[go: up one dir, main page]

DE1750208U - TERRAIN MARKING POST. - Google Patents

TERRAIN MARKING POST.

Info

Publication number
DE1750208U
DE1750208U DE1957SC019661 DESC019661U DE1750208U DE 1750208 U DE1750208 U DE 1750208U DE 1957SC019661 DE1957SC019661 DE 1957SC019661 DE SC019661 U DESC019661 U DE SC019661U DE 1750208 U DE1750208 U DE 1750208U
Authority
DE
Germany
Prior art keywords
iot
pile
öcr
dor
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE1957SC019661
Other languages
German (de)
Inventor
Walter Scherner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE1957SC019661 priority Critical patent/DE1750208U/en
Publication of DE1750208U publication Critical patent/DE1750208U/en
Expired legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Description

" Gelände-Festpunkt - Markierung" Die Erfindung betrifft eine Gelände-Festpunkt-Markierung aus Fertigteilen, bestehend aus 1.) dem höhenbolzentragendem Ramm-, bzw. "Terrain fixed point - marking" The invention relates to a terrain fixed point marking made of prefabricated parts, consisting of 1.) the height-bolt-bearing ramming or

Schraubpfahl, und 2.) der darauf lose aufgestülpten Hektometerplatte. 1. Es ist bereits bekannt, Festpunktköprer im Gelände einzugraben, r einzugrabeng oder, 2. in Bohrlöcher örtlich zu betonieren.Screw pile, and 2.) the hectometer plate loosely put on it. 1. It is already known to dig fixed point bodies in the terrain, r to be buried or, 2. concreting locally in boreholes.

Zu I. hat den Nachteil, Auflockerung des anliegenden Bodens und Beschädigung von Dichtungsschichten. Zum Beispiel an Kanaldämmen.To I. has the disadvantage of loosening the adjacent soil and damaging it of sealing layers. For example on sewer embankments.

Zu II. den Nachteil eines verhältnismäßig hohen Preises, da örtlich betonierte Körper entsandte Fachkräfte erfordern und daß der im Boden versenkte Teil keine Festigkeitskontrolle erlaubt, sowie daß eine zweite Verwendung ausgeschlossen ist.Außerdem entsteht beim örtlichem Betonieren am Pfahlkopf eine pilzartige Verdickung, die bei Frost ein Hochziehen des Pfahles und damit eine irreführende Höhenveränderung bewirkt,.To II. The disadvantage of a relatively high price, because local Concrete bodies require dispatched skilled workers and that the sunk in the ground Partly no strength control is allowed, and a second use is excluded In addition, when concreting locally, a mushroom-like thickening occurs at the pile head, in the case of frost, the pole is pulled up and thus a misleading change in height causes.

Um diesen Nachteil zu beseitigen, werden gemäß der Erfindung die Körper aus Fertigteile zur Baustelle angeliefert. In ein verjüngtes Bohrloch werden die höhenbolzentragenden Pfähle bis in eine vom Frost unbeeinflußte Tiefe eingerammt und eingeschraubt. Die nektometerplatte wird je nach Größe über ein oder mehrere Pfähle lose gestülpt. Kleine Platten werden durch Anker und Steinballast gegen unbefugtes Abheben gesichert. Der durch Frost auftreibende Boden hebt nur die lose Platte und hat auf dem Pfahl mit seinem glattem Oberteil keinen Einfluß. Hierdurch bleibt die Bolzenhöhe konstant.Weiterhin kann durch Bespritzen des Betonpfahles mit ge- sättigterChlormagnesiumlauge eine Eisbildung an der Pfohlhaut ver- hindertwerden. Die vorliegenden Gegenstände können z. B. in Senkungsgebieten bei Uferaufhöhuncen unbeschädigt beliebig ausgebaut und nieder ver- verwandt werden. Die Rammpfähle Fig. 1, 5 und 6 werden nach dem Aufsetzen einer Rammschutzkappe in ein vorgebohrtes Erdloch eingetrieben. Der Höhenbolzen am Pfahlkopf kann fest einbetonbrt, für Fein- einstellung auch nachträglich in ein fest eingebautes Gewinde geschraubte auf Höhe reguliert und unterhalb des Kopfes mit Beton abgeschrägt gestützt werden.In order to eliminate this disadvantage, the body made of prefabricated parts are delivered to the construction site according to the invention. The vertical bolt-bearing piles are driven into a tapered borehole to a depth unaffected by frost and then screwed in. Depending on its size, the nectometer plate is loosely placed over one or more posts. Small slabs are secured against unauthorized lifting by means of anchors and stone ballast. The ground that drifts up due to frost only lifts the loose slab and has no influence on the post with its smooth upper part. This means that the bolt height remains constant. Furthermore, by spraying the concrete pile with saturated magnesium chloride solution prevents ice formation on the pile skin be prevented. The present objects can e.g. B. in subsidence areas Bank elevations undamaged and expanded as desired and reduced be used. The piles Fig. 1, 5 and 6 are driven into a pre-drilled hole in the ground after a ram protection cap has been put on. The height bolt on the pile head can be firmly embedded in concrete, for fine Adjustment can also be adjusted at a later date screwed into a permanently installed thread and supported below the head with a beveled concrete.

Hierdurch wird der einregulierte Bolzenkopf in seiner Höhe festgehalten. Bei Wiedergewinnung wird die Betonschräge von dem isoliertem Gewinde entfernt. Die Scraubpfähle Fig< 2, 3 und 4 werden in ein vorgebohrtes Erdloch bis auf die gewünschte Tiefe eingeschraubt.As a result, the adjusted bolt head is held at its height. When reclaimed, the concrete slope is removed from the isolated thread. The screw piles Fig <2, 3 and 4 are in a pre-drilled Screwed in the earth hole to the desired depth.

Der Vollkörper Fig. 2 preßt den überschüssigen Boden nach außen.The solid body Fig. 2 presses the excess soil outwards.

Der Rohrkörper Fig. 3 und 4 drückt bei Rechtsdrehung mittels zweiarmiger Rohrzange und seiner Außenschnecke den Pfahl nach unten.The tubular body Fig. 3 and 4 pushes when turned to the right by means of two-armed Pipe wrench and its outer auger down the pole.

Der Pfahlschuh mit seinen nach außen gerichteten Zähnen schneidet. den Boden an, und drückt denselben nach innen, von dort aus er mit Loffelbohrer oder im Spülverfahren entfernt werden kann.The pole shoe cuts with its outward facing teeth. the ground, and press it inwards, from there he presses it with a spoon bit or can be removed by flushing.

Der Pfahlkopf ist abnehmbar und durch Schrauben abgesichert.The pile head is removable and secured with screws.

Die Hektometerplatte Fig. 7 und 8 trägt versenkte oder eingeleg- t te Ziffern, zur vereinfachter farblicher Nachbehandlung. Als Ma- terial kann für alle Körper jeder übliche Baustoff Verwendung finden. In der Zeichnung sind verschiedene Ausführungsformen der Gelände-Festpunkt-Markierung dargestellt und zwar zeigt: Fig. die schaubildliche Darstellung eines Betonrammpfahles mit höhenverstell -baren Festpunktbolzen.The hectometer plate Fig. 7 and 8 has recessed or inserted t te digits, for simplified color post-treatment. As Ma- Any common building material can be used for all bodies Find. In the drawing, various embodiments of the terrain fixed point marking are shown, namely: Fig. The diagrammatic representation of a concrete driven pile with height-adjustable fixed point bolts.

Fig. 2 einen Betonschraubpfahl mit festen Höhenbolzen in schaubildlicher Darstellung. Fig. 2 shows a concrete screw pile with fixed height bolts in diagrammatic form Depiction.

Fig. 3 einen Rohrschraubpfahl im Schaubild.3 shows a screw pipe pile in the diagram.

Fig. 4 den Schnitt durch den Vorgenannten.Fig. 4 shows the section through the aforementioned.

Fig. 5 die schaubildliche Darstellung eines hohlen Rammpfahles, mit einem oben geschlossenem Rohr, als Höhenbolzen.5 shows the diagrammatic representation of a hollow driven pile, with a tube closed at the top, as a height bolt.

Fig. 6 den Schnitt durch Fig. 5 Fig. 7 die schaubildliche Darstellung einer Hektometerplatte. Fig. 8 den Längsschnitt durch Fig. 7. Nach Fig. 1 ist in dem Beton-Raampfahl (a) der &euindetraer (b) versenkt eingebaut) der den hohenregulierbaren Dolzen (c) auf- nimmt. Die sich gegenüber liegenden Löcher (d) dienen dem Trans- port und des späteren Herausziehens des Pfahles.6 shows the section through FIG. 5; FIG. 7 shows the diagrammatic representation of a hectometer plate. FIG. 8 shows the longitudinal section through FIG. 7. According to Fig. 1, in the concrete Raampfahl (a) the & euindetraer (b) recessed built-in) which has the high adjustable dolzen (c) takes. The opposing holes (d) are used for trans- port and the subsequent extraction of the stake.

Die Hektometerplatte (e) Fig. 8 wird mit iher Aussparrung (f) lose über dem Pfahlkopf gestülpt, so daß dor Bolzenkopf (c) h) herausragt.The hectometer plate (e) Fig. 8 becomes loose with its recess (f) slipped over the pile head so that the bolt head (c) h) protrudes.

Nach Fig. 5 und 6 trägt der hohle Rammpfahl (g) den hohlen Rohrbolzen (h). Sine gleichmäßige Stärke dient der größeren Neigungslage der Hektometerplatte (e). Der nach innen unterschnittene Pfahlschuh(i) soll den restlichen Boden des unten spitz verlaufanden Bohrloches nach innen drücken. Die Luft entweicht durch die Löcher (d).According to FIGS. 5 and 6, the hollow driven pile (g) carries the hollow tubular bolt (H). Its even thickness serves the greater inclination of the hectometer plate (e). The inwardly undercut pile shoe (i) should cover the remaining soil of the Press the pointed drill hole inwards at the bottom. The air escapes through the holes (d).

Nach Fig. 2 wird der Schraubpfahl (j) mit seinem Außengewinde (k) durch einen zweiarmigen Schraubenschlüssel am Pfahlkopf (l) ge -faßt und auf genaue Höhe in das verjüngte Bohrloch eingeschraubt. Nach Fig. 3 und 4 wird der hohle Schraubpfahl (m) mit seiner Au- Benschnecke (n) in das Gelände-Bohrloch eingeschraubt. Durch den Zahnschuh (o) wird der Boden angeschnitten und nach innen ge- drückt. Der aufgesetzte halbkugelförmige Pfahlkopf(p) wird mit Schrauben (q) im Steckgewinde abgesichert. Der Pfahlkopf (p) bildet zugleich Höhenfestpunkt.According to FIG. 2, the screw pile (j) with its external thread (k) is grasped by a two-armed wrench on the pile head (l) and screwed into the tapered borehole at the exact height. According to Fig. 3 and 4, the hollow screw pile (m) with its au- B screw (s) screwed into the terrain borehole. Through the Tooth shoe (o) the floor is cut and turned inwards presses. The attached hemispherical pile head (p) is secured with screws (q) in the plug-in thread. The pile head (p) also forms a fixed height point.

Die lose über dem Pfahlkopf gestülpte Hektometerplatte(e), Fig.The hectometer plate (e) placed loosely over the pile head, Fig.

7 und 8 wird durch Stahlanker (r) in Ankerischer (s) im angrenzndem Boden unabhängig vom Pfahl abgesichert.7 and 8 are connected by steel anchors (r) in anchor turrets (s) in the adjoining The ground is secured independently of the pile.

Claims (1)

ein napreh l) eadreli oomsciehei B ein Betonparsn pfehl (a) scildot ist on öesoe opf ein Feotpbossca (e) aRSo'-'ct er durc das Guine (b) einresIierby und durch DotOMnanteluß feststellbar ist. nopyeh 2 nacR Anspuc l ddrc soonsciehet daß aa Rasachl (ß) ein spichissisracr Hhlcs aageerdnQ ist* Anspruch 3 nach Anspruch l aurch oenaoicGtta-ß dor Sehyau&pfshl () Bit Geizes \nDons<3uin- de (k) i olno oia. söhx'cmbbc. y und ösit auf iofe regulierbar iot. Anoprueh 4.) aa. <3 einen dey nopr&hc &ads ? eh okasccieh not, aa. ß äs RohFocGbßfdl (n) eine AuScn oenQClM (n) alo Bocaehraube aneornct ist. lot. nach ola"tn. dor oehyaubons voösohon is. Anspeh 6 naeh Anspruch 4 . 5 äsüreh ccnsciohret, l'icte of onöQb&r io r, till-1) on"t2 lo1ì : ! ? C11JnolD1) t), l' io't'* oino A'nocpa. ma (f) sooy-<not iot sur Auf ctülpcn sf vorGnonto Pfhlo.
Ansy e e aaogre öcr Gccns&cnQt 2 pt 70 7 a6 i'i do oesot... . ie. o (c) or lehor (c) oy PöruBüosG öcr Ictc onoeot cia. nore 9) aash Aeoeh ? T. O G oeh x soieäaott < ! 3 o 3<K : "c neto D. ooplat'5c (o) suc-cc cbiior ;'r' ohanl' ono locGü :' :-cCil vc' DOBl2 csoeyaot ca0$ sc ? aa c ? i sooßtoa Sfos sc cossrbi atoil oooe : * .. G' lo nc AsDaeL ? o daueu cca soeo. 8 Q s' toSeo er o..'o'Sos'. i. j3. c'. 'eQ (o) ocy aus a u 3. no oc, ? (il. o iot<
a napreh l) eadreli oomsciehei B a concrete parsn pfehl (a) scildot is on öesoe opf ein Feotpbossca (e) aRSo '-' ct he durc the Guinea (b) aresIierby and through DotOMnanteluss can be determined. nopyeh 2 after Anspuc l ddrc soonsciehet that aa Rasachl (ß) a spichissisracr Hhlcs aageerdnQ is * Claim 3 according to claim laurch oenaoicGtta-ß dor Sehyau & pfshl () Bit Geizes \ nDons <3uin- de (k) i olno oia. söhx'cmbbc. y and ösit adjustable to iofe iot. Anoprueh 4.) aa. <3 a dey nopr & hc & ads? eh okasccieh not, aa. ß as RohFocGbßfdl (n) an AuScn oenQClM (n) alo Bocaehraube aneornct is. lot. after ola "tn. dor oehyaubons voösohon is. App 6 according to claim 4. 5 äsüreh ccnsciohret, l'icte of onöQb & r io r, till-1) on "t2 lo1ì:! ? C11JnolD1) t), l 'io't' * oino A'nocpa. ma (f) sooy- <not iot sur Auf ctülpcn sf vorGnonto Pfhlo.
Ansy ee aaogre öcr Gccns & cnQt 2 pt 70 7 a6 i'i do oesot .... ie. o (c) or lehor (c) oy PöruBüosG öcr Ictc onoeot cia. nore 9) aash Aeoeh? T. OG anyway x soieäaott <! 3 o 3 <K: "c neto D. ooplat'5c (o) suc-cc cbiior; 'r' ohanl 'ono locGü:': -cCil vc ' DOBl2 csoeyaot ca0 $ sc? aa c? i sooßtoa Sfos sc cossrbi atoil oooe: * .. G 'lo nc AsDaeL? o long cca soeo. 8 Q s' toSeo er o .. 'o'Sos'. i. j3. c '. 'eQ (o) ocy from au 3. no oc,? (il. o iot <
DE1957SC019661 1957-04-06 1957-04-06 TERRAIN MARKING POST. Expired DE1750208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1957SC019661 DE1750208U (en) 1957-04-06 1957-04-06 TERRAIN MARKING POST.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1957SC019661 DE1750208U (en) 1957-04-06 1957-04-06 TERRAIN MARKING POST.

Publications (1)

Publication Number Publication Date
DE1750208U true DE1750208U (en) 1957-08-08

Family

ID=32745469

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1957SC019661 Expired DE1750208U (en) 1957-04-06 1957-04-06 TERRAIN MARKING POST.

Country Status (1)

Country Link
DE (1) DE1750208U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1220145B (en) * 1962-04-02 1966-06-30 Hildegard Attenberger Geb Mark Boundary mark

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1220145B (en) * 1962-04-02 1966-06-30 Hildegard Attenberger Geb Mark Boundary mark

Similar Documents

Publication Publication Date Title
CN106567717B (en) It is a kind of to double as construction access ramp structure and construction method using subway entrance
Young Ancient towers on the island of Siphnos
DE2330061A1 (en) METHOD AND DEVICE FOR THE PRODUCTION OF UNDERWATER FOUNDATIONS
DE1750208U (en) TERRAIN MARKING POST.
DE618328C (en) Support walls, dam walls, weir systems or similar structures
DE3443040A1 (en) METHOD FOR PRODUCING UNDERGROUND CONSTRUCTIONS BY MEANS OF DOOR STOCK LID CONSTRUCTION
US5702207A (en) Process for reinforcing slopes
DE10256421A1 (en) Method and device for manufacturing a tunnel or a trough
DE3620650A1 (en) Method for producing multi-storey underground structures, in particular underground garages
Yadin Excavations at Hazor, 1968-1969: Preliminary Communiqué
Measor et al. FEATURES IN THE DESIGN AND CONSTRUCTION OF THE SHELL CENTRE, LONDON.
EP0493823B1 (en) Method for constructing a foundation for a structure like a view or noise barrier, along a traffic route
DE2917994B1 (en) Process for the production of a building pit lining or support wall from reinforced concrete for incisions in the terrain
DE3214648A1 (en) Method of producing foundations for shell-shaped containers
Wace Part III. Notes on the Construction of the ‘Tomb of Clytemnestra’
DE815327C (en) Process for the production of deep foundations
Biers The Theater at Phlius: Excavations 1973
DE3716750A1 (en) Method of constructing and sinking foundation structures
DE640008C (en) Process for the construction of tunnels, galleries and other underground structures in loose, possibly water-bearing mountains
DE2022967A1 (en) Process for deepening depressions lying in front of quays and embankment walls of sea and inland ports and thus strengthened quays
DE102010000589B4 (en) Method and device for creating a sheet piling
GB2048999A (en) Improvements relating to the construction of in situ piles
Höser et al. Untersammelsdorf Tunnel–Challenges and special measures during tunnelling in lacustrine clay: Tunnel Untersammelsdorf–Herausforderungen und Sondermaßnahmen beim Vortrieb im Seeton
Quasim et al. Shore Pile and Rock Anchoring For Deep Excavation
DE825889C (en) Method and device for the series production of houses from precast concrete parts which are produced on the building site of the house