DE2512722A1 - Prefabricated wall-building elements - have blocks layered in frame enclosed by press plates and pressure infilled with binder - Google Patents

Prefabricated wall-building elements - have blocks layered in frame enclosed by press plates and pressure infilled with binder

Info

Publication number
DE2512722A1
DE2512722A1 DE19752512722 DE2512722A DE2512722A1 DE 2512722 A1 DE2512722 A1 DE 2512722A1 DE 19752512722 DE19752512722 DE 19752512722 DE 2512722 A DE2512722 A DE 2512722A DE 2512722 A1 DE2512722 A1 DE 2512722A1
Authority
DE
Germany
Prior art keywords
frame
blocks
cavities
press
press plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19752512722
Other languages
German (de)
Inventor
Horst Jaeger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ALFRED MEYER KG
Original Assignee
ALFRED MEYER KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ALFRED MEYER KG filed Critical ALFRED MEYER KG
Priority to DE19752512722 priority Critical patent/DE2512722A1/en
Publication of DE2512722A1 publication Critical patent/DE2512722A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/38Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
    • E04C2/384Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels with a metal frame
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/041Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres composed of a number of smaller elements, e.g. bricks, also combined with a slab of hardenable material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The system for production of prefabricated constructional elements consisting of square or cubic building blocks involves packing the blocks compactly into a framework such that they are precut in ordered layers with joint spacings and are in contact with one another. This layered pile is then enclosed by means of press plates at right angles to the framework and the joint spacings are infilled with a fluid, hardenable binder material under presure. The stack is left between the press plates until the binder material has set.

Description

Verfahren und Vorrichtung zur Herstellun von Fertig-Bauelementen Die Erfindung betrifft ein Verfahren und eine Vorrichtung zur Herstellung von Fertig-Bauelementen oder Wandbauteilen aus quader-oder wü@felförmigen Bausteinen.Method and device for the production of prefabricated components The invention relates to a method and a device for the production of prefabricated components or wall components made of cuboid or cube-shaped building blocks.

In der Bauwirtschaft ist man nehr und mehr bestre@t, die Bauweise mit Zeigelsteinen oder Blocksteinen mit dem großen Arbeits- und Arbeitskräfteaufwand an der Baustelle durch größere vorgefertigte Betonplatten und Bauelemente zu ersetzen, die an der Baustelle mit Kränen zusammengesetzt werden. Die Betonplatte sind aber häufig wegen ihrer Undurchlässigkeit für Luft nicht erwünscht. Um nun zu verhindern, da Zierel- oder Blocksteine an der Baustelle mühsam und zeitraubend durch Fachkräfte einzeln vermauert erden, sondern in größerer Anzahl vorgefertigt und ar der Baustelle miteinander verbunden werden, besteht das erfindun sgemäße Verfahren darin, daß an ihren Berühr@n sflächen untereinander und mit einem Rahmen zur Bildung von Fugenabständen mit vorspringenden Stegen oder dergl. versehene Bausteine in len Rahmen eingefüllt, dieser mit den Bausteinen zwischen rechtwinklig zur Rahmenachse angeordneten Preßplatten einer Preise gebracht, die Fugenhohlräume mit Druckwirkung mit einem fließbaren, erhärtenden Bindemittel ausgefüllt und die Rahmen mit den Bausteinen zumindest bis zum Erhärten der Füllmasse zwischen den Preßplatten belassen werden.In the construction industry there is more and more concern about the construction method with indicator stones or block stones with the large amount of labor and manpower to be replaced at the construction site with larger prefabricated concrete slabs and structural elements, which are assembled at the construction site with cranes. The concrete slab are however often undesirable because of their impermeability to air. To prevent now because decorative or block stones on the construction site are laborious and time-consuming for skilled workers earthed individually, but prefabricated in large numbers and ar the construction site are connected to one another, the method according to the invention consists in that at their contact surfaces with each other and with a frame to create joint spaces with protruding webs or the like. Provided blocks filled in len frame, this with the blocks between pressing plates arranged at right angles to the frame axis one price brought the joint cavities with pressure effect with a flowable, hardening binder filled and the frame with the building blocks at least up be left between the press plates to harden the filling compound.

Die Vorrichtung zur Ausübung ps Verfanrens setzt sich Ifl sesentlichen us einer Presse mit einer feststehenden und einer hydraulisch angetr@ebenen beweglichen Preßplatte, ja einem Behälter fürfließfähige Füllmasse uni flüssigem Härter mit Förderlruckpu,lpen und Antriebsmotor, einem Mischkopf und einer Druckleitung für die Hohlräume zusammen.The device for exercising ps Veranrens is essential us a press with a fixed and a hydraulically driven moving plane Press plate, yes a container for flowable filling compound with liquid hardener Förderlruckpu, lpen and drive motor, a mixing head and a pressure line for the cavities together.

Weiter@ Einzelheiten und Vorteile der Erfindung sind in der Beschreibung im Zusammenhang mit der Zeichnung näher erläutert. In der Zeichnung ist ein Ausführungsbeispiel der Vorrichtung zur Ausübung des Verfahrens und ein damit hergestelltes Bauelement schematisch dargestellt.Next @ details and advantages of the invention are in the description explained in more detail in connection with the drawing. In the drawing is an exemplary embodiment the device for performing the method and a component produced therewith shown schematically.

Es zeigt: Fig. 1 Ausführungsform eines nach dem Verfahren hergeotellten Wandbauelemente mit einem weg,ebrochenen Teil in perspektivischer Darstellung, Fig. 2 einen Schnitt längs der Linie II-II der Fig. 1, -Fig. 3 einen Schnitt längs der Linie III-III der Fig. 2, Fig. 4 eine Ausführungsform einer Presse zur Durchfuheng des Verfahrens in Seitenansicht, Fig. 5 eine schematische Darstellung einer Aufbereitungs- und Einspritzanlage für das Bindemittel.It shows: Fig. 1 embodiment of a manufactured according to the method Wall construction elements with a path, broken part in a perspective view, Fig. 2 shows a section along the line II-II of FIG. 1, -Fig. 3 shows a section along the Line III-III of FIG. 2, FIG. 4 shows an embodiment of a press for carrying out of the method in side view, Fig. 5 is a schematic representation of a processing and injection system for the binder.

Fi-. 1 zeigt in perspektivischer Ansicht ein Wandbauelement mit einem geschlossenen Rahmen l,in dem Bausteine 2 aufgeschichtet sind. Der lichte Querschnitt des Rahmens 1 ist noch nicht vollständig mit den Bausteinen 2 ausgefüllt. Zwischen den einzelnen Bausteinen 2 bzw.Fi-. 1 shows a perspective view of a wall element with a closed frame l in which building blocks 2 are stacked. The clear cross-section of the frame 1 is not yet completely filled with the building blocks 2. Between the individual building blocks 2 resp.

zwischen den Bausteinen 2 und dem angrenzenden Rahmen 1 sind vorstehende Stege oder Rippen 3 zur Bildung von Fugen angeordnet. Die vordtehenden Stege oder Rippen 3 verlaufen paarweise parellel mit Unterbrechungen 4 und lassen zwischen sich Hohlraume 4 frei, die unter sich durch die Ausnehmungen 4 verbunden sind. Diese Hohlräume 5 u. 6 sowie die Ausnehmungen 4 werden nach voilständiger Ausfüllung des Rahmens 1 mit den Bausteinen 2 nit einem Bindemittel gefüllt. Die einzelnen Bausteine 2 können als Voll- oder Hohlsteine ausgebildet sein und aus einem durchsichtigen oder undurchsichtigen Material bestehen.between the blocks 2 and the adjacent frame 1 are protruding Web or ribs 3 arranged to form joints. The protruding webs or Ribs 3 run in pairs in parallel with interruptions 4 and leave between cavities 4 are free, which are interconnected by the recesses 4. These Cavities 5 and 6 as well as the recesses 4 are after more complete Filling of the frame 1 with the building blocks 2 filled with a binder. the individual building blocks 2 can be designed as solid or hollow blocks and made of consist of a transparent or opaque material.

Zur Füllung der Hohlräume 5, 6 und der Ausnehmungen 4 mit einem Bindemittel wird der Rahmen 1 mit den lose eingelegten Wandbausteinen 2 in eine Presse (Fig. 4) zwischen zwei vertikalen Preßplatten 7 u. 8 gebracht. Die Preßplatte 8 ist ortsfest in einem festen Rahmen 9 der Presse angeordnet. Die Preßplatte 7 ist mittels Laufrollen lo auf zwei Laufschienen 1 beweglich angeordnet (in Fig. 4 nur eine sichtbar).For filling the cavities 5, 6 and the recesses 4 with a binding agent If the frame 1 with the loosely inserted wall modules 2 is placed in a press (Fig. 4) placed between two vertical press plates 7 and 8. The press plate 8 is stationary arranged in a fixed frame 9 of the press. The press plate 7 is by means of rollers lo arranged movably on two rails 1 (only one visible in FIG. 4).

Mittels hydraulischen Zylindern 12 kann die bewegliche Prebplatte 7 gegen die ortsfeste Preßplatte 8 gepreßt werden. Beide Preßplatten 7 u. 8 sind mit Schaumstoffmatten 12 verbunden. Liegt der Rahmen 1 zwischen den Preßplatten 7 u. 8, so wird die Preßplatte 7 mit Druck gegen die Preßplatte 8 gepreßt. Damit sind die Hohlräume 5, 6 und die Ausnehmungen 4 nach außen @bgeschlossen. Durch den Rahmen 1 im unteren Bereich ist eine Druckleitung 13 (Fig. 1 u. 4) hindurch geführt, welche in die Hohlräume 5,6 und die Ausnehmungen 4 mündet. Durch die obere Rahmenleiste ist eine Entlüftungsleitung 14 angeordnet, welche ebenfalls mit den Hohlräumen 5, 6 und den Ausnehmun en 4 verbunden ist. Wird nun unter Druck durch die Leitung 13 ein Bindemittel in die Hohlräume 5,6 und in die Ausnehmungen 4 gepreßt, so werden diese in dem Rahmen 1 von unten nach oben allmählich gefüllt, wobei die durch das Bindemittel verdrängte Luft durch die Entlüftungsleitung 14 entweicht, so daß eine lunkerfreie verbindung zwischen den 'titandbausteinen 2 und zwischen diesen und dem Rahmen 1 entsteht.By means of hydraulic cylinders 12, the movable pressure plate 7 are pressed against the stationary press plate 8. Both press plates 7 and 8 are connected to foam mats 12. If the frame 1 lies between the press plates 7 and 8, the press plate 7 is pressed against the press plate 8 with pressure. In order to the cavities 5, 6 and the recesses 4 are closed to the outside. Through the Frame 1 in the lower area is a pressure line 13 (Fig. 1 and 4) passed through it, which opens into the cavities 5, 6 and the recesses 4. Through the upper frame strip a vent line 14 is arranged, which is also connected to the cavities 5, 6 and the recess 4 is connected. Is now under pressure through line 13 a binding agent is pressed into the cavities 5, 6 and into the recesses 4, so this gradually filled in the frame 1 from bottom to top, whereby the through the Binder displaced air through the vent line 14 escapes, so that a void-free connection between the 'titanium building blocks 2 and between these and the frame 1 is created.

Als Bindemittel wird vorzugsweise ein Kunstharz, wie z.B. Polyesterharz, Polymethylmetakrylat-Gießharz, Epoxy-Harz, Polyurethan, usw.A synthetic resin, such as polyester resin, is preferably used as the binding agent. Polymethyl methacrylate casting resin, Epoxy resin, polyurethane, etc.

verwendet, das in einem Behälter 15 in flüssiger Form gelagert ist.used, which is stored in a container 15 in liquid form.

Ein zweiter Behälter 16 ist mit einem/ flüssigen Härter gefüllt. Den beiden Behältern 15 u. 16 ist je eine Druckpumpe 17 und 18 zugeordnet, die von einem Motor 19 angetrieben werden. Um das Bindemittel in den Rahmen 1 zu fördern, werden das Kunstharz aus dem Behälter 15 und der Härter aus dem Behälter 16 von den Pumpen 17 und 18 gleichzeitig durch Leitungen 20 und 21 in einen Mischkopf 22 gefördert,in dem die beiden Komponenten intensiv vermischt werden. Aus dem Mischkopf 22 führt die Druckleitung 13 (Fig. 1 u. 4 ) in den Rahmen 1 und wird mit Druck in die Hohlräume 5, 6, 4 gepreßt0 Das Verhältnis von Kunstharz zum Härter wird so gewählt, wie die Topfzeit benötigt wird. Sobald beim Füllen der Hohlräume im Rahmen 1 das Bindemittel in der Entlüfungsleitung 14 hochsteigt, kann die Bindemittelzufuhr durch die Druckleitung 13 abgestellt werden. Danach bleibt der Rahmen 1 mit den Wandbausteinen in vertikaler Lage unter Aufrechterhaltung des Preßdruckes zwischen den Preßplatten 7 u. 8 bis zur Aushärtung eingespannt und kann dann aus der Presse herausgenommen und verwendet werden.A second container 16 is filled with a / liquid hardener. The Both containers 15 and 16 are each assigned a pressure pump 17 and 18, which is operated by a Motor 19 are driven. To be able to promote the binder in the frame 1 the resin from the container 15 and the hardener from the container 16 from the pumps 17 and 18 conveyed simultaneously through lines 20 and 21 into a mixing head 22, in which the two components are intensively mixed. From the mixing head 22 leads the pressure line 13 (Fig. 1 and 4) in the frame 1 and is with pressure in the cavities 5, 6, 4 pressed0 The ratio of synthetic resin to hardener is chosen like that Pot life is needed. As soon as when filling the cavities in the frame 1 the binder rises in the vent line 14, the binder supply can through the pressure line 13 can be turned off. After that, the frame 1 with the wall modules remains in a vertical position Position while maintaining the pressing pressure between the pressing plates 7 and 8 to clamped for curing and can then be removed from the press and used will.

Claims (1)

Patentansprflche Claims Verfahren zur Herstellung von Fertig-Bauelementen aus quader- oder würfelförmigen Bausteinen, dadurch gekennzeichnet, dass an ihren Berahungsflächen untereinander und mit einem Rahmen zur Bildung von Fugenabständen mit vorspringenden Stegen oder dergl. versehene Bausteine in den Rahmen eingefüllt, dieser mit den Bausteinen zwischen rechtwinklig zur Rahmenachse angeordneten Pressplatten einer Presse gebracht, die Fugenhohlräume mit Druckwirkung mit einem fliessbaren, erhärtenden Bidenmittel ausgefüllt und die Rahmen mit den Bausteinen zumindest bis zum Erhärten der Füllmasse zwischen den Pressplatten belassen werden.Process for the production of prefabricated components from cuboid or cube-shaped building blocks, characterized in that on their approximated surfaces among each other and with a frame for the formation of joint spacings with protruding Bars or the like. Provided blocks filled into the frame, this with the Blocks between press plates arranged at right angles to the frame axis Press brought the joint cavities with pressure effect with a flowable, hardening Bidenmittel filled and the frame with the blocks at least until it hardens the filling compound can be left between the press plates. 2. Vorrichtung zur Ausübung des Verfahrens nach Anspruch 1, dadurch gekennzeichnet, dass sie sich im wesentlichen auseiner Presse (9) mit einer feststehenden (8) und einer hydraulisch angetriebenen beweglichen Pressplatte (7), Je einem Behälter (1), 16) für fliessfähige Füllmasse und flüssigen Härter (18), mit Förderdruckpumpen (17, 18), mit Antriebsmotor (19), einem Mischkopf (22) und einer nach den Hohlräumen führenden Druckleitung, sowie einer Entlüftungsleitung für die Hohlräume zusammen setzt Nach dem Verfahren nach Anspruch 1 hergestelltes Fertig-Bauelement. dadurch gekennzeichnet, dass es sich aus einem Rahmen (1) und darin aufgeschichteten und mit einem Bindemittel fest verbundenen würfelförmigen Bausteinen zusammensetzt.2. Apparatus for performing the method according to claim 1, characterized characterized in that it consists essentially of a press (9) with a fixed one (8) and a hydraulically driven movable press plate (7), one container each (1), 16) for flowable filling compound and liquid hardener (18), with feed pressure pumps (17, 18), with drive motor (19), a mixing head (22) and one after the cavities leading pressure line, as well as a ventilation line for the cavities together sets prefabricated component produced by the method according to claim 1. through this characterized in that it consists of a frame (1) and stacked therein and with a binding agent firmly connected cube-shaped building blocks. 4. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass als Bindemittel ein kalt aushärtender Füllstoff verwendet wird.4. The method according to claim 1, characterized in that as a binder a cold setting filler is used. 5. Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass der kalt aushärtende Füllstoff aus Polyesterharz besteht.5. The method according to claim 4, characterized in that the cold curing filler is made of polyester resin. 6. Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass der kaft aushärtende Füllstoff aus Polymethyl-Metakrylat-Giessharz besteht.6. The method according to claim 4, characterized in that the kaft The hardening filler consists of polymethyl methacrylate casting resin. 7. Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass der aushärtende Füllstoff aus Epoxy-Harz besteht.7. The method according to claim 4, characterized in that the hardening Filler is made up of epoxy resin. 8. - Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass d aushärtende Füllstoff aus Polyurethan-Giessharz besteht.8. - The method according to claim 4, characterized in that d hardening The filler consists of polyurethane casting resin. 9. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, dass zwischen den Pressplatten (7,8) und dem Rahmen (1) elastische Matten, vorzugsweise aus Schaumstoff eingelegt sind.9. The device according to claim 2, characterized in that between the pressing plates (7, 8) and the frame (1) are elastic mats, preferably made of foam are inserted. 10. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der Rahmen mit den eingefüllten Bausteinen in vertikaler Lage zwischen den Pressplatten eingelegt wird und die Fugenhohlräume zwischen den Bausteinen und zwischen diesen und dem Rahmen im unteren Bereich mit Füll- und Bindemasse gefüllt und die Luft aus den Fugen-Hohlräumen im oberen Bereich abgelassen wird.10. The method according to claim 1, characterized in that the frame inserted with the filled building blocks in a vertical position between the press plates and the joint cavities between the blocks and between them and the Frame in the lower area filled with filling and binding compound and the air out of the Joint cavities in the upper area is drained. 11. Wand-Bauelement nach Anspruch 3, dadurch gekennzeichnet, dass die Bausteine aus spritzfähigen Thermoplasten bestehen.11. Wall component according to claim 3, characterized in that the building blocks consist of injectable thermoplastics. 12. Wand-Bauelement nach Anspruch 3, dadurch gekennzeichnet, dass die Bausteine auf den einander und dem Rahmen (1) zugekehrten Seitenflächen mit fugenbildenden Abstandsrippen (3) und zwischen diesen mit zusammenliegenden Fugenhohlräumen versehen sind.12. Wall component according to claim 3, characterized in that the blocks on the side faces facing each other and the frame (1) gap-forming spacer ribs (3) and between these with joint cavities are provided.
DE19752512722 1975-03-22 1975-03-22 Prefabricated wall-building elements - have blocks layered in frame enclosed by press plates and pressure infilled with binder Pending DE2512722A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19752512722 DE2512722A1 (en) 1975-03-22 1975-03-22 Prefabricated wall-building elements - have blocks layered in frame enclosed by press plates and pressure infilled with binder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19752512722 DE2512722A1 (en) 1975-03-22 1975-03-22 Prefabricated wall-building elements - have blocks layered in frame enclosed by press plates and pressure infilled with binder

Publications (1)

Publication Number Publication Date
DE2512722A1 true DE2512722A1 (en) 1976-10-07

Family

ID=5942151

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19752512722 Pending DE2512722A1 (en) 1975-03-22 1975-03-22 Prefabricated wall-building elements - have blocks layered in frame enclosed by press plates and pressure infilled with binder

Country Status (1)

Country Link
DE (1) DE2512722A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3230078A1 (en) * 1982-08-12 1984-02-16 Kalksandsteinwerke Thoerl & Meyer GmbH & Co KG, 2000 Hamburg Prefabricated planar building element and method for manufacturing the same
WO2004020760A1 (en) * 2002-08-28 2004-03-11 Uh-Rakennus Oy A method for bricklaying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3230078A1 (en) * 1982-08-12 1984-02-16 Kalksandsteinwerke Thoerl & Meyer GmbH & Co KG, 2000 Hamburg Prefabricated planar building element and method for manufacturing the same
WO2004020760A1 (en) * 2002-08-28 2004-03-11 Uh-Rakennus Oy A method for bricklaying

Similar Documents

Publication Publication Date Title
DE1949209A1 (en) Method and device for manufacturing components
DE2604326A1 (en) DECORATIVE ELEMENT
EP0046272B1 (en) Method of manufacturing machine parts, e.g. machine tool columns
DE2512722A1 (en) Prefabricated wall-building elements - have blocks layered in frame enclosed by press plates and pressure infilled with binder
DE2714016C3 (en) Process for the production of a two-layer board
DE2518978A1 (en) THERMAL INSULATION COMPOSITE PANEL AND METHOD FOR MANUFACTURING IT
DE2915417A1 (en) METHOD FOR CONNECTING CONSTRUCTION OR CONSTRUCTION ELEMENTS AND CONSTRUCTION AND CONSTRUCTION ELEMENTS PRODUCED BY THE METHOD
DE2924867A1 (en) METHOD FOR PRODUCING A PRODUCT IMITATING A BRICK OR NATURAL STONE ARRANGEMENT, AND PEDESTRATION ELEMENT PRODUCED BY THE METHOD
EP0592695A1 (en) Assembly for prestressed concrete moulded elements
DE3410751C2 (en) Process for producing a matrix for the production of facade elements with a structured visible surface made of concrete
DE4131161C2 (en)
DE813008C (en) Process for the production of press plates for building purposes
DE4111151C2 (en) Process for grouting panel coverings and device for carrying out this process
DE2244007A1 (en) TRACK
DE29906967U1 (en) formwork
EP0004604A1 (en) Stair tread and method for its manufacture
DE2711198A1 (en) METHOD AND MOLDING TOOL FOR MANUFACTURING POINT-LOADABLE POLYGON-SHAPED BUILDING PANEL, IN PARTICULAR DOUBLE BOTTOM PANEL AND A CORE FOR USE IN THE MANUFACTURING OF THE BUILDING PANEL
DE10046407B4 (en) Process for producing a formwork element made of fiber cement
DE1509973C3 (en) Flexible, prefabricated covering board made of tiles
DE1459285C (en) Molding box for the production of concrete molded blocks
DE838948C (en) Process for the production of building structures, such as walls, ceilings and. Like., made of lightweight concrete
DE726336C (en) Method and device for the production of hollow bricks from lightweight building materials
DE2049304A1 (en) Large-area carrier plate, arched in one direction, coated with plastic on at least one side, and process for its production
DE4031643A1 (en) Casting reinforced concrete building plates-blocks - using filler blocks held in place by spikes on reinforcement mesh as concrete is cast around them
DE2201724A1 (en) CERAMIC PANEL

Legal Events

Date Code Title Description
OHJ Non-payment of the annual fee