DE4311658A1 - Method of making roadside packs and/or support pillars in underground mining, preferably coal mining - Google Patents

Method of making roadside packs and/or support pillars in underground mining, preferably coal mining

Info

Publication number
DE4311658A1
DE4311658A1 DE19934311658 DE4311658A DE4311658A1 DE 4311658 A1 DE4311658 A1 DE 4311658A1 DE 19934311658 DE19934311658 DE 19934311658 DE 4311658 A DE4311658 A DE 4311658A DE 4311658 A1 DE4311658 A1 DE 4311658A1
Authority
DE
Germany
Prior art keywords
underground
mine
mining
flotation
building material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19934311658
Other languages
German (de)
Inventor
Frank Dr Ing Fink
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FINK, FRANK W., DR.-ING., 66121 SAARBRUECKEN, DE
Original Assignee
Saarbergwerke AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Saarbergwerke AG filed Critical Saarbergwerke AG
Priority to DE19934311658 priority Critical patent/DE4311658A1/en
Publication of DE4311658A1 publication Critical patent/DE4311658A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

In a method of making roadside packs and/or support pillars in underground mining, preferably coal mining, in which the construction-material components used as well as the requisite binding agent are delivered underground, are mixed there with water and are then pumped to the operating point, it is proposed to use a floatation tailings suspension from the surface preparation plant of the mine as an essential construction-material component in addition to the binding agent. In a mine, the proposed method on the one hand enables the consumption of construction materials extraneous to the mine to be considerably reduced. On the other hand, the settling pond of the mine is clearly relieved.

Description

Die Erfindung betrifft ein Verfahren zum Herstellen von Streckenbegleitdämmen und/oder Ausbaupfeilern im untertägigen Bergbau, vorzugsweise Steinkohlenbergbau, bei dem die einge­ setzten Baustoffkomponenten sowie das benötigte Bindemittel nach untertage gefördert, mit Wasser angerührt und dann zum Einsatz­ ort gepumpt werden.The invention relates to a method for producing Line accompanying dams and / or pillars in the underground Mining, preferably hard coal mining, in which the turned add building material components and the required binder mined underground, mixed with water and then used be pumped in place.

Im Bergbau ist es seit langem bekannt, untertägige Strecken­ begleitdämme und/oder Ausbaupfeiler unter Verwendung von Flugasche und Zement und ggfs. nach weiteren Baustoffkomponenten auf hydromechanischem Wege herzustellen. Hierbei werden die verschiedenen Stoffe zunächst pneumatisch nach untertage in die Nähe des Einsatzortes gefördert, dort mit Wasser angerührt und dann zu dem entsprechend verschalten Betriebspunkt gepumpt.It has long been known in mining, underground routes accompanying dams and / or expansion pillars using Fly ash and cement and, if necessary, for other building material components to produce by hydromechanical way. Here, the various materials first pneumatically into the underground Promoted near the place of use, mixed with water and then pumped to the corresponding interconnected operating point.

Die Versorgung eines Bergwerkes mit großen Mengen der genannten bergwerksfremden Baustoffen erweist sich als aufwendig und u. a. aufgrund der Transportwege auch relativ kostenintensiv.The supply of a mine with large amounts of the above Non-mining building materials prove to be complex and u. a. due to the transport routes also relatively expensive.

Der Erfindung liegt die Aufgabe zugrunde, die Wirtschaftlichkeit der Herstellung von Streckenbegleitdämmen und/oder Ausbau­ pfeilern zu verbessern.The invention is based, the economy the production of line accompanying dams and / or expansion to improve pillars.

Diese Aufgabe wird bei einem Verfahren der eingangs genannten Art erfindungsgemäß dadurch gelöst, daß neben dem Bindemittel als wesentliche Baustoffkomponente eine Flotationsberge­ suspension aus der übertägigen Aufbereitungsanlage des Berg­ werkes verwendet wird. Dabei wird zweckmäßigerweise die als Baustoffkomponente eingesetzte Flotationsbergesuspension bereits im Zuge der Aufbereitung auf einen Wassergehalt voreingedickt, der in etwa der benötigten Abbindewassermenge beim untertägigen Einsatz entspricht, so daß eine zusätzliche Wasserversorgung zum Anrühren der Baustoffmischung entfällt.This task is carried out in a method of the type mentioned at the beginning Art solved according to the invention in that in addition to the binder as an essential building material component, a flotation mountain  suspension from the surface processing plant of the mountain works is used. It is expedient that the as Building material component already used flotation mountain suspension pre-thickened to a water content in the course of the treatment, the roughly the amount of setting water required for the underground Use corresponds, so that an additional water supply for Mixing the building material mixture is not necessary.

Es hat sich gezeigt, daß bei einem Mischungsverhältnis zwischen Flotationsberge und Zement im Verhältnis von etwa 1 : 1 sich Druckfestigkeiten ergeben, die den Anforderungen an frühfeste Baustoffe zur Herstellung von Streckenbegleitdämmen im Unter­ tagebereich genügen.It has been shown that with a mixing ratio between Flotation piles and cement in a ratio of about 1: 1 themselves Compressive strengths that meet the requirements for early strength Building materials for the production of line accompanying dams in the sub day area are sufficient.

Durch das vorgeschlagene Verfahren gelingt es somit auf einfache Weise, Flotationsberge als Wertstoff im Bergwerk selbst zu nutzen. Mit Ausnahme des benötigten Bindemittels kann im Prinzip auf die Beschaffung bergwerksfremder Baustoffkomponenten ver­ zichtet werden.The proposed method is therefore simple Way, flotation mountains as a resource in the mine itself use. In principle, with the exception of the required binder on the procurement of non-mining building material components to be waived.

Für den Betrieb eines Bergwerkes ergibt sich als weiterer Vorteil, daß die nunmehr als Baustoff eingesetzten Flotations­ bergemengen nicht mehr in den Absinkweiher des Bergwerkes ein­ geleitet werden brauchen, wodurch eine spürbare Entlastung und somit eine höhere Nutzungszeit des Weihers erreicht wird.For the operation of a mine there is another Advantage that the flotations now used as a building material recovery quantities no longer enter the sink pond of the mine need to be directed, creating a noticeable relief and thus a longer usage time of the pond is achieved.

Da die Flotationsberge in der Aufbereitung als wäßrige Sus­ pension anfällt, läßt sie sich sehr einfach nach untertage verbringen, da der hydrostatische Druck der Schachtsäule in vollem Umfang genutzt werden kann.Since the flotation mountains are processed as aqueous Sus pension is incurred, it is very easy to move underground spend because of the hydrostatic pressure of the manhole column can be used in full.

Besonders wirtschaftlich läßt sich das erfindungsgemäße Ver­ fahren in bergmännischen Betrieben anwenden, die bereits mit einer Infrastruktur für eine sogenannte Bruchhohlraumverfüllung versehen sind.The Ver according to the invention is particularly economical driving in mining operations that already use an infrastructure for a so-called fracture cavity filling are provided.

Bei der Bruchhohlraumverfüllung (vgl. beispielsweise DE-PS 34 13 602) werden die Hohlräume eines Bruchfeldes von untertägigen Grubenräumen mit einer von übertage nach untertage geförderten Suspension aus Flotationsbergen und ggf. weiteren Füllstoffen verpreßt. Durch das Einpressen dieser Füllstoffe in die noch vorhandenen Hohlräume des Bruchversatzes gelingt es, die Zusammendruckbarkeit der Bruchversatzschüttungen erheblich zu reduzieren mit entsprechend positiven Auswirkungen auf mögliche Bergschäden übertage.In the case of filling the fracture cavity (see, for example, DE-PS 34 13 602) the cavities of a fracture field become underground  Mine rooms with one mined from above to below Suspension from flotation mountains and possibly other fillers pressed. By pressing these fillers into the still existing cavities of the fracture offset are able to Compressibility of the breakage fill significantly increased reduce with corresponding positive effects on possible Mine damage above ground.

Durch die erfindungsgemäß vorgesehene Mitbenutzung der Infra­ struktur für die Bruchhohlraumverfüllung zur Herstellung von Streckenbegleitdämmen und/oder auch Ausbaupfeilern lassen sich die Kosten erheblich reduzieren, da nunmehr lediglich noch eine Infrastruktur für die Bindemittelversorgung erforderlich ist. In der praktischen Anwendung wird dabei zweckmäßigerweise das Bindemittel einer untertägigen Zwischenstation entnommen und über eine Schlauchleitung einer in der Flotationsbergeleitung kurz vor dem Austrag an der Dammböschung vorgesehenen Misch­ strecke zugeführt.Through the shared use of the infra provided according to the invention Structure for the filling of fracture cavities for the production of Line accompanying dams and / or extension pillars can be reduce the costs considerably, since now only one Binder supply infrastructure is required. In the practical application is conveniently the Binder taken from an underground intermediate station and via a hose line in the flotation line shortly before the discharge on the embankment planned mix route fed.

Claims (4)

1. Verfahren zur Herstellung von Streckenbegleitdämmen und/oder Ausbaupfeilern im untertägigen Bergbau, vorzugsweise im Steinkohlenbergbau, bei dem die eingesetzten Baustoff­ komponenten sowie das benötigte Bindemittel nach untertage gefördert, dort mit Wasser angerührt und dann zum Be­ triebspunkt gepumpt werden, dadurch gekennzeichnet, daß neben dem Bindemittel als wesentliche Baustoffkomponente eine Flotationsbergesuspension aus der übertägigen Aufberei­ tungsanlage des Bergwerkes verwendet wird.1. Process for the production of line accompanying dams and / or expansion pillars in underground mining, preferably in hard coal mining, in which the building material components and the required binder are conveyed underground, mixed there with water and then pumped to the operating point, characterized in that in addition to a flotation mountain suspension from the surface processing plant of the mine is used as the essential building material component. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die als Baustoffkomponente verwendete Flotationsbergesuspension übertage auf einen Wassergehalt eingestellt wird, der in etwa dem Wasserbedarf des Abbindevorganges entspricht
  • 3. Verfahren nach den Ansprüchen 1 oder 2, dadurch gekenn­ zeichnet, daß als Bindemittel Zement verwendet wird.
2. The method according to claim 1, characterized in that the flotation mountain suspension used as a building material component is set above ground to a water content which corresponds approximately to the water requirement of the setting process
  • 3. The method according to claims 1 or 2, characterized in that cement is used as a binder.
4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekenn­ zeichnet, daß bezogen auf die Feststoffanteile das Mischungs­ verhältnis zwischen Flotationsberge und Zement auf etwa 1 eingestellt wird.4. The method according to any one of claims 1 to 3, characterized records that based on the solids the mixture ratio between flotation mountains and cement to about 1 is set. 5. Verfahren nach einem dem Ansprüche 1 bis 4, dadurch gekenn­ zeichnet, daß die benötigte Flotationsbergesuspension untertage einem bereits vorhandenen Versorgungssystem für die Bruchhohlraumverfüllung entnommen wird.5. The method according to any one of claims 1 to 4, characterized records that the required flotation mountain suspension underground an existing supply system for the Fracture cavity filling is removed.
DE19934311658 1993-04-08 1993-04-08 Method of making roadside packs and/or support pillars in underground mining, preferably coal mining Withdrawn DE4311658A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19934311658 DE4311658A1 (en) 1993-04-08 1993-04-08 Method of making roadside packs and/or support pillars in underground mining, preferably coal mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19934311658 DE4311658A1 (en) 1993-04-08 1993-04-08 Method of making roadside packs and/or support pillars in underground mining, preferably coal mining

Publications (1)

Publication Number Publication Date
DE4311658A1 true DE4311658A1 (en) 1994-10-13

Family

ID=6485107

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19934311658 Withdrawn DE4311658A1 (en) 1993-04-08 1993-04-08 Method of making roadside packs and/or support pillars in underground mining, preferably coal mining

Country Status (1)

Country Link
DE (1) DE4311658A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19717971C1 (en) * 1997-04-28 1998-09-24 Kali & Salz Ag Process for the production of a hydraulically conveyable solid-liquid mixture
CN108915765A (en) * 2018-07-02 2018-11-30 北京科技大学 A kind of underground crude tailings-barren rock Paste-filling System and placement method
CN115217520A (en) * 2022-07-08 2022-10-21 北京科技大学 Full tailings-waste rock-rod scrub paste gas-liquid linkage filling system and filling method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19717971C1 (en) * 1997-04-28 1998-09-24 Kali & Salz Ag Process for the production of a hydraulically conveyable solid-liquid mixture
EP0875664A2 (en) 1997-04-28 1998-11-04 Kali und Salz GmbH Method for making a hydraulical transportable solid/liquid mixture
EP0875664A3 (en) * 1997-04-28 2004-03-17 K+S KALI GmbH Method for making a hydraulical transportable solid/liquid mixture
CN108915765A (en) * 2018-07-02 2018-11-30 北京科技大学 A kind of underground crude tailings-barren rock Paste-filling System and placement method
CN108915765B (en) * 2018-07-02 2020-10-09 北京科技大学 Underground full tailing-waste stone paste filling system and filling method
CN115217520A (en) * 2022-07-08 2022-10-21 北京科技大学 Full tailings-waste rock-rod scrub paste gas-liquid linkage filling system and filling method

Similar Documents

Publication Publication Date Title
DE2939051C2 (en) Method of moving excavation cavities
DE3033376A1 (en) METHOD FOR FILLING CAVES WITH FLOWABLE MATERIAL, ESPECIALLY IN MINING ENTERPRISES
DE3636503A1 (en) METHOD FOR THE PRODUCTION AND USE OF A SUPPORTING AND / OR SEALING MATERIAL
DE2103760A1 (en) Tunnel construction process
DE3005366A1 (en) PROCESS FOR THE BREAKAGE OF MIGHTY COALS IN AT LEAST TWO BENCHES AND STRENGTHENING SOLUTION TO CARRY OUT IT
DE102020115873A1 (en) Process and plant for concrete preparation
DE4311658A1 (en) Method of making roadside packs and/or support pillars in underground mining, preferably coal mining
DE3932046C2 (en)
DE3418180A1 (en) Driving shield
DE3704731C3 (en) Flotation peaks offset
DE1206938B (en) Controllable propulsion shield for driving tunnels, routes or the like, and method for producing an in-situ concrete lining with such a propulsion shield
DE1234173B (en) Process for producing gas-tight line clamps in the mine
DE3529682A1 (en) Process and device for producing dam and backfill concrete, in particular for underground mining
Lieb Materials management at the Gotthard Base Tunnel–experience from 15 years of construction
EP1538302B1 (en) Method of filling void spaces outside a machine produced tunnel wall
DE2655542A1 (en) Coarse mine rubble handling system - mixes rubble with slurry containing sand, water and binder stored above ground
DE4312570C2 (en) Aqueous, thixotropic, binder and bentonite-containing slurry for diaphragm walls
DE3925639A1 (en) Coal-mine gallery-backfilling system - uses fine granular free-flowing material introduced at roof
DE102007024057A1 (en) Process for the consolidation and / or sealing of loose geological formations in the course of geotechnical construction measures
DE8816773U1 (en) Component set for an extension
EP2810925A1 (en) Injection of CO2, acceleration of the hardening of cement with CO2 as an accelerator
DE2364925A1 (en) Sinking building foundation components - by division and supplementing with mounting walls with lining walls directed against impact
DE3104520A1 (en) Pack-building material
DE3827441A1 (en) Shield driving method for a tunnel
DE2001651B1 (en) Suspension for sealing and / or solidifying used to rolling mountains and coal layers by injection

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8127 New person/name/address of the applicant

Owner name: FINK, FRANK W., DR.-ING., 66121 SAARBRUECKEN, DE

8139 Disposal/non-payment of the annual fee