DE1887032U - SHAFT CONVEYOR WITH WORK PLATFORM. - Google Patents

SHAFT CONVEYOR WITH WORK PLATFORM.

Info

Publication number
DE1887032U
DE1887032U DEG22991U DEG0022991U DE1887032U DE 1887032 U DE1887032 U DE 1887032U DE G22991 U DEG22991 U DE G22991U DE G0022991 U DEG0022991 U DE G0022991U DE 1887032 U DE1887032 U DE 1887032U
Authority
DE
Germany
Prior art keywords
conveyor
web
shaft
shaft conveyor
conveyor according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEG22991U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gutehoffnungshutte Sterkrade AG
Original Assignee
Gutehoffnungshutte Sterkrade AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gutehoffnungshutte Sterkrade AG filed Critical Gutehoffnungshutte Sterkrade AG
Priority to DEG22991U priority Critical patent/DE1887032U/en
Publication of DE1887032U publication Critical patent/DE1887032U/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Chain Conveyers (AREA)

Description

Schachtfördermittel mit ArbeitsbühneShaft conveyor with working platform

Die Bergpolizeiverordnung schreibt eine laufende Prüfung eines Förderschachtes, z.B. seiner Auskleidung und Einbauten ¥or. Hierfür, sowie für etwaige Reparaturen, wird, insbesondere in förderschachten mit Seilführung und in eirötr ichlosen Schächten, eine Arbeitsbühne benötigt, die einen Zugang zur Schachtwandung in allen Teufen gestattet.The Mountain Police Ordinance requires an ongoing inspection of a mining shaft, e.g. its lining and internals ¥ or. For this, as well as for any repairs, especially in conveyor shafts with rope guidance and in reddish-free shafts, a work platform required, which allows access to the shaft wall at all depths.

Die Neuerung besteht darin, die Arbeitsbühne als langgestreckten Steg auszubilden, der auf dem Kopf des Fördermittels, d.h. eines Förderkorbes oder Fördergefässes^ in der Stegebene zwischen den Schachtführungen (Leitbäumen, führungsschienen oder Führungsseilen) verstellbar gelagert ist und der in seiner Arbeitsstellung nach Art eines Kragträgers in den Schacht ausladet. Bin solcher Steg kann ohne Überschreiten eines Abgrundesjbetreten werden und gestattet, den lückenlos zugänglichen Bereich des Schachtes und der Schachtwandung auf wenigstens eine Hälfte des Schachtumfanges auszudehnen. Mir die andere Hälfte wird ein zweiter Steg vorgesehen, und zwar im Falle einer zweitrümigen Förderanlage auf dem Fördermittel des anderen Fördertrumes oder im Falle einer eintrümigen Förderanlage auf deren Gegengewicht.The innovation is to design the work platform as an elongated bridge that is placed on the head of the conveyor, i.e. a hoisting cage or hoisting vessel ^ in the level between the shaft guides (guide trees, guide rails or guide ropes) adjustable is stored and unloads into the shaft in its working position in the manner of a cantilever. I am such The footbridge can be stepped on without crossing an abyss and allows the completely accessible area of the shaft and the shaft wall to at least one half of the shaft circumference. Me the other half is provided with a second web, in the case of a two-legged conveyor system on the Funding of the other conveyor run or, in the case of a single-strand conveyor system, on its counterweight.

Im Bedarfsfalle können für einen gleichzeitigen Zugang :If necessary, for simultaneous access:

— 2 —- 2 -

1717 -.21717 -.2

zu mehreren Stellen des Schaentumfanges zwei oder gar 'drei Stege demselben"Fördermittel (oder Gegengewicht) zugeordnet und unabhängig voneinander ausgerichtet werden. Auf dem Fördermittel ist nämlich genügend Platz' zum Abstellen auch mehrerer Stege vorhanden, die für den Förderbetrieb wieder einzuholen sind.two or even two places on the circumference of the shell '' three webs of the same "conveyor (or counterweight) assigned and aligned independently of each other. There is enough space on the subsidy ' There are also several footbridges available for parking, which must be recovered for the conveyor operation.

Diese und weitere Merkmale der Heuerung werden im folgenden an Hand einiger Ausführungsbeispiele erläutert, welche die Zeichnung veranschaulicht. In dieser ist:These and other characteristics of hiring are discussed below explained on the basis of some exemplary embodiments, which the drawing illustrates. In this one is:

Fig. 1 ein Querschnitt durch einen zweitrümigenFig. 1 is a cross section through a two-tower

Förderschacht mit einer Draufsicht auf die beiden Förderkörbe oder Fördergefässe;Conveyor shaft with a top view of the two conveyor baskets or conveying vessels;

Fig. 2 ein Querschnitt durch einen Schacht mit eintrümiger Förderung, also nur einem Förderkorb oder Fördergefäß und einem Gegengewicht in Draufsicht;2 shows a cross section through a shaft with single-pipe conveyance, that is to say only one conveying cage or bucket and a counterweight in plan view;

Fig. 3 eine Seitenansicht des Steges in vergrößertem Maßstab;3 shows a side view of the web on an enlarged scale;

Fig. 4 eine Stirnansicht des Steges; Fig. 5 eine Draufsicht aut den Steg.Fig. 4 is an end view of the web; Fig. 5 is a plan view of the web aut.

lach Fig. 1 sind die beimden Förderkörbe oder Fördergefässe 1 und 2 an ihren beiden äusseren Ecken mit Rollen 3 an Stahlspurlatten 4 geführt, die schachtfeste Konsolen 5 halten.Referring to Figure 1, these are the two conveyor baskets or buckets 1 and 2 at their two outer corners with rollers 3 on steel laths 4, which are fixed to the shaft Hold consoles 5.

1717 - 3 -1717 - 3 -

Führungsschuhe 6 dienen nur als Schutz gegen Übertreiben der Förderkörbe. Auf dem Kopf der beiden in üblicher Weise mit lotausstiegklappen 7 versehenen Förderkörbe sind jeweils zwei Trag- und Führungsschienen 8 und 9 für einen Arbeitssteg 10 angeordnet. Der Abstand der Schienen 8 und 9 ist so groß, daß der Steg 10 einwandfrei abgestützt wird, indem er auf der jeweils äußeren Schiene 8 als Auflager aufruht und an der inneren Schiene 9 gegen Abkippen gehalten wird. Das innere Ende des ausladenden Steges 10 greift in einen Widerlagerbügel 11 (Fig. 3 und 4) ein, der den Steg von oben übergreift. Diesen Bügel 11 trägt ein Gleitschuh 12, der die innere Schiene 9 umfaßt. Mit dem Gleitschuh 12 kann der Bügel 11 in Längsrichtung der Schiene 9 verschoben werden. Wie aus Fig. 4 ersichtlich, ist der Bügel 11 mittels eines Bolzens 13 auf dem Gleitschuh 12 drehbar gelagert, damit der in den Schacht ausladende Steg 10 nicht nur in Querrichtung verschoben, sondern auch nach beiden Seiten verschwenkt werden kann, z.B. in die in Fig. 1 auf dem rechten Korb angedeutete Stellung.Guide shoes 6 only serve as protection against overdoing the conveyor baskets. On the head of the two conveyor baskets provided in the usual way with solder exit flaps 7 two support and guide rails 8 and 9 for a work platform 10 are arranged in each case. The distance of the Rails 8 and 9 is so large that the web 10 is flawless is supported by resting on the respective outer rail 8 as a support and on the inner rail 9 is held against tipping. The inner end of the projecting web 10 engages in an abutment bracket 11 (Fig. 3 and 4), which engages over the web from above. This bracket 11 carries a sliding shoe 12, the inner Rail 9 includes. With the sliding shoe 12, the bracket 11 can be moved in the longitudinal direction of the rail 9. As can be seen from Fig. 4, the bracket 11 is rotatably mounted on the slide shoe 12 by means of a bolt 13, so that the protruding web 10 not only shifted in the transverse direction, but also to both sides can be pivoted, for example in the in Fig. 1 on the position indicated on the right basket.

Auf die äußere Schiene 8 ist gleichfalls ein Gleitschuh 14 aufgesetzt, der ein Auflager für den Steg 10 an der Außenseite des betreffenden Förderkorbes (oder Fördergefässes) bildet.There is also a sliding shoe on the outer rail 8 14 put on, which is a support for the web 10 on the outside of the relevant conveyor cage (or conveyor vessel) forms.

Bei der Ausführung nach Fig. 3 ist auf dem Gleitschuh 14 ein Zapfen 15 oder dgl. angebracht, der in den Steg 10 eingreift und diesen in seiner Arbeitsstellung gegenIn the embodiment according to FIG. 3, a pin 15 or the like is attached to the slide shoe 14, which is inserted into the web 10 intervenes and this in its working position against

1717 - 41717 - 4th

Längsverschieben auf den beiden Gleitsehuhen 12 und 14 sichert. lach Einstellen des Steges 10 auf den jeweils gewünschten Bereich des Schachtmantels sorgen Einsteekbolzen 16 (I1Ig. 4) für dein, nötigen Schutz gegen ungewolltes Querverlagern des Sieges. Die Einsteckbolzen 16 sind in Bohrungen 16' (]?ig. 5) der Schienen 8 und 9 eingesetzt.Longitudinal displacement on the two sliding blocks 12 and 14 secures. After adjusting the web 10 to the desired area of the shaft jacket, insertion bolts 16 (I 1 Ig. 4) provide the necessary protection against unintentional transverse displacement of the victory. The insert pins 16 are inserted into bores 16 ′ (FIG. 5) of the rails 8 and 9.

Haben die Einsteckbolzen gemäß Hg. 4 einen hakenförmigen Kopf, dann verleihen sie dem Steg gleichzeitig den nötigen Halt gegen längsVerlagerungen, so daß der Gleitschuh 14 statt des Zapfens 15 - wie der Gleitschuh 12 einen Widerlagerbügel aufnehmen kann, durch den der Steg beim Einbau in seine Arbeitsstellung soweit geschoben wird, bis sein inneres Ende der innere Widerlagerbügel 11 umgreift.Have the insert pins according to Hg. 4 a hook-shaped Head, then they give the web at the same time the necessary hold against longitudinal misalignments, so that the sliding shoe 14 instead of the pin 15 - like the slide shoe 12 one Can accommodate abutment bracket through which the web pushed so far into its working position during installation until the inner end of the inner abutment bracket 11 engages around it.

Bei einer solchen Ausführung kann der Steg auf den beiden Gleitschuhen 12 und 14 nach Entfernen der Einsteckbolzen 16 einwärts geschoben werden und gegebenenfalls auf den Gleitschuhen verbleiben. Dies ist dann der Pail, wenn sich der Steg beim Einholen bis in das Grundrißprofil des IPörderkorbes 1 oder 2 verlagern läßt.In such an embodiment, the web can on the two sliding blocks 12 and 14 after removing the insert bolts 16 can be pushed in and, if necessary, remain on the sliding blocks. This is then the pail, if the bar can be moved into the plan profile of the conveyor cage 1 or 2 during retrieval.

Damit die oberhalb des Förderkorbes 2 angeordneten rungsrollen 3 die Einstellung des ausladenden Steges 10 und auch seine Einholbewegung nicht einengen, sind die Schienen 8 und 9 auf Stützen 17 oberhalb der Rollen 3 angeordnet.So that the guiding rollers 3 arranged above the conveyor cage 2 adjust the setting of the projecting web 10 and also do not restrict its retrieval movement, the rails 8 and 9 are on supports 17 above the rollers 3 arranged.

■'■■■- -. - 5 "-.■ '■■■ - -. - 5 "-.

■.--.".- 5 -■ .--. ".- 5 -

Oer Saum zwischen den beiden Stützen 17 eignet sich zur ünterbringang weiterer Arbeltsstege 10' (Fig. 3), die auf die Führungsschienen-8 und. 9_ zusätzlieli aufgesetzt werden-können, wenn gleichzeitig an mehreren Stellen des Schachtes gearbeitet werden soll oder wenn zur Vergrösserung der Stegbreite zwei oder gar drei Stege unmittelbar nebeneinander angeordnet werden sollen. - .--■ '■-■■ The seam between the two supports 17 is suitable for accommodating further work webs 10 '(FIG. 3) which are attached to the guide rails 8 and. 9_ can also be attached if work is to be carried out at several points in the shaft at the same time or if two or even three webs are to be arranged directly next to one another to increase the web width. - .-- ■ '■ - ■■

Im übrigen ist es ohne weiteres möglich, auf zwei im Abstand voneinander ausladenden Stegen eine Platt·* form z.B. aus Leichtmetall aufzulegen und dadurch eine geräumige Arbeitsbühne zu schaffen. Die Plattform wird zweckmässig etwa mittels Einsteckzapfen oder dgl. an >.: den Stegen gegen Verschieben gesichert. Je nach der G-rosse der auf diese Weise zu erstellenden Bühne kann die aufzulegende Plattform mehrteilig sein. Die einzelnen Teile werden vom förderkorb (oder Fördergefäß) aus auf die Stege in deren Längsrichtung aufgeschoben.. Solche Auflageplattformen lassen sich, wie die Stege selbst, für den Förderbetrieb auf dem Kopf des Förder— korbes (oder Fördergefässes) abstellen. .In addition, it is easily possible to switch to two im Distance from each other protruding webs a plate * form e.g. made of light metal and thereby a to create a spacious working platform. The platform will appropriately, for example, by means of a plug-in pin or the like to> .: the bars secured against shifting. Depending on the The size of the stage to be created in this way can be the platform to be placed in several parts. The single ones Parts are pushed from the cage (or bucket) onto the webs in their longitudinal direction. Such Support platforms, like the bridges themselves, can be placed on the head of the conveyor for the conveying operation. put down the basket (or conveying vessel). .

Auch auf nur einem Steg können von dem einen der beiden Förderkörbe (Fördergefässe) alle Stellen einer Schachthälfte und vom anderen Förderkorb alle Stellen der anderen Schachthälfte erreicht werden. You can also use one of the two jetties on just one jetty Conveyor baskets (conveying vessels) all points of one shaft half and all points of the other half of the shaft can be reached by the other cage.

17171717

Bei der dargestellten Ausführung besteht der Steg 10 aus zwei Längsträgern 18 und mehreren, über deren Länge verteilten Querstreben 19 sowie zwei Gitterrosten 20, jje einem auf der Ober- und der Unterseite der Streben 19· In Bohrungen 21 der Längsstreben 18 (Pig. 5) werden G-eländerbügel 22 eingesetzt (Fig. 3). Die Querstreben 19 an den Stirnenden der Längsträger 18 sind mit einem Handgriff 23 versehen.In the embodiment shown, the web 10 consists from two longitudinal beams 18 and several over their length distributed cross braces 19 and two gratings 20, one on the top and one on the underside of the struts 19 · In the bores 21 of the longitudinal struts 18 (Pig. 5), railing brackets 22 are inserted (Fig. 3). The cross braces 19 at the front ends of the longitudinal members 18 are provided with a handle 23.

Einen Gitterroststeg mit etwa 2 m Länge und etwa 350 mm Breite kann ein Mann alleine montieren, indem er den Steg zunächst nur an einem Ende anhebt und in einen der beiden Bügel einschiebt, um anschließend das andere Ende anzuheben und den Steg bis zum Bügel des anderen Gleitsehuhes vorzuschieben.A grating bar about 2 m long and about 350 mm Width can be assembled by a man alone by using the The web only lifts at one end and pushes it into one of the two brackets, followed by the other Lift up the end and push the bar up to the bracket of the other sliding shoe.

Nach !ig. 1 sind die beiden Schienen 8 und 9 auf verschiedenen Seiten der am ICopf des Förderkorbes angebrachten Aufhängelaschen 24 angeordnet, weil die halbe Grundrißbreite des Förderkorbes (oder Fördergefäßes) kleiner ist als der aus Sicherheitsgründen einzuhaltende Abstand der beiden Schienen 8 und 9 voneinander. Bei Förderkörben (oder Fördergefäßen) mit größerer G-rundrißbreite empfiehlt es sieh, die beiden Führungsschienen auf ein und derselben Längshälfte zu verlegen. Bas ist beispielsweise bei der eintrümigen Förderung gemäß Fig. 2 der Fall, deren Gegengewicht 25 ebenfalls wenigstens einen Arbeitssteg für die zweite Hälfte des Schachijmantels aufnehmen kann. An lotrechten Streben265 zwischen denen Einzelgewichte aufgeschichtet sind, stützenAfter! Ig. 1, the two rails 8 and 9 are arranged on different sides of the hanging brackets 24 attached to the head of the conveyor cage, because half the plan width of the conveyor cage (or conveyor vessel) is smaller than the distance between the two rails 8 and 9 from one another, which must be maintained for safety reasons. In the case of conveyor baskets (or conveying vessels) with a larger G-round outline width, it is advisable to lay the two guide rails on one and the same longitudinal half. Bas is the case, for example, with the single-lump promotion according to FIG. 2, the counterweight 25 of which can also accommodate at least one working bridge for the second half of the Schachijmantels. Support on vertical struts 26 5 between which individual weights are stacked

- 7 -- 7 -

sich mittels Konsolen oder dgl. die Schienen 81 und 9' ab, und zwar gleichfalls oberhalb der Führungsrollen 3' des G-egengewichtes. Die Ausladung der die Schienen abstützenden Eonsolen richtet sich nach der Breite der zwischen den Streben 26 aufgeschichteten Einzelgewichte einerseits und dem gewünschten Schienenabstand andererseits. The rails 8 1 and 9 'are removed by means of brackets or the like, and also above the guide rollers 3' of the counterweight. The overhang of the Eonsolen supporting the rails depends on the width of the individual weights stacked between the struts 26 on the one hand and the desired rail spacing on the other hand.

Sowohl bei der zweitrümigen förderung nach Fig. 1 als auch bei der eintrümigen Förderung nach Fig. 2 erstrecken sich die Führungsschienen nicht nur in Grundrißlängsriehtung des FÖrdermittels. oder des G-egengewieh tes, sondern auch über die beiden Schmalseiten des Grundrisses. Darüber hinaus sind die Enden der äußeren Führungsschiene 8 auf einem Förderkorb (oder Fördergefäß) von den Schmalseiten noch ein Stück über die innere Längsseite geführt. Auf diese Weise wird der Schwenkbereich des ausladenden Steges über einen Halbkreis hinaus nach beiden Seiten /vergrößert.Both in the two-column promotion according to Fig. 1 as even in the case of the one-piece promotion according to FIG. 2, the guide rails do not only extend in the longitudinal direction of the plan of the funding. or the G-egengewieh tes, but also over the two narrow sides of the floor plan. In addition, the ends are the outer ones Guide rail 8 on a conveyor cage (or conveyor vessel) from the narrow sides a little over the inner long side. This way the swivel range of the protruding web beyond a semicircle on both sides / enlarged.

Claims (12)

Stichwortί "FÖrderkorb-Arbeitsbühne" St.- Pat . G-r / Ri Oberhausen / EhId, den 2. J>ez. 1963 Aktz.i G 22 99l/35a Gbm Snhutzansprüche:Keywordί "Conveyor basket work platform" St.- Pat. G-r / Ri Oberhausen / EhId, the 2. J> ez. 1963 Aktz.i G 22 99l / 35a Gbm protection claims: 1.) Als Arbeitsbühne auf dem Kopf des Fördermittels1.) As a working platform on the head of the conveyor (Förderkorb oder Fördergefäß) einer Bergbau-Schachtförderanlage an die Schachtwandusg ausfahrbar angeordneter Steg (10), der in seiner Arbeitsstellung nach Art eines Kragträgers in den Sehacht ausladet und der zwischen den Schachtführungen (4) in der Stegebene auf dem Fördermittel verstellbar abgestützt ist.(Conveyor cage or conveyor vessel) of a mining shaft conveyor system arranged so that it can be extended to the shaft wall Web (10) which, in its working position, protrudes into the Sehacht like a cantilever and between the shaft guides (4) in the Stebene is adjustable on the conveyor. 2.) Schachtfördermittel nach Anspruch 1 mit einem Widerlagerbügel (11), der das rückwärtige Ende des ausladenden Steges (10) übergreift,und mit einem Tragwi- ' derlager (14), das als Stegauflager vorgesehen ist. '2.) shaft conveyor according to claim 1 with an abutment bracket (11), which engages over the rear end of the projecting web (10), and with a Tragwi- ' derlager (14), which is provided as a web support. ' 3.) Schachtfördermittel nach Anspruch 2,,dessen Tragwiderlager (14) zusätzlich den Steg (10) gegen Mngsverschieben sichert und z.B. einen in den ausladenden Steg eingreifenden Zapfen (15) aufweist (Fig. 3).3.) shaft conveyor according to claim 2, whose support abutment (14) additionally secures the web (10) against displacement and e.g. one in the overhanging one Has web engaging pin (15) (Fig. 3). 4.) Schachtfördermittel nach Anspruch 2, dessen Sragwiderlager (14) ebenfalls als Bügel ausgebildet und dessen in den beiden Bügel (11) längsverstellbar gelagerter Steg (10) in jeder Sinstellage mittels Einsteekbolzen (16) oder dgl. gesichert ist (Fig. 4).4.) shaft conveyor according to claim 2, whose Srag abutment (14) also designed as a bracket and its longitudinally adjustable in the two brackets (11) stored web (10) is secured in each Sinstellage by means of Eineekbolzen (16) or the like. (Fig. 4). 1717 - 9 -1717 - 9 - 5.) Schachtfördermttel nach einem der Ansprüche 2 "bis 4 mit auf dessen Kopf nebeneinander angeordneten Führungsschienen-(8, 9, 8', 9')> auf denen die Widerlager zusammen mit dem Steg verschiebbar gelagert sind. :5.) Shaft conveyor according to one of claims 2 "to 4 with arranged side by side on its head Guide rails- (8, 9, 8 ', 9')> on which the abutments are slidably mounted together with the web. : 6.) Schachtfördermittel j dessen Schienen (8,9,8',91) nach Anspruch 5 auf Stützen (17.) oberhalb der Führungsrollen (3) oder Führungsschuhe des Fördermittels (1,2) angeordnet sind (Fig. 3,4).6.) shaft conveyor j whose rails (8,9,8 ', 9 1 ) according to claim 5 on supports (17) above the guide rollers (3) or guide shoes of the conveyor (1,2) are arranged (Fig. 3,4 ). 7.) Schachtfördermittel nach Anspruch 5 oder 6, da durch gekennzeichnet, daß der (die) Bügel (.11) zusammen mit dem ausladenden Steg ' (10) schwenkbar angeordnet und auf einem den Schienenkopf übergreifenden Gleitschuh (12,14-) drehbar gelagert ist (sind) (Fig. 4).7.) shaft conveyor according to claim 5 or 6, as through characterized that the bracket (s) (.11) together with the projecting web ' (10) arranged to be pivotable and rotatable on a slide shoe (12,14-) which overlaps the rail head is (are) stored (Fig. 4). 8.) Schachtfördermittel nach einem der Ansprüche 5 bis 7 mit Schienen (8, S, 81, 9')» die sich sowohl - in Iiängsrichtung des Fördermittelgrundrisses als auch über die beiden Schmalseiten erstrecken (Fig. 1 und 2).8.) Shaft conveyor according to one of claims 5 to 7 with rails (8, S, 8 1 , 9 ') »which extend both - in the longitudinal direction of the funding plan and over the two narrow sides (Fig. 1 and 2). 9.) Schachtfördermittel nach einem der Ansprüche 1 bis 8 mit einem gitter- oder rostartigen Steg (Fig. 5).9.) shaft conveyor according to one of claims 1 to 8 with a grid-like or grate-like web (Fig. 5). 10.) Schachtfördermittel nach einem der Ansprüche 1 bis 9 mit mehreren Stegen, die unabhängig voneinander.-Terstelltbar auf dem Kopf des Fördermittels gelagert oder unmittelbar nebeneinander angeordnet sind,10.) Shaft conveyor according to one of claims 1 to 9 with several webs, which can be set independently of one another stored on the head of the conveyor or arranged directly next to each other, 71 7 - 10 - ^ *##71 7 - 10 - ^ * ## 11.) Sehachtfördermittel nach einem der Ansprüche bis 9 mit mehreren Stegen und einer, gegebenenfalls mehrteiligen Plattform zum Überbrücken der in Arbeitsstellung im Abstande voneinander11.) Sehacht funding according to one of the claims to 9 with several bars and one, if necessary multi-part platform for bridging the in working position at a distance from each other angeordneten.Stege. . ' ' , arranged.bars. . '', 12.) Auf dem Gegengewicht (25) einer eintrümigen Schachtförderanlage angeordneter Steg nach Anspruch 1 (!ig.. 2).12.) On the counterweight (25) a single-lump Well-arranged web according to claim 1 (! Ig .. 2). ls: Dies« Unterlage {3eseh3&h3is§ und Schutecmqjr.) M dta zuietet eingereidrte; s!e weicht von ά& Wwt-ls: This "document {3eseh3 & h3is§ and Schutecmqjr.) M dta entered for rent; s! e deviates from ά & Wwt- dar ypqjrQfiqlkls elngBiÖcässK l5jHSfS*g«s ab. Bie fsdifiicfea Bedsaftäng lter Aiswsidsiing Ist jsiohi geprüft.dar ypqjrQfiqlkls elngBiÖcässK l5jHSfS * g «s. Bie fsdifiicfea Bedsaftäng lter Aiswsidsiing Is jsiohi checked. to I Asfcten Sie ksiißSi jesfsizasi ä»5ise-Nsatwsreto I Asfcten you ksiißSi jesfsizasi ä »5ise-Nsatwsre Ä i Wro ouds Feiofcopien odÄ i Wro ouds Feiofcopien od tii^s sscMfeten 3Siiäässe gofeSsrei-iTsi «iEgtsshes ^eidss. Auf Änirag wewisa Wanron ouds Feiofcopien ode» YAm,- mgofiw zu des übäkäaa frefcsc §4«#sft De«»*« Potwtamrf, Swre«l»nne(«a«fc. tii ^ s sscMfeten 3Siiääß gofeSsrei-iTsi «iEgtsshes ^ eidss. Auf Änirag wewisa Wanron ouds Feiofcopien ode » YAm, - mgofiw zu des üäkäaa frefcsc §4« #sft De «» * «Potwtamrf, Swre« l »nne (« a «fc.
DEG22991U 1960-10-28 1960-10-28 SHAFT CONVEYOR WITH WORK PLATFORM. Expired DE1887032U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG22991U DE1887032U (en) 1960-10-28 1960-10-28 SHAFT CONVEYOR WITH WORK PLATFORM.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG22991U DE1887032U (en) 1960-10-28 1960-10-28 SHAFT CONVEYOR WITH WORK PLATFORM.

Publications (1)

Publication Number Publication Date
DE1887032U true DE1887032U (en) 1964-02-06

Family

ID=33169734

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG22991U Expired DE1887032U (en) 1960-10-28 1960-10-28 SHAFT CONVEYOR WITH WORK PLATFORM.

Country Status (1)

Country Link
DE (1) DE1887032U (en)

Similar Documents

Publication Publication Date Title
DE3224817A1 (en) METHOD FOR SWIVELING A LOAD UNIT ABOVE AN ESSENTIAL VERTICAL AXIS AND DEVICE FOR CARRYING OUT THIS METHOD
DE2648916A1 (en) Loading tarpaulin for vehicles, large containers and similar
DE2208081A1 (en) Motor vehicle lifting platform
DE3505174C2 (en)
CH661494A5 (en) DEVICE FOR STORING AND EXHAUSTING PALLETS.
EP0053170A1 (en) Pallets storage installation.
EP0218165A2 (en) Parking device for motor vehicles
EP0116152A2 (en) Device for storing and collecting elongated articles
DE3527470C2 (en)
EP0462609A1 (en) Cover for elongated servicing pits
DE10038666C1 (en) Work platform for warehouse store has height adjustable base plate supported by carrier frame moved into alignment with required storage location
DE1887032U (en) SHAFT CONVEYOR WITH WORK PLATFORM.
DE2915262C2 (en)
DE3435690C2 (en)
DE3626948C2 (en)
DE1148051B (en) Shaft conveyor (conveyor basket, conveyor vessel) with work platform
DE2542069C2 (en) Conveyor system with an at least inclined main conveyor belt
DE2950352C2 (en) Drive-over plate
DE3143930C2 (en)
AT403035B (en) LIFTABLE TRAILER ALONG THE LIFT MAST
DE1756635A1 (en) Stockpile loading and unloading device for pourable goods
DE10213719B4 (en) Repair platform for motor vehicles
DE4411870A1 (en) Equipment for unloading of freight in containers
DE1164632B (en) Conveyor device for stacking vehicles or similar items
DE102021006101A1 (en) Working platforms for bridges