DE3641349C5
DE3641349C5 DE3641349A DE3641349A DE3641349C5 DE 3641349 C5 DE3641349 C5 DE 3641349C5 DE 3641349 A DE3641349 A DE 3641349A DE 3641349 A DE3641349 A DE 3641349A DE 3641349 C5 DE3641349 C5 DE 3641349C5
Authority
DE
Germany
Prior art keywords
outer tube
grooves
inner tube
struts
supplementary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE3641349A
Other languages
German (de)
Other versions
DE3641349A1 (en
DE3641349C2 (en
Inventor
Ernst-Friedrich Dipl.-Ing. Ischebeck
Joachim Isenberg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Friedr Ischebeck GmbH
Original Assignee
Friedr Ischebeck GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=6315405&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=DE3641349(C5) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Friedr Ischebeck GmbH filed Critical Friedr Ischebeck GmbH
Priority to DE3641349A priority Critical patent/DE3641349C5/en
Publication of DE3641349A1 publication Critical patent/DE3641349A1/en
Application granted granted Critical
Publication of DE3641349C2 publication Critical patent/DE3641349C2/en
Publication of DE3641349C5 publication Critical patent/DE3641349C5/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • E04G11/48Supporting structures for shutterings or frames for floors or roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/02Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
    • E04G1/12Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means comprising members of special, e.g. composite, cross-section or with lugs or the like or lateral apertures for supporting or attaching other members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/14Comprising essentially pre-assembled two-dimensional frame-like elements, e.g. of rods in L- or H-shape, with or without bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/06Shores or struts; Chocks telescopic with parts held together by positive means
    • E04G25/065Shores or struts; Chocks telescopic with parts held together by positive means by a threaded nut
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00Shores or struts; Chocks
    • E04G25/04Shores or struts; Chocks telescopic
    • E04G25/08Shores or struts; Chocks telescopic with parts held relatively to each other by friction or gripping
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/02Scaffold feet, e.g. with arrangements for adjustment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/26Connections between parts of the scaffold with separate coupling elements for use with specially-shaped scaffold members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/30Scaffolding bars or members with non-detachably fixed coupling elements
    • E04G7/302Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
    • E04G7/306Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect
    • E04G7/307Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect with tying means for connecting the bars or members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Composite Materials (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Aus teleskopartig ineinander verschieblich angeordnetem Außenrohr (1) undInnenrohr (2) bestehende Baustütze mit daran zu befestigenden Ergänzungsstreben, wobei das Außenrohr in Achsrichtung verlaufende, hinterschnittene Nuten zur Aufnahme von Befestigungs-Spannschrauben aufweist, mit beiderseits der Nuten (11) verlaufenden Anlageflächen (A) zum Anschluss der mit den Befestigungs-Spannschrauben (30, 37) festzulegenden Ergänzungsstreben, dadurch gekennzeichnet, dass die Ergänzungsstreben (23, 24) Bestandteil eines zwei Baustützen verbindenden und zufolge der längsverlaufenden Nuten stufenlos verstellbaren Rahmens (25) sind, der zum zentrischen Anschluss an das Außenrohr (1) beiderends einen die Randkanten (R) der ebenen Anlageflächen (A) mit Klauen (28) zentrierend übergreifenden Schuh (26) besitzt, dessen Befestigungsspannschrauben (30) mit einem hammerartigen Kopf (32) ausgestattet, in der Nut (11) in die Hintergriffsstellung drehbar und von einer Feder (33) in Spannrichtung belastet sind, welche Spannung wurden Anzichen einer Flügelmittel (34) zur Entspannkroft stigerbar ist.Construction support consisting of telescopically displaceable outer tube (1) and inner tube (2) with additional struts to be fastened to it, the outer tube having undercut grooves running in the axial direction for receiving fastening clamping screws, with contact surfaces (A) running on both sides of the grooves (11) for connecting the supplementary struts to be fixed with the fastening clamping screws (30, 37), characterized in that the supplementary struts (23, 24) are part of a frame (25) which connects two building supports and is infinitely adjustable due to the longitudinal grooves the outer tube (1) has at one end a shoe (26) which overlaps the marginal edges (R) of the flat contact surfaces (A) with claws (28), the fastening clamping screws (30) of which are equipped with a hammer-like head (32), in the groove (11 ) rotatable into the rear grip position and by a spring (33) in the clamping direction g are loaded, what tension were signs of a wing means (34) can be increased for relaxation.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Baustütze mit daran befestigten Ergänzungsstreben gemäß Oberbegriff des Hauptanspruches.The invention relates to a building support supplementary struts attached to it according to the generic term of the main claim.

Es sind Baustützen aus der DE 26 60 317 B1 bekannt, bei denen das Außenrohr einen im Wesentlichen rechteckigen Querschnitt besitzt und die längeren Schenkel dieses Querschnittsprofils den einen Querschenkel um ein größeres Maß überragen. Sie besitzen auf dem Überstand Löcher zum Anschluss von Streben. Ferner sind die Überstände endseitig ausgeklinkt und dienen dort zum Anschluss an einen Obergurt und einen Untergurt, so dass auch hier eine außermittige Lasteinleitung vorliegt. Die dem äußeren Querschenkel des Außenrohres zugeordneten hinterschnittenen, parallel zueinander verlaufenden Nuten dienen zur Anbringung von Firmenschildern, Werbeträgern, Abschrankungen, Haken usw. Es handelt sich diesbezüglich offensichtlich um keine tragenden Bauteile. Selbst wenn man dies unterstellen wollte, läge keine zentrische Lasteinleitung an der Baustütze vor. Die dezentrale Lasteinleitung wirkt sich im Übrigen nachteilig auf die Knicksteifigkeit der Baustütze aus. Sodann sind derartige Baustützen wenig geeignet, aus mehreren Baustützen bestehende, leicht umsetzbare Traggerüste zu erstellen.There are building supports from the DE 26 60 317 B1 are known in which the outer tube has a substantially rectangular cross-section and the longer legs of this cross-sectional profile project beyond the one transverse leg by a larger amount. They have holes on the protrusion for connecting struts. Furthermore, the protrusions are notched at the ends and are used there for connection to an upper chord and a lower chord, so that an off-center load transfer is also present here. The undercut grooves, which run parallel to each other and are assigned to the outer cross leg of the outer tube, are used for attaching company signs, advertising media, barriers, hooks, etc. In this regard, these are obviously not load-bearing components. Even if you wanted to assume this, there would be no central load transfer on the construction support. The decentralized load transfer also has a negative impact on the buckling stiffness of the construction support. Then such building supports are not very suitable for creating easily implementable supporting scaffolds consisting of several building supports.

Der Erfindung liegt daher die Aufgabe zugrunde, eine gattungsgemäße Baustütze so auszugestalten, dass neben leicht und gut hantierbaren Bauteilen eine hohe Knicksteifigkeit vorliegt und dass das Erstellen eines anpassungsfähigen Schalungsgerüstes aus wenigen, vielseitig verwendbaren Bauteilen möglich ist.The invention is therefore the object based on designing a generic prop in such a way that, in addition to components that are easy and easy to handle, a high degree of stiffness and that the creation of an adaptable formwork scaffold few, versatile components is possible.

Gelöst ist diese Aufgabe durch die im Hauptanspruch angegebenen Lösungsmittel.This task is solved by the solvents specified in the main claim.

Zufolge derartiger Ausgestaltung ist der Gebrauchswert einer gattungsgemäßen Baustütze erhöht. Die beiderseits der Nuten verlaufenden Anlageflächen erlauben über den zentrischen Anschluss von mit den Befestigungsspannschrauben festzulegender Ergänzungsstreben-Rahmen eine höhere Belastbarkeit der Baustütze. Es ist daher möglich, das Außenrohr aus Aluminium zu fertigen. Gegenüber einer Baustütze aus Stahl liegt dann die zulässige Belastbarkeit bei einer aus Aluminium gefertigten Baustütze etwa doppelt so hoch bei annähernd gleichem Gewicht. Diese Tatsache erlaubt größere Unterstützungsabstände. Ferner brauchen nur 30% bis 50% der Baustützen, die bisher verwendet wurden, montiert und transportiert zu werden. Sodann ist es möglich, an passungsfähige Schalungsgerüste aus wenigen, vielseitig verwendbaren Bauteilen zu erstellen. Die Ergänzungsstreben-Rahmen werden vorzugsweise eingesetzt für Höhen von 4 m bis 11 m. Gegenüber den bekannten Rahmenstützen und Arbeitsgerüsten ist die Menge der Bauteile zur Knickaussteifung bei einem mit erfindungsgemäß gestalteten Baustützen erstelltem Schalungsgerüst wesentlich geringer, da die freie, nicht ausgestützte Knicklänge ein Außenrohr einer aus Aluminium gefertigten Baustütze ca. 3,5 m beträgt, um eine zulässige Belastung von 50 KN abzutragen. Das entsprechend erstelle Schalungsgerüst verbindet die Vorteile einer hohen Arbeitsgeschwindigkeit beim Montieren und Demontieren von nicht ausgesteiften Baustützen mit den Vorteilen der zwangsläufigen Knickaussteifung. Die Ergänzungsstreben-Rahmen können sodann stufenlos entlang des Außenrohres verschoben werden. Das bedeutet Vorteile für eine etwaige vorzusehende Arbeitsplattform. Darüber hinaus bringt dies eine Beweglichkeit beim Begehen oder Befahren innerhalb des Schalungsgerüstes. Auch erweist sich dies als günstig, wenn die Baustützen auf unterschiedlichem Höhenniveau stehen. Ferner lassen sich leicht zu montierende Arbeitsgerüste erstellen, bestehend aus einzelnen Baustützen und den sie verbindenden Ergänzungsstreben-Rahmen, ohne dass Zusatzkräfte oder Zusatzmomente in diesem Schalungssystem auftreten. Die vorbereiteten Arbeitsgerüste lassen sich bspw. mittels eines Kranes bequem an den Aufstellort bringen. Ebenso können sie auch leicht umgesetzt werden. Am besten sind vier in gleichmäßiger Umfangsverteilung angeordnete Nuten am Außenrohr vorhanden mit diesen zugeordneten, ebenen Anlageflächen für eine zentrale, großflächige Abstützung der Schuhe der Ergänzungsstreben-Rahmen. Ein derartiger Grundriss des Außenrohres erlaubt es, Arbeitsgerüste mit rechteckigem Grundriss zu erstellen, ebenfalls verbunden mit einer zentrischen Lasteinleitung.As a result of such a design the use value of a generic prop is increased. Both sides of the grooves running contact surfaces allow over the central connection of with the fastening clamping screws Supplementary strut frame to be determined a higher resilience the construction support. It is therefore possible that outer tube made of aluminum. Across from a construction prop The permissible load capacity is then made of steel about twice as high for a construction prop made of aluminum nearly same weight. This fact allows larger support distances. Further only need 30% to 50% of the building supports that have been used so far been assembled and transported. Then it is possible to use a few, to create versatile components. The supplementary strut frame are preferably used for Heights of 4 m to 11 m. Across from the well-known frame supports and scaffolding is the amount of components for buckling stiffening in one designed according to the invention props created formwork scaffold much less, since the free, unsupported kink length is an outer tube made of aluminum manufactured construction support is about 3.5 m, to a permissible Load of 50 KN. The formwork frame created accordingly connects the advantages of a high working speed when assembling and disassembling of unstiffened building supports with the benefits of inevitable Knickaussteifung. The supplementary strut frame can then continuously along the outer tube be moved. This means advantages for any to be provided Working platform. About that this also increases mobility when walking or driving on inside the formwork framework. This also proves to be cheap, if the building supports at different levels stand. Furthermore, easy to assemble work scaffolds can be created from individual building supports and the complementary strut frame that connects them, without additional forces or additional moments occur in this formwork system. The prepared ones scaffolds can be conveniently transported to the installation site using a crane, for example bring. They can also can also be easily implemented. Four are best in an even distribution of circumference arranged grooves on the outer tube available with these assigned, flat contact surfaces for a central, large-area support of the Complementary strut frame shoes. Such a layout of the outer tube allows scaffolding with a rectangular floor plan, also connected with a centric load transfer.

Da die Ergänzungsstreben Bestandteil eines zwei Baustützen verbindenden Rahmens sind, stabilisieren diese nicht nur jede Baustütze auf der entsprechenden Länge des Schuhes in sich, sondern auch mehrere Baustützen eines Schalungsgerüstes und in ihrer Lage zueinander und dies in mehrere Richtungen. Außerdem können die Rahmen zur Auflage eines begehbaren Gerüstbelages dienen.Since the supplementary struts are part of a two props connecting frame, they not only stabilize every building support the appropriate length of the shoe in itself, but also several construction supports of a formwork scaffold and in their position to each other and in several directions. In addition, the Use frames to support a walkable scaffold covering.

Das leichte Montieren der Ergänzungsstreben-Rahmen ist dadurch ermöglicht, dass die Befestigungs-Spannschrauben, mit einem hammerartigen Kopf ausgestattet, in der Nut in die Hintergriffsstellung drehbar und von einer Feder in Spannrichtung belastet sind. Vor dem Montieren des Rahmens sind die Befestigungs-Spannschrauben so ausgerichtet, dass deren Hammerkopf in die Nut eintreten kann. Beim anschließenden Spannvorgang erfolgt eine Drehung des Hammerkopfes um 90° in die Hintergriffsstellung. Easy mounting of the additional strut frame is made possible that the fastening turnbuckles, with a hammer-like head equipped, rotatable in the groove to the rear grip position are loaded by a spring in the tensioning direction. Before assembling of the frame, the fastening clamping screws are aligned so that whose hammer head can enter the groove. During the subsequent clamping process the hammer head is turned 90 ° into the rear grip position.

Dabei sind die Ergänzungsstreben-Rahmen gegen seitliche Verschiebung dadurch gesichert, dass der Schuh die Randkanten der ebenen Anlageflächen übergreift. Diese Maßnahme bringt auch einen Zentriereffekt beim Montieren der Ergänzungsstreben-Rahmen, indem die randseitigen Klauen die Randkanten der ebenen Anlageflächen fühlbar übergreifen. The supplementary strut frames are against Lateral shift ensured by the shoe's edge edges overlaps the flat contact surfaces. This measure also brings a centering effect when mounting the supplementary strut frames, by the claws on the edge overlapping the edge of the flat contact surfaces.

Es ist ferner günstig, wenn sich am Nutenboden der aus dem Wandungsmaterial des Außenrohres geformten Nuten die Mantelfläche des mit einem Verstellgewinde ausgestatteten Innenrohres führt. Letzteres ist somit wackelfrei von dem Außenrohr aufgenommen und ermöglicht dennoch eine leichte Höhenverstellung. Der in gleichmäßiger Umfangsverteilung angeordnete Nutenboden führt dabei zu eine günstigen Abstützung der Mantelfläche des Innenrohres unter Erzielung einer insgesamt steifen Baustütze.It is also advantageous if the groove base is made of the wall material of the outer tube res shaped grooves leads the outer surface of the inner tube equipped with an adjustment thread. The latter is thus wobble-free received by the outer tube and still allows easy height adjustment. The groove base arranged in a uniform circumferential distribution leads to a favorable support of the lateral surface of the inner tube while achieving an overall rigid construction support.

Von Vorteil erweist es sich sodann, dass eine auf dem Verstellgewinde des Innenrohres laufende Stellmutter in ihrer Anlagestellung am Stirnende des Außenrohres von einer entgegen Federwirkung in die Freigabestellung bewegbaren Klinke hintergriffen ist, welche sich auf Höhe des Eintrittsspaltes der Nut erstreckt. Die Nut gestattet daher neben der Aufnahme der Befestigungs-Spannschraube auch das Verschwenken der Klinke in ihre Freigabestellung, indem sie den nötigen Freiraum für diese Klinke bildet. Die Knicksteifigkeit der anmeldungsgemäßen Baustütze kann daher über die ganze Länge annähernd gleich groß gehalten werden.It then proves to be advantageous that an adjusting nut running on the adjusting thread of the inner tube in their contact position at the front end of the outer tube from one Spring action in the release position movable pawl is which is at height of the entrance gap of the groove extends. The groove therefore allows besides the mounting of the fastening clamping screw also the swiveling the jack into its release position by giving it the necessary clearance for this Jack forms. The buckling stiffness of the construction support according to the application can therefore about the whole length nearly kept the same size become.

Der Einsatzbereich der Baustütze ist dadurch vergrößert, dass ein Stirnende des Außenrohres mit einer Kopfplatte bestückt ist, die Durchtrittslöcher für Außenrohr-Verbindungsschrauben trägt. Reicht die maximale Länge einer Baustütze nicht aus, so kann man die Außenrohre zweier Baustützen an den Kopfplatten miteinander verbinden mit endseitig angeordneten Innenrohren. Auf diese Weise erhält man einen doppelten Spindelweg. Dieser ist bei einem entsprechenden Schalungsgerüst vorteilhaft, um Unterzüge zu untertauchen und das gesamte Schalungsgerüst unzerlegt mit einer Deckenschalung seitlich zu verfahren.The area of application of the prop is enlarged by the fact that one end of the outer tube equipped with a head plate is the through holes for outer tube connecting screws wearing. Enough the maximum length a construction prop not out, so you can the outer tubes two props connect the head plates to each other with ends arranged Inner tubes. That way one double spindle path. This is with a corresponding one Megashore beneficial to joists to immerse and dismantle the entire formwork scaffold with a slab formwork to move laterally.

Der Einsatzbereich der Baustütze wird ferner noch dadurch vergrößert, dass die Kopfplatte ein Durchsteckloch für das Innenrohr besitzt. Auf diese Weise ist es möglich, einem einzigen Außenrohr zwei mit Außengewinde versehene Innenrohre zuzuordnen.The area of application of the construction prop is further enlarged by the fact that the head plate has a push-through hole for the inner tube. On this way it is possible a single outer tube two with external thread assigned inner tubes.

Nachstehend wierd wird die Erfindung anhand eines zeichnerisch veranschaulichten Ausführungsbeispiels erläutert. Es zeigtThe invention will be as follows explained with reference to an illustrative embodiment. It shows

1 eine Ansicht eines mittels der erfindungsgemäßen Baustützen erstellten Schalungsgerüstes, 1 a view of a formwork scaffold created by means of the construction supports according to the invention,

2 eine Draufsicht auf das Schalungsgerüst, 2 a top view of the formwork scaffold,

3 in Einzeldarstellung eine Ansicht einen Baustütze, 3 in single representation a view of a building support,

4 den Schnitt nach der Linie IV-IV in 3, 5 den Schnitt nach der Linie V-V in 3, 4 the section along the line IV-IV in 3 . 5 the section along the line VV in 3 .

6 eine ausschnittsweise Ansicht der Baustütze im Bereich der die Stellmutter untergreifenden Klinke, 6 a partial view of the construction support in the area of the pawl under the adjusting nut,

7 einen Längsschnitt durch 6 im Bereich der Klinke, 7 a longitudinal section through 6 in the area of the jack,

8 einen Querschnitt durch das Außenrohr der Baustütze mir verspannten Ergänzungsstreben zweier Rahmen, 8th a cross section through the outer tube of the construction support with braced supplementary struts of two frames,

9 ebenfalls einen Querschnitt durch das Außenrohr mit strichpunktiert veranschaulichten Einzel-Ergänzungsstreben, 9 also a cross-section through the outer tube with single supplementary struts illustrated in broken lines,

10 eine Ansicht eines die Ergänzungsstreben aufweisenden Rahmens, 10 a view of a frame having the supplementary struts,

11 eine Stirnansicht des Rahmens mit Blick auf dessen Schuh, 11 a front view of the frame with a view of its shoe,

12 mehrere Rahmen unterschiedlicher Länge in Ansicht, 12 several frames of different lengths in view,

13 die mittels der in 12 veranschaulichten Rahmen herstellbaren Stützenraster, 13 which by means of the 12 illustrated framework of support grid that can be produced,

14 eine Ansicht eines. Schalungsgerüstes mir an den Kopfplatten zusammengeschraubten Außensohren und 14 a view of a. Formwork scaffold and outer ears screwed together on the head plates

15 ebenfalls ein Schalungsgerüst mir unterschiedlich langen, an den Kopiplatten zusammengeschraubten Außenrohren, wobei sich die fußseitigen Innenrohre auf unterschiedlichen Ebenen ab stützen. 15 also a formwork scaffold with outer tubes of different lengths, screwed together on the coupling plates, whereby the inner tubes on the foot side are supported on different levels.

Die Baustütze besitzt ein Außenrohr 1 und ein teleskopartig zu diesem verschiebliches Innenrohr 2. Das dem Einsteckende 2' gegenüberliegende Ende 2'' des Innenrohres 2 geht von einen Fußplatte 3 aus. Sowohl das Innenrohr 2 als auch die Fußplatte 3 bestehen aus Aluminium und sind mittels einer Schweißnaht 4 miteinander verbunden. Die Mantelfläche des Innenrohres 2 ist mir einem trapezartigen Gewinde 5 ausgestatte, auf welchem eine Stellmutter 6 läuft An ihrem dem Einsteckende 2' des Innenrohres 2 zugekehrten Ende bildet die Stellmutter 6 einen Flansch 7 mit einer vorgelagerten Auflaufschräge 8 aus. Am anderen Ende der Stellmuttet 6 sind zwei sich diametral gegenüberliegende Drehnocken 9 und zwei sich dazwischen befindliche Schlagnocken 10 vorgesehen. Die Drehnocken 9 und die Schlagnocken 10 sind dabei in gleicher Winkelverteilung angeordnet und gehen materialeinheitlich von der Stellmutter aus.The construction support has an outer tube 1 and a telescopic to this inner tube 2 , That of the plugin 2 ' opposite end 2 '' the inner tube 2 goes from a base plate 3 out. Both the inner tube 2 as well as the footplate 3 are made of aluminum and are welded together 4 connected with each other. The outer surface of the inner tube 2 is a trapezoidal thread 5 equipped on which an adjusting nut 6 runs at her the plugging end 2 ' of the inner tube 2 the adjusting nut forms the opposite end 6 a flange 7 with an upstream bevel 8th out. At the other end there is the adjusting nut 6 are two diametrically opposed rotating cams 9 and two impact cams in between 10 intended. The rotary cams 9 and the blow cams 10 are arranged in the same angular distribution and are based on the same material as the adjusting nut.

Das ebenfalls aus Aluminium gefertigte Außenrohr 1 besitzt mehreckigen Grundriß, und zwar ist ein Achteck gewählt, vergl. insbesondere 8 und 9. Jeweils zwei sich gegenüberliegende Achteckseiten dieses Profils sind länger gestaltet und stehen im rechten Winkel zu einander. Von diesen vier Seiten des achteckigen Profils gehen in Achsrichtung des Außenrohres verlaufende, hinterschnittene Nuten 11 aus, welche Nuten aus dem Wandungsmaterial des Außenrohres 1 z.B. durch Strangpressen geformt sind. Aus 7 geht hervor, daß sich die Mantelfläche des Innenrohres 2 am Nutenboden 12 führt. Die Nuten 11 besitzen einen rechteckigen Grundriß, der über den in Längsrichtung verlaufenden Einsteckspalt S zur Mantelfläche des Außenrohres 1 hin offen ist.The outer tube, also made of aluminum 1 has a polygonal layout, an octagon is chosen, cf. in particular 8th and 9 , Two opposite octagon sides of this profile are longer and are at right angles to each other. From these four sides of the octagonal profile there are undercut grooves running in the axial direction of the outer tube 11 from which grooves made of the wall material of the outer tube 1 for example, are formed by extrusion. Out 7 shows that the outer surface of the inner tube 2 on the groove bottom 12 leads. The grooves 11 have a rectangular plan, which extends over the longitudinal insertion gap S to the outer surface of the outer tube 1 is open.

Das der Stellmutter 6 zugekehrte Stirnende 1' des Außenrohres 1 ist mit einer Ausgleichsscheibe 13 aus Kunststoff bestückt, um die Reibung zwischen dem Außenrohr 1 und der aus Stahl bestehenden Stellmutter 6 zu verringern Die Umrißform der Ausgleichsscheibe 13 entspricht derjenigen des Außenrohres. Eine Verankerung erfährt die Ausgleichsscheibe 13 durch zwei von ihr materialeinheitlich ausgehende Steckzapfen 14, die reibungsschlüssig in zwei sich diametral gegenüberliegende Nuten 11 eintreten Mittig ist die Ausgleichs- scheibe 13 mit einer Durchtrittsöffnung 15 für das Innenohr 2 ausgestattet.That of the lock nut 6 facing forehead 1' of the outer tube 1 is with a shim 13 tipped in plastic to reduce the friction between the outer tube 1 and the steel adjusting nut 6 to decrease the outline of the Aus same disc 13 corresponds to that of the outer tube. The shim is anchored 13 thanks to two plug pins emanating from it 14 , frictionally in two diametrically opposed grooves 11 Enter the balancing disk in the middle 13 with a passage opening 15 for the inner ear 2 fitted.

An der einen mit einer Nut versehenen Seite des Au ßenrhres 1 ist im Bereich des Stirnendes 1' eine Klinke 16 mittels eines Böckchens 17 gelagert Die Festlegung des Böckchens 17 erfolgt mittels zweier in das Material des Außenrohres 1 eintreten der Schrauben 18. Die Klinke 16 ist doppelarmig ausgebildet und schwenkt um einen Lagerzapfen 19 des Böckchens 17. Der untere Hebelarm 20 der Klinke 16 überragt die Ausgleichsscheibe 13 und untergreift den Flansch 7 der Stellmutter 6, vergl. insbesondere 7. Der andere Hebelarm 21 ist gegenüber dem unteren Hebelarm 20 länger gestaltet und dient als Handhabe. Die Klinke 16 erstreckt sich auf Höhe des Eintrittsspaltes S der Nut 11, um die Klinke entgegen der Kraft einer nicht dargestellten Feder entgegen Uhrzeigerrichtung verschwenken zu können.On one side with a groove of the outer tube 1 is in the region of the front end 1' a jack 16 by means of a lump 17 stored The definition of the lump 17 takes place by means of two in the material of the outer tube 1 entering the screws 18 , The handle 16 is double-armed and swivels around a bearing journal 19 of the goat 17th The lower lever arm 20 the jack 16 towers over the shim 13 and reaches under the flange 7 the lock nut 6 , cf. in particular 7 , The other lever arm 21 is opposite the lower lever arm 20 designed longer and serves as a handle. The handle 16 extends at the level of the entry gap S of the groove 11 to pivot the pawl counterclockwise against the force of a spring, not shown.

Das andere Stirnende 1'' des Außenrohres 1 ist Träger einer Kopfplatte 22 mit rechteckigem Grundriß. In dieser Kopfplatte sind Durchtrittslöcher 22' vorgesehen, um z.B. die Kopfplatten zweier Außenrohre mittels nicht dargestellter Außenrohr-Verbindungsschrauben verbinden zu können, vergl. z B. zwei gegeneinander verspannte Außenrohre in 1, 14 und 15. Ferner enthält die Kopfplatte 22 eine zentrale Innenrohr-Durchstecköffnung 22''.The other forehead 1'' of the outer tube 1 is a headstock carrier 22 with a rectangular layout. There are through holes in this top plate 22 ' provided, for example, to be able to connect the head plates of two outer tubes by means of outer tube connecting screws, not shown, see, for example, two outer tubes braced against one another in 1 . 14 and 15 , Also includes the headstock 22 a central inner tube push-through opening 22 ''.

Wird die zuvor beschriebene Baustütze als Einzelstütze eingesetzt, so kann zwecks Erzielung einer Grobverstellung die Stellmutter 6 auf dem Gewinde 5 des Innenrohres 2 gewirbelt werden. Dies ist nur möglich, weil dann noch nicht der Untergriff durch die Klinke 16 vorliegt Nach Beendigung der Grobverstellung ist das Innenrohr 2 in das Außenrohr so weit einzuschieben, bis der Flansch 7 die Klinke 16 beaufschlagt Über die Auflaufschräge 8 des Flansches wird die Klinke 16 entgegen Federbelastung verschwenkt. Nachdem der Flansch 7 gegen die Ausgleichsscheibe 13 getreten ist, kann die Klinke 16 federbelastet zurückschwenken unter Erzielung des Untergriffes, wobei die Klinke mit ihrem Hakenende 20' den Flansch 7 unterfängt.If the construction support described above is used as a single support, the adjusting nut can be used to achieve a rough adjustment 6 on the thread 5 of the inner tube 2 be whirled. This is only possible because then the handle does not grip the handle 16 After the rough adjustment is complete, the inner tube is 2 push into the outer tube until the flange 7 the handle 16 acted on the ramp 8th of the flange becomes the pawl 16 pivoted against spring load. After the flange 7 against the shim 13 the handle can 16 spring-loaded pivot back to achieve the underhand grip, the pawl with its hook end 20 'the flange 7 underpins.

Mittels mehrerer Baustützen läßt sich auch ein Schalungsgerüst erstellen. Es sind hierzu Ergänzungsstreben 23, 24 erforderlich, die Bestandteil eines zwei Baustreben verbindenden Rahmens 25 sind Beim Ausführungsbeispiel bilden die Ergänzungsstreben 23, 24 die beiden parallel zueinander liegenden, längeren Holme des Rahmens, die von den die Ergänzungsstreben verbindenden Schuhen 26 ausgehen. Die Ergänzungsstreben 23, 24 treten mit ihren Stirnenden gegen die vertikal ausgerichteten Schuhe 26 und sind dort durch Schweißen festgelegt Zwecks einer Stabilisierung erstrecken sich in den offenen Winkeln zwischen den Ergänzungsstreben 23, 24 und den Schuhen 26 Stabilisierungsstege 27, welche ein T-förmiges Querschnittsprofil, vergl. 10, besitzen und ebenfalls durch Schweißen an den Schuhen und an den Ergänzungsstreben festgelegt sind.A formwork scaffold can also be created using several construction supports. There are additional striving for this 23 . 24 required, the component of a frame connecting two construction struts 25 In the exemplary embodiment, the supplementary struts form 23 . 24 the two longer spars of the frame lying parallel to each other, those of the shoes connecting the supplementary struts 26 out. The supplementary struts 23 . 24 kick their vertically aligned shoes with their foreheads 26 and are fixed there by welding For the purpose of stabilization, they extend in the open angles between the supplementary struts 23 . 24 and the shoes 26 stabilizing webs 27 , which have a T-shaped cross-sectional profile, cf. 10 , and are also fixed by welding on the shoes and on the supplementary struts.

Gemäß 12 sind fünf unterschiedlich lang gestalte- te Rahmen 25a bis 25e veranschaulicht derart, daß der Rahmen 25a die geringste Länge besitzt Die beiden längeren Rahmen 25d und 25e sind in ihrer Mitte durch die Ergänzungsstreben 23, 24 verbindende Traversen 25' stabilisiert.According to 12 are five frames of different lengths 25a to 25e illustrates such that the frame 25a has the shortest length The two longer frames 25d and 25e are in their midst through the supplementary struts 23 . 24 connecting trusses 25 ' stabilized.

Beiderseits der Nut 11 bildet die Mantelfläche des Außenrohres 1 Anlageflächen A aus. Gegen diese treten die Schuhe 26 der Ergänzungsstreben 23, 24 des Rahmens 25. Die diesen ebenen Anlageflächen A zugekehrten Schuhe 26 übergreifen mit randseitigen Klauen 28 die Randkanten R der ebenen Anlageflächen A unter Erzielung eines Zentriereffektes.On both sides of the groove 11 forms the outer surface of the outer tube 1 Contact surfaces A off. The shoes kick against them 26 the supplementary struts 23 . 24 of the frame 25 , The shoes facing these flat contact surfaces A. 26 overlap with claws on the edge 28 the marginal edges R of the flat contact surfaces A to achieve a centering effect.

Jeder Schuh 26 ist mir zwei übereinanderliegenden, dem Rahmeninneren hin zugewendeten Büchsen 29 ausgestattet jede Büchse ist durch Schweißen an dem Schuh 26 festgelegt Sowohl die Büchse 29 als auch der Schuh 26 werden von dem mit einem Gewinde versehenen Schaft einer Befestigungs-Spannschraube 30 durchsetzt. Die entsprechende Bohrung 31 für den Schaft der mir einem hammerartigen Kopf 32 ausgestatteten Befestigungs-Spannschraube 30 ist kleiner als der Innendurchmesser der Büchse 29. Daher kann an dem Schuh 26 eine sich innerhalb der Büchse 29 erstreckende Druckfeder 33 ab stürzen, die gegen die Flügelmutter 3 der Spannschraube 30 drückt und den hammerartigen Kopf 32 in Spannrichtung belastet Die geringste Breite des Kopfes 32 entspricht der Weite des Spaltes S der Nut 11. Demgemäß kann bei entsprechender Ausrichtung der Köpfe 32 der Befesfigungs-Spannschrauben 30 der Rahmen 25 so an das Außenrohr 1 angesetzt werden, daß die beiden Köpfe 32 in die korrespondierende Nut 11 eintauchen. Erst bei dem anschließenden Verdrehen der Flügelmutter 34 wird reibungsschlüssig über den Schaft der Kopf 32 mitgenommen, wobei er in der hinterschnittenen Nut 11 den Hintergriff erzeugt und das Verspannen erlaubt Zufolge der längsausgerichteten Nuten 11 in den Außenrohren 1 kann eine stufenlose Verstellung der Rahmen 25 vorgenommen werden.Every shoe 26 is to me two superimposed cans facing the inside of the frame 29 Each rifle is welded to the shoe 26 set both the rifle 29 as well as the shoe 26 are made of the threaded shaft of a fastening clamping screw 30 interspersed. The corresponding hole 31 for the shaft of a hammer-like head 32 a Fitted fastening screw 30 is smaller than the inner diameter of the bush 29 , Therefore, on the shoe 26 one inside the box 29 extending compression spring 33 from crashing against the wing nut 3 the clamping screw 30 presses and the hammer-like head 32 loaded in the direction of tension The smallest width of the head 32 corresponds to the width of the gap S of the groove 11 , Accordingly, with appropriate alignment of the heads 32 the fastening clamping screws 30 the frame 25 so to the outer tube 1 that the two heads 32 in the corresponding groove 11 plunge. Only after turning the wing nut 34 becomes frictional over the shaft of the head 32 taken with him in the undercut groove 11 creates the rear grip and the bracing allows due to the longitudinal grooves 11 in the outer tubes 1 can continuously adjust the frame 25 be made.

Aus 9 geht hervor, daß zusätzlich zu den rahmenseitigen Ergänzungsstreben 23, 24 weitere Ergänzungsstreben 35, 36 vorgesehen werden können. Diese sind nicht Bestandteil eines Rahmens und dienen ausschließlich zur Aussteifung. Die entsprechenden Spannschrauben 37 sind ebenfalls mit einem hammerartigen Kopf 38 ausgestattet, vergl. 9.Out 9 shows that in addition to the frame-side struts 23 . 24 further complementary striving 35 . 36 can be provided. These are not part of a frame and are used only for stiffening. The corresponding clamping screws 37 are also with a hammer-like head 38 equipped, cf. 9 ,

Mit den in 12 veranschaulichten fünf unterschiedlichen Rahmen 25a bis 25e lassen sich, wie in 13 veranschaulicht, 15 verschiedene viereckige Stützenraster zur optimalen Anpassung an die auftretende Belastung erzeugen. Dies läßrt eine große Variation der Baustützenabstände zu, was eine Lastabtragung bei guter Auslastung der Baustützen gewährleistet Auf diese Weise wird der Anforderung auf. den Baustellen Rechnung getragen, nämlich gleiches Gerät für eine Baustelle.With the in 12 illustrated five different frames 25a to 25e can, as in 13 illustrates 15 Generate various square column grids for optimal adaptation to the load. This allows a large variation in the distance between the props, which ensures load transfer with good utilization of the props. In this way, the requirement is met. the construction sites taken into account, namely the same device for a construction site.

Aus 10 geht hervor, daß der Rahmen 25 Auflager einer oder mehrerer Gerüstbohlen 39 sein kann. In dieser Figur ist nur eine einzige Gerüstbohle 39 strichpunktiert veranschaulicht, die sich im Zwickel zwischen dem linken unteren Stabilisierungssteg 27 und der unteren Ergänzungsstrebe 24 erstreckt.Out 10 shows that the frame 25 Support for one or more scaffolding planks 39 can be. There is only one scaffold plank in this figure 39 dash-dotted lines, which is in the gusset between the lower left stabilization bar 27 and the lower supplementary strut 24 extends.

Bei dem in 1 und 2 veranschaulichten Schalungsgerüst sind jeweils zwei Außenrohre 1 an ihren Kopfplatten 2' verbunden. In die freien Stirnenden der Außenrohre 1 treten die mit Gewinde versehenen Innenrohre 2 ein. Der Verstellweg ist daher sehr groß. Verbunden sind die einzelnen Baustützen durch entsprechende Rahmen 25d, die am einsreckseitigen Ende der Außenrohre 1 verspannt sind. Durch in 2 strichpunktiert veranschaulichte Diagonalstreben 40 kann eine zusätzliche Versteifung des Schalungsgerüsts erreicht werden.At the in 1 and 2 Formwork scaffolding illustrated are two outer tubes each 1 on their headstock 2 ' connected. In the free ends of the outer tubes 1 enter the threaded inner tubes 2 on. The adjustment path is therefore very large. The individual building supports are connected by appropriate frames 25d that on the one-sided end of the outer tubes 1 are tense. By in 2 dash-dotted illustrated diagonal struts 40 additional stiffening of the formwork scaffold can be achieved.

In 14 ist ebenfalls ein Schalungsgerüst veranschaulicht Dieses besitzt jedoch eine größere Höhe als das zuvor beschriebene und ist als Arbeitsgerüst gedacht Zwecks einer Begehung desselben sind entsprechende Gerüstbohlen 39 eingelegt. Die diese nagenden Rahmen 25 erhalten ihre Verspannung ebenfalls im Bereich der Einsteckenden der Außenrohre 1.In 14 A formwork scaffold is also illustrated. However, this has a greater height than the one described above and is intended as a work scaffold 39 inserted. The gnawing frames 25 receive their tension also in the area of the insertion ends of the outer tubes 1 ,

Aus 15 geht ein Schalungsgerüst hervor, wobei jeweils zwei untereinander verspannte Außenrohre 1 unterschiedliche Länge besitzen. Auf diese Weise können die auf der linken Seite des Schalungsgerüstes angeordneten Baustützen eine kürzere Länge erhalten als die rechts befindlichen. Daher können sich die entsprechenden, den kürzeren Aufbaustützen zugeordneten unteren Innenohre 2 auf einem höheren Niveau abstüt zen als die rechts angeordneten, unteren Innenrohre 2. Demgegenüber liegen die oberen Abstützpunkte auf einer Höhe. Auch bei dieser Lösung werden die Außenrohre der Baustützen durch Rahmen 25 verbunden, die ihrerseits Bohlen 39 eines Arbeitsgerüstes tragen.Out 15 a formwork scaffold emerges, each with two outer pipes clamped together 1 have different lengths. In this way, the construction supports arranged on the left side of the formwork scaffold can have a shorter length than those on the right. Therefore, the corresponding lower inner tubes assigned to the shorter body supports can be used 2 support at a higher level than the lower inner tubes on the right 2 , In contrast, the upper support points are at one level. With this solution too, the outer tubes of the building supports are framed 25 connected, which in turn planks 39 of a scaffolding.

Claims (5)

Aus teleskopartig ineinander verschieblich angeordnetem Außenrohr (1) und Innenrohr (2) bestehende Baustütze mit daran zu befestigenden Ergänzungsstreben, wobei das Außenrohr in Achsrichtung verlaufende, hinterschnittene Nuten zur Aufnahme von Befestigungs-Spannschrauben aufweist, mit beiderseits der Nuten (11) verlaufenden Anlageflächen (A) zum Anschluss der mit den Befestigungs-Spannschrauben (30, 37) festzulegenden Ergänzungsstreben, dadurch gekennzeichnet, dass die Ergänzungsstreben (23, 24) Bestandteil eines zwei Baustützen verbindenden und zufolge der längsverlaufenden Nuten stufenlos verstellbaren Rahmens (25) sind, der zum zentrischen Anschluss an das Außenrohr (1) beiderends einen die Randkanten (R) der ebenen Anlageflächen (A) mit Klauen (28) zentrierend übergreifenden Schuh (26) besitzt, dessen Befestigungsspannschrauben (30) mit einem hammerartigen Kopf (32) ausgestattet, in der Nut (11) in die Hintergriffsstellung drehbar und von einer Feder (33) in Spannrichtung belastet sind, welche Spannung wurden Anzichen einer Flügelmittel (34) zur Entspannkroft stigerbar ist.Made of telescoping inner tube ( 1 ) and inner tube ( 2 ) existing building support with supplementary struts to be fastened to it, the outer tube having undercut grooves running in the axial direction for receiving fastening clamping screws, with the grooves on both sides ( 11 ) running contact surfaces (A) for connecting the with the clamping screws ( 30 , 37) supplementary struts to be determined, characterized in that the supplementary struts ( 23 . 24 ) Part of a frame that connects two building supports and is infinitely adjustable due to the longitudinal grooves ( 25 ) which are used for the central connection to the outer tube ( 1 ) at both ends the edge (R) of the flat contact surfaces (A) with claws ( 28 ) centering overlapping shoe ( 26 ), the fixing screws (30) with a hammer-like head ( 32 ) in the groove ( 11 ) rotatable into the rear grip position and by a spring ( 33 ) are loaded in the tensioning direction, which tension was indicated by wing means ( 34 ) can be increased to Relaxing Croft. Baustütze nach Ansprüch dadurch gekennzeichnet, daß sich am Nutenboden (12) der aus dem Wandungs- material des Außenrohres (1) geformten Nuten (11) die Mantelfläche des mit einem Verstellgewinde (5) ausgestatteten Innenrohres (2) führt.Building support according to claims, characterized in that the grooves (12) formed from the wall material of the outer tube (1) are formed on the groove bottom (12). 11 ) the outer surface of the with an adjustment thread ( 5 ) equipped inner tube ( 2 ) leads. Baustütze nach Anspruch 2 dadurch gekennzeichnet, daß eine auf dem Verstellgewinde (5) des Innenrohres (2) laufende Stellmutter (6) in ihrer An- lagestellung am Stirnende (1') des Außenrohres (1) von einer entgegen Federwirkung in die Freigabestellung bewegbaren Klinke (16) hintergriffen ist, welche sich auf Höhe des Eintrittsspaltes (S) der Nut (11) erstreckt.Construction support according to claim 2, characterized in that one on the adjusting thread ( 5 ) of the inner tube ( 2 ) running adjusting nut ( 6 ) in their position at the forehead ( 1') the outer tube ( 1 ) of a pawl which can be moved into the release position against spring action ( 16 ) which is at the level of the entry gap (S) of the groove ( 11 ) extends. Baustütze nach einem oder mehreren der vorhergehendes Ansprüche, dadurch gekennzeichnet, daß ein Stirnende (1'') des Außenrohres {1) mit einer Kopfplatte (22) bestückt ist, die Durchtrittslöcher (22') für Außenrohr-Verbindungsschrauben trägt.Construction support according to one or more of the preceding claims, characterized in that a front end ( 1'' ) of the outer tube { 1 ) with a head plate ( 22 ), the through holes ( 22 ' ) for outer tube connecting screws. Baustütze nach Anspruch 4, dadurch gekennzeichnet, daß die Kopfplatte (22) ein Durchsteckloch (22'') für das Innenrohr (2) besitzt.Construction support according to claim 4, characterized in that the head plate ( 22 ) a push-through hole ( 22 '' ) for the inner tube ( 2 ) has.
DE3641349A 1986-12-03 1986-12-03 construction support Expired - Lifetime DE3641349C5 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE3641349A DE3641349C5 (en) 1986-12-03 1986-12-03 construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE3641349A DE3641349C5 (en) 1986-12-03 1986-12-03 construction support

Publications (3)

Publication Number Publication Date
DE3641349A1 DE3641349A1 (en) 1988-06-16
DE3641349C2 DE3641349C2 (en) 1996-11-21
DE3641349C5 true DE3641349C5 (en) 2004-02-12

Family

ID=6315405

Family Applications (1)

Application Number Title Priority Date Filing Date
DE3641349A Expired - Lifetime DE3641349C5 (en) 1986-12-03 1986-12-03 construction support

Country Status (1)

Country Link
DE (1) DE3641349C5 (en)

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8915693D0 (en) * 1989-07-08 1989-08-31 Kwikform Ltd Gkn Formwork system
GB8915695D0 (en) * 1989-07-08 1989-08-31 Kwikform Ltd Gkn Formwork system
FR2658551A1 (en) * 1990-02-22 1991-08-23 Lemartinel Gerard Scaffolding which can be used on any ground surface and which comprises prefabricated standardised elements
GB9023503D0 (en) * 1990-10-29 1990-12-12 Leada Acrow Ltd Improvements in and relating to structural beam connectors
NL9100139A (en) 1991-01-28 1992-08-17 Leeuw Petrus J L De SUPPORT ELEMENT FOR APPLICATION IN BUILDING CONSTRUCTIONS.
US5263296A (en) * 1991-07-17 1993-11-23 Speral Aluminium Inc. Modular scaffolding assembly
US5240089A (en) * 1991-07-17 1993-08-31 Speral Aluminum Inc. Modular scaffolding assembly
GB9127100D0 (en) * 1991-12-20 1992-02-19 Sgb Holdings Ltd Improvements in or relating to a shoring system
GB2262561B (en) * 1991-12-20 1995-05-17 Sgb Holdings Ltd Improvements in or relating to a shoring leg
GB2262562B (en) * 1991-12-20 1994-10-19 Sgb Holdings Ltd Improvements in or relating to a shoring system
DE4201958A1 (en) * 1992-01-25 1993-08-05 Peri Gmbh CARRYING FRAME
DE4206573A1 (en) * 1992-01-25 1993-07-29 Peri Gmbh HEIGHT-ADJUSTABLE SUPPORT
GB2265921B (en) * 1992-04-08 1995-05-24 Sgb Holdings Ltd Improvements in or relating to a shoring leg
DE4400360A1 (en) * 1994-01-08 1995-07-13 Gerhard Dingler support
DE19636090A1 (en) * 1996-09-05 1998-03-12 Hollmann Niels Frame especially for a platform or a scaffold or for decking formwork used in construction
GB9725720D0 (en) * 1997-12-04 1998-02-04 Sgb Services Plc A shoring leg
EP1016766A1 (en) * 1998-12-29 2000-07-05 Tatsuo Ono Frames and structures assembled by same
DE20211384U1 (en) 2002-07-23 2002-09-26 Octanorm-Vertriebs-GmbH für Bauelemente, 70794 Filderstadt Support column for mobile structures
DE202006009860U1 (en) 2006-06-23 2006-08-24 Doka Industrie Gmbh Support frame for the vertical shuttering supports for concrete floors has open grip profiles and adjustable clamps
DE102006049841B3 (en) * 2006-10-23 2008-04-24 Doka Industrie Gmbh Support used in building constructions comprises a tube axially profiled in an end region which is accessed from outside when in use
NL2004576C2 (en) * 2010-04-19 2011-10-20 Scafom Internat B V SUPPORT ELEMENT FOR USE IN BUILDING CONSTRUCTIONS.
US20130043095A1 (en) * 2011-08-16 2013-02-21 Stephen H. Thacker Masonry scaffold system with truss level rosettes
DE102013206596A1 (en) * 2013-04-12 2014-10-16 Peri Gmbh Heavy Duty Prop
CN105178626B (en) * 2015-09-16 2017-12-08 中建钢构有限公司 The pressure computational methods of light-duty multifunctional supporting arrangement
CN109204688B (en) * 2018-09-26 2024-06-18 福建省马尾造船股份有限公司 Side pushing grille manufacturing template
FR3097579B1 (en) * 2019-06-18 2021-07-09 Altrad Coffrage Et Etaiement Assembly process between an aluminum end of a tubular shoring tower post and a steel part
DE102023110584A1 (en) * 2023-04-25 2024-10-31 Redima Ag Transport and lifting device of a formwork support structure for concrete slab formwork

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3483910A (en) * 1968-04-01 1969-12-16 Youngstown Sheet And Tube Co Attachment devices including extend working means,for apertured structural members
US3650078A (en) * 1970-09-15 1972-03-21 Economy Forms Corp Shore tower assembly
DE2602145A1 (en) * 1975-01-20 1976-07-22 Acrow Eng Ltd SUPPORT FOR CONCRETE FORMWORKS
FR2323840A1 (en) * 1975-09-10 1977-04-08 Self Lock Echafaudages Support or scaffolding construction system - has column components with clamps at ends for transverse tube sections
US4146074A (en) * 1977-10-07 1979-03-27 B-Line Systems, Inc. Fastener
DE2949795A1 (en) * 1978-12-11 1980-06-26 George W Jackson SUPPORTING CONSTRUCTION FOR CONSTRUCTION BOARDS
DE2660317B1 (en) * 1975-07-25 1980-10-02 Aluma Systems Height-adjustable support device for truss-like scaffolding frames
EP0049096A1 (en) * 1980-09-29 1982-04-07 Aluma Systems Incorporated Bolted aluminium shoring frame
US4481748A (en) * 1980-09-10 1984-11-13 Harsco Corporation Shoring system and parts thereof
US4541509A (en) * 1982-01-15 1985-09-17 Harsco Corporation Shoring frame
DD228580A1 (en) * 1984-11-09 1985-10-16 Bau U Montagekomb Ost Betr For QUICK VEHICLE DEVICE FOR LOWERING SHUTTERING SUPPLEMENTS

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3483910A (en) * 1968-04-01 1969-12-16 Youngstown Sheet And Tube Co Attachment devices including extend working means,for apertured structural members
US3650078A (en) * 1970-09-15 1972-03-21 Economy Forms Corp Shore tower assembly
DE2602145A1 (en) * 1975-01-20 1976-07-22 Acrow Eng Ltd SUPPORT FOR CONCRETE FORMWORKS
DE2660317B1 (en) * 1975-07-25 1980-10-02 Aluma Systems Height-adjustable support device for truss-like scaffolding frames
FR2323840A1 (en) * 1975-09-10 1977-04-08 Self Lock Echafaudages Support or scaffolding construction system - has column components with clamps at ends for transverse tube sections
US4146074A (en) * 1977-10-07 1979-03-27 B-Line Systems, Inc. Fastener
DE2949795A1 (en) * 1978-12-11 1980-06-26 George W Jackson SUPPORTING CONSTRUCTION FOR CONSTRUCTION BOARDS
US4481748A (en) * 1980-09-10 1984-11-13 Harsco Corporation Shoring system and parts thereof
EP0049096A1 (en) * 1980-09-29 1982-04-07 Aluma Systems Incorporated Bolted aluminium shoring frame
US4541509A (en) * 1982-01-15 1985-09-17 Harsco Corporation Shoring frame
DD228580A1 (en) * 1984-11-09 1985-10-16 Bau U Montagekomb Ost Betr For QUICK VEHICLE DEVICE FOR LOWERING SHUTTERING SUPPLEMENTS

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
Konstruktionszeichnung der Fa. Friedrich Ische- beck GmbH *
Prospekt der Fa PERI, "PERI-Modul-Unterzugscha- lung" Ausgabe 1/83 *
Prospekt der Fa. BOSCH, "Flexible Automation", Ausgabe 3 vom August 1985 *
Prospekt der Fa. Friedrich Ischebeck GmbH,"Alu- Schalungsgerüst Ischebeck Titan" *
Prospekt Fa. Friedrich Ischebeck GmbH, "Dreimal stärker als Stahl!, Alu-Spindelstütze Titan", vom März 1983 *

Also Published As

Publication number Publication date
DE3641349A1 (en) 1988-06-16
DE3641349C2 (en) 1996-11-21

Similar Documents

Publication Publication Date Title
DE3641349C5 (en) construction support
EP0514712B1 (en) Formwork for surfaces with varying curvature
DE1903129B2 (en) Device for connecting a beam to a concrete column
DD296526A5 (en) FORMWORK SYSTEM
DE2419394A1 (en) ASSEMBLY FORMWORK FOR CONCRETE CONSTRUCTION
DE2040328B2 (en) Mobile interior formwork for concrete and reinforced concrete structures
EP0270623B1 (en) Shuttering
EP0390098B1 (en) kit for railings
EP0694659A2 (en) Scaffolding
DE8805760U1 (en) Movable bridge scaffolding
DE102010027890A1 (en) Multi-piece sleeve-like connecting element for attaching stiffeners on inner tube of e.g. vertical pipes, has stiffeners uniformly arranged in specific distance at specific angle around connecting element
DE3730846C2 (en)
AT396278B (en) SUPPORT DEVICE
DE4000400A1 (en) Support for shuttering panel - is used for erecting concrete structure and has struts of adjustable length
WO1984000189A1 (en) Method for wall concreting and formwork to implement such method
DE816152C (en) Device for scaffolding adjustable in height or length
DE2462066A1 (en) Climbing formwork for reinforced concrete - has height adjustable climbing frame and formwork plates swivel mounted around axis
DE3107844C2 (en) Formwork element for the manufacture of concrete structures
DE3048043A1 (en) Ceiling formwork support structure - has folding legs swinging and set at angle round telescopic upright
DE3340941C2 (en) Component set
DE10038659A1 (en) Device to support formwork, especially for ceiling; has at least one support frame with at least two supports connected by at least one carrier and adjustable support element to support shoring
DE2413529A1 (en) BAR CONSTRUCTION
DE2302561A1 (en) HEIGHT-ADJUSTABLE SUPPORTING CONSTRUCTION FOR STRENGTHENED STRUCTURES
DE3811303A1 (en) Support-frame apparatus which can be used in the building industry
DE1866458U (en) FORMWORK BEAM.

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
D2 Grant after examination
8363 Opposition against the patent
8366 Restricted maintained after opposition proceedings
8392 Publication of changed patent specification