[go: up one dir, main page]

DE817286C - Method and device for introducing steel supports, especially heavy supports, in mining operations - Google Patents

Method and device for introducing steel supports, especially heavy supports, in mining operations

Info

Publication number
DE817286C
DE817286C DEP6710A DEP0006710A DE817286C DE 817286 C DE817286 C DE 817286C DE P6710 A DEP6710 A DE P6710A DE P0006710 A DEP0006710 A DE P0006710A DE 817286 C DE817286 C DE 817286C
Authority
DE
Germany
Prior art keywords
stamp
cap
punch
adjusting nut
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP6710A
Other languages
German (de)
Inventor
Friedrich Rueter
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DEP6710A priority Critical patent/DE817286C/en
Application granted granted Critical
Publication of DE817286C publication Critical patent/DE817286C/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D17/00Caps for supporting mine roofs
    • E21D17/02Cantilever extension or similar protecting devices
    • E21D17/0213Assembling devices for pivoting caps upwardly
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/50Component parts or details of props
    • E21D15/52Extensible units located above or below standard props
    • E21D15/526Extensible units located above or below standard props for step-by-step extension of the prop
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/58Devices for setting props or chocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Portable Nailing Machines And Staplers (AREA)

Description

Verfahren und Vorrichtung zum Einbringen von Stahlausbauen, insbesondere schwerer Ausbaue, in Abbaubetrieben Bekanntlich hat im Grubenbetrieb für die Stützung des Hangenden in Abbaubetrieben der Stahlausbau, dessen Vorzüge allgemein bekannt sind und heute auch allseitig anerkannt werden, insbesondere in der flacheren Lagerung den früher üblichen Holzausbau aus Gründen der Wirtschaftlichkeit und Betriebssicherheit immer mehr und nahezu ganz verdrängt. Dabei führten die an den Stahlausbau gestellten Anforderungen im Laufe der Jahre zu immer stärkeren Stempelprofilen, womit zwangsläufig auch die von den Stempeln getragenen Schaleisen, die sog. Stahlkappen, Schritt halten mußten und eine entsprechende Verstärkung erfuhren. Stempel und Stahlkappen nahmen daher, zumal wenn es sich um den Ausbau mächtiger Flöze handelt beträchtliche Gewichte an, die das Ausbauen begreiflicherweise äußerst schwierig und zeitraubend gestalten. Das Einbringen schwerer Ausbaue bedeutet daher eine starke Belastung der Hauer und kann nicht mehr von einem Mann allein bewältigt werden. Die durch die hohen Gewichte hervorgerufene umständliche Handhabung der Ausbauteile ist auch sehr häufig die Ursache von Verletzungen der Arbeiter und sie erschwert auch das Bankrecht- und Inrichtungstellen der Ausbaustempel, durch das nur die Gewähr der Betriebssicherheit gegeben ist. Besonders schwierig und nicht ungefährlich ist das Einbringen schwerer Stahlausbaue # bei stärkeren Flözeinfällen. Hier hat man in Abbaubetrieben mit einem Einfallen von mehr als 3o° den Stahlausbau nicht mehr oder nur sehr selten und sehr ungern angewandt. Soweit man bereits Hilfsmittel zur Erleichterung des Einbringens der Ausbaue vorgeschlagen hat, beispielsweise die behelfsmäßige Unterstützung der unter das Hangende gehobenen Stahlkappe, sind diese Vorschläge vollkommen unzulänglicher Art, so daß hierdurch die vorerwähnten Übelstände und Schwierigkeiten in keiner Weise auch nur annähernd behoben werden. Man kann daher in Abbaubetrieben immer wieder die Beobachtung machen, daß sich mehrere Hauer mit dem schweren Ausbau abmühen, mit dem Endergebnis, d413 die fertige Zimmerung doch nicht bankrecht oder nicht in Richtung steht. Ein Umstellen des Ausbaues nach erfolgter Fertigstellung ist aber sehr schwierig, zeitraubend und gefahrvoll und wird daher von den Hauern nur ungern und nur dann vorgenommen, wenn dies von den Aufsichtspersonen ausdrücklich verlangt wird. Diese werden im Hinblick auf die Umständlichkeit des Umsetzens ein Umsetzen des Ausbaues nur dann verlangen, wenn infolge des unsachgemäßen Stehens der Zimmerurig eine unmittelbare Gefahr für den Hauer oder den Streb besteht. Es liegt daher ein dringendes Bedürfnis der Arbeitsvereinfachung und Arbeitserleichterung sowie der Erhöhung der Sicherheit beim Einbringen der Stahlausbaue vor.Method and device for introducing steel supports, in particular Heavy expansion, in mining operations It is well known that mining operations for support of the hanging walls in mining operations, the steel construction, the advantages of which are well known are and are now widely recognized, especially in the flatter storage the previously common timber construction for reasons of economy and operational safety more and more and almost completely suppressed. In doing so, they led to the steel construction Requirements over the years for ever stronger stamp profiles, which is inevitable also the shell irons worn by the stamps, the so-called steel caps, keep pace had to and received a corresponding reinforcement. Took punches and steel caps therefore, especially when it comes to the expansion of thick seams, considerable weights which understandably make the expansion extremely difficult and time-consuming. The introduction of heavy extensions therefore means a heavy burden on the tusks and can no longer be mastered by one man alone. Because of the heavy weights caused cumbersome handling of the expansion parts is also very often the Cause of injuries to workers and it also complicates the banking law and Installation of the extension stamp, through which only the guarantee of operational safety given is. Bringing in is particularly difficult and not without risk Steel extensions # in the event of heavy seam incursions. Here you have in mining operations with one If more than 30 ° collapses, the steel structure no longer or only very rarely and very much reluctantly applied. As far as one already has aids to facilitate the introduction the expansion proposed, for example, the makeshift support of the These proposals are completely inadequate Kind, so that the aforementioned evils and difficulties in no way can only be remedied approximately. You can therefore go to mining operations again and again make the observation that several tusks are struggling with the difficult removal, with the end result, d413 the finished carpentry is not bankable or not is facing. A conversion of the expansion after completion is but very difficult, time-consuming and dangerous and is therefore only used by the tusks reluctantly and only undertaken if this is expressly stated by the supervisors is required. These are given in view of the awkwardness of putting one Only ask for the expansion to be carried out if it is due to improper standing the carpenter poses an immediate danger to the tusker or the longwall face. It therefore, there is an urgent need to simplify and facilitate work as well as increasing safety when installing the steel structures.

Gegenstand vorliegender Erfindung ist nun ein Verfahren und Einrichtung zum Einbringen von Stahlausbauen, insbesondere schwerer Ausbaue, in Abbaubetrieben, die diesem Bedürfnis voll und ganz Rechnung tragen, durch die also das sachgemäße Einbringen der Stahlausbaue unter gleichzeitiger Erhöhung der Sicherheit wesentlich vereinfacht und erleichtert wird. Darüber hinaus erschließt die Erfindung dem Stahlausbau auch die Abbaubetriebe mit steilerem Einfallen, in denen bisher der Stahlausbau keine Verwendung fand und in der Hauptsache noch in Holz ausgebaut wurde, so daß durch den erfindungsgemäßen Vorschlag erheblich an Grubenholz eingespart wird.The present invention now relates to a method and device for the introduction of steel supports, especially heavy supports, in mining operations, who take this need fully into account, through which, therefore, what is appropriate Bringing in the steel structures while at the same time significantly increasing safety is simplified and facilitated. In addition, the invention opens up steel construction also the mining operations with steeper incursions, in which so far the steel construction found no use and was mainly expanded in wood, so that the proposal according to the invention saves a considerable amount of pit wood.

Die Erfindung besteht im wesentlichen darin, daß zunächst ein in seiner Ausführung einfacher und leicht zu handhabender Hilfsstempel geringen Gewichtes zwischen dem Hangenders und dem Liegenden fest eingespannt wird, der in seinem oberen Teil mit einer zur Auflage der Stahlkappe dienenden Auflegeeinrichtung, beispielsweise in Form einer Konsole, versehen ist. Auf dieser gegenüber dem eingespannten Stempel in der Höhenlage verstellbaren Konsole wird alsdann die Stahlkappe nach erfolgtem Auflegen mühelos in die dem Hangendenverlauf ungefähr entsprechende Lage geschoben und gehalten, um hiernach durch Hochschrauben des die Konsole tragenden Stempelteiles mit den auf ihr aufgelegten Quetschhölzern fest gegen das Hangende gepreßt zu werden. In dieser Lage wird die Stahlkappe alsdann zunächst durch den Hilfsstempel gehalten. Es können nunmehr, unberührt vom Gewicht der Stahlkappe, die endgültigen Stahlstempel an den hierfür vorgesehenen Stellen unter die Stahlkappe gesetzt werden, wobei das Setzen der Stempel noch dadurch erleichtert wird, daß auf die Stahlkappe im Bereich der Stempelsetzstelle Hilfsmittel aufgebracht werden, die den Stempelkopf gabelförmig unterfassen und somit das Gewicht des Innenstempels übernehmen. Mittels dieses Hilfsmittels wird der in der Gabel verschiebbare Innenstempel in seine genaue Angriffslage unter die Stahlkappe geschoben, und es kann nunmehr der vom Gewicht des Innenstempelteiles entlastete AuBenstempelteil leicht und mühelos in die erforderliche bankrechte Lage und Richtung gebracht werden. Hierauf wird der Innenstempelteil in bekannter Weise mittels Setzvorrichtung o. dgl. fest gegen die Stahlkappe geprellt und das Stempelschloß verkeilt, so daß nunmehr der endgültige Ausbaustempel den Druck des Hangenden übernimmt. Nach erfolgtem Setzen der beiden die Stahlkappe tragenden endgültigen Ausbaustempel werden Hilfsstempel und Hilfsmittel zwecks Wiederverwendung von der Stahlkappe entfernt, alles Arbeiten, die gefahrlos von einem Arbeiter schnell und ohne Anstrengung bewältigt werden können.The invention consists essentially in the fact that initially one in his Execution of simple and easy-to-use auxiliary stamps of low weight is firmly clamped between the hanger and the lying, which in its upper Part with a lay-up device used to support the steel cap, for example in the form of a console. On this opposite the clamped stamp The height-adjustable console is then the steel cap after Laying up easily pushed into the position roughly corresponding to the course of the hanging wall and held to afterwards by screwing up the punch part carrying the console to be pressed firmly against the hanging wall with the wooden blocks placed on it. The steel cap is then initially held in this position by the auxiliary ram. The final steel stamp can now be used, unaffected by the weight of the steel cap be placed under the steel cap in the places provided for this purpose, whereby the Setting the punch is made even easier by putting on the steel cap in the area Aids are applied to the die setting point, which fork-shaped the die head under and thus take over the weight of the inner punch. Using this tool the inner punch, which can be displaced in the fork, is in its exact attack position below pushed the steel cap, and it can now be the weight of the inner punch part relieved the external stamp part easily and effortlessly in the required bank-oriented position and direction. The inner punch part is then made in a known manner by means of a setting device o. the like. firmly bounced against the steel cap and the ram lock wedged, so that now the final expansion stamp takes over the pressure of the hanging wall. After the two final removal stamps carrying the steel cap have been set auxiliary punches and tools are removed from the steel cap for reuse, all work that can be done safely by a worker, quickly and effortlessly can be.

Es sei noch erwähnt, daß, wenn auch der erfindungsgemäße Vorschlag in der Hauptsache für den Ausbau von Stahlkappen gedacht ist, er jedoch überall auch dort Verwendung finden kann, wo mit schweren Ausbauteilen ausgebaut wird, beispielsweise auch in Fällen, in denen mit Stahlstempeln ausgebaut wird, wo aber als Kappen für die Stützung des Hangenden keine Stahlkappen, sondern Holzkappen verwendet werden.It should also be mentioned that, albeit the proposal according to the invention It is mainly intended for the expansion of steel caps, but it is used everywhere Can also be used where heavy expansion parts are used, for example also in cases in which steel punches are used, but where as caps for instead of using steel caps, wooden caps are used to support the hanging wall.

In der Zeichnung ist der erfindungsgemäße Vorschlag sowie die hierzu verwendeten Mittel in den Abb. r bis 9 in einem Ausführungsbeispiel veranschaulicht.The drawing shows the proposal according to the invention as well as this means used in Figs. r to 9 illustrated in one embodiment.

Abb. r bis 4 zeigen das Verfahren in einem mit ungefähr 4o° einfallendem Flöz in seinen verschiedenen Vorlaufstadien.Figs. R to 4 show the process in an incident angle of approximately 40 ° Seam in its various preliminary stages.

Abb. 5 zeigt im vergrößerten Maßstabe die mittels des Hilfsstempels gegen das Hangende gepreßte Stahlkappe, wie es die Abb.4 wiedergibt. Diese Abbildung zeigt ferner das auf die Stahlkappe aufgebrachte Hilfsmittel zur Erleichterung des Setzens des endgültigen Ausbaustempels. 114n ersieht aus dieser Abbildung, wie der Innenstempelteil des endgültigen Ausbaustempels vom gabelförmigen Hilfsmittel unterfaßt ist und von diesem getragen wird.Fig. 5 shows on an enlarged scale the means of the auxiliary punch steel cap pressed against the hanging wall, as shown in Fig.4. This figure also shows the aid applied to the steel cap to facilitate the Setting the final stage of expansion. 114n can be seen from this figure how the Inner stamp part of the final extension stamp from the fork-shaped aid is and is borne by it.

Abb.6, von der Abb. 7 einen teilweisen Längsschnitt in vergrößertem Nlaßstabe wiedergibt, zeigt den Hilfsstempel für das Anpressen und Halten der Stahlkappe in Seitenansicht.Fig.6, of Fig. 7 a partial longitudinal section in enlarged Nlaßstabe reproduces, shows the auxiliary punch for pressing and holding the steel cap in side view.

Abc. 8 und 9 endlich zeigen in Seitenansicht bzw. im Querschnitt das auf die Stahlkappe aufzubringende Hilfsmittel zur Erleichterung des Setzens des endgültigen Ausbaustempels.ABC. 8 and 9 finally show in side view and in cross section that Aids to be applied to the steel cap to facilitate the setting of the final expansion temple.

Aus der Abb. r ersieht man den zwischen dem Hangenden r und dem Liegenden 2 eingespannten Hilfsstempel 3 mit auf seiner Konsole 4 aufgelegter Stahlkappe 5, welche dann auf der Konsole 4 gemäß der Abb. 2 in eine dem Hangendenverlauf ungefähr entsprechenden Lage geschoben wurde und in dieser Lage mit den aufgelegten Quetschhölzern 6 gehalten wird. Abb. 3 zeigt alsdann, wie die Stahlkappe 5 durch Hochdrücken des die Konsole .4 mit der Stahlkappe 5 tragenden Stempelteiles fest gegen das Hangende gepreßt ist und von dem Hilfsstempel 3 getragen wird. Aus Abb. ,4 ist dann das auf die Stahlkappe 5 aufgebrachte, gabelförmige, für das Unterfassen und damit für das Halten des Innenstempelteiles des endgültigen Ausbaustempels dienende Hilfsmittel 7 ersichtlich, so daß nunmehr der vom Gewicht des Innenstempelteiles entlastete Ausbaustempel 8 gesetzt werden kann. Hilfsmittel 7 kann nun entfernt und am anderen Ende der Stahlkappe zum Stellen des zweiten endgültigen Ausbaustempels aufgebracht werden. Nachdem die leiden endgültigen Ausbaustempel gesetzt sind, können Hilfsstempel 3 und Hilfsmittel ? zwecks Wiederverwendung entfernt werden und der Ausbau ist fertig, wie es die linken Seiten aller vier Abbildungen zeigen.From fig. R one can see the one between the hanging wall r and the lying one 2 clamped auxiliary punch 3 with steel cap 5 placed on its console 4, which then on the console 4 according to Fig. 2 in a hanging wall course approximately corresponding position was pushed and in this position with the applied pinch wood 6 is held. Fig. 3 then shows how the steel cap 5 by pushing up the the console .4 with the steel cap 5 bearing punch part firmly against the hanging wall is pressed and carried by the auxiliary punch 3. From Fig. 4 this is then on the steel cap 5 applied, fork-shaped, for the underclass and thus for the Holding the inner punch part of the final expansion punch serving Aids 7 can be seen, so that now relieved of the weight of the inner punch part Expansion stamp 8 can be set. Aid 7 can now be removed and on the other Applied to the end of the steel cap to place the second final expansion stamp will. After the suffering final expansion stamps have been set, auxiliary stamps can be used 3 and aids? can be removed for reuse and the removal is complete, as shown on the left of all four figures.

Gemäß den Abb. 6 und 7 besteht der Hilfsstempel im wesentlichen aus dem unteren Teil 9 mit dem ihm gegenüber versteilbaren Oberteil io, und zwar erfolgt die Verstellung mittels einer unter Zwischenschaltung eines Haltestückes 15 vom Unterteil 9 getragenen, mit Handgriffen i i in Form von Rohrstücken o. dgl. versehenen Verstellmutter 12, zu welchem Zwecke das Oberteil des Hilfsstempels teilweise mit :lußengewin(le versehen ist, in dem die Verstellmutter 12 arbeitet. Um hierbei ein Verdrehen des Oberteiles io beim Drehen der Verstellnititter 12 zu verhüten, ist das Oberteil des Hilfsstempels mit einer durchgehenden Nut 13 versehen, in die ein Stift 14 des die Mutter 12 tragenden Haltestückes 15 einfaßt. 1?iiie Ringnut 16 in der Verstelltiititter 12, in die ein weiterer Stift 17 des Haltestückes 15 einfaßt, ermöglicht eine Umdrehung der Verstellmutter 12 gegenüber dem fest stehenden Haltestück 16. Auf einer weiteren auf dem Außengewinde des oberen Stempelteiles io arbeitenden Verstellmutter 18 mit Handgriffen i9 ruht, auf dem Oberteil io gleitbar, die die Stahlkappe 5 tragende Kolisole. Diese besteht zweckmäßig aus dem durch Streite 2o abgestützten Rohrstück 21, das mit einem über (las Stempeloberteil io gestülpten und auf diesem gleitenden Rohrstück 22 verschweißt ist. Damit beim Umdrehen der Verstellmutter 18 sich das die Konsole tragende Rohrstück 22 nicht mitdreht, trägt letzteres ebenfalls einen Stift 23, der in die durchgehende Nut 13 des Stempeloberteiles io einfaßt. Durch Hochschrauben der Mutter 18 auf dem Gewinde des Stempelteiles to wird die Konsole nach oben gedrückt und damit die auf der Konsole ruhende Stahlkappe mit den auf dieser ruhenden Quetschhölzern fest gegen das Hangende gepreßt.According to Figs. 6 and 7, the auxiliary ram consists essentially of the lower part 9 with the upper part io, which can be adjusted with respect to it, namely takes place the adjustment by means of a with the interposition of a retaining piece 15 from Lower part 9 carried, with handles i i in the form of pipe pieces o. The like. Provided Adjusting nut 12, for what purpose the upper part of the auxiliary ram partially with : lußengewin (le is provided in which the adjusting nut 12 works. To this a Rotation of the upper part is to be prevented when turning the adjustment bar 12 the upper part of the auxiliary ram provided with a continuous groove 13 into which a Pin 14 of the nut 12 carrying retaining piece 15 surrounds. 1? Iiie ring groove 16 in the adjustment bar 12, in which a further pin 17 of the holding piece 15 engages, enables a rotation of the adjusting nut 12 with respect to the stationary holding piece 16. On another working on the external thread of the upper punch part io Adjusting nut 18 rests with handles i9, slidable on the upper part io, which the Steel cap 5 supporting colisoles. This expediently consists of the disputes 2o supported pipe section 21, which is fitted with an over (read stamp upper part io and is welded onto this sliding piece of pipe 22. So when you turn the Adjusting nut 18, the pipe section 22 carrying the console does not rotate with it, carries the latter also has a pin 23 which is inserted into the continuous groove 13 of the upper part of the punch io bordering. By screwing up the nut 18 on the thread of the punch part to the console is pushed up and with it the steel cap resting on the console with the wooden blocks resting on this pressed firmly against the hanging wall.

llin die Lage des Hilfsstempels auch stark wechselnde Flözmächtigkeiten anpassen zu können, ist, wie atis den Abb. 5 und 6 ersichtlich, ein Verlängerungsrohr 9° vorgesehen, welches mittels eines 13olzelis 9h am Stempelunterteil 9 des Hilfsstempels versteckbar angeordnet ist.llin the position of the auxiliary punch also strongly changing seam thicknesses to be able to adapt, as atis Figs. 5 and 6 can be seen, an extension tube 9 ° provided, which by means of a 13olzelis 9h on the lower part of the stamp 9 of the auxiliary stamp is arranged to be hidden.

Das auf die Stahlkappe aufzubringende Hilfsmittel für die Erleichterung des Setzens der endgültigen .\usbaustempel besteht gemäß den Abb. 5, 8 und 9 aus dein U-förmig gebogenen Flacheisen 24, (iessen 1?ntlen den 1#u13 der Stahlkappes umfassen. 1n den Altbildungen dient als Stahlkappe ein Doppel-T-Stück, an dessen Stelle jedoch auch eine Altschiene, eine Holzkappe o. dgl. treten kann, in welchem Falle das Flacheisen eine entsprechende Formgestaltung erhält. Durch den Keil 25, welcher in Schlitzen geführt ist, wird das U-förmig gebogene Flacheisen zuverlässig mit der Stahlkappe verbunden. Als Gleitlager für den Keil 25 und zur Erhöhung der Stabilität des U-förmig gebogenen Flacheisens gegen ein Auseinanderbiegen ist in die Führungsschlitze ein an den Enden entsprechend umgebogenes Stück Quadrateisen 26 gelegt und mit dem Flacheisen verschweißt. An den Außenseiten des U-förmig gebogenen Flacheisens angeschweißte Längsriegel 27 dienen zum Unterfassen des Stempelkopfes des endgültigen Ausbaustempels, wobei nach Einführen des Stempelkopfes ein die beiden Längsriegel 27 verschließender Querriegel 28 eingeführt wird, welcher ein Abgleiten des Stempelkopfes von dem Hilfsmittel verhindert.According to Figs. 5, 8 and 9, the aid to be applied to the steel cap to facilitate the setting of the final construction stamp consists of your U-shaped flat iron 24, (which should encompass the 1 # u13 of the steel cap. 1n den A double T-piece serves as a steel cap, but an old rail, a wooden cap or the like can also be used in its place, in which case the flat iron is given a corresponding shape The U-shaped bent flat iron is reliably connected to the steel cap. As a slide bearing for the wedge 25 and to increase the stability of the U-shaped flat iron against bending apart, a piece of square iron 26 bent at the ends is placed in the guide slots and with the flat iron Longitudinal bars 27 welded to the outside of the U-shaped bent flat iron serve to grasp under the punch head of the final expansion ustempels, whereby after the insertion of the punch head a cross bolt 28 which closes the two longitudinal bolts 27 and prevents the punch head from sliding off the aid is introduced.

Claims (6)

\PATENTANSPRCCIIE: i. Verfahren zum Einbringen von Stahlausbauen, insbesondere schwerer Ausbaue, in Abbaubetrieben, dadurch gekennzeichnet, daß zunächst ein mit einer höhenverstellbaren Auflegeeinrichtung (4) versehener Hilfsstempel (3) zwischen dem Hangenden (i) und dem Liegenden (2) eingespannt und auf seine Auflegeeinrichtung alsdann die Kappe (5) aufgelegt und in eine dem Hangendenverlauf ungefähr entsprechende Lage geschoben und gehalten wird, worauf die Kappe (5) durch Verstellen ihrer Auflagen (4) unter Zwischenlage des Spitzenverzuges (6) fest gegen das Hangende (i) gepreßt und in dieser Lage so lange gehalten wird, bis die hiernach gesetzten endgültigen Ausbaustempel (8) dem Hilfsstempel (3) die Kappe (5) abnehmen und letzterer zur erneuten Unterstützung weiterer Ausbaue entfernt werden kann. \ PATENT CLAIM: i. Procedure for the introduction of steel supports, in particular heavy extensions in mining operations, characterized in that initially an auxiliary ram provided with a height-adjustable lay-up device (4) (3) clamped between the hanging wall (i) and the lying wall (2) and on its laying device then the cap (5) is placed and in an approximately corresponding to the slope of the wall Position is pushed and held, whereupon the cap (5) by adjusting its supports (4) with the interposition of the tip warpage (6) firmly pressed against the hanging wall (i) and is held in this position until the final ones established afterwards Remove the removal stamp (8) from the auxiliary stamp (3), remove the cap (5) and use the latter to renewed support for further expansions can be removed. 2. Verfahren nach Anspruch i, gekennzeichnet durch die Verwendung zusätzlicher auf die Kappe (5) aufzubringender Hilfsmittel (7), die beim Setzen des endgültigen Ausbaustempels (8) durch Unterfassen des Stempelkopfes das Gewicht des Innenstempelteiles übernehmen und damit das Setzen des Ausbaustempels (8) erleichtern. 2. Procedure according to Claim i, characterized by the use of additional materials to be applied to the cap (5) Aids (7) when setting the final expansion stamp (8) by gripping under of the punch head take over the weight of the inner punch part and thus the setting of the removal stamp (8). 3. Zweiteiliger Hilfsstempel zur Durchführung des Verfahrens nach Anspruch i, dadurch gekennzeichnet, daß die Verstellung der beiden Stempelteile gegeneinander durch eine vom Unterteil (9) getragene, mit Handgriffen (i i) versehene Verstellmutter (12) erfolgt, die mit einem Außengewinde des Oberteiles (io) zusammenarbeitet, wobei zwecks Verhinderung einer Verdrehung des Stempeloberteiles (io) dieser mit einer durchgehenden Nut (13) versehen ist, in die ein Haltestift (14) eines die Verstellmutter (12) tragenden und auf dem Unterteil (9) aufgebrachten Haltestückes (15) einfaßt, während eine mit einem zweiten Haltestift (17) dieses Haltestückes (15) im Eingriff stehende Ringnut (16) in der Verstellmutter (12) eine Umdrehung der Verstellmutter zuläßt. :3. Two-part auxiliary stamp for implementation of the method according to claim i, characterized in that the adjustment of the two stamp parts against each other by one carried by the lower part (9), with handles (i i) provided adjusting nut (12) takes place with an external thread of the upper part (io) cooperates, with the aim of preventing rotation of the upper part of the punch (io) this is provided with a continuous groove (13) into which a retaining pin (14) one which carries the adjusting nut (12) and is applied to the lower part (9) Holding piece (15) surrounds, while one with a second retaining pin (17) this Holding piece (15) engaging annular groove (16) in the adjusting nut (12) Rotation of the adjusting nut. : 4. Hilfsstempel nach Anspruch 3, gekennzeichnet durch ein auf dem Oberteil (io) aufgestülptes, die Konsole (4) tragendes Rohrstück (22), das mittels einer mit dem Außengewinde des Oberteiles (io) zusammenarbeitenden zweiten Verstellmutter (18) auf dem Stempeloberteil (io) verschoben werden kann, wobei ein in die Nut (13) des Oberteiles (io) eingreifender Stift (23) des Rohrstückes (22) beim Umdrehen der Mutter (18) ein Mitdrehen des Rohrstückes (22) und damit der die Kappe (5) tragenden Konsole (4) verhindert. 4. Auxiliary stamp according to claim 3, characterized through a piece of pipe that is turned up on the upper part (io) and carries the console (4) (22), that by means of a with the external thread of the upper part (io) cooperating second adjusting nut (18) moved on the upper punch part (io) can be, whereby a pin (23) engaging in the groove (13) of the upper part (io) of the pipe section (22) when turning the nut (18) a co-rotation of the pipe section (22) and thus the bracket (4) carrying the cap (5). 5. Hilfsmittel zum Setzen des endgültigen Grubenstempels nach dem Verfahren nach Anspruch 2, gekennzeichnet durch ein auf der Kappe (5) befestigtes U-förmig gebogenes Flacheisen (24), dessen Enden den Fuß der Kappe (5) umfassen und mittels eines in Schlitzen geführten Keiles (25) zuverlässig mit der Kappe (5) verbunden ist, wobei zwei zum Unterfassen des Stempelkopfes dienende, an ihm angebrachte Längsriegel (27) nach Einführen des Stempelkopfes durch einen Querriegel (28) miteinander verbunden sind. 5. Tools for setting the final pit punch according to the method according to claim 2, characterized by a U-shaped bent flat iron (24) attached to the cap (5), whose The ends of the base of the cap (5) encompass and by means of a wedge guided in slots (25) is reliably connected to the cap (5), two of which are under the Serving the stamp head, attached to it longitudinal bolt (27) after insertion of the stamp head are connected to one another by a crossbar (28). 6. Hilfsmittel nach Anspruch 5, gekennzeichnet durch ein um das U-förmig gebogene Flacheisen (24) gelegtes, als Gleitfläche für den Keil (25) dienendes und die Stabilität erhöhendes Verstärkungseisen (26).6. Aid according to claim 5, characterized by a flat iron (24) bent around the U-shaped, as Reinforcing iron that serves as a sliding surface for the wedge (25) and increases its stability (26).
DEP6710A 1948-10-02 1948-10-02 Method and device for introducing steel supports, especially heavy supports, in mining operations Expired DE817286C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEP6710A DE817286C (en) 1948-10-02 1948-10-02 Method and device for introducing steel supports, especially heavy supports, in mining operations

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP6710A DE817286C (en) 1948-10-02 1948-10-02 Method and device for introducing steel supports, especially heavy supports, in mining operations

Publications (1)

Publication Number Publication Date
DE817286C true DE817286C (en) 1951-10-15

Family

ID=7360792

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP6710A Expired DE817286C (en) 1948-10-02 1948-10-02 Method and device for introducing steel supports, especially heavy supports, in mining operations

Country Status (1)

Country Link
DE (1) DE817286C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2987290A (en) * 1956-12-03 1961-06-06 Haarmann Arnold Prop arrangement for mines
US3077741A (en) * 1956-12-03 1963-02-19 Haarmann Arnold Shiftable mine prop arrangement and process for shifting mine props

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2987290A (en) * 1956-12-03 1961-06-06 Haarmann Arnold Prop arrangement for mines
US3077741A (en) * 1956-12-03 1963-02-19 Haarmann Arnold Shiftable mine prop arrangement and process for shifting mine props

Similar Documents

Publication Publication Date Title
DE102014003677B4 (en) spreading wedge
DE817286C (en) Method and device for introducing steel supports, especially heavy supports, in mining operations
DE608312C (en) Resilient iron pit stamp
DE3100044A1 (en) Wood-splitting device
DE2124675A1 (en) Mechanical lifting device
DE635044C (en) Rigid stamp with setting and robbing made possible by wedges
DE202008002460U1 (en) wood splitter
DE852444C (en) Formwork support
DE946044C (en) Device for quick and safe fixing of the pressure cylinder in mechanical coal extraction devices, for example in the coal plow
AT166294B (en) Adjusting device for iron pit punches
DE1559041B1 (en) Wedge connection of two formwork panels
DE1552346A1 (en) Process for clamping and loosening a tool cone and device for carrying out the process
DE183531C (en)
DE925707C (en) Multi-part pit punch with shear elements provided between the upper and lower punch
DE839337C (en) Cap for the pit lining
DE939894C (en) Device for connecting curtain hooks or the like with a retaining bolt
DE8812697U1 (en) Device for breaking masonry
DE1019625B (en) Setting device for multi-part pit punches in pit construction
DE1733298U (en) METHOD AND DEVICE FOR FASTENING NAILS OR THE LIKE. IN PARTICULAR IN WALLS OR. PLATES.
DE972801C (en) Stem stamp, especially for mining operations
DD238763A1 (en) NAGELZIEHGERAET
DE369603C (en) Process for the production of the movable jaw of English wrenches or the like.
AT21830B (en) Impact press for the production of roof tiles.
DE927145C (en) Flexible route expansion
DE875492C (en) Pit stamp