DE1794748U - HIGH Curb with prefabricated channel. - Google Patents
HIGH Curb with prefabricated channel.Info
- Publication number
- DE1794748U DE1794748U DE1959H0031918 DEH0031918U DE1794748U DE 1794748 U DE1794748 U DE 1794748U DE 1959H0031918 DE1959H0031918 DE 1959H0031918 DE H0031918 U DEH0031918 U DE H0031918U DE 1794748 U DE1794748 U DE 1794748U
- Authority
- DE
- Germany
- Prior art keywords
- channel
- prefabricated
- high curb
- curb
- prefabricated channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Description
Beschreibung zum Hochbordstein mit Rinnenfertigteil 1, 0 allgemein
Mit dem neuen Rinnenfertigteil und aufgesetzten Hochbordsbein soll eine Vereinfachung
und Kostenersparnis im Strassenbau herbeigeführt werden. Die beiden Teile bieten
gegenüber dem bisher bekannten Hochbordstein mit Pflasterrinne folgende Vorteile
: 1. Eine bessere Standfestigkeit der Rinne
Während der Hochbordstein im Höhenschnitt parallel zur Strassenkrohne
verlegt wird, kann die Rinne in ebenem Gelände ein Eigengefälle erhalten. Durch
die verschieden starken Mörtel-oder Betonfugen zwischen Hochbordstein und
Die Fugen können entweder mit Zementmörtel oder bituminöser Vergußmasse
vergossen werden.
3, 0 Fortschritt gegenüber der bisherigen Ausführung
von
3, 1 Die Rinnenfertigteile werden in einem Stück von 50 cm Länge auf Sandbettung verlegt. Durch die großflächige Fußfläche bilden sie eine standfeste Fahrbahnbegrenzung. Verdrückungen von einzelnen Pflastersteinen sowie die Nesterbildung in den bisher bekannten Pflasterrinnen sind nicht zu befürchten. Die Verlegearoeit ist einfacher, kann schneller ausgeführt werden und bringt damit auch eine Kostenersparnis.3, 1 The channel prefabricated parts are made in one piece of 50 cm length Relocated sand bed. Due to the large foot area, they form a stable one Lane delimitation. Displacement of individual paving stones and the formation of nests in the previously known paving gutters are not to be feared. The laying area is simpler, can be carried out more quickly and thus also brings cost savings.
5, 2 Der neue Hochbordstein ist 14 cm hoch Kann aber jetzt auf eine feste Betonunterlage, den Rinnenfertigteilen versetzt werden. Er wird aufbetoniert und ist damit mit der Rinne fest verbunden. Die bisher bekannten Verkantungen der Bordsteine zum Bürgersteig hin werden weitgehend ausgeschlossen.5, 2 The new high curb is 14 cm high, but it can now be on one solid concrete base to which the prefabricated channel parts are moved. It is concreted on and is thus firmly connected to the gutter. The previously known tilts of the Curbs to the sidewalk are largely excluded.
3, 3 Durch das'unter Ziffer 2,2 angegebene Quer-und Längsgefälle wird
das Wasser auf den RinnenferTigteilen wegen der besseren Ebenfläohigkeit schneller
ablaufen. Schmutz und Hindernisse werden sich bei sorg-
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE1959H0031918 DE1794748U (en) | 1959-05-29 | 1959-05-29 | HIGH Curb with prefabricated channel. |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE1959H0031918 DE1794748U (en) | 1959-05-29 | 1959-05-29 | HIGH Curb with prefabricated channel. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| DE1794748U true DE1794748U (en) | 1959-09-03 |
Family
ID=32881319
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| DE1959H0031918 Expired DE1794748U (en) | 1959-05-29 | 1959-05-29 | HIGH Curb with prefabricated channel. |
Country Status (1)
| Country | Link |
|---|---|
| DE (1) | DE1794748U (en) |
-
1959
- 1959-05-29 DE DE1959H0031918 patent/DE1794748U/en not_active Expired
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE1794748U (en) | HIGH Curb with prefabricated channel. | |
| DE872959C (en) | Road paving made of blocks and their production | |
| DE2449403A1 (en) | Road surface for preventing aquaplaning - has parallel concave and convex keying edges and flat grooved surface | |
| DE675776C (en) | Pavement made of natural or artificial stone | |
| AT162712B (en) | Concrete block for the production of a road surface | |
| DE19705625A1 (en) | Paved area with rainwater drainage | |
| DE2658890C2 (en) | Basin for settling suspended matter in water, as a filter basin, sludge basin, clarifier or the like | |
| DE2363227A1 (en) | FOR LAYING ON THE GROUND, LOAD-BEARING PLATE | |
| DE655373C (en) | Multi-layer concrete pavement | |
| DE1534224A1 (en) | Curb and method of laying it | |
| DE2221258C3 (en) | Process for the layer-by-layer installation of asphalt core seals for dams and dams | |
| DE2129341A1 (en) | CONCRETE SLAB FOR A FLOORING | |
| DE19822620A1 (en) | Building material for consolidating and draining earth and field surfaces to form riding surfaces for temporary uses | |
| AT367131B (en) | FOUNDATION, ESPECIALLY FOR A DAM | |
| DE102017114361A1 (en) | Form stone for a roadable pavement in the composite, as well as multi-layer block and method for producing a multi-layer block. | |
| DE647778C (en) | Concrete paving block with a top layer of asphalt | |
| DE6408C (en) | Innovations to wooden paving for roads | |
| DE911125C (en) | Shaped bricks for grouting masonry in Abteufschaechten | |
| DE706262C (en) | Watertight connection of an asphalt concrete seal to a solid structure | |
| DE736878C (en) | Process for achieving uniform settlement of structures | |
| DE29715380U1 (en) | Pluggable path system for garden and landscape design as a tub system made of plastic or metal in various shapes and sizes for easy laying on existing floor with solid covering or filling with gravel, sand, slabs or similar. Filling materials | |
| DE800758C (en) | Hollow-shaped concrete slabs for the production of ceilings on paths, squares, etc. like | |
| DE1759598A1 (en) | Process for the production of a new type of road surface | |
| DE2411648A1 (en) | Cellular brick made from concrete - has transverse and longitudinal ribs projecting beyond brick edge for keying purposes | |
| DE1797274U (en) | GUTTERS AND Curbs for the production of gutters in road construction. |