sinking the main shaft 1, the drilling unit 3 stabilizing forces in the radial and axial Can accommodate direction.
- On the shaft bottom side shaft platform 4 a number of sides 1 0 a suspension unit is further attached, extending through the main shaft 1 of the support unit 2 away.
- a number of carrying cylinders 1 1 operating in the lowering direction are mounted on the shaft-side shaft platform 4 opposite the drilling unit 3, which extend away from the shaft-base-side shaft platform 4 in the direction of the drilling unit 3 and are connected to the drilling unit 3.
- the drilling unit 3 has a support frame 1 2, to which on the one hand the support cylinder 1 1 and on the other working in Abteufraum shift cylinder 1 3 are mounted, which extend away from the shaft bottom side shaft platform 7 in the direction of a drill head 1 4 of the drilling unit 3 and with connected to this.
- bracing modules 1 5 that the drilling unit 3 is equipped with a number of bracing modules 1 5, which engage the drilling unit 3 on a drilling platform 1 6 and are provided with bracing cylinders 1 7, which extend in the radial direction extend radially inwardly connected to the drilling platform 1 6 and radially au niz lake with clamping plates 1 8 are provided.
- the clamping modules 1 5 are adapted to the drilling purity 3 to clamp radially and axially such that substantially all forces generated during operation of the drilling unit 3 for sinking the main shaft 1 in particular by the drill head 1 4 are absorbed by the drilling unit 3.
- the drilling unit 3 has an outer sealing collar 19, which can be adapted to the cross section of the main shaft 1 in the radial direction, if necessary while maintaining a minimal residual gap, which is harmless for safety reasons, and the drilling unit 3 in the region of the drilling platform 16 against the carrier unit 2 radially closes.
- the drill head 1 4 is equipped with a number of drive motors 20, with which a rotary drive 21, which is stabilized by a support cylinder 22, for rotating about an axis extending in parallel to Abteufraum axis of rotation can be driven.
- the rotary drive 21 is mounted relative to the drilling platform 16 with a drill head drive bearing 23 and has a number of drive arms 24 which extend between the rotary drive 21 and a mining bevel gear 25.
- the mining bevel gear 25 has in its from the rotary drive 23 furthest spaced area via a discharge opening 25 '.
- the mining bevel gear 25 is equipped with a number of removal tools 26 and extends in the direction of down along a complementary cone-shaped main shaft bottom 27 of radially Au Shen of the drilling platform 1 6 pioneering in the arrangement of FIG. 1 to a relative to the main shaft 1 in cross section
- the discharge opening 25 ' opens into the feed chute 29, so that material degraded by the drill head 1 4 can be conveyed away via the feed chute 29.
- the delivery chute 25' opens into the advance chute 29 in an extension of the main shaft 1 from a main shaft mouth 28 in the lowering direction.
- FIG. 1 shows the embodiment of a device according to the invention at the beginning of a Abteufzyklus in an axial cycle start position in which in this embodiment, the support cylinder 1 1 and the displacement cylinder 1 3 are in a maximum retracted Einfahrwolf, so that the support unit 2 and the drilling unit. 3 with the shaft bottom side shaft platform 4 and the drilling platform 1 6 in an absolute minimum distance.
- FIG. 1 The position of the carrier unit 2 in the direction of departure at the beginning of a removal cycle is shown in FIG. 1 and the following figures by a dot-dash line 31 whose absolute position is left unchanged.
- the drill head 1 4 of the drilling unit 3 is set to deepen the main shaft 1 in operation.
- the displacement cylinder 1 3 of the drilling unit 3 in Abteufraum.
- FIG. 2 shows a schematic sectional view of the embodiment according to FIG. 1 in a stage of the removal cycle in which the displacement cylinders 13 with the drill head 1 4 are now in an extended position in a prebent position.
- this extended position corresponds to the maximum stroke of the displacement cylinder 1 3.
- the altitude of the carrier geranne 2 is unchanged in the arrangement of FIG. 2 relative to the arrangement of FIG.
- FIG. 3 shows the embodiment of FIG. 1 in a relation to the arrangement of FIG. 2 further stage of a Abteufzyklus, which has been assumed that the Verspannmodule 1 5 starting from the arrangement of FIG. 2 of the main shaft inner wall 30 through Retracting the Verspannzylinder 1 7 have been solved, then the carrying cylinder 1 1 extended while advancing the drilling unit 3 with the drill head 1 4 to an extended position and the shift cylinder 1 3 have retracted while retracting the drill head 1 4 to a retracted position.
- Fig. 4 shows a schematic side view of the embodiment of FIG. 1 at the end of a Abteufzyklus, in which still unchanged position of the carrier unit 2 according to the arrangement of FIG. 1, the displacement cylinder 1 3 with respect to the arrangement of FIG. 3 again in a here are the maximum extended extension position.
- Fig. 5 shows a schematic side view of the embodiment of FIG. 1 at the beginning of the next Abteufzyklus, for what against the arrangement of FIG. 1, the carrier unit 2 has now been lowered by the sum of the extension strokes of the carrying cylinder 1 1 and the displacement cylinder 1 3 by tracking the side of the suspension unit 1 in Abteufraum.
- the device according to the invention is adapted to move the carrying cylinder 1 1 over a plurality of intermediate positions of a maximum retracted retraction position to a maximum extended extension position before the carrier unit 2 is lowered in Abteufraum.
- FIG. 6 shows a schematic side view of a further development of the exemplary embodiment of a device according to the invention explained with reference to FIGS. 1 to 5, wherein in the exemplary embodiment according to FIGS. 1 to 5 and in the development according to FIG provided with the same reference numerals and their operation in performing the explained with reference to FIG. 1 to FIG. 5 method for avoiding repetition are not further explained in the following.
- the development according to FIG. 6 is set up to cover the main shaft inner wall 30 with tubbing elements 32, which are backed by a backfill 33, which is preferably formed by concrete.
- a backfill 33 which is preferably formed by concrete.
- tubbing mounting ring 34 equipped radially on the outside with an inflatable tubbing mounting sealing ring, which is mounted on the drilling platform 16 and with which, as shown in FIG. Gijn 32 can be positioned via radial positioning cylinder 35 in the radial direction.
- FIG. 7 shows a schematic side view of the development according to FIG. 6 with tubbing elements 32 lying on the side of the tubing, which are pressed against the removal direction in the axial direction against the tubbing elements 32 already assembled in the removal direction by means of axial positional cylinders 36. Furthermore, in the illustration according to FIG. 7 it can be seen that by means of a supply line 37 the material for the backfilling 33, preferably liquid concrete, after inflation of the tubbing sealing ring for sealing axially downwards between the tubbing elements 32 held by the axial position cylinders 36 and the main shaft inner wall 30 can be fed.
- the material for the backfilling 33 preferably liquid concrete
- FIG. 8 shows a schematic side view of a further exemplary embodiment of a device according to the invention, wherein in the exemplary embodiment according to FIG. 8 and in the exemplary embodiment according to FIGS. 1 to 5 mutually corresponding elements are provided with the same reference symbols and the procedure when drilling a shaft in the further part not further explained.
- the exemplary embodiment according to FIG. 8 differs from the exemplary embodiment according to FIGS. 1 to 5 and from the development according to FIGS. 6 and 7 in that the drill head 1 4 is closed in the region of the main shaft bottom 27.
- the exemplary embodiment according to FIG. 8 is equipped with a delivery unit which has a suction line 38 which opens into the main shaft side deepest region of the mining bevel gear 25 and moves away from the drilling unit 3 into the carrier unit 2 stretches.
- the suction line 38 opens into a suction container 39 of the conveyor unit, which is arranged in the carrier unit 2.
- a pivotable ejector flap 40 At its drilling unit 3 end facing the suction container 38 is provided with a pivotable ejector flap 40 and equipped with a stationary Stationärschurre 41, which opens into a movable in the axial direction of the conveying vessel 42.
- a Y-type connecting line 43 of the conveying unit which opens with its two other ends into a first suction fan 44 and a second suction fan 45.
- a relative negative pressure can be generated by means of the suction fans 44, 45, by means of which the material accumulating in the removal operation via the suction line 38 and the suction container 39 can be removed from the sole region of the main shaft 1 as the only shaft here.
- FIG. 9 shows the embodiment according to FIG. 8 in a sectional view in the plane IX-IX according to FIG. 8. From FIG. 9 it can be seen that for the conveying vessel 42, not shown in FIG. 9, there is a conveying vessel guide cage 46 in order to receive the Guide container 42 in the axial direction. Furthermore, it can be seen from the illustration according to FIG. 9 that the shaft-side conveying platform 4 carries a number of operating means such as a shotcrete container 47, a control cabin 48, an electrical cabinet 49 and a hydraulic unit 50. Furthermore, a ventilation line 51 can be seen in FIG. 9, via which fresh air can be supplied to the main shaft 1. Furthermore, it can be seen particularly clearly from the illustration according to FIG. 9 that the carrier unit 2 has a plurality of cables
- FIG. 10 shows the embodiment according to FIG. 8 in a sectional view in the plane XX of FIG. 8. From FIG subsidized material can be reliably removed from the main shaft 1.
- FIG. 1 1 shows a development of the exemplary embodiment of a device according to the invention explained with reference to FIGS. 8 to 10, wherein in the exemplary embodiment according to FIGS. 8 to 10 and in the development according to FIG provided the same reference numerals and further explained in part, not in detail again.
- the development according to FIG. 1 1 differs from the exemplary embodiment according to FIGS. 8 to 10 in that the delivery unit has a first delivery vessel 52 and a second delivery vessel 53, which is shown in broken lines in the illustration according to FIG. are present, which are alternately positionable in the carrier unit 2 during operation for the efficient picking up of material from the suction container 38.
- a pivotable pivoting chute 54 is provided, which can be aligned either with the first conveying vessel 52 or the second conveying vessel 53.
- Fig. 1 2 shows in a section along the plane Xl l-Xl l of FIG.
- FIG. 11 shows the further development according to FIG. 11 in a section in the plane X11-X11 according to FIG. 11 with a second conveying vessel 53 now arranged in the region of the carrier unit 2 and a pivoting chute 54 oriented on the second conveying vessel 53
- the second conveying vessel 53 can now be filled with material from the suction container 39 and removed by extending the second conveying vessel 53, while the first conveying vessel 52, not shown in FIG. 13, returns to the arrangement according to FIG returns.
- Fig. 1 4 shows in a sectional view of another embodiment of a device according to the invention, which is alternatively equipped to the above-described embodiments with a pneumatically operating conveyor unit with a hydraulically operating conveyor unit.
- a main conveyor line 55 is present, which ends with one end in the region of the drill head 1 4 and with the means of a likewise arranged in the region of the drill head 1 4 main feed pump 56 in the region of the drill head 1 4 existing fluid 57 from - is pumpable.
- the end facing away from the drill head 1 4 of the main conveyor line 55 terminates in a desander 58, with the larger components contained in the conveyed liquid 57 discharged from the region of the drill head 1 4 as coarse-grain discharge 59 in an intermediate bunker 60 can be discharged. From the intermediate bunker 60, the coarse-grained discharge 59 for removal from the main shaft 1 in a conveying vessel 42 can be transferred. The discharged from the region of the drill head 1 4, freed from the larger components conveying fluid 57 is transferred to a desander 58 downstream collecting container 61 and by means of a shaft feed pump 62 via a shaft conveyor line 63 from the main shaft 1 away.
- a shaft return line 64 and a main return line 65 which opens in the region of the drill head 1 4 serve to feed the conveying fluid 57 into the region of the drill head 1 4.
- FIG 1 5 shows that the coarse-grained discharge 59 via a stationary chute 41 from the intermediate bunker 60 into the delivery vessel 42.
- FIG is convertible.
- FIG. 16 shows in a sectional view along the line XVI-XVI the embodiment according to FIG. 1 4. It can be seen from FIG. 16 that the coarse-grained discharge 59 falls freely into the intermediate bunker 60 which is open in the direction of the sender 58 ,
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Earth Drilling (AREA)
- Medicines Containing Material From Animals Or Micro-Organisms (AREA)
Abstract
Description
Claims
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL14727531T PL3014070T3 (pl) | 2013-06-25 | 2014-06-02 | Urządzenie do głębienia szybu i sposób głębienia szybu |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102013212098.2A DE102013212098B4 (de) | 2013-06-25 | 2013-06-25 | Vorrichtung zum Abteufen eines Schachts und Verfahren zum Abteufen eines Schachts |
| PCT/EP2014/061374 WO2014206688A2 (de) | 2013-06-25 | 2014-06-02 | Vorrichtung zum abteufen eines schachts und verfahren zum abteufen eines schachts |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3014070A2 true EP3014070A2 (de) | 2016-05-04 |
| EP3014070B1 EP3014070B1 (de) | 2019-03-27 |
Family
ID=50877305
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP14727531.7A Active EP3014070B1 (de) | 2013-06-25 | 2014-06-02 | Vorrichtung zum abteufen eines schachts und verfahren zum abteufen eines schachts |
Country Status (11)
| Country | Link |
|---|---|
| US (1) | US9995138B2 (de) |
| EP (1) | EP3014070B1 (de) |
| JP (1) | JP6424215B2 (de) |
| CN (1) | CN105408584B (de) |
| AU (1) | AU2014301480B2 (de) |
| CA (1) | CA2916440C (de) |
| DE (1) | DE102013212098B4 (de) |
| ES (1) | ES2729194T3 (de) |
| PL (1) | PL3014070T3 (de) |
| RU (1) | RU2667988C2 (de) |
| WO (1) | WO2014206688A2 (de) |
Families Citing this family (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| RU2613999C2 (ru) * | 2015-07-16 | 2017-03-22 | Общество с ограниченной ответственностью "РусШахтСпецСтройПроект" (ООО "РусШахтСпецСтройПроект") | Способ проходки вертикальных стволов и комплекс для его осуществления |
| CN105672895B (zh) * | 2016-04-11 | 2018-04-13 | 平煤建工集团特殊凿井工程有限公司 | 一种用于工程钻机的可变径的钻头稳定器 |
| CN109958440B (zh) * | 2017-12-25 | 2021-07-30 | 中铁工程装备集团有限公司 | 一种新型分体式竖井掘进机 |
| CN110670655B (zh) * | 2018-07-02 | 2022-06-21 | 喻天宝 | 沉井垂直掘进机 |
| CN109630123B (zh) * | 2018-07-23 | 2024-02-02 | 中国铁建重工集团股份有限公司 | 深竖井岩石掘进机 |
| EP4069942B1 (de) * | 2019-12-04 | 2024-10-30 | Herrenknecht AG | Vorrichtung zum abteufen einer vertikalen bohrung |
| CN110761794B (zh) * | 2019-12-26 | 2020-04-03 | 中国铁建重工集团股份有限公司 | 一种竖井掘进机及其推进系统 |
| CN111734481B (zh) * | 2020-07-31 | 2022-03-22 | 湖南科技大学 | 40m以下溜破系统矿仓衬轨安装施工方法 |
| CN113153328B (zh) * | 2021-04-08 | 2024-07-16 | 江苏锐成机械有限公司 | 轴心真空排渣式垂直掘进头 |
| CN116335676B (zh) * | 2023-04-26 | 2025-09-09 | 煤炭工业合肥设计研究院有限责任公司 | 一种深竖井全断面掘进机施工用吊盘悬吊系统及方法 |
Family Cites Families (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3379264A (en) * | 1964-11-05 | 1968-04-23 | Dravo Corp | Earth boring machine |
| FR1463945A (fr) * | 1965-11-05 | 1966-07-22 | Dravo Corp | Procédé d'excavation perfectionné et machine permettant la mise en oeuvre de ce procédé |
| DE1904684A1 (de) * | 1969-01-31 | 1970-08-20 | Deilmann Haniel Gmbh | Schachtbohrgeraet |
| US3965995A (en) * | 1975-03-06 | 1976-06-29 | The Robbins Company | Machine for boring a large diameter blind hole |
| DE2657573C3 (de) * | 1976-12-18 | 1981-07-23 | Gewerkschaft Eisenhütte Westfalia, 4670 Lünen | Einrichtung zum Erweitern von Schächten o.dgl. |
| GB2028897B (en) * | 1978-08-26 | 1982-09-15 | Paurat F | Equipment for the sinking of shafts |
| DE3011578C2 (de) * | 1980-03-26 | 1982-08-05 | Mannesmann AG, 4000 Düsseldorf | Einrichtung zum maschinellen Abteufen von seigeren Schächten |
| JPS59233094A (ja) * | 1983-06-16 | 1984-12-27 | 株式会社 白石 | 竪穴掘削機 |
| JPS6118234U (ja) * | 1984-07-09 | 1986-02-01 | 日立造船株式会社 | 連続揚土装置 |
| US4646853A (en) * | 1984-07-31 | 1987-03-03 | The Robbins Company | Shaft boring machine and method |
| JPS61158594A (ja) * | 1984-12-29 | 1986-07-18 | 株式会社大林組 | 竪坑掘削方法およびその装置 |
| DE3609111A1 (de) * | 1986-03-19 | 1987-10-01 | Turmag Turbo Masch Ag | Bohrmaschine |
| CA1329399C (en) * | 1987-11-18 | 1994-05-10 | Shiroyasu Shimazaki | Method and machine for constructing shafts |
| JPH0797892A (ja) * | 1993-09-29 | 1995-04-11 | Komatsu Ltd | 立坑掘削方法および装置 |
| JP3241235B2 (ja) * | 1995-05-01 | 2001-12-25 | 株式会社ヒメノ | 孔掘削工法及び孔掘削装置 |
| JP3733195B2 (ja) * | 1997-02-28 | 2006-01-11 | 鉄建建設株式会社 | 縦穴掘削装置 |
| RU2141030C1 (ru) * | 1997-04-24 | 1999-11-10 | ЗАО "Горнопроходческий трест "Спецтоннельстрой" | Устройство для сооружения шахтных стволов |
| JPH11280366A (ja) * | 1998-03-30 | 1999-10-12 | Chubu Electric Power Co Inc | 深礎掘削機の排土装置 |
| JP4486766B2 (ja) * | 2001-06-19 | 2010-06-23 | 株式会社大林組 | 縦穴掘削装置 |
| JP3971283B2 (ja) * | 2002-09-27 | 2007-09-05 | 株式会社奥村組 | 立坑用トンネル掘削機およびその後退方法 |
| EA016020B1 (ru) * | 2008-07-31 | 2012-01-30 | Херренкнехт Аг | Способ выработки вертикального шахтного ствола и проходческая машина |
| US8591151B2 (en) * | 2009-06-30 | 2013-11-26 | Technological Resouces Pty. Ltd. | Forming a shaft for an underground mine |
| DE102012025395A1 (de) * | 2012-12-24 | 2014-06-26 | Herrenknecht Ag | Vorrichtung zum Abteufen eines Schachts |
-
2013
- 2013-06-25 DE DE102013212098.2A patent/DE102013212098B4/de not_active Expired - Fee Related
-
2014
- 2014-06-02 JP JP2016520354A patent/JP6424215B2/ja active Active
- 2014-06-02 PL PL14727531T patent/PL3014070T3/pl unknown
- 2014-06-02 ES ES14727531T patent/ES2729194T3/es active Active
- 2014-06-02 AU AU2014301480A patent/AU2014301480B2/en active Active
- 2014-06-02 CN CN201480042275.XA patent/CN105408584B/zh active Active
- 2014-06-02 RU RU2016102058A patent/RU2667988C2/ru active
- 2014-06-02 EP EP14727531.7A patent/EP3014070B1/de active Active
- 2014-06-02 WO PCT/EP2014/061374 patent/WO2014206688A2/de not_active Ceased
- 2014-06-02 CA CA2916440A patent/CA2916440C/en active Active
- 2014-06-02 US US14/897,071 patent/US9995138B2/en active Active
Non-Patent Citations (1)
| Title |
|---|
| See references of WO2014206688A3 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2916440C (en) | 2021-01-05 |
| WO2014206688A3 (de) | 2015-09-03 |
| DE102013212098B4 (de) | 2015-11-26 |
| JP6424215B2 (ja) | 2018-11-14 |
| WO2014206688A2 (de) | 2014-12-31 |
| RU2016102058A (ru) | 2017-07-28 |
| DE102013212098A1 (de) | 2015-01-08 |
| JP2016525175A (ja) | 2016-08-22 |
| EP3014070B1 (de) | 2019-03-27 |
| RU2667988C2 (ru) | 2018-09-25 |
| ES2729194T3 (es) | 2019-10-30 |
| CA2916440A1 (en) | 2014-12-31 |
| AU2014301480A1 (en) | 2016-01-28 |
| US9995138B2 (en) | 2018-06-12 |
| CN105408584A (zh) | 2016-03-16 |
| CN105408584B (zh) | 2018-10-19 |
| PL3014070T3 (pl) | 2019-10-31 |
| US20160130942A1 (en) | 2016-05-12 |
| AU2014301480B2 (en) | 2017-08-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3014070B1 (de) | Vorrichtung zum abteufen eines schachts und verfahren zum abteufen eines schachts | |
| EP2739790B1 (de) | Abtrennen eines pfahles off shore | |
| DE1458675B2 (de) | ||
| DE2349454A1 (de) | Fahrzeug zum abbau von gestein in einem grubenstollen | |
| EP2322724B1 (de) | Unterwasserbohranordnung und Verfahren zum Einbringen eines rohrförmigen Gründungselements in den Gewässergrund | |
| LU82544A1 (de) | Vortriebsschild | |
| DE3726472C2 (de) | ||
| EP3330441B1 (de) | Unterwasserabbauvorrichtung und verfahren zum abbau | |
| DE4213987C2 (de) | Fördereinrichtung für eine Schildvortriebsmaschine zum Bohren von Tunnelstrecken | |
| WO2021069154A1 (de) | Unterwasser-abtragsvorrichtung und verfahren zum abtragen von bodenmaterial unter wasser | |
| DE3011578C2 (de) | Einrichtung zum maschinellen Abteufen von seigeren Schächten | |
| EP0305835A1 (de) | Vorrichtung zur Herstellung von unterirdischen Durchbohrungen | |
| EP3363987A1 (de) | Bohrvorrichtung und bohrverfahren zum erstellen einer bohrung | |
| DE3204564C2 (de) | Vorrichtung zum Auffahren eines Stollens, Tunnels oder dergleichen im Rohrvorpreßbetrieb, insbesondere zur Herstellung einer nicht begehbaren Rohrleitung | |
| WO2021156049A1 (de) | Imloch-bohrgerät und verfahren zum erstellen einer bohrung | |
| EP3292275B1 (de) | Verfahren zum abbau von gesteinsmaterial unter tage sowie vollschnittmaschine | |
| EP4069942B1 (de) | Vorrichtung zum abteufen einer vertikalen bohrung | |
| DE3810398A1 (de) | Einrichtung zum vortrieb von quer zu einem tunnel verlaufenden querstollen od. dgl., insbesondere von verbindungsstollen zwischen zwei im wesentlichen parallel zueinander verlaufenden tunnelroehren | |
| DE102013110730B4 (de) | Verfahren und Vorrichtung zum Entfernen von Bodenmaterial vor der Druckwand einer Schildvortriebsmaschine (SVM) sowie ein Schneidrad für die Vorrichtung | |
| DE102009012374B3 (de) | Messerschild | |
| EP3564446B1 (de) | Unterwasserabbauvorrichtung und verfahren zum abbau | |
| DE2548252A1 (de) | Verfahren und vorrichtung zum abbau von kohlehaltigem material | |
| EP3436664B1 (de) | Bohrverfahren und schachtbohrsystem | |
| EP3387209B1 (de) | Vorrichtung und verfahren zum vortreiben eines hohlraums im untertagebau | |
| DE1758505C (de) | Bohrend arbeitende Vortriebsmaschine zum Auffahren horizontal, geneigt oder vertikal verlaufender Grubenbaue |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20160112 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20181108 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1113317 Country of ref document: AT Kind code of ref document: T Effective date: 20190415 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502014011243 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190627 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20190327 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190627 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190628 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2729194 Country of ref document: ES Kind code of ref document: T3 Effective date: 20191030 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190727 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190727 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502014011243 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| 26N | No opposition filed |
Effective date: 20200103 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190630 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190602 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190630 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190630 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190630 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190602 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140602 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190327 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20250429 Year of fee payment: 12 Ref country code: DE Payment date: 20250612 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20250620 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250618 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20250616 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20250618 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20250718 Year of fee payment: 12 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20250630 Year of fee payment: 12 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 502014011243 Country of ref document: DE Representative=s name: MAUCHER JENKINS PATENTANWAELTE & RECHTSANWAELT, DE |