DE29722421U1 - Busbar overrun on switches - Google Patents
Busbar overrun on switchesInfo
- Publication number
- DE29722421U1 DE29722421U1 DE29722421U DE29722421U DE29722421U1 DE 29722421 U1 DE29722421 U1 DE 29722421U1 DE 29722421 U DE29722421 U DE 29722421U DE 29722421 U DE29722421 U DE 29722421U DE 29722421 U1 DE29722421 U1 DE 29722421U1
- Authority
- DE
- Germany
- Prior art keywords
- ramp
- run
- conductor rail
- busbar
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60M—POWER SUPPLY LINES, AND DEVICES ALONG RAILS, FOR ELECTRICALLY- PROPELLED VEHICLES
- B60M1/00—Power supply lines for contact with collector on vehicle
- B60M1/30—Power rails
- B60M1/32—Crossings; Points
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Keying Circuit Devices (AREA)
- Rotary Switch, Piano Key Switch, And Lever Switch (AREA)
Description
ABB Daimler-Benz Transportation (Technology) GmbHABB Daimler-Benz Transportation (Technology) GmbH
Berlin 19. Dezember 1997Berlin 19 December 1997
Mp.-Nr. 97/704 PAT2-PnMp. No. 97/704 PAT2-Pn
Die Erfindung bezieht sich auf einen Stromschienenauflauf an Weichen gemäß dem Oberbegriff des Anspruchs 1. Die Erfindung kann beispielsweise bei Nahverkehrs-Schienenfahrzeugen, wie S-Bahnen und U-Bahnen, verwendet werden.The invention relates to a conductor rail run-up on switches according to the preamble of claim 1. The invention can be used, for example, in local rail vehicles, such as suburban trains and subways.
Zur Führung der Stromabnehmer eines Schienentriebfahrzeuges an Weichen sind Stromschienenaufläufe erforderlich, welche den Übergang des Stromabnehmers von einer Stromschiene zur anderen gewährleisten und eine ununterbrochene elektrische Versorgung des Fahrzeuges sicherstellen. Es ist allgemein bekannt, die Stromschienen im Weichenbereich hierzu mit einstückigen seitlichen Führungsblechen zu versehen, die die Stromabnehmerschleifschuhe selbsttätig von der seitlichen Hochlage in eine Tieflage bis zur Schleifflächenunterkante der Stromschiene führen.To guide the current collectors of a rail vehicle to switches, conductor rail ramps are required, which ensure the transition of the current collector from one conductor rail to the other and ensure an uninterrupted electrical supply of the vehicle. It is generally known that the conductor rails in the switch area are provided with one-piece lateral guide plates which automatically guide the current collector grinding shoes from the lateral high position to a low position up to the contact surface lower edge of the conductor rail.
Diese seitlichen Führungsbleche sind jeweils speziell entsprechend den örtlichen Gegebenheiten der Weichen auszubilden und beispielsweise an verschiedene Schienenradien, an eventuelle zusätzliche Gleiskrümmungen und an freizuhaltende seitliche Räume anzupassen. Es sind deshalb unterschiedliche Versionen für verschiedene Weichenradien sowohl für Aluminium-Verbundstromschienen als auch für Stahl-Stromschienen üblich. Des weiteren sind diese seitlichen Führungsbleche speziell an die zu führenden Stromabnehmertypen angepaßt. Die Montage der seit-These side guide plates must be specially designed to suit the local conditions of the switches and, for example, adapted to different rail radii, to any additional track curvatures and to the side spaces that must be kept free. Different versions for different switch radii are therefore common for both aluminum composite conductor rails and steel conductor rails. Furthermore, these side guide plates are specially adapted to the current collector types to be guided. The assembly of the side
••
••
•«
•
Mp.-Nr. 97/704 .* .2^. &iacgr; *'.*..: .%&Iacgr;9. Dezember 1997Mp. No. 97/704 .* .2^. &iacgr;*'.*..: . % &Iacgr;9 December 1997
liehen Führungsbleche erfolgt z. B. durch Aufschweissen an die Stromschiene. Diese allgemein bekannten Konfigurationen sind insbesondere hinsichtlich der Montage und der speziellen Anpassung an die örtlichen Gegebenheiten und an die zu führenden Stromabnehmer relativ kostenaufwendig.The guide plates are attached, for example, by welding them onto the conductor rail. These generally known configurations are relatively expensive, particularly with regard to assembly and special adaptation to the local conditions and the current collectors to be guided.
Der Erfindung liegt die Aufgabe zugrunde, einen Stromschienenauflauf an Weichen der eingangs genannten Art anzugeben, der universell für unterschiedliche örtliche Gegebenheiten, beispielsweise verschiedene Schienenradien oder Gleiskrümmungen und unterschiedliche Stromabnehmertypen verwendbar ist.The invention is based on the object of specifying a conductor rail run-up on switches of the type mentioned at the beginning, which can be used universally for different local conditions, for example different rail radii or track curvatures and different current collector types.
Diese Aufgabe wird in Verbindung mit den Merkmalen des Oberbegriffes erfindungsgemäß durch die im Kennzeichen des Anspruchs 1 angegebenen Merkmale gelöst.This object is achieved according to the invention in conjunction with the features of the preamble by the features specified in the characterizing part of claim 1.
Die mit der Erfindung erzielbaren Vorteile bestehen insbesondere darin, daß der vorgeschlagene Stromschienenauflauf universell für unterschiedliche Schienenradien und Gleiskrümmungen geeignet ist. Durch die Aufteilung in mehrere Rampenschüsse wird der jeweils gegebene Schienenradius nachgebildet. Der Stromschienenauflauf kann universell sowohl für Aluminium-Verbundstromschienen als auch für Stahl-Stromschienen verwendet werden. Er ist universell sowohl für links- als auch für rechtsbefahrene Weichen geeignet. Des weiteren ist er universell für unterschiedliche Stromabnehmertypen verwendbar. Mit anderen Worten ist nur noch eine einzige Ausführungsform des Stromschienenauflaufs für verschiedene Schienenradien und für beide Stromschienen (Einbauort rechts oder links vom Gleis) erforderlich. The advantages that can be achieved with the invention are in particular that the proposed conductor rail ramp is universally suitable for different rail radii and track curvatures. The given rail radius is reproduced by dividing it into several ramp sections. The conductor rail ramp can be used universally for both aluminum composite conductor rails and steel conductor rails. It is universally suitable for both left-hand and right-hand switches. Furthermore, it can be used universally for different current collector types. In other words, only a single design of the conductor rail ramp is required for different rail radii and for both conductor rails (installation location to the right or left of the track).
Die einzelnen Rampenschüsse ermöglichen den Aufbau des Stromschienenauflaufes im Baukastensystem. Der Stromschienenauflauf besteht beispielsweise aus sechs bis acht Rampenschüssen. Die erforderliche Anzahl der Rampenschüsse richtet sich nach dem gegebenen Weichenradius. Je größer der Weichenradius, desto höher die Anzahl der benötigten Rampenschüsse. Das Baukastensystem führt aufgrund der Vorfertigung der Baukomponenten in hoher Stückzahl zu einer Herabsetzung der Kosten für einen Stromschienenauflauf und erleichtert die Lagerhaltung und Ersatzteilbevorratung.The individual ramp sections enable the conductor rail run-up to be constructed using a modular system. The conductor rail run-up, for example, consists of six to eight ramp sections. The required number of ramp sections depends on the given switch radius. The larger the switch radius, the higher the number of ramp sections required. The modular system reduces the costs of a conductor rail run-up due to the prefabrication of the components in large quantities and facilitates warehousing and stocking of spare parts.
Mp-Nr 97/704 ♦* ·*3. &iacgr; ** . **»! .' 19. Dezember 1997Mp-No 97/704 ♦* ·*3. &iacgr; ** . **»! .' 19 December 1997
Die komplette Stromschienenanlage (Aluminium- oder Stahl-Stromschiene) kann durchgehend fertiggestellt werden, bevor der Stromschienenauflauf an Weichen durch einfaches Aufklemmen auf die vorhandene Stromschienenanlage mittels Befestigungsvorrichtungen und ohne die Notwendigkeit z. B. des Verschweißens montiert wird. Des weiteren ist auch eine Nachrüstung einer durchgängig aufgebauten Stromschiene mit dem vorgeschlagenen Stromschienenauflauf in einfacher Weise möglich. Stromschienenlücken in bestehenden Anlagen, die beispielsweise aufgrund von Platzproblemen entstanden sind, können bei Bedarf kurzfristig mit dem vorgeschlagenen Stromschienenauflauf nachgerüstet werden.The complete conductor rail system (aluminum or steel conductor rail) can be completed in one piece before the conductor rail run-up is mounted on switches by simply clamping it onto the existing conductor rail system using fastening devices and without the need for welding, for example. Furthermore, it is also easy to retrofit a continuously constructed conductor rail with the proposed conductor rail run-up. Gaps in conductor rails in existing systems, which have arisen due to space problems, for example, can be retrofitted with the proposed conductor rail run-up at short notice if required.
Aufgrund des Baukastensystems und des sehr geringen Gewichts sowie der geringen Abmessungen der einzelnen Baukomponenten kann der Stromschienenauflauf sehr einfach „gehandelt" und montiert werden. Transportschwierigkeiten zum Einbauort treten nicht auf. Zudem sind bei der Montage des Weichenauflaufes keine Laschenverbindungen zwischen den einzelnen Baukomponenten notwendig. Der Zeitaufwand für die Montage ist stark reduziert. Deshalb sind während der Montage nur relativ kurze Sperrpausen notwendig, in denen die Durchfahrt der Schienenstrecke für Fahrzeuge gesperrt werden muß. Auch eine Demontage des Stromschienenauflaufes läßt sich sehr einfach und schnell durchführen.Due to the modular system and the very low weight and small dimensions of the individual components, the conductor rail ramp can be handled and installed very easily. There are no transport difficulties to the installation site. In addition, no lug connections between the individual components are necessary when installing the switch ramp. The time required for installation is greatly reduced. Therefore, only relatively short closure breaks are necessary during installation, during which the rail line must be blocked for vehicles. The conductor rail ramp can also be dismantled very easily and quickly.
Durch die bei einem Teil der Rampenschüsse vorgesehenen Notführungsbleche ist es in jedem Fall sichergestellt, daß der Stromabnehmerschleifschuh selbsttätig und zwangsläufig von der seitlichen Hochlage in die Tieflage bis zur Schleifflächenunterkante der Stromschiene geführt wird.The emergency guide plates provided on some of the ramp sections ensure that the current collector shoe is automatically and inevitably guided from the high position on the side to the low position to the lower edge of the contact surface of the conductor rail.
Eine Wartung des Stromschienenauflaufes ist nicht erforderlich. Bei Bedarf können verschlissene einzelne Rampenschüsse des Stromschienenauflaufes problemlos getauscht werden, ohne daß dabei in die Stromschienenanlage selbst eingegriffen werden muß.Maintenance of the conductor rail ramp is not required. If necessary, worn individual ramp sections of the conductor rail ramp can be easily replaced without having to intervene in the conductor rail system itself.
Die Erfindung wird nachstehend anhand der in der Zeichnung dargestellten Ausführungsbeispiele erläutert. Es zeigen:The invention is explained below using the embodiments shown in the drawing. The drawing shows:
Fig. 1 eine Seitenansicht des Stromschienenauflaufes,Fig. 1 a side view of the busbar run-up,
Mp.-Nr. 97/704 .·* ·4 · j .**«*··· ;*" 19. Dezember 1997Mp. No. 97/704 .·* ·4 · j .**«*··· ;*" 19 December 1997
Fig. 2 eine Sicht auf einen Abschnitt einer Weiche mit dem Stromschienenauflauf, Fig. 2 a view of a section of a switch with the conductor rail run-up,
Fig. 3 einen Schnitt A-A durch einen Rampenschuß erster Ausführungsform des Stromschienenauflaufes,Fig. 3 a section A-A through a ramp section of the first embodiment of the conductor rail run-up,
Fig. 3 einen Schnitt B-B durch einen Rampenschuß dritter Ausführungsform des Stromschienenauflaufes.Fig. 3 shows a section B-B through a ramp section of a third embodiment of the conductor rail run-up.
In Fig. 1 ist eine Seitenansicht des Stromschienenauflaufes dargestellt. Der Stromschienenauflauf 5 ist aus sechs unmittelbar nebeneinander angeordneten und auf einer durchgehenden Stromschiene 1 (Aluminium-Verbundstromschiene oder Stahl-Stromschiene) montierten Rampenschüssen 6, 7, 8, 9 zusammengesetzt, wobei jeder dieser Rampenschüsse die gleiche Länge a aufweist. Jeder der Rampenschüsse weist ein vorzugsweise feuerverzinktes Seitenblech 10 zur Führung des Stromabnehmerschleifschuhes des Schienenfahrzeuges (siehe hierzu Fig. 3) auf. Vom Rampenschuß 6 - der nachfolgend auch als Rampenschuß erster Ausführungsform bezeichnet wird - sind dabei drei Stück nebeneinander angeordnet., von den weiteren Rampenschüssen 7, 8, 9 ist jeweils nur ein Stück vorhanden.Fig. 1 shows a side view of the conductor rail ramp. The conductor rail ramp 5 is made up of six ramp sections 6, 7, 8, 9 arranged directly next to one another and mounted on a continuous conductor rail 1 (aluminum composite conductor rail or steel conductor rail), where each of these ramp sections has the same length a. Each of the ramp sections has a preferably hot-dip galvanized side plate 10 for guiding the current collector shoe of the rail vehicle (see Fig. 3). Three of the ramp sections 6 - which is also referred to below as the ramp section of the first embodiment - are arranged next to one another. Of the other ramp sections 7, 8, 9, only one is present.
Den Rampenschüssen 7, 8, 9 ist es gemeinsam, daß auf den Seitenblechen 10 zusätzliche vorzugsweise feuerverzinkte Notführungsbleche 11,12, 13 aufgeschweißt sind. Beim Rampenschuß 7 - der nachfolgend auch als Rampenschuß zweiter Ausführungsform bezeichnet wird - verläuft das Noführungsblech 11 von links nach rechts oben ansteigend. Im mittleren Abschnitt des Rampenschusses 8 - der nachfolgend auch als Rampenschuß dritter Ausführungsform bezeichnet wird - verläuft das Noführungsblech 12 waagerecht nahe der Unterkante des Seitenbleches 10 und steigt danach im rechten und linken Ast nach oben an. Beim Rampenschuß 9 - der nachfolgend auch als Rampenschuß vierter Ausführungsform bezeichnet wird - verläuft das Noführungsblech 13 von rechts nach links oben ansteigend. An den Trennfugen zwischen den Rampenschüssen 7, 8, 9 liegen sich die Stirnflächen der Notführungsbleche direkt gegenüber, so daß sich trotz der Aufteilung der Notfüh-The ramp sections 7, 8, 9 have in common that additional, preferably hot-dip galvanized, emergency guide plates 11, 12, 13 are welded onto the side plates 10. In the ramp section 7 - which is also referred to below as the ramp section of the second embodiment - the emergency guide plate 11 runs from left to right upwards. In the middle section of the ramp section 8 - which is also referred to below as the ramp section of the third embodiment - the emergency guide plate 12 runs horizontally near the lower edge of the side plate 10 and then rises upwards in the right and left branches. In the ramp section 9 - which is also referred to below as the ramp section of the fourth embodiment - the emergency guide plate 13 runs from right to left upwards. At the separation joints between ramp sections 7, 8, 9, the front surfaces of the emergency guide plates are directly opposite each other, so that despite the division of the emergency guide
Mp-Nr 97/704 ' ·* .5" · &iacgr; ** . *..i ·*&Iacgr;9. Dezember 1997Mp-No 97/704 ' ·* .5" · &iacgr; ** . *..i ·*&Iacgr;9. December 1997
rungsbleche auf drei Rampenschüsse 7, 8, 9 ein im wesentlichen versatzfreier Verlauf der Notführungsbleche ergibt.guide plates on three ramp sections 7, 8, 9, resulting in an essentially offset-free course of the emergency guide plates.
Die Montage der einzelnen Rampenschüsse 6 bis 9 erfolgt mit Hilfe von Befestigungsvorrichtungen, vorzugsweise feuerverzinkten Klauen 15 in der nachfolgend näher beschriebenen Art und Weise. Dabei ist jeder Rampenschuß vorzugsweise mittels drei lösbaren Befestigungsvorrichtungen, vorzugsweise Klauen 15 -welche mit den Seitenblechen 10 verschweißt sind - mit der Stromschiene 1 verbunden, wobei sich jeweils eine Befestigungsvorrichtung in den Endbereichen und eine Befestigungsvorrichtung im mittleren Bereich jedes Rampenschusses befindet.The individual ramp sections 6 to 9 are assembled using fastening devices, preferably hot-dip galvanized claws 15 in the manner described in more detail below. Each ramp section is preferably connected to the conductor rail 1 using three detachable fastening devices, preferably claws 15 - which are welded to the side plates 10 - with one fastening device in the end areas and one fastening device in the middle area of each ramp section.
Jeder Stromschienenauflauf an Weichen besteht vorzugsweise aus den drei Rampenschüssen 7, 8, 9 mit den Notführungen für das zwangsweise Absenken des Stromabnehmerschleifschuhes des Fahrzeuges unter die Stromschiene 1 an der Weichenspitze sowie in Abhängigkeit vom gegebenen Weichenradius aus zusätzlich drei, vier oder fünf Rampenschüssen 6. Bei einem Weichenradius von 190 m werden beispielsweise drei Rampenschüsse 6 und bei einem Weichenradius von 500 m werden beispielsweise fünf Rampenschüsse 6 verwendet. Jeder der Rampenschüsse 6 bis 9 ist vorzugsweise a = 1350 mm lang.Each conductor rail run-up at switches preferably consists of the three ramp sections 7, 8, 9 with the emergency guides for the forced lowering of the current collector shoe of the vehicle under the conductor rail 1 at the switch tip and, depending on the given switch radius, of an additional three, four or five ramp sections 6. For a switch radius of 190 m, for example, three ramp sections 6 are used and for a switch radius of 500 m, for example, five ramp sections 6 are used. Each of the ramp sections 6 to 9 is preferably a = 1350 mm long.
In Fig. 2 ist eine Sicht auf einen Abschnitt einer Weiche 22 mit dem erfindungsgemäßen Stromschienenauflauf 5 dargestellt. Die Verläufe des Streckengleises 23 und des Weichengleises 24 sowie die Lage der einzelnen Rampenschüsse 6 (drei Stück), 7, 8, 9 sind skizziert. Die Anordnung der einzelnen Befestigungsvorrichtungen, vorzugsweise Klauen 15 (drei Befestigungsvorrichtungen pro Rampenschuß) ist gut zu erkennen.Fig. 2 shows a view of a section of a switch 22 with the conductor rail run-up 5 according to the invention. The course of the main track 23 and the switch track 24 as well as the position of the individual ramp sections 6 (three pieces), 7, 8, 9 are sketched. The arrangement of the individual fastening devices, preferably claws 15 (three fastening devices per ramp section) is clearly visible.
In Fig. 3 ist ein Schnitt A-A durch einen Rampenschuß erster Ausführungsform 6 des Stromschienenauflaufes 5 dargestellt. Die genaue Lage des Schnittes A-A ist in Fig. 1 angegeben. Das Profil der Klauen 15 ist in der Schnitt-Darstellung gut zu erkennen. Einerseits weisen die Klauen 15 Keilkantenflächen auf, welche präzise in die Keilkantenflächen 2 der Stromschienen 1 eingreifen, wodurch die räumliche Lage insbesondere auch der Winkel des Seitenbleches gegenüber der Horizontalen - der einzelnen Rampenschüsse genau festgelegt wird. Da die Keilkantenflächen derIn Fig. 3, a section A-A through a ramp section of the first embodiment 6 of the busbar run-up 5 is shown. The exact position of the section A-A is shown in Fig. 1. The profile of the claws 15 can be clearly seen in the sectional view. On the one hand, the claws 15 have wedge edge surfaces which precisely engage in the wedge edge surfaces 2 of the busbars 1, whereby the spatial position - in particular the angle of the side plate relative to the horizontal - of the individual ramp sections is precisely determined. Since the wedge edge surfaces of the
Mp.-Nr. 97/704 #.* : !6 . j "#** * *..: .* 19. Dezember 1997Mp. No. 97/704 # .* : ! 6 . j "# ** * *..: .* 19 December 1997
Klauen 15 exakt an die Keilkantenflächen 2 der Stromschienen 1 angepaßt sind, ergeben sich zudem relativ große Kontaktflächen zur Stromübertragung. Die diesen Keilkantenflächen gegenüberliegenden Flächen der Klauen 15 sind um einen bestimmten Winkel gegenüber der Waagerechten geneigt, so daß sich die gewünschte, zur Führung der Stromabnehmerschleifschuhe geeignete Neigung der Seitenbleche 10 ergibt.Claws 15 are precisely adapted to the wedge edge surfaces 2 of the busbars 1, also result in relatively large contact surfaces for current transmission. The surfaces of the claws 15 opposite these wedge edge surfaces are inclined at a certain angle to the horizontal, so that the desired inclination of the side plates 10 is achieved, suitable for guiding the current collector grinding shoes.
In Höhe der Oberkante der Stromschiene 1 weist die Klaue 15 ein Widerlager 16 auf, welches bis zur Mitte der Stromschiene ragt. Eine im wesentlichen spiegelbildliche Konfiguration - bestehend aus einer vorzugsweise feuerverzinkten Gegenklaue 17 mit Widerlager 18 - befindet sich auf der gegenüberliegenden Seite der Stromschiene. In den Übergangsbereichen der Klauen bzw. Gegenklauen zu ihren Widerlagern sind Bohrungen eingebracht, welche das Durchstecken und Verbinden von Befestigungsbolzen 19, beispielsweise Schraubbolzen oder Nietbolzen, gestatten. Durch die Befestigungsbolzen 19 werden einerseits die Keilkantenflächen der Klauen 15 und Gegenklauen 17 in die entsprechenden Keilkantenflächen 2 der Stromschienen 1 gepreßt, während andererseits die Endbereiche der Widerlager 16, 18 von Klauen und Gegenklauen gegeneinanderdrücken. Auf diese Weise ergibt sich eine mechanisch stabile Befestigung.At the height of the upper edge of the busbar 1, the claw 15 has an abutment 16 which extends to the middle of the busbar. An essentially mirror-image configuration - consisting of a preferably hot-dip galvanized counter-claw 17 with abutment 18 - is located on the opposite side of the busbar. In the transition areas of the claws or counter-claws to their abutments bores are made which allow fastening bolts 19, for example screw bolts or rivet bolts, to be inserted and connected. On the one hand, the fastening bolts 19 press the wedge edge surfaces of the claws 15 and counter-claws 17 into the corresponding wedge edge surfaces 2 of the busbars 1, while on the other hand the end areas of the abutments 16, 18 of the claws and counter-claws press against each other. In this way, a mechanically stable fastening is achieved.
Eine Schutzabdeckung 20 mit winkelförmiger Zusatzschutzabdeckung 21 aus einem Kunststoffmaterial greift über den Stromschienenauflauf. Diese Schutzabdeckung ist über geeignete Muffen mit der weiteren Schutzabdeckung der Stromschienen 1 verbunden. A protective cover 20 with an angled additional protective cover 21 made of a plastic material extends over the busbar run-up. This protective cover is connected to the additional protective cover of the busbars 1 via suitable sleeves.
In Fig. 3 ist angedeutet, daß sich der vorgeschlagene Stromschienenauflauf universell sowohl für Aluminium-Verbundstromschienen als auch für Stahl-Stromschienen eignet. Die Unterkante der Stromschiene ist beispielhaft im linken Bereich als Schleifflächenunterkante 3 bei Aluminium-Verbundstromschienen und im rechten Bereich als Schleifflächenunterkante 4 bei Stahl-Stromschienen ausgebildet.Fig. 3 shows that the proposed busbar ramp is universally suitable for both aluminum composite busbars and steel busbars. The lower edge of the busbar is designed, for example, in the left-hand area as the lower edge of the grinding surface 3 for aluminum composite busbars and in the right-hand area as the lower edge of the grinding surface 4 for steel busbars.
In Fig. 4 ist ein Schnitt B-B durch einen Rampenschuß 8 dritter Ausführungsform des Stromschienenauflaufes 5 dargestellt. Die genaue Lage des Schnittes B-B ist in Fig. 1 angegeben, der Schnitt befindet sich etwa in der Mitte des Rampenschusses 8. AnIn Fig. 4, a section B-B through a ramp section 8 of the third embodiment of the conductor rail run-up 5 is shown. The exact position of the section B-B is shown in Fig. 1, the section is located approximately in the middle of the ramp section 8.
Mp.-Nr. 97/704 * .: J* , &Iacgr; * .* . %.] .**&Iacgr;9. Dezember 1997Mp. No. 97/704 * . : J* , &Iacgr; * .* . %.] .**&Iacgr;9 December 1997
dieser Stelle befindet sich das Notführungsblech 12 in horizontaler Position an der Unterkante des Seitenblechs 10. Zweckmäßig ist an dieser Position die Unterkante 25 des Seitenbleches 10 derart abgeflacht (beispielsweise abgeschliffen), daß sich ein im wesentlichen stufenloser Übergang für den Stromabnehmerschleifschuh vom Notführungsblech zur Schleifflächenunterkante der Stromschiene 1 ergibt.At this point, the emergency guide plate 12 is in a horizontal position on the lower edge of the side plate 10. At this position, the lower edge 25 of the side plate 10 is expediently flattened (e.g. ground down) in such a way that an essentially stepless transition for the current collector shoe from the emergency guide plate to the lower edge of the contact surface of the conductor rail 1 is obtained.
Der Anstieg des Notführungsbleches 12 bei seinem weiteren Verlauf längs des Seitenbleches und der Übergang zum weiteren Notführungsblech 11 sind angedeutet. Zur mechanischen Stabilisierung sind Verstrebungsbleche 14 - zweckmäßig drei Verstrebungsbleche je Rampenschuß 7, 8, 9 - zwischen den Seitenblechen 10 und den Notführungsblechen 12 vorgesehen, wobei die Montage wiederum durch Verschweißen erfolgt.The rise of the emergency guide plate 12 as it continues along the side plate and the transition to the further emergency guide plate 11 are indicated. For mechanical stabilization, bracing plates 14 - preferably three bracing plates per ramp section 7, 8, 9 - are provided between the side plates 10 and the emergency guide plates 12, with assembly again being carried out by welding.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE29722421U DE29722421U1 (en) | 1997-12-19 | 1997-12-19 | Busbar overrun on switches |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE29722421U DE29722421U1 (en) | 1997-12-19 | 1997-12-19 | Busbar overrun on switches |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE29722421U1 true DE29722421U1 (en) | 1998-02-26 |
Family
ID=8050182
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE29722421U Expired - Lifetime DE29722421U1 (en) | 1997-12-19 | 1997-12-19 | Busbar overrun on switches |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE29722421U1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009086865A1 (en) * | 2008-01-11 | 2009-07-16 | Paul Vahle Gmbh & Co. Kg | Flexible conductor line, particularly for point and crossover switches |
-
1997
- 1997-12-19 DE DE29722421U patent/DE29722421U1/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2009086865A1 (en) * | 2008-01-11 | 2009-07-16 | Paul Vahle Gmbh & Co. Kg | Flexible conductor line, particularly for point and crossover switches |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2069577B1 (en) | Vehicle restraint system | |
| DE102006025517B4 (en) | Line conveyor and chute section for this | |
| EP1927699B1 (en) | Traffic guide wall | |
| DE3324108C2 (en) | ||
| EP3575176A1 (en) | Rail vehicle with cable holder | |
| DE3447836A1 (en) | Cable trough for rail systems | |
| DE19735507C1 (en) | Roadway protective crash-barrier for vehicles | |
| DE29722421U1 (en) | Busbar overrun on switches | |
| DE2225707A1 (en) | TWO-RAIL CONVEYOR SYSTEM | |
| DE4234282C2 (en) | Channel shot for chain scraper conveyors, especially for use in mining companies | |
| DE9405557U1 (en) | Guardrail or road safety barrier | |
| DE102009030535B4 (en) | Multi-part rail chamber filling device | |
| DE2030437C3 (en) | Guide track for an extraction device attached to the excavation face of a chain conveyor | |
| DE3244038A1 (en) | GUTTER SHOT WITH SIDE PLANER GUIDE SHOT FOR USE IN PLANER PLANTS | |
| DE3701618C2 (en) | Ramp for loading bridge | |
| EP1693518B1 (en) | Guard rail | |
| DE4434027A1 (en) | Guide groove on bridge sections or the like. Of relocatable bridges and method for repairing same | |
| DE3522766C2 (en) | ||
| DE10250505B3 (en) | Device for protecting a building against the impact of rail vehicles | |
| EP0798419A1 (en) | Accessible and/or practicable device | |
| DE102017112011A1 (en) | Frame for a photovoltaic module and photovoltaic system | |
| DE102018121642A1 (en) | Signage lifting device, gantry bridge and method | |
| EP0758697B1 (en) | Guard rail | |
| DE9415420U1 (en) | Guide groove on bridge sections or the like. of relocatable bridges | |
| DE1515329C2 (en) | Device for connecting end-abutting sections of a composite busbar and device for supporting the same |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R207 | Utility model specification |
Effective date: 19980409 |
|
| R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20010214 |
|
| R081 | Change of applicant/patentee |
Owner name: BICC HOLDINGS GMBH, DE Free format text: FORMER OWNER: ABB DAIMLER-BENZ TRANSPORTATION (TECHNOLOGY) GMBH, 13627 BERLIN, DE Effective date: 20010510 |
|
| R081 | Change of applicant/patentee |
Owner name: BICC HOLDINGS GMBH, DE Free format text: FORMER OWNER: DAIMLERCHRYSLER AG, 70567 STUTTGART, DE Effective date: 20020816 |
|
| R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20040303 |
|
| R152 | Utility model maintained after payment of third maintenance fee after eight years |
Effective date: 20060119 |
|
| R071 | Expiry of right |