DE20303135U1 - House of especially wood and with two floor levels has first infrastructure container with services room and house connection for power and water supply, and infrastructure containers have technical plane adjacent to sidewall - Google Patents
House of especially wood and with two floor levels has first infrastructure container with services room and house connection for power and water supply, and infrastructure containers have technical plane adjacent to sidewallInfo
- Publication number
- DE20303135U1 DE20303135U1 DE20303135U DE20303135U DE20303135U1 DE 20303135 U1 DE20303135 U1 DE 20303135U1 DE 20303135 U DE20303135 U DE 20303135U DE 20303135 U DE20303135 U DE 20303135U DE 20303135 U1 DE20303135 U1 DE 20303135U1
- Authority
- DE
- Germany
- Prior art keywords
- infrastructure
- house
- container
- containers
- house according
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 6
- 239000002023 wood Substances 0.000 title abstract 2
- 238000010438 heat treatment Methods 0.000 claims abstract description 8
- 238000010616 electrical installation Methods 0.000 claims abstract description 4
- 238000009423 ventilation Methods 0.000 claims abstract description 4
- 238000009434 installation Methods 0.000 claims description 4
- 230000001419 dependent effect Effects 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005338 heat storage Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34869—Elements for special technical purposes, e.g. with a sanitary equipment
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Health & Medical Sciences (AREA)
- Epidemiology (AREA)
- Public Health (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Residential Or Office Buildings (AREA)
Abstract
Description
PatentanwältePatent attorneys
European Patent and Trademark AttorneysEuropean Patent and Trademark Attorneys
Anmelder: Jörg Sturm
Anwaltsakte: G-STU 10Applicant: Jörg Sturm
Attorney file: G-STU 10
BeschreibungDescription
Die vorliegende Erfindung betrifft ein Haus, insbesondere Holzhaus mit mindestens zwei Geschossebenen und je einem Infrastrukturcontaxner je Geschossebene, die aufeinander abgestimmt und übereinander angeordnet sind, wobei die Infrastrukturcontainer für an sie angrenzende Räume einen Flur mit jeweils einer Innentür als Zugang zu den angrenzenden Räumen aufweisen, wobei die den Räumen benachbarten Seitenwandungen der Infrastrukturcontainer eine Innenwand der angrenzenden Räume bilden, und wobei die Infrastrukturcontainer im Flurbereich eine Treppe zur nächsten Geschossebene aufweisen.The present invention relates to a house, in particular a wooden house with at least two storeys and one infrastructure container per storey, which are coordinated with one another and arranged one above the other, wherein the infrastructure containers for rooms adjacent to them have a corridor with an inner door as access to the adjacent rooms, wherein the side walls of the infrastructure containers adjacent to the rooms form an inner wall of the adjacent rooms, and wherein the infrastructure containers in the corridor area have a staircase to the next storey.
Aus der Internetseite „http://www.plandach.de/modulbau.htm" ist es bekannt, beim Hausbau sogenannte Zellen oder Infrastrukturcontainer zu verwenden. Beispielsweise in Form eines Containers, der ein Treppenhaus mit Diele beinhaltet. Hierzu können mehrere Container übereinander gesetzt werden, die dann das Treppenhaus bilden. Für angrenzende Räume bilden diese Container die Diele bzw. einen Flur mit Türen als Zugang zu angrenzenden Räumen. Nachteilig bei diesen übereinander stapelbaren Containern ist, dass sie zwar der Infrastruktur eines Hauses dienen, aber nicht die gesamte Infrastruktur eines Hauses beinhalten. Von der gleichen Internetseite sind sogenannte Diele / WC Module für Reihen- und Doppelhäuser bekannt. Diese für das Erdgeschoss vorgesehenen Module weisen eine Diele mit einem Zugang zu einem Haustechnikraum und zu einem WC auf. Auch diese Zellen sind nicht vorgesehen, die gesamte Infrastruktur eines Hauses zu beinhalten. Es ist auch nicht vorgesehen, diese übereinander zu stapeln. WeiterhinFrom the website "http://www.plandach.de/modulbau.htm" it is known to use so-called cells or infrastructure containers when building houses. For example in the form of a container that contains a staircase with a hallway. For this purpose, several containers can be placed on top of each other, which then form the staircase. For adjacent rooms, these containers form the hallway or a corridor with doors as access to adjacent rooms. The disadvantage of these containers that can be stacked on top of each other is that although they serve the infrastructure of a house, they do not contain the entire infrastructure of a house. From the same website, so-called hallway / toilet modules for terraced and semi-detached houses are known. These modules intended for the ground floor have a hallway with access to a building services room and a toilet. These cells are also not intended to contain the entire infrastructure of a house. It is also not intended to stack them on top of each other. Furthermore
sind, beispielsweise auch von der obengenannten Internetseite, sogenannte Bad-Zellen bekannt. Derartige Bäder-Zellen finden insbesondere für Wohnheime und Hotels Verwendung. Auch diese Zellen lösen lediglich nur Teilaspekte der Infrastruktür eines Hauses.So-called bathroom cells are known, for example from the above-mentioned website. Such bathroom cells are used in particular in dormitories and hotels. These cells also only solve partial aspects of the infrastructure of a house.
Weiterhin ist es aus der WO 95/11356 bekannt, ein mehrgeschossiges Wohnhaus mit wenigstens einem Wohnraumteil am Wohnhausort zu erstellen. Erst nach Erstellung der Wohnraumteile werden dann außen an der Außenseite austauschbare Raumzellen angeordnet, welche die Wohninfrastruktur ohne Treppenhaus enthalten. Nachteilig dabei ist, dass diese Infrastrukturcontainer lediglich über eine Seite mit den Wohnraumteilen verbunden sind. Diese Container werden ohne Abstand nebeneinander gesetzt und übereinander gestapelt. Diese Container ähneln damit bekannten Nasszellen, die von außen an ein Gebäude „angedockt" werden können. Diese Container sind jedoch nicht geeignet, um die innere Infrastruktur wie Treppenhaus, Diele etc. zu bilden.Furthermore, it is known from WO 95/11356 to build a multi-storey residential building with at least one living area on the residential site. Only after the living areas have been built are exchangeable room cells arranged on the outside, which contain the living infrastructure without a staircase. The disadvantage here is that these infrastructure containers are only connected to the living areas on one side. These containers are placed next to each other without any gaps and stacked on top of each other. These containers are therefore similar to known wet rooms that can be "docked" to a building from the outside. However, these containers are not suitable for forming the internal infrastructure such as a staircase, hallway, etc.
Bei der Erstellung eines Holzhauses besteht das Problem, dass der Zimmermann ohne Schwierigkeiten das Haus einschließlich Dach erstellen kann, jedoch für die Gewerke Heizung, Sanitär und Elektro auf die entsprechenden Fachleute angewiesen ist.The problem with building a wooden house is that the carpenter can build the house including the roof without any difficulty, but is dependent on the appropriate specialists for the heating, plumbing and electrical trades.
Aufgabe der vorliegenden Erfindung ist es daher, die bekannten Infrastrukturcontainer so zu verbessern, dass die Container zum einen möglichst umfassend die gesamte Infrastruktur aufweisen, einschließlich Diele und Treppenhaus, und zum anderen alle nicht vom Zimmermann durchzuführenden Gewerke enthalten. Gleichzeitig sollen die verwendeten Container ausreichend Spielraum für die Gestaltung der an die Container angrenzenden Räume aufweisen und nicht von außen in beeinträchtigender Weise als Container erkannt werden und damit das äußere Erscheinungsbild des zu erstellenden Hauses beeinflussen. The aim of the present invention is therefore to improve the known infrastructure containers so that the containers, on the one hand, contain the entire infrastructure as comprehensively as possible, including the hallway and staircase, and, on the other hand, contain all the trades that cannot be carried out by the carpenter. At the same time, the containers used should have sufficient scope for the design of the rooms adjacent to the containers and should not be recognized as containers from the outside in a detrimental way, thus affecting the external appearance of the house to be built.
Diese Aufgabe wird in Verbindung mit dem Oberbegriff des Anspruches 1 dadurch gelöst, dass ein erster Infrastrukturcon-This object is achieved in conjunction with the preamble of claim 1 in that a first infrastructure con-
tainer einen Technikraum und einen Hausanschluss zur Energie- und Wasserversorgung aufweist, dass die Infrastrukturcontainer mindestens einer Seitenwandung benachbart eine vertikale Technikebene aufweisen, wobei die vertikalen Technikebenen übereinandergestapelter Infrastrukturcontainer funktionsgerecht miteinander verbunden sind, und dass die Technikebenen sanitäre Ver- und Entsorgungsleitungen, elektrische Versorgungsleitungen und / oder Elektroinstallationen und / oder Heizungsverrohrung und / oder Lüftungskanäle aufweisen.
10tainer has a technical room and a house connection for energy and water supply, that the infrastructure containers have a vertical technical level adjacent to at least one side wall, wherein the vertical technical levels of stacked infrastructure containers are functionally connected to one another, and that the technical levels have sanitary supply and disposal lines, electrical supply lines and / or electrical installations and / or heating piping and / or ventilation ducts.
10
Durch den erfindungsgemäßen Infrastrukturcontainer kann praktisch die gesamte Infrastruktur eines Hauses sichergestellt werden. So bilden die Infrastrukturcontainer nicht nur zumindest einen Teil der Innentüren und Innenwände sowie Flur bzw. Diele und Treppe, sondern auch die gesamte technische Versorgung einschließlich Hausanschluss zur Energie- und Wasserversorgung sowie die gesamte Heizungsverrohrung, Elektrik- und Sanitärinstallation. Die dem Zimmermann fremden Gewerke sind damit alle in den Infrastrukturcontainern enthalten. Dadurch ist es möglich, die Infrastrukturcontainer aufzustellen und miteinander zu verbinden und anschließend die übrigen Räume um die Infrastrukturcontainer herum zu bauen, so dass das Haus allein von den Zimmerleuten fertiggestellt werden kann. Mit den Infrastrukturcontainern wird die gesamte Infrastruktür des Hauses erfasst, gleichzeitig bleiben jedoch eine Vielzahl von Möglichkeiten zur individuellen Gestaltung des gesamten Hauses. Dabei ist es auch möglich, zwei Technikebenen an einander gegenüberliegenden Stirn- oder Längsseiten anzuordnen. Die komplexe Installation der Technikebenen (Verrohrung und Installation) kann vorteilhaft von außen her vorgenommen werden.The infrastructure container according to the invention can be used to ensure practically the entire infrastructure of a house. The infrastructure containers not only form at least part of the interior doors and walls as well as the hallway and stairs, but also the entire technical supply including the house connection to the energy and water supply as well as the entire heating piping, electrical and sanitary installation. The trades that are foreign to the carpenter are therefore all contained in the infrastructure containers. This makes it possible to set up the infrastructure containers and connect them to one another and then build the remaining rooms around the infrastructure containers so that the house can be completed by the carpenters alone. The infrastructure containers cover the entire infrastructure door of the house, but at the same time there are a multitude of options for customizing the entire house. It is also possible to arrange two technical levels on opposite front or long sides. The complex installation of the technical levels (piping and installation) can advantageously be carried out from the outside.
Gemäß einer bevorzugten Ausführungsform der Erfindung weist der erste Infrastrukturcontainer im Boden- und Deckenbereich eine horizontale Technikebene auf, die mit der vertikalen Technikebene verbunden ist. Die vertikale Technikebene und die horizontalen Technikebenen sind dabei vorzugsweise der gleichen Seitenwandung des Infrastrukturcontainers benach-According to a preferred embodiment of the invention, the first infrastructure container has a horizontal technical level in the floor and ceiling area, which is connected to the vertical technical level. The vertical technical level and the horizontal technical levels are preferably adjacent to the same side wall of the infrastructure container.
bart. Der über dem ersten Infrastrukturcontainer angeordnete zweite Infrastrukturcontainer benötigt dabei lediglich eine horizontale Technikebene im Deckenbereich, da er im Bodenbereich ggf. die horizontale Technikebene im Deckenbereich des unteren Containers nutzen kann. Grundsätzlich kann aber auch der zweite Infrastrukturcontainer im Bodenbereich eine eigene horizontale Technikebene aufweisen.bart. The second infrastructure container arranged above the first infrastructure container only requires a horizontal technical level in the ceiling area, since it can use the horizontal technical level in the ceiling area of the lower container in the floor area if necessary. In principle, however, the second infrastructure container can also have its own horizontal technical level in the floor area.
Unterhalb des ersten Infrastrukturcontainers kann beispielsweise ein Fertigkeller oder eine Fertiggarage angeordnet sein, auf der der erste Infrastrukturcontainer sich abstützt. Dabei ist der Fertigkeller bzw. die Fertiggarage vorzugsweise als ein Betonfertigteil ausgebildet. Der erste Infrastrukturcontainer kann dabei einen Technikraum aufweisen, in dem die Heizungsanlage angeordnet ist. Weiterhin können im ersten Infrastrukturcontainer neben einem WC auch ein Hauswirtschaftsraum angeordnet sein. Die Infrastrukturcontainer können grundsätzlich komplett ausgerüstet sein. Der über dem ersten Infrastrukturcontainer angeordnete zweite Infrastrukturcontainer kann beispielsweise ein Bad aufweisen, da wegen des nicht benötigten Technikraumes mehr Platz zur Verfügung steht.For example, a prefabricated basement or garage can be arranged below the first infrastructure container, on which the first infrastructure container is supported. The prefabricated basement or garage is preferably designed as a prefabricated concrete part. The first infrastructure container can have a technical room in which the heating system is located. In addition to a toilet, a utility room can also be arranged in the first infrastructure container. The infrastructure containers can generally be fully equipped. The second infrastructure container arranged above the first infrastructure container can, for example, have a bathroom, since more space is available due to the technical room not being required.
Gemäß einer weiteren bevorzugten Ausführungsform der Erfindung weisen die Infrastrukturcontainer einen rechteckigen Querschnitt auf und sind so in dem zu erstellenden Haus angeordnet, dass sie mit ihren gegenüberliegenden Stirnwandungen den Hauswandungen unmittelbar benachbart sind. Dabei bilden die Längswandungen der Infrastrukturcontainer die Innenwände von benachbarten Räumen, so dass der Zugang zu den links und rechts der Infrastrukturcontainer liegenden Räume über den Flur der Infrastrukturcontainer bzw. über deren Treppe erfolgt. Die Innentüren zu den Räumen weisen die Infrastrukturcontainer ebenfalls bereits auf.
35According to a further preferred embodiment of the invention, the infrastructure containers have a rectangular cross-section and are arranged in the house to be built in such a way that their opposite end walls are immediately adjacent to the house walls. The longitudinal walls of the infrastructure containers form the inner walls of adjacent rooms, so that access to the rooms to the left and right of the infrastructure containers is via the corridor of the infrastructure containers or via their stairs. The infrastructure containers also already have the inner doors to the rooms.
35
Die Infrastrukturcontainer werden nach einer weiteren Ausführungsform der Erfindung so angeordnet, dass sie mit einer Stirnwandung und einer angrenzenden Längswandung zwei imAccording to a further embodiment of the invention, the infrastructure containers are arranged in such a way that they form two
• ··
• ··
• ··
rechten Winkel zueinander angeordneten Hausaußenwandungen unmittelbar benachbart sind. Dadurch bildet eine Längswandung und eine Stirnwandung der Infrastrukturcontainer jeweils die Innenwand von benachbarten Räumen.The external walls of the house, which are arranged at right angles to each other, are immediately adjacent. As a result, a longitudinal wall and a front wall of the infrastructure container each form the inner wall of adjacent rooms.
Während der erste der Infrastrukturcontainer in der Regel in einem Vollgeschoss angeordnet sein wird, kann der zweite bzw. der jeweils oberste Infrastrukturcontainer sowohl in einem Vollgeschoss als auch in einem Dachgeschoss angeordnet werden. Soweit der dem obersten Geschoss angeordnete Infrastrukturcontainer in einem Dachgeschoss angeordnet ist, kann er so angeordnet werden, dass er das Dach gaubenförmig durchdringt und damit zwei Dachgauben bildet.While the first of the infrastructure containers will usually be located on a full floor, the second or topmost infrastructure container can be located on a full floor or in an attic. If the infrastructure container on the top floor is located in an attic, it can be arranged in such a way that it penetrates the roof in a dormer-like manner, thus forming two dormer windows.
Grundsätzlich ist es auch möglich, einen dritten oder weiteren Infrastrukturcontainer, beispielsweise zur Erstellung eines Reihenhauses, über den anderen Infrastrukturcontainer anzuordnen. Die Erschließung des zweiten Obergeschosses kann dann beispielsweise über einen außen angeordneten Laubengang erfolgen.In principle, it is also possible to arrange a third or further infrastructure container, for example to build a terraced house, above the other infrastructure container. The second floor can then be accessed via an external arcade, for example.
Weitere Einzelheiten der Erfindung ergeben sich aus der nachfolgenden ausführlichen Beschreibung und den beigefügten Zeichnungen, in denen bevorzugte Ausfuhrungsformen der Erfindung beispielhaft veranschaulicht sind.Further details of the invention emerge from the following detailed description and the accompanying drawings, in which preferred embodiments of the invention are illustrated by way of example.
In den Zeichnungen zeigen:The drawings show:
Figur 1: Eine Seitenansicht eines Hauses mit einem ersten Infrastrukturcontainer in einem Vollgeschoss undFigure 1: A side view of a house with a first infrastructure container in a full floor and
einem zweiten Infrastrukturcontainer in einem Dachgeschoss, a second infrastructure container in an attic,
Figur 2: eine Seitenansicht des Hauses von Figur 1 aus Richtung II,Figure 2: a side view of the house of Figure 1 from direction II,
Figur 3: eine Schnittdarstellung des Erdgeschosses von Figur 1 in Draufsicht,Figure 3: a sectional view of the ground floor of Figure 1 in plan view,
Figur 4: eine Schnittdarstellung des Dachgeschosses von Figur 1 in Draufsicht,Figure 4: a sectional view of the attic of Figure 1 in plan view,
Figur 5: eine schematische Vorderansicht eines Hauses im Schnitt mit Fertigkeller, ersten InfrastrukturconFigure 5: a schematic front view of a house in section with prefabricated basement, first infrastructure con
tainer in einem Vollgeschoss und zweiten Infrastrukturcontainer in einem Dachgeschoss,tainer in a full floor and second infrastructure container in an attic,
Figur 6: eine schematische Darstellung zweier übereinander &iacgr;&ogr; gestapelter Infrastrukturcontainer mit vertikalenFigure 6: a schematic representation of two infrastructure containers stacked on top of each other with vertical
und horizontalen Technikebenen,and horizontal technology levels,
Figur 7: eine Vorderansicht eines Hauses im Schnitt, mit Anordnung von Infrastrukturcontainern in Vollgeschossen, Figure 7: a front view of a house in section, with arrangement of infrastructure containers in full floors,
Figur 8: eine Schnittdarstellung des Erdgeschosses von Figur 7 in Draufsicht,Figure 8: a sectional view of the ground floor of Figure 7 in plan view,
Figur 9: eine Schnittdarstellung des Obergeschosses von Figur 7 in Draufsicht,Figure 9: a sectional view of the upper floor of Figure 7 in plan view,
Figur 10: eine Schnittdarstellung eines Untergeschosses in Draufsicht undFigure 10: a sectional view of a basement in plan view and
Figur 11: eine räumliche Darstellung eines ersten und zweiten Infrastrukturcontainers sowie einer Containerdecke des zweiten Infrastrukturcontainers.Figure 11: a spatial representation of a first and second infrastructure container as well as a container ceiling of the second infrastructure container.
Das Haus 1 besteht im Wesentlichen aus einem ersten Infrastrukturcontainer 2, einem zweiten Infrastrukturcontainer 3 und angrenzenden Räumen 4, 5, 6, 7.House 1 essentially consists of a first infrastructure container 2, a second infrastructure container 3 and adjacent rooms 4, 5, 6, 7.
Das Haus 1 weist einen im Wesentlichen rechtwinkligen Querschnitt mit einer ersten Längswand 8, einer parallelen zweiten Längswand 9, sowie einer ersten Stirnwand 10 und einer zweiten Stirnwand 11 auf.The house 1 has a substantially rectangular cross-section with a first longitudinal wall 8, a parallel second longitudinal wall 9, as well as a first end wall 10 and a second end wall 11.
Das Haus 1 weist entsprechend Figur 1 in seinem Erdgeschoss 12 den ersten Infrastrukturcontainer 2 auf. Der erste Infrastrukturcontainer 2 weist einen rechteckigen Querschnitt auf und ist so in dem Erdgeschoss angeordnet, dass seine einander gegenüberliegenden Stirnwandungen 13, 14 HausaußenwandungenAccording to Figure 1, the house 1 has the first infrastructure container 2 on its ground floor 12. The first infrastructure container 2 has a rectangular cross-section and is arranged on the ground floor in such a way that its opposite end walls 13, 14 are the house's external walls
15, nämlich den Längswänden 8, 9, unmittelbar benachbart sind. Die beiden einander gegenüberliegenden Längswandungen15, namely the longitudinal walls 8, 9, are immediately adjacent. The two opposite longitudinal walls
16, 17 des ersten Infrastrukturcontainer 2 bilden damit Innenwände 18 von an den ersten Infrastrukturcontainer 2 angrenzenden Räumen 4, 5. Der zweite Infrastrukturcontainer 3 weist im Wesentlichen die gleichen Außenmaße auf und ist über den ersten Infrastrukturcontainer 2 so angeordnet, dass seine Stirnwandungen 19, 20 mit den Stirnwandungen 13, 14 und seine Längswandungen 21, 22 mit den Längswandungen 16, 17 des ersten Infrastrukturcontainer 2 fluchten. Der zweite Infrastrukturcontainer 3 ist im Dachgeschoss 23 des Hauses 1 angeordnet und durchdringt das Dach 24 gaubenförmig.16, 17 of the first infrastructure container 2 thus form inner walls 18 of rooms 4, 5 adjacent to the first infrastructure container 2. The second infrastructure container 3 has essentially the same external dimensions and is arranged above the first infrastructure container 2 such that its end walls 19, 20 are aligned with the end walls 13, 14 and its longitudinal walls 21, 22 are aligned with the longitudinal walls 16, 17 of the first infrastructure container 2. The second infrastructure container 3 is arranged in the attic 23 of the house 1 and penetrates the roof 24 in the shape of a dormer window.
Der erste Infrastrukturcontainer 2 weist an seiner zweiten Längswandung 17 zu seiner zweiten Stirnwandung 14 hin eine vertikale Technikebene 25 auf. Zu dem Boden 26 des ersten Infrastrukturcontainers 2 hin geht im Bereich der zweiten Längswandung 17 die vertikale Technikebne 25 in eine untere horizontale Technikebene 27 über. Im Bereich der Decke 28 des ersten Infrastrukturcontainer 2 geht die vertikale Technikebene 25 in eine obere horizontale Technikebene 29 über. Der erste Infrastrukturcontainer 2 weist der Längswandung 17 benachbart einen Hausanschluss 30 auf. Der Hausanschluss 30 kann auch in oder einem Technikraum 31 benachbart angeordnet sein. Der Technikraum 31 ist beispielsweise der zweiten Stirnwandung 14 des ersten Infrastrukturcontainer 2 benachbart angeordnet. In dem Technikraum 31 kann beispielsweise eine Heizung 32 und ein Speicher 33, z.B. für Wasser bzw. als Wärmespeicher für eine Solaranlage, angeordnet sein. Dem Technikraum 31 ist ein WC und / oder Hauswirtschaftsraum 34 vorgelagert. In dem WC und / oder Hauswirtschaftsraum 34 ist ein WC 35, ein Waschbecken 36, eine Waschmaschine 37 und ein Trockner 38 angeordnet. In der vertikalen Technikebene 25 istThe first infrastructure container 2 has a vertical technical level 25 on its second longitudinal wall 17 towards its second end wall 14. Towards the floor 26 of the first infrastructure container 2, in the area of the second longitudinal wall 17, the vertical technical level 25 merges into a lower horizontal technical level 27. In the area of the ceiling 28 of the first infrastructure container 2, the vertical technical level 25 merges into an upper horizontal technical level 29. The first infrastructure container 2 has a house connection 30 adjacent to the longitudinal wall 17. The house connection 30 can also be arranged in or adjacent to a technical room 31. The technical room 31 is arranged, for example, adjacent to the second end wall 14 of the first infrastructure container 2. In the technical room 31, for example, a heater 32 and a storage tank 33, e.g. for water or as a heat storage tank for a solar system, can be arranged. A toilet and/or utility room 34 is located in front of the technical room 31. A toilet 35, a washbasin 36, a washing machine 37 and a dryer 38 are arranged in the toilet and/or utility room 34. In the vertical technical level 25,
ein Kamin 39 angeordnet. Zur ersten Stirnwandung 13 hin ist dem WC und / oder Hauswirtschaftsraum 34 ein T-förmiger Flur 40 vorgelagert. Von dem Flur 40 führt eine erste Tür 41, die in der ersten Längswandung 16 angeordnet ist, in den ersten Raum 4. Eine zweite Tür 42 in der zweiten Längswandung 17 führt in den zweiten Raum 5. Eine dritte Tür 43 in der ersten Stirnwandung 13 dient als Haustür. Schließlich weist der Flur 40 noch eine vierte Tür 44 auf, die die Verbindung zu dem WC und / oder Hauswirtschaftraum 34 bildet. Vom Flur 40 führt &iacgr;&ogr; eine Treppe 45 zu dem zweiten Infrastrukturcontainer 3.a chimney 39 is arranged. A T-shaped corridor 40 is arranged in front of the toilet and/or utility room 34 towards the first end wall 13. From the corridor 40, a first door 41, which is arranged in the first longitudinal wall 16, leads into the first room 4. A second door 42 in the second longitudinal wall 17 leads into the second room 5. A third door 43 in the first end wall 13 serves as the front door. Finally, the corridor 40 has a fourth door 44, which forms the connection to the toilet and/or utility room 34. From the corridor 40, a staircase 45 leads to the second infrastructure container 3.
Die Technikebenen 25, 27, 29 des ersten Infrastrukturcontainer 2 weisen die nicht dargestellten Ver-/ und Entsorgeleitungen, elektrische Versorgungsleitungen und Elektroinstallationen und eine Heizungsverrohrung auf. Auch können die Technikebenen 25, 27, 29 Lüftungskanäle aufweisen.The technical levels 25, 27, 29 of the first infrastructure container 2 have the supply and disposal lines, electrical supply lines and electrical installations and heating piping (not shown). The technical levels 25, 27, 29 can also have ventilation ducts.
Der zweite Infrastrukturcontainer 3 ist so auf dem ersten Infrastrukturcontainer 2 angeordnet, dass eine vertikale Technikebene 46 des zweiten Infrastrukturcontainer 3 mit der vertikalen Technikebene 25 des ersten Infrastrukturcontainers 2 funktionell verbunden ist.The second infrastructure container 3 is arranged on the first infrastructure container 2 such that a vertical technical level 46 of the second infrastructure container 3 is functionally connected to the vertical technical level 25 of the first infrastructure container 2.
Der zweite Infrastrukturcontainer 3 weist einen auf die Treppe 45 des ersten Infrastrukturcontainer 2 abgestimmten Treppendurchbruch 47 auf, so dass die Treppe 45 in einen T-förmigen Flur 48 des zweiten Infrastrukturcontainers 3 führt. Entsprechend dem ersten Infrastrukturcontainer 2 weist der Flur 48 eine erste Tür 49 zu dem dritten Raum 6 und eine zweite Tür 50 zu dem vierten Raum 7 auf. Zur ersten Längswand 8 des Hauses 1 hin, weist der Flur 48 ein Fensterelement 51 auf. Zur zweiten Längswand 9 hin, weist der zweite Infrastrukturcontainer 3 ein Bad 52 auf. Über eine dritte Tür 53 ist das Bad 52 vom Flur 48 aus zu erreichen. Die Zwei-Meter-Linie 54 ist in den Räumen 6, 7 in Figur 4 gestrichelt dargestellt. The second infrastructure container 3 has a staircase opening 47 coordinated with the staircase 45 of the first infrastructure container 2, so that the staircase 45 leads into a T-shaped hallway 48 of the second infrastructure container 3. Corresponding to the first infrastructure container 2, the hallway 48 has a first door 49 to the third room 6 and a second door 50 to the fourth room 7. The hallway 48 has a window element 51 towards the first longitudinal wall 8 of the house 1. The second infrastructure container 3 has a bathroom 52 towards the second longitudinal wall 9. The bathroom 52 can be reached from the hallway 48 via a third door 53. The two-meter line 54 is shown in dashed lines in rooms 6, 7 in Figure 4.
Der erste Infrastrukturcontainer 2 ist auf einem Fertigkeller 55 angeordnet. Soweit das obere Geschoss 57 des Hauses 1' ebenfalls als Vollgeschoss ausgebildet ist, können die Infrastrukturcontainer 2, 3 mit einer Längswandung 16, 21 einer Hausaußenwandung 15' benachbart angeordnet sein. Die Stirnwandungen 13, 14, 19, 20 können dabei ebenfalls Hausaußenwandungen 15' unmittelbar benachbart sein. Bei einem rechteckigen Grundriss des Hauses 1' kann dabei sowohl je eine Längswandung 16, 21 und je eine Stirnwandung 20, 22 einer Hausaußenwandung 15'' benachbart sein.The first infrastructure container 2 is arranged on a prefabricated basement 55. If the upper floor 57 of the house 1' is also designed as a full floor, the infrastructure containers 2, 3 can be arranged with a longitudinal wall 16, 21 adjacent to an external wall 15' of the house. The end walls 13, 14, 19, 20 can also be directly adjacent to the external walls 15' of the house. If the house 1' has a rectangular floor plan, both a longitudinal wall 16, 21 and an end wall 20, 22 can be adjacent to an external wall 15'' of the house.
Zum Bau eines Hauses 1, 1', 1'' wird zunächst der Fertigkeller 55 aufgestellt und ggf. eine Grundplatte gegossen. Anschließend werden die Infrastrukturcontainer 2, 3, aufgestellt. Der zweite Infrastrukturcontainer 3 wird mit seiner Bodenplatte 58 auf den ersten Infrastrukturcontainer 2 aufgesetzt. Der zweite Infrastrukturcontainer 3 wird von einer Deckenplatte 59 abgedeckt. Die vertikalen Technikebenen werden dabei funktionsgerecht miteinander verbunden. Anschließend wird um die Infrastrukturcontainer 2, 3 das Holzhaus bzw. die angrenzenden Räume 4, 5, 6, 7 errichtet. Die Wandungen 13, 14, 16, 17, 19, 20, 21, 22 werden dabei wie die übrigen Wände des Hauses 1, 1' verschalt.To build a house 1, 1', 1'', the prefabricated basement 55 is first set up and, if necessary, a base plate is poured. The infrastructure containers 2, 3 are then set up. The second infrastructure container 3 is placed with its base plate 58 on the first infrastructure container 2. The second infrastructure container 3 is covered by a ceiling plate 59. The vertical technical levels are connected to one another in a functional manner. The wooden house and the adjacent rooms 4, 5, 6, 7 are then built around the infrastructure containers 2, 3. The walls 13, 14, 16, 17, 19, 20, 21, 22 are boarded up like the other walls of the house 1, 1'.
Claims (22)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE20303135U DE20303135U1 (en) | 2003-02-25 | 2003-02-25 | House of especially wood and with two floor levels has first infrastructure container with services room and house connection for power and water supply, and infrastructure containers have technical plane adjacent to sidewall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE20303135U DE20303135U1 (en) | 2003-02-25 | 2003-02-25 | House of especially wood and with two floor levels has first infrastructure container with services room and house connection for power and water supply, and infrastructure containers have technical plane adjacent to sidewall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE20303135U1 true DE20303135U1 (en) | 2003-05-15 |
Family
ID=7980374
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE20303135U Expired - Lifetime DE20303135U1 (en) | 2003-02-25 | 2003-02-25 | House of especially wood and with two floor levels has first infrastructure container with services room and house connection for power and water supply, and infrastructure containers have technical plane adjacent to sidewall |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE20303135U1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102004020023A1 (en) * | 2004-04-23 | 2005-11-17 | Az.Immocon Gmbh | Wooden building comprises two prefabricated modules with base and wall elements on which a roof element and two gable wall fitments are set down |
| NL1036789C2 (en) * | 2009-03-30 | 2010-10-04 | Adrianus Willibrordus Hubertus Aben | FLOOR ELEMENT, BUILDING, COMBINATION OF AT LEAST TWO STACKED FLOOR ELEMENTS AND METHOD FOR FORMING A COLUMN OF A BUILDING. |
| GB2636944A (en) * | 2021-05-20 | 2025-07-02 | Sano Development Ltd | Hybrid building system, building and method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3755974A (en) | 1971-10-21 | 1973-09-04 | Domodula Uno Inc | Modular housing system |
| FR2648844A1 (en) | 1989-06-23 | 1990-12-28 | Cerec | Prefabricated construction module, in particular for underground structures, and method for manufacturing the said module |
| DE19623049A1 (en) | 1996-05-29 | 1997-12-11 | Werner Schaede | Element system for house- and building construction |
| DE19733311A1 (en) | 1997-08-01 | 1999-02-25 | K & P L B Kracke & Partner Gmb | Building |
| DE10138813A1 (en) | 2001-08-14 | 2003-03-13 | Walter M Muehlbauer | Kit for constructing buildings, especially high rise houses on housing estates, comprises tunnel and level modules with open sides covered by facade wall sections |
| DE19719496C2 (en) | 1997-05-07 | 2003-04-03 | Alho Systembau Gmbh | Modular system house with elevator |
-
2003
- 2003-02-25 DE DE20303135U patent/DE20303135U1/en not_active Expired - Lifetime
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3755974A (en) | 1971-10-21 | 1973-09-04 | Domodula Uno Inc | Modular housing system |
| FR2648844A1 (en) | 1989-06-23 | 1990-12-28 | Cerec | Prefabricated construction module, in particular for underground structures, and method for manufacturing the said module |
| DE19623049A1 (en) | 1996-05-29 | 1997-12-11 | Werner Schaede | Element system for house- and building construction |
| DE19719496C2 (en) | 1997-05-07 | 2003-04-03 | Alho Systembau Gmbh | Modular system house with elevator |
| DE19733311A1 (en) | 1997-08-01 | 1999-02-25 | K & P L B Kracke & Partner Gmb | Building |
| DE10138813A1 (en) | 2001-08-14 | 2003-03-13 | Walter M Muehlbauer | Kit for constructing buildings, especially high rise houses on housing estates, comprises tunnel and level modules with open sides covered by facade wall sections |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102004020023A1 (en) * | 2004-04-23 | 2005-11-17 | Az.Immocon Gmbh | Wooden building comprises two prefabricated modules with base and wall elements on which a roof element and two gable wall fitments are set down |
| DE102004020023B4 (en) * | 2004-04-23 | 2006-12-07 | Az.Immocon Gmbh | Wooden building and method for its assembly |
| NL1036789C2 (en) * | 2009-03-30 | 2010-10-04 | Adrianus Willibrordus Hubertus Aben | FLOOR ELEMENT, BUILDING, COMBINATION OF AT LEAST TWO STACKED FLOOR ELEMENTS AND METHOD FOR FORMING A COLUMN OF A BUILDING. |
| GB2636944A (en) * | 2021-05-20 | 2025-07-02 | Sano Development Ltd | Hybrid building system, building and method |
| GB2636944B (en) * | 2021-05-20 | 2025-12-24 | Sano Development Ltd | Hybrid building system, building and method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE3208302A1 (en) | Arrangement for living or other useful purposes | |
| DE2137375A1 (en) | Modular structure | |
| DE19917302C2 (en) | honeycomb building | |
| DE2301931A1 (en) | COMPLETE HOUSE | |
| EP4036340B1 (en) | Construction module, modular building and method for erecting a modular building | |
| DE3443938A1 (en) | Prefabricated compound unit | |
| WO2015139935A1 (en) | Multi-storey residential building | |
| DE20303135U1 (en) | House of especially wood and with two floor levels has first infrastructure container with services room and house connection for power and water supply, and infrastructure containers have technical plane adjacent to sidewall | |
| EP0467191A1 (en) | Building with at least four flats and elements for its construction | |
| DE1965417A1 (en) | Prefabricated structural elements | |
| EP3498929A1 (en) | High-rise building module and building constructed from same | |
| DE19700302A1 (en) | House from prefabricated elements with wet cells | |
| EP0717158B1 (en) | System of constructional volumes for the erection of buildings | |
| CH659280A5 (en) | PREFABRICATED COMPONENT. | |
| DE2342046A1 (en) | MULTI-STORY PRE-FABRICATED BUILDING | |
| DE19707575C2 (en) | Prefabricated basement outer wall element | |
| DE2151314A1 (en) | PROCESS FOR ERECTING BUILDINGS FROM PRE-FABRICATED UNITS | |
| DE29612392U1 (en) | Component for forming at least one room below the floor slab of a house | |
| DE3446242A1 (en) | Process for producing buildings, in particular for living purposes, from prefabricated unitised units, and unitised units used for this purpose | |
| DE1434709C (en) | Two or more storey prefabricated house made of space box | |
| DE202021003718U1 (en) | Residential building consisting of stacked individual modules | |
| DE1559237C (en) | Terraced house arrangement with prefabricated houses elimination from 1434760 | |
| DE102024107052A1 (en) | Staircase module for a modular building, modular staircase and method for producing a staircase module | |
| DE102006024316A1 (en) | Room module for providing temporary accommodation during road and building construction comprises a floor and side walls with supports provided with supporting elements in the upper end region with bearings for absorbing oscillations | |
| DE10055960A1 (en) | building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R207 | Utility model specification |
Effective date: 20030618 |
|
| R163 | Identified publications notified |
Effective date: 20030917 |
|
| R150 | Utility model maintained after payment of first maintenance fee after three years |
Effective date: 20060201 |
|
| R151 | Utility model maintained after payment of second maintenance fee after six years |
Effective date: 20090303 |
|
| R158 | Lapse of ip right after 8 years |
Effective date: 20110901 |