ADJUSTMENT DEVICE FOR CONCRETE PARTS.

Info

Publication number
DE1955639U
DE1955639U DEP27743U DEP0027743U DE1955639U DE 1955639 U DE1955639 U DE 1955639U DE P27743 U DEP27743 U DE P27743U DE P0027743 U DEP0027743 U DE P0027743U DE 1955639 U DE1955639 U DE 1955639U
Authority
DE
Germany
Prior art keywords
sleeve
adjusting device
thread
adjusting
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEP27743U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PFEIFFER FA ED
Original Assignee
PFEIFFER FA ED
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PFEIFFER FA ED filed Critical PFEIFFER FA ED
Priority to DEP27743U priority Critical patent/DE1955639U/en
Publication of DE1955639U publication Critical patent/DE1955639U/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4114Elements with sockets
    • E04B1/4121Elements with sockets with internal threads or non-adjustable captive nuts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Firma Eduard Pfeifer,. Hanf- und Drahtseile, Memmingen/Allgäu Augsburger Straße 84Eduard Pfeifer company. Hemp and wire ropes, Memmingen / Allgäu Augsburger Straße 84

Justiervorrichtung für Betonteile.Adjustment device for concrete parts.

Gegenstand der Erfindung ist eineJustier-Hülse für das genaue Einjustieren von Betonteilen, insbesondere Deckenplatten, mittels eines Rohres, das am unteren Ende mit einem . Gewinde versehen ist und in das eine Schraube von oben oder außen her eingeführt wird, mit deren Hilfe das Betonteil millimetergenau einjustiert werden kann.The invention relates to an adjusting sleeve for the precise Adjustment of concrete parts, in particular ceiling panels, by means of a tube that is connected to a. Thread is provided and into which a screw is inserted from above or outside, with the help of which the concrete part can be adjusted to the millimeter.

Die Justierung mit Schrauben ist an sich bekannt, jedoch war es bei den bisherigen Methoden notwendig, mit Hilfe einer Leiter oder eines Gerüstes vor der Montage des Betonteils die Justierschraube auf die richtige Höhe zu brin-Adjustment with screws is known per se, but with the previous methods it was necessary with help a ladder or scaffolding to bring the adjusting screw to the correct height before assembling the concrete part.

gen oder aber unter der bereits versetzten Platte die Ju-or under the plate that has already been moved

schonbeautiful

stierschraube zu betätigen. Wenn die Schraube vor dem Versetzen des Betonteils.: justiert wurde, waren stets aufwendige Nivellierarbeiten notwendig, die ein späteres Nachjustieren nicht ausschließen konnten.to operate the bull screw. If the screw was adjusted before moving the concrete part .: it was always time-consuming Leveling work necessary, which could not rule out subsequent readjustment.

Die Erfindung ermöglicht es nun, die Betonteile nach dem Versetzen auf einem festen Auflager von oben her durch Verdrehung der Schrauben in den Gewindebohren auf die richtige Höhe zu bringen. Wegen des bequemen Standortes ist es dabei möglich, sehr große Kräfte auszuüben, sodaß auch schwere Betonteile mit dieser Methode justiert werden können. Wegen der oben beschriebenen schwierigen Arbeit auf Leiter oder Gerüst wurde bisher meistens auf die an sich bequeme und genaue Justierung mit Schrauben verzichtet. Statt dessen wurden Stahlplatten in der notwendigen Dicke verlegt, was oftmals zur Folge hatte, daß die Betonteile nochmals abgehoben werden mußten um die Stahlplatte gegen eine solche größerer oder kleinerer Dicke auszutauschen.The invention now makes it possible to move the concrete parts after moving on a solid support from above by turning the screws in the tapping to the correct height bring. Because of the convenient location, it is possible to exert very large forces, so that even heavy concrete parts can be adjusted using this method. Because of the difficult work on ladder or scaffolding described above Up to now, the convenient and precise adjustment with screws has mostly been dispensed with. Instead, there were steel plates laid in the necessary thickness, which often had the consequence that the concrete parts are lifted again had to exchange the steel plate for one of greater or lesser thickness.

Die neue Methode bringt demgegenüber große wirtschaftliche Vorteile, weil die Justierung auch noch in einem Zug durchgeführt werden kann, wenn eine Reihe von Betonteilen schon versetzt ist. Die neue-Methode ermöglicht es auch, zusammengesetzte Deckenplatten so genau in ihrer Höhe zu justieren,In contrast, the new method has great economic advantages because the adjustment is also carried out in one go can be made when a number of concrete parts have already been moved. The new method also enables compound To adjust the height of the ceiling panels so precisely,

daß der Fußbodenbelag (ζ.B-. Linoleum oder PVC-Belag) direkt auf die Deckenoberfläche aufgebracht werden kann, ohne daß hierzu vorher ein Estrich-aufgebracht wurde.that the floor covering (ζ.B-. Linoleum or PVC covering) directly can be applied to the ceiling surface without a screed having been applied beforehand.

dem Justiervorgang kann die Justierschraube entweder in der Justierhülse belassen werden und die Justierhülse mit Mörtel vergossen werden. Es ist aber auch möglich, nach Unterstopfen des Betonteils mit Auflagermörtel die Justierschraube durch die Hülse hindurch wiederzugewinnen und zu einem anderen Justiervorgang wieder zu verwenden. Bei schweren Betonteilen ergibt sich wegen der hohen, durch die hohe erforderliche Materialfestigkeit der Schraube bedingten Wertes der Schraube eine wesentliche Einsparung an Aufwand.During the adjustment process, the adjustment screw can either be left in the adjustment sleeve and the adjustment sleeve with it Mortar to be poured. But it is also possible, after tamping the concrete part with support mortar, the adjusting screw recovered through the sleeve and used again for another adjustment process. With severe Concrete parts result from the high value due to the high material strength required for the screw the screw a significant saving in effort.

Vorteilhaft ist die Kombination der Justierhülse mit einer. Ankerhülse, da hierbei Material und Arbeitszeit eingespart werden kann. Die Aufhängestellen von Deckenplatten für die Montage sollten aus statischen Gründen tunlichst dort liegen wo später auch die Auflag er punkte der Teile im Bauwerk sind. Auch von diesem Gesichtspunkt her ergeben sich größere Vorteile für diese Kombination.It is advantageous to combine the adjustment sleeve with a. Anchor sleeve, as this saves material and working time can be. The suspension points for ceiling panels for assembly should be located there as far as possible for structural reasons where later the support points of the parts in the building are. From this point of view, too, there are greater advantages for this combination.

Die ganze Vorrichtung setzt sich aus folgenden Teilen zusammen: The whole device consists of the following parts:

— ΑΙ . Rohrhülse - ΑΙ. Pipe sleeve

Die Rohrhülse kann in Länge Querschnitt und Querschnitts-' form variabel sein. Es'können sowohl Ründrohre als auch Vierkant— und Wellrohre aller Abmessungen verwendet werden. The pipe sleeve can be made in length, cross-section and cross-sectional ' shape to be variable. Both round tubes and Square and corrugated pipes of all dimensions can be used.

2. Untere Ankerplatte 2. Lower anchor plate

Die untere Ankerplatte dient zur Verteilung der konzentrierten Auflagerkräfte auf den Beton. Sie ist mit der Rohrhülse verschweißt, verschraubt oder auch einstückig als Gußteil hergestellt. Die Form der Ankerplatte ist • beliebig und kann jeweils den statischen Erfordernissen angepaßt werden. An Stelle der Platte kann auch ein Winkel verwendet werden, der gleichzeitig als Endverankerung für die Bewährungsstäbe des Betonteils verwendet werden kann. Ist die Verwendung einer Ankerplatte nicht möglich oder nicht notwendig, so kann die Verankerung der Rohrhülse in Beton auch durch angeschweißte Rundeisenschlaufen und dergleichen erfolgen. Der Betonteil hängt .sich dann über die Rundeisenanker an der Justierhülse auf.The lower anchor plate serves to distribute the concentrated support forces on the concrete. She is with the Tubular sleeve welded, screwed or made in one piece as a cast part. The shape of the anchor plate is • Any and can meet the static requirements be adjusted. Instead of the plate, a bracket can also be used, which also serves as an end anchor can be used for the reinforcement bars of the concrete part. It is not possible to use an anchor plate or not necessary, the anchoring of the pipe sleeve in concrete can also be done by welded-on round iron loops and the like take place. The concrete part then hangs on the adjustment sleeve via the round iron anchors.

3. Gewindeteil für die Justierung 3. Threaded part for adjustment

Bei kurzen Hülsen kann das Gewinde als Innengewinde di_ " rekt in ein Rundrohr. ■■ eingeschnitten werden. Bei langeren Hülsenteilen empfiehlt sich die Verwendung eines eingeschweißten kurzen Gewindestückes am unteren Ende derWith short sleeves, the thread can be cut di_ "right into a round tube as an internal thread. ■■ With longer sleeves It is recommended to use a short, welded threaded piece at the lower end of the sleeve parts

Hülse. Es ist auch möglich die Ankerplatte so dick zu wählen, daß das Gewinde direkt in die Ankerplatte eingeschnitten werden kann. Während des Betoniervorgangs wird der Gewindeteil und die Justierhülse durch. Kunststoffstopfen oder ähnliches verschlossen um das Eindringen von Beton zu verhindern. Auch das Justiergewinde kann zur Befestigung der Tragöse benutzt werden, z.B. beim Ausheben aus der Form.Sleeve. It is also possible to choose the anchor plate so thick that the thread cuts directly into the anchor plate can be. During the concreting process, the threaded part and the adjustment sleeve are through. Plastic stopper or the like closed to prevent the ingress of concrete. The adjustment thread can also be used for Fastening of the lifting eye, e.g. when lifting it out of the mold.

4. Justierschraube 4. Adjustment screw

Die Justierschraube wird zweckmäßig aus vergütetem Material hergestellt um eine häufige Verwendung zu ermöglichen. Die Länge der Schraube richtet sich nach der zu erwartenden Toleranz innerhalb des Bauwerks sowie nach der Belastung der Schraube. Bei entsprechendem Querschnitt der Hülse kann die Schraube einen normalen Sechskantkopf haben. Bei kleineren Hülsendurchmessern empfiehlt sich die Verwendung einer Schraube mit Innenbuchse für den Justiervorgang. Die letztere Art wird zweckmäßig auch bei der Kombination von Justier- und Ankerhülse verwendet, da hier die Justierschraube einen etwas kleineren Durchmesser als das Gewinde für die Ankerhülse haben sollte.The adjusting screw is expediently made of tempered material to enable frequent use. The length of the screw depends on the tolerance to be expected within the structure and on the load on the screw. With a suitable cross-section of the sleeve, the screw can have a normal hexagonal head to have. For smaller sleeve diameters, we recommend using a screw with an inner bush for the Adjustment process. The latter type is also expediently used when combining adjustment and anchor sleeves, because here the adjusting screw should have a slightly smaller diameter than the thread for the anchor sleeve.

β -β -

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung schematisch dargestellt. Es zeigen:An exemplary embodiment of the invention is shown schematically in the drawing. Show it:

Fig. 1 einen senkrechten Schnitt durch eine Deckenplatte mit einer Vorrichtung entsprechend der Erfindung, im eingebauten Zustand der Deckenplatte undFig. 1 is a vertical section through a ceiling plate with a device according to the invention, in the installed state of the ceiling plate and

Fig. 2 eine Draufsicht auf die erfindungsgemäße Vorrichtung vor dem Einbetonieren, wobei die Armierungswendel weggelassen ist.2 shows a plan view of the device according to the invention before it is set in concrete, the reinforcing helix being omitted is.

Die Rohrhülse 1 ist mit einer Armierungswendel 5 umgeben, die am oberen Ende 6 und am unteren Ende 7 mit der Rohrhülse verschweißt ist. Die Rohrhülse 1 oder auch die Armierungswendel 5 kann mit den anderen Armierungen beispielsweise durch Schweissung verbunden sein.The tubular sleeve 1 is surrounded by a reinforcing coil 5, which welded to the tubular sleeve at the upper end 6 and at the lower end 7 is. The tubular sleeve 1 or the reinforcement helix 5 can be welded to the other reinforcements, for example be connected.

Die Höhe der Rohrhülse 1 entspricht im wesentlichen der Höhe des Betonfertigteiles, insbesondere also der Höhe der Platte 8.The height of the tubular sleeve 1 corresponds essentially to the height of the precast concrete part, in particular the height of the plate 8th.

Bei dem gezeigten Ausführungsbeispiel sind in der Rohrhülse 1 zwei Gewinde vorgesehen. Das obere Gewinde 9 dient der Befestigung einer Aufhängeöse, die nicht näher dargestellt ist. Mittels dieser Aufhängeöse kann die Bodenplatte nach der Herstel- In the embodiment shown, two threads are provided in the tubular sleeve 1. The upper thread 9 is used for fastening a hanging loop, which is not shown in detail. By means of this hanging loop, the base plate can be

— 7 —- 7 -

lung aus der Eorm herausgezogen werden. Insbesondere dient aber die Aufhängeöse zum Transport an die Baustelle, sowie zum Transport auf- der Baustelle bis zur Verlegung der Bodenplatte. Das Gewinde 9 ist vorzugsweise in die Innenwandung der Hülse eingeschnitten.lung can be pulled out of the Eorm. In particular serves but the suspension eye for transport to the construction site, as well as for transport on the construction site until the floor slab is laid. The thread 9 is preferably cut into the inner wall of the sleeve.

Am unteren Ende der Hülse 1 ist eine eingesetzte Büchse 3 vorgesehen. Diese Büchse 3 besitzt ein' .Innengewinde 10, das die Justierschraube 4 aufnimmt. Die Gewi-nde 10 und 9 sind derart aufeinander abgestimmt, daß die Justierschraube 4 von oben in die Büchse 3 eingedreht werden kann. Hierfür wird vorzugsweise ein .Werkzeug mit magnetischer Halterung benützt, mittels welchen Werkzeuges die Justierschraube 4 nach der Verwendung wieder herausgenommen werden kann.At the lower end of the sleeve 1 an inserted sleeve 3 is provided. This sleeve 3 has an internal thread 10 which receives the adjusting screw 4. The threads 10 and 9 are like this coordinated so that the adjusting screw 4 can be screwed into the sleeve 3 from above. For this it is preferred a .Tool with magnetic holder used, by means of which Tool the adjusting screw 4 can be removed again after use.

Mittels eines Steckschlüssels und des Innensechskants kann nach dem Verlegen der Platte 8 die Justierung vorgenommen werden. Die Justierschraube 4 wirkt dabei mit dem Auflager 11 zusammen, das von der schematisch angedeuteten Stütze 12 des Bauwerkes getragen wird. Nach der Justierung wird der Zwischenraum zwischen der Unterfläche der Platte 8 und dem Auflager 11 mit Mörtel 13 gefüllt. Ist der Mörtel hinreichend erhärtet, kann die Justierschraube wieder entfernt und weiterverwendet werden.Adjustment can be carried out using a socket wrench and the hexagon socket after the plate 8 has been laid. The adjusting screw 4 interacts with the support 11, which is supported by the schematically indicated support 12 of the structure will be carried. After the adjustment, the space between the lower surface of the plate 8 and the support 11 is filled with mortar 13 filled. Once the mortar has hardened sufficiently, the adjusting screw can be removed again and used again.

Das untere Ende Rohrhülse 1 is.t mit einer Ankerplatte 2 versehen, insbesondere durch Schweißung verbunden, Die Ankerplatte 2 kann auch winklig ausgebildet sein und das Winkelstück H kann mit den Armierungen verbunden werden.The lower end of the pipe sleeve 1 is provided with an anchor plate 2, in particular connected by welding. The anchor plate 2 can also be angled and the angle piece H can be connected to the reinforcements.

Die Oberfläche 15 der Platte 8 dient unmittelbar als Untergrund für den Fußbodenbelag.The surface 15 of the plate 8 serves directly as a substrate for the floor covering.

Die Erfindung kann nicht nur bei Decken- bzw. Bodenplatten angewandt werden, sondern bei allen Bauteilen aus Beton, die an der Baustelle eine Justierung erfordern. Im allgemeinen werden für jedes Bauteil vier Rohrhülsen mit den zugehörigen Einrichtungen benützt, ohne daß diese Zahl eine notwendige Bedingung der Erfindung wäre.The invention can not only be applied to ceiling or floor tiles but for all concrete components that require adjustment at the construction site. Generally will four pipe sleeves with the associated facilities are used for each component, without this number being a necessary condition of the invention.

Die Erfindung kann in verschiedener Weise abgewandelt werden. Wenn auch bei der bevorzugten Ausführungsform der Erfindung das Gewinde 10 in der Nähe des unteren Rohrendes der Bodenplatte angeordnet ist und die Justierschraube 4 direkt auf das Auflager 11-einwirkt, so ist doch auch eine Ausführungsform möglich, bei der zwischen der Justierschraube 4 und dem Auflager ein Zwischenstück vorgesehen wird, wobei es dann möglich ist, das G-ewinde 10 der Justierschraube an einer anderen Stelle der Rohrhülse anzuordnen. So kann auch das G-ewinde 9 das Gewinde 10 ersetzen, wenn die Justierschraube 4 oder ein Zwischenstück hinreichend lang ausgebildet ist.The invention can be modified in various ways. Even if in the preferred embodiment of the invention that Thread 10 is arranged in the vicinity of the lower end of the tube of the base plate and the adjusting screw 4 directly on the support 11-acts, an embodiment is also possible, in which an intermediate piece is provided between the adjusting screw 4 and the support, whereby it is then possible to arrange the thread 10 of the adjusting screw at a different point on the tubular sleeve. So the G-thread 9 can also do the thread Replace 10 if the adjusting screw 4 or an intermediate piece is long enough.

Es ist besonders wichtig, daß durch die Erfindung die Einsparung eines Fußbodenestrichs möglich wird. Der Bodenbelag kann direkt auf der Deckenoberfläche verlegt werden.It is particularly important that by means of the invention the saving a floor screed becomes possible. The floor covering can be laid directly on the ceiling surface.

Die Betonteile der Decken haben bekanntlich in ihrer Dicke stets Maßabweichungen, die vor dem Versetzen der Deckenplatten nicht hundertprozentig berücksichtigt werden können. Erst die Entwicklung des beschriebenen Justierverfahrens ermöglicht es, die Oberflächen der einzelnen Deckenteile einander mit so großer G-enauigkeit anzupassen, daß Höhenunterschiede nicht mehr vorhanden sind und sich demgemäß die Höhenunterschiede auch nicht mehr im Fußbodenbelag abzeichnen können. Di-e Einsparung eines Estrichs bewirkt eine wesentliche Bauzeitverkürzung, weil nach dem Vergießen der Deckenplatten keine Feuchtigkeit mehr in das Bauwerk hineingetragen wird.As is well known, the concrete parts of the ceilings always have dimensional deviations in their thickness that occurred before the ceiling slabs were moved cannot be taken into account one hundred percent. Only the development of the adjustment process described makes it possible to adapt the surfaces of the individual ceiling parts to one another with such great precision that Height differences are no longer present and accordingly the height differences are no longer in the floor covering can draw. The saving of a screed brings about a significant reduction in construction time, because after the pouring the ceiling panels no longer carry moisture into the structure.

Claims (14)

1. Justiervorrichtung für Betonteile, zum Beispiel Bodenbzw. Deckenplatten, gekennzeichnet durch eine Rohrhülse im Betonteil9 mit einer Justierschraube (^), welche Justierschraube sich über ein Gewinde (10) an der Rohrhülse (l) abstützt,- deren Druckfläche gegen das eine Ende der Hülse (1) gerichtet ist und die von dem anderen Ende der Hülse h©r betätigbar ist*1. Adjustment device for concrete parts, for example Bodenbzw. Ceiling slabs, characterized by a pipe sleeve in the concrete part 9 with an adjusting screw (^), which adjusting screw is supported on the pipe sleeve (l) via a thread (10), - the pressure surface of which is directed against one end of the sleeve (1) and that of the other end of the sleeve can be operated * 2» Justiervorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Rohrhülse (i) eine Länge aufweist, die der . Dicke des Betonteiles (8) entspricht.2 »Adjusting device according to claim 1, characterized in that that the tubular sleeve (i) has a length that of the. Thickness of the concrete part (8) corresponds. 3· Justiervorrichtung nach einem oder beiden der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Rohrhülse auf der Auflageseite eine Ankerplatte (2) besitzt«3 · Adjustment device according to one or both of the preceding Claims, characterized in that the tubular sleeve has an anchor plate (2) on the support side. 4. Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die An-4. Adjusting device according to one or more of the preceding Claims, characterized in that the kerplatte (2) winklig (2, l4) ausgebildet ist.kerplatte (2) angled (2, l4) is formed. 5. Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Rohrhülse (1) und die Ankerplatte miteinander verschweißt
sind«
5. Adjusting device according to one or more of the preceding claims, characterized in that the tubular sleeve (1) and the anchor plate are welded together
are"
6. Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das Justiergewinde am Auflagerende der Rohrhülse angeordnet
ist.
6. Adjusting device according to one or more of the preceding claims, characterized in that the adjusting thread is arranged on the support end of the tubular sleeve
is.
7» Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß das Justiergewinde in einer in das Rohr eingesetzten Büchse
angeordnet ist.
7 »Adjusting device according to one or more of the preceding claims, characterized in that the adjusting thread in a bushing inserted into the tube
is arranged.
8. Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Justierschraube einen Innensechskant trägt.8. Adjusting device according to one or more of the preceding claims, characterized in that the adjusting screw carries a hexagon socket. 9. Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Justierschraube von der der Auflagestelle abgewandten Seite der Platte in die Rohrhülse einbringbar und durch die freie Rohröffnung wieder entfernbar ist.9. Adjusting device according to one or more of the preceding Claims, characterized in that the adjusting screw from the side facing away from the support point the plate can be introduced into the pipe sleeve and removed again through the free pipe opening. 10. Justiervorrichtung nach einem oder mehreren der vorher-10. Adjustment device according to one or more of the _ _ " P.A.020 979*12.1.67./JP.A.020 979 * 12.1.67. / J gehenden Ansprüches dadurch gekennzeichnet-, daß die Rohrhülse als Ankerhülse für eine lösbar zu befestigende
Tragöse ausgebildet ist.
going claims s characterized- that the tubular sleeve is used as an anchor sleeve for a detachable to be fastened
Carrying eye is formed.
11. Justiervorrichtung nach einem oder mehreren der vorhergehenden "Ansprüche-, dadurch gekennzeichnet 3 daß das Justiergewinde (10) als Befestigungsgewinde der Tragöse
ausgebildet ist.
11. Adjusting device according to one or more of the preceding "claims, characterized 3 that the adjusting thread (10) as a fastening thread of the lifting eye
is trained.
12. Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüches dadurch gekennzeichnet 3 daß an dem
der Auflagestelle abgewandten Hülsenende ein weiteres
Gewinde (9) für die Tragöse eingeschnitten ist.
12. Adjusting device according to one or more of the preceding claims s wherein 3 that at the
the end of the sleeve facing away from the support point
Thread (9) is cut for the lifting eye.
13. Justiervorrichtung nach einem oder mehreren der vorhergehenden Ansprüche s dadurch gekennzeichnet, daß das Befestigungsgewinde für die Tragöse einen größeren Durchmesser aufweist s als das Justiergewinde (10).13. Adjusting device according to one or more of the preceding claims s characterized in that the fastening thread for the lifting eye has a larger diameter than the Justiergewinde s (10). 14. Justiervorrichtung nach einem-oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet,, daß die Ankerplatte bzw. ein Winkel (l4) der Ankerplatte als Befestigungselement der Armierung des Betonteils dient.14. Adjusting device according to one or more of the preceding claims, characterized in that the anchor plate or an angle (l4) of the anchor plate as a fastening element serves to reinforce the concrete part.
DEP27743U 1966-07-30 1966-07-30 ADJUSTMENT DEVICE FOR CONCRETE PARTS. Expired DE1955639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEP27743U DE1955639U (en) 1966-07-30 1966-07-30 ADJUSTMENT DEVICE FOR CONCRETE PARTS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEP27743U DE1955639U (en) 1966-07-30 1966-07-30 ADJUSTMENT DEVICE FOR CONCRETE PARTS.

Publications (1)

Publication Number Publication Date
DE1955639U true DE1955639U (en) 1967-02-16

Family

ID=33367102

Family Applications (1)

Application Number Title Priority Date Filing Date
DEP27743U Expired DE1955639U (en) 1966-07-30 1966-07-30 ADJUSTMENT DEVICE FOR CONCRETE PARTS.

Country Status (1)

Country Link
DE (1) DE1955639U (en)

Similar Documents

Publication Publication Date Title
EP3150779B1 (en) Assembly of formwork and graduated anchoring system
CH284298A (en) Process for the production of bodies provided with steel reinforcement and bodies produced by the process.
DE4234892C2 (en) Arrangement for the stable and directionally stable installation of anchoring parts in concrete
CH701411A1 (en) Formwork and method for constructing a formwork.
DE1684390A1 (en) Adjustment device for concrete parts
DE2819062A1 (en) Concrete edge guard rail post holder - has socket on transverse beam clamped against support with bolt screwed in
DE1955639U (en) ADJUSTMENT DEVICE FOR CONCRETE PARTS.
DE3318050A1 (en) METHOD FOR PRODUCING AN ARMED CONCRETE SUPPORT ELEMENT
DE10045735A1 (en) Pillar for rotary pillar crane has flange on underside detachably directly connected with extension resistance to anchor rods cast in concrete foundation
DE2732183B2 (en) Connection of two reinforced concrete parts facing each other with their end faces
EP1295839B1 (en) Method and template to instal a landing door of an elevator
DE1916590A1 (en) Process for the production of ventilated facades
DE19537373A1 (en) Reinforcing system for chimney in building
DE10028514C1 (en) Shuttering unit for edge shuttering has shuttering element provided with openings receiving fixing bolts for securing to further shuttering unit
DE1559043C3 (en) Method for shuttering and stripping floor slabs in concrete buildings with the help of large-area shuttering for walls and ceilings and a device for carrying out the method
DE20316774U1 (en) Component for the particular subsequent spaced-apart attachment of components to building parts
DE102007034500B4 (en) Clamping screw for formwork construction, as well as clamping screw arrangement for formwork construction
DE2060486A1 (en) Scaffolding for a work platform and method for its assembly on buildings or the like.
CH585825A5 (en) Prefabricated concrete shaft for cellar held on wall - has projecting flat brackets seated in fasteners on wall
DE4412594A1 (en) Horizontal load-bearing member for structures
AT521549B1 (en) Process for producing an anchor for a tension member in a concrete slab
EP4541979A1 (en) System for mounting a balcony on a building, and mounting method
AT315456B (en) Device for coating a wall surface
DE2342135A1 (en) ANCHORING DEVICE
EP0686736B1 (en) Method and device for the fixing of mounts on the end plains of slabs of concrete or plates of concrete