DE3015366A1 - STRINGING MACHINE WITH SEMI-AUTOMATIC COIL CHANGER - Google Patents
STRINGING MACHINE WITH SEMI-AUTOMATIC COIL CHANGERInfo
- Publication number
- DE3015366A1 DE3015366A1 DE19803015366 DE3015366A DE3015366A1 DE 3015366 A1 DE3015366 A1 DE 3015366A1 DE 19803015366 DE19803015366 DE 19803015366 DE 3015366 A DE3015366 A DE 3015366A DE 3015366 A1 DE3015366 A1 DE 3015366A1
- Authority
- DE
- Germany
- Prior art keywords
- bobbin
- lifting frame
- stranding machine
- lifting
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- D—TEXTILES; PAPER
- D07—ROPES; CABLES OTHER THAN ELECTRIC
- D07B—ROPES OR CABLES IN GENERAL
- D07B7/00—Details of, or auxiliary devices incorporated in, rope- or cable-making machines; Auxiliary apparatus associated with such machines
- D07B7/16—Auxiliary apparatus
Landscapes
- Ropes Or Cables (AREA)
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
Description
Verlitzmaschine mit halbautomatischer Spulenwechselvorrichtung Stranding machine with semi-automatic bobbin changing device
Die Erfindung betrifft eine Verlitzmaschine, insbesondere zur Anwendung in der Kabelindustrie, mit einer halbautomatischen Spulenwechselvorrichtung, welche abgesehen von dem Einrollen der leeren Spule in die Maschine sowie von der Fixierung dieser Spule im Joch die einzelnen Phasen des Einhebeas und des Ausrollens automatisch durchführen kann, wobeiveie den Grundflächenbedarf der Verlitzmaschine nicht beeinflußt·The invention relates to a stranding machine, in particular for use in the cable industry, with a semi-automatic bobbin changing device which, apart from rolling the empty bobbin into the machine and fixing this bobbin in the yoke, can automatically carry out the individual phases of lifting leash and unrolling, whereby v eie does not affect the floor space requirement of the bunching machine
Es ist bekannt, daß die Verseilung mit Hilfe vonIt is known that the stranding with the help of
Verlitzmaschinen ein speäi'elles Gebiet der Kabel- und Lei-Stranding machines a special area of cable and wire
A 1830-113 XV *A 1830-113 XV *
030044/0857030044/0857
BAD ORIGINALBATH ORIGINAL
tungsherstellung darstellt, und durch eine hohe Produktivität ausgezeichnet ist, Bei diesen Maschinen wird der Draht (die Fertigware) zwischen den Rotoren der Maschine, auf einer Spule oder Trommel gesammelt, die in einer sogenannten Jochkonstruktion angeordnet ist« Nachdem diese Maschinen hauptsächlich zur Herstellung von Drähten aus unisolierten rotkupfernen Elementarfasern geeignet sind, so ist die mit Kabelstrang gefüllte, volle Spule äußerst schwer« Üblicherweise wird diese Spule von Hand oder mit Hilfe einer Spulenaushebevorrichtung aus der Maschine herausgehoben« production production, and by high productivity is excellent, With these machines the wire (the finished product) is placed between the rotors of the machine, collected on a spool or drum, which is arranged in a so-called yoke structure «After this Machines are mainly suitable for the production of wires from uninsulated red copper elementary fibers, so the full spool filled with cable harness is extremely heavy «Usually this spool is made by hand or with Lifted out of the machine with the help of a bobbin lifting device «
Wie es schon allgemein bekannt ist, besteht die herkömmliche Spulenaushebevorrichtung aus einem Auslegerdrehkran, mit welchem die volle Spule durch den oberen Teil der Verlitzmaschine hindurch aus der Jochkonstruktion herausgehoben werden muß, in welcher wegen der eingebauten Konstruktionsteile (Abzugs- und Aufspulorgane) die Bewegungsmöglichkeiten beschränkt sind, infolge dessen sowohl an der Verlitzmaschine als auch am auf der Spule befindlichen Ka bei site ng leicht ein Schaden entstehen kann«. Der Spulenwechsel ist zugleich auch sehr zeitaufwendig, weil die Spule vor dem Ausheben mit dem Hebeseil der Hebevorrichtung verbunden, und nach dem Ausheben diese Verbindung gelöst werden soll, und besteht dabei eine ständige Unfallgefahr· Die herkömmliche Spulenaushebevorrichtung erhöht den Grundflächenbedarf der Maschinenstraße«As it is already well known, the conventional bobbin lifting device consists of a boom crane, with which the full bobbin through the upper one Part of the stranding machine must be lifted out of the yoke structure, in which because of the built-in Construction parts (take-off and winding elements) the possibilities of movement are limited, as a result of both the stranding machine as well as the ka bei site ng on the spool can easily be damaged «. Changing the bobbin is also very time-consuming because the bobbin is lifted with the lifting rope of the lifting device before it is lifted out connected, and after excavation this connection is to be released, and there is a constant Risk of accident · The conventional bobbin lifting device increases the footprint of the machine line «
Bekannt ist eine Verlitzmaschine mit einmaliger Verseilung, deren konstruktiver Aufbau einen einfachenA stranding machine with a single stranding is known, the structural design of which is simple
-S--S-
Spulenwechsel ermöglicht. Eine solche Vorrichtung wird in der GB-PS 1 138 783 erläutert, welche aber nur bei Verlitzmaschinen mit einmaliger Verseilung, neben erhöhter Unfallgefahr und Geräuschbeschädigung eingesetzt werden kann·Allows bobbin change. Such a device will explained in GB-PS 1 138 783, but this only applies to Stranding machines with single stranding, in addition to increased Accident risk and noise damage can be used
Es ist weiterhin eine ungarische Patentschrift Nr. 173 580 bekannt, die den Titel "Verlitzmaschine mit einer Spulenwechselvorrichtung für die Fertigwarenspule11 trägt· Gemäß dieser technischen Lösung ist die Spulenwechselvorrichtung für die Fertigwarenspule unter der Jochkonstruktion, auf dem Tragrahmen der Gerüstkonstruktion angeordnet· Bei dieser Lösung kann die Auswechselung der Fertigwarenspule in einfacher Weise vor sich gehen, aber für Spulen beliebigen Gewichtes ist diese Vorrichtung auch nicht geeignet, da sich für die Arme und die Gelenke der '!Nürnberger Schere" dieser Vorrichtung bei einer vollen Spule mit einem Randdurchraesser über 630 mm schon so große geometrische Abmessungen ergeben, daß eine solche Nürnberger Schere in die Verlitzraaschine nicht mehr eingebaut werden kann.Furthermore, a Hungarian patent specification No. 173 580 is known, which bears the title "Stranding machine with a bobbin changing device for the finished goods reel 11 · According to this technical solution, the bobbin changing device for the finished goods reel is arranged under the yoke structure on the supporting frame of the scaffolding construction · In this solution the replacement of the finished goods reel can be done in a simple manner, but this device is not suitable for reels of any weight, as this device is suitable for the arms and joints of the '! Nürnberger Schere' with a full reel with an edge diameter of more than 630 mm The geometrical dimensions are so large that such Nuremberg scissors can no longer be built into the lashing machine.
Darüber hinaus ist diese Wechselvorrichtung für Fertigwarenspulen nur zum Einheben bzw. zum Absenken der Aufnahmespule in die Jochkonstruktion geeignet. Die zum Ausrollen aus der Maschine notwendige Verdrehung um 90° bzw. das Ausrollen selbst schon manuell durchgeführt werden müssens wodurch sich die Maschinenbedienungszeit und die Unfallgefahr erhöhen.In addition, this changing device for finished goods reels is only suitable for lifting or lowering the take-up reel into the yoke structure. The necessary from the machine for rolling rotation by 90 ° or rolling out s must be carried out by yourself manually control the machine time and the risk of accidents is thereby increased.
030044/0857030044/0857
3G153663G15366
Die Aufgabe der Erfindung ist die Schaffung einer Verlfcfczmaschine mit einer halbautomatischen Spulenwechselvorrichtung, die bei den Verlitzmaschinen den Spulenwechsel von unten bei einem beliebigen fertig»arengewicht unter der möglichst kürzesten Maschinenbedienungszeit unfallsfrei ermöglicht und den Grundflächenbedarf nicht erhöht. The object of the invention is to create a threading machine with a semi-automatic bobbin changing device, the bobbin change on the stranding machines from below at any finished weight below the shortest possible machine operating time possible without accidents and does not increase the footprint.
Grundlage der Erfindung ist die Erkenntnis, daß der Spulenwechsel der Verlitzmasohine bei einem beliebigen Spulengewioht ohne äußere Spulenabhebevorrichtung durchgeführt werden kann, wenn in dem Raum zwischen der Konstruktionseinheit "Grundrahmen-Gerüste" und der Jochkonstruktion statt einer mit Gelenkmechanismus versehenen Hebevorrichtung eine solche, aus geeigneten Konstruktionselementen ausgebildete Spulenwechselvorrichtung angeordnet wird, deren geometrische Abesssungen mit der wachsenden Belastung nur in unbdutandem Maße erhöht werden müssen· The basis of the invention is the knowledge that the bobbin change of the Verlitzmasohine with any Spulengewioht can be carried out without an external spool lifting device if in the space between the Construction unit "base frame scaffolding" and the yoke construction instead of a lifting device provided with an articulated mechanism, such a bobbin changing device formed from suitable construction elements is arranged whose geometrical dimensions only need to be increased to an unpredictable degree with the increasing load
Die gestellte Aufgabe wird bei einer Versatzmaschine mit einer geschlossenen Gerüstkonstruktion, einer beiderseits gelagerten Jochkonstruktion zur Halterung der. Abzugs- und Aufspulorgane, sowie einer Spulenwechselvorrichtung, die zum Ein- und Ausrollen der Fertig«arenspule mit einer durch ein Steuerorgan gesteuerten Tür und einer auf dem Grundrahmen befestigten und beim Öffnen der Tür ausschwenkbaren fiollbahn ausgerüstet ist, erfindungsgemäß dadurch gelöst, daß die Spulenwechselvorrichtung unter der in der Jochkonstruktion angeordneten Spule einen an dieThe task at hand is with a staggering machine with a closed frame construction, a yoke construction supported on both sides to hold the. Take-off and winding elements, as well as a bobbin changing device, which is used to roll in and unroll the finished arbor bobbin with a door controlled by a controller and one fixed on the base frame and when the door is opened swiveling fiollbahn is equipped, according to the invention solved in that the bobbin changing device under the coil arranged in the yoke structure one to the
030Q 4A/085 7030Q 4A / 085 7
- Sr -- Sr -
auf den inneren Stirnflächen der Gerüste befestigten Schienen mit Hilfe von mindestens drei Leitrollen je Gerüst sowie von einem auf Umlenkrollen geführten Seil angeschlossenen Heberahmen aufweist· Der Heberahmen verfügt über eine aus einem feststehenden und einem beweglichen Teil bestehen de Wendeplatte, auf deren beweglichen Teil ein fixierter Anschlag, dem gegenüber symmetrisch angeordnete, nur unter dem Gewicht der vollen Spule hineindrückbare Federstifte und senkrecht auf diese Federstifte parallele Führungsleisten angebracht sind, während auf dem unteren, feststehenden Teil der Wendeplatte eine mit Nut versehene Wendehülse ausgebildet ist,die gegebenfalls mit einem unter dem Heberahmen angeordneten, auf dem Grundrahmen befestigten V/endezapfen im Eingriff steht. Zur Bewegung des Heberahmeos ist ein Antrieb vorgesehen·rails attached to the inner end faces of the scaffolding with the help of at least three guide rollers per scaffolding as well as has a lifting frame connected by a rope guided on deflection pulleys · The lifting frame has a consists of a fixed and a moving part de turning plate, on the moving part of a fixed Stop, opposite the symmetrically arranged spring pins that can only be pushed in under the weight of the full bobbin and perpendicular to these spring pins parallel guide strips are attached, while on the lower, stationary Part of the insert is formed with a groove provided with a reversible sleeve, which is optionally provided with an under the lifting frame arranged, on the base frame fastened V / endezapfen engages. To move the lifting gear is a drive provided
Der Antrieb des Heberahmens ist vorteilhafterweise in dem unter den Gerüsten befindlichen Raum des Grundrahmens eingebaut ist·The drive of the lifting frame is advantageously in the space of the base frame located under the scaffolding is built in
Der Antrieb ist zweckmäßigerweise ein elektromechanischer Antrieb, er kann aber auch pneumatisch oder hydraulisch ausgeführt werden·The drive is expediently an electromechanical one Drive, but it can also be carried out pneumatically or hydraulically
Die Vorteile der erfindungsgemäßen Verlitzmaschine ergeben sich vor allen dadurch, daß der Vfechsel der vollen Spule außer dem Einrollen und der Fixierung der Spule in der Jochkonstruktion bei Verlitzmaschinen beliebiger Größenordnung automatisch erfolgt. Die erfindungsgemäße Spulenwechselvorrichtung erhöht nicht den Grundflächenbedaff der Verlitzmaschine· So kann mit einem relativ geringenThe advantages of the stranding machine according to the invention result above all from the fact that the Vfwechsel of the full Coil except for rolling in and fixing the coil in the yoke structure in stranding machines of any size takes place automatically. The bobbin changing device according to the invention does not increase the footprint the stranding machine · So can with a relatively low
Ü300U/0857Ü300U / 0857
-ir--ir-
Herstellungekostenaufwand die Maaohinenbedienüngszeit verringert werden und die Arbeiter werden von einer eohweren körperlichen Arbeit befreit·Manufacturing costs the Maaohinen operating time are reduced and workers are relieved of a lot of physical labor
Die Erfindung wird ausführlicher anhand der Zeiohnung erläutert, in der eine vorteilhafte Ausführungsform der Erfindung dargestellt ist. In der Zeiohnung zeigenThe invention is explained in more detail with reference to the drawing in which an advantageous embodiment of the invention is shown. Show in the newspaper
Fig. 1 eine Vorderansicht der in die erfindungsgemäße Verlitzmaschine eingebauten Spulenwechselvorrichtung;1 shows a front view of the bobbin changing device built into the stranding machine according to the invention;
Hg· 2. eine Draufsicht der in die erfindungsgemäße Verlitzmaschine eingebauten Spulenwechselvorrichtung;Fig. 2. a plan view of the bobbin changing device built into the stranding machine according to the invention;
Mg« 3 einen Schnitt nach der Linie A-A der fig· 2;Mg «3 a section along the line A-A of fig · 2;
Pig, 4 eine Draufsicht der Wendeplatte der Spulenwechselvorrichtung·Pig, 4 a top view of the turning plate of the bobbin changing device
Wie es in Pig· 1 ersichtlich ist, auf einem Grundrahmen 1 der Verlitzmasohine sind Gerüste 2 und 3 befestigt · In den Gerüsten 2 und 3 ist eine Jochkonstruktion 4 gelagert und innerhalb dieser Jochkonstruktion 4 ist eine Spule 5 angeordnet· Unterhalb der Jochkonstruktion let auf dem Grundrahmen 1 ein Wendezapfen 6 angebracht·As can be seen in Pig · 1, frames 2 and 3 are attached to a base frame 1 of the lashing machine. In the frames 2 and 3 there is a yoke construction 4 and within this yoke construction 4 a coil 5 is arranged. Below the yoke construction let a pivot pin 6 be attached to the base frame 1
Oberhalb des Wendezapfens 6, auf einem Heberahmen 7 ist eine Wendeplatte 8 befestigt,die aus einem feststehenden und einem (nicht dargestellten) beweglichen Teil besteht. Die leichte Verdrehbarkeit der Wendeplatte 8 wirdAbove the turning pin 6, on a lifting frame 7, a turning plate 8 is fastened, which consists of a fixed and a movable part (not shown) consists. The easy rotatability of the insert 8 is
030044/0857030044/0857
durch eine zwischen die beiden Teile eingebaute Lagerung, und zwar vorteilhafterweise durch eine Lagerung aus einer Kugelreihe gesichert·by a bearing built in between the two parts, and advantageously secured by a bearing made of a row of balls
Am unteren, feststehenden Teil der Wendeplatte 8 ist eine zweckmäßigprweise mit Nut versehene Wendehülse 9 angebracht, die beim Absenken des Heberahmens 7 mit dem Wendezapfen 6 im Eingriff steht.On the lower, fixed part of the turning plate 8 is a turning sleeve 9 which is expediently provided with a groove attached, which is in engagement with the pivot pin 6 when the lifting frame 7 is lowered.
Auf der Obefläche des beweglichen Teiles der Wendeplatte 8 ist, wie es in Fig. 4 gezeigt ist, ein fixierter Anschlag 10 angeordnet und dem gegenüber, in symmetrischer Anordnung sind Federstifte 11 und 12 angeordnet, welche so bemessen sind, daß sie nur durch das Gewicht der vollen Spule 5 heruntergedrückt werden. So ist die fixierte Lage der leeren Spule 5 auch in der schrägen Stellung der Wendeplatte 8 gewährleistet. Weiterhin befinden sich hier Führungsleisten 13 und 14, die zur Führung der Spule 5 während des Einrollens sowie zur Fixierung der Spule in einer geeigneten Lage im Vergleich zur Jochkonstruktion 4 dienen, bzw. auf diesen Führungsleisten 13 und 14 sind verschiebbare Gummiböcke befestigt, welche so ausgebildet Bind, daß sie beim Zurückkippen der Jochkonstruktion 4, zusammen mit deren Rand in Querrichtung verschieben können.On the surface of the movable part of the insert 8, as shown in Fig. 4, a fixed one Stop 10 arranged and opposite, in a symmetrical arrangement spring pins 11 and 12 are arranged, which are dimensioned so that they are only pressed down by the weight of the full spool 5. That's how it is Fixed position of the empty bobbin 5 also guaranteed in the inclined position of the insert 8. Still reside Here there are guide strips 13 and 14, which are used to guide the bobbin 5 during rolling and to fix the bobbin serve in a suitable position compared to the yoke structure 4, or on these guide strips 13 and 14 Slidable rubber blocks are attached, which bind designed so that they are when tilting back the yoke structure 4, together with the edge can move in the transverse direction.
Der Heberahmen 7 ist vorteilhafterweise eine aus Profileisen zusammengeschweißte Konstruktion, deren Bewegung in senkrechter Ebene durch die Führung der auf ihr befestigten Leitrollen 17, 18, 19 bzw. 20, 21, 22 in denThe lifting frame 7 is advantageously a construction welded together from profile iron, the movement of which in a vertical plane through the leadership of the guide rollers 17, 18, 19 and 20, 21, 22 attached to it in the
030044/0857030044/0857
auf den inneren Stirnflächen der Gerüste 2 und 3 ausgebildeten Schienen 23 und 24 gewährleistet ist. Die einapannfreie Beweglichkeit des Heberahmens 7 in senkrechter Ebene wird durch eine entsprechende Anzahl und Anordnung der Leitrollen gesichert. Die Anzahl der Leitrollen beträgt auf einer Seite mindestens drei, d.h. auf den beiden Seiten sind gleichzeitig insgesamt mindestens sechs Leitrollen notwendig.on the inner end faces of the frames 2 and 3 formed rails 23 and 24 is guaranteed. The movement of the lifting frame 7 in the vertical plane without any interference is ensured by a corresponding number and arrangement of the guide rollers. The number of guide rollers is at least three on one side, i.e. a total of at least six on both sides at the same time Guide rollers necessary.
Das Anheben bzw. Absenken des Heberahmens 7 erfolgt mit Hilfe eines in den Grundrahmen 1 eingebauten Hydraulikzylinders 25, welcher zusammen mit dem hydraulischen Steuerorgan in dem Raum unterhalb der Gerüste 2 und 3 angeordnet ist. Die durch den Hydraulikzylinder 25 ausgeübte Kraft wird durch ein an das Ende der Kolbenstange befestigtes Drahtseil 26 mit Hilfe von auf den Grundrahmen 1 bzw. an die innere Stirnfläche der Gerüste 2 und 3 befestigten Umlenkrollen 27, 28, 29, 30 und 31 auf die beiden Enden des Heberahmens 7 übertragen.The lifting frame 7 is raised or lowered with the aid of a built-in base frame 1 Hydraulic cylinder 25, which together with the hydraulic control element in the space below the scaffolding 2 and 3 is arranged. The force exerted by the hydraulic cylinder 25 is applied to the end of the piston rod attached wire rope 26 with the help of on the base frame 1 or on the inner end face of the frameworks 2 and 3 attached pulleys 27, 28, 29, 30 and 31 transferred to the two ends of the lifting frame 7.
Am unteren Teil der Bedienungsseite der Verlitzmasohine ist eine Celektrisch geriegelte) Tür 32 angeord- net, deren Steuerorgan mit dem Hauptsteuerorgan der Ver- -litzmaschine in Verbindung steht· Auf dem Grundrahmen 1, zwischen der Tür 32 und der Wendeplatte 8 ist eine zum Ein- und Ausrollen der Spule 5 geeignete Rollbahn 33 angeordnet.On the lower part of the operating side of the Verlitz machine there is an electrically locked door 32. net, the control element of which is in connection with the main control element of the litz machine · On the base frame 1, Between the door 32 and the turning plate 8 there is arranged a roller track 33 suitable for rolling the reel 5 in and out.
Bei weiteren (in der Zeichnung nicht dargestellten) Ausführungsbeispielen kann der Heberahmen 7 auf pneu-In further exemplary embodiments (not shown in the drawing), the lifting frame 7 can be based on pneumatic
030044/0857030044/0857
~~ M- saatisohem oder auch auf elektromechanischen! Wege bewegt «erden· ~~ M- saatisohem or on electromechanical! Moving Paths «to earth ·
Die Arbeiteweise der erfindungsgemäßen Verlitzmaschine wird in zwei Arbeitsphasen erläutert:The mode of operation of the stranding machine according to the invention is explained in two working phases:
It in der Phase des Einhebens der leeren Spule; Ht in der Phase des Aushebens der vollen Spule«It in the phase of lifting the empty bobbin; Ht in the phase of lifting the full bobbin "
Zu It In der Phase des Einhebens der leeren Spule wird «vorteilhaftererweise mit Hilfe eines Fühlers am Rotorkopf, und einer elektrischen Steuerung - beim Stillstand der Verlitzmaschine und bei der waagerechten Lage des Verseilrahmens die elektrisch verriegelte Tür 32 geöffnet und die Rollbahn 33 wird heruntergekippt· Das Einrollen der Spule 5 auf die Wendeplatte 8 wird von Hand durchgeführt. Die Spule 5 bleibt auf der Wendeplatte 8 im Verhält als zur Jochkonstruktion 4 in einer orientierten Lage, €Ü© durch die Federstifte 11 und 12 bzw· die Führungsleisten 13 und 14 gewährleistet wird·To It In the phase of lifting the empty bobbin, «advantageously with the help of a sensor on the rotor head, and an electrical control - when the stranding machine is at a standstill and when the The electrically locked door 32 is opened and the runway 33 is tipped down the coil 5 on the insert 8 is carried out by hand. The coil 5 remains on the turning plate 8 in relation to the yoke structure 4 in an oriented position, € Ü © by the spring pins 11 and 12 or the guide strips 13 and 14 is guaranteed
Nach dem Schließen der Tür 32 bewegt sich der.Heberalimen 7 aus seiner unteren Ausgangslage in Richtung der Jochkonstruktion 4, in senkrechter Ebene, während die Wendeplatte 8 in die waagerechte Ebene zurückkippt, dann verdreht sie sich automatisch um 90° mit Hilfe des Wendezapfens 6 und der Wendehülse 9· Der Heberahmen 7 wird mit Hilf© der durch den Hydraulikzylinder 25 ausgeübten Kraft bewegt, die mit Hilfe der Umlenkrollen 27, 28, 29, 30 und 31 durch das Drahtseil 26 auf die beiden Enden des Heberahmens 7 übertragen wird· So übt die Hebekraft ihre Wir-After the door 32 has been closed, the lifting arm moves 7 from its lower starting position in the direction of the yoke structure 4, in the vertical plane, while the Turning plate 8 tilts back into the horizontal plane, then it rotates automatically by 90 ° with the help of the turning pin 6 and the reversible sleeve 9 · The lifting frame 7 is opened with the aid of the force exerted by the hydraulic cylinder 25 moved with the help of pulleys 27, 28, 29, 30 and 31 through the wire rope 26 to the two ends of the lifting frame 7 is transferred This is how the lifting force exerts its effect
0300U/08570300U / 0857
kung in die Heberiohtung aus, was bekannterweise am günstigsten.ist. Die Kolbenbewegung kann somit beliebig, in sehr weiten Grenzen geregelt werden·in the lifting direction, which is known to be the cheapest. The piston movement can thus be arbitrarily in very wide limits are regulated
Am Ende des Einhebens der Spule 5 in die Jochkon» struktion 4 wird diese notwendigerfalle durch die auf der Wendeplatte 8 befindlichen Gummiböoke in die waagerechte Ebene gekippt bzw. durch die erwähnten Gummiböcke wird der Dinaraismus des Aufprallens vermindert, weil die Spule 5 nur in einer solchen Lage festgehalten werden kann· Die Einspannvorrichtung der Spule 5 kann durch die manuelle Bewegung der konischen Einspannspitzen in axialer Richtung bewegt werden· Der Heberahmen 7 bewegt sich nach unten, bis er wieder die untere Ausgangslage erreicht·At the end of the lifting of the coil 5 into the yoke con » This necessary case is covered by instruction 4 by the Turning plate 8 located Gummiböoke in the horizontal Tilted plane or the rubber blocks mentioned, the dinaraism of the impact is reduced because the coil 5 can only be held in such a position · The jig of the spool 5 can be manually Movement of the conical clamping tips can be moved in the axial direction · The lifting frame 7 moves downwards until he reaches the lower starting position again
Die Verlitzmaschine kann nur in Betrieb gesetzt werden, wenn die Tür 32 in geschlossenem Zustand und der Heberahmen 7 in seiner unteren Ausgangslage ist· Diese Positionen werden durch Endschalter kontrolliert·The stranding machine can only be put into operation when the door 32 is closed and the lifting frame 7 is in its lower starting position These positions are controlled by limit switches
Zu Ht Die Arbeitsweise der erfindungsgemäBen Verlitzmaschine in der Phase des Aushebens der vollen Spule ist wie folgt!To Ht The method of operation of the stranding machine according to the invention in the phase of lifting out the full bobbin is like follows!
Naoh der Füllung der Spule 5 und dem Abstellen der Verlitzmasohine Cduroh die elektrische Steuerung der Masohine wird nämlich die Betätigung der Spulenwechselvorrichtung bei einer sich drehenden Maschine verhindert) bewegt sioh der Heberahmen 7 zusammen mit der Wendeplatte 8 gemäß dem Vorgang während des Einhebens der leeren Spule 5 bis zur unteren Ebene der Jochkonstruktion 4 (bis erAfter filling the coil 5 and turning off the Verlitzmasohine Cduroh the electrical control of the Masohine prevents the bobbin changing device from being operated on a rotating machine) moves sioh the lifting frame 7 together with the turning plate 8 according to the process during the lifting of the empty bobbin 5 to the lower level of the yoke structure 4 (until it
030044/0857030044/0857
daran aufliegt). Die die Spule 5 fixierende Verbindung muß von Hand gelöst werden, wodurch die Spule 5 auf die Wendeplatte 8 gelangt, wonach der Heberahmen 7 in an sich sohon bekannter Weise in seine untere Ausgangslage zurückkehrt· Dann wird die Tür 32 geöffnet und die Äollbahn 33 heruntergeschwenkt· Nachdem die Wendeplatte 8 zu dieser Zeit schon in Richtung des Ausrollens im Verhältnis zur horizontalen Ebene um einen bestimmten Winkel sohon heruntergekippt ist, sowie infolge der zweckmäßigen Bemessung der Federstifte 11 und 12, rollt die volle Spule 5 aus der Maschine automatisch heraus·rests on it). The connection fixing the coil 5 must be released by hand, whereby the coil 5 on the Turning plate 8 arrives, after which the lifting frame 7 in on then returns to its lower starting position in a known manner · Then the door 32 is opened and the Äollbahn 33 swiveled down · After the insert 8 at this time already in the direction of unrolling in relation to the horizontal plane by a certain angle sohon tipped down, as well as due to the functional Dimensioning of the spring pins 11 and 12, the full bobbin 5 automatically rolls out of the machine
Nach dem Spulenwechsel kann die Verlitzmaschine erst dann wieder in Betrieb gesetzt werden, wenn der Heberahmen 7 in seiner unteren Ausgangslage und die Tür in geschlossenem Zustand ist·After the bobbin change, the stranding machine can only be put back into operation when the lifting frame 7 is in its lower starting position and the door is in the closed position
030044/0857030044/0857
Claims (6)
ORIGINAL INSPECTS)Q30044 / 0857
ORIGINAL INSPECTS)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| HU79DI313A HU178511B (en) | 1979-04-23 | 1979-04-23 | Cabel industrial plaiting machine with semi-automatic creeling device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| DE3015366A1 true DE3015366A1 (en) | 1980-10-30 |
| DE3015366C2 DE3015366C2 (en) | 1985-06-20 |
Family
ID=10995001
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE3015366A Expired DE3015366C2 (en) | 1979-04-23 | 1980-04-22 | Stranding machine with semi-automatic bobbin changing device |
Country Status (7)
| Country | Link |
|---|---|
| DD (1) | DD150230A5 (en) |
| DE (1) | DE3015366C2 (en) |
| FR (1) | FR2454992B1 (en) |
| GB (1) | GB2048975B (en) |
| HU (1) | HU178511B (en) |
| IT (1) | IT1148821B (en) |
| SU (1) | SU1175368A3 (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111547581A (en) * | 2020-05-28 | 2020-08-18 | 王玮 | Bobbin creel structure for bobbin winder |
| CN112233858B (en) * | 2020-10-16 | 2022-03-01 | 安徽华宇电缆集团有限公司 | High-performance ultra-flexible transmission line for aerospace |
| CN112309646B (en) * | 2020-10-26 | 2022-09-27 | 浙江三科线缆股份有限公司 | Insulating core wire wrapping device for wire and cable production |
| CN113628812A (en) * | 2021-09-10 | 2021-11-09 | 合肥神马科技集团有限公司 | Wire coil replacing equipment for wire twisting machine |
| CN114242342B (en) * | 2021-11-27 | 2023-10-03 | 杭州普天乐电缆有限公司 | Frame strander with automatic disc feeding function |
| CN114351588B (en) * | 2021-12-02 | 2024-06-04 | 东南大学 | A suspension bridge main cable saddle twisting device and use method |
| CN116024832B (en) * | 2023-02-07 | 2023-12-22 | 浙江东翼新材料有限公司 | Wire twisting device for copper-clad steel strand |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2451754A (en) * | 1944-12-13 | 1948-10-19 | Larmuth Allin | Loading and unloading device for wire stranding, rope, and cable making machines |
| DE2846016A1 (en) * | 1978-10-23 | 1980-04-24 | Diosgyoeri Gepgyar | SEALING MACHINE |
-
1979
- 1979-04-23 HU HU79DI313A patent/HU178511B/en unknown
-
1980
- 1980-04-22 DE DE3015366A patent/DE3015366C2/en not_active Expired
- 1980-04-22 FR FR8008998A patent/FR2454992B1/en not_active Expired
- 1980-04-22 IT IT21566/80A patent/IT1148821B/en active
- 1980-04-23 SU SU802913901A patent/SU1175368A3/en active
- 1980-04-23 DD DD80220645A patent/DD150230A5/en unknown
- 1980-04-23 GB GB8013449A patent/GB2048975B/en not_active Expired
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2451754A (en) * | 1944-12-13 | 1948-10-19 | Larmuth Allin | Loading and unloading device for wire stranding, rope, and cable making machines |
| DE2846016A1 (en) * | 1978-10-23 | 1980-04-24 | Diosgyoeri Gepgyar | SEALING MACHINE |
Non-Patent Citations (1)
| Title |
|---|
| DE-Z.: Draht, 1969, S. 131/132 * |
Also Published As
| Publication number | Publication date |
|---|---|
| GB2048975A (en) | 1980-12-17 |
| DD150230A5 (en) | 1981-08-19 |
| IT8021566A0 (en) | 1980-04-22 |
| DE3015366C2 (en) | 1985-06-20 |
| FR2454992A1 (en) | 1980-11-21 |
| HU178511B (en) | 1982-05-28 |
| IT1148821B (en) | 1986-12-03 |
| GB2048975B (en) | 1983-11-23 |
| FR2454992B1 (en) | 1985-06-07 |
| SU1175368A3 (en) | 1985-08-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE69106006T2 (en) | Lifting device. | |
| DE2252836B1 (en) | TOWER CRANE | |
| EP0628507B1 (en) | Device for lifting a reel and for winding a cable on the reel | |
| DE1611809B2 (en) | WEIGHT COMPENSATION DEVICE FOR A HEIGHT-ADJUSTABLE DRAWING TABLE | |
| DE4139824C1 (en) | ||
| DE3015366C2 (en) | Stranding machine with semi-automatic bobbin changing device | |
| DE3407729C2 (en) | Rope feed device on a rope winch for guiding the rope to the rope drum | |
| DE1987883U (en) | HANGES - MATERIAL HANDLING DEVICE. | |
| DE2356904A1 (en) | Slewing rail-mounted crane - has telescopic jib retracting to less than half full length | |
| DE1196929B (en) | Device for changing cable drums in a winding device | |
| DE4402350C2 (en) | Gate drive for a horizontally movable sectional gate | |
| CH234846A (en) | Lifting device. | |
| DE2627066A1 (en) | PLANT FOR CONTINUOUS WINDING OF THREAD ON SPOOLS | |
| DE3519591C2 (en) | Device for the exchangeable suspension of the winding axis of a fabric bale | |
| DE2846016C3 (en) | Stranding machine | |
| DE3519590C2 (en) | ||
| DE2508163C3 (en) | Winding device | |
| DE4421916A1 (en) | Bobbin-changing device | |
| DE4206359A1 (en) | Tower crane with single drive - uses guide pulleys placed on boom and trolley, to lift and move hook | |
| EP0694497A1 (en) | Device for winding and unwinding a cable on a drum | |
| DE2330130C3 (en) | Device for moving weft thread carriers in the shed of a wave shed loom | |
| DE948390C (en) | Device used for traffic with the ship | |
| DE852135C (en) | Device for lifting or lowering and tilting by means of a winch | |
| DE2447277C3 (en) | Device for moving the weft thread carriers of a shaft shed loom | |
| DE3433751A1 (en) | Bobbin changer for spinning machines |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| OAP | Request for examination filed | ||
| OD | Request for examination | ||
| D2 | Grant after examination | ||
| 8364 | No opposition during term of opposition | ||
| 8339 | Ceased/non-payment of the annual fee |