[go: up one dir, main page]

DE20113897U1 - Infrastructure channel - Google Patents

Infrastructure channel

Info

Publication number
DE20113897U1
DE20113897U1 DE20113897U DE20113897U DE20113897U1 DE 20113897 U1 DE20113897 U1 DE 20113897U1 DE 20113897 U DE20113897 U DE 20113897U DE 20113897 U DE20113897 U DE 20113897U DE 20113897 U1 DE20113897 U1 DE 20113897U1
Authority
DE
Germany
Prior art keywords
infrastructure
infrastructure channel
channel
channel according
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE20113897U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE20113897U priority Critical patent/DE20113897U1/en
Publication of DE20113897U1 publication Critical patent/DE20113897U1/en
Priority to DE10229088A priority patent/DE10229088A1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/022Partitioned to allow more than one medium to flow through
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/04Pipes or fittings specially adapted to sewers

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)

Description

Infrastruktur-KanalInfrastructure channel

Die Erfindung bezieht sich auf einen Infrastruktur-Kanal nach der Gattung des Hauptanspruches. Ein derartiger Infrastruktur-Kanal ist bekannt.The invention relates to an infrastructure channel according to the preamble of the main claim. Such an infrastructure channel is known.

Solche bekannten Infrastruktur-Kanäle werden verwendet, um vorzugsweise in Neubaugebieten alle Versorgungs- und Entwässerungs-Leitungen in einem einzigen Kanalelement zusammenzufassen. Damit sind Überwachungs-, Reparatur- und/oder Ergänzungs- und Ausbauarbeiten wesentlich vereinfacht und verbilligt.Such well-known infrastructure channels are used to combine all supply and drainage lines in a single channel element, preferably in new development areas. This makes monitoring, repair and/or extension and expansion work significantly easier and cheaper.

Als Kanalelemente werden meist armierte Betonrohre verwendet, die fabrikmäßig hergestellt wurden und die dann auf der Baustelle zu einem Rohrleitungs-Kanal unter Verwendung von Stirndichtungen zusammengesetzt wurden.The channel elements used are usually reinforced concrete pipes that were manufactured in a factory and then assembled on site to form a pipeline channel using end seals.

Nachteilig an einer solchen Bauweise ist, dass die im Querschnitt runden Betonrohre nach ihrer Verlegung unterfüttert werden müssen, weil der den Aufnahmegraben aushebende Bagger mit seiner Schaufei nur weitgehend ebene Auflage-Bodenflächen erstellen kann. Eine solche Unterfütterung ist aber zeitraubend und teuer. Außerdem sind die Rohre mit rundem Querschnitt nicht auftriebssicher gegenüber dem Grundwasser.The disadvantage of this type of construction is that the concrete pipes, which have a round cross-section, have to be lined after they have been laid, because the excavator digging the trench can only create a largely flat support surface with its shovel. However, this type of lined surface is time-consuming and expensive. In addition, the pipes with a round cross-section are not buoyant against groundwater.

Der Erfindung liegt die Aufgabe zugrunde, die aufgezeigten Nachteile zu vermeiden und einen Infrastruktur-Kanal zu schaffen, der eine der Baggerschaufel angepasste, zumindest weitgehend ebene Grundplatte hat, der weiterhin keine Unterfütterung benötigt, der auftriebssicher ist und der, abgesehen von einem Transportschutz, ohne Armierung auskommt.The invention is based on the object of avoiding the disadvantages outlined and of creating an infrastructure channel which has a base plate adapted to the excavator bucket and is at least largely flat, which furthermore does not require any underlay, which is buoyancy-proof and which, apart from transport protection, does not require any reinforcement.

Diese Aufgabe wird gemäß der Erfindung gelöst durch die kennzeichnenden Merkmale des Hauptsanspruches. Vorteilhafte Weiterbildungen des Gegenstandes des Anspruches 1 ergeben sich aus den Merkmalen der Unteransprüche. So ist es gemäß den Merkmalen des Anspruches 8 von Vorteil, dass die Fertig-Segmente wegen ihrer Gewölbe-Bauweise ohne statische DrücKe aufnehmende Armierungen hergesieiii werden können, denn herkömmliche Eisenbetonrohre sind aufgrund ihrer notwendigen Armierung verhältnismäßig teuer.This object is achieved according to the invention by the characterizing features of the main claim. Advantageous further developments of the subject matter of claim 1 result from the features of the subclaims. Thus, according to the features of claim 8, it is advantageous that the prefabricated segments can be manufactured without reinforcements to absorb static pressures due to their arched construction, since conventional reinforced concrete pipes are relatively expensive due to the necessary reinforcement.

Zeichnungdrawing

Ein Ausführungsbeispiel der Erfindung ist in der Zeichnung perspektivisch dargestellt und in der nachfolgenden Beschreibung näher erläutert.An embodiment of the invention is shown in perspective in the drawing and explained in more detail in the following description.

Beschreibung des AusführungsbeispielsDescription of the embodiment

Ein Infrastruktur-Kanal 1 ist aus einzelnen monolithisch hergestellten Fertig-Segmenten 2 zusammengestellt. Die Fertig-Segmente 2 sind aus Beton fabrikmäßig hergestellt und werden als Fertigteile an die Baustelle angeliefert. An mindestens einer ihrer beiden Stirnseiten 3 und 4 sind sie mit umlaufenden Dichtungen 5 versehen, so dass die auf der Baustelle zusammengesetzten Fertig-Segmente 2 einen durchgehenden, dichten Infrastruktur-Kanal 1 bilden.An infrastructure channel 1 is composed of individual monolithically manufactured prefabricated segments 2. The prefabricated segments 2 are manufactured from concrete in a factory and are delivered to the construction site as prefabricated parts. They are provided with circumferential seals 5 on at least one of their two end faces 3 and 4, so that the prefabricated segments 2 assembled on the construction site form a continuous, sealed infrastructure channel 1.

Wie aus der Zeichnung zu erkennen, ist der Querschnitt des Infrastruktur-Kanals 1 insgesamt gewölbeartig gestaltet mit einer Grundplatte 6, an die sich zwei seitliche Wände 7 und 8 anschließen, und oben werden die Wände 7 und 8 über eine Wölbung 9 miteinander verbunden. Auf diese Weise ist ein in sich geschlossenes, einstückiges und druckbelastbares Gewölbe 10 geschaffen, das durchgehenden Leitungen einen druckfesten Schutz bietet.As can be seen from the drawing, the cross-section of the infrastructure channel 1 is designed as a vault with a base plate 6, to which two side walls 7 and 8 are connected, and at the top the walls 7 and 8 are connected to each other via a vault 9. In this way, a self-contained, one-piece and pressure-resistant vault 10 is created, which offers pressure-resistant protection for continuous lines.

Als solche Leitungen kommen in Frage und sind dargestellt: Zwei Leitungen 11 und 12 (Vor- und Rücklauf) für Fernwärme, ein Kommunikations-Kabel-Kanal 13, zwei Leitungen 14 und 15 für Trinkwasser und Brauchwasser, eine Vakuum-Leitung 16 für Schwarzwasser und Grünabfall und eine Regenwasser-Sammel-Leitung 19, die zu einer Zisterne 20 führt. Natürlich ließe sich die Anzahl der Leitungen bei Bedarf noch vergrößern.The following lines are possible and are shown: two lines 11 and 12 (supply and return) for district heating, a communication cable duct 13, two lines 14 and 15 for drinking water and service water, a vacuum line 16 for black water and green waste and a rainwater collection line 19 that leads to a cistern 20. Of course, the number of lines could be increased if necessary.

Außenanschlüsse der genannten Leitungen werden durch Durchbrüche 17 und 18 in den Wänden 7 und 8 installiert. Innen sind an den Wänden 7 und 8 Konsole 21 zum Abstützen der Leitungen vorgesehen. Diese Konsole 21 sind vorzugsweise unmittelbar an die Wände 7 und 8 angeformt, d.h. angegossen. Im Gewölbe 10 links oben sind außerdem 20 kW-, 360 V- und Solarleitungen an die Wand 7 anmontiert. Die Grundplatte 6 ist desweiteren mit einem eingegossenen bzw. eingeformten Abwasser-Kanal 22 ausgestattet, derExternal connections of the above-mentioned lines are installed through openings 17 and 18 in the walls 7 and 8. Inside, on the walls 7 and 8, brackets 21 are provided to support the lines. These brackets 21 are preferably molded directly onto the walls 7 and 8, i.e. cast onto them. In the vault 10 at the top left, 20 kW, 360 V and solar lines are also mounted on the wall 7. The base plate 6 is also equipped with a cast or molded-in wastewater channel 22, which

vorzugsweise mit einem Bodenblech 23 abgedeckt wird, insbesondere auch deshalb, weil der Infrastruktur-Kanal 1 so bemessen ist, dass er begehbar ist. Ein Verteilerkasten schließlich trägt die Bezugszahl 24.preferably covered with a base plate 23, particularly because the infrastructure channel 1 is dimensioned so that it can be walked on. Finally, a distribution box bears the reference number 24.

WirkungsweiseHow it works

Die fabrikmäßig monolithisch hergestellten Fertig-Segmente 2 werden per Lastwagen oder per Bahn an die Baustelle angeliefert. Dort hat ein Bagger einen Graben ausgehoben mit durchgehender, ebener Sohle und glatten Seitenwänden, die in ihren Abmessungen auf die Fertigsegmente 2 abgestimmt sind. In diesen derart vorbereiteten Graben werden die Fertigsegmente 2 mittels Greifer eingebracht, wobei ihr äußerer Querschnitt den Graben satt ausfüllt. Ein Unterfüttern und ein seitliches Auffüllen kann damit entfallen. Übliche Bodensetzungen sind damit vermieden. Auch Verdichtungsarbeiten sind nicht notwendig. Damit werden Zeit und Geld und Ärger erspart.The factory-made monolithic prefabricated segments 2 are delivered to the construction site by truck or rail. There, an excavator has dug a trench with a continuous, flat base and smooth side walls, the dimensions of which are tailored to the prefabricated segments 2. The prefabricated segments 2 are placed in the trench prepared in this way using a grabber, with their outer cross-section filling the trench completely. This means that there is no need for underlay and side filling. This avoids the usual ground settlement. Compaction work is also not necessary. This saves time, money and hassle.

Die gewölbeartige Form der Einzel-Segmente 2 gewährleistet eine hervorragende Festigkeit und Drucksicherheit des Struktur-Kanals 1, so dass das Bauwerk eine lange Lebensdauer aufweist. Die ebene Grundplatte 6 garantiert desweiteren eine weitgehende Auftriebssicherheit gegenüber steigendem Grundwasserspiegel.The arch-like shape of the individual segments 2 ensures excellent strength and pressure resistance of the structural channel 1, so that the structure has a long service life. The flat base plate 6 also guarantees a high degree of buoyancy protection against rising groundwater levels.

Bei der Erstellung des Infrastruktur-Kanals 1 ist es vorteilhaft, in gewissen Abständen T-Stücke als Fertig-Segmente 2 einzubauen, bei denen der T-Abzweig mit einer Tür verschließbar, das Fertig-Segment 2 also zugänglich ist. Auf diese Weise hat dann Montageoder Wartungspersonal einen Zugang zum Kanal-Inneren. Auch ist es möglich, ein Fertig-Segment 2 mit einem Mannloch zu versehen, das durch einen Deckel verschließbar ist. Dann wäre ein Zugang von oben geschaffen. Des weiteren sind Einrichtungen für Belüftung und Beleuchtung im Inneren des Gewölbes 10 zu installieren.When constructing the infrastructure channel 1, it is advantageous to install T-pieces as prefabricated segments 2 at certain intervals, where the T-branch can be closed with a door, so that the prefabricated segment 2 is accessible. In this way, assembly or maintenance personnel have access to the interior of the channel. It is also possible to provide a prefabricated segment 2 with a manhole that can be closed with a cover. This would then create access from above. Furthermore, ventilation and lighting facilities must be installed inside the vault 10.

Schließlich ist noch zu bemerken, dass die Fertig-Segmente 2 nicht nur aus reinem Beton sondern auch aus einem faserverstärkten Sonderbeton, insbesondere aus einem Polymer-Beton hergestellt sein können. Auch eine Ausführung der Fertig-Segmente 2 aus Kunststoff ist denkbar.Finally, it should be noted that the prefabricated segments 2 can be made not only from pure concrete but also from a fiber-reinforced special concrete, in particular from a polymer concrete. It is also conceivable that the prefabricated segments 2 can be made from plastic.

BezuqszeichenlisteList of reference symbols I nf rastru ktu r-KanalI nf rastru ktu r-channel 11 Fertig-SegmentFinished segment 22 StirnseiteFront side 33 StirnseiteFront side 44 Dichtungpoetry 55 GrundplatteBase plate 66 WandWall 77 WandWall &dgr;&dgr; WölbungCurvature 99 GewölbeVault 1010 LeitungLine 1111 LeitungLine 1212 LeitungLine 1313 LeitungLine 1414 LeitungLine 1515 Vakuum-LeitungVacuum line 1616 Durchbruchbreakthrough 1717 Durchbruchbreakthrough 1818 Regenwasser-Sammel-LeitungRainwater collection pipe 1919 Zisternecistern 2020 Konsoleconsole 2121 Abwasserkanalsewer 2222 Boden blechFloor sheet 2323 elektr. Verteilerkastenelectrical distribution box 2424

Claims (8)

1. Infrastruktur Kanal, der aus einzelnen monolithisch hergestellten, zu einem durchgehenden Kanal dichtend zusammensetzbaren Fertig-Segmenten besteht, dadurch gekennzeichnet, dass jedes Fertig-Segment (2) eine Grundplatte (6) aufweist, an die zwei seitliche Wände (7 und 8) anschließen, die über eine Wölbung (9) miteinander einstückig zu einem Gewölbe (10) verbunden sind. 1. Infrastructure channel, which consists of individual monolithically manufactured prefabricated segments which can be assembled in a sealing manner to form a continuous channel, characterized in that each prefabricated segment ( 2 ) has a base plate ( 6 ) to which two lateral walls ( 7 and 8 ) are connected, which are connected to one another in one piece to form a vault ( 10 ) via a curvature ( 9 ). 2. Infrastruktur-Kanal nach Anspruch 1, dadurch gekennzeichnet, dass die Fertig-Segmente (2) aus Beton erstellt sind. 2. Infrastructure channel according to claim 1, characterized in that the prefabricated segments ( 2 ) are made of concrete. 3. Infrastruktur-Kanal nach Anspruch 2, dadurch gekennzeichnet, dass der Beton ein faserverstärkter Sonder-Beton, insbesondere in Polymer-Beton ist. 3. Infrastructure channel according to claim 2, characterized in that the concrete is a fiber-reinforced special concrete, in particular polymer concrete. 4. Infrastruktur-Kanal nach Anspruch 1, dadurch gekennzeichnet, dass die Fertig-Segmente (2) aus Kunststoff hergestellt sind. 4. Infrastructure channel according to claim 1, characterized in that the finished segments ( 2 ) are made of plastic. 5. Infrastruktur Kanal nach einem der Ansprüche 1-4, dadurch gekennzeichnet, dass an den seitlichen Wänden (7 und 8) Konsole (21) vorgesehen sind. 5. Infrastructure channel according to one of claims 1-4, characterized in that brackets ( 21 ) are provided on the side walls ( 7 and 8 ). 6. Infrastruktur-Kanal nach einem der Ansprüche 1-5, dadurch gekennzeichnet, dass in die Grundplatte (6) des Gewölbes (10) ein Abwasserkanal (22) integriert ist. 6. Infrastructure channel according to one of claims 1-5, characterized in that a sewage channel ( 22 ) is integrated into the base plate ( 6 ) of the vault ( 10 ). 7. Infrastruktur Kanal nach einem der Ansprüche 1-6, dadurch gekennzeichnet, dass ein Querschnitt des Infrastruktur-Kanals (1) derart bemessen ist, dass der Kanal begehbar ist. 7. Infrastructure channel according to one of claims 1-6, characterized in that a cross-section of the infrastructure channel ( 1 ) is dimensioned such that the channel is walkable. 8. Infrastruktur-Kanal nach einem der Ansprüche 1-7, dadurch gekennzeichnet, dass die Fertig-Segemente (2) ohne Armierung, gegebenenfalls lediglich mit einer Transportschutz-Armierung, erstellt sind. 8. Infrastructure channel according to one of claims 1-7, characterized in that the finished segments ( 2 ) are constructed without reinforcement, possibly only with a transport protection reinforcement.
DE20113897U 2001-08-22 2001-08-22 Infrastructure channel Expired - Lifetime DE20113897U1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE20113897U DE20113897U1 (en) 2001-08-22 2001-08-22 Infrastructure channel
DE10229088A DE10229088A1 (en) 2001-08-22 2002-06-28 Infrastructure channel for supply and drainage conduits is assembled in sealed manner from individual, monolithic, ready-made segments, each having baseplate to which two lateral walls connect

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE20113897U DE20113897U1 (en) 2001-08-22 2001-08-22 Infrastructure channel

Publications (1)

Publication Number Publication Date
DE20113897U1 true DE20113897U1 (en) 2001-11-22

Family

ID=7960809

Family Applications (2)

Application Number Title Priority Date Filing Date
DE20113897U Expired - Lifetime DE20113897U1 (en) 2001-08-22 2001-08-22 Infrastructure channel
DE10229088A Withdrawn DE10229088A1 (en) 2001-08-22 2002-06-28 Infrastructure channel for supply and drainage conduits is assembled in sealed manner from individual, monolithic, ready-made segments, each having baseplate to which two lateral walls connect

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE10229088A Withdrawn DE10229088A1 (en) 2001-08-22 2002-06-28 Infrastructure channel for supply and drainage conduits is assembled in sealed manner from individual, monolithic, ready-made segments, each having baseplate to which two lateral walls connect

Country Status (1)

Country Link
DE (2) DE20113897U1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007061802B3 (en) * 2007-12-19 2009-03-05 Frank Dupre Channel system for receiving power cables

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007061802B3 (en) * 2007-12-19 2009-03-05 Frank Dupre Channel system for receiving power cables

Also Published As

Publication number Publication date
DE10229088A1 (en) 2003-03-06

Similar Documents

Publication Publication Date Title
DE69623414T2 (en) Waterproofing system for hydraulic structures made of rigid plastic material
CN102482871B (en) Liquid Escape Treatment System
CN206538789U (en) A kind of pipe gallery
DE202015003692U1 (en) arch house
DE102020004384A1 (en) Building protection and pre-wall element with building protection
DE20206800U1 (en) Infrastructure Channel
EP2049739A1 (en) Arrangement for the construction of a structure having prefabricated construction components
DE60317611T2 (en) Wide drainage channel
EP3149821A1 (en) Service connection room placed outside for forming a service connection
DE202004005768U1 (en) Underground drainage duct with heat reclamation fitting has open channels provided in the base of the duct profile for subsequent fitting of heat exchange pipes
DE20113897U1 (en) Infrastructure channel
DE10023399B4 (en) Access, inspection and distribution shaft with house connection angle plate
DE20319998U1 (en) Connection between main sewer, domestic drain and road gully, comprises pre=fabricated part acting as common inspection shaft
DE19509467A1 (en) Waste water processing plant
WO2001042574A2 (en) Multimedia shaft building
EP1662051B1 (en) Method of connecting municipal manhole with supply mains to buildung supply
DE20210039U1 (en) Infrastructure Channel
DE10315559A1 (en) Method for reconstruction of sewage shaft system uses sewer constructed through it, and plastic shaft lining aligned through and connected to, sewer
KR100458354B1 (en) Underground laying construction of road
DE102005006240B4 (en) Infrastructure empty pipe system
DE202022000765U1 (en) All-sector house connection transfer cistern
DE20217666U1 (en) Concrete main drainage sewer e pipe has flat sole
EP1820905B1 (en) Floor construction
DE3102415A1 (en) Ready-to-erect stormwater-overflow structure with vertically adjustable, arcuate sill and anti-flooding means which can be built on
DE29924193U1 (en) Walkable drainage and installation channel

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20020103

R156 Lapse of ip right after 3 years